Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
by user
Comments
Transcript
Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft
Stakeholder Comment Matrix AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft Date: 2014-04-29 Consultation on proposed “Allowable Dispatch Variance” Amended ISO Rule Definition (“Allowable Dispatch Variance Definition Amendment”) Date of Request for Comment [yyyy/mm/dd]: Period of Consultation [yyyy/mm/dd]: Comments From: 2014-04-29 2014-04-29 through 2014-05-28 Suncor Energy Products Inc. Date [yyyy/mm/dd]: Contact: Cathy Cooper Phone: 403-296-5059 E-mail: [email protected] June 2, 2014 Definitions – Amended Existing “allowable dispatch variance” means, for each generating source asset as measured from the dispatch quantity: (i) plus or minus five (5) MW for a generating source asset with a maximum capability of two hundred (200) MW or less, or (ii) plus or minus ten (10) MW for a generating source asset with a maximum capability of greater than two hundred (200) MW. Proposed Rationale “allowable dispatch variance” means: Wind aggregated generating facilities cannot control their output when wind speed is decreasing, but they can control their output when wind speed is increasing and if they are equipped with new control technology. Accordingly, the AESO proposes to change the definition of “allowable dispatch variance” to also apply to wind aggregated generating facilities. (i) for each generating source asset, other than a wind aggregated generating facility, as measured from the dispatch quantity: (a) plus or minus five (5) MW for a generating source asset with a maximum capability of two hundred (200) MW or less; or (b) plus or minus ten (10) MW for a generating source asset with a maximum Issued for Stakeholder Consultation: 2014-04-29 The dispatch quantity of a wind aggregated generating facility is based on its in-merit energy offer. If its potential real power capability in realtime is less than the dispatch quantity, Stakeholder Comments and/or Alternate Proposal 1. The AESO is proposing an Allowable Dispatch Variance (ADV) of 5 MW above or below the dispatch quantity for wind facilities < 200 MW if the potential real power is equal or greater to the dispatch quantity. Suncor believes that the ADV is too low for wind facilities of this size. Suncor’s Wintering Hills is an 88 MW facility consisting of 55 - 1.6 MW turbines. Under the AESO’s proposed ADV of 5 MW, the variance band is equivalent to only 3.1 AESO Reply Page 1 of 3 capability of greater than two hundred (200) MW; (ii) for each wind aggregated generating facility with a maximum capability of two hundred (200) MW or less: (a) five (5) MW greater than the dispatch quantity and five (5) MW less than the potential real power capability, if the potential real power capability is less than the dispatch quantity; or the lower boundary of the allowable dispatch variance is measured from that potential real power capability. The wind aggregated generating facility will remain in compliance as long as its output does not exceed the dispatch quantity by more than the allowable dispatch variance. If the potential real power capability of a wind aggregated generating facility is greater than or equal to the dispatch quantity, the allowable dispatch variance is measured from the dispatch quantity as it is for a generating source asset that is not a wind aggregated generating facility. turbines in capacity. The AESO’s proposed ADV does not take into consideration the size of the turbines at individual wind farms. With turbines available in the 3 to 5 MW range, wind generators risk ADV non-compliance due to unscheduled turbine down time. The ADV should be a percentage of the wind facility’s total capacity. In the case of Wintering Hills an ADV of 10% would be equivalent to 8.8 MW and represents a more reasonable operational limit. (b) plus or minus five (5) MW from the dispatch quantity, if the potential real power capability is greater than or equal to the dispatch quantity; and (iii) for each wind aggregated generating facility with a maximum capability of greater than two hundred (200) MW: (a) ten (10) MW greater than the dispatch quantity and ten (10) MW less than the potential real power capability, if the potential real power capability is less than the dispatch quantity; Issued for Stakeholder Consultation: 2013-04-29 Page 2 of 3 or (b) plus or minus ten (10) MW from the dispatch quantity, if the potential real power capability is greater than or equal to the dispatch quantity. Issued for Stakeholder Consultation: 2013-04-29 Page 3 of 3