...

   SCHEMATIC DESIGN APPROVAL   

by user

on
Category: Documents
13

views

Report

Comments

Transcript

   SCHEMATIC DESIGN APPROVAL   
 SCHEMATIC DESIGN APPROVAL Name of Project: Location of Project: Project Number: Date of Request: Life Sciences Research and Teaching Facility University of Alaska, Fairbanks Campus 2010100 LFRF October 19, 2010 Total Project Cost: $88,275,000 Approval Required: Schematic Design Approval Prior Approvals/Actions: Preliminary Administrative Approval: 8/15/2006 Project Agreement: 10/30/10 (Originally 12/6/2006) Formal Project Approval: 2/18/2010 Reference Materials:  One Page Budget  Site Plan  Floor Plans (Basement through Fourth Floor)  Exterior Elevations  Mechanical Spaces UNIVERSITY OF ALASKA
Project Name: Life Sciences Classroom and Lab Facility
MAU: UAF
Building: New‐Life Sciences
Date:
9‐Nov‐10
Campus: Fairbanks
Prepared by:
Wohlford
Project #: LFRF 2010100
Acct #:
TBD
Total GSF Affected by Project:
97700
97607
PROJECT BUDGET
FPA Budget
SDA Budget
A. Professional Services
Advance Planning, Program Development
$0
$0
Consultant: Design Services
$5,400,000
$5,320,806
Consultant: Construction Phase Services
$725,000
$985,246
Consul: Extra Services (List:_____________________)
$0
$0
Site Survey
$60,000
$25,000
Soils Testing & Engineering
$65,000
$50,000
Special Inspections
$25,000
$25,000
Plan Review Fees / Permits
$275,000
$275,000
Other
Professional Services Subtotal
$6,550,000
$6,681,052
B. Construction
General Construction Contract(s)
$67,100,000
$67,100,000
Other Contractors (List:Parking, HVAC Balancing)
$1,400,000
$1,350,000
Construction Contingency
$3,870,250
$3,867,425
Construction Subtotal
$72,370,250
$72,317,425
Construction Cost per GSF
$740.74
$740.90
C. Building Completion Activity
Equipment $500,000
$500,000
Fixtures
$100,000
$100,000
Furnishings
$750,000
$725,000
Signage not in construction contract
$50,000
$50,000
Move‐Out Costs
$0
$0
Move‐In Costs
$350,000
$300,000
Art
$200,000
$200,000
Other (Interim Space Needs or Temp Reloc. Costs)
$0
$0
OIT Support
$450,000
$450,000
Maintenance Operation Support
$250,000
$250,000
Building Completion Activity Subtotal
$2,650,000
$2,575,000
D. Owner Activities & Administrative Costs
Project Plng, Staff Support
$3,670,661
$3,670,807
Project Management
$2,814,089
$2,810,717
Misc. Expenses: Advertising, Printing, Supplies, Etc.
$220,000
$220,000
Owner Activities & Administrative Costs Subtotal
$6,704,750
$6,701,523
E. Total Project Cost
$88,275,000
$88,275,000
Total Project Cost per GSF
$903.53
$904.39
F. Total Appropriation(s)
$88,275,000
$88,275,000
SHEENJEK DR
PARKING
LIFT STATION
&
COOLING TOWER
WRBB
ELVEY
STATE
VIROLOGY
LIFE
L
I F S C IENCES
B L DING
BUI
O’NEILL
BiRD
IRVING 1
IRVING 2
IARC
DRIVE
KO
STATE VIROLOGY
YU
KUK
U
UNDERGROUND
PASSAGE
U
UP
UP
SHEENJEK DRIVE
60
ARCTIC HEALTH
RESEARCH BUILDING
MUSEUM
IRVING ANNEX
BUTROVICH
SERVICE YARD
IAB GREENHOUSE
O
25
5O
1OO
OO
O
BIRD
IRVING I
IRVING II
0
30
60
KOYUKUK DR
SEPTEMBER 2010
LFRF
LIFE SCIENCES BUILDING
STAIR 3
SHAFT
EQUIP
SPACE
FS
SS
EW
CART OFOI
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
FS
ICE OFOI
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
INC OFOI
GRADUATE
STUDENT
WORKSTATIONS
FUME HOOD
TISSUE CULTURE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EW
EQUIP
SPACE
FUME HOOD
POST DOC
KITCHENETTE
MWS72
AIR
TABLE
OFOI
MT60x36
MT72
ELEC ELEC
RACK RACK
OFOI OFOI
AIR
TABLE
OFOI
AIR
TABLE
OFOI
MWS72
INTERACTION
STAIR 2
MWS72
AIR
TABLE
OFOI
ELEC ELEC
RACK RACK
OFOI OFOI
MT72
MWS72
MT48
INTERACTION
STAIR 2
MT60
FUTURE 6'CFH
SHAFT
MT60
FUTURE 6'CFH
ELECTRICAL
ELECTRICAL
IDF
IDF
EAST ENTRY
SHAFT
MEN
SHAFT
FS
EW
5'CFH
ELEVATOR 2
ELEVATOR 2
SS
AUTOCLAVE
20x20x38
MEN
ELEVATOR 2
AUTOCLAVE,
GLASSWASH
ANIMAL HOLDING
EQUIP
SPACE
EQUIP
SPACE
VESTIBULE INSECTARY
EQUIP
SPACE
HAZARDOUS
MATERIALS
ELEVATOR 1
JAN
CLASSROOM
JAN
ELEVATOR 1
MT72
MAIN ELECTRICAL
WOMEN
WOMEN
MT72
WOMEN
ELEVATOR 1
MT72
HAZARDOUS
MATERIALS
POST DOC
BIOMEDICAL OPEN
LAB
EQUIP
SPACE
MT60x36
EQUIP
SPACE
EQUIP
SPACE
INC OFOI
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
CART OFOI
EQUIP
SPACE
EQUIP
SPACE
SS
EW
EQUIP
SPACE
MT60x36
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
AIR
TABLE
OFOI
ELEC ELEC
RACK RACK
OFOI OFOI
MT48
EW
INC OFOI
EQUIP
SPACE
EQUIP
SPACE
FS
CART OFOI
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
CART OFOI
-5°C TO 37°C
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
FS
ICE OFOI
EQUIP
SPACE
EW
MT48
MT48
AIR
TABLE
OFOI
ELEVATOR 1
POST DOC
KITCHENETTE
MWS72
MT48
EQUIP
SPACE
EQUIP
SPACE
MWS72
MWS72
6'BSC
MT72
MWS72
MT48
INSTRUMENT /
FLEX
POST DOC
GRADUATE
STUDENT
WORKSTATIONS
MT48
MWS72
MWS72
EQUIP
SPACE
EQUIP
SPACE
MWS72
MWS72
MWS72
MT48
6'BSC
MWS72
AIR
TABLE
OFOI
JAN
PI OFFICE
COPY
MT72
ELEC ELEC
RACK RACK
OFOI OFOI
AIR
TABLE
OFOI
MEN
PI OFFICE
MICROSCOPY
6'BSC
MWS72
MWS72
MT48
MWS72
MWS72
MWS72
MWS72
MWS72
MT48
MWS72
MWS72
MWS72
ELEVATOR 2
PI OFFICE
AUTOCLAVE
EQUIPMENT
SHAFT
ELECTRICAL
MEN
WOMEN
COPY
6'CFH
AIR
TABLE
OFOI
AIR
TABLE
OFOI
ELEC ELEC
RACK RACK
OFOI OFOI
SHAFT
DATA /
COMMUNICATION
STORAGE
SS
INTERACTION
STAIR 2
SHOWER
TISSUE CULTURE
PI OFFICE
TISSUE CULTURE
SS
SHOWER
FLEX LAB
FLEX LAB
FUME HOOD
KITCHENETTE
TISSUE CULTURE
SS
MECHANICAL
SHOWER
MWS72
POST DOC
MWS72
CONFOCAL
MWS72
MICROSCOPE
MOLECULAR
BIOLOGY OPEN
LAB
MWS72
POST DOC
GRADUATE
STUDENT
WORKSTATIONS
PI OFFICE
GRADUATE
STUDENT
WORKSTAITONS
PI OFFICE
PI OFFICE
MWS72
MT48
MT48
AIR
TABLE
OFOI
6'CFH
MWS72
INSTR. FLEX
MICROSCOPE
MWS72
ELEC ELEC
RACK RACK
OFOI OFOI
AIR
TABLE
OFOI
MT48
MWS72
NEUROSCIENCE
OPEN LAB
RESEARCH &
BUILDING
STORAGE
LOADING AND
RECYCLING
MWS72
CHILLER
MWS72
HISTOLOGY
AUTOCLAVE
EQUIPMENT
MWS72
AIR
TABLE
OFOI
ELEC ELEC
RACK RACK
OFOI OFOI
MT48
PI OFFICE
MWS72
AIR
TABLE
OFOI
JANITOR'S
CENTRAL
STORAGE
GLASS WASH
FUTURE 6'CFH
MRI EQUIPMENT
COPY
EQUIPMENT
DRESSING
MT72
MT48
AUTOCLAVE
20x20x38
PI OFFICE
MT72
AIR
TABLE
OFOI
MRI EXAM 7T
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
EQUIP
SPACE
MT60
ELEC ELEC
RACK RACK
OFOI OFOI
AIR
TABLE
OFOI
MT48
FUTURE 6'CFH
FLEX LAB
AUTOCLAVE
6'CFH
FUTURE 6'CFH
6'CFH
COLD
DRESSING
DIRTY TISSUE
CULTURE
FLEX LAB
MT72
SS
RECOVERY
IMAGING
OPERATOR
GRADUATE
STUDENT
WORKSTATIONS
6'BSC
EQUIP
SPACE
PI OFFICE
AUTOCLAVE
20x20x38
FUME HOOD
PI OFFICE
FUTURE 6'CFH
FABRICATION
PI OFFICE
MT72
FREEZER FARM
GRADUATE
STUDENT
WORKSTATIONS
CONFERENCE
SHAFT
SHAFT
MRI EXAM 1.5T
MT72
MRI EQUIPMENT
6'BSC
STORAGE
STAIR 3
CONFERENCE
CONFERENCE
6'BSC
PREP /
ANESTHESIA
STAIR 3
STAIR 3
EW
NORTH ENTRY
MT72
STORAGE
MT72
SHAFT
MT72
MT72
6'CFH
MT72
MT72
EW
MT72
MT72
MT72
SS
GENETICS LAB
EW
EW
5'CFH
SS
MT72
MICROBIOLOGY /
CELL BIOLOGY
PHYSIOLOGICAL
ECOLOGY LAB
SS
CLASSROOM
FOOD SERVICE
CLASSROOM
PREP
MT72
FOOD SERVICE
STORAGE
SHAFT
INTRODUCTION TO
BIOLOGY LAB
SS
MT72
SHAFT
EW
JANITOR
UTILIDOR
MT72
ELEVATOR
MACHINE
EQUIP
SPACE
EQUIP
SPACE
CLASSROOM /
CONF. ROOM
EQUIP
SPACE
VESTIBULE
ANATOMY /
PHYSIOLOGY
PREP LAB
PREP LAB
STOCKROOM
SPECIMEN
STORAGE
OFFICE
SS
EQUIP
SPACE
EW
MICROBIOLOGY
PREP
MT72
MT72
MT72
SS
5'CFH
EW
MT72
MT72
MT72
MT72
MT72
MT72
MT72
MT72
MT72
MT72
MT72
MT72
MT72
EQUIP
SPACE
SS
EW
EW
VENDING
LOBBY
LADDER TO
PENTHOUSE
SHAFT
SHAFT
VESTIBULE
ANATOMY /
PHYSIOLOGY /
WILDLIFE
DISEASES LAB
AQUATIC
ORGANISMS /
INVERTIBRATE
ZOOLOGY LAB
SS
MT72
MT72
MT72
MT72
STUDENT
ADVISER
INTRODUCTION TO
BIOLOGY LAB
MT72
DEPARTMENT
OFFICE
RECEPTION
MT72
DEVELOPMENTAL
BIOLOGY /
IMMUNOLOGY LAB
GRAD STUDENT
COORDINATOR
VESTIBULE
MT72
ADMIN. ASST
STORAGE
WET PREP LAB
MT72
MAIL/COPY/FILE
EW
SCIENCE
GALLERY
AUDITORIUM
SS
DEPARTMENT
CHAIR
STAGE
OPEN TO LOBBY BELOW
STUDENT
INTERACTION
STAIR 1
STAIR 1
STAIR 1
STUDY BALCONY
BUILDING CIRCULATION
BUILDING CIRCULATION
BUILDING CIRCULATION
BUILDING CIRCULATION
BUILDING SUPPORT
BUILDING SUPPORT
BUILDING SUPPORT
BUILDING SUPPORT
LAB SUPPORT
CLASSROOM
INTERACTION
INTERACTION
MRI LAB (FUTURE)
INTERACTION
LAB
LAB
VERTICAL CIRCULATION
LAB
LAB SUPPORT
LAB SUPPORT
LAB SUPPORT
OFFICE
OFFICE
OFFICE
OFFICE SUPPORT
OFFICE SUPPORT
OFFICE SUPPORT
OPEN OFFICE
OPEN OFFICE
OPEN OFFICE
SHAFT
SHAFT
SHAFT
TEACHING LAB
TEACHING LAB
VERTICAL CIRCULATION
TEACHING SUPPORT
TEACHING SUPPORT
VERTICAL CIRCULATION
VERTICAL CIRCULATION
SEPTEMBER 2010
LFRF
LIFE SCIENCES BUILDING
SEPTEMBER 2010
LFRF
LIFE SCIENCES BUILDING
SEPTEMBER 2010
LFRF
LIFE SCIENCES BUILDING
INSULATED METAL PANEL
COLOR #1
INSULATED METAL PANEL
COLOR #2
CAST CONCRETE
NANOGEL INSULATED
CHANNEL GLASS
INSULATED METAL PANEL
WITH VERTICAL RIBS AND
COLOR TO MATCH MULLIONS
SOUTH ELEVATION
0
10
20
40
TRIPLE-GLAZED WINDOW
WITH KALWALL OR FRITTED
UPPER GLAZING
HEAVY-DUTY THERMAL-GLAZED
ALUMINUM DOORS
TRIPLE GLAZED CURTAIN WALL
WITH FLUSH EXTERIOR JOINTS
TRIPLE-GLAZED CURTAINWALL
WITH FLUSH EXTERIOR JOINTS
AND DEEP VERTICAL TRIM
INSULATED METAL
ROLL-UP DOOR
NORTH ELEVATION
0
10
20
40
SEPTEMBER 2010
LFRF
LIFE SCIENCES BUILDING
INSULATED METAL PANEL
COLOR #1
INSULATED METAL PANEL
COLOR #2
CAST CONCRETE
NANOGEL INSULATED
CHANNEL GLASS
INSULATED METAL PANEL
WITH VERTICAL RIBS AND
COLOR TO MATCH MULLIONS
EAST ELEVATION
0
10
20
40
TRIPLE-GLAZED WINDOW
WITH KALWALL OR FRITTED
UPPER GLAZING
ALUMINUM LOUVERS
TRIPLE GLAZED CURTAIN WALL
WITH FLUSH EXTERIOR JOINTS
TRIPLE-GLAZED CURTAINWALL
WITH FLUSH EXTERIOR JOINTS
AND DEEP VERTICAL TRIM
INSULATED METAL
ROLL-UP DOOR
WEST ELEVATION
0
10
20
40
SEPTEMBER 2010
LFRF
LIFE SCIENCES BUILDING
Fly UP