Comments
Description
Transcript
SCHEMATIC DESIGN APPROVAL
SCHEMATIC DESIGN APPROVAL Name of Project: Location of Project: Project Number: Date of Request: Life Sciences Research and Teaching Facility University of Alaska, Fairbanks Campus 2010100 LFRF October 19, 2010 Total Project Cost: $88,275,000 Approval Required: Schematic Design Approval Prior Approvals/Actions: Preliminary Administrative Approval: 8/15/2006 Project Agreement: 10/30/10 (Originally 12/6/2006) Formal Project Approval: 2/18/2010 Reference Materials: One Page Budget Site Plan Floor Plans (Basement through Fourth Floor) Exterior Elevations Mechanical Spaces UNIVERSITY OF ALASKA Project Name: Life Sciences Classroom and Lab Facility MAU: UAF Building: New‐Life Sciences Date: 9‐Nov‐10 Campus: Fairbanks Prepared by: Wohlford Project #: LFRF 2010100 Acct #: TBD Total GSF Affected by Project: 97700 97607 PROJECT BUDGET FPA Budget SDA Budget A. Professional Services Advance Planning, Program Development $0 $0 Consultant: Design Services $5,400,000 $5,320,806 Consultant: Construction Phase Services $725,000 $985,246 Consul: Extra Services (List:_____________________) $0 $0 Site Survey $60,000 $25,000 Soils Testing & Engineering $65,000 $50,000 Special Inspections $25,000 $25,000 Plan Review Fees / Permits $275,000 $275,000 Other Professional Services Subtotal $6,550,000 $6,681,052 B. Construction General Construction Contract(s) $67,100,000 $67,100,000 Other Contractors (List:Parking, HVAC Balancing) $1,400,000 $1,350,000 Construction Contingency $3,870,250 $3,867,425 Construction Subtotal $72,370,250 $72,317,425 Construction Cost per GSF $740.74 $740.90 C. Building Completion Activity Equipment $500,000 $500,000 Fixtures $100,000 $100,000 Furnishings $750,000 $725,000 Signage not in construction contract $50,000 $50,000 Move‐Out Costs $0 $0 Move‐In Costs $350,000 $300,000 Art $200,000 $200,000 Other (Interim Space Needs or Temp Reloc. Costs) $0 $0 OIT Support $450,000 $450,000 Maintenance Operation Support $250,000 $250,000 Building Completion Activity Subtotal $2,650,000 $2,575,000 D. Owner Activities & Administrative Costs Project Plng, Staff Support $3,670,661 $3,670,807 Project Management $2,814,089 $2,810,717 Misc. Expenses: Advertising, Printing, Supplies, Etc. $220,000 $220,000 Owner Activities & Administrative Costs Subtotal $6,704,750 $6,701,523 E. Total Project Cost $88,275,000 $88,275,000 Total Project Cost per GSF $903.53 $904.39 F. Total Appropriation(s) $88,275,000 $88,275,000 SHEENJEK DR PARKING LIFT STATION & COOLING TOWER WRBB ELVEY STATE VIROLOGY LIFE L I F S C IENCES B L DING BUI O’NEILL BiRD IRVING 1 IRVING 2 IARC DRIVE KO STATE VIROLOGY YU KUK U UNDERGROUND PASSAGE U UP UP SHEENJEK DRIVE 60 ARCTIC HEALTH RESEARCH BUILDING MUSEUM IRVING ANNEX BUTROVICH SERVICE YARD IAB GREENHOUSE O 25 5O 1OO OO O BIRD IRVING I IRVING II 0 30 60 KOYUKUK DR SEPTEMBER 2010 LFRF LIFE SCIENCES BUILDING STAIR 3 SHAFT EQUIP SPACE FS SS EW CART OFOI EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE FS ICE OFOI EQUIP SPACE EQUIP SPACE EQUIP SPACE INC OFOI GRADUATE STUDENT WORKSTATIONS FUME HOOD TISSUE CULTURE EQUIP SPACE EQUIP SPACE EQUIP SPACE EW EQUIP SPACE FUME HOOD POST DOC KITCHENETTE MWS72 AIR TABLE OFOI MT60x36 MT72 ELEC ELEC RACK RACK OFOI OFOI AIR TABLE OFOI AIR TABLE OFOI MWS72 INTERACTION STAIR 2 MWS72 AIR TABLE OFOI ELEC ELEC RACK RACK OFOI OFOI MT72 MWS72 MT48 INTERACTION STAIR 2 MT60 FUTURE 6'CFH SHAFT MT60 FUTURE 6'CFH ELECTRICAL ELECTRICAL IDF IDF EAST ENTRY SHAFT MEN SHAFT FS EW 5'CFH ELEVATOR 2 ELEVATOR 2 SS AUTOCLAVE 20x20x38 MEN ELEVATOR 2 AUTOCLAVE, GLASSWASH ANIMAL HOLDING EQUIP SPACE EQUIP SPACE VESTIBULE INSECTARY EQUIP SPACE HAZARDOUS MATERIALS ELEVATOR 1 JAN CLASSROOM JAN ELEVATOR 1 MT72 MAIN ELECTRICAL WOMEN WOMEN MT72 WOMEN ELEVATOR 1 MT72 HAZARDOUS MATERIALS POST DOC BIOMEDICAL OPEN LAB EQUIP SPACE MT60x36 EQUIP SPACE EQUIP SPACE INC OFOI EQUIP SPACE EQUIP SPACE EQUIP SPACE CART OFOI EQUIP SPACE EQUIP SPACE SS EW EQUIP SPACE MT60x36 EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE AIR TABLE OFOI ELEC ELEC RACK RACK OFOI OFOI MT48 EW INC OFOI EQUIP SPACE EQUIP SPACE FS CART OFOI EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE CART OFOI -5°C TO 37°C EQUIP SPACE EQUIP SPACE EQUIP SPACE FS ICE OFOI EQUIP SPACE EW MT48 MT48 AIR TABLE OFOI ELEVATOR 1 POST DOC KITCHENETTE MWS72 MT48 EQUIP SPACE EQUIP SPACE MWS72 MWS72 6'BSC MT72 MWS72 MT48 INSTRUMENT / FLEX POST DOC GRADUATE STUDENT WORKSTATIONS MT48 MWS72 MWS72 EQUIP SPACE EQUIP SPACE MWS72 MWS72 MWS72 MT48 6'BSC MWS72 AIR TABLE OFOI JAN PI OFFICE COPY MT72 ELEC ELEC RACK RACK OFOI OFOI AIR TABLE OFOI MEN PI OFFICE MICROSCOPY 6'BSC MWS72 MWS72 MT48 MWS72 MWS72 MWS72 MWS72 MWS72 MT48 MWS72 MWS72 MWS72 ELEVATOR 2 PI OFFICE AUTOCLAVE EQUIPMENT SHAFT ELECTRICAL MEN WOMEN COPY 6'CFH AIR TABLE OFOI AIR TABLE OFOI ELEC ELEC RACK RACK OFOI OFOI SHAFT DATA / COMMUNICATION STORAGE SS INTERACTION STAIR 2 SHOWER TISSUE CULTURE PI OFFICE TISSUE CULTURE SS SHOWER FLEX LAB FLEX LAB FUME HOOD KITCHENETTE TISSUE CULTURE SS MECHANICAL SHOWER MWS72 POST DOC MWS72 CONFOCAL MWS72 MICROSCOPE MOLECULAR BIOLOGY OPEN LAB MWS72 POST DOC GRADUATE STUDENT WORKSTATIONS PI OFFICE GRADUATE STUDENT WORKSTAITONS PI OFFICE PI OFFICE MWS72 MT48 MT48 AIR TABLE OFOI 6'CFH MWS72 INSTR. FLEX MICROSCOPE MWS72 ELEC ELEC RACK RACK OFOI OFOI AIR TABLE OFOI MT48 MWS72 NEUROSCIENCE OPEN LAB RESEARCH & BUILDING STORAGE LOADING AND RECYCLING MWS72 CHILLER MWS72 HISTOLOGY AUTOCLAVE EQUIPMENT MWS72 AIR TABLE OFOI ELEC ELEC RACK RACK OFOI OFOI MT48 PI OFFICE MWS72 AIR TABLE OFOI JANITOR'S CENTRAL STORAGE GLASS WASH FUTURE 6'CFH MRI EQUIPMENT COPY EQUIPMENT DRESSING MT72 MT48 AUTOCLAVE 20x20x38 PI OFFICE MT72 AIR TABLE OFOI MRI EXAM 7T EQUIP SPACE EQUIP SPACE EQUIP SPACE EQUIP SPACE MT60 ELEC ELEC RACK RACK OFOI OFOI AIR TABLE OFOI MT48 FUTURE 6'CFH FLEX LAB AUTOCLAVE 6'CFH FUTURE 6'CFH 6'CFH COLD DRESSING DIRTY TISSUE CULTURE FLEX LAB MT72 SS RECOVERY IMAGING OPERATOR GRADUATE STUDENT WORKSTATIONS 6'BSC EQUIP SPACE PI OFFICE AUTOCLAVE 20x20x38 FUME HOOD PI OFFICE FUTURE 6'CFH FABRICATION PI OFFICE MT72 FREEZER FARM GRADUATE STUDENT WORKSTATIONS CONFERENCE SHAFT SHAFT MRI EXAM 1.5T MT72 MRI EQUIPMENT 6'BSC STORAGE STAIR 3 CONFERENCE CONFERENCE 6'BSC PREP / ANESTHESIA STAIR 3 STAIR 3 EW NORTH ENTRY MT72 STORAGE MT72 SHAFT MT72 MT72 6'CFH MT72 MT72 EW MT72 MT72 MT72 SS GENETICS LAB EW EW 5'CFH SS MT72 MICROBIOLOGY / CELL BIOLOGY PHYSIOLOGICAL ECOLOGY LAB SS CLASSROOM FOOD SERVICE CLASSROOM PREP MT72 FOOD SERVICE STORAGE SHAFT INTRODUCTION TO BIOLOGY LAB SS MT72 SHAFT EW JANITOR UTILIDOR MT72 ELEVATOR MACHINE EQUIP SPACE EQUIP SPACE CLASSROOM / CONF. ROOM EQUIP SPACE VESTIBULE ANATOMY / PHYSIOLOGY PREP LAB PREP LAB STOCKROOM SPECIMEN STORAGE OFFICE SS EQUIP SPACE EW MICROBIOLOGY PREP MT72 MT72 MT72 SS 5'CFH EW MT72 MT72 MT72 MT72 MT72 MT72 MT72 MT72 MT72 MT72 MT72 MT72 MT72 EQUIP SPACE SS EW EW VENDING LOBBY LADDER TO PENTHOUSE SHAFT SHAFT VESTIBULE ANATOMY / PHYSIOLOGY / WILDLIFE DISEASES LAB AQUATIC ORGANISMS / INVERTIBRATE ZOOLOGY LAB SS MT72 MT72 MT72 MT72 STUDENT ADVISER INTRODUCTION TO BIOLOGY LAB MT72 DEPARTMENT OFFICE RECEPTION MT72 DEVELOPMENTAL BIOLOGY / IMMUNOLOGY LAB GRAD STUDENT COORDINATOR VESTIBULE MT72 ADMIN. ASST STORAGE WET PREP LAB MT72 MAIL/COPY/FILE EW SCIENCE GALLERY AUDITORIUM SS DEPARTMENT CHAIR STAGE OPEN TO LOBBY BELOW STUDENT INTERACTION STAIR 1 STAIR 1 STAIR 1 STUDY BALCONY BUILDING CIRCULATION BUILDING CIRCULATION BUILDING CIRCULATION BUILDING CIRCULATION BUILDING SUPPORT BUILDING SUPPORT BUILDING SUPPORT BUILDING SUPPORT LAB SUPPORT CLASSROOM INTERACTION INTERACTION MRI LAB (FUTURE) INTERACTION LAB LAB VERTICAL CIRCULATION LAB LAB SUPPORT LAB SUPPORT LAB SUPPORT OFFICE OFFICE OFFICE OFFICE SUPPORT OFFICE SUPPORT OFFICE SUPPORT OPEN OFFICE OPEN OFFICE OPEN OFFICE SHAFT SHAFT SHAFT TEACHING LAB TEACHING LAB VERTICAL CIRCULATION TEACHING SUPPORT TEACHING SUPPORT VERTICAL CIRCULATION VERTICAL CIRCULATION SEPTEMBER 2010 LFRF LIFE SCIENCES BUILDING SEPTEMBER 2010 LFRF LIFE SCIENCES BUILDING SEPTEMBER 2010 LFRF LIFE SCIENCES BUILDING INSULATED METAL PANEL COLOR #1 INSULATED METAL PANEL COLOR #2 CAST CONCRETE NANOGEL INSULATED CHANNEL GLASS INSULATED METAL PANEL WITH VERTICAL RIBS AND COLOR TO MATCH MULLIONS SOUTH ELEVATION 0 10 20 40 TRIPLE-GLAZED WINDOW WITH KALWALL OR FRITTED UPPER GLAZING HEAVY-DUTY THERMAL-GLAZED ALUMINUM DOORS TRIPLE GLAZED CURTAIN WALL WITH FLUSH EXTERIOR JOINTS TRIPLE-GLAZED CURTAINWALL WITH FLUSH EXTERIOR JOINTS AND DEEP VERTICAL TRIM INSULATED METAL ROLL-UP DOOR NORTH ELEVATION 0 10 20 40 SEPTEMBER 2010 LFRF LIFE SCIENCES BUILDING INSULATED METAL PANEL COLOR #1 INSULATED METAL PANEL COLOR #2 CAST CONCRETE NANOGEL INSULATED CHANNEL GLASS INSULATED METAL PANEL WITH VERTICAL RIBS AND COLOR TO MATCH MULLIONS EAST ELEVATION 0 10 20 40 TRIPLE-GLAZED WINDOW WITH KALWALL OR FRITTED UPPER GLAZING ALUMINUM LOUVERS TRIPLE GLAZED CURTAIN WALL WITH FLUSH EXTERIOR JOINTS TRIPLE-GLAZED CURTAINWALL WITH FLUSH EXTERIOR JOINTS AND DEEP VERTICAL TRIM INSULATED METAL ROLL-UP DOOR WEST ELEVATION 0 10 20 40 SEPTEMBER 2010 LFRF LIFE SCIENCES BUILDING