1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 12/23/2015 OFFICE OF WORK PROGRAM
by user
Comments
Transcript
1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 12/23/2015 OFFICE OF WORK PROGRAM
PAGE 1 SARASOTA-MANATEE MPO FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ ITEM NUMBER:196114 2 DISTRICT:01 ROADWAY ID:13030000 PROJECT DESCRIPTION:US 41 (SR 45) FROM I-275 TO HILLSBOROUGH CL COUNTY:MANATEE PROJECT LENGTH: 4.686MI FUND CODE ____ 153,703 5,369,995 5,523,698 5,523,698 PROJECT DESCRIPTION:SR 45 (US 41/TAMIAMI TRAIL) AT PINEY POINT RD AND DOCK ST(PORT MANATEE *NON-SIS* COUNTY:MANATEE TYPE OF WORK:INTERSECTION IMPROVEMENT PROJECT LENGTH: .655MI LANES EXIST/IMPROVED/ADDED: 4/ 4/ 0 FUND CODE ____ 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT NHPP 28,891 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT EB NHRE SA TOTAL 196114 3 TOTAL 196114 3 ITEM NUMBER:201032 6 DISTRICT:01 ROADWAY ID:13075000 PROJECT DESCRIPTION:I-75 AT SR 64 COUNTY:MANATEE PROJECT LENGTH: 427,026 4,019,495 4,118,122 8,593,534 8,593,534 *SIS* TYPE OF WORK:INTERCHANGE IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 6/ 6/ 0 2.476MI FUND CODE ____ 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT EB SA TOTAL 201032 6 TOTAL 201032 6 ITEM NUMBER:420875 1 DISTRICT:01 ROADWAY ID:13000136 *NON-SIS* TYPE OF WORK:RESURFACING LANES EXIST/IMPROVED/ADDED: 6/ 6/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT EB SA TOTAL 196114 2 TOTAL 196114 2 ITEM NUMBER:196114 3 DISTRICT:01 ROADWAY ID:13030000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP 149,755 1,156,809 1,306,564 1,306,564 PROJECT DESCRIPTION:HABEN BOULEVARD AT 12TH AVENUE EAST COUNTY:MANATEE PROJECT LENGTH: 1.044MI FUND CODE ____ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE SA TOTAL 420875 1 TOTAL 420875 1 *NON-SIS* TYPE OF WORK:ROUNDABOUT LANES EXIST/IMPROVED/ADDED: 2/ 0/ 0 2015 _______________ 366,459 366,459 366,459 PAGE 2 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ SARASOTA-MANATEE MPO ITEM NUMBER:422403 1 DISTRICT:01 ROADWAY ID:13050000 PROJECT DESCRIPTION:SR 70 FROM 0.08 W OF BRENDLE RD TO 0.90 MI W OF CURTIS RD COUNTY:MANATEE PROJECT LENGTH: 6.254MI FUND CODE ____ -5,773 -5,773 -5,773 PROJECT DESCRIPTION:SR 70 FROM E OF LORRAINE ROAD TO CR 675/WATERBURY RD COUNTY:MANATEE PROJECT LENGTH: 5.860MI FUND CODE ____ PROJECT DESCRIPTION:US 41 AT SR 70 (53RD AVENUE W) COUNTY:MANATEE PROJECT LENGTH: FUND CODE ____ -14,439 9,147 -5,292 -5,292 *NON-SIS* TYPE OF WORK:TRAFFIC SIGNAL UPDATE LANES EXIST/IMPROVED/ADDED: 6/ 6/ 0 .060MI 2015 _______________ PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP -105,945 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT SA TOTAL 427298 1 TOTAL 427298 1 36,200 -69,745 -69,745 ITEM NUMBER:427363 1 DISTRICT:01 ROADWAY ID:13130000 *NON-SIS* TYPE OF WORK:RESURFACING LANES EXIST/IMPROVED/ADDED: 2/ 2/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT EB SA TOTAL 425234 1 TOTAL 425234 1 ITEM NUMBER:427298 1 DISTRICT:01 ROADWAY ID:13010000 *NON-SIS* TYPE OF WORK:RESURFACING LANES EXIST/IMPROVED/ADDED: 2/ 2/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT SU TOTAL 422403 1 TOTAL 422403 1 ITEM NUMBER:425234 1 DISTRICT:01 ROADWAY ID:13160000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP PROJECT DESCRIPTION:US 41 (SR 55) FROM S OF 301 BLVD TO S OF 23RD AVENUE COUNTY:MANATEE PROJECT LENGTH: .970MI FUND CODE ____ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT SA TOTAL 427363 1 TOTAL 427363 1 2015 _______________ -20,225 -20,225 -20,225 *NON-SIS* TYPE OF WORK:RESURFACING LANES EXIST/IMPROVED/ADDED: 6/ 6/ 0 PAGE 3 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ SARASOTA-MANATEE MPO ITEM NUMBER:427995 1 DISTRICT:01 ROADWAY ID:13020000 PROJECT DESCRIPTION:SR43 (US301) FROM CR 675 TO MOCCASIN WALLOW RD COUNTY:MANATEE PROJECT LENGTH: 1.212MI FUND CODE ____ 169,682 PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT SU TOTAL 427995 1 TOTAL 427995 1 48,705 218,387 218,387 PROJECT DESCRIPTION:NEAL PRESERVE FROM CAUSEWAY PATHWAY AND BOARDWALK COUNTY:MANATEE PROJECT LENGTH: .300MI FUND CODE ____ *NON-SIS* TYPE OF WORK:BIKE PATH/TRAIL LANES EXIST/IMPROVED/ADDED: 2/ 0/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY MANATEE COUNTY BOCC TALT -32,348 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE TALU TOTAL 428133 1 TOTAL 428133 1 ITEM NUMBER:429496 1 DISTRICT:01 ROADWAY ID:13010000 *NON-SIS* TYPE OF WORK:ADD LANES & RECONSTRUCT LANES EXIST/IMPROVED/ADDED: 2/ 2/ 2 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT SU ITEM NUMBER:428133 1 DISTRICT:01 ROADWAY ID:13150000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP PROJECT DESCRIPTION:US 41/SR 45 AT 69TH AVENUE W COUNTY:MANATEE PROJECT LENGTH: -3,000 -35,348 -35,348 *NON-SIS* TYPE OF WORK:TRAFFIC SIGNAL UPDATE LANES EXIST/IMPROVED/ADDED: 3/ 0/ 0 .057MI FUND CODE ____ 2015 _______________ PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP -8,325 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP TOTAL 429496 1 TOTAL 429496 1 24,433 16,108 16,108 ITEM NUMBER:429503 1 DISTRICT:01 ROADWAY ID:13010000 PROJECT DESCRIPTION:US 41 / SR 45 AT 60TH AVE W COUNTY:MANATEE PROJECT LENGTH: FUND CODE ____ PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP TOTAL 429503 1 TOTAL 429503 1 *NON-SIS* TYPE OF WORK:TRAFFIC SIGNAL UPDATE LANES EXIST/IMPROVED/ADDED: 6/ 0/ 0 .017MI 2015 _______________ -66,310 -66,310 -66,310 PAGE 4 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ SARASOTA-MANATEE MPO ITEM NUMBER:429504 1 DISTRICT:01 ROADWAY ID:13010000 PROJECT DESCRIPTION:US 41 / SR 45 AT BAYSHORE PKWY COUNTY:MANATEE PROJECT LENGTH: DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP *NON-SIS* TYPE OF WORK:TRAFFIC SIGNAL UPDATE LANES EXIST/IMPROVED/ADDED: 3/ 0/ 0 .027MI FUND CODE ____ 2015 _______________ PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA -93,041 -9,511 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 429504 1 TOTAL 429504 1 595,385 8,418 501,251 501,251 ITEM NUMBER:429506 1 DISTRICT:01 ROADWAY ID:13010000 PROJECT DESCRIPTION:US 41 / SR 45 FROM 63RD AVE W TO 53RD AVE W COUNTY:MANATEE PROJECT LENGTH: 1.247MI FUND CODE ____ *NON-SIS* TYPE OF WORK:LIGHTING LANES EXIST/IMPROVED/ADDED: 3/ 0/ 0 2015 _______________ PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP 943,738 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 429506 1 TOTAL 429506 1 1,021,112 25,000 1,989,850 1,989,850 ITEM NUMBER:429526 1 DISTRICT:01 ROADWAY ID:13010000 PROJECT DESCRIPTION:US 41 / SR 45 AT SR 684 (CORTEZ RD) COUNTY:MANATEE PROJECT LENGTH: .334MI FUND CODE ____ 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 429526 1 TOTAL 429526 1 ITEM NUMBER:429869 1 DISTRICT:01 ROADWAY ID:13000000 *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 5/ 0/ 0 -80,225 1,608 -78,617 -78,617 PROJECT DESCRIPTION:COQUINA BEACH TURNAROUND WEST OF SR 789 COUNTY:MANATEE PROJECT LENGTH: .014MI FUND CODE ____ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY MANATEE COUNTY BOCC SU TOTAL 429869 1 TOTAL 429869 1 *NON-SIS* TYPE OF WORK:MISCELLANEOUS CONSTRUCTION LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 2015 _______________ 30,985 30,985 30,985 PAGE 5 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ SARASOTA-MANATEE MPO ITEM NUMBER:429871 1 DISTRICT:01 ROADWAY ID:13000101 PROJECT DESCRIPTION:57TH ST E AT SR 64 COUNTY:MANATEE PROJECT LENGTH: 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY MANATEE COUNTY SU 448,777 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE SU TOTAL 429871 1 TOTAL 429871 1 1,000 449,777 449,777 PROJECT DESCRIPTION:SR 684 FROM SR 789 (GULF DRIVE) TO 123RD STREET WEST COUNTY:MANATEE PROJECT LENGTH: .900MI FUND CODE ____ 638,249 638,249 638,249 PROJECT DESCRIPTION:US 301 (1ST ST) FROM 21ST ST TO RR TRACKS RR XING 624712-B COUNTY:MANATEE PROJECT LENGTH: .806MI FUND CODE ____ *NON-SIS* TYPE OF WORK:RAIL SAFETY PROJECT LANES EXIST/IMPROVED/ADDED: 2/ 0/ 0 2015 _______________ PHASE: RAILROAD AND UTILITIES / RESPONSIBLE AGENCY: MANAGED BY FDOT RHP TOTAL 430632 1 TOTAL 430632 1 ITEM NUMBER:430861 1 DISTRICT:01 ROADWAY ID:13050000 *NON-SIS* TYPE OF WORK:PD&E/EMO STUDY LANES EXIST/IMPROVED/ADDED: 2/ 0/ 0 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT SU TOTAL 430204 1 TOTAL 430204 1 ITEM NUMBER:430632 1 DISTRICT:01 ROADWAY ID:13130403 *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 2/ 0/ 0 .400MI FUND CODE ____ ITEM NUMBER:430204 1 DISTRICT:01 ROADWAY ID:13040000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP PROJECT DESCRIPTION:SR 64 AT 66TH STREET COURT E COUNTY:MANATEE PROJECT LENGTH: FUND CODE ____ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 430861 1 TOTAL 430861 1 -55,427 -55,427 -55,427 *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 6/ 0/ 0 .086MI 2015 _______________ 391,321 32,530 423,851 423,851 PAGE 6 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ SARASOTA-MANATEE MPO ITEM NUMBER:430930 1 DISTRICT:01 ROADWAY ID:13060000 PROJECT DESCRIPTION:SR 62 AT CR 39 COUNTY:MANATEE PROJECT LENGTH: *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 .331MI FUND CODE ____ 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP TALT TOTAL 430930 1 TOTAL 430930 1 ITEM NUMBER:431350 1 DISTRICT:01 ROADWAY ID:13120000 -782 -24,698 -25,480 -25,480 PROJECT DESCRIPTION:15TH STREET EAST FROM TALLEVAST ROAD TO US 41 COUNTY:MANATEE PROJECT LENGTH: 4.744MI FUND CODE ____ 254,723 254,723 254,723 PROJECT DESCRIPTION:SR 45 (US 41) AT MOCCASIN WALLOW ROAD COUNTY:MANATEE PROJECT LENGTH: .284MI FUND CODE ____ *NON-SIS* TYPE OF WORK:TRAFFIC SIGNALS LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 432661 1 TOTAL 432661 1 ITEM NUMBER:433369 1 DISTRICT:01 ROADWAY ID:13020000 PROJECT DESCRIPTION:US 301 AT 25TH DRIVE EAST COUNTY:MANATEE PROJECT LENGTH: FUND CODE ____ -128,975 4,589 -124,386 -124,386 *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 .114MI 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 433369 1 TOTAL 433369 1 ITEM NUMBER:433372 1 DISTRICT:01 ROADWAY ID:13162000 *NON-SIS* TYPE OF WORK:PD&E/EMO STUDY LANES EXIST/IMPROVED/ADDED: 2/ 2/ 2 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT SU TOTAL 431350 1 TOTAL 431350 1 ITEM NUMBER:432661 1 DISTRICT:01 ROADWAY ID:13030000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP 332,102 15,150 347,252 347,252 PROJECT DESCRIPTION:SR 70 FROM 6TH STREET EAST TO 9TH STREET EAST COUNTY:MANATEE PROJECT LENGTH: .217MI FUND CODE ____ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 4/ 4/ 0 2015 _______________ 486,466 PAGE 7 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ SARASOTA-MANATEE MPO SA TOTAL 433372 1 TOTAL 433372 1 ITEM NUMBER:433547 1 DISTRICT:01 ROADWAY ID:13010001 22,360 508,826 508,826 PROJECT DESCRIPTION:US 41 BUSINESS AT 3RD AVE COUNTY:MANATEE PROJECT LENGTH: *NON-SIS* TYPE OF WORK:ADD RIGHT TURN LANE(S) LANES EXIST/IMPROVED/ADDED: 2/ 0/ 1 .048MI FUND CODE ____ 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT SU TOTAL 433547 1 TOTAL 433547 1 ITEM NUMBER:433549 1 DISTRICT:01 ROADWAY ID:13020000 125,000 125,000 125,000 PROJECT DESCRIPTION:US 41 AT US 301 (10TH STREET E) IN PALMETTO COUNTY:MANATEE PROJECT LENGTH: .200MI FUND CODE ____ PROJECT DESCRIPTION:US 301 AT SR 70 COUNTY:MANATEE PROJECT LENGTH: FUND CODE ____ 257,745 257,745 257,745 *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 .500MI 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 434505 1 TOTAL 434505 1 ITEM NUMBER:434809 1 DISTRICT:01 ROADWAY ID:13150000 *NON-SIS* TYPE OF WORK:SIDEWALK LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT SU TOTAL 433549 1 TOTAL 433549 1 ITEM NUMBER:434505 1 DISTRICT:01 ROADWAY ID:13121000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP 30,712 10,000 40,712 40,712 PROJECT DESCRIPTION:SR 64 FROM 75TH STREET WEST TO 59TH STREET WEST COUNTY:MANATEE PROJECT LENGTH: 1.101MI FUND CODE ____ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 434809 1 TOTAL 434809 1 *NON-SIS* TYPE OF WORK:LIGHTING LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 2015 _______________ 493,207 75,000 568,207 568,207 PAGE 8 SARASOTA-MANATEE MPO ITEM NUMBER:434943 1 DISTRICT:01 ROADWAY ID:13080000 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ PROJECT DESCRIPTION:SR789 FROM 27TH ST TO SR 64 COUNTY:MANATEE PROJECT LENGTH: 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT SE -13,471 PHASE: GRANTS AND MISCELLANEOUS / RESPONSIBLE AGENCY: MANAGED BY FDOT SE TOTAL 434943 1 TOTAL 434943 1 PROJECT DESCRIPTION:9TH AVE E AT 15TH ST EAST COUNTY:MANATEE PROJECT LENGTH: -9,850 -23,321 -23,321 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT SU TOTAL 435090 1 TOTAL 435090 1 342,380 342,380 342,380 PROJECT DESCRIPTION:ELLENTON GILLETTE RD AT 69TH ST E COUNTY:MANATEE PROJECT LENGTH: .215MI FUND CODE ____ *NON-SIS* TYPE OF WORK:ADD LEFT TURN LANE(S) LANES EXIST/IMPROVED/ADDED: 2/ 0/ 1 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT TALU TOTAL 435120 1 TOTAL 435120 1 ITEM NUMBER:435136 1 DISTRICT:01 ROADWAY ID:13150000 *NON-SIS* TYPE OF WORK:ADD TURN LANE(S) LANES EXIST/IMPROVED/ADDED: 2/ 0/ 1 .136MI FUND CODE ____ ITEM NUMBER:435120 1 DISTRICT:01 ROADWAY ID:13100000 *NON-SIS* TYPE OF WORK:SIDEWALK LANES EXIST/IMPROVED/ADDED: 2/ 2/ 0 .843MI FUND CODE ____ ITEM NUMBER:435090 1 DISTRICT:01 ROADWAY ID:13000060 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP 229,814 229,814 229,814 PROJECT DESCRIPTION:SR 64 FROM MARTINIQUE DR TO EAST OF 107TH CT WEST COUNTY:MANATEE PROJECT LENGTH: .987MI FUND CODE ____ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT TALU TOTAL 435136 1 TOTAL 435136 1 *NON-SIS* TYPE OF WORK:BIKE LANE/SIDEWALK LANES EXIST/IMPROVED/ADDED: 2/ 2/ 0 2015 _______________ 30,000 30,000 30,000 PAGE 9 SARASOTA-MANATEE MPO ITEM NUMBER:435349 1 DISTRICT:01 ROADWAY ID:13010001 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ PROJECT DESCRIPTION:US 41 GREEN BRIDGE MULTI-USE PATH COUNTY:MANATEE PROJECT LENGTH: 1.032MI FUND CODE ____ *NON-SIS* TYPE OF WORK:BIKE PATH/TRAIL LANES EXIST/IMPROVED/ADDED: 4/ 4/ 0 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT TALU TOTAL 435349 1 TOTAL 435349 1 ITEM NUMBER:436514 1 DISTRICT:01 ROADWAY ID:13000000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP 253,004 253,004 253,004 PROJECT DESCRIPTION:CITY OF BRADENTON SIDEWALKS TO SCHOOLS VARIOUS LOCATIONS COUNTY:MANATEE PROJECT LENGTH: .001MI FUND CODE ____ 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY CITY OF BRADENTON TALU 433,732 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE TALU TOTAL 436514 1 TOTAL 436514 1 1,000 434,732 434,732 *NON-SIS* TYPE OF WORK:SIDEWALK LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 PAGE 10 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ SARASOTA-MANATEE MPO ITEM NUMBER:198017 4 DISTRICT:01 ROADWAY ID:17180000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP PROJECT DESCRIPTION:SR 45/US 41 (VENICE BYPASS) FROM GULF COAST BLVD TO BIRD BAY DR WEST *NON-SIS* COUNTY:SARASOTA TYPE OF WORK:ADD LANES & RECONSTRUCT PROJECT LENGTH: 1.138MI LANES EXIST/IMPROVED/ADDED: 4/ 4/ 2 FUND CODE ____ 2015 _______________ PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT SU 92,119 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT CM SU TOTAL 198017 4 TOTAL 198017 4 295,568 2,280,349 2,668,036 2,668,036 ITEM NUMBER:200610 3 DISTRICT:01 ROADWAY ID:17000000 PROJECT DESCRIPTION:ENGLEWOOD/INT/CONN FROM CENTER ROAD TO I-75 COUNTY:SARASOTA PROJECT LENGTH: 12.000MI FUND CODE ____ 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE HPP TOTAL 200610 3 TOTAL 200610 3 ITEM NUMBER:201277 5 DISTRICT:01 ROADWAY ID:17075000 PROJECT DESCRIPTION:I-75 (SR93) AT BEE RIDGE ROAD COUNTY:SARASOTA PROJECT LENGTH: FUND CODE ____ -122,805 -122,805 -122,805 *SIS* TYPE OF WORK:INTERCHANGE IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 6/ 6/ 0 .750MI 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT NHPP TOTAL 201277 5 TOTAL 201277 5 ITEM NUMBER:406314 3 DISTRICT:01 ROADWAY ID:17075000 *NON-SIS* TYPE OF WORK:PRELIM ENG FOR FUTURE CAPACITY LANES EXIST/IMPROVED/ADDED: 0/ 0/ 4 1,035,248 1,035,248 1,035,248 PROJECT DESCRIPTION:I-75 FROM N OF NORTH RIVER RD TO NORTH OF SR 681 COUNTY:SARASOTA PROJECT LENGTH: 9.368MI FUND CODE ____ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT NH TOTAL 406314 3 TOTAL 406314 3 *SIS* TYPE OF WORK:ADD LANES & REHABILITATE PVMNT LANES EXIST/IMPROVED/ADDED: 7/ 7/ 2 2015 _______________ -25,438 -25,438 -25,438 PAGE 11 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ SARASOTA-MANATEE MPO ITEM NUMBER:406314 7 DISTRICT:01 ROADWAY ID:17075000 PROJECT DESCRIPTION:I-75 JACARANDA BLVD LAUREL ROAD COUNTY:SARASOTA PROJECT LENGTH: 3.372MI FUND CODE ____ 1,493 1,493 1,493 PROJECT DESCRIPTION:I-75 (SR93) FROM CHARLOTTE COUNTY LINE TO TOLEDO BLADE BLVD COUNTY:SARASOTA PROJECT LENGTH: 7.465MI FUND CODE ____ 22,000 22,000 22,000 PROJECT DESCRIPTION:I-75 FROM CHARLOTTE CO/L TO MANATEE CO/L COUNTY:SARASOTA PROJECT LENGTH: 42.615MI FUND CODE ____ *SIS* TYPE OF WORK:ITS FREEWAY MANAGEMENT LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT NHPP TOTAL 414730 1 TOTAL 414730 1 ITEM NUMBER:417577 1 DISTRICT:01 ROADWAY ID:17020000 *SIS* TYPE OF WORK:ADD LANES & RECONSTRUCT LANES EXIST/IMPROVED/ADDED: 4/ 4/ 2 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT EB TOTAL 413044 2 TOTAL 413044 2 ITEM NUMBER:414730 1 DISTRICT:01 ROADWAY ID:17075000 *SIS* TYPE OF WORK:LIGHTING LANES EXIST/IMPROVED/ADDED: 6/ 6/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT NHPP TOTAL 406314 7 TOTAL 406314 7 ITEM NUMBER:413044 2 DISTRICT:01 ROADWAY ID:17075000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP PROJECT DESCRIPTION:US 41 AT MAIN STREET COUNTY:SARASOTA PROJECT LENGTH: FUND CODE ____ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT EB SU TOTAL 417577 1 TOTAL 417577 1 -205,312 -205,312 -205,312 *NON-SIS* TYPE OF WORK:ADD LEFT TURN LANE(S) LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 .119MI 2015 _______________ -140 -4,301 -4,441 -4,441 PAGE 12 SARASOTA-MANATEE MPO ITEM NUMBER:417949 1 DISTRICT:01 ROADWAY ID: FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ PROJECT DESCRIPTION:TRAILHEADS ALONG ALLIGATOR CREEK COUNTY:SARASOTA PROJECT LENGTH: .000 FUND CODE ____ -96,830 -96,830 -96,830 PROJECT DESCRIPTION:SARASOTA ATMS PHASE IV - COUNTYWIDE COUNTY:SARASOTA PROJECT LENGTH: .001MI FUND CODE ____ PROJECT DESCRIPTION:US 41 AT SUMTER BLVD COUNTY:SARASOTA PROJECT LENGTH: 400 400 400 *NON-SIS* TYPE OF WORK:ADD RIGHT TURN LANE(S) LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 .004MI FUND CODE ____ 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE SU TOTAL 427939 1 TOTAL 427939 1 ITEM NUMBER:427940 1 DISTRICT:01 ROADWAY ID:17000572 *NON-SIS* TYPE OF WORK:ATMS - ARTERIAL TRAFFIC MGMT LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE SU TOTAL 420974 4 TOTAL 420974 4 ITEM NUMBER:427939 1 DISTRICT:01 ROADWAY ID:17010000 *NON-SIS* TYPE OF WORK:SIDEWALK LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE SE TOTAL 417949 1 TOTAL 417949 1 ITEM NUMBER:420974 4 DISTRICT:01 ROADWAY ID:17000000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP PROJECT DESCRIPTION:PRICE BLVD AT HABERLAND BLVD COUNTY:SARASOTA PROJECT LENGTH: FUND CODE ____ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE SA TOTAL 427940 1 TOTAL 427940 1 -306 -306 -306 *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 2/ 0/ 0 .004MI 2015 _______________ 600 600 600 PAGE 13 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ SARASOTA-MANATEE MPO ITEM NUMBER:428135 1 DISTRICT:01 ROADWAY ID:17010000 PROJECT DESCRIPTION:US 41 FROM ALMONTE TERR TO BISCAYNE DRIVE COUNTY:SARASOTA PROJECT LENGTH: 1.141MI FUND CODE ____ 32 32 32 PROJECT DESCRIPTION:ALTA VISTA ELEMENTARY SAFE ROUTES TO SCHOOL COUNTY:SARASOTA PROJECT LENGTH: .001MI FUND CODE ____ -96,738 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE TALU TOTAL 428249 1 TOTAL 428249 1 -2,500 -99,238 -99,238 PROJECT DESCRIPTION:SR45 (US 41) FROM 10TH STREET TO 14TH STREET COUNTY:SARASOTA PROJECT LENGTH: .972MI FUND CODE ____ *NON-SIS* TYPE OF WORK:ROUNDABOUT LANES EXIST/IMPROVED/ADDED: 8/ 8/ 0 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT SU TOTAL 428383 1 TOTAL 428383 1 ITEM NUMBER:429119 1 DISTRICT:01 ROADWAY ID:17008000 *NON-SIS* TYPE OF WORK:SIDEWALK LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY CITY OF SARASOTA TALU ITEM NUMBER:428383 1 DISTRICT:01 ROADWAY ID:17020000 *NON-SIS* TYPE OF WORK:LIGHTING LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE TALT TOTAL 428135 1 TOTAL 428135 1 ITEM NUMBER:428249 1 DISTRICT:01 ROADWAY ID:17000000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP 282,305 282,305 282,305 PROJECT DESCRIPTION:SR 758 BEE RIDGE RD FROM CATTLEMAN ROAD TO E OF PHILLIPPI CREEK COUNTY:SARASOTA PROJECT LENGTH: .565MI FUND CODE ____ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT SA TOTAL 429119 1 TOTAL 429119 1 2015 _______________ 26,143 26,143 26,143 *NON-SIS* TYPE OF WORK:RESURFACING LANES EXIST/IMPROVED/ADDED: 6/ 4/ 0 PAGE 14 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ SARASOTA-MANATEE MPO ITEM NUMBER:429131 1 DISTRICT:01 ROADWAY ID:17020000 PROJECT DESCRIPTION:US 41 / SR 45 FROM MARCIA ST TO BAYWOOD DR COUNTY:SARASOTA PROJECT LENGTH: 2.450MI FUND CODE ____ *NON-SIS* TYPE OF WORK:SIDEWALK LANES EXIST/IMPROVED/ADDED: 6/ 0/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT SU TOTAL 429831 1 TOTAL 429831 1 310,161 310,161 310,161 PROJECT DESCRIPTION:SR758 (BEE RIDGE RD) FROM SR45 (US 41) TO DUNN DRIVE COUNTY:SARASOTA PROJECT LENGTH: 3.630MI FUND CODE ____ *NON-SIS* TYPE OF WORK:PEDESTRIAN SAFETY IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 6/ 1/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 430855 1 TOTAL 430855 1 ITEM NUMBER:430863 1 DISTRICT:01 ROADWAY ID:17070000 136,740 136,740 136,740 PROJECT DESCRIPTION:SR 780 (FRUITVILLE) FROM HONORE AVE TO CATTLEMEN ROAD COUNTY:SARASOTA PROJECT LENGTH: .671MI FUND CODE ____ ITEM NUMBER:430855 1 DISTRICT:01 ROADWAY ID:17008000 *NON-SIS* TYPE OF WORK:RESURFACING LANES EXIST/IMPROVED/ADDED: 4/ 4/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT NHRE TOTAL 429131 1 TOTAL 429131 1 ITEM NUMBER:429831 1 DISTRICT:01 ROADWAY ID:17040000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP 349,952 30,310 380,262 380,262 PROJECT DESCRIPTION:SR 72 (STICKNEY POINT RD) AT SWIFT ROAD COUNTY:SARASOTA PROJECT LENGTH: .199MI FUND CODE ____ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 430863 1 TOTAL 430863 1 *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 6/ 0/ 0 2015 _______________ -41,677 14,000 -27,677 -27,677 PAGE 15 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ SARASOTA-MANATEE MPO ITEM NUMBER:431306 1 DISTRICT:01 ROADWAY ID:17008000 PROJECT DESCRIPTION:SR 758 FROM SIESTA DRIVE TO BOND PL COUNTY:SARASOTA PROJECT LENGTH: 3.821MI FUND CODE ____ *NON-SIS* TYPE OF WORK:FLEXIBLE PAVEMENT RECONSTRUCT. LANES EXIST/IMPROVED/ADDED: 6/ 6/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT SA TOTAL 431306 1 TOTAL 431306 1 ITEM NUMBER:432753 1 DISTRICT:01 ROADWAY ID:17020000 11,867,399 11,867,399 11,867,399 PROJECT DESCRIPTION:US 41 FROM BISPHAM ROAD TO GULF GATE DRIVE COUNTY:SARASOTA PROJECT LENGTH: .246MI FUND CODE ____ -2,769 -2,769 -2,769 PROJECT DESCRIPTION:US 41 FROM VENETIAN DRIVE TO PALM DRIVE COUNTY:SARASOTA PROJECT LENGTH: .295MI FUND CODE ____ 35,700 PHASE: GRANTS AND MISCELLANEOUS / RESPONSIBLE AGENCY: MANAGED BY FDOT TALU TOTAL 432754 1 TOTAL 432754 1 PROJECT DESCRIPTION:US 41 AT MAIN STREET COUNTY:SARASOTA PROJECT LENGTH: 40,000 75,700 75,700 *NON-SIS* TYPE OF WORK:ROUNDABOUT LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 .161MI FUND CODE ____ 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT SU TOTAL 433225 1 TOTAL 433225 1 ITEM NUMBER:433373 1 DISTRICT:01 ROADWAY ID:17070000 *NON-SIS* TYPE OF WORK:SIDEWALK LANES EXIST/IMPROVED/ADDED: 2/ 0/ 0 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT TALU ITEM NUMBER:433225 1 DISTRICT:01 ROADWAY ID:17020000 *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 5/ 0/ 0 2015 _______________ PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP TOTAL 432753 1 TOTAL 432753 1 ITEM NUMBER:432754 1 DISTRICT:01 ROADWAY ID:17020000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP PROJECT DESCRIPTION:SR 72 AT MYAKKA VALLEY TRAIL COUNTY:SARASOTA PROJECT LENGTH: FUND CODE ____ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT SA 502,000 502,000 502,000 *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 2/ 2/ 0 .355MI 2015 _______________ -18 PAGE 16 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ SARASOTA-MANATEE MPO PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP TALU TOTAL 433373 1 TOTAL 433373 1 ITEM NUMBER:433550 1 DISTRICT:01 ROADWAY ID:17020000 319,145 22,330 341,457 341,457 PROJECT DESCRIPTION:US 41 FROM BLACKBURN POINT ROAD TO STICKNEY PT ROAD COUNTY:SARASOTA PROJECT LENGTH: 6.343MI FUND CODE ____ 3,000 3,000 3,000 PROJECT DESCRIPTION:SR45 (US41) OVER MYAKKAHATCHEE CREEK (BIG SLOUGH)(SOUTHBOUND) COUNTY:SARASOTA PROJECT LENGTH: .102MI FUND CODE ____ PROJECT DESCRIPTION:SR 758 AT BEACH ROAD ROUNDABOUT COUNTY:SARASOTA PROJECT LENGTH: 250 250 250 *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 2/ 2/ 0 .379MI FUND CODE ____ 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 434491 1 TOTAL 434491 1 ITEM NUMBER:434504 1 DISTRICT:01 ROADWAY ID:17070000 *NON-SIS* TYPE OF WORK:PEDESTRIAN/WILDLIFE OVERPASS LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT TALU TOTAL 433562 1 TOTAL 433562 1 ITEM NUMBER:434491 1 DISTRICT:01 ROADWAY ID:17080000 *NON-SIS* TYPE OF WORK:BIKE LANE/SIDEWALK LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT SU TOTAL 433550 1 TOTAL 433550 1 ITEM NUMBER:433562 1 DISTRICT:01 ROADWAY ID:17010000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP PROJECT DESCRIPTION:SR 72 AT BEE RIDGE ROAD COUNTY:SARASOTA PROJECT LENGTH: FUND CODE ____ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 434504 1 TOTAL 434504 1 436,443 25,000 461,443 461,443 *NON-SIS* TYPE OF WORK:ROUNDABOUT LANES EXIST/IMPROVED/ADDED: 2/ 0/ 0 .500MI 2015 _______________ 261,420 10,000 271,420 271,420 PAGE 17 SARASOTA-MANATEE MPO ITEM NUMBER:434728 1 DISTRICT:01 ROADWAY ID:17020000 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ HIGHWAYS ================ PROJECT DESCRIPTION:US 41 AT HANSEN BLVD COUNTY:SARASOTA PROJECT LENGTH: 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT HSP SA TOTAL 434728 1 TOTAL 434728 1 *NON-SIS* TYPE OF WORK:RESURFACING LANES EXIST/IMPROVED/ADDED: 4/ 4/ 0 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT SA TOTAL 434961 1 TOTAL 434961 1 50,000 50,000 50,000 PROJECT DESCRIPTION:TRAIL BRIDGE OVER LAUREL RD LEGACY TRAIL COUNTY:SARASOTA PROJECT LENGTH: .217MI FUND CODE ____ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT TALT 435450 1 435450 1 DIST: 01 HIGHWAYS TOTAL TOTAL TOTAL TOTAL 69,999 10,000 79,999 79,999 PROJECT DESCRIPTION:SR 45 (US 41) TAMIAMI TRL FROM PALERMO PLACE TO VENICE AVENUE COUNTY:SARASOTA PROJECT LENGTH: .626MI FUND CODE ____ ITEM NUMBER:435450 1 DISTRICT:01 ROADWAY ID:17000000 *NON-SIS* TYPE OF WORK:INTERSECTION IMPROVEMENT LANES EXIST/IMPROVED/ADDED: 6/ 0/ 0 .133MI FUND CODE ____ ITEM NUMBER:434961 1 DISTRICT:01 ROADWAY ID:17010000 DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP *NON-SIS* TYPE OF WORK:PEDESTRIAN/WILDLIFE OVERPASS LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 2015 _______________ 496,971 496,971 496,971 41,369,427 41,369,427 PAGE 18 SARASOTA-MANATEE MPO ITEM NUMBER:423646 1 DISTRICT:01 ROADWAY ID: FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM ANNUAL OBLIGATIONS REPORT ================ PLANNING ================ PROJECT DESCRIPTION:SARASOTA/MANATEE COUNTY MPO FY 2013/2014 UPWP COUNTY:SARASOTA PROJECT LENGTH: .000 FUND CODE ____ PROJECT DESCRIPTION:VENICE DOWNTOWN MOBILITY STUDY COUNTY:SARASOTA PROJECT LENGTH: FUND CODE ____ -836,132 -836,132 -836,132 *NON-SIS* TYPE OF WORK:TRANSPORTATION PLANNING LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 .000 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE SA TOTAL 424226 1 TOTAL 424226 1 ITEM NUMBER:425671 1 DISTRICT:01 ROADWAY ID: -1,471 -1,471 -1,471 PROJECT DESCRIPTION:SARASOTA/MANATEE COUNTY MPO 2015/2016 UPWP COUNTY:SARASOTA PROJECT LENGTH: .000 FUND CODE ____ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT PL PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE PL TOTAL 425671 1 TOTAL 425671 1 TOTAL DIST: 01 TOTAL PLANNING GRAND TOTAL *NON-SIS* TYPE OF WORK:TRANSPORTATION PLANNING LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 2015 _______________ PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE PL TOTAL 423646 1 TOTAL 423646 1 ITEM NUMBER:424226 1 DISTRICT:01 ROADWAY ID: DATE RUN: 12/23/2015 TIME RUN: 15.47.11 MBROBLTP *NON-SIS* TYPE OF WORK:TRANSPORTATION PLANNING LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 2015 _______________ 53,000 1,335,834 1,388,834 1,388,834 551,231 551,231 41,920,658