Comments
Description
Transcript
UNIT-IN-PLACE COSTS
UNIT-IN-PLACE COSTS INSTRUCTIONS for Converting Square Foot Costs into Whole Dollar Costs for an Entire Residence. Step A: Select the the proper proper class Step A: Select class for for the the residence. residence. Step B: B: Select Select and and list list Unit-in-Place Unit-in-Place components components for Step for all all construction construction areas areas ofofthe theresidence. residence. (Tip: Tip: Work through page by page, through the the Unit-in-Place Unit-in-Place section section page first marking down down the first selecting selecting a component, component, then marking corresponding class cost. cost. For For an example of how corresponding class example of this you this step step isis done, done, see see the thefollowing following pages. pages. IfIf you are of the exact specifications of the are not notsure sure of the exact specifications of resithe dence, referrefer to the Specification pages located in residence, to the Specification pages located front of the Square Foot cost tables. in front of the Square Foot cost tables. Step C: Convert Unit-in-Place Unit-in-Place costs Step C: Convert costs into into whole whole dollar dollar costs. Pay Pay special special attention attention to unit of of measure measure costs. to the the unit converting costs. costs. For additional additional conversion conversion when converting help, see thethe example on the folsee below belowororrefer referto to example on the lowing pages. following pages. Step D: Total all whole whole dollar dollarcosts. costs. Step D: Total all Step E: Divide the result Step D D by the ground area of of result of Step ground area your residence in square feet. your residence in square feet. CONVERSION INSTRUCTIONS In order to convert the various Unit-in-Place costs into whole dollar costs, use the following formulas: UNIT-IN-PLACE SECTION BASE UNIT OF MEASURE CONVERSION FORMULA Exterior wall Sq. Ft. of Wall Area Unit-in-Place Cost x Sq. Ft. of Wall Area = Whole Dollar Cost Windows Sq. Ft. of Window Area Unit-in-Place Cost x Sq. Ft. of Window Area = Whole Dollar Cost Roof Sq. Ft. of Ground Area Unit-in-Place Cost x Sq. Ft. of Ground Area = Whole Dollar Cost Interior partitions and finish Sq. Ft. of Partition Area Unit-in-Place Cost x Sq. Ft. of Partition Area = Whole Dollar Cost Floor finish Sq. Ft. of Floor Area Unit-in-Place Cost x Sq. Ft. of Floor Area = Whole Dollar Cost Ceiling Sq. Ft. of Ceiling Area Unit-in-Place Cost x Sq. Ft. of Ceiling Area = Whole Dollar Cost Excavation Sq. Ft. of Ground Area Unit-in-Place Cost x Sq. Ft. of Ground Area = Whole Dollar Cost Basement walls, foundations and footings Sq. Ft. of Wall Area Unit-in-Place Cost x Sq. Ft. of Wall Area = Whole Dollar Cost Basement floor Sq. Ft. of Floor Area Unit-in-Place Cost x Sq. Ft. of Floor Area = Whole Dollar Cost Floor construction Sq. Ft. of Floor Area Unit-in-Place Cost x Sq. Ft. of Floor Area = Whole Dollar Cost Heat and air conditioning Sq. Ft. of Living Area Unit-in-Place Cost x Sq. Ft. of Living Area = Whole Dollar Cost Electric lighting system Sq. Ft. of Living Area Unit-in-Place Cost x Sq. Ft. of Living Area = Whole Dollar Cost As a final note, when determining costs for exterior walls and interior partitions, originally assume no window or door openings to arrive at a total area for each unit. For example, an interior partition (wall) 8 feet high and 10 linear feet long with a door opening would be measured as 80 square feet of interior partition. ©2003 - State of Michigan 179 UNIT-IN-PLACE EXAMPLE CONVERTING UNIT-IN-PLACE COSTS INTO SQUARE FOOT COSTS FOR AN ENTIRE RESIDENCE. Instructions for Steps (A) through (E) are located on the previous page. Assume we have chosen a Class C, one-story residence with the following measurements: STEP A STEP B Dimensions: 40' X 25' Square Feet of Ground: 1000 Square Feet of Living Area: 1000 Square Feet of Window: 125 Square Feet of Basement Wall: 1000 Square Feet of Exterior Wall: 1040 Exterior Walls Wood frame with: Face brick veneer Building paper 1/2" insulation board 2" x 6" studs, 24" o.c. 6" batt insulation 1/2" drywall Interior surface: painted, two coats Two exterior doors (wood raised panel) Aluminum storm and screen door Wood double hung windows Aluminum storms and screens Roof 4/12 pitch 235# asphalt shingles Felt 1/2" plywood 2" x 6" rafters, 16" o.c. 1' overhang and soffit Gutters and downspouts Interior Partitions and Finish 8' walls 1/2" drywall, two sides Painted, two coats, two sides 2" x 4" studs, 16" o.c. Softwood trim Flush hollow core doors Closet shelving Floor Finish 65% carpet with pad 35% vinyl inlay 35% 5/8" underlayment 180 Square Feet of Partition: 896 Square Feet of Basement Floor: 1000 Linear Feet of Footing: 130 Interior Doors: 20 Linear Feet of Interior Trim: 164 Linear Feet of Closet Shelving: 24 STEP Unit-in-Place C Cost $ Unit 8.94 .18 .95 1.35 .74 1.12 .51 370.00 205.00 13.66 5.65 1.27 .18 1.02 1.55 .96 .58 2.23 1.02 1.30 1.63 220.00 1.95 2.49 2.90 1.21 Whole Dollar Cost x 1040 s.f. wall x 1040 s.f. wall x 1040 s.f. wall x 1040 s.f. wall x 1040 s.f. wall x 1040 s.f. wall x 1040 s.f. wall x 2 (cost each) x 1 (cost each) x 125 s.f. wind. x 125 s.f. wind. Subtotals = = = = = = = = = = = $9,297.60 187.20 988.00 1,404.00 769.60 1,164.80 530.40 740.00 205.00 $1,707.50 706.25 = = = = = = $1,270.00 180.00 1,020.00 1,550.00 960.00 580.00 $5,560.00 = = = = = = $1,998.08 913.92 1,164.80 267.32 4,400.00 46.80 $8,790.92 x 1000 s.f. floor x 65% = x 1000 s.f. floor x 35% = x 1000 s.f. floor x 35% = $1,618.50 1,015.00 423.50 $3,057.00 x x x x x x x x x x x x 1000 1000 1000 1000 1000 1000 s.f. s.f. s.f. s.f. s.f. s.f. ground ground ground ground ground ground 896 s.f. partition 896 s.f. partition 896 s.f. partition 164 l.f. trim 20 (cost each) 24 l.f. shelving $15,286.60 $2,413.75 ©2003 - State of Michigan STEP B Ceiling 1/2" drywall Painted, two coats 8" insulation 2" x 6" Joists, 16" o.c. STEP C Excavation 8' Basement Unit-in-Place Cost 1.56 .81 .94 1.07 1.17 Unit x x x x 1000 1000 1000 1000 s.f. s.f. s.f. s.f. ceiling ceiling ceiling ceiling Whole Dollar Cost = $1,560.00 = 810.00 = 940.00 = 1,070.00 Subtotals $4,380.00 x 1000 s.f. ground = $1,170.00 $1,170.00 x x x x = = = = $6,160.00 1,619.80 637.00 925.60 $9,342.40 Basement Walls 8" concrete block 8" x 24" footings Drain tile, one side Waterproofing 6.16 12.46 4.90 .89 Basement Floor 4" gravel base 4" concrete floor Vapor barrier .46 2.44 .16 x 1000 s.f. floor = x 1000 s.f. floor = x 1000 s.f. floor = $ 460.00 2,440.00 160.00 $3,060.00 Floor Construction Felt underlay 1/2" plywood 2" x 10" joists, 16" o.c. Bridging 8" steel I-beam 3" diameter steel posts .30 1.02 1.86 .21 .50 .20 x x x x x x = = = = = = $ 300.00 1,020.00 1,860.00 210.00 500.00 200.00 $4,090.00 3.95 115.00 x 1000 s.f. living = x 22 Ht. of chimney = $3,950.00 2,530.00 $6,480.00 3.84 x 1000 s.f. living = $3,840.00 $3,840.00 = = = = = = = $ 480.00 765.00 1,015.00 290.00 660.00 525.00 650.00 $4,385.00 = = = = Summary $2,000.00 890.00 805.60 555.00 STEP D Total Whole Dollar Cost of Unit-in-Place Components: Square Feet of Ground Area: Whole Dollar Cost/Square Feet of Ground Area: $76,106.27 1,000 $76.11 Heating and Cooling Gas-fired forced-air, with return ducts Block chimney, 16" x 22' Ht. Electric 100-ampere, 110/220-volt, Romex Plumbing White fixtures: One sink, countertop One toilet One bathtub with shower Ceramic tile, tub alcove One two-compartment kitchen sink One two-compartment laundry tub One 40-gallon gas water heater Built-In Units Wood veneer kitchen cabinets 16' base with laminated plastic top 10' wall mounted, 30" high 6' wall mounted, 18" high Open-riser basement stairs STEP E ©2003 - State of Michigan 1000 s.f. wall 130 l.f. footing 130 l.f. footing 1040 s.f. wall 480.00 765.00 1,015.00 290.00 660.00 525.00 650.00 125.00 89.00 76.00 555.00 x x x x x x x x x x x 1000 1000 1000 1000 1000 1000 1 1 1 1 1 1 1 s.f. s.f. s.f. s.f. s.f. s.f. (cost (cost (cost (cost (cost (cost (cost floor floor floor floor floor floor each) each) each) each) each) each) each) 16 l.f. cabinet 10 l.f. cabinet 6 l.f. cabinet 1 (cost each) $ 4,250.60 $76,106.27 181 UNIT-IN-PLACE COSTS D CD C BC B A 5.14 5.66 6.42 7.10 5.61 6.05 6.89 7.66 13.10 17.26 9.05 10.38 9.60 10.77 12.66 5.38 5.90 6.73 7.50 5.94 6.46 7.38 8.23 13.96 18.37 9.61 10.96 10.50 11.70 13.73 5.65 6.16 7.08 7.93 6.32 6.92 7.93 8.87 14.90 19.59 10.23 11.59 11.50 12.74 14.92 6.30 6.79 7.93 8.99 7.22 8.02 9.26 10.41 17.19 22.56 11.73 13.12 13.97 15.30 17.85 6.72 7.20 8.47 9.66 7.79 8.72 10.11 11.40 18.65 24.45 12.69 14.10 15.55 16.93 19.72 7.26 7.74 9.18 10.52 8.53 9.62 11.18 12.64 20.50 26.85 13.91 15.36 17.54 18.99 22.07 4.33 .39 4.76 .49 5.24 .63 6.43 1.03 7.20 1.34 8.16 1.75 1.61 1.15 2.66 1.83 2.33 4.33 1.88 1.24 3.13 1.96 2.47 4.77 2.19 1.34 3.69 2.11 2.63 5.26 3.04 1.59 5.18 2.46 3.01 6.49 3.61 1.75 6.19 2.68 3.25 7.28 4.35 1.95 7.51 2.96 3.56 8.28 1.66 2.05 1.50 1.61 1.39 1.50 1.66 1.44 1.72 1.50 3.44 9.21 8.60 10.26 12.48 14.97 2.00 2.27 1.96 2.39 1.61 1.74 1.48 1.61 1.75 1.51 1.81 1.55 4.11 9.74 9.30 11.06 13.44 16.53 2.15 2.42 2.33 2.78 1.73 1.89 1.59 1.73 1.85 1.59 1.92 1.61 4.92 10.33 10.09 11.94 14.50 18.28 2.32 2.59 3.30 3.83 2.04 2.25 1.86 2.04 2.08 1.78 2.17 1.76 7.13 11.76 12.02 14.11 17.10 22.65 2.73 2.99 3.97 4.53 2.23 2.49 2.02 2.23 2.23 1.90 2.33 1.86 8.68 12.67 13.25 15.48 18.76 25.46 2.99 3.24 4.83 5.44 2.48 2.78 2.24 2.48 2.42 2.06 2.54 1.99 10.69 13.84 14.80 17.22 20.84 29.00 3.32 3.56 7.44 6.55 7.16 8.15 7.18 7.82 8.94 7.88 8.56 10.90 9.63 10.38 12.15 10.75 11.54 13.73 12.16 13.00 21.37 18.04 12.49 9.37 8.74 23.14 19.44 13.67 10.25 9.98 25.11 20.99 14.99 11.24 11.41 29.94 24.78 18.26 13.69 15.11 33.01 27.19 20.35 15.26 17.56 36.89 30.24 22.98 17.24 20.68 EXTERIOR WALLS Costs/Sq. Ft. of Wall Area MASONRY WALLS Block, concrete, 6" 8" 10" 12" Block, reinforced, 6" 8" 10" 12" Brick, common, 8" 12" Brick, 6", SCR modular 8" Concrete, reinforced, 5" – 6" 8" 12" Additives for block and concrete walls Synth. plaster on rigid insul. (EIFS) Stay-in-place forming SIDINGS Aluminum Asphalt Cement fiber (asbestos), embossed Siding or shingles, horizontal Vinyl Synth. plaster on rigid insul. (EIFS) Wood Board and batten Clapboard Hardboard sheet, embossed Siding or shingles, horizontal Masonite, 1/8" tempered Masonite, 1/4" tempered Plywood, 3/8" textured 1/2" plain 5/8" textured 5/8" plain Rustic or log siding, veneer Half rounds with full corners Full logs, 6" – 7" in diameter 8" 10" Hand hewn or oversized logs Shingle, cedar Shake VENEERS Face brick veneer Select common brick veneer Select reused brick veneer Stone veneers Ashlar, granite Split Native stone Permastone Split rock 182 ©2003 - State of Michigan UNIT-IN-PLACE COSTS D CD C BC B A 12.43 29.97 31.36 34.41 3.89 12.93 .77 8.04 8.89 studs 1.66 1.22 .89 1.72 1.22 3.11 2.33 1.50 14.04 32.76 35.18 37.41 4.14 13.64 .83 8.83 9.66 15.90 35.89 39.53 40.75 4.41 14.41 .90 9.72 10.52 20.64 43.59 50.56 48.95 5.08 16.30 1.08 11.92 12.62 23.74 48.52 57.74 54.18 5.51 17.50 1.19 13.33 13.96 27.69 54.73 66.83 60.78 6.05 19.05 1.33 15.10 15.65 1.70 1.28 .93 1.77 1.28 3.20 2.40 1.54 1.75 1.35 .98 1.82 1.35 3.31 2.49 1.60 1.86 1.51 1.10 1.96 1.51 3.57 2.70 1.73 1.94 1.62 1.17 2.05 1.62 3.75 2.84 1.82 2.05 1.75 1.27 2.18 1.75 3.99 3.02 1.93 1.31 1.09 1.53 1.31 1.36 1.13 1.58 1.35 1.41 1.17 1.63 1.39 1.54 1.27 1.76 1.50 1.62 1.34 1.85 1.57 1.73 1.43 1.97 1.67 1.64 1.37 1.97 1.64 .50 1.70 1.41 2.03 1.69 .59 1.76 1.47 2.09 1.74 ----- 1.91 1.59 2.25 1.88 ----- 2.01 1.68 2.36 1.97 ----- 2.15 1.79 2.50 2.09 ----- .41 .48 .67 .44 .50 .70 .47 .53 .74 .54 .59 .84 .58 .63 .90 .64 .69 .98 .55 .77 .43 .60 .52 2.00 2.88 .59 .81 .47 .66 .56 2.16 2.98 .63 .86 .52 .72 .60 2.35 3.08 .72 .98 .64 .89 .71 2.80 3.34 .77 1.06 .71 .99 .77 3.08 3.51 .85 1.16 .81 1.12 .86 3.44 3.75 .16 .90 1.05 1.11 1.16 1.33 .17 .93 1.08 1.13 1.19 1.35 .18 .95 1.12 1.15 1.21 1.38 .22 1.03 1.20 1.22 1.28 1.45 .24 1.08 1.26 1.26 1.32 1.51 .27 1.15 1.34 1.33 1.39 1.58 Costs/Sq. Ft. of Wall Area MISCELLANEOUS Glass panel Local stone, rough cut, solid, 12" Granite Limestone Add for each 6" variation in thickness Rammed earth, soil cement, 24" Add for each 6" variation in thickness Sand. panels, cement fiber or Shotcrete Stucco on baled straw FRAMING (Frame including sills, plates and wood) 2" x 4", 12" o.c. 16" o.c. 24" o.c. 2" x 6", 16" o.c. 24" o.c. 2" x 8", 12" o.c. 16" o.c. 24" o.c. Steel studs Light (to 25 gauge) 4" – 16" o.c. 4" – 24" o.c. 6" – 16" o.c. 6" – 24" o.c. Medium (to 20 gauge) 4" – 16" o.c. 4" – 24" o.c. 6" – 16" o.c. 6" – 24" o.c. Wood pole framing INSULATION Insulation, 2-1/2" 3-1/2" 6" FINISHES Paint on exterior, two coats Three coats On masonry, two coats Three coats Stain on exterior, two coats Stucco, two coats on masonry Three coats on metal lath Sheathing Building paper Insulation board, 1/2" 25/32" Plywood, 3/8" 1/2" 5/8" ©2003 - State of Michigan 183 UNIT-IN-PLACE COSTS D CD C BC B A 1.00 1.03 1.06 1.14 1.19 1.26 1.10 1.23 1.33 1.12 1.26 1.40 1.15 1.30 1.48 1.21 1.38 1.66 1.26 1.44 1.78 1.33 1.53 1.93 6.05 .90 1.05 1.11 .67 7.21 .93 1.08 1.15 .74 8.60 .97 1.12 1.19 .82 12.41 1.07 1.20 1.29 1.03 15.05 1.13 1.25 1.36 1.16 18.51 1.21 1.33 1.45 1.33 .24 .41 .58 2.38 2.88 2.00 .90 2.05 .27 .46 .64 2.51 2.99 2.09 1.02 2.35 .30 .51 .72 2.66 3.10 2.18 1.16 2.71 .38 .65 .91 3.00 3.38 2.42 1.52 3.62 .43 .73 1.04 3.22 3.56 2.58 1.75 4.23 .50 .85 1.20 3.50 3.81 2.78 2.05 5.01 150 215 260 245 175 245 295 280 205 275 335 320 280 360 440 425 335 420 505 495 400 490 590 585 255 265 330 350 455 3,250 950 1,165 540 705 200 290 315 380 405 510 3,790 1,070 1,590 575 780 220 335 370 435 465 570 4,425 1,210 2,170 615 860 245 445 520 575 630 725 6,115 1,560 4,090 715 1,060 305 520 620 670 735 830 7,260 1,790 5,670 775 1,185 345 620 750 790 875 960 8,735 2,075 7,970 850 1,345 400 7.06 7.95 6.38 9.93 7.77 8.42 6.86 10.78 8.57 8.93 7.39 11.72 10.55 10.17 8.70 14.05 11.82 10.96 9.53 15.53 13.42 11.98 10.57 17.40 7.88 8.73 7.15 11.65 1.16 8.73 9.33 7.76 12.92 1.28 9.69 10.00 8.43 14.35 1.43 12.08 11.62 10.07 17.95 1.78 13.62 12.65 11.12 20.27 2.01 15.57 13.96 12.45 23.20 2.30 Costs/Sq. Ft. of Wall Area OSB (oriented strand board), 3/8" 1/2" 5/8" Wood board, 1" x 6" Interior finish of exterior walls Ceramic tile Drywall, one side 3/8" 1/2" 5/8" Furring, wood strips on masonry Painting One coat Two coats Three coats Plaster, two coats on gypsum Three coats on gypsum Two coats on masonry Wall paper Custom EXTERIOR DOORS Cost Each Entrance doors, cost each Aluminum storm and screen Metal, hollow core Insulated Deluxe Wood Flat panel Raised panel Dutch French Carved, stock Custom, carved Hardwood, solid core, flat panel Raised panel Sliding glass door, 6' opening Sliding insul. glass door, 6' opening Wood storm and screen Garage Doors, cost/sq. ft. of garage door area Single Overhead Metal Plastic Wood Redwood or select cedar Sectional Metal Plastic Wood Redwood or select cedar Add for insulation 184 ©2003 - State of Michigan UNIT-IN-PLACE COSTS D CD C BC B A 4.87 5.30 4.16 7.99 5.56 5.90 4.79 8.81 6.36 6.57 5.53 9.74 8.41 8.25 7.46 12.05 9.78 9.34 8.74 13.53 11.51 10.71 10.39 15.41 5.64 6.08 4.94 10.26 1.00 6.41 6.73 5.63 11.34 1.11 7.31 7.46 6.44 12.55 1.23 9.61 9.30 8.52 15.59 1.53 11.13 10.48 9.90 17.54 1.72 13.06 11.98 11.66 20.00 1.97 10.07 10.51 7.01 8.94 10.84 11.55 7.79 9.65 11.69 12.73 8.67 10.43 13.77 15.64 10.89 12.34 15.09 17.51 12.32 13.55 16.76 19.86 14.13 15.09 12.09 12.61 8.41 10.73 13.01 13.87 9.34 11.58 14.03 15.27 10.41 12.52 16.52 18.77 13.07 14.81 18.11 21.01 14.79 16.27 20.11 23.83 16.96 18.11 6.26 11.81 14.42 9.82 9.76 6.96 12.69 15.64 10.56 10.45 7.75 13.66 17.00 11.39 11.20 9.74 16.04 20.33 13.41 13.05 11.02 17.55 22.46 14.69 14.22 12.65 19.45 25.13 16.31 15.71 4.91 5.23 5.27 5.59 5.65 5.99 6.60 6.97 7.20 7.59 7.96 8.38 5.81 6.06 6.17 6.45 6.56 6.87 7.52 7.90 8.13 8.56 8.90 9.39 27.73 26.34 25.02 41.59 39.51 37.53 39.69 37.70 35.82 45.57 40.67 38.64 29.09 27.63 26.25 44.77 42.53 40.40 42.75 40.62 38.59 48.73 43.75 41.56 30.58 29.05 27.60 48.29 45.87 43.58 46.15 43.84 41.65 52.22 47.15 44.79 34.22 32.51 30.88 56.88 54.04 51.34 54.46 51.74 49.15 60.70 55.45 52.68 36.55 34.73 32.99 62.35 59.23 56.27 59.74 56.75 53.91 66.09 60.73 57.70 39.57 37.60 35.72 69.26 65.79 62.50 66.41 63.09 59.94 72.93 67.41 64.04 Garage doors, cost/sq. ft. of a garage door area Double Overhead Metal Plastic Wood Redwood or select cedar Sectional Metal Plastic Wood Redwood or select cedar Add for insulation WINDOWS Costs/Sq. Ft. of Window Area Metal windows Double-hung Casement Slide-by Picture, fixed For double glazed, add 50% Vinyl-sash, windows Double-hung Casement Slide-by Picture, fixed For double glazed, add 50% Wood windows Double-hung, barn sash type Double-hung Casement Slide-by Picture, fixed For double glazed, add 50% Aluminum storms and screens Double-hung or slide-by Casement Wood storms and screens Double-hung or slide-by Casement Bay Windows (cost/sq. ft. of wall area displaced) Wood, single-pane, awning Casement Double-hung Insulated glass, wood, awning Casement Double-hung Metal, awning Casement Double-hung Vinyl, awning Casement Double-hung ©2003 - State of Michigan 185 UNIT-IN-PLACE COSTS D CD C BC B A 4.26 1.40 1.58 2.24 1.28 1.57 4.97 8.76 11.65 12.44 1.07 7.71 8.68 10.81 11.66 3.36 3.63 .58 .23 5.02 1.56 1.73 2.57 1.44 1.77 5.71 10.87 13.36 14.25 1.26 8.70 9.67 12.40 13.36 3.87 4.17 .69 .25 .91 1.07 1.22 1.47 .95 1.10 1.35 2.03 1.47 .98 1.15 1.32 1.60 1.02 1.18 1.46 2.26 1.67 2.18 1.91 1.53 1.15 2.26 1.83 1.38 2.64 2.14 1.60 3.33 2.71 2.02 2.37 2.06 1.65 1.24 2.43 1.97 1.49 2.85 2.31 1.72 3.59 2.92 2.18 99.25 103.75 84.75 194.75 212.50 170.75 111.75 117.25 95.50 223.50 245.25 196.25 ROOF (4" rise in 12" run) Costs/Sq. Ft. of Ground Area Roofing Asbestos shingles 2.11 2.41 2.76 3.66 Asphalt singles, 210# .93 1.01 1.09 1.28 235# 1.12 1.19 1.27 1.46 290# 1.26 1.41 1.57 1.98 Built-up 2-ply and gravel .82 .89 .97 1.16 Built-up 3-ply and gravel .98 1.07 1.17 1.41 Cement tile 2.81 3.13 3.49 4.39 Clay Spanish tile 3.36 4.04 4.87 7.16 Copper, flat or standing seam 6.62 7.36 8.20 10.29 Batten seam 7.11 7.90 8.78 11.01 Roll asphalt roofing .53 .60 .69 .92 Slate 3/16" and 1/4" 4.74 5.19 5.69 6.92 Slate 3/8" 5.69 6.15 6.65 7.89 Terne, flat or standing seam 6.13 6.82 7.59 9.55 Batten seam 6.68 7.41 8.24 10.32 Wood shingle 1.89 2.10 2.35 2.96 Shake 2.05 2.28 2.55 3.20 Add for fire-resistant finish .29 .33 .38 .50 Felt, 15# .15 .16 .18 .21 Sheathing Plywood, 5/16" .71 .74 .77 .85 3/8" .83 .87 .91 1.00 1/2" .93 .98 1.02 1.14 5/8" 1.09 1.15 1.21 1.37 OSB (oriented strand board), 3/8" .77 .79 .82 .90 1/2" .87 .90 .94 1.04 5/8" 1.02 1.07 1.13 1.26 Boards, 1" x 6" solid 1.35 1.46 1.57 1.85 Boards, 1" x 6" spaced .88 .96 1.06 1.31 Rafters 2" x 4", trussed frame 1.62 1.71 1.80 2.03 2" x 4", 12" o.c. 1.48 1.54 1.62 1.79 16" o.c. 1.19 1.24 1.30 1.44 24" o.c. .89 .93 .97 1.08 2" x 6", 12" o.c. 1.75 1.83 1.91 2.12 16" o.c. 1.42 1.48 1.55 1.72 24" o.c. 1.07 1.12 1.17 1.30 2" x 8", 12" o.c. 2.05 2.14 2.24 2.48 16" o.c. 1.66 1.73 1.81 2.01 24" o.c. 1.24 1.29 1.35 1.50 2" x 10", 12" o.c. 2.58 2.69 2.82 3.13 16" o.c. 2.10 2.19 2.29 2.54 24" o.c. 1.57 1.64 1.71 1.90 DORMERS (Per linear foot, measured across face of dormer) Unfinished area dormer are for attics areas, finished areas are for finished upper floors. Unfinished areas, gable roof 54.50 61.50 69.25 88.00 Hip roof 56.75 64.00 72.25 92.00 Shed roof 47.25 53.00 59.50 75.50 Finished areas, gable roof 98.00 112.50 129.00 169.75 Hip roof 103.50 119.50 138.00 184.00 Shed roof 85.00 97.75 112.25 148.50 186 ©2003 - State of Michigan UNIT-IN-PLACE COSTS D CD C BC B A 25.65 27.85 28.15 30.10 28.70 31.45 36.00 26.50 27.05 29.50 29.95 32.65 31.55 34.75 39.25 29.10 28.55 31.25 32.00 35.50 34.75 38.50 43.25 32.00 32.20 35.50 36.75 42.50 42.75 47.75 52.75 39.25 34.50 38.25 40.00 47.00 48.00 53.75 59.00 43.75 37.50 41.75 44.00 52.50 54.50 61.25 66.75 49.50 64.25 45.25 5.30 3.05 8.90 7.10 310 .83 .49 69.50 49.25 5.70 3.35 9.25 7.40 320 .89 .53 75.50 53.75 6.20 3.70 9.65 7.75 335 .96 .58 89.75 64.75 7.30 4.55 10.60 8.50 365 1.12 .69 98.75 71.75 8.05 5.10 11.20 9.00 385 1.22 .77 110.25 80.50 8.95 5.75 12.05 9.70 415 1.35 .86 Costs/Sq. Ft. of Ground Area Skylights (per square foot of framed area) Flat, plain glass or plastic Wire glass Pitched, without vent, plain glass or plastic Wire glass Pitched, with vent, plain glass or plastic Wire glass Plastic domes, fixed, small (under 3 sq. ft.) Large (over 3 sq. ft.) Roof windows or vented domes, Small (under 3 sq. ft.) Large (over 3 sq. ft.) Add for blinds, small (under 3 sq. ft.) Large (over 3 sq. ft.) Add for screens, small (under 3 sq. ft.) Large (over 3 sq. ft.) Electric controls, each Each 1'-0" overhang and soffit Gutters and downspouts Roof Pitch Adjustment All roof costs above include an adjustment for a 4" rise in a 12" run. Use these multipliers to adjust for deviations. Rise in Run 4" in 12" 5" in 12" 6" in 12" 8" in 12" 10" in 12" 12" in 12" 14" in 12" 16" in 12" Multiplier 1.00 1.03 1.07 1.14 1.24 1.35 1.47 1.56 INTERIOR PARTITIONS AND FINISH Costs/Sq. Ft. of Partition Area Ceramic tile Drywall, 5/8", one side Two sides 1/2”, one side Two sides 3/8", one side Two sides Paint, one coat, one side One coat, two sides Two coats, one side Two coats, two sides Three coats, one side Three coats, two sides Plaster, two coats, one side Two sides ©2003 - State of Michigan 6.05 1.11 2.22 1.05 2.11 .90 1.80 .24 .49 .41 .82 .58 1.15 2.05 4.10 7.21 1.15 2.29 1.08 2.17 .93 1.87 .27 .54 .46 .92 .64 1.29 2.19 4.38 8.60 1.19 2.38 1.12 2.23 .97 1.94 .30 .61 .51 1.02 .72 1.44 2.35 4.69 12.41 1.29 2.58 1.20 2.40 1.07 2.13 .38 .76 .65 1.29 .91 1.83 2.72 5.44 15.05 1.36 2.72 1.25 2.51 1.13 2.25 .43 .86 .73 1.47 1.04 2.08 2.96 5.92 18.51 1.45 2.90 1.33 2.66 1.21 2.42 .50 .99 .85 1.69 1.20 2.39 3.26 6.53 187 UNIT-IN-PLACE COSTS D CD C BC B A 2.66 5.32 .67 .89 2.79 5.59 .71 .95 2.94 5.87 .76 1.02 3.29 6.58 .89 1.19 3.51 7.03 .97 1.29 3.81 7.61 1.08 1.43 1.18 .84 1.26 1.05 .90 1.24 .88 1.30 1.08 1.02 1.30 .93 1.35 1.12 1.16 1.45 1.04 1.47 1.22 1.52 1.54 1.11 1.55 1.28 1.75 1.66 1.21 1.65 1.37 2.05 195 255 1.59 1.71 2.33 2.32 2.86 1.75 1.27 205 270 1.76 1.87 2.46 2.54 3.13 2.19 1.44 220 295 1.95 2.05 2.59 2.78 3.43 2.76 1.63 250 345 2.43 2.46 2.89 3.34 4.11 4.41 2.11 275 380 2.74 2.69 3.05 3.65 4.50 5.63 2.43 300 420 3.12 2.95 3.22 4.00 4.93 7.29 2.83 1.43 1.43 6.07 6.38 15.53 .21 5.48 5.42 2.32 16.09 7.30 2.48 1.25 9.99 4.31 6.66 .93 1.09 1.21 1.88 2.21 1.57 1.89 7.86 7.40 17.43 .23 6.22 6.25 2.59 19.26 8.54 2.99 1.36 11.02 4.80 7.59 .98 1.15 1.40 2.33 2.82 1.72 2.49 10.20 8.60 19.61 .25 7.07 7.23 2.90 23.11 10.01 3.61 1.49 12.19 5.36 8.68 1.02 1.21 1.62 2.90 3.60 2.10 4.39 17.40 11.76 25.11 .31 9.26 9.78 3.67 33.70 13.92 5.32 1.77 15.11 6.76 11.49 1.14 1.37 2.18 4.52 5.97 2.34 5.89 22.94 13.89 28.70 .34 10.70 11.49 4.17 41.09 16.58 6.53 1.93 16.98 7.66 13.35 1.22 1.47 2.56 5.70 7.76 2.65 8.00 30.66 16.62 33.24 .38 12.54 13.68 4.81 50.77 20.01 8.12 2.11 19.34 8.80 15.71 1.32 1.60 3.04 7.29 10.22 Costs/Sq. Ft. of Partition Area Plaster, three coats, one side Two sides Stained wood finish, two coats, one side Three coats, one side Stud framing 2" x 4" wood, 16" o.c. 24" o.c. 4" steel, 16" o.c. 24" o.c. Wall paper Interior doors, cost each Flush doors Panel doors Closet shelving, cost per linear foot Paneling, lauan Birch Oak Walnut Trim, hardwood, cost per linear foot Softwood FLOOR FINISH Costs/Sq. Ft. of Floor Area Asphalt tile Carpet Custom Ceramic tile Custom Felt underlay Hardwood, 1/2" 25/32" Linoleum Marble Parquet block Rubber tile Standing and seal for wood floor Slate Softwood Terrazzo Underlayment, 1/2" plywood 5/8" plywood Vinyl composition tile Vinyl inlay Vinyl tile 188 ©2003 - State of Michigan UNIT-IN-PLACE COSTS D CD C BC B A 1.29 .99 .70 1.50 1.17 .89 1.89 1.47 1.03 2.20 1.73 1.21 1.83 2.49 1.38 1.27 1.33 1.33 1.03 .73 1.55 1.21 .92 1.96 1.53 1.07 2.29 1.79 1.26 2.03 2.73 1.59 1.37 1.44 1.38 1.07 .76 1.61 1.26 .96 2.04 1.59 1.11 2.38 1.86 1.31 2.26 3.00 1.83 1.47 1.56 1.51 1.17 .82 1.76 1.38 1.05 2.23 1.74 1.21 2.61 2.04 1.43 2.83 3.67 2.47 1.74 1.86 1.59 1.23 .87 1.86 1.46 1.11 2.35 1.84 1.28 2.76 2.15 1.51 3.21 4.10 2.89 1.90 2.05 1.70 1.32 .92 1.99 1.56 1.19 2.52 1.97 1.37 2.96 2.30 1.62 3.68 4.64 3.44 2.11 2.29 .94 .61 2.77 5.53 .34 .62 1.88 .47 .67 .85 1.02 1.20 1.07 .69 3.12 6.93 .41 .71 2.13 .49 .71 .89 1.08 1.26 1.22 .77 3.54 8.70 .49 .81 2.41 .52 .74 .94 1.13 1.33 1.62 1.00 4.59 13.89 .72 1.09 3.14 .58 .84 1.06 1.28 1.50 1.88 1.14 5.27 17.71 .88 1.27 3.61 .62 .90 1.14 1.37 1.61 2.22 1.33 6.15 22.90 1.08 1.50 4.22 .67 .98 1.24 1.49 1.75 1.27 1.14 1.02 .93 .89 .51 .25 .32 1.10 .66 1.36 1.22 1.09 .99 .95 .54 .27 .34 1.15 .69 1.46 1.31 1.17 1.06 1.02 .58 .29 .36 1.20 .72 1.70 1.53 1.36 1.24 1.19 .68 .34 .42 1.33 .80 1.85 1.67 1.48 1.35 1.30 .74 .37 .46 1.41 .85 2.04 1.84 1.64 1.49 1.43 .82 .41 .51 1.52 .91 CEILING Costs/Sq. Ft. of Ceiling Area Joists, 2" x 6", 12" o.c. 16" o.c. 24" o.c. 2" x 8", 12" o.c. 16" o.c. 24" o.c. 2" x 10", 12" o.c. 16" o.c. 24" o.c. 2" x 12", 12" o.c. 16" o.c. 24" o.c. Plaster, two coats Three coats Acoustic tile Drywall, 3/8" 1/2" Furring Metal Wood Hardwood Coffered/vaulted panel with molding Paint, one coat flat Two coats flat Wood, boards or T&G, softwood Insulation, 4" 6" 8" 10" 12" EXCAVATION Costs/Sq. Ft. of Ground Area Basement, excavation, 10'-0" deep 9'-0" 8'-0" 7'-4" 7'-0" Crawl space excavation, 4'-0" deep 2'-0" Pier pits Trench excavation, 4' -0" deep 2'-0" ©2003 - State of Michigan 189 UNIT-IN-PLACE COSTS D CD C BC B A BASEMENT WALLS/FOUNDATIONS AND FOOTINGS Costs/Sq. Ft. of Wall Area Basement walls Block, concrete, 8" thick 10" 12" Add for stay-in-place forming Poured concrete, 6" thick 8" 10" 12" Treated wood, 2" x 4" studs 2" x 6" Footings, cost per linear foot 8" x 16" 8" x 18" 8" x 20" 8" x 24" 10" x 20" 10" x 24" 12" x 24" Drain tile, cost per linear foot, one side two sides Perimeter insulation, cost/sq. ft. Piers, block, cost per linear foot Sill plate, cost per linear foot Waterproofing, cost per sq. ft. of wall 5.94 6.61 7.21 .39 8.60 9.43 9.99 10.54 3.76 4.31 6.04 6.79 7.46 .48 8.80 9.64 10.23 10.83 3.95 4.49 6.16 6.99 7.74 .61 9.02 9.86 10.51 11.16 4.16 4.68 6.49 7.50 8.43 .96 9.61 10.47 11.23 11.98 4.67 5.14 6.73 7.85 8.88 1.22 10.02 10.89 11.71 12.54 5.00 5.45 7.07 8.32 9.49 1.57 10.58 11.48 12.39 13.30 5.42 5.85 9.96 10.48 10.84 11.54 12.07 13.30 14.92 4.55 7.96 .72 9.55 1.60 .50 10.40 10.94 11.29 11.98 12.53 13.78 15.44 4.72 8.42 .86 10.05 1.82 .66 10.87 11.44 11.78 12.46 13.04 14.30 16.00 4.90 8.93 1.02 10.59 2.06 .89 12.04 12.67 13.00 13.66 14.31 15.61 17.41 5.35 10.17 1.47 11.92 2.68 1.59 12.80 13.47 13.79 14.44 15.13 16.47 18.34 5.65 10.96 1.77 12.77 3.10 2.16 13.78 14.51 14.83 15.47 16.22 17.62 19.58 6.04 11.97 2.18 13.86 3.62 2.96 1.59 1.89 1.98 2.33 2.68 3.00 .43 .61 8.64 .14 .28 1.62 1.94 2.04 2.38 2.74 3.07 .44 .63 9.45 .15 .31 1.66 1.99 2.11 2.44 2.81 3.16 .46 .66 10.37 .16 .35 1.76 2.13 2.27 2.59 3.00 3.39 .49 .72 12.63 .18 .45 1.83 2.23 2.38 2.69 3.13 3.54 .51 .76 14.07 .20 .52 1.93 2.36 2.53 2.84 3.31 3.75 .54 .81 15.89 .22 .60 1.16 .83 .94 1.16 .26 1.23 .86 .98 1.21 .28 1.30 .89 1.02 1.27 .30 1.48 .97 1.13 1.42 .35 1.60 1.02 1.20 1.51 .39 1.75 1.08 1.29 1.63 .44 BASEMENT FLOOR Costs/Sq. Ft. of Floor Area Concrete floor, 2" thick, raked finish 3" 3" thick, trowel finish 4" 5" 6" Gravel base, 4" 6" Terrazzo on 3" concrete Vapor barrier Wire mesh reinforcing FLOOR CONSTRUCTION Costs/Sq. Ft. of Floor Area Subfloor Common board, 1" x 6" Plywood, 3/8" 1/2" 3/4" Felt underlay 190 ©2003 - State of Michigan UNIT-IN-PLACE COSTS D CD C BC B A 1.34 1.22 .81 1.52 1.39 .92 1.83 1.66 1.11 2.13 1.94 1.29 .20 .43 .47 .58 .30 .18 .21 .14 2.45 2.81 3.15 .43 .61 .49 .36 .14 1.39 1.27 .84 1.59 1.45 .96 1.93 1.76 1.17 2.27 2.07 1.38 .21 .44 .48 .60 .31 .19 .22 .15 2.50 2.88 3.23 .44 .63 .58 .44 .15 1.45 1.32 .88 1.67 1.52 1.01 2.05 1.86 1.24 2.42 2.20 1.47 .21 .45 .50 .62 .31 .20 .22 .15 2.56 2.95 3.32 .46 .66 .69 .54 .16 1.59 1.44 .96 1.85 1.68 1.12 2.32 2.11 1.41 2.79 2.54 1.69 .23 .48 .53 .66 .33 .21 .24 .17 2.72 3.15 3.56 .49 .72 1.00 .82 .18 1.68 1.52 1.01 1.97 1.79 1.19 2.50 2.27 1.51 3.03 2.75 1.83 .25 .51 .56 .69 .34 .23 .25 .18 2.83 3.29 3.72 .51 .76 1.22 1.02 .20 1.79 1.63 1.09 2.13 1.93 1.29 2.72 2.48 1.65 3.32 3.02 2.01 .27 .54 .59 .73 .36 .24 .27 .19 2.98 3.48 3.93 .54 .81 1.50 1.29 .22 3.95 3.17 5.06 3.68 3.85 1.32 5.04 .73 2.10 5.03 4.08 6.50 4.61 4.82 1.61 6.61 .90 2.60 5.73 4.67 7.43 5.21 5.45 1.79 7.65 1.00 2.93 6.61 5.42 8.62 5.97 6.24 2.02 8.98 1.14 3.33 5.87 6.27 1,575 5,000 4.98 6.88 6.90 2,150 7,100 6.07 7.48 7.29 2,525 8,500 6.84 8.24 7.85 3,000 10,250 7.91 105.50 79.00 113.50 110.00 89.00 121.00 113.50 95.00 126.00 118.00 103.50 133.00 Costs/Sq. Ft. of Wall Area Wood joists, 2" x 6", 12" o.c. 16" o.c. 24" o.c. 2" x 8", 12" o.c. 16" o.c. 24" o.c. 2" x 10", 12" o.c. 16" o.c. 24" o.c. 2" x 12", 12" o.c. 16" o.c. 24" o.c. Bridging Steel I-beam, 6" 8" 10" Wood beams Steel posts, 3" diameter 4" diameter Wood posts Slab on grade, concrete, 4" thick 5" 6" Gravel base, 4" 6" Sleepers, 1" x 2" Insulation additive for crawl space Vapor barrier, polyethylene HEATING AND AIR CONDITIONING Costs/Sq. Ft. of Living Area Heating systems Forced warm air, with return ducts 3.15 3.52 Without return ducts 2.50 2.81 Forced hot water/steam 4.00 4.49 Electric wall heaters, baseboard type 2.98 3.31 Electric ceiling, radiant 3.11 3.46 Electric wall heaters 1.11 1.21 Radiant (in-floor) heating 3.89 4.42 Space heaters .61 .67 Wall or floor furnace, no ducts 1.71 1.89 Heating and cooling combined systems Forced air, same ducts 5.08 5.39 Heat pump 5.78 5.96 Wood burner integrated with furnace, add 1,200 1,375 Exterior furnace 3,600 4,250 Cooling only with separate ducts 4.20 4.56 Solar for space and hot water system (costs per sq. ft. of collector area) Fluid system, vacuum tube collectors 103.00 104.00 Other collectors 71.00 74.50 Air system 108.50 111.00 ©2003 - State of Michigan 191 UNIT-IN-PLACE COSTS D CD C BC B A 12.15 8.00 9.55 11.94 625 875 1,550 2,700 725 12.89 8.56 11.03 14.08 675 925 1,625 2,825 775 13.85 9.28 12.92 16.84 700 975 1,725 3,000 825 Costs/Sq. Ft. of Wall Area Storage wall, concrete, cost/sq. ft. area 10.12 10.54 11.01 Block 6.45 6.78 7.13 Floor, pavers 5.65 6.41 7.29 Quarry tile 6.50 7.53 8.75 Tanks, storage, LP gas, 125 gallons 550 575 600 250 gallons 750 775 800 500 gallons 1,325 1,375 1,425 1,000 gallons 2,375 2,425 2,500 Fuel oil, 275 gallons 625 650 675 Costs are for gas-fired systems. For oil-fired, add 7% plus storage tank. Note: The assessor should analyze whether the added cost of oil heat contributes to the value. ELECTRIC LIGHTING SYSTEMS Costs/Sq. Ft. of Living Area 60-amp. system, Romex BX Conduit 100-amp. system BX Conduit 150-amp. system BX Conduit 200-amp. system BX Conduit Garage lighting, $140 to $550 per garage. 2.67 3.14 4.16 3.22 3.79 4.47 3.55 4.18 4.93 3.88 4.58 5.40 2.91 3.43 4.46 3.51 4.14 4.88 3.87 4.57 5.39 4.24 5.00 5.90 3.19 3.76 4.78 3.84 4.53 5.34 4.24 5.00 5.90 4.64 5.47 6.45 3.86 4.56 5.58 4.66 5.50 6.48 5.14 6.06 7.15 5.62 6.63 7.82 4.30 5.07 6.08 5.18 6.11 7.20 5.72 6.74 7.95 6.25 7.37 8.70 4.84 5.71 6.72 5.84 6.89 8.12 6.44 7.60 8.96 7.05 8.31 9.80 525 630 495 650 755 720 325 370 390 475 830 580 540 635 1,500 1,600 220 665 1,880 6,290 665 780 615 815 925 875 395 445 465 550 940 670 645 745 1,575 1,725 255 760 2,120 6,880 845 965 770 1,015 1,140 1,075 480 530 555 640 1,065 775 765 880 1,675 1,875 290 875 2,405 7,535 1,375 1,500 1,225 1,610 1,735 1,625 710 760 795 870 1,390 1,050 1,105 1,230 1,850 2,200 390 1,175 3,120 9,160 1,775 1,900 1,550 2,045 2,165 2,000 875 925 960 1,025 1,605 1,225 1,335 1,470 1,975 2,400 455 1,370 3,590 10,195 2,325 2,425 2,000 2,630 2,740 2,525 1,095 1,135 1,180 1,220 1,880 1,475 1,650 1,775 2,075 2,600 540 1,625 4,185 11,505 PLUMBING Cost Each Bathtub, no shower, white Colored Fiberglass With shower, white Colored Fiberglass Sink, countertop, white Colored Wall hung, white Colored Shower stall, ceramic tile Fiberglass Toilet, white Colored Electric, incinerator type Composting Ceramic tile, tub alcove Wainscoting, per room Marble, tub alcove Wainscoting, per room 192 ©2003 - State of Michigan UNIT-IN-PLACE COSTS D CD C BC B A 405 445 465 490 515 445 315 395 535 565 615 480 505 600 900 3,325 265 280 350 445 485 510 570 600 535 360 455 570 605 660 515 545 650 955 3,675 305 310 390 490 530 555 660 695 640 410 525 610 650 715 550 585 700 1,015 4,075 355 340 430 605 645 680 900 950 925 545 715 705 765 850 635 690 835 1,175 5,100 485 420 545 675 720 755 1,060 1,125 1,150 635 840 765 835 935 690 755 915 1,250 5,750 570 470 620 770 810 855 1,275 1,350 1,400 750 1,000 845 925 1,040 760 835 1,020 1,375 6,600 680 535 710 1,825 1,575 2,425 3,575 4,400 2,050 1,575 2,550 3,775 4,675 2,325 1,575 2,700 3,975 4,975 2,975 1,600 3,050 4,475 5,700 3,425 1,625 3,250 4,800 6,150 3,975 1,675 3,550 5,225 6,750 2,720 3,425 4,500 2,895 3,675 4,750 3,085 3,950 5,000 3,550 4,600 5,650 3,850 5,025 6,050 4,225 5,575 6,575 3,000 3,775 4,950 3,875 3,200 4,075 5,275 4,450 3,450 4,400 5,575 5,125 4,025 5,200 6,400 6,925 4,400 5,725 6,900 8,100 4,850 6,400 7,550 9,625 70 130 87 77 21.85 6.05 85 145 104 93 23.30 6.75 104 165 125 112 24.90 7.45 160 215 180 165 28.80 9.30 195 250 220 205 31.25 10.50 250 295 275 255 34.40 12.00 Costs Each Kitchen sink, one compartment, white Colored Steel Two compartments, white Colored Steel Laundry tub, one compartment Two compartments Water heater, gas, 30-gallon 40-gallon 50-gallon Electric, 30-gallon 40-gallon 52-gallon 80-gallon Solar with 100-gallon tank Floor drain Rough-in Sump pump WATER AND WASTE DISPOSAL Cost Each Municipal connections, including trench, pipe, tap and fees (40-foot setback) Well system, 50 feet deep 100 feet 150 feet 200 feet Septic system, 1000-sq. ft. bed 1000-gallon tank 1500-gallon tank 2000-gallon tank Septic system, mound type, 1000-sq. ft. bed 1000-gallon tank 1500-gallon tank 2000-gallon tank Grinder pump system, add BUILT-IN UNITS Costs as Shown Kitchen cabinet, cost per linear foot Base, with laminated plastic top Softwood Hardwood Hardwood veneer Laminated plastic veneer Ceramic tile top, add Linoleum top, deduct ©2003 - State of Michigan 193 UNIT-IN-PLACE COSTS D CD C BC B A Cost as Shown Wall mounted, 18" Softwood Hardwood Hardwood veneer Laminated plastic veneer Wall mounted, 30" Softwood Hardwood Hardwood veneer Laminated plastic veneer China cabinet, 80" high, corner type Medicine cabinet, cost each Vanity cabinet, cost each Fireplace, cost each Inside chimney, one-story Two-story Add for second fireplace, same stack Two-sided fireplace Outside chimney, one-story Two-story Add for second fireplace, same stack Prefabricated fireplace Pellet or corn cob stoves Heat-circulating device Direct vented (no chimney) gas fireplace Chimney, inside, furnace, cost per lin. ft. Common brick with liner, 16" x 16" 16" x 20" Concrete block with liner, 16" x 16" 16" x 20" Metal, single-wall Double-wall Triple-wall Custom fireplace, cost each Inside chimney, one-story Two-story Add for second fireplace, same stack Two-sided fireplace Outside chimney, one-story Two-story Add for second fireplace, same stack Direct vented (no chimney) gas fireplaces Stairs, second floor, with balustrade Partial balustrade Custom stairs, curved or floating Attic Attic, disappearing, manual Motorized Basement, open riser Closed riser Range, drop-in, each With standard oven With self-cleaning oven Custom Cooktop, countertop, four burners With self-venting grille (Jenn Air) 194 42 84 63 52 48 92 69 58 54 101 76 65 72 125 91 82 84 140 101 94 99 155 114 108 50 99 74 58 530 140 165 57 110 81 65 580 170 210 65 120 89 73 635 210 270 86 145 108 93 770 325 455 100 160 120 107 855 410 590 117 180 135 125 960 525 780 2,600 3,075 2,200 3,775 3,050 3,700 2,200 1,330 1,750 490 725 2,900 3,425 2,425 4,200 3,450 4,150 2,425 1,710 1,950 530 925 3,250 3,825 2,650 4,675 3,875 4,650 2,650 2,200 2,175 575 1,200 4,100 4,800 3,200 5,800 4,925 5,875 3,200 3,630 2,700 675 2,000 4,575 5,350 3,500 6,450 5,525 6,600 3,500 4,660 3,000 730 2,575 5,150 5,975 3,850 7,200 6,225 7,400 3,850 5,990 3,350 790 3,325 99.00 111.50 80.50 93.00 21.95 25.40 34.25 112.00 125.50 90.00 103.50 24.25 28.25 37.90 126.00 142.00 100.50 115.00 26.90 31.45 42.05 163.00 183.00 127.50 145.00 33.50 39.55 52.35 187.00 210.00 145.00 164.00 37.75 44.75 59.05 217.50 244.00 167.00 188.00 43.10 51.35 67.45 6,675 7,800 3,325 8,675 7,550 9,025 3,325 2,800 940 6,950 8,125 3,475 9,025 8,000 9,550 3,475 3,150 1,125 7,250 8,450 3,625 9,400 8,475 10,100 3,625 3,550 1,355 7,850 9,200 3,925 10,225 9,525 11,300 3,925 4,575 1,985 8,175 9,575 4,100 10,650 10,100 11,975 4,100 5,175 2,425 8,525 9,975 4,275 11,075 10,725 12,675 4,275 5,850 3,005 795 10,750 775 360 7,175 965 13,950 835 450 7,475 1,175 18,100 905 570 7,825 1,755 31,000 1,075 920 8,675 2,165 41,000 1,185 1,180 9,200 2,705 54,750 1,325 1,535 9,925 430 725 490 835 555 965 720 1,275 815 1,470 930 1,695 595 770 5,300 290 480 690 915 5,750 365 590 800 1,090 6,225 455 725 1,070 1,535 7,325 705 1,090 1,245 1,820 7,950 880 1,340 1,440 2,160 8,600 1,095 1,640 ©2003 - State of Michigan UNIT-IN-PLACE COSTS D CD C BC B A 605 725 865 1,235 1,475 1,760 1,120 1,325 1,570 2,200 2,600 3,080 335 400 480 690 825 990 Microwave combination 1,345 1,510 1,695 2,140 2,400 2,695 Custom double-wall 2,400 2,725 3,125 4,075 4,675 5,325 450 595 785 1,370 1,810 2,385 Deluxe 2,400 2,850 3,375 4,775 5,675 6,725 Icemaker 495 590 705 1,005 1,200 1,430 Cost as Shown Oven, built-in Double Microwave Refrigerator/freezer, built-in Dishwasher, built-in 475 535 610 790 895 1,015 1,070 1,235 1,420 1,885 2,175 2,500 165 190 215 285 325 375 375 405 440 520 565 610 100 115 135 190 220 260 150 170 190 240 275 310 135 165 195 280 335 400 240 285 335 465 545 645 1,950 2,505 3,215 5,295 6,790 8,715 3,815 4,120 4,455 5,280 5,805 6,470 345 395 450 585 670 765 75 85 90 110 120 130 Jacuzzi tub 2,995 3,560 4,240 6,085 7,360 9,025 Sauna with heater and controls Deluxe Garbage disposal Deluxe, heavy duty Heater, bathroom, without fan With fan Hood, range, unvented Vented Custom, stainless steel or copper Hot tub, with whirlpool, built-in Intercom system, master station Satellite 3,850 4,585 5,460 7,750 9,235 11,000 Skylight, costs per square foot 45 50 55 70 75 90 Smoke detector, each 70 80 90 120 135 155 480 515 555 650 700 755 1,345 1,420 1,495 1,660 1,750 1,840 100 115 135 180 210 245 Kitchen 110 125 145 190 215 245 Attic 440 470 505 575 615 660 Whole house 910 940 970 1,040 1,075 1,110 1,100 1,125 1,150 1,205 1,235 1,265 50,000-grain 1,225 1,255 1,285 1,350 1,380 1,415 75,000-grain 1,270 1,310 1,345 1,425 1,465 1,505 100,000-grain 1,320 1,360 1,405 1,495 1,545 1,595 700 725 750 800 850 900 50,000-grain 850 875 875 950 975 1,050 75,000-grain 900 950 975 1,075 1,125 1,200 125,000-grain 1,050 1,100 1,125 1,225 1,300 1,375 450 475 525 625 700 775 875 1,050 1,275 1,875 2,300 2,850 950 1,125 1,350 2,000 2,425 3,000 1,000 1,200 1,425 2,075 2,525 3,125 Trash compactor Vacuum, central system Vent fan, bathroom Water softener, automatic, 25,000-grain Manual, 25,000-grain Wet bar Deluxe Wood-burning stove, freestanding Fireplace insert ©2003 - State of Michigan 195 UNIT-IN-PLACE COSTS D CD C BC B A 2,320 2,595 690 1,935 2,735 2,900 905 2,290 3,235 3,250 1,185 2,720 4,575 4,125 2,060 3,880 5,490 4,695 2,745 4,680 6,685 5,415 3,705 5,720 70 70 310 10 95 70 10 75 75 40 45 80 90 355 15 110 90 15 85 85 40 50 90 115 410 20 125 115 15 100 100 45 60 120 185 555 40 170 185 25 125 125 60 80 135 235 650 55 200 235 30 145 145 70 95 155 305 770 75 235 305 35 170 170 80 115 85 85 85 85 70 665 105 105 105 100 90 880 130 130 130 125 110 1,165 205 205 205 195 175 2,085 260 260 260 240 225 2,810 335 335 335 305 290 3,845 70 10 70 70 70 80 10 80 80 80 90 10 90 90 90 120 15 120 120 120 135 15 135 135 135 155 15 155 155 155 215 145 105 40 15 240 175 135 40 20 270 210 170 45 30 350 305 275 50 70 400 375 355 55 100 465 465 465 60 150 Cost as Shown SECURITY ALARM SYSTEMS Audio/video entry systems Home automation systems Residential security systems, wireless Hard-wired Sensors Point-area detectors (per opening) Alarm glass (wired) Screen (burglarproof, wired) Photoelectric, beam interrupt Field of view changes Stress detectors, floor Pressure mat Trip or pull switches (wire trap) Switch sensors, magnetic, (each) Mercury Self-contained (battery) Vibration detectors Volume detectors Motion detectors, infrared Microwave Ultrasonic Self-contained (battery) Sound detectors, sensing units Remote monitoring Annunciators Alarms, local, residential Bells Buzzers Horns Sirens Lights Control units (transmission/display) Control panel Remote annunciator Add for: electrical switch locks Remote transmitters, each Stand-by power, battery 196 ©2003 - State of Michigan LAND IMPROVEMENTS D CD C BC B A 1.42 1.81 2.98 3.12 3.39 3.67 1.20 1.51 1.86 3.20 3.35 3.78 4.07 1.22 1.61 1.92 3.44 3.61 4.21 4.54 1.24 1.86 2.08 4.04 4.23 5.31 5.70 1.29 2.01 2.18 4.41 4.63 6.02 6.45 1.33 2.21 2.32 4.89 5.13 6.91 7.39 1.39 7.93 6.84 9.03 8.62 7.45 9.95 9.39 8.13 10.98 11.28 9.80 13.55 12.49 10.87 15.20 14.01 12.22 17.29 21.50 14.15 8.95 8.30 7.05 6.30 16.80 11.05 8.10 6.55 5.60 4.95 32.25 21.15 15.35 12.45 10.60 9.40 36.00 23.61 17.14 13.90 11.83 10.49 21.84 14.37 10.53 8.52 7.28 6.44 24.20 15.90 10.05 9.35 7.95 7.10 19.00 12.55 9.10 7.45 6.35 5.65 36.45 23.90 17.30 14.05 11.95 10.65 41.30 27.08 19.60 15.92 13.54 12.07 24.70 16.32 11.83 9.69 8.26 7.35 25.15 16.50 10.50 9.70 8.30 7.35 19.75 13.00 9.50 7.70 6.55 5.85 37.80 24.75 17.95 14.55 12.40 11.05 43.15 28.25 20.49 16.61 14.15 12.61 25.68 16.90 12.35 10.01 8.52 7.61 27.15 17.80 11.30 10.45 8.90 7.95 21.30 14.00 10.20 8.30 7.05 6.30 40.70 26.75 19.35 15.65 13.35 11.90 46.81 30.76 22.25 18.00 15.35 13.69 27.69 18.20 13.26 10.79 9.17 8.19 DRIVEWAYS AND WALKS Costs/Sq. Ft. Asphalt paving Sealer, two coats Concrete, plain, 3-1/2" thick 4" Reinforced, 4" 5" Crushed rock TERRACE OR PATIO Costs/Sq. Ft. Brick Concrete patio blocks Flagstone WOOD DECKS Costs/Sq. Ft. (includes decking, railings, girder, joists, posts and footings) Pressure-treated wood, 12 sq. ft. 25 sq. ft. 50 sq. ft. 100 sq. ft. 200 sq. ft. 500 sq. ft. Regular (pine or similar), 12 sq. ft. 25 sq. ft. 50 sq. ft. 100 sq. ft. 200 sq. ft. 500 sq. ft. Redwood or cedar, 12 sq. ft. 25 sq. ft. 50 sq. ft. 100 sq. ft. 200 sq. ft. 500 sq. ft. Vinyl, 12 sq. ft. 25 sq. ft. 50 sq. ft. 100 sq. ft. 200 sq. ft. 500 sq. ft. Wood polymer composite, 12 sq. ft. 25 sq. ft. 50 sq. ft. 100 sq. ft. 200 sq. ft. 500 sq. ft. ©2003 - State of Michigan 19.75 12.95 8.20 7.60 6.50 5.75 15.45 10.20 7.45 6.05 5.15 4.55 29.60 19.40 14.05 11.35 9.75 8.60 32.56 21.34 15.46 12.49 10.73 9.46 20.09 13.26 9.69 7.87 6.70 5.92 20.60 13.55 8.60 7.95 6.75 6.00 16.15 10.65 7.80 6.30 5.35 4.75 30.90 20.30 14.75 11.90 10.15 9.00 34.24 22.50 16.35 13.19 11.25 9.97 21.00 13.85 10.14 8.19 6.96 6.18 197 LAND IMPROVEMENTS D CD C BC B A RETAINING WALLS Costs/Sq. Ft. of Wall Area (includes footings) Block, reinforced, 6" 8" Block w/ pilaster, reinforced, 8" Brick, 8" thick 12" thick Precast, 8" nonretaining Retaining 8.05 8.93 7.15 14.97 19.19 5.82 9.54 8.43 9.40 7.38 15.57 20.06 5.96 9.70 8.85 9.91 7.64 16.22 21.02 6.11 9.88 9.86 11.15 8.29 17.84 23.37 6.50 10.39 10.52 11.95 8.72 18.89 24.89 6.77 10.76 11.36 12.97 9.30 20.27 26.86 7.14 11.29 .12 .17 1.74 .21 .39 .14 .21 1.86 .23 .47 .16 .26 1.98 .27 .56 .21 .38 2.29 .34 .82 .24 .47 2.48 .40 .99 .28 .59 2.73 .46 1.22 1.25 .44 1.74 10.10 24.80 76.80 1.37 .53 1.94 11.25 28.00 85.80 1.49 .63 2.17 12.55 31.70 96.05 1.81 .93 2.73 15.90 41.15 121.80 2.00 1.15 3.10 18.05 47.35 138.55 2.26 1.42 3.56 20.80 55.20 159.70 65 300 790 80 355 935 105 415 1,110 165 590 1,590 215 710 1,915 280 860 2,345 16.36 15.27 22.36 18.27 16.96 24.40 20.43 18.86 26.68 25.88 23.63 32.30 29.41 26.72 35.98 33.88 30.61 40.41 17.45 16.09 3.27 10.91 6.00 7.64 9.55 10.09 3.27 .76 19.41 17.82 3.54 12.04 6.73 8.16 10.09 10.78 3.71 .84 21.63 19.78 3.84 13.31 7.56 8.74 10.69 11.54 4.21 .93 27.21 24.67 4.58 16.49 9.67 10.15 12.15 13.38 5.50 1.16 30.81 27.82 5.05 18.53 11.04 11.05 13.07 14.56 6.35 1.30 35.36 31.80 5.65 21.10 12.78 12.18 14.26 16.05 7.43 1.49 LANDSCAPING Costs as Shown Soil preparation, per sq. ft. Fine grading Mulching Top dressing or bedding Lawns, per sq. ft., seeding Sodded Ground cover, per sq. ft. Gravel/wood chip Spreading plants Edging redwood, per lin. ft. Shrubs and hedges, each, small Medium Large Trees, each Small, 15-gallon, 20" box Medium, 24" to 36" box Large, 42" box and larger FENCES Cost/Lin. Ft. Vinyl fencing Spaced slat panels 6' 4' – 5' Basketweave, 5' Solid board panels 6' 4' – 5' Add for lattice top Picket, 36" – 48" high Lattice, framed 24" – 50" high Two rails, 36" – 48" high Three rails, 60" high Four rails, 60" high Lattice, arbor, per sq. ft. Trellis (no frame) 198 ©2003 - State of Michigan LAND IMPROVEMENTS D CD C BC B A 14.18 12.93 13.91 13.15 16.69 16.15 7.64 10.15 7.04 7.75 9.49 7.58 .27 15.24 13.85 15.06 14.11 17.79 17.13 8.31 10.85 7.50 8.27 10.17 8.16 .30 16.41 14.87 16.34 15.17 18.99 18.20 9.06 11.64 8.01 8.85 10.92 8.80 .32 19.26 17.35 19.49 17.77 21.92 20.82 10.90 13.54 9.26 10.27 12.75 10.36 .38 21.07 18.92 21.49 19.42 23.78 22.48 12.07 14.75 10.05 11.16 13.92 11.35 .42 23.36 20.92 24.01 21.51 26.15 24.60 13.55 16.28 11.05 12.30 15.39 12.60 .48 1.84 1.57 1.57 1.95 180 235 385 480 1.87 1.60 1.59 2.00 190 265 425 540 1.90 1.62 1.60 2.05 205 300 475 600 1.98 1.70 1.66 2.19 245 385 595 760 2.04 1.76 1.70 2.29 265 445 670 860 2.14 1.84 1.77 2.42 295 520 770 990 4.88 7.59 5.89 8.80 7.13 10.23 10.59 13.99 13.02 16.53 16.24 19.78 .45 .31 109.00 .50 .32 115.00 .55 .34 121.50 .69 .38 137.25 .79 .41 147.25 .90 .44 160.25 66.75 42.15 33.55 27.90 69.95 44.65 35.90 29.70 73.50 47.45 38.45 31.70 82.10 54.25 44.65 36.55 87.60 58.55 48.65 39.60 94.80 64.10 53.65 43.50 76.75 48.45 38.60 34.90 82.15 52.45 42.10 37.40 88.05 56.85 46.05 40.15 102.45 67.70 55.75 46.90 111.60 74.60 61.95 51.15 123.20 83.30 69.75 56.55 Cost/Ln. Ft. Wood fencing Solid board, horizontal or vertical, 6' 5' Split redwood/grape stake, 6' 5' Basketweave, 6' 5' Wood picket, 12" to 24" 30" – 40" Split, two-rail, 24" to 36" high Three-rail, 36" to 48" high Four-rail, 42" to 54" high Wooden gates, per sq. ft. Paint, per sq. ft., per coat CHAIN LINK FENCES Cost/Sq. Ft. Mesh, 2", #9 wire #11 wire Add for rails Add for three-strand barbed wire Gates, 3' wide 5' wide 10' wide 15’ wide METAL FENCES AND GRILLS Cost/Sq. Ft. Hand-forged wrought iron Modular, steel or aluminum LAWN SPRINKLERS Cost/Sq. Ft. Conventional Rainbird or Rain Jet systems For automatic control, add per station SWIMMING POOLS Cost/Sq. Ft. Surface Area (including filter, diving board, steps and ladder) Gunite pool Surface area: 200 sq. ft. 400 sq. ft. 600 sq. ft. 800 sq. ft. Poured concrete pool, in ground Surface area: 200 sq. ft. 400 sq. ft. 600 sq. ft. 800 sq. ft. ©2003 - State of Michigan 199 LAND IMPROVEMENTS D CD C BC B A 56.75 35.80 28.50 23.70 59.45 37.95 30.50 25.25 62.45 40.35 32.65 26.95 69.80 46.10 37.95 31.05 74.50 49.80 41.35 33.65 80.55 54.45 45.60 37.00 51.45 31.20 24.80 20.40 51.90 31.95 25.35 20.85 52.45 32.85 25.95 21.40 54.30 35.10 27.55 22.75 55.80 36.65 28.65 23.70 58.10 38.75 30.20 25.05 465 435 955 85 490 515 490 1,175 135 635 575 555 1,450 215 825 730 715 2,200 530 1,410 825 820 2,775 845 1,865 950 950 3,500 1,365 2,495 Attached whirlpool bath (portable type, including hot tubs) 4,800 5,350 5,975 7,550 8,575 9,850 Separate whirlpool bath, (4–10 persons) 6,475 7,700 9,200 13,225 16,000 19,650 Cost/Sq. Ft. Surface Area (including filter, diving board, steps and ladder) Fiberglass pool, in ground Surface area: 200 sq. ft. 400 sq. ft. 600 sq. ft. 800 sq. ft. Plastic-lined pool, in ground Surface area: 200 sq. ft. 400 sq. ft. 600 sq. ft. 800 sq. ft. Pool accessories Deduct for lack of filter Deduct for lack of diving board Add for heater Chlorinator Hydrosweep GAZEBOS Typical cost each (8' to 20' wood units including minimal foundation but excluding floors) Standard Deluxe 1,275 11,250 1,800 13,250 2,500 15,750 4,950 22,500 7,050 27,250 10,150 33,250 18.00 23.23 19.57 23.85 21.31 24.66 25.61 26.43 28.34 27.63 24.40 29.28 BOAT DOCKS Cost/Sq. Ft. (including fenders and railings) Decking, light posts, 2" Light piling, 3" SHEDS Cost/Sq. Ft. (excluding permanent foundation or slab and electrical. Includes entry doors with some windows in better qualities). Exterior wall height is 8'. For loft/barn (gambrel), add 10 to 15%. Wood frame, 40 sq. ft. 100 sq. ft. 200 sq. ft. 300 sq. ft. 400 sq. ft. Metal prefabricated, 40, sq. ft. 100 sq. ft. 200 sq. ft. 300 sq. ft. 400 sq. ft. 200 10.66 9.06 7.70 7.05 6.45 8.33 7.49 6.75 6.16 5.62 11.95 10.15 8.63 7.90 7.23 9.16 8.16 7.28 6.64 6.06 13.42 11.40 9.69 8.87 8.12 10.08 8.90 7.86 7.18 6.55 17.14 14.57 12.38 11.33 10.37 12.39 10.73 9.30 8.49 7.75 19.56 16.62 14.13 12.93 11.83 13.87 11.90 10.21 9.32 8.51 22.62 19.23 16.34 14.95 13.68 15.73 13.37 11.37 10.37 9.47 ©2003 - State of Michigan