UNIT-IN-PLACE COSTS
UNIT-IN-PLACE COSTS
INSTRUCTIONS for Converting Square Foot Costs into Whole Dollar Costs for an Entire Residence.
Step A:
Select the
the proper
proper class
Step
A: Select
class for
for the
the residence.
residence.
Step B:
B: Select
Select and
and list
list Unit-in-Place
Unit-in-Place components
components for
Step
for all
all
construction
construction areas
areas ofofthe
theresidence.
residence. (Tip:
Tip: Work
through
page by page,
through the
the Unit-in-Place
Unit-in-Place section
section page
first
marking down
down the
first selecting
selecting a component,
component, then marking
corresponding
class cost.
cost. For
For an example
of how
corresponding class
example of
this
you
this step
step isis done,
done, see
see the
thefollowing
following pages.
pages. IfIf you
are
of the
exact
specifications
of the
are not
notsure
sure
of the
exact
specifications
of resithe
dence,
referrefer
to the
Specification
pages
located
in
residence,
to the
Specification
pages
located
front
of
the
Square
Foot
cost
tables.
in front of the Square Foot cost tables.
Step C:
Convert Unit-in-Place
Unit-in-Place costs
Step
C: Convert
costs into
into whole
whole dollar
dollar
costs. Pay
Pay special
special attention
attention to
unit of
of measure
measure
costs.
to the
the unit
converting costs.
costs. For additional
additional conversion
conversion
when converting
help, see
thethe
example
on the
folsee below
belowororrefer
referto to
example
on the
lowing
pages.
following
pages.
Step
D: Total
all whole
whole dollar
dollarcosts.
costs.
Step D:
Total all
Step E: Divide the result
Step D
D by the ground
area of
of
result of Step
ground area
your
residence
in
square
feet.
your residence in square feet.
CONVERSION INSTRUCTIONS
In order to convert the various Unit-in-Place costs into whole dollar costs, use the following formulas:
UNIT-IN-PLACE
SECTION
BASE UNIT OF
MEASURE
CONVERSION FORMULA
Exterior wall
Sq. Ft. of Wall Area
Unit-in-Place Cost x Sq. Ft. of Wall Area
=
Whole Dollar Cost
Windows
Sq. Ft. of Window Area
Unit-in-Place Cost x Sq. Ft. of Window Area =
Whole Dollar Cost
Roof
Sq. Ft. of Ground Area
Unit-in-Place Cost x Sq. Ft. of Ground Area =
Whole Dollar Cost
Interior partitions and
finish
Sq. Ft. of Partition Area
Unit-in-Place Cost x Sq. Ft. of Partition Area =
Whole Dollar Cost
Floor finish
Sq. Ft. of Floor Area
Unit-in-Place Cost x Sq. Ft. of Floor Area
=
Whole Dollar Cost
Ceiling
Sq. Ft. of Ceiling Area
Unit-in-Place Cost x Sq. Ft. of Ceiling Area =
Whole Dollar Cost
Excavation
Sq. Ft. of Ground Area
Unit-in-Place Cost x Sq. Ft. of Ground Area =
Whole Dollar Cost
Basement walls,
foundations and
footings
Sq. Ft. of Wall Area
Unit-in-Place Cost x Sq. Ft. of Wall Area
=
Whole Dollar Cost
Basement floor
Sq. Ft. of Floor Area
Unit-in-Place Cost x Sq. Ft. of Floor Area
=
Whole Dollar Cost
Floor construction
Sq. Ft. of Floor Area
Unit-in-Place Cost x Sq. Ft. of Floor Area
=
Whole Dollar Cost
Heat and air
conditioning
Sq. Ft. of Living Area
Unit-in-Place Cost x Sq. Ft. of Living Area
=
Whole Dollar Cost
Electric lighting
system
Sq. Ft. of Living Area
Unit-in-Place Cost x Sq. Ft. of Living Area
= Whole Dollar Cost
As a final note, when determining costs for exterior walls and interior partitions, originally assume no window or door openings to arrive at a total area for each unit. For example, an interior partition (wall) 8 feet high and 10 linear feet long with a
door opening would be measured as 80 square feet of interior partition.
©2003 - State of Michigan
179
UNIT-IN-PLACE EXAMPLE
CONVERTING UNIT-IN-PLACE COSTS INTO SQUARE FOOT COSTS FOR AN ENTIRE RESIDENCE.
Instructions for Steps (A) through (E) are located on the previous page.
Assume we have chosen a Class C, one-story residence with the following measurements:
STEP
A
STEP
B
Dimensions: 40' X 25'
Square Feet of Ground: 1000
Square Feet of Living Area: 1000
Square Feet of Window: 125
Square Feet of Basement Wall: 1000
Square Feet of Exterior Wall: 1040
Exterior Walls
Wood frame with:
Face brick veneer
Building paper
1/2" insulation board
2" x 6" studs, 24" o.c.
6" batt insulation
1/2" drywall
Interior surface: painted, two coats
Two exterior doors (wood raised panel)
Aluminum storm and screen door
Wood double hung windows
Aluminum storms and screens
Roof
4/12 pitch
235# asphalt shingles
Felt
1/2" plywood
2" x 6" rafters, 16" o.c.
1' overhang and soffit
Gutters and downspouts
Interior Partitions and Finish
8' walls
1/2" drywall, two sides
Painted, two coats, two sides
2" x 4" studs, 16" o.c.
Softwood trim
Flush hollow core doors
Closet shelving
Floor Finish
65% carpet with pad
35% vinyl inlay
35% 5/8" underlayment
180
Square Feet of Partition: 896
Square Feet of Basement Floor: 1000
Linear Feet of Footing: 130
Interior Doors: 20
Linear Feet of Interior Trim: 164
Linear Feet of Closet Shelving: 24
STEP Unit-in-Place
C
Cost
$
Unit
8.94
.18
.95
1.35
.74
1.12
.51
370.00
205.00
13.66
5.65
1.27
.18
1.02
1.55
.96
.58
2.23
1.02
1.30
1.63
220.00
1.95
2.49
2.90
1.21
Whole Dollar
Cost
x 1040 s.f. wall
x 1040 s.f. wall
x 1040 s.f. wall
x 1040 s.f. wall
x 1040 s.f. wall
x 1040 s.f. wall
x 1040 s.f. wall
x 2 (cost each)
x 1 (cost each)
x 125 s.f. wind.
x 125 s.f. wind.
Subtotals
=
=
=
=
=
=
=
=
=
=
=
$9,297.60
187.20
988.00
1,404.00
769.60
1,164.80
530.40
740.00
205.00
$1,707.50
706.25
=
=
=
=
=
=
$1,270.00
180.00
1,020.00
1,550.00
960.00
580.00
$5,560.00
=
=
=
=
=
=
$1,998.08
913.92
1,164.80
267.32
4,400.00
46.80
$8,790.92
x 1000 s.f. floor x 65% =
x 1000 s.f. floor x 35% =
x 1000 s.f. floor x 35% =
$1,618.50
1,015.00
423.50
$3,057.00
x
x
x
x
x
x
x
x
x
x
x
x
1000
1000
1000
1000
1000
1000
s.f.
s.f.
s.f.
s.f.
s.f.
s.f.
ground
ground
ground
ground
ground
ground
896 s.f. partition
896 s.f. partition
896 s.f. partition
164 l.f. trim
20 (cost each)
24 l.f. shelving
$15,286.60
$2,413.75
©2003 - State of Michigan
STEP
B
Ceiling
1/2" drywall
Painted, two coats
8" insulation
2" x 6" Joists, 16" o.c.
STEP
C
Excavation
8' Basement
Unit-in-Place
Cost
1.56
.81
.94
1.07
1.17
Unit
x
x
x
x
1000
1000
1000
1000
s.f.
s.f.
s.f.
s.f.
ceiling
ceiling
ceiling
ceiling
Whole Dollar
Cost
=
$1,560.00
=
810.00
=
940.00
=
1,070.00
Subtotals
$4,380.00
x 1000 s.f. ground =
$1,170.00
$1,170.00
x
x
x
x
=
=
=
=
$6,160.00
1,619.80
637.00
925.60
$9,342.40
Basement Walls
8" concrete block
8" x 24" footings
Drain tile, one side
Waterproofing
6.16
12.46
4.90
.89
Basement Floor
4" gravel base
4" concrete floor
Vapor barrier
.46
2.44
.16
x 1000 s.f. floor =
x 1000 s.f. floor =
x 1000 s.f. floor =
$ 460.00
2,440.00
160.00
$3,060.00
Floor Construction
Felt underlay
1/2" plywood
2" x 10" joists, 16" o.c.
Bridging
8" steel I-beam
3" diameter steel posts
.30
1.02
1.86
.21
.50
.20
x
x
x
x
x
x
=
=
=
=
=
=
$ 300.00
1,020.00
1,860.00
210.00
500.00
200.00
$4,090.00
3.95
115.00
x 1000 s.f. living =
x 22 Ht. of chimney =
$3,950.00
2,530.00
$6,480.00
3.84
x 1000 s.f. living =
$3,840.00
$3,840.00
=
=
=
=
=
=
=
$ 480.00
765.00
1,015.00
290.00
660.00
525.00
650.00
$4,385.00
=
=
=
=
Summary
$2,000.00
890.00
805.60
555.00
STEP
D
Total Whole Dollar Cost of Unit-in-Place Components:
Square Feet of Ground Area:
Whole Dollar Cost/Square Feet of Ground Area:
$76,106.27
1,000
$76.11
Heating and Cooling
Gas-fired forced-air, with return ducts
Block chimney, 16" x 22' Ht.
Electric
100-ampere, 110/220-volt, Romex
Plumbing
White fixtures:
One sink, countertop
One toilet
One bathtub with shower
Ceramic tile, tub alcove
One two-compartment kitchen sink
One two-compartment laundry tub
One 40-gallon gas water heater
Built-In Units
Wood veneer kitchen cabinets
16' base with laminated plastic top
10' wall mounted, 30" high
6' wall mounted, 18" high
Open-riser basement stairs
STEP
E
©2003 - State of Michigan
1000 s.f. wall
130 l.f. footing
130 l.f. footing
1040 s.f. wall
480.00
765.00
1,015.00
290.00
660.00
525.00
650.00
125.00
89.00
76.00
555.00
x
x
x
x
x
x
x
x
x
x
x
1000
1000
1000
1000
1000
1000
1
1
1
1
1
1
1
s.f.
s.f.
s.f.
s.f.
s.f.
s.f.
(cost
(cost
(cost
(cost
(cost
(cost
(cost
floor
floor
floor
floor
floor
floor
each)
each)
each)
each)
each)
each)
each)
16 l.f. cabinet
10 l.f. cabinet
6 l.f. cabinet
1 (cost each)
$ 4,250.60
$76,106.27
181
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
5.14
5.66
6.42
7.10
5.61
6.05
6.89
7.66
13.10
17.26
9.05
10.38
9.60
10.77
12.66
5.38
5.90
6.73
7.50
5.94
6.46
7.38
8.23
13.96
18.37
9.61
10.96
10.50
11.70
13.73
5.65
6.16
7.08
7.93
6.32
6.92
7.93
8.87
14.90
19.59
10.23
11.59
11.50
12.74
14.92
6.30
6.79
7.93
8.99
7.22
8.02
9.26
10.41
17.19
22.56
11.73
13.12
13.97
15.30
17.85
6.72
7.20
8.47
9.66
7.79
8.72
10.11
11.40
18.65
24.45
12.69
14.10
15.55
16.93
19.72
7.26
7.74
9.18
10.52
8.53
9.62
11.18
12.64
20.50
26.85
13.91
15.36
17.54
18.99
22.07
4.33
.39
4.76
.49
5.24
.63
6.43
1.03
7.20
1.34
8.16
1.75
1.61
1.15
2.66
1.83
2.33
4.33
1.88
1.24
3.13
1.96
2.47
4.77
2.19
1.34
3.69
2.11
2.63
5.26
3.04
1.59
5.18
2.46
3.01
6.49
3.61
1.75
6.19
2.68
3.25
7.28
4.35
1.95
7.51
2.96
3.56
8.28
1.66
2.05
1.50
1.61
1.39
1.50
1.66
1.44
1.72
1.50
3.44
9.21
8.60
10.26
12.48
14.97
2.00
2.27
1.96
2.39
1.61
1.74
1.48
1.61
1.75
1.51
1.81
1.55
4.11
9.74
9.30
11.06
13.44
16.53
2.15
2.42
2.33
2.78
1.73
1.89
1.59
1.73
1.85
1.59
1.92
1.61
4.92
10.33
10.09
11.94
14.50
18.28
2.32
2.59
3.30
3.83
2.04
2.25
1.86
2.04
2.08
1.78
2.17
1.76
7.13
11.76
12.02
14.11
17.10
22.65
2.73
2.99
3.97
4.53
2.23
2.49
2.02
2.23
2.23
1.90
2.33
1.86
8.68
12.67
13.25
15.48
18.76
25.46
2.99
3.24
4.83
5.44
2.48
2.78
2.24
2.48
2.42
2.06
2.54
1.99
10.69
13.84
14.80
17.22
20.84
29.00
3.32
3.56
7.44
6.55
7.16
8.15
7.18
7.82
8.94
7.88
8.56
10.90
9.63
10.38
12.15
10.75
11.54
13.73
12.16
13.00
21.37
18.04
12.49
9.37
8.74
23.14
19.44
13.67
10.25
9.98
25.11
20.99
14.99
11.24
11.41
29.94
24.78
18.26
13.69
15.11
33.01
27.19
20.35
15.26
17.56
36.89
30.24
22.98
17.24
20.68
EXTERIOR WALLS
Costs/Sq. Ft. of Wall Area
MASONRY WALLS
Block, concrete, 6"
8"
10"
12"
Block, reinforced, 6"
8"
10"
12"
Brick, common, 8"
12"
Brick, 6", SCR modular
8"
Concrete, reinforced, 5" – 6"
8"
12"
Additives for block and concrete walls
Synth. plaster on rigid insul. (EIFS)
Stay-in-place forming
SIDINGS
Aluminum
Asphalt
Cement fiber (asbestos), embossed
Siding or shingles, horizontal
Vinyl
Synth. plaster on rigid insul. (EIFS)
Wood
Board and batten
Clapboard
Hardboard sheet, embossed
Siding or shingles, horizontal
Masonite, 1/8" tempered
Masonite, 1/4" tempered
Plywood, 3/8" textured
1/2" plain
5/8" textured
5/8" plain
Rustic or log siding, veneer
Half rounds with full corners
Full logs, 6" – 7" in diameter
8"
10"
Hand hewn or oversized logs
Shingle, cedar
Shake
VENEERS
Face brick veneer
Select common brick veneer
Select reused brick veneer
Stone veneers
Ashlar, granite
Split
Native stone
Permastone
Split rock
182
©2003 - State of Michigan
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
12.43
29.97
31.36
34.41
3.89
12.93
.77
8.04
8.89
studs
1.66
1.22
.89
1.72
1.22
3.11
2.33
1.50
14.04
32.76
35.18
37.41
4.14
13.64
.83
8.83
9.66
15.90
35.89
39.53
40.75
4.41
14.41
.90
9.72
10.52
20.64
43.59
50.56
48.95
5.08
16.30
1.08
11.92
12.62
23.74
48.52
57.74
54.18
5.51
17.50
1.19
13.33
13.96
27.69
54.73
66.83
60.78
6.05
19.05
1.33
15.10
15.65
1.70
1.28
.93
1.77
1.28
3.20
2.40
1.54
1.75
1.35
.98
1.82
1.35
3.31
2.49
1.60
1.86
1.51
1.10
1.96
1.51
3.57
2.70
1.73
1.94
1.62
1.17
2.05
1.62
3.75
2.84
1.82
2.05
1.75
1.27
2.18
1.75
3.99
3.02
1.93
1.31
1.09
1.53
1.31
1.36
1.13
1.58
1.35
1.41
1.17
1.63
1.39
1.54
1.27
1.76
1.50
1.62
1.34
1.85
1.57
1.73
1.43
1.97
1.67
1.64
1.37
1.97
1.64
.50
1.70
1.41
2.03
1.69
.59
1.76
1.47
2.09
1.74
-----
1.91
1.59
2.25
1.88
-----
2.01
1.68
2.36
1.97
-----
2.15
1.79
2.50
2.09
-----
.41
.48
.67
.44
.50
.70
.47
.53
.74
.54
.59
.84
.58
.63
.90
.64
.69
.98
.55
.77
.43
.60
.52
2.00
2.88
.59
.81
.47
.66
.56
2.16
2.98
.63
.86
.52
.72
.60
2.35
3.08
.72
.98
.64
.89
.71
2.80
3.34
.77
1.06
.71
.99
.77
3.08
3.51
.85
1.16
.81
1.12
.86
3.44
3.75
.16
.90
1.05
1.11
1.16
1.33
.17
.93
1.08
1.13
1.19
1.35
.18
.95
1.12
1.15
1.21
1.38
.22
1.03
1.20
1.22
1.28
1.45
.24
1.08
1.26
1.26
1.32
1.51
.27
1.15
1.34
1.33
1.39
1.58
Costs/Sq. Ft. of Wall Area
MISCELLANEOUS
Glass panel
Local stone, rough cut, solid, 12"
Granite
Limestone
Add for each 6" variation in thickness
Rammed earth, soil cement, 24"
Add for each 6" variation in thickness
Sand. panels, cement fiber or Shotcrete
Stucco on baled straw
FRAMING (Frame including sills, plates and wood)
2" x 4", 12" o.c.
16" o.c.
24" o.c.
2" x 6", 16" o.c.
24" o.c.
2" x 8", 12" o.c.
16" o.c.
24" o.c.
Steel studs
Light (to 25 gauge)
4" – 16" o.c.
4" – 24" o.c.
6" – 16" o.c.
6" – 24" o.c.
Medium (to 20 gauge)
4" – 16" o.c.
4" – 24" o.c.
6" – 16" o.c.
6" – 24" o.c.
Wood pole framing
INSULATION
Insulation, 2-1/2"
3-1/2"
6"
FINISHES
Paint on exterior, two coats
Three coats
On masonry, two coats
Three coats
Stain on exterior, two coats
Stucco, two coats on masonry
Three coats on metal lath
Sheathing
Building paper
Insulation board, 1/2"
25/32"
Plywood, 3/8"
1/2"
5/8"
©2003 - State of Michigan
183
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
1.00
1.03
1.06
1.14
1.19
1.26
1.10
1.23
1.33
1.12
1.26
1.40
1.15
1.30
1.48
1.21
1.38
1.66
1.26
1.44
1.78
1.33
1.53
1.93
6.05
.90
1.05
1.11
.67
7.21
.93
1.08
1.15
.74
8.60
.97
1.12
1.19
.82
12.41
1.07
1.20
1.29
1.03
15.05
1.13
1.25
1.36
1.16
18.51
1.21
1.33
1.45
1.33
.24
.41
.58
2.38
2.88
2.00
.90
2.05
.27
.46
.64
2.51
2.99
2.09
1.02
2.35
.30
.51
.72
2.66
3.10
2.18
1.16
2.71
.38
.65
.91
3.00
3.38
2.42
1.52
3.62
.43
.73
1.04
3.22
3.56
2.58
1.75
4.23
.50
.85
1.20
3.50
3.81
2.78
2.05
5.01
150
215
260
245
175
245
295
280
205
275
335
320
280
360
440
425
335
420
505
495
400
490
590
585
255
265
330
350
455
3,250
950
1,165
540
705
200
290
315
380
405
510
3,790
1,070
1,590
575
780
220
335
370
435
465
570
4,425
1,210
2,170
615
860
245
445
520
575
630
725
6,115
1,560
4,090
715
1,060
305
520
620
670
735
830
7,260
1,790
5,670
775
1,185
345
620
750
790
875
960
8,735
2,075
7,970
850
1,345
400
7.06
7.95
6.38
9.93
7.77
8.42
6.86
10.78
8.57
8.93
7.39
11.72
10.55
10.17
8.70
14.05
11.82
10.96
9.53
15.53
13.42
11.98
10.57
17.40
7.88
8.73
7.15
11.65
1.16
8.73
9.33
7.76
12.92
1.28
9.69
10.00
8.43
14.35
1.43
12.08
11.62
10.07
17.95
1.78
13.62
12.65
11.12
20.27
2.01
15.57
13.96
12.45
23.20
2.30
Costs/Sq. Ft. of Wall Area
OSB (oriented strand board), 3/8"
1/2"
5/8"
Wood board, 1" x 6"
Interior finish of exterior walls
Ceramic tile
Drywall, one side 3/8"
1/2"
5/8"
Furring, wood strips on masonry
Painting
One coat
Two coats
Three coats
Plaster, two coats on gypsum
Three coats on gypsum
Two coats on masonry
Wall paper
Custom
EXTERIOR DOORS
Cost Each
Entrance doors, cost each
Aluminum storm and screen
Metal, hollow core
Insulated
Deluxe
Wood
Flat panel
Raised panel
Dutch
French
Carved, stock
Custom, carved
Hardwood, solid core, flat panel
Raised panel
Sliding glass door, 6' opening
Sliding insul. glass door, 6' opening
Wood storm and screen
Garage Doors, cost/sq. ft. of garage door area
Single
Overhead
Metal
Plastic
Wood
Redwood or select cedar
Sectional
Metal
Plastic
Wood
Redwood or select cedar
Add for insulation
184
©2003 - State of Michigan
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
4.87
5.30
4.16
7.99
5.56
5.90
4.79
8.81
6.36
6.57
5.53
9.74
8.41
8.25
7.46
12.05
9.78
9.34
8.74
13.53
11.51
10.71
10.39
15.41
5.64
6.08
4.94
10.26
1.00
6.41
6.73
5.63
11.34
1.11
7.31
7.46
6.44
12.55
1.23
9.61
9.30
8.52
15.59
1.53
11.13
10.48
9.90
17.54
1.72
13.06
11.98
11.66
20.00
1.97
10.07
10.51
7.01
8.94
10.84
11.55
7.79
9.65
11.69
12.73
8.67
10.43
13.77
15.64
10.89
12.34
15.09
17.51
12.32
13.55
16.76
19.86
14.13
15.09
12.09
12.61
8.41
10.73
13.01
13.87
9.34
11.58
14.03
15.27
10.41
12.52
16.52
18.77
13.07
14.81
18.11
21.01
14.79
16.27
20.11
23.83
16.96
18.11
6.26
11.81
14.42
9.82
9.76
6.96
12.69
15.64
10.56
10.45
7.75
13.66
17.00
11.39
11.20
9.74
16.04
20.33
13.41
13.05
11.02
17.55
22.46
14.69
14.22
12.65
19.45
25.13
16.31
15.71
4.91
5.23
5.27
5.59
5.65
5.99
6.60
6.97
7.20
7.59
7.96
8.38
5.81
6.06
6.17
6.45
6.56
6.87
7.52
7.90
8.13
8.56
8.90
9.39
27.73
26.34
25.02
41.59
39.51
37.53
39.69
37.70
35.82
45.57
40.67
38.64
29.09
27.63
26.25
44.77
42.53
40.40
42.75
40.62
38.59
48.73
43.75
41.56
30.58
29.05
27.60
48.29
45.87
43.58
46.15
43.84
41.65
52.22
47.15
44.79
34.22
32.51
30.88
56.88
54.04
51.34
54.46
51.74
49.15
60.70
55.45
52.68
36.55
34.73
32.99
62.35
59.23
56.27
59.74
56.75
53.91
66.09
60.73
57.70
39.57
37.60
35.72
69.26
65.79
62.50
66.41
63.09
59.94
72.93
67.41
64.04
Garage doors, cost/sq. ft. of a garage door area
Double
Overhead
Metal
Plastic
Wood
Redwood or select cedar
Sectional
Metal
Plastic
Wood
Redwood or select cedar
Add for insulation
WINDOWS
Costs/Sq. Ft. of Window Area
Metal windows
Double-hung
Casement
Slide-by
Picture, fixed
For double glazed, add 50%
Vinyl-sash, windows
Double-hung
Casement
Slide-by
Picture, fixed
For double glazed, add 50%
Wood windows
Double-hung, barn sash type
Double-hung
Casement
Slide-by
Picture, fixed
For double glazed, add 50%
Aluminum storms and screens
Double-hung or slide-by
Casement
Wood storms and screens
Double-hung or slide-by
Casement
Bay Windows (cost/sq. ft. of wall area displaced)
Wood, single-pane, awning
Casement
Double-hung
Insulated glass, wood, awning
Casement
Double-hung
Metal, awning
Casement
Double-hung
Vinyl, awning
Casement
Double-hung
©2003 - State of Michigan
185
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
4.26
1.40
1.58
2.24
1.28
1.57
4.97
8.76
11.65
12.44
1.07
7.71
8.68
10.81
11.66
3.36
3.63
.58
.23
5.02
1.56
1.73
2.57
1.44
1.77
5.71
10.87
13.36
14.25
1.26
8.70
9.67
12.40
13.36
3.87
4.17
.69
.25
.91
1.07
1.22
1.47
.95
1.10
1.35
2.03
1.47
.98
1.15
1.32
1.60
1.02
1.18
1.46
2.26
1.67
2.18
1.91
1.53
1.15
2.26
1.83
1.38
2.64
2.14
1.60
3.33
2.71
2.02
2.37
2.06
1.65
1.24
2.43
1.97
1.49
2.85
2.31
1.72
3.59
2.92
2.18
99.25
103.75
84.75
194.75
212.50
170.75
111.75
117.25
95.50
223.50
245.25
196.25
ROOF (4" rise in 12" run)
Costs/Sq. Ft. of Ground Area
Roofing
Asbestos shingles
2.11
2.41
2.76
3.66
Asphalt singles, 210#
.93
1.01
1.09
1.28
235#
1.12
1.19
1.27
1.46
290#
1.26
1.41
1.57
1.98
Built-up 2-ply and gravel
.82
.89
.97
1.16
Built-up 3-ply and gravel
.98
1.07
1.17
1.41
Cement tile
2.81
3.13
3.49
4.39
Clay Spanish tile
3.36
4.04
4.87
7.16
Copper, flat or standing seam
6.62
7.36
8.20
10.29
Batten seam
7.11
7.90
8.78
11.01
Roll asphalt roofing
.53
.60
.69
.92
Slate 3/16" and 1/4"
4.74
5.19
5.69
6.92
Slate 3/8"
5.69
6.15
6.65
7.89
Terne, flat or standing seam
6.13
6.82
7.59
9.55
Batten seam
6.68
7.41
8.24
10.32
Wood shingle
1.89
2.10
2.35
2.96
Shake
2.05
2.28
2.55
3.20
Add for fire-resistant finish
.29
.33
.38
.50
Felt, 15#
.15
.16
.18
.21
Sheathing
Plywood, 5/16"
.71
.74
.77
.85
3/8"
.83
.87
.91
1.00
1/2"
.93
.98
1.02
1.14
5/8"
1.09
1.15
1.21
1.37
OSB (oriented strand board), 3/8"
.77
.79
.82
.90
1/2"
.87
.90
.94
1.04
5/8"
1.02
1.07
1.13
1.26
Boards, 1" x 6" solid
1.35
1.46
1.57
1.85
Boards, 1" x 6" spaced
.88
.96
1.06
1.31
Rafters
2" x 4", trussed frame
1.62
1.71
1.80
2.03
2" x 4", 12" o.c.
1.48
1.54
1.62
1.79
16" o.c.
1.19
1.24
1.30
1.44
24" o.c.
.89
.93
.97
1.08
2" x 6", 12" o.c.
1.75
1.83
1.91
2.12
16" o.c.
1.42
1.48
1.55
1.72
24" o.c.
1.07
1.12
1.17
1.30
2" x 8", 12" o.c.
2.05
2.14
2.24
2.48
16" o.c.
1.66
1.73
1.81
2.01
24" o.c.
1.24
1.29
1.35
1.50
2" x 10", 12" o.c.
2.58
2.69
2.82
3.13
16" o.c.
2.10
2.19
2.29
2.54
24" o.c.
1.57
1.64
1.71
1.90
DORMERS (Per linear foot, measured across face of dormer)
Unfinished area dormer are for attics areas, finished areas are for finished upper floors.
Unfinished areas, gable roof
54.50
61.50
69.25
88.00
Hip roof
56.75
64.00
72.25
92.00
Shed roof
47.25
53.00
59.50
75.50
Finished areas, gable roof
98.00
112.50
129.00
169.75
Hip roof
103.50
119.50
138.00
184.00
Shed roof
85.00
97.75
112.25
148.50
186
©2003 - State of Michigan
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
25.65
27.85
28.15
30.10
28.70
31.45
36.00
26.50
27.05
29.50
29.95
32.65
31.55
34.75
39.25
29.10
28.55
31.25
32.00
35.50
34.75
38.50
43.25
32.00
32.20
35.50
36.75
42.50
42.75
47.75
52.75
39.25
34.50
38.25
40.00
47.00
48.00
53.75
59.00
43.75
37.50
41.75
44.00
52.50
54.50
61.25
66.75
49.50
64.25
45.25
5.30
3.05
8.90
7.10
310
.83
.49
69.50
49.25
5.70
3.35
9.25
7.40
320
.89
.53
75.50
53.75
6.20
3.70
9.65
7.75
335
.96
.58
89.75
64.75
7.30
4.55
10.60
8.50
365
1.12
.69
98.75
71.75
8.05
5.10
11.20
9.00
385
1.22
.77
110.25
80.50
8.95
5.75
12.05
9.70
415
1.35
.86
Costs/Sq. Ft. of Ground Area
Skylights (per square foot of framed area)
Flat, plain glass or plastic
Wire glass
Pitched, without vent, plain glass or plastic
Wire glass
Pitched, with vent, plain glass or plastic
Wire glass
Plastic domes, fixed, small (under 3 sq. ft.)
Large (over 3 sq. ft.)
Roof windows or vented domes,
Small (under 3 sq. ft.)
Large (over 3 sq. ft.)
Add for blinds, small (under 3 sq. ft.)
Large (over 3 sq. ft.)
Add for screens, small (under 3 sq. ft.)
Large (over 3 sq. ft.)
Electric controls, each
Each 1'-0" overhang and soffit
Gutters and downspouts
Roof Pitch Adjustment
All roof costs above include an adjustment for a 4" rise in a 12" run. Use these multipliers to adjust for deviations.
Rise in Run
4" in 12"
5" in 12"
6" in 12"
8" in 12"
10" in 12"
12" in 12"
14" in 12"
16" in 12"
Multiplier
1.00
1.03
1.07
1.14
1.24
1.35
1.47
1.56
INTERIOR PARTITIONS AND FINISH
Costs/Sq. Ft. of Partition Area
Ceramic tile
Drywall, 5/8", one side
Two sides
1/2”, one side
Two sides
3/8", one side
Two sides
Paint, one coat, one side
One coat, two sides
Two coats, one side
Two coats, two sides
Three coats, one side
Three coats, two sides
Plaster, two coats, one side
Two sides
©2003 - State of Michigan
6.05
1.11
2.22
1.05
2.11
.90
1.80
.24
.49
.41
.82
.58
1.15
2.05
4.10
7.21
1.15
2.29
1.08
2.17
.93
1.87
.27
.54
.46
.92
.64
1.29
2.19
4.38
8.60
1.19
2.38
1.12
2.23
.97
1.94
.30
.61
.51
1.02
.72
1.44
2.35
4.69
12.41
1.29
2.58
1.20
2.40
1.07
2.13
.38
.76
.65
1.29
.91
1.83
2.72
5.44
15.05
1.36
2.72
1.25
2.51
1.13
2.25
.43
.86
.73
1.47
1.04
2.08
2.96
5.92
18.51
1.45
2.90
1.33
2.66
1.21
2.42
.50
.99
.85
1.69
1.20
2.39
3.26
6.53
187
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
2.66
5.32
.67
.89
2.79
5.59
.71
.95
2.94
5.87
.76
1.02
3.29
6.58
.89
1.19
3.51
7.03
.97
1.29
3.81
7.61
1.08
1.43
1.18
.84
1.26
1.05
.90
1.24
.88
1.30
1.08
1.02
1.30
.93
1.35
1.12
1.16
1.45
1.04
1.47
1.22
1.52
1.54
1.11
1.55
1.28
1.75
1.66
1.21
1.65
1.37
2.05
195
255
1.59
1.71
2.33
2.32
2.86
1.75
1.27
205
270
1.76
1.87
2.46
2.54
3.13
2.19
1.44
220
295
1.95
2.05
2.59
2.78
3.43
2.76
1.63
250
345
2.43
2.46
2.89
3.34
4.11
4.41
2.11
275
380
2.74
2.69
3.05
3.65
4.50
5.63
2.43
300
420
3.12
2.95
3.22
4.00
4.93
7.29
2.83
1.43
1.43
6.07
6.38
15.53
.21
5.48
5.42
2.32
16.09
7.30
2.48
1.25
9.99
4.31
6.66
.93
1.09
1.21
1.88
2.21
1.57
1.89
7.86
7.40
17.43
.23
6.22
6.25
2.59
19.26
8.54
2.99
1.36
11.02
4.80
7.59
.98
1.15
1.40
2.33
2.82
1.72
2.49
10.20
8.60
19.61
.25
7.07
7.23
2.90
23.11
10.01
3.61
1.49
12.19
5.36
8.68
1.02
1.21
1.62
2.90
3.60
2.10
4.39
17.40
11.76
25.11
.31
9.26
9.78
3.67
33.70
13.92
5.32
1.77
15.11
6.76
11.49
1.14
1.37
2.18
4.52
5.97
2.34
5.89
22.94
13.89
28.70
.34
10.70
11.49
4.17
41.09
16.58
6.53
1.93
16.98
7.66
13.35
1.22
1.47
2.56
5.70
7.76
2.65
8.00
30.66
16.62
33.24
.38
12.54
13.68
4.81
50.77
20.01
8.12
2.11
19.34
8.80
15.71
1.32
1.60
3.04
7.29
10.22
Costs/Sq. Ft. of Partition Area
Plaster, three coats, one side
Two sides
Stained wood finish, two coats, one side
Three coats, one side
Stud framing
2" x 4" wood, 16" o.c.
24" o.c.
4" steel, 16" o.c.
24" o.c.
Wall paper
Interior doors, cost each
Flush doors
Panel doors
Closet shelving, cost per linear foot
Paneling, lauan
Birch
Oak
Walnut
Trim, hardwood, cost per linear foot
Softwood
FLOOR FINISH
Costs/Sq. Ft. of Floor Area
Asphalt tile
Carpet
Custom
Ceramic tile
Custom
Felt underlay
Hardwood, 1/2"
25/32"
Linoleum
Marble
Parquet block
Rubber tile
Standing and seal for wood floor
Slate
Softwood
Terrazzo
Underlayment, 1/2" plywood
5/8" plywood
Vinyl composition tile
Vinyl inlay
Vinyl tile
188
©2003 - State of Michigan
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
1.29
.99
.70
1.50
1.17
.89
1.89
1.47
1.03
2.20
1.73
1.21
1.83
2.49
1.38
1.27
1.33
1.33
1.03
.73
1.55
1.21
.92
1.96
1.53
1.07
2.29
1.79
1.26
2.03
2.73
1.59
1.37
1.44
1.38
1.07
.76
1.61
1.26
.96
2.04
1.59
1.11
2.38
1.86
1.31
2.26
3.00
1.83
1.47
1.56
1.51
1.17
.82
1.76
1.38
1.05
2.23
1.74
1.21
2.61
2.04
1.43
2.83
3.67
2.47
1.74
1.86
1.59
1.23
.87
1.86
1.46
1.11
2.35
1.84
1.28
2.76
2.15
1.51
3.21
4.10
2.89
1.90
2.05
1.70
1.32
.92
1.99
1.56
1.19
2.52
1.97
1.37
2.96
2.30
1.62
3.68
4.64
3.44
2.11
2.29
.94
.61
2.77
5.53
.34
.62
1.88
.47
.67
.85
1.02
1.20
1.07
.69
3.12
6.93
.41
.71
2.13
.49
.71
.89
1.08
1.26
1.22
.77
3.54
8.70
.49
.81
2.41
.52
.74
.94
1.13
1.33
1.62
1.00
4.59
13.89
.72
1.09
3.14
.58
.84
1.06
1.28
1.50
1.88
1.14
5.27
17.71
.88
1.27
3.61
.62
.90
1.14
1.37
1.61
2.22
1.33
6.15
22.90
1.08
1.50
4.22
.67
.98
1.24
1.49
1.75
1.27
1.14
1.02
.93
.89
.51
.25
.32
1.10
.66
1.36
1.22
1.09
.99
.95
.54
.27
.34
1.15
.69
1.46
1.31
1.17
1.06
1.02
.58
.29
.36
1.20
.72
1.70
1.53
1.36
1.24
1.19
.68
.34
.42
1.33
.80
1.85
1.67
1.48
1.35
1.30
.74
.37
.46
1.41
.85
2.04
1.84
1.64
1.49
1.43
.82
.41
.51
1.52
.91
CEILING
Costs/Sq. Ft. of Ceiling Area
Joists, 2" x 6", 12" o.c.
16" o.c.
24" o.c.
2" x 8", 12" o.c.
16" o.c.
24" o.c.
2" x 10", 12" o.c.
16" o.c.
24" o.c.
2" x 12", 12" o.c.
16" o.c.
24" o.c.
Plaster, two coats
Three coats
Acoustic tile
Drywall, 3/8"
1/2"
Furring
Metal
Wood
Hardwood
Coffered/vaulted panel with molding
Paint, one coat flat
Two coats flat
Wood, boards or T&G, softwood
Insulation, 4"
6"
8"
10"
12"
EXCAVATION
Costs/Sq. Ft. of Ground Area
Basement, excavation, 10'-0" deep
9'-0"
8'-0"
7'-4"
7'-0"
Crawl space excavation, 4'-0" deep
2'-0"
Pier pits
Trench excavation, 4' -0" deep
2'-0"
©2003 - State of Michigan
189
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
BASEMENT WALLS/FOUNDATIONS AND FOOTINGS
Costs/Sq. Ft. of Wall Area
Basement walls
Block, concrete, 8" thick
10"
12"
Add for stay-in-place forming
Poured concrete, 6" thick
8"
10"
12"
Treated wood, 2" x 4" studs
2" x 6"
Footings, cost per linear foot
8" x 16"
8" x 18"
8" x 20"
8" x 24"
10" x 20"
10" x 24"
12" x 24"
Drain tile, cost per linear foot, one side
two sides
Perimeter insulation, cost/sq. ft.
Piers, block, cost per linear foot
Sill plate, cost per linear foot
Waterproofing, cost per sq. ft. of wall
5.94
6.61
7.21
.39
8.60
9.43
9.99
10.54
3.76
4.31
6.04
6.79
7.46
.48
8.80
9.64
10.23
10.83
3.95
4.49
6.16
6.99
7.74
.61
9.02
9.86
10.51
11.16
4.16
4.68
6.49
7.50
8.43
.96
9.61
10.47
11.23
11.98
4.67
5.14
6.73
7.85
8.88
1.22
10.02
10.89
11.71
12.54
5.00
5.45
7.07
8.32
9.49
1.57
10.58
11.48
12.39
13.30
5.42
5.85
9.96
10.48
10.84
11.54
12.07
13.30
14.92
4.55
7.96
.72
9.55
1.60
.50
10.40
10.94
11.29
11.98
12.53
13.78
15.44
4.72
8.42
.86
10.05
1.82
.66
10.87
11.44
11.78
12.46
13.04
14.30
16.00
4.90
8.93
1.02
10.59
2.06
.89
12.04
12.67
13.00
13.66
14.31
15.61
17.41
5.35
10.17
1.47
11.92
2.68
1.59
12.80
13.47
13.79
14.44
15.13
16.47
18.34
5.65
10.96
1.77
12.77
3.10
2.16
13.78
14.51
14.83
15.47
16.22
17.62
19.58
6.04
11.97
2.18
13.86
3.62
2.96
1.59
1.89
1.98
2.33
2.68
3.00
.43
.61
8.64
.14
.28
1.62
1.94
2.04
2.38
2.74
3.07
.44
.63
9.45
.15
.31
1.66
1.99
2.11
2.44
2.81
3.16
.46
.66
10.37
.16
.35
1.76
2.13
2.27
2.59
3.00
3.39
.49
.72
12.63
.18
.45
1.83
2.23
2.38
2.69
3.13
3.54
.51
.76
14.07
.20
.52
1.93
2.36
2.53
2.84
3.31
3.75
.54
.81
15.89
.22
.60
1.16
.83
.94
1.16
.26
1.23
.86
.98
1.21
.28
1.30
.89
1.02
1.27
.30
1.48
.97
1.13
1.42
.35
1.60
1.02
1.20
1.51
.39
1.75
1.08
1.29
1.63
.44
BASEMENT FLOOR
Costs/Sq. Ft. of Floor Area
Concrete floor, 2" thick, raked finish
3"
3" thick, trowel finish
4"
5"
6"
Gravel base, 4"
6"
Terrazzo on 3" concrete
Vapor barrier
Wire mesh reinforcing
FLOOR CONSTRUCTION
Costs/Sq. Ft. of Floor Area
Subfloor
Common board, 1" x 6"
Plywood, 3/8"
1/2"
3/4"
Felt underlay
190
©2003 - State of Michigan
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
1.34
1.22
.81
1.52
1.39
.92
1.83
1.66
1.11
2.13
1.94
1.29
.20
.43
.47
.58
.30
.18
.21
.14
2.45
2.81
3.15
.43
.61
.49
.36
.14
1.39
1.27
.84
1.59
1.45
.96
1.93
1.76
1.17
2.27
2.07
1.38
.21
.44
.48
.60
.31
.19
.22
.15
2.50
2.88
3.23
.44
.63
.58
.44
.15
1.45
1.32
.88
1.67
1.52
1.01
2.05
1.86
1.24
2.42
2.20
1.47
.21
.45
.50
.62
.31
.20
.22
.15
2.56
2.95
3.32
.46
.66
.69
.54
.16
1.59
1.44
.96
1.85
1.68
1.12
2.32
2.11
1.41
2.79
2.54
1.69
.23
.48
.53
.66
.33
.21
.24
.17
2.72
3.15
3.56
.49
.72
1.00
.82
.18
1.68
1.52
1.01
1.97
1.79
1.19
2.50
2.27
1.51
3.03
2.75
1.83
.25
.51
.56
.69
.34
.23
.25
.18
2.83
3.29
3.72
.51
.76
1.22
1.02
.20
1.79
1.63
1.09
2.13
1.93
1.29
2.72
2.48
1.65
3.32
3.02
2.01
.27
.54
.59
.73
.36
.24
.27
.19
2.98
3.48
3.93
.54
.81
1.50
1.29
.22
3.95
3.17
5.06
3.68
3.85
1.32
5.04
.73
2.10
5.03
4.08
6.50
4.61
4.82
1.61
6.61
.90
2.60
5.73
4.67
7.43
5.21
5.45
1.79
7.65
1.00
2.93
6.61
5.42
8.62
5.97
6.24
2.02
8.98
1.14
3.33
5.87
6.27
1,575
5,000
4.98
6.88
6.90
2,150
7,100
6.07
7.48
7.29
2,525
8,500
6.84
8.24
7.85
3,000
10,250
7.91
105.50
79.00
113.50
110.00
89.00
121.00
113.50
95.00
126.00
118.00
103.50
133.00
Costs/Sq. Ft. of Wall Area
Wood joists, 2" x 6", 12" o.c.
16" o.c.
24" o.c.
2" x 8", 12" o.c.
16" o.c.
24" o.c.
2" x 10", 12" o.c.
16" o.c.
24" o.c.
2" x 12", 12" o.c.
16" o.c.
24" o.c.
Bridging
Steel I-beam, 6"
8"
10"
Wood beams
Steel posts, 3" diameter
4" diameter
Wood posts
Slab on grade, concrete, 4" thick
5"
6"
Gravel base, 4"
6"
Sleepers, 1" x 2"
Insulation additive for crawl space
Vapor barrier, polyethylene
HEATING AND AIR CONDITIONING
Costs/Sq. Ft. of Living Area
Heating systems
Forced warm air, with return ducts
3.15
3.52
Without return ducts
2.50
2.81
Forced hot water/steam
4.00
4.49
Electric wall heaters, baseboard type
2.98
3.31
Electric ceiling, radiant
3.11
3.46
Electric wall heaters
1.11
1.21
Radiant (in-floor) heating
3.89
4.42
Space heaters
.61
.67
Wall or floor furnace, no ducts
1.71
1.89
Heating and cooling combined systems
Forced air, same ducts
5.08
5.39
Heat pump
5.78
5.96
Wood burner integrated with furnace, add
1,200
1,375
Exterior furnace
3,600
4,250
Cooling only with separate ducts
4.20
4.56
Solar for space and hot water system (costs per sq. ft. of collector area)
Fluid system, vacuum tube collectors
103.00
104.00
Other collectors
71.00
74.50
Air system
108.50
111.00
©2003 - State of Michigan
191
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
12.15
8.00
9.55
11.94
625
875
1,550
2,700
725
12.89
8.56
11.03
14.08
675
925
1,625
2,825
775
13.85
9.28
12.92
16.84
700
975
1,725
3,000
825
Costs/Sq. Ft. of Wall Area
Storage wall, concrete, cost/sq. ft. area
10.12
10.54
11.01
Block
6.45
6.78
7.13
Floor, pavers
5.65
6.41
7.29
Quarry tile
6.50
7.53
8.75
Tanks, storage, LP gas, 125 gallons
550
575
600
250 gallons
750
775
800
500 gallons
1,325
1,375
1,425
1,000 gallons
2,375
2,425
2,500
Fuel oil, 275 gallons
625
650
675
Costs are for gas-fired systems. For oil-fired, add 7% plus storage tank.
Note: The assessor should analyze whether the added cost of oil heat contributes to the
value.
ELECTRIC LIGHTING SYSTEMS
Costs/Sq. Ft. of Living Area
60-amp. system, Romex
BX
Conduit
100-amp. system
BX
Conduit
150-amp. system
BX
Conduit
200-amp. system
BX
Conduit
Garage lighting, $140 to $550 per garage.
2.67
3.14
4.16
3.22
3.79
4.47
3.55
4.18
4.93
3.88
4.58
5.40
2.91
3.43
4.46
3.51
4.14
4.88
3.87
4.57
5.39
4.24
5.00
5.90
3.19
3.76
4.78
3.84
4.53
5.34
4.24
5.00
5.90
4.64
5.47
6.45
3.86
4.56
5.58
4.66
5.50
6.48
5.14
6.06
7.15
5.62
6.63
7.82
4.30
5.07
6.08
5.18
6.11
7.20
5.72
6.74
7.95
6.25
7.37
8.70
4.84
5.71
6.72
5.84
6.89
8.12
6.44
7.60
8.96
7.05
8.31
9.80
525
630
495
650
755
720
325
370
390
475
830
580
540
635
1,500
1,600
220
665
1,880
6,290
665
780
615
815
925
875
395
445
465
550
940
670
645
745
1,575
1,725
255
760
2,120
6,880
845
965
770
1,015
1,140
1,075
480
530
555
640
1,065
775
765
880
1,675
1,875
290
875
2,405
7,535
1,375
1,500
1,225
1,610
1,735
1,625
710
760
795
870
1,390
1,050
1,105
1,230
1,850
2,200
390
1,175
3,120
9,160
1,775
1,900
1,550
2,045
2,165
2,000
875
925
960
1,025
1,605
1,225
1,335
1,470
1,975
2,400
455
1,370
3,590
10,195
2,325
2,425
2,000
2,630
2,740
2,525
1,095
1,135
1,180
1,220
1,880
1,475
1,650
1,775
2,075
2,600
540
1,625
4,185
11,505
PLUMBING
Cost Each
Bathtub, no shower, white
Colored
Fiberglass
With shower, white
Colored
Fiberglass
Sink, countertop, white
Colored
Wall hung, white
Colored
Shower stall, ceramic tile
Fiberglass
Toilet, white
Colored
Electric, incinerator type
Composting
Ceramic tile, tub alcove
Wainscoting, per room
Marble, tub alcove
Wainscoting, per room
192
©2003 - State of Michigan
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
405
445
465
490
515
445
315
395
535
565
615
480
505
600
900
3,325
265
280
350
445
485
510
570
600
535
360
455
570
605
660
515
545
650
955
3,675
305
310
390
490
530
555
660
695
640
410
525
610
650
715
550
585
700
1,015
4,075
355
340
430
605
645
680
900
950
925
545
715
705
765
850
635
690
835
1,175
5,100
485
420
545
675
720
755
1,060
1,125
1,150
635
840
765
835
935
690
755
915
1,250
5,750
570
470
620
770
810
855
1,275
1,350
1,400
750
1,000
845
925
1,040
760
835
1,020
1,375
6,600
680
535
710
1,825
1,575
2,425
3,575
4,400
2,050
1,575
2,550
3,775
4,675
2,325
1,575
2,700
3,975
4,975
2,975
1,600
3,050
4,475
5,700
3,425
1,625
3,250
4,800
6,150
3,975
1,675
3,550
5,225
6,750
2,720
3,425
4,500
2,895
3,675
4,750
3,085
3,950
5,000
3,550
4,600
5,650
3,850
5,025
6,050
4,225
5,575
6,575
3,000
3,775
4,950
3,875
3,200
4,075
5,275
4,450
3,450
4,400
5,575
5,125
4,025
5,200
6,400
6,925
4,400
5,725
6,900
8,100
4,850
6,400
7,550
9,625
70
130
87
77
21.85
6.05
85
145
104
93
23.30
6.75
104
165
125
112
24.90
7.45
160
215
180
165
28.80
9.30
195
250
220
205
31.25
10.50
250
295
275
255
34.40
12.00
Costs Each
Kitchen sink, one compartment, white
Colored
Steel
Two compartments, white
Colored
Steel
Laundry tub, one compartment
Two compartments
Water heater, gas, 30-gallon
40-gallon
50-gallon
Electric, 30-gallon
40-gallon
52-gallon
80-gallon
Solar with 100-gallon tank
Floor drain
Rough-in
Sump pump
WATER AND WASTE DISPOSAL
Cost Each
Municipal connections, including trench,
pipe, tap and fees (40-foot setback)
Well system, 50 feet deep
100 feet
150 feet
200 feet
Septic system, 1000-sq. ft. bed
1000-gallon tank
1500-gallon tank
2000-gallon tank
Septic system, mound type, 1000-sq. ft. bed
1000-gallon tank
1500-gallon tank
2000-gallon tank
Grinder pump system, add
BUILT-IN UNITS
Costs as Shown
Kitchen cabinet, cost per linear foot
Base, with laminated plastic top
Softwood
Hardwood
Hardwood veneer
Laminated plastic veneer
Ceramic tile top, add
Linoleum top, deduct
©2003 - State of Michigan
193
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
Cost as Shown
Wall mounted, 18"
Softwood
Hardwood
Hardwood veneer
Laminated plastic veneer
Wall mounted, 30"
Softwood
Hardwood
Hardwood veneer
Laminated plastic veneer
China cabinet, 80" high, corner type
Medicine cabinet, cost each
Vanity cabinet, cost each
Fireplace, cost each
Inside chimney, one-story
Two-story
Add for second fireplace, same stack
Two-sided fireplace
Outside chimney, one-story
Two-story
Add for second fireplace, same stack
Prefabricated fireplace
Pellet or corn cob stoves
Heat-circulating device
Direct vented (no chimney) gas fireplace
Chimney, inside, furnace, cost per lin. ft.
Common brick with liner, 16" x 16"
16" x 20"
Concrete block with liner, 16" x 16"
16" x 20"
Metal, single-wall
Double-wall
Triple-wall
Custom fireplace, cost each
Inside chimney, one-story
Two-story
Add for second fireplace, same stack
Two-sided fireplace
Outside chimney, one-story
Two-story
Add for second fireplace, same stack
Direct vented (no chimney) gas fireplaces
Stairs, second floor, with balustrade
Partial balustrade
Custom stairs, curved or floating
Attic
Attic, disappearing, manual
Motorized
Basement, open riser
Closed riser
Range, drop-in, each
With standard oven
With self-cleaning oven
Custom
Cooktop, countertop, four burners
With self-venting grille (Jenn Air)
194
42
84
63
52
48
92
69
58
54
101
76
65
72
125
91
82
84
140
101
94
99
155
114
108
50
99
74
58
530
140
165
57
110
81
65
580
170
210
65
120
89
73
635
210
270
86
145
108
93
770
325
455
100
160
120
107
855
410
590
117
180
135
125
960
525
780
2,600
3,075
2,200
3,775
3,050
3,700
2,200
1,330
1,750
490
725
2,900
3,425
2,425
4,200
3,450
4,150
2,425
1,710
1,950
530
925
3,250
3,825
2,650
4,675
3,875
4,650
2,650
2,200
2,175
575
1,200
4,100
4,800
3,200
5,800
4,925
5,875
3,200
3,630
2,700
675
2,000
4,575
5,350
3,500
6,450
5,525
6,600
3,500
4,660
3,000
730
2,575
5,150
5,975
3,850
7,200
6,225
7,400
3,850
5,990
3,350
790
3,325
99.00
111.50
80.50
93.00
21.95
25.40
34.25
112.00
125.50
90.00
103.50
24.25
28.25
37.90
126.00
142.00
100.50
115.00
26.90
31.45
42.05
163.00
183.00
127.50
145.00
33.50
39.55
52.35
187.00
210.00
145.00
164.00
37.75
44.75
59.05
217.50
244.00
167.00
188.00
43.10
51.35
67.45
6,675
7,800
3,325
8,675
7,550
9,025
3,325
2,800
940
6,950
8,125
3,475
9,025
8,000
9,550
3,475
3,150
1,125
7,250
8,450
3,625
9,400
8,475
10,100
3,625
3,550
1,355
7,850
9,200
3,925
10,225
9,525
11,300
3,925
4,575
1,985
8,175
9,575
4,100
10,650
10,100
11,975
4,100
5,175
2,425
8,525
9,975
4,275
11,075
10,725
12,675
4,275
5,850
3,005
795
10,750
775
360
7,175
965
13,950
835
450
7,475
1,175
18,100
905
570
7,825
1,755
31,000
1,075
920
8,675
2,165
41,000
1,185
1,180
9,200
2,705
54,750
1,325
1,535
9,925
430
725
490
835
555
965
720
1,275
815
1,470
930
1,695
595
770
5,300
290
480
690
915
5,750
365
590
800
1,090
6,225
455
725
1,070
1,535
7,325
705
1,090
1,245
1,820
7,950
880
1,340
1,440
2,160
8,600
1,095
1,640
©2003 - State of Michigan
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
605
725
865
1,235
1,475
1,760
1,120
1,325
1,570
2,200
2,600
3,080
335
400
480
690
825
990
Microwave combination
1,345
1,510
1,695
2,140
2,400
2,695
Custom double-wall
2,400
2,725
3,125
4,075
4,675
5,325
450
595
785
1,370
1,810
2,385
Deluxe
2,400
2,850
3,375
4,775
5,675
6,725
Icemaker
495
590
705
1,005
1,200
1,430
Cost as Shown
Oven, built-in
Double
Microwave
Refrigerator/freezer, built-in
Dishwasher, built-in
475
535
610
790
895
1,015
1,070
1,235
1,420
1,885
2,175
2,500
165
190
215
285
325
375
375
405
440
520
565
610
100
115
135
190
220
260
150
170
190
240
275
310
135
165
195
280
335
400
240
285
335
465
545
645
1,950
2,505
3,215
5,295
6,790
8,715
3,815
4,120
4,455
5,280
5,805
6,470
345
395
450
585
670
765
75
85
90
110
120
130
Jacuzzi tub
2,995
3,560
4,240
6,085
7,360
9,025
Sauna with heater and controls
Deluxe
Garbage disposal
Deluxe, heavy duty
Heater, bathroom, without fan
With fan
Hood, range, unvented
Vented
Custom, stainless steel or copper
Hot tub, with whirlpool, built-in
Intercom system, master station
Satellite
3,850
4,585
5,460
7,750
9,235
11,000
Skylight, costs per square foot
45
50
55
70
75
90
Smoke detector, each
70
80
90
120
135
155
480
515
555
650
700
755
1,345
1,420
1,495
1,660
1,750
1,840
100
115
135
180
210
245
Kitchen
110
125
145
190
215
245
Attic
440
470
505
575
615
660
Whole house
910
940
970
1,040
1,075
1,110
1,100
1,125
1,150
1,205
1,235
1,265
50,000-grain
1,225
1,255
1,285
1,350
1,380
1,415
75,000-grain
1,270
1,310
1,345
1,425
1,465
1,505
100,000-grain
1,320
1,360
1,405
1,495
1,545
1,595
700
725
750
800
850
900
50,000-grain
850
875
875
950
975
1,050
75,000-grain
900
950
975
1,075
1,125
1,200
125,000-grain
1,050
1,100
1,125
1,225
1,300
1,375
450
475
525
625
700
775
875
1,050
1,275
1,875
2,300
2,850
950
1,125
1,350
2,000
2,425
3,000
1,000
1,200
1,425
2,075
2,525
3,125
Trash compactor
Vacuum, central system
Vent fan, bathroom
Water softener, automatic, 25,000-grain
Manual, 25,000-grain
Wet bar
Deluxe
Wood-burning stove, freestanding
Fireplace insert
©2003 - State of Michigan
195
UNIT-IN-PLACE COSTS
D
CD
C
BC
B
A
2,320
2,595
690
1,935
2,735
2,900
905
2,290
3,235
3,250
1,185
2,720
4,575
4,125
2,060
3,880
5,490
4,695
2,745
4,680
6,685
5,415
3,705
5,720
70
70
310
10
95
70
10
75
75
40
45
80
90
355
15
110
90
15
85
85
40
50
90
115
410
20
125
115
15
100
100
45
60
120
185
555
40
170
185
25
125
125
60
80
135
235
650
55
200
235
30
145
145
70
95
155
305
770
75
235
305
35
170
170
80
115
85
85
85
85
70
665
105
105
105
100
90
880
130
130
130
125
110
1,165
205
205
205
195
175
2,085
260
260
260
240
225
2,810
335
335
335
305
290
3,845
70
10
70
70
70
80
10
80
80
80
90
10
90
90
90
120
15
120
120
120
135
15
135
135
135
155
15
155
155
155
215
145
105
40
15
240
175
135
40
20
270
210
170
45
30
350
305
275
50
70
400
375
355
55
100
465
465
465
60
150
Cost as Shown
SECURITY ALARM SYSTEMS
Audio/video entry systems
Home automation systems
Residential security systems, wireless
Hard-wired
Sensors
Point-area detectors (per opening)
Alarm glass (wired)
Screen (burglarproof, wired)
Photoelectric, beam interrupt
Field of view changes
Stress detectors, floor
Pressure mat
Trip or pull switches (wire trap)
Switch sensors, magnetic, (each)
Mercury
Self-contained (battery)
Vibration detectors
Volume detectors
Motion detectors, infrared
Microwave
Ultrasonic
Self-contained (battery)
Sound detectors, sensing units
Remote monitoring
Annunciators
Alarms, local, residential
Bells
Buzzers
Horns
Sirens
Lights
Control units (transmission/display)
Control panel
Remote annunciator
Add for: electrical switch locks
Remote transmitters, each
Stand-by power, battery
196
©2003 - State of Michigan
LAND IMPROVEMENTS
D
CD
C
BC
B
A
1.42
1.81
2.98
3.12
3.39
3.67
1.20
1.51
1.86
3.20
3.35
3.78
4.07
1.22
1.61
1.92
3.44
3.61
4.21
4.54
1.24
1.86
2.08
4.04
4.23
5.31
5.70
1.29
2.01
2.18
4.41
4.63
6.02
6.45
1.33
2.21
2.32
4.89
5.13
6.91
7.39
1.39
7.93
6.84
9.03
8.62
7.45
9.95
9.39
8.13
10.98
11.28
9.80
13.55
12.49
10.87
15.20
14.01
12.22
17.29
21.50
14.15
8.95
8.30
7.05
6.30
16.80
11.05
8.10
6.55
5.60
4.95
32.25
21.15
15.35
12.45
10.60
9.40
36.00
23.61
17.14
13.90
11.83
10.49
21.84
14.37
10.53
8.52
7.28
6.44
24.20
15.90
10.05
9.35
7.95
7.10
19.00
12.55
9.10
7.45
6.35
5.65
36.45
23.90
17.30
14.05
11.95
10.65
41.30
27.08
19.60
15.92
13.54
12.07
24.70
16.32
11.83
9.69
8.26
7.35
25.15
16.50
10.50
9.70
8.30
7.35
19.75
13.00
9.50
7.70
6.55
5.85
37.80
24.75
17.95
14.55
12.40
11.05
43.15
28.25
20.49
16.61
14.15
12.61
25.68
16.90
12.35
10.01
8.52
7.61
27.15
17.80
11.30
10.45
8.90
7.95
21.30
14.00
10.20
8.30
7.05
6.30
40.70
26.75
19.35
15.65
13.35
11.90
46.81
30.76
22.25
18.00
15.35
13.69
27.69
18.20
13.26
10.79
9.17
8.19
DRIVEWAYS AND WALKS
Costs/Sq. Ft.
Asphalt paving
Sealer, two coats
Concrete, plain, 3-1/2" thick
4"
Reinforced, 4"
5"
Crushed rock
TERRACE OR PATIO
Costs/Sq. Ft.
Brick
Concrete patio blocks
Flagstone
WOOD DECKS
Costs/Sq. Ft.
(includes decking, railings, girder, joists, posts and footings)
Pressure-treated wood, 12 sq. ft.
25 sq. ft.
50 sq. ft.
100 sq. ft.
200 sq. ft.
500 sq. ft.
Regular (pine or similar), 12 sq. ft.
25 sq. ft.
50 sq. ft.
100 sq. ft.
200 sq. ft.
500 sq. ft.
Redwood or cedar, 12 sq. ft.
25 sq. ft.
50 sq. ft.
100 sq. ft.
200 sq. ft.
500 sq. ft.
Vinyl, 12 sq. ft.
25 sq. ft.
50 sq. ft.
100 sq. ft.
200 sq. ft.
500 sq. ft.
Wood polymer composite, 12 sq. ft.
25 sq. ft.
50 sq. ft.
100 sq. ft.
200 sq. ft.
500 sq. ft.
©2003 - State of Michigan
19.75
12.95
8.20
7.60
6.50
5.75
15.45
10.20
7.45
6.05
5.15
4.55
29.60
19.40
14.05
11.35
9.75
8.60
32.56
21.34
15.46
12.49
10.73
9.46
20.09
13.26
9.69
7.87
6.70
5.92
20.60
13.55
8.60
7.95
6.75
6.00
16.15
10.65
7.80
6.30
5.35
4.75
30.90
20.30
14.75
11.90
10.15
9.00
34.24
22.50
16.35
13.19
11.25
9.97
21.00
13.85
10.14
8.19
6.96
6.18
197
LAND IMPROVEMENTS
D
CD
C
BC
B
A
RETAINING WALLS
Costs/Sq. Ft. of Wall Area
(includes footings)
Block, reinforced, 6"
8"
Block w/ pilaster, reinforced, 8"
Brick, 8" thick
12" thick
Precast, 8" nonretaining
Retaining
8.05
8.93
7.15
14.97
19.19
5.82
9.54
8.43
9.40
7.38
15.57
20.06
5.96
9.70
8.85
9.91
7.64
16.22
21.02
6.11
9.88
9.86
11.15
8.29
17.84
23.37
6.50
10.39
10.52
11.95
8.72
18.89
24.89
6.77
10.76
11.36
12.97
9.30
20.27
26.86
7.14
11.29
.12
.17
1.74
.21
.39
.14
.21
1.86
.23
.47
.16
.26
1.98
.27
.56
.21
.38
2.29
.34
.82
.24
.47
2.48
.40
.99
.28
.59
2.73
.46
1.22
1.25
.44
1.74
10.10
24.80
76.80
1.37
.53
1.94
11.25
28.00
85.80
1.49
.63
2.17
12.55
31.70
96.05
1.81
.93
2.73
15.90
41.15
121.80
2.00
1.15
3.10
18.05
47.35
138.55
2.26
1.42
3.56
20.80
55.20
159.70
65
300
790
80
355
935
105
415
1,110
165
590
1,590
215
710
1,915
280
860
2,345
16.36
15.27
22.36
18.27
16.96
24.40
20.43
18.86
26.68
25.88
23.63
32.30
29.41
26.72
35.98
33.88
30.61
40.41
17.45
16.09
3.27
10.91
6.00
7.64
9.55
10.09
3.27
.76
19.41
17.82
3.54
12.04
6.73
8.16
10.09
10.78
3.71
.84
21.63
19.78
3.84
13.31
7.56
8.74
10.69
11.54
4.21
.93
27.21
24.67
4.58
16.49
9.67
10.15
12.15
13.38
5.50
1.16
30.81
27.82
5.05
18.53
11.04
11.05
13.07
14.56
6.35
1.30
35.36
31.80
5.65
21.10
12.78
12.18
14.26
16.05
7.43
1.49
LANDSCAPING
Costs as Shown
Soil preparation, per sq. ft.
Fine grading
Mulching
Top dressing or bedding
Lawns, per sq. ft., seeding
Sodded
Ground cover, per sq. ft.
Gravel/wood chip
Spreading plants
Edging redwood, per lin. ft.
Shrubs and hedges, each, small
Medium
Large
Trees, each
Small, 15-gallon, 20" box
Medium, 24" to 36" box
Large, 42" box and larger
FENCES
Cost/Lin. Ft.
Vinyl fencing
Spaced slat panels
6'
4' – 5'
Basketweave, 5'
Solid board panels
6'
4' – 5'
Add for lattice top
Picket, 36" – 48" high
Lattice, framed 24" – 50" high
Two rails, 36" – 48" high
Three rails, 60" high
Four rails, 60" high
Lattice, arbor, per sq. ft.
Trellis (no frame)
198
©2003 - State of Michigan
LAND IMPROVEMENTS
D
CD
C
BC
B
A
14.18
12.93
13.91
13.15
16.69
16.15
7.64
10.15
7.04
7.75
9.49
7.58
.27
15.24
13.85
15.06
14.11
17.79
17.13
8.31
10.85
7.50
8.27
10.17
8.16
.30
16.41
14.87
16.34
15.17
18.99
18.20
9.06
11.64
8.01
8.85
10.92
8.80
.32
19.26
17.35
19.49
17.77
21.92
20.82
10.90
13.54
9.26
10.27
12.75
10.36
.38
21.07
18.92
21.49
19.42
23.78
22.48
12.07
14.75
10.05
11.16
13.92
11.35
.42
23.36
20.92
24.01
21.51
26.15
24.60
13.55
16.28
11.05
12.30
15.39
12.60
.48
1.84
1.57
1.57
1.95
180
235
385
480
1.87
1.60
1.59
2.00
190
265
425
540
1.90
1.62
1.60
2.05
205
300
475
600
1.98
1.70
1.66
2.19
245
385
595
760
2.04
1.76
1.70
2.29
265
445
670
860
2.14
1.84
1.77
2.42
295
520
770
990
4.88
7.59
5.89
8.80
7.13
10.23
10.59
13.99
13.02
16.53
16.24
19.78
.45
.31
109.00
.50
.32
115.00
.55
.34
121.50
.69
.38
137.25
.79
.41
147.25
.90
.44
160.25
66.75
42.15
33.55
27.90
69.95
44.65
35.90
29.70
73.50
47.45
38.45
31.70
82.10
54.25
44.65
36.55
87.60
58.55
48.65
39.60
94.80
64.10
53.65
43.50
76.75
48.45
38.60
34.90
82.15
52.45
42.10
37.40
88.05
56.85
46.05
40.15
102.45
67.70
55.75
46.90
111.60
74.60
61.95
51.15
123.20
83.30
69.75
56.55
Cost/Ln. Ft.
Wood fencing
Solid board, horizontal or vertical, 6'
5'
Split redwood/grape stake, 6'
5'
Basketweave, 6'
5'
Wood picket, 12" to 24"
30" – 40"
Split, two-rail, 24" to 36" high
Three-rail, 36" to 48" high
Four-rail, 42" to 54" high
Wooden gates, per sq. ft.
Paint, per sq. ft., per coat
CHAIN LINK FENCES
Cost/Sq. Ft.
Mesh, 2", #9 wire
#11 wire
Add for rails
Add for three-strand barbed wire
Gates, 3' wide
5' wide
10' wide
15’ wide
METAL FENCES AND GRILLS
Cost/Sq. Ft.
Hand-forged wrought iron
Modular, steel or aluminum
LAWN SPRINKLERS
Cost/Sq. Ft.
Conventional
Rainbird or Rain Jet systems
For automatic control, add per station
SWIMMING POOLS
Cost/Sq. Ft. Surface Area
(including filter, diving board, steps and ladder)
Gunite pool
Surface area: 200 sq. ft.
400 sq. ft.
600 sq. ft.
800 sq. ft.
Poured concrete pool, in ground
Surface area: 200 sq. ft.
400 sq. ft.
600 sq. ft.
800 sq. ft.
©2003 - State of Michigan
199
LAND IMPROVEMENTS
D
CD
C
BC
B
A
56.75
35.80
28.50
23.70
59.45
37.95
30.50
25.25
62.45
40.35
32.65
26.95
69.80
46.10
37.95
31.05
74.50
49.80
41.35
33.65
80.55
54.45
45.60
37.00
51.45
31.20
24.80
20.40
51.90
31.95
25.35
20.85
52.45
32.85
25.95
21.40
54.30
35.10
27.55
22.75
55.80
36.65
28.65
23.70
58.10
38.75
30.20
25.05
465
435
955
85
490
515
490
1,175
135
635
575
555
1,450
215
825
730
715
2,200
530
1,410
825
820
2,775
845
1,865
950
950
3,500
1,365
2,495
Attached whirlpool bath
(portable type, including hot tubs)
4,800
5,350
5,975
7,550
8,575
9,850
Separate whirlpool bath,
(4–10 persons)
6,475
7,700
9,200
13,225
16,000
19,650
Cost/Sq. Ft. Surface Area
(including filter, diving board, steps and ladder)
Fiberglass pool, in ground
Surface area: 200 sq. ft.
400 sq. ft.
600 sq. ft.
800 sq. ft.
Plastic-lined pool, in ground
Surface area: 200 sq. ft.
400 sq. ft.
600 sq. ft.
800 sq. ft.
Pool accessories
Deduct for lack of filter
Deduct for lack of diving board
Add for heater
Chlorinator
Hydrosweep
GAZEBOS
Typical cost each
(8' to 20' wood units including minimal foundation but excluding floors)
Standard
Deluxe
1,275
11,250
1,800
13,250
2,500
15,750
4,950
22,500
7,050
27,250
10,150
33,250
18.00
23.23
19.57
23.85
21.31
24.66
25.61
26.43
28.34
27.63
24.40
29.28
BOAT DOCKS
Cost/Sq. Ft.
(including fenders and railings)
Decking, light posts, 2"
Light piling, 3"
SHEDS
Cost/Sq. Ft.
(excluding permanent foundation or slab and electrical. Includes entry doors with some windows in
better qualities). Exterior wall height is 8'. For loft/barn (gambrel), add 10 to 15%.
Wood frame, 40 sq. ft.
100 sq. ft.
200 sq. ft.
300 sq. ft.
400 sq. ft.
Metal prefabricated, 40, sq. ft.
100 sq. ft.
200 sq. ft.
300 sq. ft.
400 sq. ft.
200
10.66
9.06
7.70
7.05
6.45
8.33
7.49
6.75
6.16
5.62
11.95
10.15
8.63
7.90
7.23
9.16
8.16
7.28
6.64
6.06
13.42
11.40
9.69
8.87
8.12
10.08
8.90
7.86
7.18
6.55
17.14
14.57
12.38
11.33
10.37
12.39
10.73
9.30
8.49
7.75
19.56
16.62
14.13
12.93
11.83
13.87
11.90
10.21
9.32
8.51
22.62
19.23
16.34
14.95
13.68
15.73
13.37
11.37
10.37
9.47
©2003 - State of Michigan
Fly UP