Comments
Description
Transcript
NU C LE AR RE G UL AT O RY ...
UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LI LIN N GTON , TEXAS 76011-4125 March 4, 2009 James R. Douet Vice President Operations Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 SUBJECT: ANNUAL ASSESSMENT LETTER - GRAND GULF NUCLEAR STATION (NRC INSPECTION REPORT 05000416/2009001) Dear Mr. Douet: On February 12, 2009, the NRC staff completed its performance review of Grand Gulf Nuclear Station. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2008. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the security cornerstone review and resultant inspection plan. Overall, Grand Gulf Nuclear Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Regulatory Response Column of the NRC’s Action Matrix as a result of a White performance indicator for unplanned scrams per 7000 critical hours. This performance indicator initially crossed the Green-White threshold in the first quarter of this assessment period. The NRC completed a supplemental inspection using Inspection Procedure 95001, “Supplemental Inspection for One or Two White inputs in a Strategic Performance Area,” on June 12, 2008, and the performance indicator returned to Green in the second quarter of 2008. During the fourth quarter of 2008, it again returned to White as a result of two additional unplanned scrams. The staff commenced an additional supplemental inspection per Inspection Procedure 95001 in February, 2009. This inspection will provide assurance that the root and contributing causes for the White performance indicator are understood, the extent of condition and extent of cause are identified, and that corrective actions are sufficient to address the root and contributing causes and prevent their recurrence. The staff identified that there were more than three green or safety significant inspection findings for the current 12-month assessment period with documented cross-cutting aspects in the area of human performance, and there is a cross-cutting theme in the aspect of human error prevention techniques (H.4.a) associated with these findings. In evaluating the scope of efforts and progress in addressing the cross-cutting theme, the staff determined that you appropriately recognized the theme and developed and began implementation of a new station performance Entergy Operations, Inc. -2- improvement plan to address it. Because a reasonable duration of time has not passed for the staff to determine the effectiveness of the performance improvement plan, we have determined that a substantive cross-cutting issue does not exist at this time. We will continue to closely monitor the progress of your corrective actions through the baseline inspection program over the next assessment period. The enclosed inspection plan details the inspections, less those related to security scheduled through June 30, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid cycle review. In accordance with 10 CFR 2.390 of the NRC’s “Rules of Practice,” a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Geoffrey Miller at (817) 860-8144 with any questions you may have regarding this letter or the inspection plan. Sincerely, /RA/ Dwight D. Chamberlain, Director Division of Reactor Projects Docket: 50-416 License: NPF-29 Enclosure: Grand Gulf Inspection/Activity Plan cc w/enclosure: Allen Burks, President Supervisor, District 1 Claiborne County 2047 Woodvine Road Lorman, MS 39096 Marvin Ratliff, Sr. Ward 4 512 Jackson Street Port Gibson, MS 39150 The Honorable Alex Davis Mayor, Town of Newellton P.O. Box 477 Newellton, LA 71357-477 Mattie Sampson Board of Alderpersons P.O. Box 395 Newellton, LA 71357-0395 Mr. Carroll Fuller Board of Alderpersons P.O. Box 303 Newellton, LA 71357-0303 Entergy Operations, Inc. Tim Turner Board of Alderpersons P.O. Box 283 Newellton, LA 71357-0283 Rhonda King Clerk 435 Beasley Road Newellton, LA 71357 Gayle Kowan Ferriday City Clerk 1116 South 2nd Street Ferriday, LA 71334 The Honorable Edward Brown Mayor, Town of St. Joseph St. Joseph, LA 71366 Edward Dandridge Board of Alderpersons District B P.O. Box 112 St. Joseph, LA 71366 -3Mike Womack, Director Mississippi Emergency Management Agency P.O. Box 4644 Pearl, MS 39288 Jerry Cain, Director Office of Pollution Control Department of Environmental Quality P.O. Box 2261 Jackson, MS 39225 Conrad S. Burnside, Chief Technological Hazards Branch National Preparedness Division DHS/FEMA 3003 Chamblee Tucker Road Atlanta, GA 30341 Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76209 Evelyn Guy Board of Alderpersons District E P.O. Box 730 St. Joseph, LA 71366 Annie Watson Clerk P.O. Box 529 Waterproof, LA 71375 Karl J. Koch Town Attorney P.O. Box 1909 Baton Rouge, LA 70821 Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 The Honorable Haley Barbour Office of the Governor P.O. Box 139 Jackson, MS 39201 Senior Vice President and COO Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995 Attorney General Assistant Attorney General State of Mississippi P.O. Box 220 Jackson, MS 39205 Vice President, Oversight Entergy Services, Inc. P.O. Box 31995 Jackson, MS 39286-1995 Entergy Operations, Inc. Chief, Energy and Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P.O. Box 10385 Jackson, MS 39289-0385 President Claiborne County Board of Supervisors 510 Market Street Port Gibson, MS 39150 Senior Manager Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 -4- Office of the Governor State of Mississippi P.O. Box 139 Jackson, MS 39201 Attorney General Assistant Attorney General State of Mississippi P.O. Box 220 Jackson, MS 39205 State Health Officer State Health Board P.O. Box 1700 Jackson, MS 39215 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Louisiana Dept. of Environmental Qualityl Radiological Emergency Planning and Response Division P.O. Box 4312 Baton Rouge, LA 70821-4312 Entergy Operations, Inc. -5- Electronic distribution by RIV: Regional Administrator ([email protected]) Deputy Regional Administrator ([email protected]) DRP Director ([email protected]) DRP Deputy Director ([email protected]) DRP Director ([email protected]) DRP Deputy Director ([email protected]) Senior Resident Inspector ([email protected]) Branch Chief, DRP/C ([email protected]) Senior Project Engineer, DRP/C ([email protected]) Team Leader, DRP/TSS ([email protected]) RITS Coordinator ([email protected]) Public Affairs Officer ([email protected]) Regional State Liaison Officer ([email protected]) RA Secretary ([email protected]) DRA Secretary ([email protected]) Branch Chief, DRS/EB1 ([email protected]) Branch Chief, DRS/EB2 ([email protected]) Branch Chief, DRS/PSB1 ([email protected]) Branch Chief, DRS/PSB2 ([email protected]) Branch Chief, DRS/OB ([email protected]) OEDO RIV Coordinator, Primary ([email protected]) OEDO RIV Coordinator, Backup ([email protected]) OEDO, TRPS ([email protected]) Deputy Director, DIRS, NRR ([email protected]) Director, DORL, NRR (Joseph [email protected]) Deputy Director, DORL, NRR ([email protected]) Chief, PLB IV, DORL, NRR ([email protected]) NRR Project Manager ([email protected]) RidsNrrDirslpab [email protected] [email protected] [email protected] File located: R:\_REACTORS\EOC\EPC Assessment Letters\2009\GG.doc SUNSI Rev Compl. 7 Yes No ADAMS 7 Yes No Reviewer Initials Publicly Avail 7 Yes No Sensitive Yes 7 No Sens. Type Initials RIV/SPE/DRP/C WCWalker /RA/ 2/19/2009 SRI:DRP/C C:DRP/C RLSmith GBMiller /RA/E-WWalker /RA/ 2/19/2009 2/19/2009 OFFICIAL RECORD COPY D:DRS RJCaniano /RA 2/23/2009 T=Telephone WCW WCW D:DRP DDChamberlain /RA/ 2/23/2009 E=E-mail F=Fax Grand Gulf Inspection / Activity Plan 03/01/2009 - 06/30/2010 Page 1 of 2 02/23/2009 12:42:10 Report 22 Unit Number Planned Dates Start End Inspection Activity EXAM 1 03/02/2009 03/07/2009 - INITIAL EXAMINATION X02379 95001 1 02/02/2009 04/03/2009 Title - OCCUPATIONAL RADIATION SAFETY - ACCESS 06/08/2009 06/12/2009 IP 7112101 Access Control to Radiologically Significant Areas 1 06/08/2009 06/12/2009 IP 7112102 ALARA Planning and Controls 1 06/08/2009 06/12/2009 IP 71151 Performance Indicator Verification 1 08/17/2009 08/21/2009 REQUAL - BIENNIAL REQUAL IP 7111111B RPTEAM - RADIATION SAFETY TEAM INSPECTION 1 08/17/2009 08/21/2009 IP 2515/173 1 08/17/2009 08/21/2009 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1 08/17/2009 08/21/2009 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1 08/17/2009 08/21/2009 IP 7112202 Radioactive Material Processing and Transportation 1 08/17/2009 08/21/2009 IP 7112203 PSB2-52B 10/30/2009 11/16/2009 11/20/2009 IP 71152B RP-ORS5 1 11/30/2009 12/04/2009 IP 7112101 1 11/30/2009 12/04/2009 IP 7112102 ALARA Planning and Controls 1 11/30/2009 12/04/2009 IP 71151 Performance Indicator Verification 1 01/11/2010 01/15/2010 1 02/01/2010 02/12/2010 1 03/01/2010 03/05/2010 X02440 INITIAL EXAM-GG (04/2010) 1 04/05/2010 04/05/2010 X02440 INITIAL EXAM-GG (04/2010) 1 05/03/2010 05/07/2010 IP 7111402 Alert and Notification System Testing 1 05/03/2010 05/07/2010 IP 7111403 Emergency Response Organization Augmentation Testing 1 05/03/2010 05/07/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 05/03/2010 05/07/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies - TRIENNIAL HEAT SINK PERFORMANCE EB1-17 EXAM 1 3 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications - INITIAL EXAM EP-1 1 Heat Sink Performance - 50.59 AND MODS IP 7111117 4 Identification and Resolution of Problems Access Control to Radiologically Significant Areas IP 7111107T 4 Identification and Resolution of Problems - OCCUPATIONAL RADIATON SAFETY EB2-07T 3 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program - BIENNIAL PI&R INSPECTION IP 71152B 1 Licensed Operator Requalification Program Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 10/26/2009 1 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 1 1 4 GRAND GULF-INITIAL EXAM (08/2008) - 95001 SUPPLEMENTAL INSPECTION IP 95001 RP-ORS4 1 No. of Staff on Site - BIENNIAL EP PROGRAM INSPECTION This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. 4 1 Grand Gulf Inspection / Activity Plan 03/01/2009 - 06/30/2010 Page 2 of 2 02/23/2009 12:42:10 Report 22 Unit Number Planned Dates Start End Inspection Activity EP-1 Title - BIENNIAL EP PROGRAM INSPECTION 1 05/03/2010 05/07/2010 IP 71151-EP01 Drill/Exercise Performance 1 05/03/2010 05/07/2010 IP 71151-EP02 ERO Drill Participation 1 05/03/2010 05/07/2010 IP 71151-EP03 Alert & Notification System 1 05/03/2010 05/21/2010 EB1 08 - INSERVICE INSPECTION IP 7111108G Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. No. of Staff on Site 1 1