NUCLEAR REGULATORY COMMISSION September 1, 2015 Mr. Dennis Koehl
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
September 1, 2015
Mr. Dennis Koehl
President and Chief Executive Officer
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT
ELECTRIC GENERATING STATION (REPORT 05000498/2015005
AND 05000499/2015005)
Dear Mr. Koehl:
On August 11, 2015, the Nuclear Regulatory Commission (NRC) completed its mid-cycle
performance review of South Texas Project Electric Generating Station, Units 1 and 2. The
NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection
results and enforcement actions from July 1, 2014 through June 30, 2015. This letter informs
you of the NRC’s assessment of your facility during this period and its plans for future
inspections at your facility.
The NRC determined that overall, South Texas Project Electric Generating Station, Units 1
and 2 operated in a manner that preserved public health and safety and met all cornerstone
objectives. The NRC determined the performance at South Texas Project Electric Generating
Station, Units 1 and 2 during the most recent quarter was within the Licensee Response
Column of the NRC’s Reactor Oversight Process (ROP) Action Matrix because all inspection
findings had very low (i.e., green) safety significance, and all PIs indicated that your
performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to
conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine
inspections performed by resident inspectors are not included in the inspection plan. The
inspections listed during the second half of the inspection plan are tentative and may be revised
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
you as soon as possible to discuss changes to the inspection plan should circumstances
warrant any changes. This inspection plan does not include security related inspections, which
will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, “Order
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-DesignBasis External Events,” which requires licensees to develop, implement, and maintain guidance
and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling
D. Koehl
-2-
capabilities following a beyond-design-basis external event. Additionally, the Commission
issued Order EA-12-051, “Order Modifying Licenses with Regard to Reliable Spent Fuel Pool
Instrumentation,” which requires licensees to have a reliable means of remotely monitoring
wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and
recovery actions in the event of a beyond-design-basis external event. The NRC is conducting
audits of licensee efforts towards compliance with these Orders. The audit has been completed
at South Texas Project Electric Generating Station, Units 1 and 2, and the information gathered
will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff
receives the Final Compliance letter for the site, the Final Safety Evaluation will be
issued. Then, the NRC staff will confirm through inspections the full implementation of the
orders mentioned above by performing Temporary Instruction 2515/191, “Inspection of the
Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and
Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.”
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC’s
“Rules of Practice,” a copy of this letter will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1141 with any questions you have regarding this letter.
Sincerely,
/RA/
Nicholas H. Taylor, Branch Chief
Project Branch B
Division of Reactor Projects
Docket Nos.: 50-498; 50-499
License Nos.: NPF-76; NPF-80
Enclosure: South Texas Project Electric
Generating Station, Units 1 and 2
Inspection /Activity Plan
D. Koehl
-2-
capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051,
“Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,” which requires licensees to
have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of
event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting
audits of licensee efforts towards compliance with these Orders. The audit has been completed at South Texas
Project Electric Generating Station, Units 1 and 2, and the information gathered will aid staff in development of the
ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final
Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the
orders mentioned above by performing Temporary Instruction 2515/191, “Inspection of the Implementation of
Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
Communication/Staffing/Multi-Unit Dose Assessment Plans.”
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC’s “Rules of Practice,” a
copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1141 with any questions you have regarding this letter.
Sincerely,
/RA/
Nicholas H. Taylor, Branch Chief
Project Branch B
Division of Reactor Projects
Docket Nos.: 50-498; 50-499
License Nos.: NPF-76; NPF-80
Enclosure: South Texas Project Electric
Generating Station, Units 1 and 2
Inspection /Activity Plan
DISTRIBUTION:
See next page
ADAMS ACCESSION NUMBER:
 SUNSI Review
By: NHTaylor
OFFICE
RIV/BC/DRP
NAME
NTaylor
SIGNATURE /RA/
DATE
8/26/15
ML15243A561
ADAMS
 Yes  No
RIV/D/DRS
AVegel
/RA/
8/26/15
 Publicly Available
 Non-Publicly Available
RIV/D/DRP
TPruett
/RA/
8/27/15
OFFICIAL RECORD COPY
 Non-Sensitive
 Sensitive
Letter to Dennis L. Koehl from Nicholas H. Taylor dated September 1, 2015
SUBJECT:
ANNUAL ASSESSMENT LETTER SOUTH TEXAS PROJECT ELECTRIC
GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2015005
AND 05000499/2015005)
DISTRIBUTION:
Regional Administrator ([email protected])
Deputy Regional Administrator ([email protected])
DRP Director ([email protected])
DRP Deputy Director ([email protected])
DRS Director ([email protected])
DRS Deputy Director ([email protected])
Senior Resident Inspector ([email protected])
Resident Inspector ([email protected])
Branch Chief, DRP/B ([email protected])
Senior Project Engineer, DRP/B ([email protected])
Project Engineer, DRP/B ([email protected])
Project Engineer, DRP/B ([email protected])
STP Administrative Assistant ([email protected])
Public Affairs Officer ([email protected])
Public Affairs Officer ([email protected])
RIV State Liaison Officer ([email protected])
Project Manager ([email protected])
Acting Team Leader, DRS/TSS ([email protected])
Director, DIRS, NRR ([email protected])
Deputy Director, DIRS, NRR ([email protected])
Acting Director, DORL, NRR ([email protected])
Acting Deputy Director, DORL ([email protected])
Director, NSIR/DPR ([email protected])
Chief, PLB IV, DORL, NRR ([email protected])
RITS Coordinator ([email protected])
Regional Counsel ([email protected])
Technical Support Assistant ([email protected])
Congressional Affairs Officer ([email protected])
RIV Congressional Affairs Officer ([email protected])
RIV/ETA: OEDO ([email protected])
ROPassessment [email protected]
[email protected]
OEMail [email protected]
Electronic Distribution for South Texas Project Electric Generating Station
07/27/2015
07/27/2015
09/14/2015
10/12/2015
11/16/2015
11/16/2015
11/16/2015
11/16/2015
11/16/2015
11/16/2015
11/16/2015
12/07/2015
01/25/2016
03/01/2016
03/21/2016
07/11/2016
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
2
1
1, 2
1
09/28/2015
09/28/2015
08/31/2015
08/31/2015
07/01/2015
2
2
07/15/2016
03/25/2016
05/30/2016
02/12/2016
12/11/2015
11/20/2015
11/20/2015
11/20/2015
11/20/2015
11/20/2015
11/20/2015
11/20/2015
10/23/2015
09/18/2015
07/31/2015
07/31/2015
07/31/2015
10/09/2015
10/09/2015
09/04/2015
09/04/2015
Planned Dates
Start
End
14:08:13
1
1
1
Unit
Number
Report 22
08/26/2015
Page 1 of 3
IP 7111107T
Heat Sink Performance
IP 7111121
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Drill/Exercise Performance
- EP PERFORMANCE INDICATORS
IP 71151-EP01
EP-2
Component Design Bases Inspection
Operation Of An ISFSI
- STP EQ/CDBI INSPECTION (PILOT)
IP 60855
- DRY RUN INSPECTION (MULTIPLE VISITS)
Component Design Bases Inspection
- STP COMPONENT DESIGN BASIS INSPECTION
EB1-21EQ
ISFSI
IP 7111121
EB1-21T
Alert & Notification System Reliability
ERO Readiness
Drill/Exercise Performance
- STP TRIENNIAL HEAT SINK PERFORMANCE
IP 71151-EP03
EB1-07T
Correction of Emergency Preparedness Weaknesses and Deficiencies
Emergency Action Level and Emergency Plan Changes
- EP PERFORMANCE INDICATORS
IP 71151-EP02
Title
Emergency Preparedness Organization Staffing and Augmentation System
Alert and Notification System Testing
- BIENNIAL EP PROGAM INSPECTION
Inservice Inspection Activities - PWR
- INSERVICE INSPECTION 1R19
Licensed Operator Requalification Program
- OPERATOR REQUAL INSPECTION
Occupational Dose Assessment
Occupational ALARA Planning and Controls
- RADIATION SAFETY
Operation Of An ISFSI
- PAD POUR INSPECTION (ONE WEEK VISIT)
INITIAL EXAM STP UNIT 2 (9/2015)
INITIAL EXAM STP UNIT 1 (9/2015)
INITIAL EXAM STP UNIT 2 (9/2015)
INITIAL EXAM STP UNIT 1 (9/2015)
- INITIAL OPERATOR EXAM
IP 71151-EP01
EP-2
IP 7111405
IP 7111404
IP 7111403
IP 7111402
EP-1
IP 7111108P
71111.08
IP 7111111B
INSP
IP 71124.04
IP 71124.02
RS 24
IP 60855
ISFSI
X02555
X02554
X02555
X02554
EXAM
Inspection Activity
South Texas Project
Inspection / Activity Plan
07/01/2015 - 06/30/2017
2
3
1
6
1
1
1
1
3
2
1
6
No. of Staff
on Site
10/17/2016
10/17/2016
10/17/2016
10/17/2016
11/14/2016
12/05/2016
11/28/2016
11/28/2016
11/28/2016
11/28/2016
01/23/2017
02/06/2017
03/27/2017
03/27/2017
03/27/2017
03/27/2017
03/27/2017
05/08/2017
05/08/2017
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1, 2
1
1, 2
1, 2
07/11/2016
1
1, 2
07/11/2016
1
10/10/2016
07/11/2016
2
07/11/2016
1
05/12/2017
05/12/2017
04/07/2017
03/31/2017
03/31/2017
03/31/2017
03/31/2017
02/10/2017
01/27/2017
12/02/2016
12/02/2016
12/02/2016
12/02/2016
12/09/2016
11/18/2016
10/21/2016
10/21/2016
10/21/2016
10/21/2016
10/21/2016
07/16/2016
07/16/2016
07/15/2016
07/15/2016
Planned Dates
Start
End
14:08:13
1
Unit
Number
Report 22
08/26/2015
Page 2 of 3
Emergency Preparedness Organization Staffing and Augmentation System
Alert and Notification System Testing
- BIENNIAL EP PROGRAM INSPECTION
Inservice Inspection Activities - PWR
- INSERVICE INSPECTION UNIT 1
RETS/ODCM Radiological Effluent Occurrences
Occupational Exposure Control Effectiveness
In-Plant Airborne Radioactivity Control and Mitigation
Radiological Hazard Assessment and Exposure Controls
- RADIATION SAFETY
Fire Protection [Triennial]
Fire Protection [Triennial]
- TRIENNIAL FIRE PROTECTION INSPECTION
Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
Radiological Environmental Monitoring Program
Radioactive Gaseous and Liquid Effluent Treatment
Radiation Monitoring Instrumentation
- RADIATION SAFETY - TEAM
Problem Identification and Resolution
Problem Identification and Resolution
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 7111403
IP 7111402
EP-1
IP 7111108P
RETS/ODCM Radiological Effluent Occurrences
Occupational Exposure Control Effectiveness
Occupational ALARA Planning and Controls
Radiological Hazard Assessment and Exposure Controls
- BIENNIAL PI&R INSPECTION
IP 71151-PR01
71111.08
Inservice Inspection Activities - PWR
- RADIATION SAFETY
IP 71151-OR01
IP 71124.03
IP 71124.01
RS 13 PI
IP 7111105T
IP 7111105T
EB2-05T
IP 71124.08
IP 71124.07
IP 71124.06
IP 71124.05
RS 5678
IP 71152B
IP 71152B
Title
Emergency Action Level and Emergency Plan Changes
Exercise Evaluation
- INSERVICE INSPECTION
IP 71151-PR01
TSB 52B
Alert & Notification System Reliability
- BIENNIAL EP EXERCISE INSPECTION
IP 71151-OR01
IP 71124.02
IP 71124.01
RS 12 PI
IP 7111108P
71111.08
IP 7111404
IP 7111401
EP-3
IP 71151-EP03
ERO Readiness
- EP PERFORMANCE INDICATORS
IP 71151-EP02
EP-2
Inspection Activity
South Texas Project
Inspection / Activity Plan
07/01/2015 - 06/30/2017
1
1
3
4
4
4
2
1
4
2
No. of Staff
on Site
05/08/2017
05/08/2017
05/08/2017
05/08/2017
1, 2
1, 2
1, 2
05/12/2017
05/12/2017
05/12/2017
05/12/2017
Planned Dates
Start
End
14:08:13
1, 2
Unit
Number
Report 22
08/26/2015
Page 3 of 3
Correction of Emergency Preparedness Weaknesses and Deficiencies
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Alert & Notification System Reliability
ERO Readiness
- EP PERFORMANCE INDICATOR VERIFICATION
IP 71151-EP03
Title
Emergency Action Level and Emergency Plan Changes
- BIENNIAL EP PROGRAM INSPECTION
IP 71151-EP02
EP-2
IP 7111405
IP 7111404
EP-1
Inspection Activity
South Texas Project
Inspection / Activity Plan
07/01/2015 - 06/30/2017
1
1
No. of Staff
on Site