April 17, 2014 Mr. Michael D. Skaggs Senior Vice President
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
April 17, 2014
Mr. Michael D. Skaggs
Senior Vice President
Nuclear Generation Development and Construction
Tennessee Valley Authority
6A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
SUBJECT:
MEETING SUMMARY – PUBLIC MEETING WATTS BAR NUCLEAR
UNIT 2
Dear Mr. Skaggs:
This refers to the meeting conducted at our request at the Comfort Inn in Athens, TN on April 9,
2014 at 5:30 p.m. The meeting's purpose was to discuss the status of the Watts Bar Nuclear
(WBN) Unit 2 Construction Project, including major milestones and potential challenges that
may impact the project schedule.
On April 9, 2014, the NRC held a Category 1 meeting in which TVA provided a presentation
about the current progress and scheduling plans for the WBN Unit 2 Construction Project. The
NRC staff presented information on the current status of the NRC’s licensing and construction
inspection programs for WBN Unit 2. Additional topics related to the WBN Unit 2 Construction
Project were discussed between the NRC and TVA. Following these presentations and
discussions, members of the public had an opportunity to provide comments and ask questions.
The agenda (Enclosure 1), the list of attendees (Enclosure 2), the TVA presentation material
used for discussions (Enclosure 3), and the NRC presentation material used for discussions
(Enclosure 4) are attached to this letter.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room (PDR) or from
the Publicly Available Records (PARS) component of NRC’s document system (ADAMS).
M. Skaggs
2
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room). Should you have any questions concerning this meeting,
please contact Chris Even at 404-997-4661.
Sincerely,
/RA/
Robert Haag, Chief
Construction Projects Branch 2
Division of Construction Projects
Docket No. 50-391
Construction Permit No: CPPR-92
Enclosures:
1. Agenda
2. List of Attendees
3. Presentation - TVA
4. Presentation – NRC
M. Skaggs
3
cc w/encl:
Mr. Gordon P. Arent
Director, Licensing
Watts Bar Nuclear Plant
Tennessee Valley Authority
P.O. Box 2000
Spring City, Tennessee 37381
Mr. R. R. Baron, Senior Manager
Nuclear Construction Quality Assurance
WBN Unit Two
Watts Bar Nuclear Plant
Tennessee Valley Authority
P.O. Box 2000
Spring City, Tennessee 37381
Mr. O. J. Zeringue, General Manager
Engineering and Construction
WBN Unit Two
Watts Bar Nuclear Plant
Tennessee Valley Authority
P.O. Box 2000
Spring City, Tennessee 37381
Mr. Joseph Shea, Vice President
Nuclear Licensing
Tennessee Valley Authority
1101 Market Street
3R Lookout Place
Chattanooga, TN 37402-2801
Mr. R. A. Hruby, General Manager
Technical Services
WBN Unit Two
Watts Bar Nuclear Plant
Tennessee Valley Authority
P.O. Box 2000
Spring City Tennessee 37381
Mr. James O’Dell, Manager
Licensing and Industry Affairs
WBN Nuclear Plant
Tennessee Valley Authority
P.O. Box 2000
Spring City, Tennessee 37381
Mr. Joseph P. Grimes
Chief Nuclear Officer
and Executive Vice President
Tennessee Valley Authority
1101 Market Place
3R Lookout Place
Chattanooga, Tennessee 37402-2801
County Executive
375 Church Street
Suite 215
Dayton, Tennessee 37321
Mr. Dave Gronek
Plant Manager, WBN Nuclear Plant
Tennessee Valley Authority
P.O. Box 2000
Spring City, Tennessee 37381
Mr. E. J. Vigluicci
Assistant General Counsel
Tennessee Valley Authority
400 West Summit Hill Drive
6A West Tower
Knoxville, Tennessee 37402
Mr. Lawrence E. Nanney, Director
Tennessee Department of Environmental
Health & Conservation
Division of Radiological Health
3rd Floor, L&C Annex
401 Church Street
Nashville, TN 37243-1532
Mr. Chris Church
Site Vice President
Watts Bar Nuclear Plant
Tennessee Valley Authority
P.O. Box 2000
Spring City, Tennessee 37381
County Mayor
P.O. Box 156
Decatur, Tennessee 37322
Ms. Ann P. Harris
Public
341 Swing Loop
Rockwood, TN 37854
M. Skaggs
cc email distribution w/encl:
Greg Scott
Tennessee Valley Authority
Electronic Mail Distribution
Watts Bar 2 Licensing
Tennessee Valley Authority
Electronic Mail Distribution
4
M. Skaggs
2
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room). Should you have any questions concerning this meeting,
please contact Chris Even at 404-997-4661.
Sincerely,
/RA/
Robert Haag, Chief
Construction Projects Branch 2
Division of Construction Projects
Docket No. 50-391
Construction Permit No: CPPR-92
Enclosures:
1. Agenda
2. List of Attendees
3. Presentation - TVA
4. Presentation – NRC
* See Previous Concurrence
■ PUBLICLY AVAILABLE
□ NON-PUBLICLY AVAILABLE
ADAMS: ■ Yes
ACCESSION NUMBER: ML14108A045 _________
OFFICE
SIGNATURE
NAME
DATE
E-MAIL COPY?
RII:DCP
RII:DCP
RCH
CJE
RHaag
04/17/2014
CEven
04/17/2014
YES
NO YES
RII:DCP
NO YES
□ SENSITIVE
■ NON-SENSITIVE
■ SUNSI REVIEW COMPLETE
RII:DCP
NO
YES
RII:DCP
NO YES
RII:DCP
NO YES
RII:DCI
NO
OFFICIAL RECORD COPY
DOCUMENT NAME: G:\CCI\DCP\CPB3\WATTS BAR 2\PUBLIC MEETINGS\APRIL
2014\PUBLIC MEETING\MEETING SUMMARY.DOCX
YES
NO
Letter to Michael D. Skaggs from Robert C. Haag dated April 17, 2014.
SUBJECT:
MEETING SUMMARY – PUBLIC MEETING WATTS BAR NUCLEAR PLANT
UNIT 2
Distribution w/encl:
Region II Regional Coordinator, OEDO
J. Quichocho, NRR
J. Poole, NRR
J. Dion, NRR
A. Hon, NRR
C. Evans, RII
L. Douglas, RII EICS
S. Shaeffer, RII DRP
R. Monk, RII WBN Unit 1 SRI
S. Dubose, RII Administrative Assistant
Region II State Liaison Officer
Region II Public Affairs Officer
OE Mail (email address if applicable)
[email protected]
PUBLIC
PUBLIC MEETING AGENDA
PUBLIC MEETING WATTS BAR NUCLEAR UNIT 2
April 09, 2014, 05:30 PM to 07:00 PM
Comfort Inn, Meeting Room
2811 Decatur Pike
Athens, TN
5:30 - 6:00 - Status of Watts Bar Unit 2 Construction - Presentation by TVA
6:00 - 6:30 - Status of NRC Licensing and Inspection for Watts Bar Unit 2 - Presentation by Region II
and Office of Nuclear Reactor Regulations Staff
The time of the meeting is local to the jurisdiction where the meeting is being held.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If
reasonable accommodation is needed to participate in this meeting, or if a meeting notice, transcript, or
other information from this meeting is needed in another format (e.g., Braille, large print), please notify the
NRC meeting contact. Determinations on requests for reasonable accommodation will be made on a
case-by-case basis.
ADAMS Accession Number: ML14083A359
Name
Robert Haag
Office
RII/DCP/CPB3
Date
03/20/2014
OFFICIAL RECORD COPY
Link to meeting details: http://meetings.nrc.gov/pmns/mtg?do=details&Code=20140561
Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings"
67 Federal Register 36920, May 28, 2002
The policy statement may be found on the NRC website http://www.nrc.gov/reading-rm/doccollections/commission/policy/67fr36920.html
Enclosure 1
SIGN-IN SHEET
WATTS BAR PUBLIC MEETING
Date: 4/16/2013
Name
Location: Comfort Inn, Athens TN.
Company
Brad Devendorf
Public
Pete Johnson
Public
Gretel Johnston
BEST/MATRR
Garry Morgan
BREDL/BEST/MATRR
Jimmy Green
SACE
John Monninger
NRC
Michele Evans
NRC
Jeanne Dion
NRC
Jason Christensen
NRC
Robert C. Haag
NRC
Chris Even
NRC
Joel T. Munday
NRC
Justin Poole
NRC
Joe Calle
TVA
Raymond Hruby
TVA
Gordon Arent
TVA
Bob Williams
TVA
Ed Freeman
TVA
Nick Welch
TVA
Michael Skaggs
TVA
Enclosure 2
Fly UP