LWR Activities in Korea IAEA TWG-LWR Vienna, June 18-20, 2013
by user
Comments
Transcript
LWR Activities in Korea IAEA TWG-LWR Vienna, June 18-20, 2013
LWR Activities in Korea IAEA TWG-LWR Vienna, June 18-20, 2013 Presented by Jong-Tae Seo 1. Overall Status 2. Operating Plants 3. New Plants under Construction 4. National Plan 5. Proposal for Future IAEA Activities 2/18 1. Overall Status Units (MWe) HANUL Kori Ulchin 8 (7,937) In Operation 2 (2,800) Under Construction Under Planning Shin Ulchin #3,4 2 (2,800) Under Planning Shin Kori #5,6 2 (2,800) Wolsong HANBIT Younggwang 6 (5,900) 6 (5,900) 6 (4,779) In Operation # 1,2,3,4 (HWR) 4 (2,779) SWS# 1(PWR) 1 (1,000) In Operation # 1,2,3,4,5,6 6 (5,900) Shin Ulchin #1,2 2 (2,800) Under Construction Shin Kori #3,4 In Operation # 1,2,3,4,5,6 #1 ~ 4, SKN #1,2 6 (5,137) 8 (8,700) Under Construction ShinWolsong #2 1 (1,000) 3/18 1. Overall Status Units (MWe) In Operation Under Construction Total 23 20,716 5 6,600 28 27,316 Capacity Factor Korea 100 World Average 84.3% 90 80 70 60 `00 `01 `02 `03 `04 `05 `06 `07 `08 `09 `10 `11 `12 4/18 1. Overall Status Generation Mix Power Generation Installed Capacity 9% 8% 3% 1% 2% 25% (20,716 MW) 22% 25% as of January 1, 2013 (150,327 GWh) 39% 30% Total: 81,806 MW 30% 6% Nuclear Coal Gas Oil Hydro Others Total: 504,869 GWh Generation in 2012 5 5/18 2. Operating Plants Kori unit 1 • Reactor vessel head replacement will be completed July 2013 Hanul (Ulchin) units 3 & 4 • • Unit 4 SG replacement will be completed by August 2013 Unit 3 SG replacement planned in February 2014 6/18 6 2. Operating Plants Wolsung unit 1 • • 30 year license expired in 2012.11 Under licensing review for continued operation Additional Stress Test is on-going • Hanbit (Yonggwang ) unit 3 • • Shutdown for CEDM nozzle repair Completion date : June 2013 7/18 7 2. Operating Plants Shin-Kori units 1&2 • • Shutdown for cable replacement Both units will be on-line in October Shin-Wolsong unit 1 • • Shutdown for cable replacement Both units will be on-line in October 8/18 8 3. New Plants under Construction Shin-Wolsong 2 (OPR1000) • • • Unit #2 HFT : 2012.4.30 Unit #1 Fuel Loading : 2011.12.3 Commercial Operation : Unit #1 : 2012. 7.31 Unit #2 : 2013. 12 • • • • Unit #3 CHT : 2012.5.1 Unit #3 HFT : 2012.11 Unit #3 Fuel Loading : 2013.10 Commercial Operation : Unit #3 : 2013.12 Unit #4 : 2014.12 99.6 % In Progress Shin-Kori 3&4 (APR1400) 96.5 % In Progress 9/18 9 3. New Plants under Construction Shin-Hanul 1&2 (APR1400) • • • 39.0% Construction Permit : 2011.12.3 Unit #1 First Concrete : 2012.7 Commercial Operation : Unit #1 : 2017.4 Unit #2 : 2018.4 In Progress Barakah NPP in UAE • • • • • 19.4 % In Progress PSAR Submit : 2010.12.31 Construction Permit : 2012.7 Unit #2 First Concrete : 2013.5 Unit #1 RV Setting : 2014.7 Commercial Operation : 2017.5 ~ 2020.5 10/18 10 3. New Plants under Construction Shin-Kori 5&6 (APR1400) • • PSAR Submitted for Construction License : May 2012 Commercial Operation : Unit #5 : 2019 Unit #6 : 2020 Shin-Hanul 3&4 (APR1400) • • Contract Negotiation Commercial Operation : Unit #5 : 2020 Unit #6 : 2021 11/18 11 3. New Plants under Construction NPP Construction Schedule 1995 2000 2005 95 / 96 YGN 3&4 98 /99 Ulchin 3&4 01/02 Yonggwang 5&6 Ulchin 5&6 2010 2015 2020 2013. 6 OPR 1000 (Operation) 04/05 2010 / 2011 Shin-Kori 1& 2 2011 / 2012 Shin-Wolsong 1& 2 OPR 1000 (Construction) 2013 / 2014 Shin-Kori 3&4 2017 / 2018 Shin-Ulchin 1&2 2017~ 2020 Braka (UAE) 1,2,3,4 2019 / 2020 Shin-Kori 5&6 2020 / 2021 Shin-Ulchin 3&4 APR 1400 (Construction) APR 1400 (Planning) 12/18 4. National Plan National Energy Master Plan (2008~2013) 39 units In Operation Installed Capacity 2030 41% Generation Share 59% New 5&6 APR+ TBD New 3&4 APR+ TBD New 1&2 APR+ TBD SKN 7&8 APR+ 2022/2023 SUN 3&4 APR1400 2020/2021 SKN 5&6 APR1400 2018/2019 Future Units 20 units In Operation 26% Installed Capacity 2007 Generation Share 35% SUN 1&2 APR1400 2016/2017 SKN 3&4 APR1400 2013/2014 SWN 1&2 OPR1000 2011/2012 SKN 1&2 OPR1000 2010/2011 Units Under Construction 13/18 4. National Plan National Energy Master Plan Revision (2013~2018) The 2nd National Energy Master Plan Development Expert Committee review started Will be completed in the Second half of 2013 Challenges Post-Fukushima Impact Low Gas Price Recent CFSI (Counterfeit, Fraudulent, and Suspected Items) issues with anti-nuclear movement 14/18 4. National Plan Nuclear Policy of New Government Key Words from President : Safety First with Public Trust Responsible management System to build up public trust Top priority to ensure safe operation of nuclear power plants Safe nuclear energy as an important resource Safety First Safe Energy Infra. Public Trust 15/18 4. National Plan New National Agenda Licensee’s Quality Management System Shorten Quality Inspection Interval : 2 years to 1 year Increase Inspectors : 5 to 15 Life Extension of Old Reactors Kori unit #1 and Wolsong unit #1 “Stress Test” based on comprehensive Safety Assessment Technical Competency of Regulator Periodic evaluation on technical competency Develop education and training program Government Reorganization NSSC under the control of Prime Minister 9 commissioners (National Assembly designate 4) 16/18 4. National Plan Changes in Regulatory System President President NSSC Prime Minister NSSC Prime Minister Other Ministries MKE Nuclear Industry National Assembly MEST Nuclear R&D KINS/KINAC MKE : Ministry of Knowledge and Economy MEST : Ministry of Education, Science and Technology Other Ministries MOTIE Nuclear Industry MSIP Nuclear R&D KINS/KINAC MOTIE : Ministry of Trade, Industry and Energy MSIP : Ministry of Science, ICT and Future Planning 17/18 5. Proposal for Future IAEA Activities Global Nuclear Supply Chain Management and Control Nuclear Supply Chain becomes Global Quality of Nuclear Equipment Starts from Vendors/Subvendors and Material Suppliers Quality Control and Inspection Program on each Entities in the Supply Chain need to be Improved Globally Acceptable Guidance on the CFSI Treatment needs to be developed 18/18