August 15, 2013
SUBJECT:
PUBLIC MEETING NOTICE
LICENSEE:
Omaha Public Power District (OPPD)
FACILITY:
Fort Calhoun Station
DOCKET:
50-285
DATE & TIME:
Tuesday, August 27, 2013
1:30 p.m. – 4:00 p.m. (CDT)
LOCATION:
U. S. Nuclear Regulatory Commission
PURPOSE:
The U.S. Nuclear Regulatory Commission (NRC) will meet with
OPPD to discuss their Plan for Sustained Improvement for the Fort
Calhoun Station.
CATEGORY:
This is a Category 1 meeting. The public is invited to listen to the
meeting and will have one or more opportunities to communicate
with the NRC after the business portion and discussion with OPPD.
Region IV Office
1600 East Lamar Boulevard
Arlington, TX 76011-4511
Interested members of the public may participate in this meeting via
toll-free audio teleconference by calling (877) 917-3405, and entering
participant passcode 3179621.
PARTICIPANTS:
NRC (Region IV)
Steve Reynolds, Acting Regional Administrator
Tony Vegel, Director, Division of Nuclear Material Safety
and Inspection Manual Chapter 0350 Chairman
Kriss Kennedy, Director, Division of Reactor Projects
Troy Pruett, Deputy Director, Division of Reactor Projects
Jeff Clark, Deputy Director, Division of Reactor Safety
Michael Hay, Branch Chief, Division of Reactor Projects
Chris Smith, Project Engineer, Division of Reactor Projects
Omaha Public Power District
-2LICENSEE
Lou Cortopassi, Site Vice President
Bob Svaleson, Vice President, Exelon Nuclear
Mike Prospero, Plant Manager
Kerry Ihnen, Nuclear Oversight Manager
Terry Simpkin, Regulatory Affairs Manager
Rich Haug, Senior Consultant
Bruce Rash, Recovery Lead
Jack Grobe, Senior Director, Exelon Nuclear
MEETING CONTACT:
Mike Hay
(817) 200-1147
Documents related to the meeting are posted on this website devoted to the special oversight at
Fort Calhoun Station, available at http://www.nrc.gov/info-fnder/reactor/fcs/special-oversight.html.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If
you need a reasonable accommodation to participate in this meeting, or need this meeting notice
or the transcript or other information from the meeting in another format (e.g. braille, large print),
please notify the NRC's meeting coordinator. Determinations on requests for reasonable
accommodation will be made on a case-by-case basis.
In accordance with 10 CFR 2.390 of the NRC’s “Rules of Practice,” a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC’s Public Document
Room or from the Publicly Available Records (PARS) component of the NRC’s Agency wide
Documents Access and Management System (ADAMS). ADAMS is accessible from the Public
Electronic Reading Room page of the NRC’s public web site at:
http://www.nrc.gov/readingrm/adams.html.
To receive a summary of future meetings and other plant-specific e-mail distributions, you must
subscribe to the Operating Reactor Correspondence electronic distribution for this plant via
http://www.nrc.gov/public-involve/listserver/plants-by-region.html
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe
at any time by visiting the same web address above.
Omaha Public Power District
-3-
Electronic distribution by RIV:
NRC Attendees
PMNS Resource, Meeting Announcement Coordinator ([email protected])
RIV Acting Regional Administrator ([email protected])
RIV Acting Deputy Regional Administrator ([email protected])
RIV DRP Director ([email protected])
RIV DRP Deputy Director ([email protected])
RIV DRS Director ([email protected])
RIV DRS Deputy Director ([email protected])
RIV Senior Resident Inspector ([email protected])
RIV Resident Inspector ([email protected])
RIV Branch Chief, DRP/F ([email protected])
RIV Senior Project Engineer, DRP/F ([email protected])
RIV Special Assistant, DRP/F ([email protected])
RIV Project Engineer, DRP/F ([email protected])
RIV Public Affairs Officer ([email protected])
RIV Public Affairs Officer ([email protected])
NRR Project Manager ([email protected])
NRR Project Manager ([email protected])
RIV Branch Chief, DRS/TSB ([email protected])
RIV RITS Coordinator ([email protected])
RIV Regional Counsel ([email protected])
Congressional Affairs Officer ([email protected])
OEMail Resource
OEWEB Resource ([email protected])
RIV/ETA: OEDO ([email protected])
RIV RSLO ([email protected])
MC 0350 Panel Chairman ([email protected])
MC 0350 Panel Vice Chairman ([email protected])
MC 0350 Panel Member ([email protected])
MC 0350 Panel Member ([email protected])
Karla Fuller, Region IV RC ([email protected])
Heather Gepford, Region IV ACES
Cale Young, Region IV ACES ([email protected])
Peter Jayroe, Region IV ACES ([email protected])
Lisa Quayle, Region IV Administrative Assistant ([email protected])
Anita Tannenbaum, Region IV Administrative Assistant ([email protected])
Earnestine Clay, DRMA, ([email protected])
Stacey Munroe, DRMA, ([email protected])
Harold McKelvey, IRMB ([email protected])
Trevor Fleischmann, Meeting Support/Service ([email protected])
Cherry Pemberton, Receptionist ([email protected])
Melody Foreman, ([email protected])
Ann Mattila, DRMA ([email protected])
RIV Guards
Omaha Public Power District
-4-
R:\_REACTORS\FCS\2013\FCS Mtg Notice 8-27-13.pdf
SUNSI Rev Compl. Yes  No
ADAMS
 Yes  No
Publicly Avail
 Yes  No Sensitive
 Yes  No
RIV/C:DRP/F
MHay
/RA/
8/14/13
PAO
LUselding
/RA/
8/14/13
OFFICIAL RECORD COPY
RSLO
WAMaier
/RA via Email/
8/14/13
Reviewer Initials
Sens. Type Initials
D:DRP
KKennedy
/RA/
8/14/13
T=Telephone
rwd
rwd
D:DNMS
AVegel
/RA/T-Deese
8/15/13
E=E-mail
F=Fax
Fly UP