May 3, 2010 Warren Brandon, Manager Nuclear Service Center

by user

on
Category: Documents
13

views

Report

Comments

Transcript

May 3, 2010 Warren Brandon, Manager Nuclear Service Center
May 3, 2010
Warren Brandon, Manager
Nuclear Service Center
Sulzer Pumps (US) Inc.
4126 Caine Lane
Chattanooga, TN 37421
SUBJECT:
NRC INSPECTION REPORT NO. 99901361/2010-201, NOTICE OF VIOLATION
AND NOTICE OF NONCONFORMANCE
Dear Mr. Brandon:
From March 23 to March 26, 2010, the U.S. Nuclear Regulatory Commission (NRC) conducted
an inspection at the Sulzer Pumps (Sulzer) facility in Chattanooga, Tennessee. The enclosed
report presents the results of this inspection.
This was a limited scope inspection, which focused on assessing Sulzer’s dedication and
manufacturing processes that may have contributed to the Service Water Pump 2E failure at the
Farley Nuclear Power Plant. This inspection also reviewed the adequacy of Sulzer’s corrective
actions and nonconformance programs, audits and design control. This NRC inspection report
does not constitute NRC endorsement of Sulzer’s overall quality assurance (QA) or 10 CFR
Part 21 programs.
Based on the results of this inspection, the NRC has determined that one Severity Level IV
violation of NRC requirements occurred. The violation is cited in the enclosed Notice of
Violation (Notice) and the circumstances surrounding it is described in detail in the subject
inspection report. The violation is being cited in the Notice because NRC inspectors identified
that Sulzer failed to meet the requirements set forth in 10 CFR Part 21 for an adequate
procedure to evaluate deviations and failures to comply.
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
During this inspection, NRC inspectors also found that implementation of your QA program
failed to meet certain NRC requirements contractually imposed on you by your customers. The
NRC inspectors noted five deficiencies for: 1) inadequate classification of a safety-related
service; 2) failure to evaluate a requirement specified by the licensee in the procurement
document; 3) inadequate timeliness of corrective actions; 4) inadequate commercial-grade
dedication surveys; and 5) inadequate verification of a critical characteristic during the
dedication process. The specific findings and references to the pertinent requirements are
identified in the enclosures to this letter.
Sulzer Inc.
-2-
These nonconformances are cited in the enclosed NON, and the circumstances that surround
them are described in the enclosed report. Please provide a written explanation or statement
within 30 days of this letter in accordance with the instructions specified in the enclosed Notice
of Nonconformance. We will consider extending the response time if you show good cause for
us to do so.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its
enclosures, and your response will be made available electronically for public inspection in the
NRC Public Document Room or from the NRC’s document system (ADAMS), accessible from
the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your
response should not include any personal privacy, proprietary, or Safeguards Information so
that it can be made available to the Public without redaction. If personal privacy or proprietary
information is necessary to provide an acceptable response, then please provide a bracketed
copy of your response that identifies the information that should be protected and a redacted
copy of your response that deletes such information. If you request that such material is
withheld from public disclosure, you must specifically identify the portions of your response that
you seek to have withheld and provide in detail the bases for your claim (e.g., explain why the
disclosure of information will create an unwarranted invasion of personal privacy or provide the
information required by 10 CFR 2.390(b) to support a request for withholding confidential
commercial or financial information). If Safeguards Information is necessary to provide an
acceptable response, please provide the level of protection described in 10 CFR 73.21.
Sincerely,
/RA/
Patrick Hiland, Director
Division of Engineering
Office of Nuclear Reactor Regulation
Docket No.: 99901361
Enclosures:
1. Notice of Violation
2. Notice of Nonconformance
3. Inspection Report 99901361/2010-201
4. Attachment
Sulzer Inc.
-2-
These nonconformances are cited in the enclosed NON, and the circumstances that surround
them are described in the enclosed report. Please provide a written explanation or statement
within 30 days of this letter in accordance with the instructions specified in the enclosed Notice
of Nonconformance. We will consider extending the response time if you show good cause for
us to do so.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its
enclosures, and your response will be made available electronically for public inspection in the
NRC Public Document Room or from the NRC’s document system (ADAMS), accessible from
the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your
response should not include any personal privacy, proprietary, or Safeguards Information so
that it can be made available to the Public without redaction. If personal privacy or proprietary
information is necessary to provide an acceptable response, then please provide a bracketed
copy of your response that identifies the information that should be protected and a redacted
copy of your response that deletes such information. If you request that such material is
withheld from public disclosure, you must specifically identify the portions of your response that
you seek to have withheld and provide in detail the bases for your claim (e.g., explain why the
disclosure of information will create an unwarranted invasion of personal privacy or provide the
information required by 10 CFR 2.390(b) to support a request for withholding confidential
commercial or financial information). If Safeguards Information is necessary to provide an
acceptable response, please provide the level of protection described in 10 CFR 73.21.
Sincerely,
/RA/
Patrick Hiland, Director
Division of Engineering
Office of Nuclear Reactor Regulation
Docket No.: 99901361
Enclosures:
1. Notice of Violation
2. Notice of Nonconformance
3. Inspection Report 99901361/2010-201
4. Attachment
DISTRIBUTION:
RidsNroDcipCqvb
RidsNroDcipCqvp
KKavanagh
ADAMS Accession No.: ML101230395
OFFICE NRR/DE/EQVB
NRR/DE/EQVB
NRR/DE/EQVB
NAME
CRoquecruz
JOrtega
PPrescott
DATE
04 / 28 /10
04 / 28 /10
04 /30 /10
OFFICIAL RECORD COPY
NRR/DE/EQVB
DThatcher
04 /30 /10
NRR/DE
PHiland
05 /03 /10
NOTICE OF VIOLATION
Sulzer Pumps (US) Inc.
4126 Caine Lane
Chattanooga, TN 37421
Docket Number 99901361
Inspection Report No. 99901361/2010-201
Based on the results of a Nuclear Regulatory Commission (NRC) inspection conducted March
23 to March 26, of activities performed at Sulzer Pumps (Sulzer), one violation of NRC
requirements was identified. In accordance with the NRC Enforcement Policy, the violation is
listed below:
A. 10 CFR Part 21, Section 21.21(a)(1), “Notification of failure to comply or existence of a
defect and its evaluation,” states in part that, “each individual, corporation, partnership,
or other entity subject to 10 CFR Part 21 shall adopt appropriate procedures to evaluate
deviations and failures to comply associated with substantial safety hazards as soon as
practicable and, except as provided in paragraph (a)(2) of this section, in all cases within
60 days of discovery, in order to identify a reportable defect or failure to comply that
could create a substantial safety hazard, were it to remain uncorrected.”
10 CFR Part 21, Section 21.21(b), states that, “If the deviation or failure to comply is
discovered by a supplier of basic components, or services associated with basic
components, and the supplier determines that it does not have the capability to perform
the evaluation to determine if a defect exists, then the supplier must inform the
purchasers or affected licensees within five working days of this determination so that
the purchasers or affected licensees may evaluate the deviation or failure to comply,
pursuant to § 21.21(a).”
10 CFR Part 21, Section 21.51, “Maintenance and inspection of records” sets forth
requirements for the maintenance of records related to 10 CFR Part 21 evaluations and
notifications.
Contrary to the above, as of March 26, 2010;
Sulzer Pumps (US) Inc. procedure CHQ-001, “Compliance with 10CFR Part 21,”
Revision 1, dated July 10, 2007, did not provide adequate guidance to meet the
requirements of 10 CFR Part 21. Specifically:
1. CHQ-001 did not provide guidance to inform the purchasers or affected licensees
when Sulzer makes the determination that they do not have the capability to perform
the evaluation to determine if a defect exists.
2. CHQ-001 did not reflect the time frames of 10 CFR 21.51 for maintenance and
retention of Part 21 records.
This issue has been identified as Violation 99901361/2010-201-01.
This is a Severity Level IV violation (Supplement VII).
ENCLOSURE
-2Pursuant to the provisions of 10 CFR 2.201, "Notice of Violation," you are required to submit a
written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document
Control Desk, Washington, D.C. 20555-0001, with a copy to the Director, Division of
Engineering, Office of Nuclear Reactor Regulation, within 30 days of the date of the letter
transmitting this Notice of Violation. This reply should be clearly marked as a "Reply to a Notice
of Violation" and should include: (1) the reason for the violation, or, if contested, the basis for
disputing the violation; (2) the corrective steps that have been taken and the results achieved;
(3) the corrective steps that will be taken to avoid further violations; and (4) the date when full
compliance will be achieved. Your response may reference or include previous docketed
correspondence, if the correspondence adequately addresses the required response. Where
good cause is shown, consideration will be given to extending the response time.
If you contest this enforcement action, you should also provide a copy of your response, with
the basis for your denial, to the Director, Office of Enforcement, United States Nuclear
Regulatory Commission, Washington, DC 20555-0001.
Because your response will be made available electronically for public inspection in the NRC
Public Document Room or from the NRC's Agency-wide Documents Access and Management
System (ADAMS), to the extent possible, it should not include any personal privacy, proprietary,
or Safeguards Information so that it can be made available to the public without redaction.
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If
personal privacy or proprietary information is necessary to provide an acceptable response,
then please provide a bracketed copy of your response that identifies the information that
should be protected and a redacted copy of your response that deletes such information. If you
request withholding of such material, you must specifically identify the portions of your response
that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g.,
explain why the disclosure of information will create an unwarranted invasion of personal
privacy or provide the information required by 10 CFR 2.390(b) to support a request for
withholding confidential commercial or financial information). If Safeguards Information is
necessary to provide an acceptable response, please provide the level of protection, described
in 10 CFR 73.21.
Dated this 3rd day of May 2010
NOTICE OF NONCONFORMANCE
Sulzer Pumps (US) Inc.
4126 Caine Lane
Chattanooga, TN 37421
Docket Number 99901361
Inspection Report No. 99901361/2010-201
Based on the results of a Nuclear Regulatory Commission (NRC) inspection conducted March
23 to March 26, of activities performed at Sulzer Pumps (Sulzer), certain activities were not
conducted in accordance with NRC requirements, which were contractually imposed upon
Sulzer by NRC licensees.
A.
Criterion II, “Quality Assurance Program,” of Appendix B to 10 CFR Part 50 states, in
part, “The applicant shall identify the structures, systems, and components to be covered
by the quality assurance program and the major organizations participating in the
program, together with the designated functions of these organizations. The quality
assurance program shall provide control over activities affecting the quality of the
identified structures, systems, and components, to an extent consistent with their
importance to safety.”
Sulzer Nuclear Service Center Quality Assurance Manual, Revision 4, dated January 13,
2010, Section 3-A titled, “Design Control,” paragraph 5.0, “Design Process,” states in
part that, “The Engineering Manager shall prescribe and document the design activities
to the level of detail necessary to permit the design process to be performed to permit
verification the design meets requirements.”
Sulzer’s Document No. CHE-032, Revision 2, dated September 8, 2008, “Nuclear Parts
Commercial Grade Dedication Program Classification and Critical Characteristics
Worksheets,” paragraph 2.0, “Purpose,” states in part that, “Engineering defines the
following for pump parts and equipment in nuclear safety related service: Determine if
component is a commercial grade item and/or basic component,…”
Contrary to the above as of March 26, 2010:
1.
Sulzer failed to evaluate and classify the coating process performed on a safetyrelated component (shaft) in Farley’s Service Water pumps.
This issue has been identified as Nonconformance 99901361/2010-201-02.
B.
Criterion III, “Design Control” of Appendix B to 10 CFR Part 50, states in part that,
“Measures shall be established to assure that applicable regulatory requirements…, for
those structures, systems, and components to which this appendix applies are correctly
translated into specification, drawings, procedures, and instructions. Design
changes…shall be subject to design control measures commensurate with those applied
to the original design…”
Sulzer’s Nuclear Service Center Quality Assurance Manual, Revision 4, dated January
13, 2010, Section 3-A titled, “Design Control,” paragraph 4.0, “Design Input,” states in
part that, “The Customer Design Specification shall be reviewed for design basis and
input in sufficient detail to form the basis for construction in accordance with the Code.
ENCLOSURE 2
-2Design inputs include, but are not limited to: Design bases, performance requirements,
regulatory requirements, codes and standards. Changes from approved design inputs,
including the reason for revision, shall be identified, approved, documented and
controlled.
Specification Number FM-S-05-001, Version 1.0, Specification for Replacement Service
Water Pumps for Joseph M. Farley Nuclear Plant – Unit No. 1 and 2,” Paragraph 3.6.2.1,
states in part that, “Pump rotors shall be designed with critical speeds at least 25 percent
above normal rated speed.”
Sulzer’s Engineering Department Manual, Document Number E 10.13, Revision Number
10, dated November 2004, “Fits Tolerances & Clearances (Imperial dimensioning),”
provides minimum and maximum diametrical fit tolerances for wear rings of a specified
size.
Contrary to the above, as of March 26, 2010:
Sulzer failed to provide evaluations for deviations from the approved design inputs,
through design change control measures or approvals and control of associated
documentation for the change. Specifically:
1.
The requirement for pump rotors to be designed with critical speeds at least 25
percent above normal rated speed as specified in Specification Number FM-S05-001 for the replacement service water pumps for Joseph M. Farley Nuclear
Plant, Units No. 1 and 2 had no design change control measures or approvals
documenting the change.
2.
The minimum and maximum diametrical fit tolerances for the wear rings on
Sulzer’s design drawings differed from the specifications in Document Number
E 10.13, with no associated design change control measures or approvals
documenting the change.
This issue has been identified as Nonconformance 99901361/2010-201-03.
C.
Criterion XVI, “Corrective Action,” of Appendix B to 10 CFR Part 50 states in part that,
“Measures shall be established to assure that conditions adverse to quality, such as
failures, malfunctions, deficiencies, deviations, defective material and equipment, and
nonconformances are promptly identified and corrected. In the case of significant
conditions adverse to quality, the measures shall assure that the cause of the condition
is determined and corrective action taken to preclude repetition.”
Sulzer’s Nuclear Service Center Quality Assurance Manual, Revision 4, dated January
13, 2010, Section 16-A titled, “Corrective Action,” Revision 1, dated January 13, 2010,
states in part that, “The responsible person shall determine the cause of the
unsatisfactory condition and the action necessary to preclude recurrence of the
condition. The cause, corrective action and schedule for implementation of the
corrective action(s) shall be recorded on the CAR and the Quality Assurance Manager
approval obtained.”
-3Contrary to the above as of March 26, 2010:
1.
Sulzer’s corrective action program does not provide a systematic method for the
review and follow up of corrective actions to determine if they are being
completed in a timely fashion and are effective in precluding recurrence of the
deficiencies.
This issue has been identified as Nonconformance 99901361/2010-201-04.
D.
Criterion VII, “Control of Purchased Material, Equipment, and Services,” of Appendix B
to 10 CFR Part 50 states in part, “Measures shall be established to assure that
purchased material, equipment, and services, whether purchased directly or through
contractors and subcontractors, conform to the procurement documents. These
measures shall include provisions, as appropriate, for source evaluation and selection,
objective evidence of quality furnished by the contractor or subcontractor, inspection at
the contractor or subcontractor source, and examination of products upon delivery.”
Sulzer’s Procedure CHQ-007, Revision 4, dated January 29, 2009, Section 3.0 titled,
“Responsibilities,” paragraph 3.2.6.b, “Method 2 – Commercial Grade Survey,” states in
part, “When Method 2 is utilized, then Supplier Programmatic Elements/Critical
Characteristics for materials and special processes as established by Engineering, shall
be documented and verified during the Commercial Grade Survey.”
Contrary to the above as of March 26, 2010:
1.
Sulzer performed audits instead of commercial-grade surveys for several
commercial-grade suppliers.
This issue has been identified as Nonconformance 99901361/2010-201-05.
E.
Criterion III, “Design Control” of Appendix B to 10 CFR Part 50, states in part that,
“Measures shall be established to assure that applicable regulatory requirements…, for
those structures, systems, and components to which this appendix applies are correctly
translated into specifications, drawings, procedures, and instructions. These measures
shall include provisions to assure that appropriate quality standards are specified and
included in design documents and that deviations from such standards are controlled.”
Sulzer’s Nuclear Service Center Quality Assurance Manual, Revision 4, dated January
13, 2010, Section 3-A titled, “Design Control,” paragraph 5.0, “Design Process,” states in
part that, “The Engineering Manager shall prescribe and document the design activities
to the level of detail necessary to permit the design process to be performed to permit
verification the design meets requirements.”
Sulzer’s Procedure CHQ-007, Revision 4, dated January 29, 2009, “Commercial Grade
Dedication Program,” Section 5.0, “Dedication Process,” paragraph 5.1.6., states in part,
“QA/QC shall perform receipt inspection of vendor supplied material, parts and
documentation and perform specified inspections per Form S0402.”
-2Contrary to the above as of March 26, 2010:
1.
Sulzer failed to adequately verify by survey or receipt inspection, the rubber
material (a critical characteristic) used in bearings made by commercial-grade
supplier Duramax Marine, during the dedication process.
This issue has been identified as Nonconformance 99901361/2010-201-06.
Please provide a written statement or explanation to the U.S. Nuclear Regulatory Commission,
ATTN: Document Control Desk, Washington, DC 20555-0001 with a copy to the Director,
Division of Engineering, within 30 days of the date of the letter transmitting this Notice of
Nonconformance. This reply should be clearly marked as a "Reply to a Notice of
Nonconformance” and should include for each noncompliance: (1) the reason for the
noncompliance, or if contested, the basis for disputing the noncompliance; (2) the corrective
steps that have been taken and the results achieved; (3) the corrective steps that will be taken
to avoid non-compliances; and (4) the date when your corrective action will be completed.
Where good cause is shown, consideration will be given to extending the response time.
Because your response will be made available electronically for public inspection in the NRC
Public Document Room or from the NRC’s document system (ADAMS), accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html, to the extent possible, it should not
include any personal privacy, proprietary, or Safeguards Information so that it can be made
available to the public without redaction. If personal privacy or proprietary information is
necessary to provide an acceptable response, then please provide a bracketed copy of your
response that identifies the information that should be protected and a redacted copy of your
response that deletes such information. If you request withholding of such material, you must
specifically identify the portions of your response that you seek to have withheld and provide in
detail the bases for your claim of withholding (e.g., explain why the disclosure of information will
create an unwarranted invasion of personal privacy or provide the information required by 10
CFR 2.390(b) to support a request for withholding confidential commercial or financial
information). If Safeguards Information is necessary to provide an acceptable response, please
provide the level of protection described in 10 CFR 73.21.
Dated this 3rd day of May 2010
U.S. NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
DIVISION OF ENGINEERING
VENDOR INSPECTION REPORT
Docket No.:
99901361
Report No.:
99901361/2010-201
Vendor:
Sulzer Pumps (US) Inc.
4126 Caine Lane
Chattanooga, TN 37461
Vendor Contact:
Tommy Craig
Quality Assurance Manager
Phone: (423) 296-1935
Nuclear Industry:
Sulzer Pumps (US) Inc. is a pump manufacturer with focus on
specialized centrifugal pumps and agitators/mixers for several
markets, including the nuclear power generation market.
Inspection Dates:
March 23 - March 26
Inspection Team Leader:
Carla Roquecruz, NRR/DE
Inspectors:
Paul Prescott, NRR/DE
Jonathan Ortega-Luciano, NRR/DE
Cale Young, Region II/DRP (Observer)
Approved by:
Dale Thatcher, Chief
Quality & Vendor Branch
Division of Engineering
Office of Nuclear Reactor Regulation
ENCLOSURE 3
-2EXECUTIVE SUMMARY
Sulzer Pumps (US) Inc.
99901361/2010-201
The purpose of this inspection was to assess Sulzer Pumps (US) Inc. (Sulzer’s) dedication and
manufacturing processes that may have contributed to the Farley Nuclear Power Plant’s Service
Water Pump 2E failure. In addition, the inspectors reviewed selected portions of Sulzer’s quality
assurance (QA) and 10 CFR Part 21 (Part 21) programs. The inspection was conducted at
Sulzer’s facility in Chattanooga, Tennessee.
The NRC inspection bases were:
•
•
Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel
Reprocessing Plants," to Part 50 of Title 10 of the Code of Federal Regulations; and
10 CFR Part 21, "Reporting of Defects and Noncompliance."
The last NRC inspection conducted at Sulzer’s facility in Chattanooga, Tennessee occurred in
September 2006. During that inspection, the NRC staff did not identify any violations or
nonconformances.
10 CFR Part 21 Program
The inspectors identified one violation of Part 21. Violation 99901361/2010-201-01 was cited
for one example of failure to adopt an appropriate procedure to ensure effective identification
and evaluation of deviations and failures to comply associated with a substantial safety hazard.
The second example was cited for failure to establish proper Part 21 record retention
requirements. With the exception of the violation noted above, the inspectors concluded that
Sulzer’s Part 21 program was consistent with regulatory requirements.
Quality Assurance Program
The inspectors identified one Nonconformance of Appendix B to 10 CFR Part 50.
Nonconformance 99901361/2010-201-02 was cited for failure to adequately categorize a
process performed in a safety-related component as a safety-related activity. With the
exception of the Nonconformance noted above, the inspectors concluded that Sulzer’s QA
Program and implementation were consistent with the regulatory requirements of Criterion II of
Appendix B to 10 CFR Part 50.
Design Control
The inspectors identified one Nonconformance of Appendix B to 10 CFR Part 50.
Nonconformance 99901361/2010-201-03 was cited with two examples noted, for failure to
provide evaluations for deviations from the approved design inputs and control of associated
documentation for the change. With the exception of the Nonconformance noted above, the
inspectors concluded that Sulzer’s design control process requirements and implementation
were consistent with the regulatory requirements of Criterion III of Appendix B to 10 CFR Part
50.
-3Corrective Action
The inspectors identified one nonconformance of Appendix B to 10 CFR Part 50.
Nonconformance 99901361/2010-201-04 was cited for timeliness of corrective action. With the
exception of the above nonconformance, the inspectors determined that Sulzer’s corrective
action program and implementation met the requirements of Criterion XVI of Appendix B to 10
CFR Part 50.
Commercial-Grade Dedication
The inspectors identified two Nonconformances of Appendix B to 10 CFR Part 50.
Nonconformance 99901361/2010-201-05 was cited for failure to perform commercial-grade
surveys instead of audits for several commercial-grade suppliers. Nonconformance
99901361/2010-201-06 was cited for failure to adequately verify the material supplied by a
commercial-grade supplier not previously surveyed, during the dedication process. With the
exception of the nonconformances mentioned above, the inspectors determined that Sulzer’s
commercial-grade dedication process and implementation was in compliance with regulatory
requirements and industry guidance.
Audits
Based on the review of Sulzer’s process for performing audits, implementing procedures, and
recent audit reports, the inspectors concluded that Sulzer process met the requirements of
Criterion XVIII of Appendix B to 10 CFR Part 50. No findings of significance were identified.
-4REPORT DETAILS
1.
10 CFR Part 21 Program
a.
Inspection Scope
The inspectors reviewed Sulzer’s Quality Assurance Manual (QAM), Revision 4, dated
January 13, 2010, and procedures that govern the Part 21 program to determine
compliance with 10 CFR Part 21. Specifically, the inspectors focused on Procedure
CHQ-001, “Compliance with 10CFR Part 21,” Revision 1, dated July 10, 2007, and
Procedure CHQ-021, “Control of Nonconforming Items or Activities,” Revision 1, dated
January 29, 2009.
The inspectors discussed the Part 21 process with Sulzer’s Quality Assurance (QA)
Manager to evaluate the vendor’s Part 21 program and reviewed a sample of completed
Part 21 evaluations.
b.
Observations and Findings
The inspectors verified that Sulzer’s procedure CHQ-001 met the requirements of Part
21. The inspectors noted that procedure CHQ-001 outlined the process Sulzer used for
the reporting of defects and noncompliance, as well as the responsibilities of employees,
managers, and the QA Manager with respect to Part 21.
The inspectors noted that CHQ-001, Section 2.0, “Responsibility,” provides instructions
for any worker who obtained information indicating that a safety-related component
could contain a condition that could cause the component to fail to perform its intended
function, to promptly report the condition to the QA Manager. Also, under the QA
Manger’s responsibilities, the procedure states in part that, “The Manager of Sulzer has
delegated the responsibility of handling all 10 CFR Part 21 reports, evaluations, and
notifications to the Quality Assurance Manager.” The QA Manager is responsible to
ensure that all conditions are evaluated and reported in accordance with procedure
CHQ-001.
During the review of the CHQ-001, specifically under section 5.0, “Evaluation,” the
inspectors noted that the procedure did not contain adequate guidance to meet the
regulatory requirements of 10 CFR Part 21.21. Specifically, CHQ-001 did not provide for
measures to inform purchasers or affected licensees within 5 days of Sulzer’s
determination that it does not have the capability to perform the Part 21 evaluation. This
issue is identified as an example of Violation 99901361/2010-201-01.
The inspectors noted that maintenance of Part 21 records is addressed in Sulzer’s
procedure CHQ-001, Section 8, “Record Maintenance.” This section requires the QA
Manager to keep the required Part 21 records for a period of at least one year or 10
years if the record was associated with a Part 21 violation, including a record of basic
component purchasers. 10 CFR 21.51, “Maintenance and Inspection of Records,”
establishes the following time-frames for retention of Part 21 records:
-5•
Retain evaluations of all deviations and failures to comply for a minimum of five
years after the date of the evaluation;
Suppliers of basic components must retain any notifications sent to purchasers
and affected licensees for a minimum of five years after the date of the notification;
and
•
•
Suppliers of basic components must retain a record of the purchasers of basic
components for 10 years after delivery of the basic component or service
associated with a basic component.
Contrary to the requirements of the regulation, Sulzer’s CHQ-001 procedure
requirements differed from those established in Part 21. This issue is identified as
another example of Violation 99901361/2010-201-01.
c.
Conclusions
The inspectors identified one violation of Part 21. Violation 99901361/2010-201-01 was
cited for one example of failure to adopt an appropriate procedure to ensure effective
identification and evaluation of deviations and failures to comply associated with a
substantial safety hazard. The second example of violation 99901361/2010-201-01 was
cited for failure to establish proper Part 21 record retention requirements. With the
exception of the violation noted above, the inspectors concluded that Sulzer’s Part 21
program was consistent with regulatory requirements.
2.
Quality Assurance Program
a. Inspection Scope
The inspectors reviewed Sulzer’s QA policies and implementing procedures that covered
the classification of pump parts, equipment and services as safety-related or
commercial-grade, to verify compliance with the requirements of Criterion II, “Quality
Assurance Program,” of Appendix B to 10 CFR Part 50 as applied to the Farley Nuclear
Power Plant (Farley) procurement of service water (SW) pumps. Specifically, the
inspectors reviewed the procurement documents, bill of material (BOM), dedication
packages and drawings for Farley’s SW pumps 2D and 2E. In addition, the inspectors
held discussions with the engineering manager, the QA manager, other Sulzer QA
personnel and the QA manager for a sub-supplier that provided a service for the SW
pumps. The procedures, documents, and records reviewed within the scope of the
inspection in this area included:
•
Document No. CHE-032, Revision 2, dated September 8, 2008, “Nuclear Parts
Commercial Grade Dedication Program Classification and Critical Characteristics
Worksheets;”
•
Procedure CHQ-007, Revision 4, dated January 29, 2009, “Commercial Grade
Dedication Program;”
-6•
Form SO802-0, “Job Specific Bill of Material,” Revision 7, Job Number
08C02145;
•
List of Sulzer Supplied Parts Referenced to sectional dwg. E-08C02145 Revision
F, Job Number 08C02145, Johnston Model 27CC – 2 Stage Pump;
•
Sulzer Purchase Order (PO) 08407839 to Dubose National Energy Service Inc.,
for Bar Round 2¼” Diameter, 36¾” long, material A582 – 416A, dated March 16,
2006;
•
Sulzer PO 08407902 to Engineered Coatings & Machining (ECM), for head shaft,
2¼” Diameter bar stock 36¾” long to be coated 9.25” (+/-1/16”) long with chrome
cxide 0.020-0.022” thick, 16⅛” (+/-⅛”) from one end, dated April 10, 2006; and
•
Sulzer PO 08407976 to ECM, for line shaft, 2 3/16” diameter bar stock 120½ ”
(+1/-0) to be coated 7-5/8” (+/-1/16”) long with chrome oxide 0.020-0.022” thick,
8¾ ” (+/-⅛”) from one end.
b. Observations and Findings
The inspectors reviewed the BOM and procurement documents for the shaft in Farley’s
SW pump 2E and noted that the head shaft, line shaft and pump shaft were classified as
safety-related. According to Sulzer’s PO, the shaft bearing journals for the SW pumps
are comprised as follows: a machined surface of the shaft base material, a chromium
oxide layer, and a phenolic sealer. The inspectors noted that Sulzer used the coating
services of commercial-grade supplier, ECM in Birmingham, Alabama, to apply the shaft
bearing journals coating for Farley’s SW pumps. Through discussions with Sulzer
personnel, the inspectors learned that for the first three SW pumps sent to Farley, Sulzer
considered this coating service as a commercial-grade activity. Sulzer did not verify or
dedicate the coating services provided by ECM for the chromium oxide coating applied
to the shafts.
The inspectors noted, during the review of the documentation related to the procurement
of the Farley’s SW pumps, that Sulzer did not perform an evaluation to determine that
this coating process was not essential to the function of these pumps. No failure mode
and effects analysis was performed for the shaft bearing journals coating, as a result, no
documented evidence could be found to support Sulzer’s conclusion that this coating
process was not a safety-related activity. This issue was identified as Nonconformance
99901361/2010-201-02.
c. Conclusion
The inspectors identified one nonconformance of Appendix B to 10 CFR Part 50.
Nonconformance 99901361/2010-02 was cited for failure to adequately categorize a
process performed on a safety-related component as a safety-related activity. With the
exception of the above nonconformance, the inspectors determined that Sulzer’s QA
program was consistent with regulatory requirements.
-73.
Design Control
a. Inspection Scope
The inspectors reviewed Sulzer’s QA policies and implementing procedures that
governed the design control process to verify compliance with the requirements of
Criterion III, “Design Control,” of Appendix B to 10 CFR Part 50 as applied to the Farley
replacement SW pumps. The inspectors held discussions with the Engineering Manager
on the design changes implemented for the Farley SW pumps. Specifically, the
inspectors reviewed the documents governing the implementation of Sulzer’s design
control measures related to the development of component specifications and the pump
calculations that supported the procurement controls for selected safety significant
components of the pump. The inspectors also reviewed PO documents associated with
the Farley SW pumps to verify that the licensee’s design specifications were properly
translated into design documents. The procedures, documents and records reviewed
within the scope of the inspection in this area included:
b.
•
Specification Number FM-S-05-001, Version 1.0, Specification for Replacement
Service Water Pumps for Joseph M. Farley Nuclear Plant – Unit No. 1 and 2;”
•
Form SO802-0, “Job Specific Bill of Material,” Revision 7, Job Number
08C02145;
•
Document Number E12.51183 for Order No. 08C02145/49, E068-1089, “Design
Report – ASME Pressure Vessel Calculation Unit 2-27CC 2-Stage;”
•
Document Number E12.5.1186 for Order No. 08C02145/49, “Seismic Stress
Analysis for Unit 2 – 27CC 2-Stage Pumps;”
•
Document No. CHE-006, Revision 0, “Order Review, Acceptance and Entry;” and
•
Engineering Department Manual Document Number E 10.13, “Fits, Tolerances &
Clearances (Imperial Dimensioning).”
Observations and Findings
The inspectors reviewed all of the major design changes implemented for the Farley SW
pumps. The changes were adequately identified in the licensee’s PO specification and
for the most part, translated into the vendor’s BOM. Licensee POs for pumps or
components are reviewed by Sulzer using CHE-006. Engineering is responsible for
coordination of activities with other internal organizations. The BOM will identify all
necessary parts and associated drawings. The final BOM is maintained as a quality
record. It is a job specific engineering document that controls design, inspection and
manufacturing requirements necessary to ensure PO requirements are met.
Sulzer’s design process is controlled by CHE-001. The two main products engineering
develops from the licensee’s PO, subsequent to completion of the BOM are a design
-8report and seismic analysis document. The majority of design changes for the Farley
SW pumps were related to material changes. The impact on the original pump design
was evaluated for Code compliance and seismic impact analysis, as detailed in the
respective documents above. However, the inspectors requested the design evaluation
for not meeting the licensee’s specified PO requirement that the pump rotors shall be
designed with critical speeds at least 25 percent above normal rated speed. Seismic
Report E12.5.1186 did not document the deviation from the critical speed calculation. In
discussions with the engineering manager, he stated that nonconformance reports
(NCRs) were generated to document this issue for both units. The disposition of NCR
1672, related to the Unit 2 pumps, had been approved by the licensee. The Unit 1
NCRs were still under review, but all of the pumps except for one are of the same
design. The condition was determined not to affect the operability of the Unit 2 pumps;
however, long term reliability would be impacted. The licensee and Sulzer have agreed
to replace or modify the pumps with a number of design changes to address this issue
as well as other potential reliability issues related to the pumps. Assurance of near-term
operability was provided by the licensee’s pump monitoring compensatory measures.
The pump procurement specification in Specification Number FM-S-05-001, paragraph
3.6.2.1, stated a requirement that the pump rotors shall be designed with critical speeds
at least 25 percent above normal rated speed. This requirement was not explicitly called
out in the PO; however, the PO invokes the specification. The PO required a certificate
of conformance (CofC) certifying compliance to the specifications and requirements of
the PO. The specification also required certification that the pumps are designed in
accordance with the specification.
The specification requirement only addresses rotor critical speed but did not address the
natural frequency of the pump structure or assembly. This distinction is important
because it is possible to have pump vibration problems that are not caused by the critical
speed of the rotor. The requirement in the specification for rotor critical speed margin is
largely a carryover from the original specification for the SW pumps. However, industry
guidance recommends that new pump design should be analyzed by the manufacturer
to address structural natural frequency separation from operation speed as well as rotor
critical speed margin.
There is no specific requirement in the specification to have the vendor submit results of
the rotor critical speed analysis to the licensee for review. Thus vendor noncompliance
was not easily detectable by normal contract administration.
Structural natural frequency of the pump assembly was actually analyzed by the pump
vendor as part of the stress seismic analysis reports. As described in these reports, the
frequency separation from running speed was analyzed to be 12.75 percent. These
reports were reviewed by licensee personnel and were found to be acceptable from a
seismic qualification standpoint. However, these personnel would not normally be aware
of the intent to maintain larger margins for purposes unrelated to seismic qualification.
The inspectors determined that Sulzer had not performed an analysis or adequately
identified to the licensee that the pump rotors were not designed with critical speeds at
-9least 25 percent above normal rated speed. This issue was identified as one example of
Nonconformance 99901361/2010-201-03.
The inspectors reviewed Sulzer’s design control and procurement processes to ensure
an adequate technical review was performed of the change of the wear ring material and
clearances from what was originally specified in the licensee’s specifications. Sulzer
selected hardened grade 410 stainless steel for the wear rings. The wear rings were
installed with shrink fits which may have been an excessive mismatch between the
mounting and the mounted parts.
The first stage and second stage impellers have a bottom and top set of stainless steel
rings. The bottom rings that are attached to the impeller are called the wear ring. The
wear ring of each impeller is interference fit with the bottom side of the impeller. The top
stainless steel rings that are attached to the impeller are called the balance rings. The
balance ring of each impeller is interference fit with the top side of the impeller.
Sulzer’s document E 10.13, states the minimum and maximum diametrical fit for the
wear ring interference fit range to meet Sulzer design standards to produce acceptable
stress for the parts. The drawings for both of the rings had a greater tolerance range.
The greater allowance in tolerance range could result in allowing for excessive wear ring
stress. This was identified as a second example of Nonconformance 99901361/2010201-03.
c.
Conclusion
The inspectors identified one nonconformance of Appendix B to 10 CFR Part 50.
Nonconformance 99901361/2010-03, had two examples of inadequate design control.
One example of was cited for a failure to perform a technical justification to support that
the pump rotors were not designed with critical speeds at least 25 percent above normal
rated speed. The other example was cited for a failure to meet the wear ring
interference fit range specified of the vendor’s design standards. With the exception of
the above nonconformances, the inspectors determined that Sulzer’s design control
process was consistent with regulatory requirements.
4.
Corrective Actions
a.
Inspection Scope
The inspectors reviewed Sulzer’s QAM, Revision 4, dated January 13, 2010, and
implementing policies and procedures that govern the corrective action process to
ensure the procedures provided adequate guidance consistent with the requirements of
Appendix B to 10 CFR Part 50 and Part 21. The inspectors also evaluated a sample of
corrective action reports (CARs) and nonconformance reports (NCRs) and to verify
compliance with the program requirements and adequate implementation of those
requirements.
- 10 b.
Observations and Findings
The inspectors reviewed Sections 15-A, “Nonconformance Control,” and 16-A,
“Corrective Action,” of Sulzer’s QAM, which describes the nonconformance and
corrective action processes. These sections describe the process for identifying,
documenting, segregating, evaluating, and handling nonconformances
Procedure CHQ-021, “Control of Nonconforming Items or Activities,” Revision 1, dated
January 29, 2009, assigned responsibilities for identification, documentation, and
disposition of nonconforming items, services and program activities. The procedure
described the process for identifying, evaluating, reporting, and correcting
nonconformances. The process for identifying and documenting nonconformances was
initiated when Form S0561-1, “Sulzer Nuclear Service Center Non-Conformance Report
(NCR),” was prepared by QA or Quality Control personnel when a nonconformance was
recognized. In addition, the inspectors discussed the nonconformance process with the
vendor, including the establishment and roles of the Material Review Board (MRB)
responsible for reviewing all potential nonconformances generated against the program.
The MRB is comprised of the QA Manager and Engineering Manager at a minimum.
The inspectors noted that each NCR contains a detailed description of the concern and
at least one proposed corrective action associated with the identified deficiency. The
inspectors verified that the NCRs included the appropriate review and signoff and, when
applicable, verified that each corrective action is assigned to an organization lead
responsible for its completion.
The inspectors discussed the Corrective Action Program (CAP) with the vendor as
defined in Section16-A of the QAM.
The inspectors reviewed a sample of corrective actions and noted that most of the
corrective actions had been completed in a timely manner; however, some took an
extended period of time to be completed. The inspectors discussed this with the vendor
and determined that the QAM or associated CAP procedures did not describe a process
for ensuring timely closure of corrective actions. As described by the vendor, if the due
date for a corrective action is near, the QA manager will contact the responsible person
with a reminder to complete the work. At that time, if necessary, a new due date is
established for closure of the corrective action. Although the QA manager maintained a
list of all corrective actions, the Sulzer’s program did not provide a systematic method for
the review of corrective actions to determine if they are being completed in a timely
fashion and are effective in precluding recurrence of the deficiencies. The inspectors
identified this issue as Nonconformance 99901361/2010-201-04.
c.
Conclusions
The inspectors identified one nonconformance of Appendix B to 10 CFR Part 50.
Nonconformance 99901361/2010-04 was cited for timeliness of corrective action
program. With the exception of the above nonconformance, the inspectors determined
that Sulzer’s corrective action process was consistent with regulatory requirements.
- 11 5.
Commercial-Grade Dedication Process
a.
Inspection Scope
The Inspectors reviewed Sulzer’s QA Manual, Revision 4, dated January 13, 2010, and
the implementation process for commercial-grade dedication activities. The inspectors
also reviewed the following Sulzer dedication procedures and instructions: Chattanooga
Quality Procedure CHQ-007, “Commercial Grade Dedication Program,” Revision 4,
dated January 29, 2009; Chattanooga Engineering Document No. CHE-032, “Nuclear
Parts Commercial Dedication Plan Classification and Critical Characteristic Worksheets”,
Revision 2, dated September 8, 2008; and the Commercial Grade Dedication
Checksheet S0402, Revision 5.
The inspectors reviewed the quality and work procedures governing the implementation
of commercial-grade dedication activities, and a sample of completed dedication
packages. The inspectors interviewed Sulzer personnel and conducted a tour of Sulzer’s
facility.
b.
Observations and Findings
The inspectors noted that Sulzer’s procedure CHQ-007 outlined the dedication process
from the procurement of commercial material to the preparation of the Commercial
Grade Dedication (CGD) Checksheet (Form S0402) that contained the critical
characteristics to be verified and the acceptance of CGD items. CHQ-007 stated that
commercial-grade items will be inspected/tested based on critical attributes and
characteristics as defined by Sulzer Engineering. Sulzer’s CHE-032 contains the safety
classification, component function, credible failure mode(s) and critical characteristics for
all their pump parts and equipment. If Sulzer identified an item as commercial-grade,
but the customer requested the item as safety-related, then Sulzer engineering used the
process described in procedure CHQ-007 to create a CHE-032 worksheet and perform
the dedication. CHE-032 stated that parts may require CGD as dictated by the
customer, even though Sulzer has determined the part failure would not prevent the
parent item from performing as intended. The part specific worksheet in CHE-032
included critical characteristics for dedication, as applicable.
The inspectors noted that during the early stages of the dedication process, Sulzer
engineering utilized the CHE-032 checksheet for the specific pump part or equipment to
prepare form S0402, which was then submitted to QA for review/approval. Form S0402
included the CHE-032 page and revision used; material PO; PO item number; customer
PO number; heat or serial number; material of construction; method of inspection;
hardness; dimensions; and visual inspections results.
Sulzer primarily performed Method 1, special test and inspections and Method 2,
commercial-grade survey to perform CGD. These methods are included in NRC
endorsed industry guidance (Electric Power Research Institute EPRI 5652.) The
inspectors requested a sample of CGD surveys performed by Sulzer and the Approved
Vendor List (AVL) for American Society of Mechanical Engineers (ASME), safety-related
and commercial suppliers. The inspectors reviewed the CGD surveys for ECM, in
- 12 Birmingham, AL; MetalTek Int., in Chattanooga, TN; Tennessee Rand Co., in
Chattanooga, TN; and Sulzer Pumps in Brookshire, TX. The inspectors noted that
Sulzer’s CGD surveys were limited scope audits of the commercial suppliers’ QA
programs. Sulzer did not perform a CGD survey focused on the critical characteristics
that Sulzer intended to take credit for during the dedication process. This issue was
identified as Nonconformance 99901361/2010-201-05.
Sulzer’s AVL for commercial vendors contained the supplier’s name, item/services
provided by that vendor and what type of CGD acceptance method it used with each
supplier. While reviewing CGD package for PO 10252412 from Entergy, for a marine
style, cutless and rubber with bronze sleeve bearing, the inspectors noted that Sulzer
purchased the bearing shell from a safety-related supplier, Metaltek Intl., and then
provided this material to a commercial supplier, Duramax Marine, who then provided the
finished item to Sulzer. According to Sulzer’s PO 4500121088 for Duramax Marine’s
service, this supplier had to do all the machining and provide Sulzer with the finished
item including the nitrile rubber lining used to finish the bearings.
According to Sulzer’s AVL for commercial suppliers when using Duramax Marine’s
services Sulzer uses Method 1 to do the CGD dedication. For the dedication of the
bearings, Sulzer used the CofC provided by Duramax Marine and a durometer test
(hardness test) as the acceptance criteria for the rubber material used in the bearings.
Through discussions with Sulzer staff, the inspectors determined that Sulzer was taking
credit for Duramax Marine CofC for the rubber material in the bearings and then testing
only the hardness; however, Duramax Marine was never surveyed by Sulzer to take
credit for this critical characteristic during the dedication process for these bearings.
This issue was identified as Nonconformance 99901361/2010-201-06.
c.
Conclusion
The inspectors identified two nonconformances to 10 CFR Part 50, Appendix B.
Nonconformance, 99901361/2010-201-05, was cited for Sulzer failing to perform
commercial-grade surveys instead of audits for several commercial-grade suppliers.
Nonconformance 99901361/2010-201-06 was cited for failure to adequately verify the
material supplied by a commercial-grade supplier not previously surveyed, during the
dedication process. With the exception of the above nonconformances, the inspectors
determined that Sulzer’s commercial-grade dedication program was consistent with
regulatory requirements.
6.
Audits
a.
Inspection Scope
The inspectors reviewed Sulzer’s QAM, Section 18-A, “Audits,” Revision 1, Section 7-B,
“Supplier Evaluation and Selection,” Revision 2, and Section 2-E, “Qualification of Audit
Personnel,” Revision 2, all dated January 13, 2010 and implementing procedures that
govern the process for internal and external audits. The inspectors evaluated a sample
of external audit reports and corrective actions implemented by Sulzer for findings
identified during audits.
- 13 b.
Observations and Findings
1.
External Audits
The inspectors noted that Section 18-A, “Audits,” of Sulzer’s QAM provided a description
of the process and requirements for performing external audits. This section contained
specific requirements such as, audit plans, checklists, and information required in the
audit report. The inspectors noted that forms S1322 “Audit Plan,” S1324 “Audit
Checklist” and S1323 “Audit Report,” were of sufficient detail to provide an adequate
scope for a supplier audit.
Section 7-B, “Supplier Evaluation and Selection,” described the process for conducting
periodic audits/commercial-grade surveys of suppliers to evaluate the effectiveness of
their quality program and of their ability to supply materials in accordance with specified
requirements. This section stated that suppliers surveyed or audited by a subcontractor
that met the requirements in section 7-B may be placed on the AVL.
The inspectors reviewed a sample of external supplier audits from Sulzer’s AVL. The
inspectors verified that Sulzer’s recent audits of the following suppliers met the
requirements of Criterion XVIII of Appendix B to 10 CFR Part 50.
•
Dubose Nat. Energy Svc. Inc., in Clinton, North Carolina, which supplied Ferrous
& Non Ferrous materials;
•
John Crane Inc., in Morton Grove, Illinois, which supplied seal glands and parts;
and
•
PRL Industries, Inc., in Cornwall, Pennsylvania, which supplied Ferrous and Non
Ferrous castings, testing and machining.
The inspectors’ review of external audits did not identify any findings of significance.
c.
Conclusion
Based on the review of Sulzer’s process for performing audits, implementing
procedures, and recent audit reports, the inspectors concluded that Sulzer is
implementing external audit process in compliance with regulatory requirements and
industry guidance. No findings of significance were identified.
7. Exit Meeting
On March 26, 2010, the inspectors presented the inspection scope and findings during an
exit meeting with Sulzer’s Manager, Warren Brandon, other Sulzer personnel and
personnel from Southern Nuclear Operation Company. In addition, inspectors from
NRC’s Region II office were present during part of the inspection and exit meeting.
ATTACHMENT
1.
PERSONS CONTACTED
W. Brandon, Manager, Sulzer Nuclear Service Center
T Craig, Quality Systems Manager, Sulzer Nuclear Service Center
A. Washburn, Engineering Manager, Sulzer Nuclear Service Center
L. Carson, Nuclear Product Manager, Sulzer Nuclear Service Center
J. Grimm, Quality Assurance Engineer, Sulzer Nuclear Service Center
J. Foster, Operations Manager, Sulzer Nuclear Service Center
2.
INSPECTION PROCEDURES USED
IP 36100, “Inspection of 10 CFR Parts 21 and 50.55(e) Programs for Reporting Defects
and Noncompliance”
IP 43001, “Reactive Inspection of Nuclear Vendors”
3.
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
The last NRC inspection conducted at Sulzer Pumps facility in Chattanooga, Tennessee
occurred in September 2006. During that inspection, the NRC staff did not identify any
violations or nonconformances.
4.
Item Number
Status
Type
Description
99901361/2010-201-01
99901361/2010-201-02
99901361/2010-201-03
99901361/2010-201-04
99901361/2010-201-05
99901361/2010-201-06
Opened
Opened
Opened
Opened
Opened
Opened
NOV
NON
NON
NON
NON
NON
Part 21
Criterion II
Criterion III
Criterion XVI
Criterion VII
Criterion III
LIST OF ACRONYMS USED
US
NRC
Sulzer
QA
Notice
ADAMS
Part 21
QAM
SW
BOM
ECM
PO
NCR
CofC
United States
Nuclear Regulatory Commission
Sulzer Pumps (US) Inc.
Quality Assurance
Notice of Violation
Agency-wide Documents Access and Management System
10 CFR Part 21
Quality Assurance Manual
Service Water
Bill of Material
Engineered Coatings & Machining
Purchase Order
Nonconformance Report
Certificate of Conformance
ENCLOSURE 4
-2CAR
MRB
CGD
AVL
Farley
EPRI
Corrective Action Report
Material Review Board
Commercial-Grade Dedication
Approved Vendors List
Farley Nuclear Power Plant
Electric Power Research Institute
Fly UP