Comments
Description
Transcript
7 8 20 31
1/200 App. E.2 - PWR Systems Drawings REACTOR COOLANT SYSTEM (Numbers Represent Groups) 7 8 31 20 4 19 6 9 21 18 12 5 10 11 13 38 3 2 22 1 32 38 2/200 App. E.2 - PWR Systems Drawings GROUP 1: RCS Cold Leg Piping (Covers worksheets RCS-CL – 1 thru 28) 3 4 Thermowell details 6 5 5 3 4 ? Loop 3 6 26 9 25 19 17 18 16 14 15 13 12 24 27 28 2 11 20 Large Bore Branch nozzles (3”) 21 Small Bore Branch nozzles (<3”) 22 Accumulator 45-deg. Angle nozzle (10”) 23 3” x 1-1/2” reducer attached to branch nozzles 8 10 1 7 7 3/200 App. E.2 - PWR Systems Drawings GROUP 2: RCS Crossover Leg Piping (Covers worksheets RCS-XL – 1 thru 18) 1 ? 2 4 15 5 3 6 7 18 8 16 10 17 9 11 x x x 12 13 14 2” & 3” Branch Nozzles 4/200 App. E.2 - PWR Systems Drawings GROUP 3: RCS Hot Leg Piping (Covers worksheets RCS-HL – 1 thru 22) 22 8 Large Bore Branch Nozzle 17 Small Bore Branch Nozzle 2 ? 16 20 10 18 4 11 21 3 9 5 6 19 12 13 14 15 7 1 5/200 App. E.2 - PWR Systems Drawings GROUP 4: Pressurizer (Sheet 1 of 2) (Covers worksheets RCS-PZR – 1 thru 44) 21 12 5 16 9 13 4 20 15 22 19 8 14 18 3 7 2 6 1 10 11 17 6/200 App. E.2 - PWR Systems Drawings GROUP 4: Pressurizer (Sheet 2 of 2) (Covers worksheets RCS-PZR – 1 thru 44) 40 38 37 39 41 42 23 40 34 41 36 Lifting Trunnion Buildup 35 29 28 33 25 27 26 31 24 32 30 43 44 7/200 App. E.2 - PWR Systems Drawings GROUP 5: Pressurizer Spray Line (Sheet 1 of 3) (Covers worksheets RCS-Spray – 1 thru 36) 5 4 3 2 6 1 7 8 A 9 10 PZR SPRAY NOZZLE 8/200 App. E.2 - PWR Systems Drawings GROUP 5: Pressurizer Spray Line (Sheet 2 of 3) (Covers worksheets RCS-Spray – 1 thru 36) A 29 28 19 27 FROM LOOP 4 COLD LEG 11 26 12 20 B 24 25 23 13 22 21 18 17 16 14 15 9/200 App. E.2 - PWR Systems Drawings GROUP 5: Pressurizer Spray Line (Sheet 3 of 3) (Covers worksheets RCS-Spray – 1 thru 36) 32 31 35 33 30 FROM LOOP 3 COLD LEG 36 B 34 10/200 App. E.2 - PWR Systems Drawings Group 6: Pressurizer Surge Line (Covers worksheets RCS-Surge – 1 thru 6) 1 2 6 3 5 4 11/200 App. E.2 - PWR Systems Drawings GROUP 7: Pressurizer to PORVs (Covers worksheets RCS-PORV – 1 thru 21) 15 16 17 18 19 14 13 12 11 10 9 21 8 7 20 6 4 5 3 2 1 12/200 App. E.2 - PWR Systems Drawings GROUP 8: Pressurizer to SRVs (Covers worksheets RCS-SRV – 1 thru 9) 2 1 9 3 5 6 8 4 7 13/200 App. E.2 - PWR Systems Drawings GROUP 9: Reactor Coolant Pump (Covers worksheets RCS-RCP – 1 thru 5) 5 3 2 4 1 14/200 App. E.2 - PWR Systems Drawings GROUP 10: Reactor Pressure Vessel (Sheet 1 of 4) (Covers worksheets RCS-RPV – 1 thru 31) 20 30 19 18 21 22 27 24 26 26 25 31 23 28 29 15/200 App. E.2 - PWR Systems Drawings GROUP 10: Reactor Pressure Vessel (Sheet 2 of 4) (Covers worksheets RCS-RPV – 1 thru 31) 8 5 9 10 11 7 6 4 3 12 2 1 13 15 14 16/200 App. E.2 - PWR Systems Drawings GROUP 10: Reactor Pressure Vessel (Sheet 3 of 4) (Covers worksheets RCS-RPV – 1 thru 31) 17 16 17/200 App. E.2 - PWR Systems Drawings GROUP 10: Reactor Pressure Vessel (Sheet 4 of 4) (Covers worksheets RCS-RPV – 1 thru 31) 7 6 10 8 9 11 18/200 App. E.2 - PWR Systems Drawings GROUP 11: Steam Generator (Covers worksheets RCS-SG – 1 thru 71) 15 63 58 17 15 67 21 14 13 23 - 33 SG Tubes – Alloy 600 34 - 44 SG Tubes – Alloy 600TT 45 SG Tubes – Alloy 690 - 55 61 Nozzle Safe Ends 68 SG Tube Plugs/Sleeves - 600 69 SG Tube Plugs/Sleeves – 600TT 70 SG Tube Plugs/Sleeves – 690 71 Tube support plates 7 59 18 12 59 12 6 12 5 11 62 12 4 20 10 22 59 3 22 59 16 9 22 60 22 56 22 2 1 Support pads 64 65 66 19 57 19/200 App. E.2 - PWR Systems Drawings GROUP 12: Reactor Vessel Internals (Covers Worksheets RCS-RVI – 1 thru 25) 12 3 1 9 7 5 11 8 2 13 10 4 14 15 6 & former 16 17 23 18 22 21 20 19 24 25 20/200 App. E.2 - PWR Systems Drawings GROUP 13: RCS Stop Valve Loop Bypass Line (Sheet 1 of 3) (Covers Worksheets RCS-LPBYP – 1 thru 38) 12 11 10 Hot Leg Cold Leg 38 1 A 4 6 8 2 9 3 5 7 21/200 App. E.2 - PWR Systems Drawings GROUP 13: RCS Stop Valve Loop Bypass Line (Sheet 2 of 3) (Covers Worksheets RCS-LPBYP – 1 thru 38) 26 25 B 23 24 19 20 17 22 21 16 15 14 13 A 22/200 App. E.2 - PWR Systems Drawings GROUP 13: RCS Stop Valve Loop Bypass Line (Sheet 3 of 3) (Covers Worksheets RCS-LPBYP – 1 thru 38) 27 31 30 32 33 34 35 29 B 28 Cold Leg 36 37 23/200 App. E.2 - PWR Systems Drawings ENGINEERED SAFETY FEATURES (ESF) EMERGENCY CORE COOLING SYSTEMS (ECCS) (Numbers Represent Groups) GROUPS 31-40 18 15 22 14 21 20 17 19 GROUP 23 16 24/200 App. E.2 - PWR Systems Drawings GROUP 14: RWST HEADER (Sheet 1 of 3) (Covers Worksheets ECCS-RWSTHDR – 1 thru 56) 56 1 2 3 4 8 5 6 7 9 A 10 11 To SI Pumps 25/200 App. E.2 - PWR Systems Drawings GROUP 14: RWST HEADER (Sheet 2 of 3) (Covers Worksheets ECCS-RWSTHDR – 1 thru 56) 12 C 27 26 13 28 D 18 24 25 19 14 20 D 15 A 22 21 16 17 23 C RHR Pump B 30 29 35 31 37 32 33 34 36 Cont. Spray A B 26/200 App. E.2 - PWR Systems Drawings GROUP 14: RWST HEADER (Sheet 3 of 3) (Covers Worksheets ECCS-RWSTHDR – 1 thru 56) 38 B 39 40 CVCS Pumps 43 42 45 41 55 54 50 Tie from discharge side of RHR Pumps GROUP 20 53 44 Cont. Spray B 52 RHR Pump A 49 51 48 27/200 App. E.2 - PWR Systems Drawings GROUP 15: CVCS Pump Suction Lines (Sheet 1 of 4) (Covers Worksheets ECCS-CVPMPS – 1 thru 57) From RWST Header 26 14 28 29 25 30 To CVCS Pump B 24 31 32 12 27 21 33 A 22 34 35 23 36 13 37 CVCS Pump A 11 2 19 15 4 To PDP 16 20 FROM VCT 10 5 17 1 18 8 9 7 6 3 B 28/200 App. E.2 - PWR Systems Drawings GROUP 15: CVCS Pump Suction Lines (Sheet 2 of 4) (Covers Worksheets ECCS-CVPMPS – 1 thru 57) 43 44 Suction CVCS Pump B To CVCS Pump A 42 38 41 39 40 A 29/200 App. E.2 - PWR Systems Drawings GROUP 15: CVCS Pump Suction Lines (Sheet 3 of 4) (Covers Worksheets ECCS-CVPMPS – 1 thru 57) To PDP B 45 To CVCS Pumps 46 47 52 To SI Pumps From VCT C 51 50 From RHR Discharge Side 48 49 30/200 App. E.2 - PWR Systems Drawings GROUP 15: CVCS Pump Suction Lines (Sheet 4 of 4) (Covers Worksheets ECCS-CVPMPS – 1 thru 57) 55 56 54 53 From VCT C 31/200 App. E.2 - PWR Systems Drawings GROUP 16: SI Pump Suction Lines (Sheet 1 of 3) (Covers Worksheets ECCS-SIPMPS – 1 thru 48) RWST Header 2 1 4 8 3 6 5 7 9 1O 12 16 13 11 A 23 21 17 14 18 15 19 24 26 27 20 B 22 25 28 To Cold Leg 2 Acc. Nozzle A 29 30 SI Pump B Suction To SI Pump A C 32/200 App. E.2 - PWR Systems Drawings GROUP 16: SI Pump Suction Lines (Sheet 2 of 3) (Covers Worksheets ECCS-SIPMPS – 1 thru 48) 38 34 36 C 37 35 33 41 43 ps um P g rgin P 15 a h U C To GRO 44 39 40 42 45 33/200 App. E.2 - PWR Systems Drawings GROUP 16: SI Pump Suction Lines (Sheet 3 of 3) (Covers Worksheets ECCS-SIPMPS – 1 thru 48) B 46 47 To Cold Leg 2 Accm. Nozzle GROUP 21 To RHR Pump Discharge Line GROUP 21 34/200 App. E.2 - PWR Systems Drawings GROUP 17: RHR Pump Suction Lines (Sheet 1 of 3) (Covers Worksheets ECCS-RHPMPS – 1 thru 77) 40 44 43 41 42 43 27, 28, 29, 30 39 A 26 38 31 35 36 C 24 34 GROUP 14 45 23 33 37 32 25 22 From Hot Leg Loop 1 21 48 46 20 19 B 18 14 A 13 17 16 15 12 1 11 2 3 8 4 5 6 7 9 10 35/200 App. E.2 - PWR Systems Drawings GROUP 17: RHR Pump Suction Lines (Sheet 2 of 3) (Covers Worksheets ECCS-RHPMPS – 1 thru 77) B 50 49 GROUP 19 36/200 App. E.2 - PWR Systems Drawings GROUP 17: RHR Pump Suction Lines (Sheet 3 of 3) (Covers Worksheets ECCS-RHPMPS – 1 thru 77) 55, 56, 57, 58 61 51 60 59 63 To Sump A 62 54 52 53 C 67 To CS Pump A 65 & 66 inaccessible 64 72 76 75 74 73 68 69 70 71 37/200 App. E.2 - PWR Systems Drawings GROUP 18: Accumulator to RCS Cold Leg Connections (Sheet 1 of 2) (Covers Worksheets ECCS-ACCM – 1 thru 41) 41 1 2 3 4 5 6 7 8 10 A 9 11 38/200 App. E.2 - PWR Systems Drawings GROUP 18: Accumulator to RCS Cold Leg Connections (Sheet 2 of 2) (Covers Worksheets ECCS-ACCM – 1 thru 41) 30 31 32 18 28 27 16 17 26 33 15 25 21 14 29 A 35 23 36 12 GROUP 21 37 20 19 38 39 40 34 24 13 22 39/200 App. E.2 - PWR Systems Drawings GROUP 19: SI/RHR to RCS Hot Leg Connections (Sheet 1 of 4) (Covers Worksheets ECCS-HLCONN – 1 thru 58) 13 12 14 11 10 7 A SI Connection To RHR 9 8 6 Hot Leg 28 A 25 26 GROUP 17 27 5 16 4 18 1 23 This branch SI/RHR Inlet line 17 24 22 15 21 20 19 2 3 40/200 App. E.2 - PWR Systems Drawings GROUP 19: SI/RHR to RCS Hot Leg Connections (Sheet 2 of 4) (Covers Worksheets ECCS-HLCONN – 1 thru 58) p3 o o L HL To 43 41 B To Loop 1 HL RHR/SI SYSTEM 42 40 39 35 33 34 B 31 38 37 36 32 29 30 To SI/RHR Pumps 41/200 App. E.2 - PWR Systems Drawings GROUP 19: SI/RHR to RCS Hot Leg Connections (Sheet 3 of 4) (Covers Worksheets ECCS-HLCONN – 1 thru 58) C d pe p a C 44 45 48 47 46 42/200 App. E.2 - PWR Systems Drawings GROUP 19: SI/RHR to RCS Hot Leg Connections (Sheet 4 of 4) (Covers Worksheets ECCS-HLCONN – 1 thru 58) 51 56 54 53 52 57 55 50 49 C 58 43/200 App. E.2 - PWR Systems Drawings GROUP 20: RHR Pump Discharge Lines (Sheet 1 of 4) (Covers Worksheets ECCS–RHPMPD – 1 thru 54) 8 RH B R“ ”T n rai 7 9 10 6 11 A To Train B 5 13 To SI Pumps Train B GROUP 21 14 4 1 15 2 3 16 22 12 RHR “A” Train 17 18 19 To Hot Leg Loop 1 & 3 12” Nozzles GROUP 19 23 20 21 Tie to RHR Suction GROUP 14 To SI Pump Train A 44/200 App. E.2 - PWR Systems Drawings GROUP 20: RHR Pump Discharge Lines (Sheet 2 of 4) (Covers Worksheets ECCS–RHPMPD – 1 thru 54) in 2 Tra – B 29 30 31 B rain nn. T o R RH HL C m Fro 28 32 A 27 26 25 33 B 24 34 53, 54 RHR HX-B 39 36 37 38 From RHR Pump B Discharge 35 45/200 App. E.2 - PWR Systems Drawings GROUP 20: RHR Pump Discharge Lines (Sheet 3 of 4) (Covers Worksheets ECCS–RHPMPD – 1 thru 54) 46 47 48 B 45 44 43 42 41 40 RHR Pump B Discharge 46/200 App. E.2 - PWR Systems Drawings GROUP 20: RHR Pump Discharge Lines (Sheet 4 of 4) (Covers Worksheets ECCS–RHPMPD – 1 thru 54) 53 and 54 52 49 51 49 – Hx Shell to bottom Ho 50 50 -- Hx Shell to bottom Ho 51 – Nozzle to shell 52 – Nozzle to shell 47/200 App. E.2 - PWR Systems Drawings GROUP 21: RHR TO RCS Cold Leg Accumulator Connections (Sheet 1 of 3) (Covers Worksheets ECCS-RHRCL – 1 thru 30) 12 9 8 7 1 A 10 n rai s T r B CL ulato o T cum Ac Connected to GROUP 16 2 4 6 5 3 To RHR Pump Discharge Lines GROUP 20 48/200 App. E.2 - PWR Systems Drawings GROUP 21: RHR TO RCS Cold Leg Accumulator Connections (Sheet 2 of 3) (Covers Worksheets ECCS-RHRCL – 1 thru 30) Train B B B 12 A 16 C 18 17 19 2 op o L g To ld Le Co 15 14 To Loop 3 Cold Leg 13 49/200 App. E.2 - PWR Systems Drawings GROUP 21: RHR TO RCS Cold Leg Accumulator Connections (Sheet 3 of 3) (Covers Worksheets ECCS-RHRCL – 1 thru 30) Connected to Loop 2 GROUP 18 20 21 24 C 25 22 30 23 26 27 29 28 50/200 App. E.2 - PWR Systems Drawings GROUP 22: Charging System to Cold Leg Injection (Sheet 1 of 6) (Covers Worksheets ECCS–CVCL – 1 thru 86) C 20 8 7 5 A 6 10 12 14 21 29 22 28 23 B 9 27 11 From CV Pump B 15 13 24 26 25 3 4 2 17 19 34 16 1 33 18 32 31 30 Conn. To PDP & Reg. HX B A 51/200 App. E.2 - PWR Systems Drawings GROUP 22: Charging System to Cold Leg Injection (Sheet 2 of 6) (Covers Worksheets ECCS–CVCL – 1 thru 86) 35 C 36 37 38 41 47 48 43 39 40 D 42 46 45 44 52/200 App. E.2 - PWR Systems Drawings GROUP 22: Charging System to Cold Leg Injection (Sheet 3 of 6) (Covers Worksheets ECCS–CVCL – 1 thru 86) 49 D 50 51 52 53 54 58 59 56 To RCS CL 1 & 2 E To RCS CL 3 & 4 55 57 53/200 App. E.2 - PWR Systems Drawings GROUP 22: Charging System to Cold Leg Injection (Sheet 4 of 6) (Covers Worksheets ECCS–CVCL – 1 thru 86) E To RCS CL 1 F To RCS CL 2 61 61 54/200 App. E.2 - PWR Systems Drawings GROUP 22: Charging System to Cold Leg Injection (Sheet 5 of 6) (Covers Worksheets ECCS–CVCL – 1 thru 86) G 75 74 78 72 76 77 71 70 66 73 65 64 63 69 68 67 F To CL 2 55/200 App. E.2 - PWR Systems Drawings GROUP 22: Charging System to Cold Leg Injection (Sheet 6 of 6) (Covers Worksheets ECCS–CVCL – 1 thru 86) 80 82 83 81 G 84-86 BIT Components 56/200 App. E.2 - PWR Systems Drawings GROUP 23 –SAFETY INJECTION PUMP DISCHARGE (Sheet 1 of 7) (Covers Worksheets ECCS-SIPMPD – 1 thru 53) S mp u P I B C 40 C To e g tL Ho A To e g tL o H 19 21 To eg L ld o C 20 22 14 18 17 13 16 15 3 2 5 1 4 12 11 10 9 8 6 7 S mp u P I A 57/200 App. E.2 - PWR Systems Drawings To CL 1 &4 GROUP 23 – SAFETY INJECTION PUMP DISCHARGE (Sheet 2 of 7) (Covers Worksheets ECCS-SIPMPD – 1 thru 53) 28 26 CL 2 B To 25 Co e inm nta 27 nt ia xil Au 24 23 A ry 58/200 App. E.2 - PWR Systems Drawings GROUP 23 –SAFETY INJECTION PUMP DISCHARGE (Sheet 3 of 7) (Covers Worksheets ECCS-SIPMPD – 1 thru 53) 21 3 P U t 3 of O e GRe She 3 Se CL i ne 6” l B1 31 30 29 39 28 27 B 34 38 33 35 37 36 B1 32 59/200 App. E.2 - PWR Systems Drawings GROUP 23 –SAFETY INJECTION PUMP DISCHARGE (Sheet 4 of 7) (Covers Worksheets ECCS-SIPMPD – 1 thru 53) n ch a r AB C 41 42 D 43 60/200 App. E.2 - PWR Systems Drawings GROUP 23 –SAFETY INJECTION PUMP DISCHARGE (Sheet 5 of 7) (Covers Worksheets ECCS-SIPMPD – 1 thru 53) To 1 HL F D To 4 HL E 44 45 46 47 48 49 50 61/200 App. E.2 - PWR Systems Drawings GROUP 23 –SAFETY INJECTION PUMP DISCHARGE (Sheet 6 of 7) (Covers Worksheets ECCS-SIPMPD – 1 thru 53) 6” x T L oH 4 2” 9 p 13 of 4) u Gro eet h eS (s e 51 E 62/200 App. E.2 - PWR Systems Drawings GROUP 23 –SAFETY INJECTION PUMP DISCHARGE (Sheet 7 of 7) (Covers Worksheets ECCS-SIPMPD – 1 thru 53) G 19) p u ro of 4 e et (Sh To 1 HL 1 52 F 53 63/200 App. E.2 - PWR Systems Drawings GROUP 24 – MAIN STEAM (Sheet 1 of 3) (Covers Worksheets PCS-MS – 1 thru 89) 4 5 6 7 8 9 10 3 2 1 64/200 App. E.2 - PWR Systems Drawings GROUP 24 – MAIN STEAM (Sheet 2 of 3) (Covers Worksheets PCS-MS – 1 thru 89) 38 39 46 37 34 35 40 45 33 32 36 31 41 53 60 42 28 30 52 44 51 29 43 56 25 27 24 26 67 59 49 47 66 58 65 50 74 57 48 54 63 55 73 61 13 72 64 62 70 68 75 15 20 11 71 12 14 16 17 18 19 21 22 23 76 69 65/200 App. E.2 - PWR Systems Drawings GROUP 24 – MAIN STEAM (Sheet 3 of 3) (Covers Worksheets PCS-MS – 1 thru 89) 80 79 81 82 86 78 88 85 To MFP Turbine To MFP Turbine 77 89 84 87 83 66/200 App. E.2 - PWR Systems Drawings GROUP 25 – MAIN FEEDWATER SYSTEM (Sheet 1 of 3) (Covers Worksheets PCS-MFW – 1 thru 56) 2 1 3 5 6 7 4 8 9 10 12 13 11 14 67/200 App. E.2 - PWR Systems Drawings GROUP 25 – MAIN FEEDWATER SYSTEM (Sheet 2 of 3) (Covers Worksheets PCS-MFW – 1 thru 56) 16 17 15 18 21 19 20 29 24 22 26 28 23 25 27 68/200 App. E.2 - PWR Systems Drawings GROUP 25 – MAIN FEEDWATER SYSTEM (Sheet 3 of 3) (Covers Worksheets PCS-MFW – 1 thru 56) To Flanged Venturi check valve and MFW pump 49 44 34 35 33 36 32 48 47 31 30 41 37 38 42 46 45 43 40 39 69/200 App. E.2 - PWR Systems Drawings GROUP 26 – AUXILIARY FEEDWATER SYSTEM (Sheet 1 of 6) (Covers Worksheets PCS-AFW – 1 thru 45) 2 5 6 1 7 4 3 4” LINE 8 9 10 11 70/200 App. E.2 - PWR Systems Drawings GROUP 26 – AUXILIARY FEEDWATER SYSTEM (Sheet 2 of 6) (Covers Worksheets PCS-AFW – 1 thru 45) 13 12 14 15 16 71/200 App. E.2 - PWR Systems Drawings GROUP 26 – AUXILIARY FEEDWATER SYSTEM (Sheet 3 of 6) (Covers Worksheets PCS-AFW – 1 thru 45) 6” 25 24 23 22 21 20 19 18 17 4” 72/200 App. E.2 - PWR Systems Drawings GROUP 26 – AUXILIARY FEEDWATER SYSTEM (Sheet 4 of 6) (Covers Worksheets PCS-AFW – 1 thru 45) 31 27 30 34 33 32 Tie to other pump 26 29 28 73/200 App. E.2 - PWR Systems Drawings GROUP 26 – AUXILIARY FEEDWATER SYSTEM (Sheet 5 of 6) (Covers Worksheets PCS-AFW – 1 thru 45) 36 35 74/200 App. E.2 - PWR Systems Drawings GROUP 26 – AUXILIARY FEEDWATER SYSTEM (Sheet 6 of 6) (Covers Worksheets PCS-AFW – 1 thru 45) 37 38 39 40 41 42 43 45 44 75/200 App. E.2 - PWR Systems Drawings GROUP 27 – STEAM GENERATOR BLOWDOWN (Sheet 1 of 5) (Covers Worksheets PCS-SGBD – 1 thru 55) 1 2 3 4 17 5 9 11 6 7 13 12 10 14 18 15 19 16 20 21 8 76/200 App. E.2 - PWR Systems Drawings GROUP 27 – STEAM GENERATOR BLOWDOWN (Sheet 2 of 5) (Covers Worksheets PCS-SGBD – 1 thru 55) 22 23 24 25 26 27 77/200 App. E.2 - PWR Systems Drawings GROUP 27 – STEAM GENERATOR BLOWDOWN (Sheet 3 of 5) (Covers Worksheets PCS-SGBD – 1 thru 55) 28 29 78/200 App. E.2 - PWR Systems Drawings GROUP 27 – STEAM GENERATOR BLOWDOWN (Sheet 4 of 5) (Covers Worksheets PCS-SGBD – 1 thru 55) 44 43 45 42 41 30 46 40 32 31 33 34 35 36 38 37 39 79/200 App. E.2 - PWR Systems Drawings GROUP 27 – STEAM GENERATOR BLOWDOWN (Sheet 5 of 5) (Covers Worksheets PCS-SGBD – 1 thru 55) 47 48 49 50 51 52 53 54 55 To Flash Tank and Condenser 80/200 App. E.2 - PWR Systems Drawings GROUP 28 – SERVICE WATER SUCTION FROM POND (Sheet 1 of 4) (Covers Worksheets SS-SWSUC – 1 thru 49) 13 A 12 10 11 9 8 7 6 5 4 3 2 1 81/200 App. E.2 - PWR Systems Drawings GROUP 28 – SERVICE WATER SUCTION FROM POND (Sheet 2 of 4) (Covers Worksheets SS-SWSUC – 1 thru 49) B C 19 18 21 17 20 16 15 14 B A 82/200 App. E.2 - PWR Systems Drawings GROUP 28 – SERVICE WATER SUCTION FROM POND (Sheet 3 of 4) (Covers Worksheets SS-SWSUC – 1 thru 49) 31 32 t1 Uni 30 29 t2 Uni 24 22 27 28 26 25 23 C 83/200 App. E.2 - PWR Systems Drawings GROUP 28 – SERVICE WATER SUCTION FROM POND (Sheet 4 of 4) (Covers Worksheets SS-SWSUC – 1 thru 49) 49 48 45 44 47 42 38 46 43 36 37 41 39 35 34 33 40 84/200 App. E.2 - PWR Systems Drawings GROUP 29 – SERVICE WATER DISCHARGE TO AUXILIARY AND CONTAINMENT BUILDINGS (Sheet 1 of 2) (Covers Worksheets SS-SWDIS – 1 thru 70) 27 28 26 30 24 29 23 22 21 20 31 25 A 34 32 33 18 19 ont. C x u To A Bldg. 17 16 12 13 5 35 7 6 4 3 1 8 9 14 10 t. Con x u To A Bldg. 11 15 2 To other CCW Hx 85/200 App. E.2 - PWR Systems Drawings GROUP 29 – SERVICE WATER DISCHARGE TO AUXILIARY AND CONTAINMENT BUILDINGS (Sheet 2 of 2) (Covers Worksheets SS-SWDIS – 1 thru 70) 52 51 63 sel Di e To oads L 54 55 56 64 D 65 67-70 - CCW HX Components FOR HX NOZZLES SEE GROUP 41 W AF To mp u P 57 58 B 60 66 59 62 50 C CS EC s o T d Loa 49 E C 47 53 41 46 48 45 D 39 40 44 38 43 nt me n i nta ers Co ool To an C F 37 E 42 36 61 B A 86/200 App. E.2 - PWR Systems Drawings GROUP 30 – SERVICE WATER INSIDE CONTAINMENT (Sheet 1 of 4) (Covers Worksheets SS-SWCONT – 1 thru 56) 14 15 13 16 12 17 11 18 10 19 5 4 3 20 9 2 8 6 1 7 87/200 App. E.2 - PWR Systems Drawings GROUP 30 – SERVICE WATER INSIDE CONTAINMENT (Sheet 2 of 4) (Covers Worksheets SS-SWCONT – 1 thru 56) 21 22 23 24 33 25 26 27 28 29 30 31 32 34 88/200 App. E.2 - PWR Systems Drawings GROUP 30 – SERVICE WATER INSIDE CONTAINMENT (Sheet 3 of 4) (Covers Worksheets SS-SWCONT – 1 thru 56) 43 44 37 38 39 42 45 40 36 35 To Containment Fan Cooler Nozzles thru 56 47 41 46 89/200 App. E.2 - PWR Systems Drawings GROUP 30 – SERVICE WATER INSIDE CONTAINMENT (Sheet 4 of 4) (Covers Worksheets SS-SWCONT – 1 thru 56) 49 56 51 55 54 50 48 53 52 47 90/200 App. E.2 - PWR Systems Drawings GROUP 31 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) PUMPS TO CROSSOVER LEG INJECTION PIPING (Sheet 1 of 4) (Covers Worksheets SS-CVXL – 1 thru 49) 15 14 24 23 25 16 12 17 18 19 A1 20 21 11 22 13 10 9 8 7 6 5 4 3 2 1 From Charging Pumps 91/200 App. E.2 - PWR Systems Drawings GROUP 31 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) PUMPS TO CROSSOVER LEG INJECTION PIPING (Sheet 2 of 4) (Covers Worksheets SS-CVXL – 1 thru 49) 27 33 A1 28 34 36 35 26 37 29 39 38 30 32 31 40 A2 92/200 App. E.2 - PWR Systems Drawings GROUP 31 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) PUMPS TO CROSSOVER LEG INJECTION PIPING (Sheet 3 of 4) (Covers Worksheets SS-CVXL – 1 thru 49) 41 A2 Loops A,B,C XL A3 Loop D XL 93/200 App. E.2 - PWR Systems Drawings GROUP 31 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) PUMPS TO CROSSOVER LEG INJECTION PIPING (Sheet 4 of 4) (Covers Worksheets SS-CVXL – 1 thru 49) A4 Lo op XL D 42 49 44 43 45 48 46 47 94/200 App. E.2 - PWR Systems Drawings GROUP 32 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) NORMAL LETDOWN PIPING CL 3 to Regenerative HX (Sheet 1 of 4) (Covers Worksheets SS-CVLD – 1 thru 35) 1 A1 Cold Leg 2 3 4 8 5 6 7 95/200 App. E.2 - PWR Systems Drawings GROUP 32 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) NORMAL LETDOWN PIPING CL 3 to Regenerative HX (Sheet 2 of 4) (Covers Worksheets SS-CVLD – 1 thru 35) A2 12 11 10 A1 9 96/200 App. E.2 - PWR Systems Drawings GROUP 32 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) NORMAL LETDOWN PIING CL 3 to Regenerative HX (Sheet 3 of 4) (Covers Worksheets SS-CVLD – 1 thru 35) 18 20 17 A3 16 15 21 14 13 19 A3 22 23 A2 97/200 App. E.2 - PWR Systems Drawings GROUP 32 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) NORMAL LETDOWN PIPING CL 3 to Regenerative HX (Sheet 4 of 4) (Covers Worksheets SS-CVLD – 1 thru 35) 28 27 26 29 30 25 24 31 32 HX Tubes 33 Tube Sheets 34 Fittings 35 Supports (outside) 98/200 App. E.2 - PWR Systems Drawings GROUP 33 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Regenerative HX to Letdown HX (Sheet 1 of 4) (Covers Worksheets SS-RHXLHX – 1 thru 56) 7 6 8 9 11 10 12 13 17 16 18 21 14 22 19 A1 23 20 15 24 26 25 5 27 4 1 2 3 28 A1 29 A2 99/200 App. E.2 - PWR Systems Drawings GROUP 33 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Regenerative HX to Letdown HX (Sheet 2 of 4) (Covers Worksheets SS-RHXLHX – 1 thru 56) 34 35 30 31 A3 33 Co nt. Au x. 32 A2 36 100/200 App. E.2 - PWR Systems Drawings GROUP 33 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Regenerative HX to Letdown HX (Sheet 3 of 4) (Covers Worksheets SS-RHXLHX – 1 thru 56) 50 From LD Reheat Hx A4 48 47 49 A4 46 37 45 38 A3 39 42 40 43 41 44 101/200 App. E.2 - PWR Systems Drawings GROUP 33 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Regenerative HX to Letdown HX (Sheet 4 of 4) (Covers Worksheets SS-RHXLHX – 1 thru 56) 51 Shell side nozzle 52 Shell side piping 53 Shell side fittings 54 Tube side nozzles 55 Tubes 56 Tube sheet 102/200 App. E.2 - PWR Systems Drawings GROUP 34 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Letdown HX to VCT (Sheet 1 of 6) (Covers Worksheets SS-LHXVCT – 1 thru 53) HX LD 4 3 1 2 11 10 9 13 8 14 7 15 6 16 17 5 20 21 22 23 12 24 25 18 A 26 B 19 C To Filter To De min . 103/200 App. E.2 - PWR Systems Drawings GROUP 34 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Letdown HX to VCT (Sheet 2 of 6) (Covers Worksheets SS-LHXVCT – 1 thru 53) 30 B1 Fro LD m HX 29 27 A 28 B C B1 To Filter 104/200 App. E.2 - PWR Systems Drawings GROUP 34 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Letdown HX to VCT (Sheet 3 of 6) (Covers Worksheets SS-LHXVCT – 1 thru 53) 33 36 m Fro X DH A L 35 34 To n. mi De E B C D 41 F 31 G 32 T VC o T 40 H T VC o T E D I 38 37 F I n oro le B To ecyc R E G F H D Fr Fil om ter m Fro in. m De 39 To T VC 105/200 App. E.2 - PWR Systems Drawings GROUP 34 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Letdown HX to VCT (Sheet 4 of 6) (Covers Worksheets SS-LHXVCT – 1 thru 53) H1 42 44 H G I H1 43 106/200 App. E.2 - PWR Systems Drawings GROUP 34 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Letdown HX to VCT (Sheet 5 of 6) (Covers Worksheets SS-LHXVCT – 1 thru 53) 48 46 47 45 107/200 App. E.2 - PWR Systems Drawings GROUP 34 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Letdown HX to VCT (Sheet 6 of 6) (Covers Worksheets SS-LHXVCT – 1 thru 53) 49 50 51 53 52 108/200 App. E.2 - PWR Systems Drawings GROUP 35 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) From Mixed and Cation Beds to Filter (Sheet 1 of 6) (Covers Worksheets SS-MBFTR – 1 thru 48) To Cation A From Mixed Bed 22 21 4 1 19 20 18 2 3 5 6 7 8 11 9 10 15 12 17 13 16 B m Fro ion t Ca T il oF ter C 14 109/200 App. E.2 - PWR Systems Drawings GROUP 35 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) From Mixed and Cation Beds to Filter (Sheet 2 of 6) (Covers Worksheets SS-MBFTR – 1 thru 48) 33 34 32 23 31 29 24 30 25 26 28 27 A 110/200 App. E.2 - PWR Systems Drawings GROUP 35 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) From Mixed and Cation Beds to Filter (Sheet 3 of 6) (Covers Worksheets SS-MBFTR – 1 thru 48) Cation Bed 36 35 B 111/200 App. E.2 - PWR Systems Drawings GROUP 35 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) From Mixed and Cation Beds to Filter (Sheet 4 of 6) (Covers Worksheets SS-MBFTR – 1 thru 48) C From Boron Recovery 38 37 39 40 To Filter To Boron Recovery 112/200 App. E.2 - PWR Systems Drawings GROUP 35 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) From Mixed and Cation Beds to Filter (Sheet 5 of 6) (Covers Worksheets SS-MBFTR – 1 thru 48) 41 42 43 44 MIXED BED 113/200 App. E.2 - PWR Systems Drawings GROUP 35 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) From Mixed and Cation Beds to Filter (Sheet 6 of 6) (Covers Worksheets SS-MBFTR – 1 thru 48) 45 46 47 48 CATION BED 114/200 App. E.2 - PWR Systems Drawings GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) VCT/RCP Seal Return Piping to Charging Pumps (Sheet 1 of 7) (Covers Worksheets SS-VCTCVP – 1 thru 70) 18 20 A1 16 17 19 14 13 15 12 10 P RC m o Fr eals S 11 1 2 9 3 7 6 8 To Filter Bypass 4 5 115/200 App. E.2 - PWR Systems Drawings GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) VCT/RCP Seal Return Piping to Charging Pumps (Sheet 2 of 7) (Covers Worksheets SS-VCTCVP – 1 thru 70) 21 A1 A2 r lte i F m ass o Fr yp B 22 116/200 App. E.2 - PWR Systems Drawings GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) VCT/RCP Seal Return Piping to Charging Pumps (Sheet 3 of 7) (Covers Worksheets SS-VCTCVP – 1 thru 70) A3 33 34 29 28 35 32 36 31 37 30 38 27 39 26 40 C1 A4 From Charging Pumps 25 23 24 A3 A2 117/200 App. E.2 - PWR Systems Drawings GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) VCT/RCP Seal Return Piping to Charging Pumps (Sheet 4 of 7) (Covers Worksheets SS-VCTCVP – 1 thru 70) To Charging Pumps 41 52 53 A4 49 48 A5 51 50 43 A5 From VCT B1 44 42 45 54 46 47 B1 55 118/200 App. E.2 - PWR Systems Drawings GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) VCT/RCP Seal Return Piping to Charging Pumps (Sheet 5 of 7) (Covers Worksheets SS-VCTCVP – 1 thru 70) 58 57 C1 See Sheet 3 56 C2 From Cha Pum rging ps 119/200 App. E.2 - PWR Systems Drawings GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) VCT/RCP Seal Return Piping to Charging Pumps (Sheet 6 of 7) (Covers Worksheets SS-VCTCVP – 1 thru 70) 64 63 61 C3 C4 62 60 59 C2 67 66 65 C3 120/200 App. E.2 - PWR Systems Drawings GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) VCT/RCP Seal Return Piping to Charging Pumps (Sheet 7 of 7) (Covers Worksheets SS-VCTCVP – 1 thru 70) 68 69 70 From Charging Pumps C4 121/200 App. E.2 - PWR Systems Drawings GROUP 37 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Charging Pumps to Regenerative HX (Sheet 1 of 4) (Covers Worksheets SS-CVPRHX – 1 thru 53) 4 3 5 2 1 6 15 14 13 12 7 16 30 11 17 31 8 18 9 10 19 26 20 21 22 27 23 24 25 A1 29 28 122/200 App. E.2 - PWR Systems Drawings GROUP 37 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Charging Pumps to Regenerative HX (Sheet 2 of 4) (Covers Worksheets SS-CVPRHX – 1 thru 53) A2 A3 A1 32 36 35 37 39 38 40 41 A3 A4 NT CO . X. AU 34 33 A2 123/200 App. E.2 - PWR Systems Drawings GROUP 37 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Charging Pumps to Regenerative HX (Sheet 3 of 4) (Covers Worksheets SS-CVPRHX – 1 thru 53) 42 43 44 A4 A5 . NT CO 45 X. AU 124/200 App. E.2 - PWR Systems Drawings GROUP 37 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Charging Pumps to Regenerative HX (Sheet 4 of 4) (Covers Worksheets SS-CVPRHX – 1 thru 53) 52 51 50 A6 49 47 48 46 53 A5 A6 125/200 App. E.2 - PWR Systems Drawings GROUP 38 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Regenerative HX to RCS Loop 2 Cold Leg (Sheet 1 of 3) (Covers Worksheets SS-RHXCL – 1 thru 24) 15 18 19 14 20 17 13 16 A1 12 11 10 8 5 7 4 6 3 2 1 9 126/200 App. E.2 - PWR Systems Drawings GROUP 38 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Regenerative HX to RCS Loop 2 Cold Leg (Sheet 2 of 3) (Covers Worksheets SS-RHXCL – 1 thru 24) A4 21 A5 T Lo o op 2 22 23 A3 Lo To op 1 A4 127/200 App. E.2 - PWR Systems Drawings GROUP 38 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Regenerative HX to RCS Loop 2 Cold Leg (Sheet 3 of 3) (Covers Worksheets SS-RHXCL – 1 thru 24) Loop2 Cold Leg Normal Charging Loop1 Cold Leg Alternate Charging 24 A5 128/200 App. E.2 - PWR Systems Drawings GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Injection Filter to Reactor Coolant Pump Seals (Sheet 1 of 7) (Covers Worksheets SS-RCPINJ– 1 thru 65) 10 9 7 6 8 5 3 2 4 1 11 12 From Charging Pumps 13 14 15 16 17 18 19 A1 20 21 129/200 App. E.2 - PWR Systems Drawings GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Injection Filter to Reactor Coolant Pump Seals (Sheet 2 of 7) (Covers Worksheets SS-RCPINJ– 1 thru 65) 31 A2 30 29 28 27 A1 22 23 24 25 26 130/200 App. E.2 - PWR Systems Drawings GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Injection Filter to Reactor Coolant Pump Seals (Sheet 3 of 7) (Covers Worksheets SS-RCPINJ– 1 thru 65) 32 A2 A3 33 34 131/200 App. E.2 - PWR Systems Drawings GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Injection Filter to Reactor Coolant Pump Seals (Sheet 4 of 7) (Covers Worksheets SS-RCPINJ– 1 thru 65) A5 45 44 43 40 41 42 36 35 39 38 37 A4 132/200 App. E.2 - PWR Systems Drawings GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Injection Filter to Reactor Coolant Pump Seals (Sheet 5 of 7) (Covers Worksheets SS-RCPINJ– 1 thru 65) 49 50 51 52 53 54 Cont. Aux. 48 A5 47 46 A6 133/200 App. E.2 - PWR Systems Drawings GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Injection Filter to Reactor Coolant Pump Seals (Sheet 6 of 7) (Covers Worksheets SS-RCPINJ– 1 thru 65) 56 A6 57 55 A7 134/200 App. E.2 - PWR Systems Drawings GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Injection Filter to Reactor Coolant Pump Seals (Sheet 7 of 7) (Covers Worksheets SS-RCPINJ– 1 thru 65) 64 63 62 65 61 RCP (1RC01PD-1D) 60 59 A7 58 135/200 App. E.2 - PWR Systems Drawings GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Reactor Coolant Pump Seals to Return Filter (Sheet 1 of 7) (Covers Worksheets SS-RCPRET – 1 thru 46) 7 8 4 5 6 3 9 2 1 10 A1 136/200 App. E.2 - PWR Systems Drawings GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Reactor Coolant Pump Seals to Return Filter (Sheet 2 of 7) (Covers Worksheets SS-RCPRET – 1 thru 46) A1 11 12 13 14 A2 137/200 App. E.2 - PWR Systems Drawings GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Reactor Coolant Pump Seals to Return Filter (Sheet 3 of 7) (Covers Worksheets SS-RCPRET – 1 thru 46) 20 21 22 A2 15 16 17 19 18 A3 138/200 App. E.2 - PWR Systems Drawings GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Reactor Coolant Pump Seals to Return Filter (Sheet 4 of 7) (Covers Worksheets SS-RCPRET – 1 thru 46) H. SC 40 H. SC 60 1 A6 25 24 23 A5 139/200 App. E.2 - PWR Systems Drawings GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Reactor Coolant Pump Seals to Return Filter (Sheet 5 of 7) (Covers Worksheets SS-RCPRET – 1 thru 46) 33 32 31 30 29 28 A7 27 26 A6 140/200 App. E.2 - PWR Systems Drawings GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Reactor Coolant Pump Seals to Return Filter (Sheet 6 of 7) (Covers Worksheets SS-RCPRET – 1 thru 46) Con t . 36 Aux . A9 35 34 A8 141/200 App. E.2 - PWR Systems Drawings GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS) Reactor Coolant Pump Seals to Return Filter (Sheet 7 of 7) (Covers Worksheets SS-RCPRET – 1 thru 46) 38 37 39 40 41 42 43 44 45 A9 46 A10 142/200 App. E.2 - PWR Systems Drawings GROUP 41 – COMPONENT COOLING WATER PIPING Surge Tank to CCW HX (Sheet 1 of 8) (Covers Worksheets SS-CCWHX – 1 thru 72) A1 9 8 6 K. ET G IT R SU CCO I 10 11 4 1 3 12 2 13 5 7 143/200 App. E.2 - PWR Systems Drawings GROUP 41 – COMPONENT COOLING WATER PIPING Surge Tank to CCW HX (Sheet 2 of 8) (Covers Worksheets SS-CCWHX – 1 thru 72) From Group 43 A1 A2 14 18 15 16 17 144/200 App. E.2 - PWR Systems Drawings GROUP 41 – COMPONENT COOLING WATER PIPING Surge Tank to CCW HX (Sheet 3 of 8) (Covers Worksheets SS-CCWHX – 1 thru 72) 19 20 21 22 A2 23 A3 145/200 App. E.2 - PWR Systems Drawings GROUP 41 – COMPONENT COOLING WATER PIPING Surge Tank to CCW HX (Sheet 4 of 8) (Covers Worksheets SS-CCWHX – 1 thru 72) 31 32 33 35 36 A4 34 37 38 39 A5 24 CCW Pump 1B 40 26 25 A3 27 A4 30 29 28 146/200 App. E.2 - PWR Systems Drawings GROUP 41 – COMPONENT COOLING WATER PIPING Surge Tank to CCW HX (Sheet 5 of 8) (Covers Worksheets SS-CCWHX – 1 thru 72) 58 56 57 55 54 51 53 59 61 52 60 50 62 63 64 49 42 A5 41 48 43 44 47 45 46 147/200 App. E.2 - PWR Systems Drawings GROUP 41 – COMPONENT COOLING WATER PIPING Surge Tank to CCW HX (Sheet 6 of 8) (Covers Worksheets SS-CCWHX – 1 thru 72) 66 67 65 68 69 SURGE TANK (ICCOIT) 148/200 App. E.2 - PWR Systems Drawings GROUP 41 – COMPONENT COOLING WATER PIPING Surge Tank to CCW HX (Sheet 7 of 8) (Covers Worksheets SS-CCWHX – 1 thru 72) 70 CCW PUMP (ICCOIPB) 149/200 App. E.2 - PWR Systems Drawings GROUP 41 – COMPONENT COOLING WATER PIPING Surge Tank to CCW HX (Sheet 8 of 8) (Covers Worksheets SS-CCWHX – 1 thru 72) 71 Shell Side Nozzles 72 Tube Side Nozzles FOR CCW HX COMPONENTS EXCEPT NOZZLES - SEE GROUP 29 CCW HX (ICCOIA) 150/200 App. E.2 - PWR Systems Drawings GROUP 42 – COMPONENT COOLING WATER PIPING CCW HX to RHR HX (Sheet 1 of 4) (Covers Worksheets SS-CCWRHR – 1 thru 50) 12 4 7 10 6 2 3 13 1 14 5 15 9 8 16 17 18 B1 19 24 23 22 11 20 21 A1 151/200 App. E.2 - PWR Systems Drawings GROUP 42 – COMPONENT COOLING WATER PIPING CCW HX to RHR HX (Sheet 2 of 4) (Covers Worksheets SS-CCWRHR – 1 thru 50) 29 30 31 32 28 B2 27 Sheet 4 A2 25 26 B1 A1 152/200 App. E.2 - PWR Systems Drawings GROUP 42 – COMPONENT COOLING WATER PIPING CCW HX to RHR HX (Sheet 3 of 4) (Covers Worksheets SS-CCWRHR – 1 thru 50) 34 33 B2 153/200 App. E.2 - PWR Systems Drawings GROUP 42 – COMPONENT COOLING WATER PIPING CCW HX to RHR HX (Sheet 4 of 4) (Covers Worksheets SS-CCWRHR – 1 thru 50) A2 A3 From Sheet 2 39 35 38 37 36 46 40 47 41 49 48 44 43 42 45 50 A3 154/200 App. E.2 - PWR Systems Drawings GROUP 43 – COMPONENT COOLING WATER PIPING Cooling Water to Other Loads Outside Containment (Sheet 1 of 5) (Covers Worksheets SS-CCWLDS – 1 thru 56) 21 20 2 1 A1 19 3 14 13 15 12 11 16 18 From CCW Hx 17 7 8 6 To RCP – 10 9 4 5 155/200 App. E.2 - PWR Systems Drawings GROUP 43 – COMPONENT COOLING WATER PIPING Cooling Water to Other Loads Outside Containment (Sheet 2 of 5) (Covers Worksheets SS-CCWLDS – 1 thru 56) 25 27 26 28 24 23 22 A1 29 30 31 A2 A3 A2 156/200 App. E.2 - PWR Systems Drawings GROUP 43 – COMPONENT COOLING WATER PIPING Cooling Water to Other Loads Outside Containment (Sheet 3 of 5) (Covers Worksheets SS-CCWLDS – 1 thru 56) 36 35 A3 34 33 To CCW Pumps 32 157/200 App. E.2 - PWR Systems Drawings GROUP 43 – COMPONENT COOLING WATER PIPING Cooling Water to Other Loads Outside Containment (Sheet 4 of 5) (Covers Worksheets SS-CCWLDS – 1 thru 56) 45 44 43 47 46 42 41 48 49 50 B1 51 37 40 38 39 158/200 App. E.2 - PWR Systems Drawings GROUP 43 – COMPONENT COOLING WATER PIPING Cooling Water to Other Loads Outside Containment (Sheet 5 of 5) (Covers Worksheets SS-CCWLDS – 1 thru 56) 52 To CCW Pumps 53 54 55 56 B1 159/200 App. E.2 - PWR Systems Drawings GROUP 44 – COMPONENT COOLING WATER PIPING Cooling Water to RCP Inside Containment (Sheet 1 of 4) (Covers Worksheets SS-CCWRCP – 1 thru 58) – . NT O C X. AU 9 A1 3 4 5 6 7 8 10 2 1 160/200 App. E.2 - PWR Systems Drawings GROUP 44 – COMPONENT COOLING WATER PIPING Cooling Water to RCP Inside Containment (Sheet 2 of 4) (Covers Worksheets SS-CCWRCP – 1 thru 58) A2 14 13 12 11 A1 31 A2 30 A3 16 24 17 15 22 23 21 20 19 18 29 28 27 26 25 161/200 App. E.2 - PWR Systems Drawings GROUP 44 – COMPONENT COOLING WATER PIPING Cooling Water to RCP Inside Containment (Sheet 3 of 4) (Covers Worksheets SS-CCWRCP – 1 thru 58) 35 A3 34 32 33 36 A4 37 38 A4 40 41 42 39 A5 162/200 App. E.2 - PWR Systems Drawings GROUP 44 – COMPONENT COOLING WATER PIPING Cooling Water to RCP Inside Containment (Sheet 4 of 4) (Covers Worksheets SS-CCWRCP – 1 thru 58) A5 43 44 46 48 45 47 49 55 56 57 50 51 52 53 54 58 163/200 App. E.2 - PWR Systems Drawings GROUP 45 – SPENT FUEL POOL COOLING PIPING SFP Cooling System (Sheet 1 of 6) (Covers Worksheets SS-SFPCLG – 1 thru 66) 4 19 18 3 20 2 17 16 21 15 14 1 A2 13 5 6 7 A1 12 9 10 A1 11 8 164/200 App. E.2 - PWR Systems Drawings GROUP 45 – SPENT FUEL POOL COOLING PIPING SFP Cooling System (Sheet 2 of 6) (Covers Worksheets SS-SFPCLG – 1 thru 66) 37 39 36 38 34 35 33 40 A3 22 32 A2 23 24 31 47 46 30 48 25 29 26 28 27 A4 A3 45 44 43 42 41 165/200 App. E.2 - PWR Systems Drawings GROUP 45 – SPENT FUEL POOL COOLING PIPING SFP Cooling System (Sheet 3 of 6) (Covers Worksheets SS-SFPCLG – 1 thru 66) A4 49 50 51 52 53 54 55 56 From Demin. 166/200 App. E.2 - PWR Systems Drawings GROUP 45 – SPENT FUEL POOL COOLING PIPING SFP Cooling System (Sheet 4 of 6) (Covers Worksheets SS-SFPCLG – 1 thru 66) 57 Tube side nozzles 58 Tube sheet 59 Tubes 60 Shell 61 Shell side nozzles Spent Fuel Pit HX (IFCOIA) 167/200 App. E.2 - PWR Systems Drawings GROUP 45 – SPENT FUEL POOL COOLING PIPING SFP Cooling System (Sheet 5 of 6) (Covers Worksheets SS-SFPCLG – 1 thru 66) 62 Spent Fuel Pit Pump (IFCOIP) 168/200 App. E.2 - PWR Systems Drawings GROUP 45 – SPENT FUEL POOL COOLING PIPING SFP Cooling System (Sheet 6 of 6) (Covers Worksheets SS-SFPCLG – 1 thru 66) 63 64 65 66 Fuel Pit Strainer (IFC03F) 169/200 App. E.2 - PWR Systems Drawings GROUP 46 – SPENT FUEL POOL CLEANING PIPING SFP Cleanup System (Sheet 1 of 10) (Covers Worksheets SS-SFPCLN – 1 thru 46) A1 8 7 9 6 4 3 5 2 1 10 11 A2 A1 170/200 App. E.2 - PWR Systems Drawings GROUP 46 – SPENT FUEL POOL CLEANING PIPING SFP Cleanup System (Sheet 2 of 10) (Covers Worksheets SS-SFPCLN – 1 thru 46) 12 17 13 A4 14 15 A2 A3 16 A3 171/200 App. E.2 - PWR Systems Drawings GROUP 46 – SPENT FUEL POOL CLEANING PIPING SFP Cleanup System (Sheet 3 of 10) (Covers Worksheets SS-SFPCLN – 1 thru 46) A5 19 A4 18 172/200 App. E.2 - PWR Systems Drawings GROUP 46 – SPENT FUEL POOL CLEANING PIPING SFP Cleanup System (Sheet 4 of 10) (Covers Worksheets SS-SFPCLN – 1 thru 46) A5 20 A6 173/200 App. E.2 - PWR Systems Drawings GROUP 46 – SPENT FUEL POOL CLEANING PIPING SFP Cleanup System (Sheet 5 of 10) (Covers Worksheets SS-SFPCLN – 1 thru 46) To Demin. A7 A8 21 A6 A7 174/200 App. E.2 - PWR Systems Drawings GROUP 46 – SPENT FUEL POOL CLEANING PIPING SFP Cleanup System (Sheet 6 of 10) (Covers Worksheets SS-SFPCLN – 1 thru 46) 22 A9 A8 175/200 App. E.2 - PWR Systems Drawings GROUP 46 – SPENT FUEL POOL CLEANING PIPING SFP Cleanup System (Sheet 7 of 10) (Covers Worksheets SS-SFPCLN – 1 thru 46) A10 IFCO 32 24 33 A9 25 26 23 27 28 29 30 31 4F 176/200 App. E.2 - PWR Systems Drawings GROUP 46 – SPENT FUEL POOL CLEANING PIPING SFP Cleanup System (Sheet 8 of 10) (Covers Worksheets SS-SFPCLN – 1 thru 46) 38 A12 36 37 34 A12 A11 A10 35 A11 177/200 App. E.2 - PWR Systems Drawings GROUP 46 – SPENT FUEL POOL CLEANING PIPING SFP Cleanup System (Sheet 9 of 10) (Covers Worksheets SS-SFPCLN – 1 thru 46) 39 40 41 42 Mixed Bed (IFCOID) 178/200 App. E.2 - PWR Systems Drawings GROUP 46 – SPENT FUEL POOL CLEANING PIPING SFP Cleanup System (Sheet 10 of 10) (Covers Worksheets SS-SFPCLN – 1 thru 46) 43 44 45 46 Spent Fuel Pit Filters (IFCO2F and IFC04F) 179/200 App. E.2 - PWR Systems Drawings GROUP 47 – SPENT FUEL POOL AND RACKS Spent Fuel Storage Pool (Sheet 1 of 10) (Covers Worksheets AS- SFPRACK – 1 thru 9) 180/200 App. E.2 - PWR Systems Drawings GROUP 47 – SPENT FUEL POOL AND RACKS Rack Arrangement (Sheet 2 of 10) (Covers Worksheets AS- SFPRACK – 1 thru 9) 181/200 App. E.2 - PWR Systems Drawings GROUP 47 – SPENT FUEL POOL AND RACKS Pool Liner Plan (Sheet 3 of 10) (Covers Worksheets AS- SFPRACK – 1 thru 9) 182/200 App. E.2 - PWR Systems Drawings GROUP 47 – SPENT FUEL POOL AND RACKS Pool Liner Details (Sheet 4 of 10) (Covers Worksheets AS- SFPRACK – 1 thru 9) 183/200 App. E.2 - PWR Systems Drawings GROUP 47 – SPENT FUEL POOL AND RACKS Storage Rack in Region 1 (Sheet 5 of 10) (Covers Worksheets AS- SFPRACK – 1 thru 9) 184/200 App. E.2 - PWR Systems Drawings GROUP 47 – SPENT FUEL POOL AND RACKS Typical Cell in Region 1 (Sheet 6 of 10) (Covers Worksheets AS- SFPRACK – 1 thru 9) 185/200 App. E.2 - PWR Systems Drawings GROUP 47 – SPENT FUEL POOL AND RACKS Storage Rack in Region 2 (Sheet 7 of 10) (Covers Worksheets AS- SFPRACK – 1 thru 9) 186/200 App. E.2 - PWR Systems Drawings GROUP 47 – SPENT FUEL POOL AND RACKS Typical Cell in Region 2 (Sheet 8 of 10) (Covers Worksheets AS- SFPRACK – 1 thru 9) 187/200 App. E.2 - PWR Systems Drawings GROUP 47 – SPENT FUEL POOL AND RACKS Rack Structure (Sheet 9 of 10) (Covers Worksheets AS- SFPRACK – 1 thru 9) 188/200 App. E.2 - PWR Systems Drawings GROUP 47 – SPENT FUEL POOL AND RACKS Adjustable Supports (Sheet 10 of 10) (Covers Worksheets AS- SFPRACK – 1 thru 9) 189/200 App. E.2 - PWR Systems Drawings GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS INSIDE CONTAINMENT CONFIG. 1- 3 (Sheet 1 of 12) (Covers Worksheets ESF- CONTPEN – 1 thru 10) 190/200 App. E.2 - PWR Systems Drawings GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS INSIDE CONTAINMENT CONFIG. 4 & 5 (Sheet 2 of 12) (Covers Worksheets ESF- CONTPEN – 1 thru 10) 191/200 App. E.2 - PWR Systems Drawings GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS OUTSIDE CONTAINMENT CONFIG. 1 & 2 (Sheet 3 of 12) (Covers Worksheets ESF- CONTPEN – 1 thru 10) 192/200 App. E.2 - PWR Systems Drawings GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS OUTSIDE CONTAINMENT CONFIG. 3 & 4 (Sheet 4 of 12) (Covers Worksheets ESF- CONTPEN – 1 thru 10) 193/200 App. E.2 - PWR Systems Drawings GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS OUTSIDE CONTAINMENT CONFIG. 5 (Sheet 5 of 12) (Covers Worksheets ESF- CONTPEN – 1 thru 10) 194/200 App. E.2 - PWR Systems Drawings GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS OUTSIDE CONTAINMENT CONFIG. 6 (Sheet 6 of 12) (Covers Worksheets ESF- CONTPEN – 1 thru 10) 195/200 App. E.2 - PWR Systems Drawings GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS OUTSIDE CONTAINMENT CONFIG. 7 (Sheet 7 of 12) (Covers Worksheets ESF- CONTPEN– 1 thru 10) 196/200 App. E.2 - PWR Systems Drawings GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS RECIRC SUMP GUARD PIPE & BELLOWS (Sheet 8 of 12) (Covers Worksheets ESF- CONTPEN– 1 thru 10) 197/200 App. E.2 - PWR Systems Drawings GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS Detail 22-CCW; Detail 23-SW; Detail 24-MS/FW (Sheet 9 of 12) (Covers Worksheets ESF- CONTPEN– 1 thru 10) 198/200 App. E.2 - PWR Systems Drawings GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS MAIN STEAM AND FEEDWATER (Sheet 10 of 12) (Covers Worksheets ESF- CONTPEN– 1 thru 10) 199/200 App. E.2 - PWR Systems Drawings GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS MISC CONFIGURATIONS (Sheet 11 of 12) (Covers Worksheets ESF- CONTPEN – 1 thru 10) 200/200 App. E.2 - PWR Systems Drawings GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS SPECIAL PIPING DETAILS (Sheet 12 of 12) (Covers Worksheets ESF- CONTPEN – 1 thru 10)