...

7 8 20 31

by user

on
Category: Documents
28

views

Report

Comments

Description

Transcript

7 8 20 31
1/200
App. E.2 - PWR Systems Drawings
REACTOR COOLANT SYSTEM
(Numbers Represent Groups)
7
8
31
20
4
19
6
9
21
18
12
5
10
11
13
38
3
2
22
1
32
38
2/200
App. E.2 - PWR Systems Drawings
GROUP 1: RCS Cold Leg Piping
(Covers worksheets RCS-CL – 1 thru 28)
3
4
Thermowell details
6
5
5
3
4
? Loop 3
6
26
9
25
19
17
18
16
14
15
13
12
24
27
28
2
11
20
Large Bore Branch nozzles (3”)
21
Small Bore Branch nozzles (<3”)
22
Accumulator 45-deg. Angle nozzle (10”)
23
3” x 1-1/2” reducer attached to branch nozzles
8
10
1
7
7
3/200
App. E.2 - PWR Systems Drawings
GROUP 2: RCS Crossover Leg Piping
(Covers worksheets RCS-XL – 1 thru 18)
1
?
2
4
15
5
3
6
7
18
8
16
10
17
9
11
x x x
12
13
14
2” & 3” Branch Nozzles
4/200
App. E.2 - PWR Systems Drawings
GROUP 3: RCS Hot Leg Piping
(Covers worksheets RCS-HL – 1 thru 22)
22
8
Large Bore Branch Nozzle
17
Small Bore Branch Nozzle
2
?
16
20
10
18
4
11
21
3
9
5
6
19
12
13
14
15
7
1
5/200
App. E.2 - PWR Systems Drawings
GROUP 4: Pressurizer (Sheet 1 of 2)
(Covers worksheets RCS-PZR – 1 thru 44)
21
12
5
16
9
13
4
20
15
22
19
8
14
18
3
7
2
6
1
10
11
17
6/200
App. E.2 - PWR Systems Drawings
GROUP 4: Pressurizer (Sheet 2 of 2)
(Covers worksheets RCS-PZR – 1 thru 44)
40
38
37
39
41
42
23
40
34
41
36
Lifting Trunnion Buildup
35
29
28
33
25
27
26
31
24
32
30
43
44
7/200
App. E.2 - PWR Systems Drawings
GROUP 5: Pressurizer Spray Line (Sheet 1 of 3)
(Covers worksheets RCS-Spray – 1 thru 36)
5
4
3
2
6
1
7
8
A
9
10
PZR
SPRAY
NOZZLE
8/200
App. E.2 - PWR Systems Drawings
GROUP 5: Pressurizer Spray Line (Sheet 2 of 3)
(Covers worksheets RCS-Spray – 1 thru 36)
A
29
28
19
27
FROM
LOOP 4
COLD LEG
11
26
12
20
B
24
25
23
13
22
21
18
17
16
14
15
9/200
App. E.2 - PWR Systems Drawings
GROUP 5: Pressurizer Spray Line (Sheet 3 of 3)
(Covers worksheets RCS-Spray – 1 thru 36)
32
31
35
33
30
FROM
LOOP 3
COLD LEG
36
B
34
10/200
App. E.2 - PWR Systems Drawings
Group 6: Pressurizer Surge Line
(Covers worksheets RCS-Surge – 1 thru 6)
1
2
6
3
5
4
11/200
App. E.2 - PWR Systems Drawings
GROUP 7: Pressurizer to PORVs
(Covers worksheets RCS-PORV – 1 thru 21)
15
16
17
18
19
14
13
12
11
10
9
21
8
7
20
6
4
5
3
2
1
12/200
App. E.2 - PWR Systems Drawings
GROUP 8: Pressurizer to SRVs
(Covers worksheets RCS-SRV – 1 thru 9)
2
1
9
3
5
6
8
4
7
13/200
App. E.2 - PWR Systems Drawings
GROUP 9: Reactor Coolant Pump
(Covers worksheets RCS-RCP – 1 thru 5)
5
3
2
4
1
14/200
App. E.2 - PWR Systems Drawings
GROUP 10: Reactor Pressure Vessel (Sheet 1 of 4)
(Covers worksheets RCS-RPV – 1 thru 31)
20
30
19
18
21
22
27
24
26
26
25
31
23
28
29
15/200
App. E.2 - PWR Systems Drawings
GROUP 10: Reactor Pressure Vessel (Sheet 2 of 4)
(Covers worksheets RCS-RPV – 1 thru 31)
8
5
9
10
11
7
6
4
3
12
2
1
13
15
14
16/200
App. E.2 - PWR Systems Drawings
GROUP 10: Reactor Pressure Vessel (Sheet 3 of 4)
(Covers worksheets RCS-RPV – 1 thru 31)
17
16
17/200
App. E.2 - PWR Systems Drawings
GROUP 10: Reactor Pressure Vessel (Sheet 4 of 4)
(Covers worksheets RCS-RPV – 1 thru 31)
7
6
10
8
9
11
18/200
App. E.2 - PWR Systems Drawings
GROUP 11: Steam Generator
(Covers worksheets RCS-SG – 1 thru 71)
15
63
58
17
15
67
21
14
13
23 - 33
SG Tubes – Alloy 600
34 - 44
SG Tubes – Alloy 600TT
45
SG Tubes – Alloy 690
- 55
61
Nozzle Safe Ends
68
SG Tube Plugs/Sleeves - 600
69
SG Tube Plugs/Sleeves – 600TT
70
SG Tube Plugs/Sleeves – 690
71
Tube support plates
7
59
18
12
59
12
6
12
5
11
62
12
4
20
10
22
59
3
22
59
16
9
22
60
22
56
22
2
1
Support pads
64
65
66
19
57
19/200
App. E.2 - PWR Systems Drawings
GROUP 12: Reactor Vessel Internals
(Covers Worksheets RCS-RVI – 1 thru 25)
12
3
1
9
7
5
11
8
2
13
10
4
14
15
6
& former
16
17
23
18
22
21
20
19
24
25
20/200
App. E.2 - PWR Systems Drawings
GROUP 13: RCS Stop Valve Loop Bypass Line (Sheet 1 of 3)
(Covers Worksheets RCS-LPBYP – 1 thru 38)
12
11
10
Hot Leg
Cold Leg
38
1
A
4
6
8
2
9
3
5
7
21/200
App. E.2 - PWR Systems Drawings
GROUP 13: RCS Stop Valve Loop Bypass Line (Sheet 2 of 3)
(Covers Worksheets RCS-LPBYP – 1 thru 38)
26
25
B
23
24
19
20
17
22
21
16
15
14
13
A
22/200
App. E.2 - PWR Systems Drawings
GROUP 13: RCS Stop Valve Loop Bypass Line (Sheet 3 of 3)
(Covers Worksheets RCS-LPBYP – 1 thru 38)
27
31
30
32
33
34
35
29
B
28
Cold Leg
36
37
23/200
App. E.2 - PWR Systems Drawings
ENGINEERED SAFETY FEATURES (ESF)
EMERGENCY CORE COOLING SYSTEMS (ECCS)
(Numbers Represent Groups)
GROUPS
31-40
18
15
22
14
21
20
17
19
GROUP 23
16
24/200
App. E.2 - PWR Systems Drawings
GROUP 14: RWST HEADER (Sheet 1 of 3)
(Covers Worksheets ECCS-RWSTHDR – 1 thru 56)
56
1
2
3
4
8
5
6
7
9
A
10
11
To
SI Pumps
25/200
App. E.2 - PWR Systems Drawings
GROUP 14: RWST HEADER (Sheet 2 of 3)
(Covers Worksheets ECCS-RWSTHDR – 1 thru 56)
12
C
27
26
13
28
D
18
24
25
19
14
20
D
15
A
22
21
16
17
23
C
RHR
Pump B
30
29
35
31
37
32
33
34
36
Cont.
Spray A
B
26/200
App. E.2 - PWR Systems Drawings
GROUP 14: RWST HEADER (Sheet 3 of 3)
(Covers Worksheets ECCS-RWSTHDR – 1 thru 56)
38
B
39
40
CVCS Pumps
43
42
45
41
55
54
50
Tie from discharge
side of RHR Pumps
GROUP 20
53
44
Cont.
Spray B
52
RHR
Pump A
49
51
48
27/200
App. E.2 - PWR Systems Drawings
GROUP 15: CVCS Pump Suction Lines (Sheet 1 of 4)
(Covers Worksheets ECCS-CVPMPS – 1 thru 57)
From
RWST
Header
26
14
28
29
25
30
To CVCS
Pump B
24
31
32
12
27
21
33
A
22
34
35
23
36
13
37
CVCS
Pump A
11
2
19
15
4
To PDP
16
20
FROM VCT
10
5
17
1
18
8
9
7
6
3
B
28/200
App. E.2 - PWR Systems Drawings
GROUP 15: CVCS Pump Suction Lines (Sheet 2 of 4)
(Covers Worksheets ECCS-CVPMPS – 1 thru 57)
43
44
Suction
CVCS
Pump B
To CVCS
Pump A
42
38
41
39
40
A
29/200
App. E.2 - PWR Systems Drawings
GROUP 15: CVCS Pump Suction Lines (Sheet 3 of 4)
(Covers Worksheets ECCS-CVPMPS – 1 thru 57)
To PDP
B
45
To CVCS
Pumps
46
47
52
To SI Pumps
From VCT
C
51
50
From RHR
Discharge Side
48
49
30/200
App. E.2 - PWR Systems Drawings
GROUP 15: CVCS Pump Suction Lines (Sheet 4 of 4)
(Covers Worksheets ECCS-CVPMPS – 1 thru 57)
55
56
54
53
From VCT
C
31/200
App. E.2 - PWR Systems Drawings
GROUP 16: SI Pump Suction Lines (Sheet 1 of 3)
(Covers Worksheets ECCS-SIPMPS – 1 thru 48)
RWST
Header
2
1
4
8
3
6
5
7
9
1O
12
16
13
11
A
23
21
17
14
18
15
19
24
26
27
20
B
22
25
28
To Cold Leg 2
Acc. Nozzle
A
29
30
SI Pump B
Suction
To
SI Pump A
C
32/200
App. E.2 - PWR Systems Drawings
GROUP 16: SI Pump Suction Lines (Sheet 2 of 3)
(Covers Worksheets ECCS-SIPMPS – 1 thru 48)
38
34
36
C
37
35
33
41
43
ps
um
P
g
rgin P 15
a
h
U
C
To GRO
44
39
40
42
45
33/200
App. E.2 - PWR Systems Drawings
GROUP 16: SI Pump Suction Lines (Sheet 3 of 3)
(Covers Worksheets ECCS-SIPMPS – 1 thru 48)
B
46
47
To Cold Leg 2
Accm. Nozzle
GROUP 21
To RHR Pump
Discharge Line
GROUP 21
34/200
App. E.2 - PWR Systems Drawings
GROUP 17: RHR Pump Suction Lines (Sheet 1 of 3)
(Covers Worksheets ECCS-RHPMPS – 1 thru 77)
40
44
43
41
42
43
27, 28, 29, 30
39
A
26
38
31
35
36
C
24
34
GROUP
14
45
23
33
37
32
25
22
From Hot Leg
Loop 1
21
48
46
20
19
B
18
14
A
13
17
16
15
12
1
11
2
3
8
4
5
6
7
9
10
35/200
App. E.2 - PWR Systems Drawings
GROUP 17: RHR Pump Suction Lines (Sheet 2 of 3)
(Covers Worksheets ECCS-RHPMPS – 1 thru 77)
B
50
49
GROUP 19
36/200
App. E.2 - PWR Systems Drawings
GROUP 17: RHR Pump Suction Lines (Sheet 3 of 3)
(Covers Worksheets ECCS-RHPMPS – 1 thru 77)
55, 56, 57, 58
61
51
60
59
63
To Sump A
62
54
52
53
C
67
To
CS Pump A
65 & 66
inaccessible
64
72
76
75
74
73
68
69
70
71
37/200
App. E.2 - PWR Systems Drawings
GROUP 18: Accumulator to RCS Cold Leg Connections (Sheet 1 of 2)
(Covers Worksheets ECCS-ACCM – 1 thru 41)
41
1
2
3
4
5
6
7
8
10
A
9
11
38/200
App. E.2 - PWR Systems Drawings
GROUP 18: Accumulator to RCS Cold Leg Connections (Sheet 2 of 2)
(Covers Worksheets ECCS-ACCM – 1 thru 41)
30
31
32
18
28
27
16
17
26
33
15
25
21
14
29
A
35
23
36
12
GROUP
21
37
20
19
38
39
40
34
24
13
22
39/200
App. E.2 - PWR Systems Drawings
GROUP 19: SI/RHR to RCS Hot Leg Connections (Sheet 1 of 4)
(Covers Worksheets ECCS-HLCONN – 1 thru 58)
13
12
14
11
10
7
A
SI Connection
To RHR
9
8
6
Hot Leg
28
A
25
26
GROUP 17
27
5
16
4
18
1
23
This branch
SI/RHR Inlet line
17
24
22
15
21
20
19
2
3
40/200
App. E.2 - PWR Systems Drawings
GROUP 19: SI/RHR to RCS Hot Leg Connections (Sheet 2 of 4)
(Covers Worksheets ECCS-HLCONN – 1 thru 58)
p3
o
o
L
HL
To
43
41
B
To Loop 1 HL
RHR/SI SYSTEM
42
40
39
35
33
34
B
31
38
37
36
32
29
30
To SI/RHR
Pumps
41/200
App. E.2 - PWR Systems Drawings
GROUP 19: SI/RHR to RCS Hot Leg Connections (Sheet 3 of 4)
(Covers Worksheets ECCS-HLCONN – 1 thru 58)
C
d
pe
p
a
C
44
45
48
47
46
42/200
App. E.2 - PWR Systems Drawings
GROUP 19: SI/RHR to RCS Hot Leg Connections (Sheet 4 of 4)
(Covers Worksheets ECCS-HLCONN – 1 thru 58)
51
56
54
53
52
57
55
50
49
C
58
43/200
App. E.2 - PWR Systems Drawings
GROUP 20: RHR Pump Discharge Lines (Sheet 1 of 4)
(Covers Worksheets ECCS–RHPMPD – 1 thru 54)
8
RH
B
R“
”T
n
rai
7
9
10
6
11
A
To Train B
5
13
To SI Pumps
Train B
GROUP 21
14
4
1
15
2
3
16
22
12
RHR “A” Train
17
18
19
To Hot Leg Loop 1 & 3
12” Nozzles
GROUP 19
23
20
21
Tie to RHR Suction
GROUP 14
To
SI Pump
Train A
44/200
App. E.2 - PWR Systems Drawings
GROUP 20: RHR Pump Discharge Lines (Sheet 2 of 4)
(Covers Worksheets ECCS–RHPMPD – 1 thru 54)
in 2
Tra
–
B
29
30
31
B
rain nn.
T
o
R
RH HL C
m
Fro
28
32
A
27
26 25
33
B
24
34
53, 54
RHR
HX-B
39
36
37 38
From RHR Pump B
Discharge
35
45/200
App. E.2 - PWR Systems Drawings
GROUP 20: RHR Pump Discharge Lines (Sheet 3 of 4)
(Covers Worksheets ECCS–RHPMPD – 1 thru 54)
46
47
48
B
45
44
43
42
41
40
RHR Pump B
Discharge
46/200
App. E.2 - PWR Systems Drawings
GROUP 20: RHR Pump Discharge Lines (Sheet 4 of 4)
(Covers Worksheets ECCS–RHPMPD – 1 thru 54)
53
and
54
52
49
51
49 – Hx Shell to bottom Ho
50
50 -- Hx Shell to bottom Ho
51 – Nozzle to shell
52 – Nozzle to shell
47/200
App. E.2 - PWR Systems Drawings
GROUP 21: RHR TO RCS Cold Leg Accumulator Connections (Sheet 1 of 3)
(Covers Worksheets ECCS-RHRCL – 1 thru 30)
12
9
8
7
1
A
10
n
rai s
T
r
B
CL ulato
o
T cum
Ac
Connected to
GROUP 16
2
4
6
5
3
To RHR Pump
Discharge Lines
GROUP 20
48/200
App. E.2 - PWR Systems Drawings
GROUP 21: RHR TO RCS Cold Leg Accumulator Connections (Sheet 2 of 3)
(Covers Worksheets ECCS-RHRCL – 1 thru 30)
Train B
B
B
12
A
16
C
18
17
19
2
op
o
L
g
To ld Le
Co
15
14
To Loop 3
Cold Leg
13
49/200
App. E.2 - PWR Systems Drawings
GROUP 21: RHR TO RCS Cold Leg Accumulator Connections (Sheet 3 of 3)
(Covers Worksheets ECCS-RHRCL – 1 thru 30)
Connected to
Loop 2
GROUP 18
20
21
24
C
25
22
30
23
26
27
29
28
50/200
App. E.2 - PWR Systems Drawings
GROUP 22: Charging System to Cold Leg Injection (Sheet 1 of 6)
(Covers Worksheets ECCS–CVCL – 1 thru 86)
C
20
8
7
5
A
6
10
12
14
21
29
22
28
23
B
9
27
11
From
CV Pump B
15
13
24
26
25
3
4
2
17
19
34
16
1
33
18
32
31
30
Conn. To
PDP & Reg. HX
B
A
51/200
App. E.2 - PWR Systems Drawings
GROUP 22: Charging System to Cold Leg Injection (Sheet 2 of 6)
(Covers Worksheets ECCS–CVCL – 1 thru 86)
35
C
36
37
38
41
47
48
43
39
40
D
42
46
45
44
52/200
App. E.2 - PWR Systems Drawings
GROUP 22: Charging System to Cold Leg Injection (Sheet 3 of 6)
(Covers Worksheets ECCS–CVCL – 1 thru 86)
49
D
50
51
52
53
54
58
59
56
To RCS CL 1 & 2
E
To RCS CL 3 & 4
55
57
53/200
App. E.2 - PWR Systems Drawings
GROUP 22: Charging System to Cold Leg Injection (Sheet 4 of 6)
(Covers Worksheets ECCS–CVCL – 1 thru 86)
E
To RCS CL 1
F
To RCS CL 2
61
61
54/200
App. E.2 - PWR Systems Drawings
GROUP 22: Charging System to Cold Leg Injection (Sheet 5 of 6)
(Covers Worksheets ECCS–CVCL – 1 thru 86)
G
75
74
78
72
76
77
71
70
66
73
65
64
63
69
68
67
F
To CL 2
55/200
App. E.2 - PWR Systems Drawings
GROUP 22: Charging System to Cold Leg Injection (Sheet 6 of 6)
(Covers Worksheets ECCS–CVCL – 1 thru 86)
80
82
83
81
G
84-86
BIT Components
56/200
App. E.2 - PWR Systems Drawings
GROUP 23 –SAFETY INJECTION PUMP DISCHARGE (Sheet 1 of 7)
(Covers Worksheets ECCS-SIPMPD – 1 thru 53)
S
mp
u
P
I
B
C
40
C
To e g
tL
Ho
A
To e g
tL
o
H
19
21
To eg
L
ld
o
C
20
22
14
18
17
13
16
15
3
2
5
1
4
12
11
10
9
8
6
7
S
mp
u
P
I
A
57/200
App. E.2 - PWR Systems Drawings
To
CL
1
&4
GROUP 23 – SAFETY INJECTION PUMP DISCHARGE (Sheet 2 of 7)
(Covers Worksheets ECCS-SIPMPD – 1 thru 53)
28
26
CL
2
B
To
25
Co
e
inm
nta
27
nt
ia
xil
Au
24
23
A
ry
58/200
App. E.2 - PWR Systems Drawings
GROUP 23 –SAFETY INJECTION PUMP DISCHARGE (Sheet 3 of 7)
(Covers Worksheets ECCS-SIPMPD – 1 thru 53)
21 3
P
U t 3 of
O
e
GRe She
3
Se
CL
i ne
6” l
B1
31
30
29
39
28
27
B
34
38
33
35
37
36
B1
32
59/200
App. E.2 - PWR Systems Drawings
GROUP 23 –SAFETY INJECTION PUMP DISCHARGE (Sheet 4 of 7)
(Covers Worksheets ECCS-SIPMPD – 1 thru 53)
n ch
a
r
AB
C
41
42
D
43
60/200
App. E.2 - PWR Systems Drawings
GROUP 23 –SAFETY INJECTION PUMP DISCHARGE (Sheet 5 of 7)
(Covers Worksheets ECCS-SIPMPD – 1 thru 53)
To
1
HL
F
D
To
4
HL
E
44
45
46
47
48
49
50
61/200
App. E.2 - PWR Systems Drawings
GROUP 23 –SAFETY INJECTION PUMP DISCHARGE (Sheet 6 of 7)
(Covers Worksheets ECCS-SIPMPD – 1 thru 53)
6” x
T
L
oH
4
2”
9
p 13 of 4)
u
Gro eet
h
eS
(s e
51
E
62/200
App. E.2 - PWR Systems Drawings
GROUP 23 –SAFETY INJECTION PUMP DISCHARGE (Sheet 7 of 7)
(Covers Worksheets ECCS-SIPMPD – 1 thru 53)
G
19)
p
u
ro of 4
e et
(Sh
To
1
HL
1
52
F
53
63/200
App. E.2 - PWR Systems Drawings
GROUP 24 – MAIN STEAM (Sheet 1 of 3)
(Covers Worksheets PCS-MS – 1 thru 89)
4
5
6
7
8
9
10
3
2
1
64/200
App. E.2 - PWR Systems Drawings
GROUP 24 – MAIN STEAM (Sheet 2 of 3)
(Covers Worksheets PCS-MS – 1 thru 89)
38
39
46
37
34
35
40
45
33
32
36
31
41
53
60
42
28
30
52
44
51
29
43
56
25
27
24
26
67
59
49
47
66
58
65
50
74
57
48
54
63
55
73
61
13
72
64
62
70
68
75
15
20
11
71
12
14
16
17
18
19
21
22
23
76
69
65/200
App. E.2 - PWR Systems Drawings
GROUP 24 – MAIN STEAM (Sheet 3 of 3)
(Covers Worksheets PCS-MS – 1 thru 89)
80
79
81
82
86
78
88
85
To MFP
Turbine
To MFP
Turbine
77
89
84
87
83
66/200
App. E.2 - PWR Systems Drawings
GROUP 25 – MAIN FEEDWATER SYSTEM (Sheet 1 of 3)
(Covers Worksheets PCS-MFW – 1 thru 56)
2
1
3
5
6
7
4
8
9
10
12
13
11
14
67/200
App. E.2 - PWR Systems Drawings
GROUP 25 – MAIN FEEDWATER SYSTEM (Sheet 2 of 3)
(Covers Worksheets PCS-MFW – 1 thru 56)
16
17
15
18
21
19
20
29
24
22
26
28
23
25
27
68/200
App. E.2 - PWR Systems Drawings
GROUP 25 – MAIN FEEDWATER SYSTEM (Sheet 3 of 3)
(Covers Worksheets PCS-MFW – 1 thru 56)
To Flanged Venturi
check valve and
MFW pump
49
44
34
35
33
36
32
48
47
31
30
41
37
38
42
46
45
43
40
39
69/200
App. E.2 - PWR Systems Drawings
GROUP 26 – AUXILIARY FEEDWATER SYSTEM (Sheet 1 of 6)
(Covers Worksheets PCS-AFW – 1 thru 45)
2
5
6
1
7
4
3
4” LINE
8
9
10
11
70/200
App. E.2 - PWR Systems Drawings
GROUP 26 – AUXILIARY FEEDWATER SYSTEM (Sheet 2 of 6)
(Covers Worksheets PCS-AFW – 1 thru 45)
13
12
14
15
16
71/200
App. E.2 - PWR Systems Drawings
GROUP 26 – AUXILIARY FEEDWATER SYSTEM (Sheet 3 of 6)
(Covers Worksheets PCS-AFW – 1 thru 45)
6”
25
24
23
22
21
20
19
18
17
4”
72/200
App. E.2 - PWR Systems Drawings
GROUP 26 – AUXILIARY FEEDWATER SYSTEM (Sheet 4 of 6)
(Covers Worksheets PCS-AFW – 1 thru 45)
31
27
30
34
33
32
Tie to other
pump
26
29
28
73/200
App. E.2 - PWR Systems Drawings
GROUP 26 – AUXILIARY FEEDWATER SYSTEM (Sheet 5 of 6)
(Covers Worksheets PCS-AFW – 1 thru 45)
36
35
74/200
App. E.2 - PWR Systems Drawings
GROUP 26 – AUXILIARY FEEDWATER SYSTEM (Sheet 6 of 6)
(Covers Worksheets PCS-AFW – 1 thru 45)
37
38
39
40
41
42
43
45
44
75/200
App. E.2 - PWR Systems Drawings
GROUP 27 – STEAM GENERATOR BLOWDOWN (Sheet 1 of 5)
(Covers Worksheets PCS-SGBD – 1 thru 55)
1
2
3
4
17
5
9
11
6
7
13
12
10
14
18
15
19
16
20
21
8
76/200
App. E.2 - PWR Systems Drawings
GROUP 27 – STEAM GENERATOR BLOWDOWN (Sheet 2 of 5)
(Covers Worksheets PCS-SGBD – 1 thru 55)
22
23
24
25
26
27
77/200
App. E.2 - PWR Systems Drawings
GROUP 27 – STEAM GENERATOR BLOWDOWN (Sheet 3 of 5)
(Covers Worksheets PCS-SGBD – 1 thru 55)
28
29
78/200
App. E.2 - PWR Systems Drawings
GROUP 27 – STEAM GENERATOR BLOWDOWN (Sheet 4 of 5)
(Covers Worksheets PCS-SGBD – 1 thru 55)
44
43
45
42
41
30
46
40
32
31
33
34
35
36
38
37
39
79/200
App. E.2 - PWR Systems Drawings
GROUP 27 – STEAM GENERATOR BLOWDOWN (Sheet 5 of 5)
(Covers Worksheets PCS-SGBD – 1 thru 55)
47
48
49
50
51
52
53
54
55
To Flash Tank
and Condenser
80/200
App. E.2 - PWR Systems Drawings
GROUP 28 – SERVICE WATER SUCTION FROM POND (Sheet 1 of 4)
(Covers Worksheets SS-SWSUC – 1 thru 49)
13
A
12
10
11
9
8
7
6
5
4
3
2
1
81/200
App. E.2 - PWR Systems Drawings
GROUP 28 – SERVICE WATER SUCTION FROM POND (Sheet 2 of 4)
(Covers Worksheets SS-SWSUC – 1 thru 49)
B
C
19
18
21
17
20
16
15
14
B
A
82/200
App. E.2 - PWR Systems Drawings
GROUP 28 – SERVICE WATER SUCTION FROM POND (Sheet 3 of 4)
(Covers Worksheets SS-SWSUC – 1 thru 49)
31
32
t1
Uni
30
29
t2
Uni
24
22
27
28
26
25
23
C
83/200
App. E.2 - PWR Systems Drawings
GROUP 28 – SERVICE WATER SUCTION FROM POND (Sheet 4 of 4)
(Covers Worksheets SS-SWSUC – 1 thru 49)
49
48
45
44
47
42
38
46
43
36
37
41
39
35
34
33
40
84/200
App. E.2 - PWR Systems Drawings
GROUP 29 – SERVICE WATER DISCHARGE TO AUXILIARY
AND CONTAINMENT BUILDINGS (Sheet 1 of 2)
(Covers Worksheets SS-SWDIS – 1 thru 70)
27
28
26
30
24
29
23
22
21
20
31
25
A
34
32
33
18
19
ont.
C
x
u
To A Bldg.
17
16
12
13
5
35
7
6
4
3
1
8
9
14
10
t.
Con
x
u
To A Bldg.
11
15
2
To other
CCW Hx
85/200
App. E.2 - PWR Systems Drawings
GROUP 29 – SERVICE WATER DISCHARGE TO AUXILIARY
AND CONTAINMENT BUILDINGS (Sheet 2 of 2)
(Covers Worksheets SS-SWDIS – 1 thru 70)
52
51
63
sel
Di e
To oads
L
54
55
56
64
D
65
67-70 - CCW HX Components
FOR HX NOZZLES SEE GROUP 41
W
AF
To mp
u
P
57
58
B
60
66
59
62
50
C
CS
EC s
o
T
d
Loa
49
E
C
47
53
41
46
48
45
D
39
40
44
38
43
nt
me
n
i
nta ers
Co ool
To an C
F
37
E
42
36
61
B
A
86/200
App. E.2 - PWR Systems Drawings
GROUP 30 – SERVICE WATER INSIDE CONTAINMENT (Sheet 1 of 4)
(Covers Worksheets SS-SWCONT – 1 thru 56)
14
15
13
16
12
17
11
18
10
19
5
4
3
20
9
2
8
6
1
7
87/200
App. E.2 - PWR Systems Drawings
GROUP 30 – SERVICE WATER INSIDE CONTAINMENT (Sheet 2 of 4)
(Covers Worksheets SS-SWCONT – 1 thru 56)
21
22
23
24
33
25
26
27
28
29
30
31
32
34
88/200
App. E.2 - PWR Systems Drawings
GROUP 30 – SERVICE WATER INSIDE CONTAINMENT (Sheet 3 of 4)
(Covers Worksheets SS-SWCONT – 1 thru 56)
43
44
37
38
39
42
45
40
36
35
To Containment
Fan Cooler Nozzles
thru 56
47
41
46
89/200
App. E.2 - PWR Systems Drawings
GROUP 30 – SERVICE WATER INSIDE CONTAINMENT (Sheet 4 of 4)
(Covers Worksheets SS-SWCONT – 1 thru 56)
49
56
51
55
54
50
48
53
52
47
90/200
App. E.2 - PWR Systems Drawings
GROUP 31 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
PUMPS TO CROSSOVER LEG INJECTION PIPING (Sheet 1 of 4)
(Covers Worksheets SS-CVXL – 1 thru 49)
15
14
24
23
25
16
12
17
18
19
A1
20
21
11
22
13
10
9
8
7
6
5
4
3
2
1
From Charging
Pumps
91/200
App. E.2 - PWR Systems Drawings
GROUP 31 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
PUMPS TO CROSSOVER LEG INJECTION PIPING (Sheet 2 of 4)
(Covers Worksheets SS-CVXL – 1 thru 49)
27
33
A1
28
34
36
35
26
37
29
39
38
30
32
31
40
A2
92/200
App. E.2 - PWR Systems Drawings
GROUP 31 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
PUMPS TO CROSSOVER LEG INJECTION PIPING (Sheet 3 of 4)
(Covers Worksheets SS-CVXL – 1 thru 49)
41
A2
Loops
A,B,C XL
A3
Loop D
XL
93/200
App. E.2 - PWR Systems Drawings
GROUP 31 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
PUMPS TO CROSSOVER LEG INJECTION PIPING (Sheet 4 of 4)
(Covers Worksheets SS-CVXL – 1 thru 49)
A4
Lo
op
XL D
42
49
44
43
45
48
46
47
94/200
App. E.2 - PWR Systems Drawings
GROUP 32 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
NORMAL LETDOWN PIPING CL 3 to Regenerative HX (Sheet 1 of 4)
(Covers Worksheets SS-CVLD – 1 thru 35)
1
A1
Cold Leg
2
3
4
8
5
6
7
95/200
App. E.2 - PWR Systems Drawings
GROUP 32 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
NORMAL LETDOWN PIPING CL 3 to Regenerative HX (Sheet 2 of 4)
(Covers Worksheets SS-CVLD – 1 thru 35)
A2
12
11
10
A1
9
96/200
App. E.2 - PWR Systems Drawings
GROUP 32 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
NORMAL LETDOWN PIING CL 3 to Regenerative HX (Sheet 3 of 4)
(Covers Worksheets SS-CVLD – 1 thru 35)
18
20
17
A3
16
15
21
14
13
19
A3
22
23
A2
97/200
App. E.2 - PWR Systems Drawings
GROUP 32 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
NORMAL LETDOWN PIPING CL 3 to Regenerative HX (Sheet 4 of 4)
(Covers Worksheets SS-CVLD – 1 thru 35)
28
27
26
29
30
25
24
31
32
HX Tubes
33
Tube Sheets
34
Fittings
35
Supports (outside)
98/200
App. E.2 - PWR Systems Drawings
GROUP 33 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Regenerative HX to Letdown HX (Sheet 1 of 4)
(Covers Worksheets SS-RHXLHX – 1 thru 56)
7
6
8
9
11
10
12
13
17
16
18
21
14
22
19
A1
23
20
15
24
26
25
5
27
4
1
2
3
28
A1
29
A2
99/200
App. E.2 - PWR Systems Drawings
GROUP 33 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Regenerative HX to Letdown HX (Sheet 2 of 4)
(Covers Worksheets SS-RHXLHX – 1 thru 56)
34
35
30
31
A3
33
Co
nt.
Au
x.
32
A2
36
100/200
App. E.2 - PWR Systems Drawings
GROUP 33 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Regenerative HX to Letdown HX (Sheet 3 of 4)
(Covers Worksheets SS-RHXLHX – 1 thru 56)
50
From LD
Reheat Hx
A4
48
47
49
A4
46
37
45
38
A3
39
42
40
43
41
44
101/200
App. E.2 - PWR Systems Drawings
GROUP 33 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Regenerative HX to Letdown HX (Sheet 4 of 4)
(Covers Worksheets SS-RHXLHX – 1 thru 56)
51
Shell side nozzle
52
Shell side piping
53
Shell side fittings
54
Tube side nozzles
55
Tubes
56
Tube sheet
102/200
App. E.2 - PWR Systems Drawings
GROUP 34 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Letdown HX to VCT (Sheet 1 of 6)
(Covers Worksheets SS-LHXVCT – 1 thru 53)
HX
LD
4
3
1
2
11
10
9
13
8
14
7
15
6
16
17
5
20
21
22
23
12
24
25
18
A
26
B
19
C
To Filter
To
De
min
.
103/200
App. E.2 - PWR Systems Drawings
GROUP 34 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Letdown HX to VCT (Sheet 2 of 6)
(Covers Worksheets SS-LHXVCT – 1 thru 53)
30
B1
Fro
LD m
HX
29
27
A
28
B
C
B1
To Filter
104/200
App. E.2 - PWR Systems Drawings
GROUP 34 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Letdown HX to VCT (Sheet 3 of 6)
(Covers Worksheets SS-LHXVCT – 1 thru 53)
33
36
m
Fro X
DH
A L
35
34
To n.
mi
De
E
B
C
D
41
F
31
G
32
T
VC o
T
40
H
T
VC o
T E
D
I
38
37
F
I
n
oro le
B
To ecyc
R
E
G
F
H
D
Fr
Fil om
ter
m
Fro in.
m
De
39
To
T
VC
105/200
App. E.2 - PWR Systems Drawings
GROUP 34 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Letdown HX to VCT (Sheet 4 of 6)
(Covers Worksheets SS-LHXVCT – 1 thru 53)
H1
42
44
H
G
I
H1
43
106/200
App. E.2 - PWR Systems Drawings
GROUP 34 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Letdown HX to VCT (Sheet 5 of 6)
(Covers Worksheets SS-LHXVCT – 1 thru 53)
48
46
47
45
107/200
App. E.2 - PWR Systems Drawings
GROUP 34 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Letdown HX to VCT (Sheet 6 of 6)
(Covers Worksheets SS-LHXVCT – 1 thru 53)
49
50
51
53
52
108/200
App. E.2 - PWR Systems Drawings
GROUP 35 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
From Mixed and Cation Beds to Filter (Sheet 1 of 6)
(Covers Worksheets SS-MBFTR – 1 thru 48)
To Cation
A
From Mixed
Bed
22
21
4
1
19
20
18
2
3
5
6
7
8
11
9
10
15
12
17
13
16
B m
Fro ion
t
Ca
T
il
oF
ter
C
14
109/200
App. E.2 - PWR Systems Drawings
GROUP 35 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
From Mixed and Cation Beds to Filter (Sheet 2 of 6)
(Covers Worksheets SS-MBFTR – 1 thru 48)
33
34
32
23
31
29
24
30
25
26
28
27
A
110/200
App. E.2 - PWR Systems Drawings
GROUP 35 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
From Mixed and Cation Beds to Filter (Sheet 3 of 6)
(Covers Worksheets SS-MBFTR – 1 thru 48)
Cation Bed
36
35
B
111/200
App. E.2 - PWR Systems Drawings
GROUP 35 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
From Mixed and Cation Beds to Filter (Sheet 4 of 6)
(Covers Worksheets SS-MBFTR – 1 thru 48)
C
From Boron
Recovery
38
37
39
40
To Filter
To Boron
Recovery
112/200
App. E.2 - PWR Systems Drawings
GROUP 35 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
From Mixed and Cation Beds to Filter (Sheet 5 of 6)
(Covers Worksheets SS-MBFTR – 1 thru 48)
41
42
43
44
MIXED
BED
113/200
App. E.2 - PWR Systems Drawings
GROUP 35 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
From Mixed and Cation Beds to Filter (Sheet 6 of 6)
(Covers Worksheets SS-MBFTR – 1 thru 48)
45
46
47
48
CATION
BED
114/200
App. E.2 - PWR Systems Drawings
GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
VCT/RCP Seal Return Piping to Charging Pumps (Sheet 1 of 7)
(Covers Worksheets SS-VCTCVP – 1 thru 70)
18
20
A1
16
17
19
14
13
15
12
10
P
RC
m
o
Fr eals
S
11
1
2
9
3
7
6
8
To Filter
Bypass
4
5
115/200
App. E.2 - PWR Systems Drawings
GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
VCT/RCP Seal Return Piping to Charging Pumps (Sheet 2 of 7)
(Covers Worksheets SS-VCTCVP – 1 thru 70)
21
A1
A2
r
lte
i
F
m ass
o
Fr yp
B
22
116/200
App. E.2 - PWR Systems Drawings
GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
VCT/RCP Seal Return Piping to Charging Pumps (Sheet 3 of 7)
(Covers Worksheets SS-VCTCVP – 1 thru 70)
A3
33
34
29
28
35
32
36
31
37
30
38
27
39
26
40
C1
A4
From
Charging
Pumps
25
23
24
A3
A2
117/200
App. E.2 - PWR Systems Drawings
GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
VCT/RCP Seal Return Piping to Charging Pumps (Sheet 4 of 7)
(Covers Worksheets SS-VCTCVP – 1 thru 70)
To Charging
Pumps
41
52
53
A4
49
48
A5
51
50
43
A5
From
VCT
B1
44
42
45
54
46
47
B1
55
118/200
App. E.2 - PWR Systems Drawings
GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
VCT/RCP Seal Return Piping to Charging Pumps (Sheet 5 of 7)
(Covers Worksheets SS-VCTCVP – 1 thru 70)
58
57
C1
See
Sheet 3
56
C2
From
Cha
Pum rging
ps
119/200
App. E.2 - PWR Systems Drawings
GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
VCT/RCP Seal Return Piping to Charging Pumps (Sheet 6 of 7)
(Covers Worksheets SS-VCTCVP – 1 thru 70)
64
63
61
C3
C4
62
60
59
C2
67
66
65
C3
120/200
App. E.2 - PWR Systems Drawings
GROUP 36 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
VCT/RCP Seal Return Piping to Charging Pumps (Sheet 7 of 7)
(Covers Worksheets SS-VCTCVP – 1 thru 70)
68
69
70
From
Charging
Pumps
C4
121/200
App. E.2 - PWR Systems Drawings
GROUP 37 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Charging Pumps to Regenerative HX (Sheet 1 of 4)
(Covers Worksheets SS-CVPRHX – 1 thru 53)
4
3
5
2
1
6
15
14
13
12
7
16
30
11
17
31
8
18
9
10
19
26
20
21
22
27
23
24
25
A1
29
28
122/200
App. E.2 - PWR Systems Drawings
GROUP 37 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Charging Pumps to Regenerative HX (Sheet 2 of 4)
(Covers Worksheets SS-CVPRHX – 1 thru 53)
A2
A3
A1
32
36
35
37
39
38
40
41
A3
A4
NT
CO
.
X.
AU
34
33
A2
123/200
App. E.2 - PWR Systems Drawings
GROUP 37 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Charging Pumps to Regenerative HX (Sheet 3 of 4)
(Covers Worksheets SS-CVPRHX – 1 thru 53)
42
43
44
A4
A5
.
NT
CO
45
X.
AU
124/200
App. E.2 - PWR Systems Drawings
GROUP 37 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Charging Pumps to Regenerative HX (Sheet 4 of 4)
(Covers Worksheets SS-CVPRHX – 1 thru 53)
52
51
50
A6
49
47
48
46
53
A5
A6
125/200
App. E.2 - PWR Systems Drawings
GROUP 38 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Regenerative HX to RCS Loop 2 Cold Leg (Sheet 1 of 3)
(Covers Worksheets SS-RHXCL – 1 thru 24)
15
18
19
14
20
17
13
16
A1
12
11
10
8
5
7
4
6
3
2
1
9
126/200
App. E.2 - PWR Systems Drawings
GROUP 38 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Regenerative HX to RCS Loop 2 Cold Leg (Sheet 2 of 3)
(Covers Worksheets SS-RHXCL – 1 thru 24)
A4
21
A5
T
Lo o
op
2
22
23
A3
Lo To
op
1
A4
127/200
App. E.2 - PWR Systems Drawings
GROUP 38 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Regenerative HX to RCS Loop 2 Cold Leg (Sheet 3 of 3)
(Covers Worksheets SS-RHXCL – 1 thru 24)
Loop2
Cold Leg
Normal
Charging
Loop1
Cold Leg
Alternate
Charging
24
A5
128/200
App. E.2 - PWR Systems Drawings
GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Injection Filter to Reactor Coolant Pump Seals (Sheet 1 of 7)
(Covers Worksheets SS-RCPINJ– 1 thru 65)
10
9
7
6
8
5
3
2
4
1
11
12
From
Charging
Pumps
13
14
15
16
17
18
19
A1
20
21
129/200
App. E.2 - PWR Systems Drawings
GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Injection Filter to Reactor Coolant Pump Seals (Sheet 2 of 7)
(Covers Worksheets SS-RCPINJ– 1 thru 65)
31
A2
30
29
28
27
A1
22
23
24
25
26
130/200
App. E.2 - PWR Systems Drawings
GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Injection Filter to Reactor Coolant Pump Seals (Sheet 3 of 7)
(Covers Worksheets SS-RCPINJ– 1 thru 65)
32
A2
A3
33
34
131/200
App. E.2 - PWR Systems Drawings
GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Injection Filter to Reactor Coolant Pump Seals (Sheet 4 of 7)
(Covers Worksheets SS-RCPINJ– 1 thru 65)
A5
45
44
43
40
41
42
36
35
39
38
37
A4
132/200
App. E.2 - PWR Systems Drawings
GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Injection Filter to Reactor Coolant Pump Seals (Sheet 5 of 7)
(Covers Worksheets SS-RCPINJ– 1 thru 65)
49
50
51
52
53
54
Cont.
Aux.
48
A5
47
46
A6
133/200
App. E.2 - PWR Systems Drawings
GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Injection Filter to Reactor Coolant Pump Seals (Sheet 6 of 7)
(Covers Worksheets SS-RCPINJ– 1 thru 65)
56
A6
57
55
A7
134/200
App. E.2 - PWR Systems Drawings
GROUP 39 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Injection Filter to Reactor Coolant Pump Seals (Sheet 7 of 7)
(Covers Worksheets SS-RCPINJ– 1 thru 65)
64
63
62
65
61
RCP
(1RC01PD-1D)
60
59
A7
58
135/200
App. E.2 - PWR Systems Drawings
GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Reactor Coolant Pump Seals to Return Filter (Sheet 1 of 7)
(Covers Worksheets SS-RCPRET – 1 thru 46)
7
8
4
5
6
3
9
2
1
10
A1
136/200
App. E.2 - PWR Systems Drawings
GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Reactor Coolant Pump Seals to Return Filter (Sheet 2 of 7)
(Covers Worksheets SS-RCPRET – 1 thru 46)
A1
11
12
13
14
A2
137/200
App. E.2 - PWR Systems Drawings
GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Reactor Coolant Pump Seals to Return Filter (Sheet 3 of 7)
(Covers Worksheets SS-RCPRET – 1 thru 46)
20
21
22
A2
15
16
17
19
18
A3
138/200
App. E.2 - PWR Systems Drawings
GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Reactor Coolant Pump Seals to Return Filter (Sheet 4 of 7)
(Covers Worksheets SS-RCPRET – 1 thru 46)
H.
SC 40
H.
SC 60
1
A6
25
24
23
A5
139/200
App. E.2 - PWR Systems Drawings
GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Reactor Coolant Pump Seals to Return Filter (Sheet 5 of 7)
(Covers Worksheets SS-RCPRET – 1 thru 46)
33
32
31
30
29
28
A7
27
26
A6
140/200
App. E.2 - PWR Systems Drawings
GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Reactor Coolant Pump Seals to Return Filter (Sheet 6 of 7)
(Covers Worksheets SS-RCPRET – 1 thru 46)
Con
t
.
36
Aux
.
A9
35
34
A8
141/200
App. E.2 - PWR Systems Drawings
GROUP 40 – CHEMICAL VOLUME AND CONTROL SYSTEM (CVCS)
Reactor Coolant Pump Seals to Return Filter (Sheet 7 of 7)
(Covers Worksheets SS-RCPRET – 1 thru 46)
38
37
39
40
41
42
43
44
45
A9
46
A10
142/200
App. E.2 - PWR Systems Drawings
GROUP 41 – COMPONENT COOLING WATER PIPING
Surge Tank to CCW HX (Sheet 1 of 8)
(Covers Worksheets SS-CCWHX – 1 thru 72)
A1
9
8
6
K.
ET
G
IT
R
SU CCO
I
10
11
4
1
3
12
2
13
5
7
143/200
App. E.2 - PWR Systems Drawings
GROUP 41 – COMPONENT COOLING WATER PIPING
Surge Tank to CCW HX (Sheet 2 of 8)
(Covers Worksheets SS-CCWHX – 1 thru 72)
From
Group
43
A1
A2
14
18
15
16
17
144/200
App. E.2 - PWR Systems Drawings
GROUP 41 – COMPONENT COOLING WATER PIPING
Surge Tank to CCW HX (Sheet 3 of 8)
(Covers Worksheets SS-CCWHX – 1 thru 72)
19
20
21
22
A2
23
A3
145/200
App. E.2 - PWR Systems Drawings
GROUP 41 – COMPONENT COOLING WATER PIPING
Surge Tank to CCW HX (Sheet 4 of 8)
(Covers Worksheets SS-CCWHX – 1 thru 72)
31
32
33
35
36
A4
34
37
38
39
A5
24
CCW Pump
1B
40
26
25
A3
27
A4
30
29
28
146/200
App. E.2 - PWR Systems Drawings
GROUP 41 – COMPONENT COOLING WATER PIPING
Surge Tank to CCW HX (Sheet 5 of 8)
(Covers Worksheets SS-CCWHX – 1 thru 72)
58
56
57
55
54
51
53
59
61
52
60
50
62
63
64
49
42
A5
41
48
43
44
47
45
46
147/200
App. E.2 - PWR Systems Drawings
GROUP 41 – COMPONENT COOLING WATER PIPING
Surge Tank to CCW HX (Sheet 6 of 8)
(Covers Worksheets SS-CCWHX – 1 thru 72)
66
67
65
68
69
SURGE TANK
(ICCOIT)
148/200
App. E.2 - PWR Systems Drawings
GROUP 41 – COMPONENT COOLING WATER PIPING
Surge Tank to CCW HX (Sheet 7 of 8)
(Covers Worksheets SS-CCWHX – 1 thru 72)
70
CCW PUMP
(ICCOIPB)
149/200
App. E.2 - PWR Systems Drawings
GROUP 41 – COMPONENT COOLING WATER PIPING
Surge Tank to CCW HX (Sheet 8 of 8)
(Covers Worksheets SS-CCWHX – 1 thru 72)
71
Shell Side Nozzles
72
Tube Side Nozzles
FOR CCW HX COMPONENTS EXCEPT NOZZLES - SEE GROUP 29
CCW HX (ICCOIA)
150/200
App. E.2 - PWR Systems Drawings
GROUP 42 – COMPONENT COOLING WATER PIPING
CCW HX to RHR HX (Sheet 1 of 4)
(Covers Worksheets SS-CCWRHR – 1 thru 50)
12
4
7
10
6
2
3
13
1
14
5
15
9
8
16
17
18
B1
19
24
23
22
11
20
21
A1
151/200
App. E.2 - PWR Systems Drawings
GROUP 42 – COMPONENT COOLING WATER PIPING
CCW HX to RHR HX (Sheet 2 of 4)
(Covers Worksheets SS-CCWRHR – 1 thru 50)
29
30
31
32
28
B2
27
Sheet
4
A2
25
26
B1
A1
152/200
App. E.2 - PWR Systems Drawings
GROUP 42 – COMPONENT COOLING WATER PIPING
CCW HX to RHR HX (Sheet 3 of 4)
(Covers Worksheets SS-CCWRHR – 1 thru 50)
34
33
B2
153/200
App. E.2 - PWR Systems Drawings
GROUP 42 – COMPONENT COOLING WATER PIPING
CCW HX to RHR HX (Sheet 4 of 4)
(Covers Worksheets SS-CCWRHR – 1 thru 50)
A2
A3
From Sheet 2
39
35
38
37
36
46
40
47
41
49
48
44
43
42
45
50
A3
154/200
App. E.2 - PWR Systems Drawings
GROUP 43 – COMPONENT COOLING WATER PIPING
Cooling Water to Other Loads Outside Containment (Sheet 1 of 5)
(Covers Worksheets SS-CCWLDS – 1 thru 56)
21
20
2
1
A1
19
3
14
13
15
12
11
16
18
From
CCW Hx
17
7
8
6
To
RCP
–
10
9
4
5
155/200
App. E.2 - PWR Systems Drawings
GROUP 43 – COMPONENT COOLING WATER PIPING
Cooling Water to Other Loads Outside Containment (Sheet 2 of 5)
(Covers Worksheets SS-CCWLDS – 1 thru 56)
25
27
26
28
24
23
22
A1
29
30
31
A2
A3
A2
156/200
App. E.2 - PWR Systems Drawings
GROUP 43 – COMPONENT COOLING WATER PIPING
Cooling Water to Other Loads Outside Containment (Sheet 3 of 5)
(Covers Worksheets SS-CCWLDS – 1 thru 56)
36
35
A3
34
33
To CCW
Pumps
32
157/200
App. E.2 - PWR Systems Drawings
GROUP 43 – COMPONENT COOLING WATER PIPING
Cooling Water to Other Loads Outside Containment (Sheet 4 of 5)
(Covers Worksheets SS-CCWLDS – 1 thru 56)
45
44
43
47
46
42
41
48
49
50
B1
51
37
40
38
39
158/200
App. E.2 - PWR Systems Drawings
GROUP 43 – COMPONENT COOLING WATER PIPING
Cooling Water to Other Loads Outside Containment (Sheet 5 of 5)
(Covers Worksheets SS-CCWLDS – 1 thru 56)
52
To CCW
Pumps
53
54
55
56
B1
159/200
App. E.2 - PWR Systems Drawings
GROUP 44 – COMPONENT COOLING WATER PIPING
Cooling Water to RCP Inside Containment (Sheet 1 of 4)
(Covers Worksheets SS-CCWRCP – 1 thru 58)
–
.
NT
O
C
X.
AU
9
A1
3
4
5
6
7
8
10
2
1
160/200
App. E.2 - PWR Systems Drawings
GROUP 44 – COMPONENT COOLING WATER PIPING
Cooling Water to RCP Inside Containment (Sheet 2 of 4)
(Covers Worksheets SS-CCWRCP – 1 thru 58)
A2
14
13
12
11
A1
31
A2
30
A3
16
24
17
15
22
23
21
20
19
18
29
28
27
26
25
161/200
App. E.2 - PWR Systems Drawings
GROUP 44 – COMPONENT COOLING WATER PIPING
Cooling Water to RCP Inside Containment (Sheet 3 of 4)
(Covers Worksheets SS-CCWRCP – 1 thru 58)
35
A3
34
32
33
36
A4
37
38
A4
40
41
42
39
A5
162/200
App. E.2 - PWR Systems Drawings
GROUP 44 – COMPONENT COOLING WATER PIPING
Cooling Water to RCP Inside Containment (Sheet 4 of 4)
(Covers Worksheets SS-CCWRCP – 1 thru 58)
A5
43
44
46
48
45
47
49
55
56
57
50
51
52
53
54
58
163/200
App. E.2 - PWR Systems Drawings
GROUP 45 – SPENT FUEL POOL COOLING PIPING
SFP Cooling System (Sheet 1 of 6)
(Covers Worksheets SS-SFPCLG – 1 thru 66)
4
19
18
3
20
2
17
16
21
15
14
1
A2
13
5
6
7
A1
12
9
10
A1
11
8
164/200
App. E.2 - PWR Systems Drawings
GROUP 45 – SPENT FUEL POOL COOLING PIPING
SFP Cooling System (Sheet 2 of 6)
(Covers Worksheets SS-SFPCLG – 1 thru 66)
37
39
36
38
34
35
33
40
A3
22
32
A2
23
24
31
47
46
30
48
25
29
26
28
27
A4
A3
45
44
43
42
41
165/200
App. E.2 - PWR Systems Drawings
GROUP 45 – SPENT FUEL POOL COOLING PIPING
SFP Cooling System (Sheet 3 of 6)
(Covers Worksheets SS-SFPCLG – 1 thru 66)
A4
49
50
51
52
53
54
55
56
From
Demin.
166/200
App. E.2 - PWR Systems Drawings
GROUP 45 – SPENT FUEL POOL COOLING PIPING
SFP Cooling System (Sheet 4 of 6)
(Covers Worksheets SS-SFPCLG – 1 thru 66)
57
Tube side nozzles
58
Tube sheet
59
Tubes
60
Shell
61
Shell side nozzles
Spent Fuel Pit HX
(IFCOIA)
167/200
App. E.2 - PWR Systems Drawings
GROUP 45 – SPENT FUEL POOL COOLING PIPING
SFP Cooling System (Sheet 5 of 6)
(Covers Worksheets SS-SFPCLG – 1 thru 66)
62
Spent Fuel
Pit Pump
(IFCOIP)
168/200
App. E.2 - PWR Systems Drawings
GROUP 45 – SPENT FUEL POOL COOLING PIPING
SFP Cooling System (Sheet 6 of 6)
(Covers Worksheets SS-SFPCLG – 1 thru 66)
63
64
65
66
Fuel Pit
Strainer
(IFC03F)
169/200
App. E.2 - PWR Systems Drawings
GROUP 46 – SPENT FUEL POOL CLEANING PIPING
SFP Cleanup System (Sheet 1 of 10)
(Covers Worksheets SS-SFPCLN – 1 thru 46)
A1
8
7
9
6
4
3
5
2
1
10
11
A2
A1
170/200
App. E.2 - PWR Systems Drawings
GROUP 46 – SPENT FUEL POOL CLEANING PIPING
SFP Cleanup System (Sheet 2 of 10)
(Covers Worksheets SS-SFPCLN – 1 thru 46)
12
17
13
A4
14
15
A2
A3
16
A3
171/200
App. E.2 - PWR Systems Drawings
GROUP 46 – SPENT FUEL POOL CLEANING PIPING
SFP Cleanup System (Sheet 3 of 10)
(Covers Worksheets SS-SFPCLN – 1 thru 46)
A5
19
A4
18
172/200
App. E.2 - PWR Systems Drawings
GROUP 46 – SPENT FUEL POOL CLEANING PIPING
SFP Cleanup System (Sheet 4 of 10)
(Covers Worksheets SS-SFPCLN – 1 thru 46)
A5
20
A6
173/200
App. E.2 - PWR Systems Drawings
GROUP 46 – SPENT FUEL POOL CLEANING PIPING
SFP Cleanup System (Sheet 5 of 10)
(Covers Worksheets SS-SFPCLN – 1 thru 46)
To
Demin.
A7
A8
21
A6
A7
174/200
App. E.2 - PWR Systems Drawings
GROUP 46 – SPENT FUEL POOL CLEANING PIPING
SFP Cleanup System (Sheet 6 of 10)
(Covers Worksheets SS-SFPCLN – 1 thru 46)
22
A9
A8
175/200
App. E.2 - PWR Systems Drawings
GROUP 46 – SPENT FUEL POOL CLEANING PIPING
SFP Cleanup System (Sheet 7 of 10)
(Covers Worksheets SS-SFPCLN – 1 thru 46)
A10
IFCO
32
24
33
A9
25
26
23
27
28
29
30
31
4F
176/200
App. E.2 - PWR Systems Drawings
GROUP 46 – SPENT FUEL POOL CLEANING PIPING
SFP Cleanup System (Sheet 8 of 10)
(Covers Worksheets SS-SFPCLN – 1 thru 46)
38
A12
36
37
34
A12
A11
A10
35
A11
177/200
App. E.2 - PWR Systems Drawings
GROUP 46 – SPENT FUEL POOL CLEANING PIPING
SFP Cleanup System (Sheet 9 of 10)
(Covers Worksheets SS-SFPCLN – 1 thru 46)
39
40
41
42
Mixed Bed
(IFCOID)
178/200
App. E.2 - PWR Systems Drawings
GROUP 46 – SPENT FUEL POOL CLEANING PIPING
SFP Cleanup System (Sheet 10 of 10)
(Covers Worksheets SS-SFPCLN – 1 thru 46)
43
44
45
46
Spent Fuel Pit
Filters
(IFCO2F and IFC04F)
179/200
App. E.2 - PWR Systems Drawings
GROUP 47 – SPENT FUEL POOL AND RACKS
Spent Fuel Storage Pool (Sheet 1 of 10)
(Covers Worksheets AS- SFPRACK – 1 thru 9)
180/200
App. E.2 - PWR Systems Drawings
GROUP 47 – SPENT FUEL POOL AND RACKS
Rack Arrangement (Sheet 2 of 10)
(Covers Worksheets AS- SFPRACK – 1 thru 9)
181/200
App. E.2 - PWR Systems Drawings
GROUP 47 – SPENT FUEL POOL AND RACKS
Pool Liner Plan (Sheet 3 of 10)
(Covers Worksheets AS- SFPRACK – 1 thru 9)
182/200
App. E.2 - PWR Systems Drawings
GROUP 47 – SPENT FUEL POOL AND RACKS
Pool Liner Details (Sheet 4 of 10)
(Covers Worksheets AS- SFPRACK – 1 thru 9)
183/200
App. E.2 - PWR Systems Drawings
GROUP 47 – SPENT FUEL POOL AND RACKS
Storage Rack in Region 1 (Sheet 5 of 10)
(Covers Worksheets AS- SFPRACK – 1 thru 9)
184/200
App. E.2 - PWR Systems Drawings
GROUP 47 – SPENT FUEL POOL AND RACKS
Typical Cell in Region 1 (Sheet 6 of 10)
(Covers Worksheets AS- SFPRACK – 1 thru 9)
185/200
App. E.2 - PWR Systems Drawings
GROUP 47 – SPENT FUEL POOL AND RACKS
Storage Rack in Region 2 (Sheet 7 of 10)
(Covers Worksheets AS- SFPRACK – 1 thru 9)
186/200
App. E.2 - PWR Systems Drawings
GROUP 47 – SPENT FUEL POOL AND RACKS
Typical Cell in Region 2 (Sheet 8 of 10)
(Covers Worksheets AS- SFPRACK – 1 thru 9)
187/200
App. E.2 - PWR Systems Drawings
GROUP 47 – SPENT FUEL POOL AND RACKS
Rack Structure (Sheet 9 of 10)
(Covers Worksheets AS- SFPRACK – 1 thru 9)
188/200
App. E.2 - PWR Systems Drawings
GROUP 47 – SPENT FUEL POOL AND RACKS
Adjustable Supports (Sheet 10 of 10)
(Covers Worksheets AS- SFPRACK – 1 thru 9)
189/200
App. E.2 - PWR Systems Drawings
GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS
INSIDE CONTAINMENT CONFIG. 1- 3 (Sheet 1 of 12)
(Covers Worksheets ESF- CONTPEN – 1 thru 10)
190/200
App. E.2 - PWR Systems Drawings
GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS
INSIDE CONTAINMENT CONFIG. 4 & 5 (Sheet 2 of 12)
(Covers Worksheets ESF- CONTPEN – 1 thru 10)
191/200
App. E.2 - PWR Systems Drawings
GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS
OUTSIDE CONTAINMENT CONFIG. 1 & 2 (Sheet 3 of 12)
(Covers Worksheets ESF- CONTPEN – 1 thru 10)
192/200
App. E.2 - PWR Systems Drawings
GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS
OUTSIDE CONTAINMENT CONFIG. 3 & 4 (Sheet 4 of 12)
(Covers Worksheets ESF- CONTPEN – 1 thru 10)
193/200
App. E.2 - PWR Systems Drawings
GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS
OUTSIDE CONTAINMENT CONFIG. 5 (Sheet 5 of 12)
(Covers Worksheets ESF- CONTPEN – 1 thru 10)
194/200
App. E.2 - PWR Systems Drawings
GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS
OUTSIDE CONTAINMENT CONFIG. 6 (Sheet 6 of 12)
(Covers Worksheets ESF- CONTPEN – 1 thru 10)
195/200
App. E.2 - PWR Systems Drawings
GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS
OUTSIDE CONTAINMENT CONFIG. 7 (Sheet 7 of 12)
(Covers Worksheets ESF- CONTPEN– 1 thru 10)
196/200
App. E.2 - PWR Systems Drawings
GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS
RECIRC SUMP GUARD PIPE & BELLOWS (Sheet 8 of 12)
(Covers Worksheets ESF- CONTPEN– 1 thru 10)
197/200
App. E.2 - PWR Systems Drawings
GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS
Detail 22-CCW; Detail 23-SW; Detail 24-MS/FW (Sheet 9 of 12)
(Covers Worksheets ESF- CONTPEN– 1 thru 10)
198/200
App. E.2 - PWR Systems Drawings
GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS
MAIN STEAM AND FEEDWATER (Sheet 10 of 12)
(Covers Worksheets ESF- CONTPEN– 1 thru 10)
199/200
App. E.2 - PWR Systems Drawings
GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS
MISC CONFIGURATIONS (Sheet 11 of 12)
(Covers Worksheets ESF- CONTPEN – 1 thru 10)
200/200
App. E.2 - PWR Systems Drawings
GROUP 48 – CONTAINMENT ISOLATION PENETRATIONS
SPECIAL PIPING DETAILS (Sheet 12 of 12)
(Covers Worksheets ESF- CONTPEN – 1 thru 10)
Fly UP