Comments
Transcript
GROUP 1 – RPV CLOSURE HEAD (Sheet 1 of 4) “A” “B”
GROUP 1 – RPV CLOSURE HEAD (Sheet 1 of 4) (Covers Worksheets RCS-RPVCH – 1 thru 24) 1 12 “A” 2 “B” 3 DOLLAR PLATE 13 11 10 4 14 9 5 7 6 8 1/179 App. F.2 - BWR Systems Drawings GROUP 1 – RPV CLOSURE HEAD (Sheet 2 of 4) (Covers Worksheets RCS-RPVCH – 1 thru 24) Spray Nozzle Vent Nozzle Inst. Nozzle 21 19 19 2/179 App. F.2 - BWR Systems Drawings GROUP 1 – RPV CLOSURE HEAD (Sheet 3 of 4) (Covers Worksheets RCS-RPVCH – 1 thru 24) 22 3/179 App. F.2 - BWR Systems Drawings 17 18 21 16 20 15 19 GROUP 1 – RPV CLOSURE HEAD (Sheet 4 of 4) (Covers Worksheets RCS-RPVCH – 1 thru 24) 23 24 4/179 App. F.2 - BWR Systems Drawings GROUP 2 – RPV SHELL (Sheet 1 of 7 ) (Covers Worksheets RCS-RPVSHL – 1 thru 88) 5/179 App. F.2 - BWR Systems Drawings 1 10 12 2 Upper Shell A-A 3 15 4 13 B-B 5 11 Intermediate Shell “A” 6 14 16 7 19 Intermediate Shell “B” 18 Intermediate Shell “C” C-C 21 D-D 8 20 9 17 Upper Vessel Shell Assembly GROUP 2 – RPV SHELL (Sheet 2 of 7 ) (Covers Worksheets RCS-RPVSHL – 1 thru 88) 6/179 App. F.2 - BWR Systems Drawings 22 24 23 29 33 32 38 31 30 40 39 41 46 26 49 50 45 27 25 28 35 34 36 37 42 48 47 52 54 51 53 55 56 57 58 59 43 44 GROUP 2 – RPV SHELL (Sheet 3 of 7 ) (Covers Worksheets RCS-RPVSHL – 1 thru 88) 60 61 63 62 7/179 App. F.2 - BWR Systems Drawings GROUP 2 – RPV SHELL (Sheet 4 of 7 ) (Covers Worksheets RCS-RPVSHL – 1 thru 88) 8/179 App. F.2 - BWR Systems Drawings 61 Main Steam (Qty. 4) 64 Water Level Instrumentation (Qty. 4) 65 23 Feedwater (Qty. 6) 39 52 CRD HYD. System Return (Qty. 1) LPCI (Qty. 3) Water Level Instrumentation (Qty. 2) 48 48 30 Core Spray (Qty. 2) Water Level Instrumentation (Qty. 4) 48 GROUP 2 – RPV SHELL (Sheet 5 of 7 ) (Covers Worksheets RCS-RPVSHL – 1 thru 88) 67 9/179 App. F.2 - BWR Systems Drawings 72 70 77 73 76 74 66 69 78 68 71 80 83 81 79 84 82 75 GROUP 2 – RPV SHELL (Sheet 6 of 7 ) (Covers Worksheets RCS-RPVSHL – 1 thru 88) 68 Guide Rod Bracket (Qty-2) 71 Steam Dryer Support Bracket (Qty-4) 74 Feedwater Sparger Bracket (Qty-12) Core Spray Bracket (Qty-8) 77 81 Surveillance Specimen Bracket (Qty-3) 81 Surveillance Specimen Bracket (Qty-3) Jet Pump Riser Bracket (Qty-20) 84 10/179 App. F.2 - BWR Systems Drawings GROUP 2 – RPV SHELL (Sheet 7 of 7 ) (Covers Worksheets RCS-RPVSHL – 1 thru 88) 11/179 App. F.2 - BWR Systems Drawings 86 85 86 87 88 Seal Skirt 88 Vessel Stabilizer GROUP 3 – RPV BOTTOM HEAD (Sheet 1 of 8) (Covers Worksheets RCS-RPVBH – 1 thru 55) 1 12/179 App. F.2 - BWR Systems Drawings 6 4 2 Lower Shell 3 5 13/179 GROUP 3 – RPV BOTTOM HEAD (Sheet 2 of 8) (Covers Worksheets RCS-RPVBH – 1 thru 55) “A” 7 “B” 13 Dollar Plate 8 9 12 10 11 App. F.2 - BWR Systems Drawings 14/179 App. F.2 - BWR Systems Drawings GROUP 3 – RPV BOTTOM HEAD (Sheet 3 of 8) (Covers Worksheets RCS-RPVBH – 1 thru 55) CENTRAL 28A 30A Recirc. Out (Qty – 2) Recirc. In (Qty – 10) 21 15 Jet Pump Inst. (Qty – 2) INTERMEDIATE 28B 30B 17 PERIPHERAL 28C 30C 30 28 GROUP 3 – RPV BOTTOM HEAD (Sheet 4 of 8) (Covers Worksheets RCS-RPVBH – 1 thru 55) 14 15 16 17 15/179 App. F.2 - BWR Systems Drawings 16/179 GROUP 3 – RPV BOTTOM HEAD (Sheet 5 of 8) (Covers Worksheets RCS-RPVBH – 1 thru 55) 19 18 20 21 22 23 25 24 26 App. F.2 - BWR Systems Drawings GROUP 3 – RPV BOTTOM HEAD (Sheet 6 of 8) (Covers Worksheets RCS-RPVBH – 1 thru 55) 28 A, B, C 30 A, B, C 37 34 29 27 36 35 32 33 31 40 39 44 42 38 43 41 17/179 App. F.2 - BWR Systems Drawings GROUP 3 – RPV BOTTOM HEAD (Sheet 7 of 8) App. F.2 - BWR Systems18/179 Drawings (Covers Worksheets RCS-RPVBH – 1 thru 55) 45 46 GROUP 3 – RPV BOTTOM HEAD (Sheet 8 of 8) (Covers Worksheets RCS-RPVBH – 1 thru 55) 47 48 55 50 49 51 54 52 53 19/179 App. F.2 - BWR Systems Drawings GROUP 4 – REACTOR VESSEL INTERNALS SHROUD (Sheet 1 of 8) (Covers Worksheets RCS-SHROUD – 1 thru 47) 20/179 App. F.2 - BWR Systems Drawings 1 2 24 25 3 4 15 5 16 17 6 43 7 18 8 45 9 19 46 10 11 12 20 13 21 14 GROUP 4 – REACTOR VESSEL INTERNALS 21/179 App. F.2 - BWR Systems Drawings SHROUD (Sheet 2 of 8) (Covers Worksheets RCS-SHROUD – 1 thru 47) 1 15 4 16 3 2 17 5 6 18 7 8 9 19 10 11 13 20 12 14 21 RPV SHROUD WELD/PLATE IDENTIFICATION ELEVATION VIEW GROUP 4 – REACTOR VESSEL INTERNALS SHROUD (Sheet 3 of 8) (Covers Worksheets RCS-SHROUD – 1 thru 47) 24 22 23 27 25 26 29 28 31 30 32 33 34 35 36 37 22/179 App. F.2 - BWR Systems Drawings GROUP 4 – REACTOR VESSEL INTERNALS SHROUD (Sheet 4 of 8) (Covers Worksheets RCS-SHROUD – 1 thru 47) 39 38 39 40 41 23/179 App. F.2 - BWR Systems Drawings GROUP 4 – REACTOR VESSEL INTERNALS SHROUD (Sheet 5 of 8) (Covers Worksheets RCS-SHROUD – 1 thru 47) 34 35 24 25 42 23 22 24/179 App. F.2 - BWR Systems Drawings GROUP 4 – REACTOR VESSEL INTERNALS SHROUD (Sheet 6 of 8) (Covers Worksheets RCS-SHROUD – 1 thru 47) 43 TOP GUIDE 25/179 App. F.2 - BWR Systems Drawings GROUP 4 – REACTOR VESSEL INTERNALS App. F.2 - BWR Systems26/179 Drawings SHROUD (Sheet 7 of 8) (Covers Worksheets RCS-SHROUD – 1 thru 47) 44 GROUP 4 – REACTOR VESSEL INTERNALS SHROUD (Sheet 8 of 8) (Covers Worksheets RCS-SHROUD – 1 thru 47) 47 46 45 CORE PLATE Core Plate Plug 27/179 App. F.2 - BWR Systems Drawings 28/179 App. F.2 - BWR Systems Drawings 29/179 App. F.2 - BWR Systems Drawings GROUP 5 – REACTOR VESSEL INTERNALS 30/179 CORE CONTROLS (Sheet 1 of 15) App. F.2 - BWR Systems Drawings (Covers Worksheets RCS-CORECTRL – 1 thru 42) 1 2 3 4 5 RPV CORE AREA INTERNALS 31/179 GROUP 5 – REACTOR VESSEL INTERNALS App. F.2 - BWR Systems Drawings CORE CONTROLS (Sheet 2 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 1 FUEL ASSEMBLY (Quantity – 764) GROUP 5 – REACTOR VESSEL INTERNALS CORE CONTROLS (Sheet 3 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 2 6 ORIFICED FUEL SUPPORT ASSEMBLY 32/179 App. F.2 - BWR Systems Drawings GROUP 5 – REACTOR VESSEL INTERNALS CORE CONTROLS (Sheet 4 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 3 9 5 8 7 CONTROL ROD DRIVE 33/179 App. F.2 - BWR Systems Drawings GROUP 5 – REACTOR VESSEL INTERNALS CORE CONTROLS (Sheet 5 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 3 CONTROL ROD GUIDE TUBE 34/179 App. F.2 - BWR Systems Drawings GROUP 5 – REACTOR VESSEL INTERNALS 35/179 App. F.2 - BWR Systems Drawings CORE CONTROLS (Sheet 6 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 4 CONTROL ROD (QUANTITY – 185) 36/179 GROUP 5 – REACTOR VESSEL INTERNALS App. F.2 - BWR Systems Drawings CORE CONTROLS (Sheet 7 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 11 CONTROL ROD DRIVE 10 GROUP 5 – REACTOR VESSEL INTERNALS CORE CONTROLS (Sheet 8 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 37/179 App. F.2 - BWR Systems Drawings 17 16 15 13 14 NEUTRON MONITORING IN-CORE SYSTEM 12 GROUP 5 – REACTOR VESSEL INTERNALS CORE CONTROLS (Sheet 9 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 17 DRY TUBE ASSEMBLY NEUTRON MONITORING SYSTEM 38/179 App. F.2 - BWR Systems Drawings GROUP 5 – REACTOR VESSEL INTERNALS 39/179 App. F.2 - BWR Systems Drawings CORE CONTROLS (Sheet 10 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 19 5 18 11 20 21 22 CONTROL ROD DRIVE HOUSING SUPPORT ASSEMBLY 40/179 GROUP 5 – REACTOR VESSEL INTERNALS App. F.2 - BWR Systems Drawings CORE CONTROLS (Sheet 11 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 19 BEAM 18 HANGER ROD GROUP 5 – REACTOR VESSEL INTERNALS 41/179 App. F.2 - BWR Systems Drawings CORE CONTROLS (Sheet 12 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 20 21 SUPPORT BAR GRID 22 GRID CLAMP GROUP 5 – REACTOR VESSEL INTERNALS 42/179 App. F.2 - BWR Systems Drawings CORE CONTROLS (Sheet 13 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 23 CONTROL ROD-DRIVE HOUSING RESTRAINT BEAM GROUP 5 – REACTOR VESSEL INTERNALS 43/179 App. F.2 - BWR Systems Drawings CORE CONTROLS (Sheet 14 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 36 40 39 35 34 33 38 32 31 28 30 27 29 26 25 24 DIFFERENTIAL PRESURE AND LIQUID CONTROL LINE 37 GROUP 5 – REACTOR VESSEL INTERNALS CORE CONTROLS (Sheet 15 of 15) (Covers Worksheets RCS-CORECTRL – 1 thru 42) 41 42 CRD HYDRAULIC SYSTEM RETURN (CAPPED) 44/179 App. F.2 - BWR Systems Drawings GROUP 6 – REACTOR VESSEL INTERNALS JET PUMP ASSEMBLY (Sheet 1 of 6) (Covers Worksheets RCS-JETPUMP – 1 thru 22) 7 8 9 6 10 5 11 12 21 4 3 2 22 13 14 15 16 1 18 17A JET PUMP ASSEMBLY (QUANTITY 10) 17B 45/179 App. F.2 - BWR Systems Drawings Riser bracket to Riser weld GROUP 6 – REACTOR VESSEL INTERNALS JET PUMP ASSEMBLY (Sheet 2 of 6) (Covers Worksheets RCS-JETPUMP – 1 thru 22) 7 8 12 46/179 App. F.2 - BWR Systems Drawings GROUP 6 – REACTOR VESSEL INTERNALS JET PUMP ASSEMBLY (Sheet 3 of 6) (Covers Worksheets RCS-JETPUMP – 1 thru 22) 20 20 19 19 SHROUD SUPPORT PLATE PLAN VIEW 47/179 App. F.2 - BWR Systems Drawings GROUP 6 – REACTOR VESSEL INTERNALS JET PUMP ASSEMBLY (Sheet 4 of 6) (Covers Worksheets RCS-JETPUMP – 1 thru 22) 19 JET PUMP ACCESS HOLE COVER 48/179 App. F.2 - BWR Systems Drawings GROUP 6 – REACTOR VESSEL INTERNALS JET PUMP ASSEMBLY (Sheet 5 of 6) (Covers Worksheets RCS-JETPUMP – 1 thru 22) 17A JET PUMP ADAPTER (UNIT 1) 49/179 App. F.2 - BWR Systems Drawings GROUP 6 – REACTOR VESSEL INTERNALS JET PUMP ASSEMBLY (Sheet 6 of 6) (Covers Worksheets RCS-JETPUMP – 1 thru 22) 17B JET PUMP ADAPTER (UNIT 2) 50/179 App. F.2 - BWR Systems Drawings GROUP 7 – REACTOR VESSEL INTERNALS 51/179 App. F.2 - BWR Systems Drawings ECCS CONNECTIONS (Sheet 1 of 8 ) (Covers Worksheets RCS-ECCSCONN – 1 thru 50) 2 3 1 7 4 17 6 5 18 14 13 12 11 16 10 8 9 FEEDWATER SPARGER (QUANTITY 6) 15 GROUP 7 – REACTOR VESSEL INTERNALS 52/179 App. F.2 - BWR Systems Drawings ECCS CONNECTIONS (Sheet 2 of 8 ) (Covers Worksheets RCS-ECCSCONN – 1 thru 50) 19 20 FEEDWATER SPARGER GROUP 7 – REACTOR VESSEL INTERNALS 53/179 App. F.2 - BWR Systems Drawings ECCS CONNECTIONS (Sheet 3 of 8 ) (Covers Worksheets RCS-ECCSCONN – 1 thru 50) 24 21 25 26 23 22 27 28 LPCI SUPPLY (3 LOCATIONS) CORE SPRAY PIPING INSIDE VESSEL 54/179 GROUP 7 – REACTOR VESSEL INTERNALS App. F.2 - BWR Systems Drawings ECCS CONNECTIONS (Sheet 4 of 8 ) (Covers Worksheets RCS-ECCSCONN – 1 thru 50) 27 24 22 TEE BOX CORE SPRAY LINE (Quantity 2) 55/179 GROUP 7 – REACTOR VESSEL INTERNALS App. F.2 - BWR Systems Drawings ECCS CONNECTIONS (Sheet 5 of 8 ) (Covers Worksheets RCS-ECCSCONN – 1 thru 50) 31 35 32 33 LPCI HEADER 34 30 29 SHROUD ASSEMBLY GROUP 7 – REACTOR VESSEL INTERNALS 56/179 App. F.2 - BWR Systems Drawings ECCS CONNECTIONS (Sheet 6 of 8 ) (Covers Worksheets RCS-ECCSCONN – 1 thru 50) 32 33 34 36 39 40 37 38 42 41 CORE SPRAY SPARGER HEADER/NOZZLES GROUP 7 – REACTOR VESSEL INTERNALS 57/179 App. F.2 - BWR Systems Drawings ECCS CONNECTIONS (Sheet 7 of 8 ) (Covers Worksheets RCS-ECCSCONN – 1 thru 50) LPCI COUPLING LOCATION 35 LPCI SHROUD PENETRATION (QUANTITY 3) LPCI HEADER GROUP 7 – REACTOR VESSEL INTERNALS 58/179 App. F.2 - BWR Systems Drawings ECCS CONNECTIONS (Sheet 8 of 8 ) (Covers Worksheets RCS-ECCSCONN – 1 thru 50) SHROUD 49 43 44 45 46 47 50 48 LPCI COUPLING (QUANTITY 3) GROUP 8 – REACTOR VESSEL INTERNALS 59/179 STEAM SEPARATOR AND STEAM DRYER (Sheet 1 of 7) App. F.2 - BWR Systems Drawings (Covers Worksheets– RCS-STMSEP 1 thru 14) 2 1 STEAM DRYER ASSEMBLY GROUP 8 – REACTOR VESSEL INTERNALS 60/179 STEAM SEPARATOR AND STEAM DRYER (Sheet 2 ofApp.7)F.2 - BWR Systems Drawings (Covers Worksheets– RCS-STMSEP 1 thru 14) 5 4 1 2 3 STEAM DRYER ASSEMBLY GROUP 8 – REACTOR VESSEL INTERNALS 61/179 App. F.2 - BWR Systems Drawings STEAM SEPARATOR AND STEAM DRYER (Sheet 3 of 7) (Covers Worksheets– RCS-STMSEP 1 thru 14) 6 7 8 STEAM SEPARATOR ASSEMBLY GROUP 8 – REACTOR VESSEL INTERNALS 62/179 STEAM SEPARATOR AND STEAM DRYER (Sheet 4 ofApp.7)F.2 - BWR Systems Drawings (Covers Worksheets– RCS-STMSEP 1 thru 14) 9 6 STEAM SEPARATOR AND SHROUD ASSEMBLY GROUP 8 – REACTOR VESSEL INTERNALS App. F.2 - BWR Systems63/179 Drawings STEAM SEPARATOR AND STEAM DRYER (Sheet 5 of 7) (Covers Worksheets– RCS-STMSEP 1 thru 14) 7 STEAM SEPARATOR ASSEMBLY GROUP 8 – REACTOR VESSEL INTERNALS 64/179 App. F.2 - BWR Systems Drawings STEAM SEPARATOR AND STEAM DRYER (Sheet 6 of 7) (Covers Worksheets– RCS-STMSEP 1 thru 14) 10 STEAM SEPARATOR GUIDE PIN (QUANTITY 2) GROUP 8 – REACTOR VESSEL INTERNALS 65/179 App. F.2 - BWR Systems Drawings STEAM SEPARATOR AND STEAM DRYER (Sheet 7 of 7) (Covers Worksheets– RCS-STMSEP 1 thru 14) 11 12 13 14 HEAD SPRAY NOZZLE 66/179 App. F.2 - BWR Systems Drawings GROUP 9 – REACTOR COOLANT RECIRCULATION SYSTEM (Sheet 1 of 4) (Covers Worksheets RCS-RECIRC – 1 thru 90) A1 15 5 16 1 6 2 7 37 17 36 3 18 8 33 4 35 19 9 22 34 23 20 10 24 32 31 21 11 12 25 26 13 A2 30 27 28 45 14 A1 29 38 42 39 40 41 43 44 67/179 App. F.2 - BWR Systems Drawings GROUP 9 – REACTOR COOLANT RECIRCULATION SYSTEM (Sheet 2 of 4) (Covers Worksheets RCS-RECIRC – 1 thru 90) A3 64 68 63 67 62 65 61 66 60 59 A2 58 46 57 47 48 49 50 56 51 52 53 54 55 GROUP 9 – REACTOR COOLANT RECIRCULATION SYSTEM (Sheet of68/179 4) App. F.2 - BWR3 Systems Drawings (Covers Worksheets RCS-RECIRC – 1 thru 90) 86 87 85 84 82 81 83 80 78 79 77 76 74 75 70 73 72 71 69 A3 GROUP 9 – REACTOR COOLANT RECIRCULATION SYSTEM (Sheet 4 of 4)69/179 App. F.2 - BWR Systems Drawings (Covers Worksheets RCS-RECIRC – 1 thru 90) 90 89 88 RR PUMP GROUP 10 – LOW PRESSURE CORE SPRAY (Sheet 1 of 10) 70/179 App. F.2 - BWR Systems Drawings (Covers Worksheets ECCS-LPCS – 1 thru 96) RY NDA NT O C SE AINME T CON LPCS PUMP SUCTION ARY PRIM MENT TAIN 4 CON 5 8 3 7 2 6 1 RHR CONNECTION B105LS 9 11 10 12 FROM SUPPRESSION POOL 13 14 17 20 15 19 LPCS PUMP SUCTION 16 21 18 23 A1 22 GROUP 10 – LOW PRESSURE CORE SPRAY (Sheet 2 of 10) 71/179 App. F.2 - BWR Systems Drawings (Covers Worksheets ECCS-LPCS – 1 thru 96) A2 34 35 36 37 38 39 40 33 32 41 31 42 30 29 LPCS PUMP DISCHARGE 28 27 A1 26 25 24 72/179 GROUP 10 – LOW PRESSURE CORE SPRAY (Sheet 3 of 10) App. F.2 - BWR Systems Drawings (Covers Worksheets ECCS-LPCS – 1 thru 96) A3 46 45 47 44 43 48 51 49 50 TO SUPPRESSION POOL B1 See Sheet 6 A2 GROUP 10 – LOW PRESSURE CORE SPRAY (Sheet 4 of 10) 73/179 App. F.2 - BWR Systems Drawings (Covers Worksheets ECCS-LPCS – 1 thru 96) 54 53 52 56 A3 55 A4 74/179 F.2 - BWR Systems Drawings GROUP 10 – LOW PRESSURE CORE SPRAY (Sheet 5 ofApp.10) (Covers Worksheets ECCS-LPCS – 1 thru 96) 74 WELD to RPV LPCS NOZZLE SAFE END 77 76 73 75 SECONDARY CONTAINMENT PRIMARY CONTAINMENT 72 71 A4 58 67 70 69 66 68 65 64 63 59 60 61 62 57 GROUP 10 – LOW PRESSURE CORE SPRAY (Sheet 6 of 10) 75/179 App. F.2 - BWR Systems Drawings (Covers Worksheets ECCS-LPCS – 1 thru 96) From Sheet 3 B1 78 79 B2 76/179 GROUP 10 – LOW PRESSURE CORE SPRAY (Sheet 7 of 10) App. F.2 - BWR Systems Drawings (Covers Worksheets ECCS-LPCS – 1 thru 96) B3 B2 81 80 77/179 GROUP 10 – LOW PRESSURE CORE SPRAY (Sheet 8 of App.10) F.2 - BWR Systems Drawings (Covers Worksheets ECCS-LPCS – 1 thru 96) 82 83 SUPPRESSION POOL SECONDARY PRIMARY CONTAINMENT CONTAINMENT B3 78/179 GROUP 10 – LOW PRESSURE CORE SPRAY (Sheet 9 of App.10) F.2 - BWR Systems Drawings (Covers Worksheets ECCS-LPCS – 1 thru 96) 84 92 91 85 90 89 86 88 LPCS PUMP E21 C001 87 79/179 GROUP 10 – LOW PRESSURE CORE SPRAY (Sheet 10 App. ofF.210) - BWR Systems Drawings (Covers Worksheets ECCS-LPCS – 1 thru 96) 94 93 95 96 SUPPRESSION POOL SUCTION STRAINER (LPCS, HPCS, AND RHR) GROUP 11 – HIGH PRESSURE CORE SPRAY (Sheet 1 of 7) 80/179 App. F.2 - BWR Systems Drawings (Covers Worksheets ECCS-HPCS – 1 thru 83) 14 8 Y AR ND ENT O M C SE TAIN N CO 6 5 7 RY T IMA EN PR AINM NT CO 4 3 2 13 1 20 12 11 19 A1 18 10 9 17 15 16 FROM SUPPRESSION POOL GROUP 11 – HIGH PRESSURE CORE SPRAY (Sheet 2 App. ofF.27)- BWR Systems81/179 Drawings (Covers Worksheets ECCS-HPCS – 1 thru 83) HPCS PUMP SUCTION A2 23 24 A1 25 FROM CYCLED CST 22 21 82/179 GROUP 11 – HIGH PRESSURE CORE SPRAY (Sheet 3App. ofF.27) - BWR Systems Drawings (Covers Worksheets ECCS-HPCS – 1 thru 83) A3 SHEET 5 B1 39 38 TO SUPPRESSION POOL 37 36 35 HPCS PUMP DISCHARGE 34 33 32 31 29 30 A2 28 27 26 GROUP 11 – HIGH PRESSURE CORE SPRAY (Sheet 4 ofApp.7)F.2 - BWR Systems83/179 Drawings (Covers Worksheets ECCS-HPCS – 1 thru 83) Y NDAR SECO INMENT A T CON ARY PRIM MENT I A T N CON 54 53 IS O AB LA AN TE D D O AN N ED D DISCHARGE TO SUPPRESSION POOL B1 52 45 46 51 40 50 41 47 42 43 48 44 49 84/179 App. F.2 - BWR Systems Drawings GROUP 11 – HIGH PRESSURE CORE SPRAY (Sheet 5 of 7) (Covers Worksheets ECCS-HPCS – 1 thru 83) 58 A4 57 56 55 A3 SHEET 3 GROUP 11 – HIGH PRESSURE CORE SPRAY (Sheet 6 of 7) 85/179 App. F.2 - BWR Systems Drawings (Covers Worksheets ECCS-HPCS – 1 thru 83) 73 WELD TO RPV HPCS NOZZLE SAFE END 70 71 72 74 69 64 59 61 66 62 A4 SECONDARY CONTAINMENT 65 68 60 PRIMARY CONTAINMENT 63 67 GROUP 11 – HIGH PRESSURE CORE SPRAY (Sheet 7 App. ofF.27)- BWR Systems86/179 Drawings (Covers Worksheets ECCS-HPCS – 1 thru 83) 83 75 DISCHARGE 82 81 80 77 76 SUCTION 78 79 HPCS PUMP (IE22C001) GROUP 12 – REACTOR CORE ISOLOATION COOLING (Sheet 1 of 7) 87/179 App. F.2 - BWR Systems Drawings (Covers Worksheets AS-RCIC – 1 thru 80) 4C 4B 4A 4 2 5 3 6 7 1 9 8 10 11 12 13 14 A1 GROUP 12 – REACTOR CORE ISOLOATION COOLING (SheetApp.2F.2of 7) 88/179 - BWR Systems Drawings (Covers Worksheets AS-RCIC – 1 thru 80) A1 15 16 PRIMARY SECONDARY CONTAINMENT CONTAINMENT 18 19 31 17 A2 24 30 20 From RHR 21 27 22 26 23 25 28 29 GROUP 12 – REACTOR CORE ISOLOATION COOLING (SheetApp.3F.2of- BWR 7)Systems89/179 Drawings (Covers Worksheets AS-RCIC – 1 thru 80) 34 35 33 36 A2 32 A3 GROUP 12 – REACTOR CORE ISOLOATION COOLING (SheetApp.4F.2of 7)Systems90/179 - BWR Drawings (Covers Worksheets AS-RCIC – 1 thru 80) A3 37 38 39 40 42 41 RCIC PUMP DISCHARGE 43 A4 44 App. F.25 - BWR Drawings GROUP 12 – REACTOR CORE ISOLOATION COOLING (Sheet ofSystems 7) 91/179 (Covers Worksheets AS-RCIC – 1 thru 80) 67 68 69 PRIMARY CONTAINMENT 63 SECONDARY CONTAINMENT From CCST (Outdoor Piping) 60 62 54 64 65 53 66 55 52 61 SUPPRESSION POOL 51 56 59 50 57 49 58 48 RCIC PUMP SUCTION 47 46 45A A4 45 GROUP 12 – REACTOR CORE ISOLOATION COOLING (Sheet 6 of 7) 92/179 App. F.2 - BWR Systems Drawings (Covers Worksheets AS-RCIC – 1 thru 80) 76 75 74 73 72 71 70 RCIC PUMP (E51-COO1) GROUP 12 – REACTOR CORE ISOLOATION COOLING (Sheet 7 of 7) 93/179 App. F.2 - BWR Systems Drawings (Covers Worksheets AS-RCIC – 1 thru 80) 78 77 80 79 RCIC SUPPRESSION POOL STRAINER IE51-D300 GROUP 13 – RESIDUAL HEAT REMOVAL 94/179 App. F.2 - BWR Systems Drawings SUPPRESSION POOL PIPING TO RHR PUMP (Sheet 1 of 4) (Covers Worksheets ESF-RHRPMPS – 1 thru 58) 3 2 RR LOOP “A” 1 4 5 6 7 8 9 10 12 11 13 14 PRIMARY CONTAINMENT SECONDARY CONTAINMENT A1 15 16 17 GROUP 13 – RESIDUAL HEAT REMOVAL 95/179 App. F.2 - BWR Systems Drawings SUPPRESSION POOL PIPING TO RHR PUMP (Sheet 2 of 4) (Covers Worksheets ESF-RHRPMPS – 1 thru 58) 23 22 21 20 19 A1 18 24 25 26 27 28 To RHR “B” Loop A2 29 30 31 GROUP 13 – RESIDUAL HEAT REMOVAL 96/179 App. F.2 - BWR Systems Drawings SUPPRESSION POOL PIPING TO RHR PUMP (Sheet 3 of 4) (Covers Worksheets ESF-RHRPMPS – 1 thru 58) 37 38 32 A3 A2 33 36 34 35 GROUP 13 – RESIDUAL HEAT REMOVAL 97/179 App. F.2 - BWR Systems Drawings SUPPRESSION POOL PIPING TO RHR PUMP (Sheet 4 of 4) (Covers Worksheets ESF-RHRPMPS – 1 thru 58) 51 50 52 46 A3 45 39 40 53 49 41 44 48 57 58 54 47 55 56 SUPPRESION POOL SUCTION STRAINER From LPCS Blanked Off (Test Only) 43 42 RHR Pump E12-C002A Suction GROUP 14 – RESIDUAL HEAT REMOVAL 98/179 App. F.2 - BWR Systems Drawings RHR PUMP To RHR HX (Sheet 1 of 6) (Covers Worksheets ESF-RHRPMPHX – 1 thru 78) A1 17 16 15 14 13 12 11 10 9 8 7 6 B1 5 4 RHR PUMP DISCHARGE 3 2 1 GROUP 14 – RESIDUAL HEAT REMOVAL 99/179 App. F.2 - BWR Systems Drawings RHR PUMP To RHR HX (Sheet 2 of 6) (Covers Worksheets ESF-RHRPMPHX – 1 thru 78) RETURN TO SUPPRESSION POOL 34 33 32 31 20 30 19 29 26 25 28 27 B1 24 23 22 21 18 GROUP 14 – RESIDUAL HEAT REMOVAL 100/179 App. F.2 - BWR Systems Drawings RHR PUMP To RHR HX (Sheet 3 of 6) (Covers Worksheets ESF-RHRPMPHX – 1 thru 78) 43 A2 RHR HX INLET SHEET 5 C1 SHEET 4 42 D1 SHEET 5 41 39 38 40 35 37 36 A1 GROUP 14 – RESIDUAL HEAT REMOVAL RHR PUMP To RHR HX (Sheet 4 of 6) (Covers Worksheets ESF-RHRPMPHX – 1 thru 78) 50 51 53 54 55 101/179 App. F.2 - BWR Systems Drawings 56 57 49 48 58 46 47 59 C1 60 45 44 52 61 FROM RCIC: STEAM CONDENSING MODE ABANDONED 62 102/179 GROUP 14 – RESIDUAL HEAT REMOVAL App. F.2 - BWR Systems Drawings RHR PUMP To RHR HX (Sheet 5 of 6) (Covers Worksheets ESF-RHRPMPHX – 1 thru 78) TO RHR GROUP 15 SHEET 1 D1 SHEET 3 63 A2 RHR HX OUTLET SHEET 3 66 67 64 65 103/179 App. F.2 - BWR Systems Drawings GROUP 14 – RESIDUAL HEAT REMOVAL RHR PUMP To RHR HX (Sheet 6 of 6) (Covers Worksheets ESF-RHRPMPHX – 1 thru 78) 69 70 68 74 71 75 HX TUBES 76 TUBE SHEET 77 FITTINGS 78 SUPPORTS (OUTSIDE) RHR HX E12-BOO1A 72 73 GROUP 15 – RESIDUAL HEAT REMOVAL 104/179 NORMAL SHUTDOWN PIPING (Sheet 1 of 7) App. F.2 - BWR Systems Drawings (Covers Worksheets ESF-RHRSHTDWN – 1 thru 71) 2 1 3 B1 SHEET 6 GROUP 14 SHEET 5 4 5 7 6 15 16 8 10 A1 9 14 11 TO GROUP 16 SHEET 8 12 13 TO GROUP 16 SHEET 1 GROUP 15 – RESIDUAL HEAT REMOVAL 105/179 NORMAL SHUTDOWN PIPING (Sheet 2 of 7) App. F.2 - BWR Systems Drawings (Covers Worksheets ESF-RHRSHTDWN – 1 thru 71) A1 17 22 21 LOCKED CLOSED 20 19 18 23 24 25 26 A2 GROUP 15 – RESIDUAL HEAT REMOVAL 106/179 App. F.2 - BWR Systems Drawings NORMAL SHUTDOWN PIPING (Sheet 3 of 7) (Covers Worksheets ESF-RHRSHTDWN – 1 thru 71) A2 27 28 29 30 GROUP 14 SHEET 2 A3 GROUP 15 – RESIDUAL HEAT REMOVAL 107/179 App. F.2 - BWR Systems Drawings NORMAL SHUTDOWN PIPING (Sheet 4 of 7) (Covers Worksheets ESF-RHRSHTDWN – 1 thru 71) A3 A4 108/179 GROUP 15 – RESIDUAL HEAT REMOVAL App. F.2 - BWR Systems Drawings NORMAL SHUTDOWN PIPING (Sheet 5 of 7) (Covers Worksheets ESF-RHRSHTDWN – 1 thru 71) A4 CO PR NT IMA AI RY NM EN T 35 36 S CO EC NT ON AI DA NM RY EN T 37 34 SUPPRESSION POOL 33 31 32 GROUP 15 – RESIDUAL HEAT REMOVAL NORMAL SHUTDOWN PIPING (Sheet 6 of 7) App. F.2 - BWR Systems109/179 Drawings (Covers Worksheets ESF-RHRSHTDWN – 1 thru 71) To RCIC GROUP 12, SHEET 2 (VESSEL HEAD SPRAY) 52 51 B2 50 49 53 48 47 46 45 44 43 42 41 40 B1 39 38 GROUP 15 – RESIDUAL HEAT REMOVAL 110/179 NORMAL SHUTDOWN PIPING (Sheet 7 of 7) App. F.2 - BWR Systems Drawings (Covers Worksheets ESF-RHRSHTDWN – 1 thru 71) 54 55 Y AR ND ENT CO SE TAINM N CO RY T MA PRI INMEN A NT CO 69 60 59 58 57 B2 68 RR RETURN GROUP 9, SHEET 2 56 71 70 61 62 66 63 64 67 65 GROUP 16 – RESIDUAL HEAT REMOVAL 111/179 App. F.2 - BWR Systems Drawings SPRAY PIPING (Sheet 1 of 8) (Covers Worksheets ESF-RHRSPRAY – 1 thru 73) FROM GROUP 15 SHEET 1 A1 SHEET 5 1 2 9 3 4 5 6 7 8 10 B1 GROUP 16 – RESIDUAL HEAT REMOVAL 112/179 App. F.2 - BWR Systems Drawings SPRAY PIPING (Sheet 2 of 8) (Covers Worksheets ESF-RHRSPRAY – 1 thru 73) B1 B2 11 12 GROUP 16 – RESIDUAL HEAT REMOVAL 113/179 App. F.2 - BWR Systems Drawings SPRAY PIPING (Sheet 3 of 8) (Covers Worksheets ESF-RHRSPRAY – 1 thru 73) 18 B3 17 16 15 14 13 B2 GROUP 16 – RESIDUAL HEAT REMOVAL SPRAY PIPING (Sheet 4 of 8) (Covers Worksheets ESF-RHRSPRAY – 1 thru 73) 114/179 App. F.2 - BWR Systems Drawings B4 28 29 30 24 WELD TO RPV RHR NOZZLE SAFE END (LPCI) 31 25 23 26 22 27 PRIMARY CONTAINMENT 32 SECONDARY CONTAINMENT 21 20 19 B4 B3 115/179 GROUP 16 – RESIDUAL HEAT REMOVAL App. F.2 - BWR Systems Drawings SPRAY PIPING (Sheet 5 of 8) (Covers Worksheets ESF-RHRSPRAY – 1 thru 73) A2 42 40 41 39 34 38 37 33 36 35 A1 SHEET 1 GROUP 16 – RESIDUAL HEAT REMOVAL 116/179 SPRAY PIPING (Sheet 6 of 8) App. F.2 - BWR Systems Drawings (Covers Worksheets ESF-RHRSPRAY – 1 thru 73) A3 47 48 46 49 SECONDARY PRIMARY CONTAINMENT CONTAINMENT 45 A2 43 44 117/179 App. F.2 - BWR Systems Drawings GROUP 16 – RESIDUAL HEAT REMOVAL SPRAY PIPING (Sheet 7 of 8) (Covers Worksheets ESF-RHRSPRAY – 1 thru 73) DRYWELL SPRAY HEADER 55 54 53 52 51 50 A3 GROUP 16 – RESIDUAL HEAT REMOVAL 118/179 App. F.2 - BWR Systems Drawings SPRAY PIPING (Sheet 8 of 8) (Covers Worksheets ESF-RHRSPRAY – 1 thru 73) PRIMARY SECONDARY CONTAINMENT CONTAINMENT 62 FROM GROUP 15 SHEET 1 63 64 56 65 57 67 66 73 72 58 71 68 70 69 SUPPRESSION POOL SPRAY HEADER 59 61 60 GROUP 17 – MAIN STEAM (Sheet 1 of 9) (Covers Worksheets PCS-MS – 1 thru 75) 1 119/179 App. F.2 - BWR Systems Drawings 2 3 4 C1 13 5 REACTOR NOZZLE SAFE END 12 11 10 9 8 B1 TO RCIC TURBINE-DRIVEN PUMP 6 A1 7 GROUP 17 – MAIN STEAM (Sheet 2 of 9) (Covers Worksheets PCS-MS – 1 thru 75) 16 17 18 14 15 120/179 App. F.2 - BWR Systems Drawings B1 19 20 To RCIC TURBINE-DRIVEN PUMP ESI-C002 GROUP 17 – MAIN STEAM (Sheet 3 of 9) (Covers Worksheets PCS-MS – 1 thru 75) 121/179 App. F.2 - BWR Systems Drawings A1 A2 27 ST TU EAM NN EL 24 P CO RIM NT AR AI N Y ME NT 21 26 25 23 22 GROUP 17 – MAIN STEAM (Sheet 4 of 9) (Covers Worksheets PCS-MS – 1 thru 75) A2 28 29 30 31 A3 122/179 App. F.2 - BWR Systems Drawings 123/179 App. F.2 - BWR Systems Drawings GROUP 17 – MAIN STEAM (Sheet 5 of 9) (Covers Worksheets PCS-MS – 1 thru 75) A4 38 39 40 41 A3 ST TU EAM NN EL 32 TU BU RBI ILD NE IN G 33 37 36 34 35 GROUP 17 – MAIN STEAM (Sheet 6 of 9) (Covers Worksheets PCS-MS – 1 thru 75) 124/179 App. F.2 - BWR Systems Drawings TO STEAM BYPASS VALVES STEAM TO TURBINES 62 51 61 50 60 49 AUXILIARY STEAM SUPPLY 48 59 58 47 57 54 46 55 56 45 44 53 52 43 A4 42 125/179 GROUP 17 – MAIN STEAM (Sheet 7 of 9) (Covers Worksheets PCS-MS – 1 thru 75) STEAM BYPASS VALVES 64 63 STEAM TO TURBINES App. F.2 - BWR Systems Drawings GROUP 17 – MAIN STEAM (Sheet 8 of 9) (Covers Worksheets PCS-MS – 1 thru 75) SRV DISCHARGE C1 65 126/179 App. F.2 - BWR Systems Drawings 66 67 68 69 70 71 72 SUPPRESSION POOL 73 74 Tee-Quencher Support Plate Tee-Quencher Support Plate Bolts Tee-Quencher Sparger GROUP 17 – MAIN STEAM (Sheet 9 of 9) (Covers Worksheets PCS-MS – 1 thru 75) 75 MAIN STEAM SRV 127/179 App. F.2 - BWR Systems Drawings GROUP 18 – CYCLED CONDENSATE STORAGE TANK (Sheet 1 of 11)128/179 App. F.2 - BWR Systems Drawings (Covers Worksheets ESF-CCST – 1 thru 58) 3 43 7 49 11 CCST ASSEMBLY GROUP 18 – CYCLED CONDENSATE STORAGE TANK (Sheet 2 of 11)129/179 App. F.2 - BWR Systems Drawings (Covers Worksheets ESF-CCST – 1 thru 58) 1 1 2 3 4 CCST ROOF WELDMENT (PLAN VIEW) 130/179 GROUP 18 – CYCLED CONDENSATE STORAGE TANK (Sheet ofSystems 11) App. F.23 - BWR Drawings (Covers Worksheets ESF-CCST – 1 thru 58) 5 6 7 8 9 CCST ELEVATION VIEW 131/179 App. F.2 - BWR Systems Drawings GROUP 18 – CYCLED CONDENSATE STORAGE TANK (Sheet 4 of 11) (Covers Worksheets ESF-CCST – 1 thru 58) 10 11 12 CCST BOTTOM WELDMENT (PLAN VIEW) GROUP 18 – CYCLED CONDENSATE STORAGE TANK (Sheet 5 of 11)132/179 App. F.2 - BWR Systems Drawings (Covers Worksheets ESF-CCST – 1 thru 58) 21 23 22 15 14 20 13 17 16 18 19 14”SHELL NOZZLE (C) GROUP 18 – CYCLED CONDENSATE STORAGE TANK (Sheet 6 of 11) (Covers Worksheets ESF-CCST – 1 thru 58) App. F.2 - BWR Systems133/179 Drawings 25 24 26 28 27 29 24” SHELL NOZZLE (B) GROUP 18 – CYCLED CONDENSATE STORAGE TANK (Sheet 7 of 11)134/179 App. F.2 - BWR Systems Drawings (Covers Worksheets ESF-CCST – 1 thru 58) 36 35 32 31 34 30 33 24” SHELL MANHOLE (A) GROUP 18 – CYCLED CONDENSATE STORAGE TANK (Sheet 8 of 11)135/179 App. F.2 - BWR Systems Drawings (Covers Worksheets ESF-CCST – 1 thru 58) 41 38 37 40 39 6” ROOF NOZZLE (P) GROUP 18 – CYCLED CONDENSATE STORAGE TANK (Sheet 9 of 11)136/179 App. F.2 - BWR Systems Drawings (Covers Worksheets ESF-CCST – 1 thru 58) 44 43 45 46 42 24” SCREENED VENT (L) GROUP 18 – CYCLED CONDENSATE STORAGE TANK (SheetApp.10 11)137/179 F.2 - of BWR Systems Drawings (Covers Worksheets ESF-CCST – 1 thru 58) 47 48 49 50 51 53 52 54 10” COLUMN SUPPORT (U) 138/179 App. F.2 - BWR Systems Drawings GROUP 18 – CYCLED CONDENSATE STORAGE TANK (Sheet 11 of 11) (Covers Worksheets ESF-CCST – 1 thru 58) 55 56 58 57 INTERNAL ROOF FRAMING GROUP 19 – FEEDWATER (Sheet 1 of 6) (Covers Worksheets PCS-FW – 1 thru 107) 139/179 App. F.2 - BWR Systems Drawings REACTOR VESSEL 22 21 1 23 24 2 25 20 3 19 4 18 8 17 7 6 5 16 A1 14 15 12 10 9 13 11 GROUP 19 – FEEDWATER (Sheet 2 of 6) (Covers Worksheets PCS-FW – 1 thru 107) 39 38 140/179 App. F.2 - BWR Systems Drawings FROM RWCU 37 A1 43 26 35 27 36 44 A2 34 28 33 29 32 31 30 ARY PRIM ENT AINM CONT DARY SECON ENT INM CONTA 40 41 42 GROUP 19 – FEEDWATER (Sheet 3 of 6) (Covers Worksheets PCS-FW – 1 thru 107) HP HEATER OUTLET A2 45 63 46 47 A4 48 49 A3 A3 59 62 61 60 50 51 52 56 58 53 55 54 TO CONDENSER 57 141/179 App. F.2 - BWR Systems Drawings GROUP 19 – FEEDWATER (Sheet 4 of 6) (Covers Worksheets PCS-FW – 1 thru 107) 142/179 App. F.2 - BWR Systems Drawings B1 FW PUMP DISCHARGE 85 84 79 C1 78 76 77 83 82 81 80 67 86 87 68 66 74 75 65 88 69 64 B1 70 TO CONDENSER 73 A4 C1 71 72 HP HEATER INLET GROUP 19 – FEEDWATER (Sheet 5 of 6) (Covers Worksheets PCS-FW – 1 thru 107) 143/179 App. F.2 - BWR Systems Drawings COND OUTLET 98 97 STEAM INLET 101 96 FW OUTLET 94 95 100 FW INLET 92 91 90 89 99 93 102 HX TUBES 104 103 TUBE SHEET 105 FITTINGS SUPPORTS (OUTSIDE) GROUP 19 – FEEDWATER (Sheet 6 of 6) (Covers Worksheets PCS-FW – 1 thru 107) OUTLET 106 107 FEEDWATER PUMP (1FW01PA) INLET INLET 144/179 App. F.2 - BWR Systems Drawings GROUP 20 – CONTROL ROD DRIVE (Sheet 1 of 4) 145/179 App. F.2 - BWR Systems Drawings (Covers Worksheets AS-CRD – 1 thru 62) 30 22 9 6 3 7 8 23 21 13 10 20 17 14 16 18 31 32 33 34 A1 27 24 19 4 5 2 11 12 25 15 29 26 28 1 FROM CCST 37 35 55 48 36 47 54 46 45 53 44 A1 52 42 38 43 40 39 41 49 50 51 PLANT DRAWINGS NOT AVAILABLE GROUP 20 – CONTROL ROD DRIVE (Sheet 2 of 4)App. F.2 - BWR Systems146/179 Drawings (Covers Worksheets AS-CRD – 1 thru 62) 61 60 57 59 58 56 PUMP INLET FILTER (1C11-D010) GROUP 20 – CONTROL ROD DRIVE (Sheet 3 of 4) 147/179 App. F.2 - BWR Systems Drawings (Covers Worksheets AS-CRD – 1 thru 62) 62 CRD PUMP (1C11-C001A) GROUP 20 – CONTROL ROD DRIVE (Sheet 4 of 4) (Covers Worksheets AS-CRD – 1 thru 62) PLAN VIEW ELEVATION VIEW TYPICAL CRD HYDRAULIC PIPING (FOR REFERENCE ONLY) 148/179 App. F.2 - BWR Systems Drawings GROUP 21 – MAIN CONDENSER (Sheet 1 of 1) 149/179 App. F.2 - BWR Systems Drawings (Covers Worksheets PCS-CONDNSR – 1 thru 32) 19 1 STM IN (3) 20 2 TOP PLATE 3 4 5 21 INTERMEDIATE PLATE 6 22 END PLATE 9 23 7 8 SIDE PLATE 24 10 25 26 CW OUT (2) CW IN (2) COND. OUT (4) 11 14 18 17 16 13 12 15 30 INTERNAL BAFFLE PLATES TUBE SHEET 31 OTHER COMPONENT REPAIR SLEEVES TUBE SUPPORTS 32 TUBE REPAIR SLEEVES/PLUGS 27 HX TUBES 28 29 GROUP 22 – CONDENSATE 150/179 CONDENSER DISCHARGE PIPING (Sheet 1 of 4) App. F.2 - BWR Systems Drawings (Covers Worksheets PCS-CONDISCH – 1 thru 53) PLANT DRAWINGS NOT AVAILABLE 34 33 35 49 36 37 38 48 50 39 51 40 41 52 42 43 44 53 32 6 Pipe – Elbow – 24” 7 Elbow – 24” 20 21 Pipe – Elbow – 16” Elbow – 16” 30 Pipe – Elbow – 30” 31 Elbow – 30” 45 Condensate Pump Body 46 Pump Suction Nozzle 47 Pump Discharge Nozzle 1 2 3 4 8 5 9 14 10 17 18 12 16 15 13 11 19 22 28 29 27 26 25 23 24 GROUP 22 – CONDENSATE 151/179 App. F.2 - BWR Systems Drawings CONDENSER DISCHARGE PIPING (Sheet 2 of 4) (Covers Worksheets PCS-CONDISCH – 1 thru 53) STEAM JET AIR EJECTOR (FOR REFERENCE ONLY) GROUP 22 – CONDENSATE 152/179 App. F.2 - BWR Systems Drawings CONDENSER DISCHARGE PIPING (Sheet 3 of 4) (Covers Worksheets PCS-CONDISCH – 1 thru 53) CONDENSATE PUMP (FOR REFERENCE ONLY) GROUP 22 – CONDENSATE 153/179 App. F.2 - BWR Systems Drawings CONDENSER DISCHARGE PIPING (Sheet 4 of 4) (Covers Worksheets PCS-CONDISCH – 1 thru 53) STEAM PACKING EXHAUSTER (FOR REFERENCE ONLY) GROUP 23 – CONDENSATE 154/179 App. F.2 - BWR Systems Drawings CONDENSATE PIPING TO BOOSTER PUMP (Sheet 1 of 3) (Covers Worksheets PCS-CONDBPMP – 1 thru 57) 12 9 13 A1 14 A4 11 15 8 10 7 16 6 3 2 4 Pipe – Elbow – 30” 5 Elbow – 30” 17 Pipe – Elbow – 14” 18 Elbow – 14” 45 Pipe – Elbow – 20” 46 Elbow – 20” 1 40 41 42 49 50 43 44 47 53 48 51 52 PLANT DRAWINGS NOT AVAILABLE 155/179 GROUP 23 – CONDENSATE App. F.2 - BWR Systems Drawings CONDENSATE PIPING TO BOOSTER PUMP (Sheet 2 of 3) (Covers Worksheets PCS-CONDBPMP – 1 thru 57) 19 20 A1 21 25 22 26 A2 A3 55 54 33 34 35 39 A4 36 38 23 Pipe – Elbow – 12” 24 Elbow – 12” 37 GROUP 23 – CONDENSATE 156/179 App. F.2 - BWR Systems Drawings CONDENSATE PIPING TO BOOSTER PUMP (Sheet 3 of 3) (Covers Worksheets PCS-CONDBPMP – 1 thru 57) 31 A3 30 32 56 57 A2 27 28 29 GROUP 24 – CONDENSATE 157/179 App. F.2 - BWR Systems Drawings BOOSTER PUMP PIPING TO FW PUMP (Sheet 1 of 6) (Covers Worksheets PCS-CONDFWPMP – 1 thru 65) 13 12 14 15 11 A1 16 17 19 10 18 8 9 7 6 A2 4 5 3 2 1 CONDENSATE BOOSTER PUMP A1 GROUP 24 – CONDENSATE 158/179 App. F.2 - BWR Systems Drawings BOOSTER PUMP PIPING TO FW PUMP (Sheet 2 of 6) (Covers Worksheets PCS-CONDFWPMP – 1 thru 65) 27 A3 LOW PRESSURE HEATER INLET 20 21 A2 22 23 24 26 25 59 - LP HEATER SHELL 60 - LP HTR HEADS 61 - LP HTR INLET/OUTLET NOZZLES 62 - LP HTR TUBES 63 - LP HTR TUBESHEET 64 - LP HTR STEAM INLET NOZZLE 65 - LP HTR COND. DRAIN NOZZLE GROUP 24 – CONDENSATE 159/179 App. F.2 - BWR Systems Drawings BOOSTER PUMP PIPING TO FW PUMP (Sheet 3 of 6) (Covers Worksheets PCS-CONDFWPMP – 1 thru 65) 30 31 29 28 A3 34 LP HEATER OUTLET 35 33 32 A4 160/179 App. F.2 - BWR Systems Drawings GROUP 24 – CONDENSATE BOOSTER PUMP PIPING TO FW PUMP (Sheet 4 of 6) (Covers Worksheets PCS-CONDFWPMP – 1 thru 65) A7 A6 37 38 A5 48 36 47 50 49 A4 A6 39 45 40 41 42 43 44 A5 46 161/179 GROUP 24 – CONDENSATE App. F.2 - BWR Systems Drawings BOOSTER PUMP PIPING TO FW PUMP (Sheet 5 of 6) (Covers Worksheets PCS-CONDFWPMP – 1 thru 65) 55 54 53 56 FW PUMP 52 51 A7 162/179 GROUP 24 – CONDENSATE App. F.2 - BWR Systems Drawings BOOSTER PUMP PIPING TO FW PUMP (Sheet 6 of 6) (Covers Worksheets PCS-CONDFWPMP – 1 thru 65) 57 58 CONDENSATE BOOSTER PUMP (1CB01PA) PUMP NOZZLES GROUP 25 – REACTOR WATER CLEANUP 163/179 App. F.2 - BWR Systems Drawings RR PIPING to PUMPS (Sheet 1 of 5) (Covers Worksheets SS-RWCUPMPS – 1 thru 65) 19 18 17 16 A1 15 14 10 11 12 13 RR SYSTEM GROUP 9, SHEET 1 9 8 1 2 3 4 5 6 7 GROUP 25 – REACTOR WATER CLEANUP 164/179 App. F.2 - BWR Systems Drawings RR PIPING to PUMPS (Sheet 2 of 5) (Covers Worksheets SS-RWCUPMPS – 1 thru 65) A2 31 30 29 28 ARY PRIM ENT AINM T N O C 27 26 25 A1 RPV DRAIN CONNECTION 24 23 22 21 20 DARY SECON ENT INM CONTA GROUP 25 – REACTOR WATER CLEANUP 165/179 RR PIPING to PUMPS (Sheet 3 of 5) App. F.2 - BWR Systems Drawings (Covers Worksheets SS-RWCUPMPS – 1 thru 65) A3 43 42 40 41 39 38 37 36 35 34 33 32 A2 GROUP 25 – REACTOR WATER CLEANUP RR PIPING to PUMPS (Sheet 4 of 5) (Covers Worksheets SS-RWCUPMPS – 1 thru 65) A3 RWCU PUMP SUCTION 52 51 45 166/179 App. F.2 - BWR Systems Drawings 50 44 53 49 48 47 46 54 GROUP 25 – REACTOR WATER CLEANUP RR PIPING to PUMPS (Sheet 5 of 5) (Covers Worksheets SS-RWCUPMPS – 1 thru 65) 56 55 57 58 59 60 61 65 64 63 62 RWCU PUMP (1G-33-C001A) 167/179 App. F.2 - BWR Systems Drawings GROUP 26 – REACTOR WATER CLEANUP 168/179 RWCU PUMP PIPING to NRHX/RHX (Sheet 1 of 7) App. F.2 - BWR Systems Drawings (Covers Worksheets SS-RWCUHX – 1 thru 49) RWCU PUMP DISCHARGE 1 2 3 A1 4 15 5 14 13 12 6 8 11 10 9 7 GROUP 26 – REACTOR WATER CLEANUP 169/179 RWCU PUMP PIPING to NRHX/RHX (Sheet 2 of 7) App. F.2 - BWR Systems Drawings (Covers Worksheets SS-RWCUHX – 1 thru 49) 17 16 A2 A1 GROUP 26 – REACTOR WATER CLEANUP RWCU PUMP PIPING to NRHX/RHX (Sheet 3 of 7)App. F.2 - BWR Systems170/179 Drawings (Covers Worksheets SS-RWCUHX – 1 thru 49) A3 18 OTHER HX TRAIN 19 A2 GROUP 26 – REACTOR WATER CLEANUP RWCU PUMP PIPING to NRHX/RHX (Sheet 4 of 7) (Covers Worksheets SS-RWCUHX – 1 thru 49) 171/179 App. F.2 - BWR Systems Drawings 26 25 24 23 22 21 27 REGENERATIVE HX INLET 20 A3 A4 GROUP 26 – REACTOR WATER CLEANUP RWCU PUMP PIPING to NRHX/RHX (Sheet 5 of 7) (Covers Worksheets SS-RWCUHX – 1 thru 49) A4 26 27 32 29 30 28 31 172/179 App. F.2 - BWR Systems Drawings GROUP 26 – REACTOR WATER CLEANUP 173/179 App. F.2 - BWR Systems Drawings RWCU PUMP PIPING to NRHX/RHX (Sheet 6 of 7) (Covers Worksheets SS-RWCUHX – 1 thru 49) 35 RETURN OUTLET N4 34 39 SUPPLY INLET N1 33 RETURN INLET N3 36 TUBESHEETS 37 TUBES 38 BAFFLES 40 FITTINGS SUPPLY OUTLET N2 REGENERATIVE HX GROUP 26 – REACTOR WATER CLEANUP 174/179 App. F.2 - BWR Systems Drawings RWCU PUMP PIPING to NRHX/RHX (Sheet 7 of 7) (Covers Worksheets SS-RWCUHX – 1 thru 49) 41 RWCU OUTLET 43 SW INLET 48 44 42 45 TUBESHEETS 46 TUBES 47 BAFFLES 49 FITTINGS RWCU INLET NON-REGENERATIVE HX SW OUTLET GROUP 27 – REACTOR WATER CLEANUP 175/179 App. F.2 - BWR Systems Drawings RWCU PIPING TO FILTERS (Sheet 1 of 2) (Covers Worksheets SS-RWCUFLTR – 1 thru 31) PLANT DRAWINGS NOT AVAILABLE 28 27 26 A2 5 1 14 6 2 9 7 A1 13 10 12 15 3 Pipe - Elbow 4 Elbow – 4” 11 8 Valve - Elbow GROUP 27 – REACTOR WATER CLEANUP 176/179 App. F.2 - BWR Systems Drawings RWCU PIPING TO FILTERS (Sheet 2 of 2) (Covers Worksheets SS-RWCUFLTR – 1 thru 31) CLEANUP FILTER DEMINERALIZER 18 Pipe - Elbow 19 Elbow – 3” 29 Demin. Shell 30 Demin. Nozzles 31 Demin. Fittings 25 24 A1 A2 20 16 17 21 22 23 GROUP 28 – REACTOR WATER CLEANUP 177/179 HX OUTLET PIPING to FEEDWATER (Sheet 1 of 3)App. F.2 - BWR Systems Drawings (Covers Worksheets SS-RWCUFW – 1 thru 26) 4 3 2 A1 9 8 1 15 11 14 10 7 12 13 5 6 RHX RETURN OUTLET GROUP 28 – REACTOR WATER CLEANUP 178/179 HX OUTLET PIPING to FEEDWATER (Sheet 2 of 3)App. F.2 - BWR Systems Drawings (Covers Worksheets SS-RWCUFW – 1 thru 26) 16 A1 A2 17 18 GROUP 28 – REACTOR WATER CLEANUP HX OUTLET PIPING to FEEDWATER (Sheet 3 of 3)App. F.2 - BWR Systems179/179 Drawings (Covers Worksheets SS-RWCUFW – 1 thru 26) 22 A2 23 21 24 25 20 26 19 FEEDWATER TO RPV GROUP 19, SHEET 2