Comments
Transcript
Donald C. Cook Nuclear Plant NFPA 805 Pre
Donald C. Cook Nuclear Plant NFPA 805 Pre--LAR Submittal Meeting Pre Presented by: Richard Gray – NFPA 805 Project Manager Dan MacDougall – SSD Engineer Jim Hawley – Supervisor, Risk Management Michael Scarpello - Manager, Regulatory Affairs 1 Meeting Purpose Project Status ¾ Nuclear Safety Capability Assessment (NSCA) ¾ Fire Modeling ¾ Fire PRA ¾ Fire Risk Evaluation (FRE) ¾ Fire Safety Analysis (FSA) ¾ Recovery Actions (RAs) ¾ Monitoring Program ¾ NPO Analysis LAR Submittal and Implementation 2 Nuclear Safety Capability Assessment (NSCA) z Documents Chapter 4 Compliance z NFPA 805 Analysis Model (SAFE) z Fire Area Analysis y Strategies g z Identification of VFDRs z Status - Analysis Complete 3 Fire Modeling ¾Used Verified & Validated (V&V’d) Fire Models ¾57 Fire Areas ¾18 Deterministic, ¾39 Performance Based ¾Process followed NUREG/CR-6850 and the Fire PRA Standard ¾Performed over 900 scenarios supporting the Fire PRA ¾Status - Complete 4 Fire PRA ¾ Fire PRA Peer Review - October, 2009 by WOG ¾ Fire PRA Integrated with Internal Events PRA ¾ No Significant g Finding g ¾ 61 F&Os - 36 Suggestions, 25 Findings – All Impacts Resolved ¾ PWROG Indicated That Overall, the Fire PRA Quality was Found to be Very Good with Many Elements Being Performed at the State-of-the-Art Level ¾ Status – Analysis Complete 5 Fire Risk Evaluation ¾ Determined Delta Risk between Compliant Plant and NFPA 805 Plant ¾ Over 900 Scenarios Evaluated ¾ Over 260 VFDR Risk Evaluations ¾ Based on NUREG-6850 Guidance ¾ Status – Analyses Complete 6 Fire Safety Analysis ¾ 57 FSAs Document Each Fire Area ¾ Fire Protection Systems and Features ¾ NSCA Compliance Strategy ¾ VFDRs VFDR and d Recovery R Actions A ti ¾ Fire PRA Risk Evaluation Results ¾ Radioactive Release Review ¾ NPO Compliance Review ¾ Monitoring Program Input ¾ Defense-In-Depth and Safety Margin Review ¾ Status - Complete 7 Recovery Actions Appendix R ¾Cold Shutdown – 1221 OMAs ¾Hot Standby – 598 OMAs NFPA 805 ¾VFDRs - 260 ¾Recovery Actions – 140 ¾Status – Evaluations Complete 8 Monitoring Program z Scoping of Fire SSCs based on Key Programmatic Elements and Engineering Assumptions z Screening Using Risk Criteria – CDF and LERF z Risk Target Value Determination based on Risk Assessment z Monitoring Implementation To Be Consistent with FAQ-0059 9 Non--Power Operations Non ¾ Higher Risk Evolution (HRE) Key Safety Functions (KSF) Contingency Plans/Protective Measures Identified ¾ Reviewed Existing Plant Outage Processes to Determine Equipment Required for KSF, Including Support Functions ¾ Established Defense-In-Depth Features ¾ Update Procedures Before “Going Live” 10 LAR Status z Using NEI Template z Nine Packages + Assembly – 3rd Party Review z Eight Packages Complete z No Significant Gaps or Alternate Methods z Completion Target for Final Review – 5/31/2011 11 Project Implementation z Modifications and Implementation Items to be Completed Prior to Issuance of NRC SE – MOV IN 92-18 Mods – Conversion of CO2 Systems from Manual to Automatic – Transient Combustibles Control with Combustible Free Zones (CFZ) – Develop Monitoring and NPO Programs – Update Procedures and Other Documentation z Training After Receipt of NRC SE z “Go Live” 90 Days after Receipt of NRC SE 12 Summary z z z z z Complete LAR to be Forwarded On or Before 6/29/2011 Nothing Unique or Challenging No Issues Requiring Enforcement Discretion Modifications to be Completed Prior to Issuance of NRC SE “Go Live” 90 Days after Receipt of SE (To Allow for Training) 13