...

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR NOTES

by user

on
Category: Documents
14

views

Report

Comments

Transcript

Bellefonte Nuclear Plant, Units 3 & 4 COL Application Part 2, FSAR NOTES
Bellefonte Nuclear Plant, Units 3 & 4
COL Application
Part 2, FSAR
NOTES
1. SEE SHEET 2 FOR TRASH RAKE, TRAVELING SCREEN
AND SCREEN WASH PUMP.
MOTOR DRIVEN
FP PUMP
RECIRC LINE
2. ALTERNATE GRAVITY FLOW MAKE UP TO SWS COOLING
TOWER BASIN PER AP1000 DCD 9.2.1.2.2.
RWS
CITY OF
HOLLYWOOD,AL.
MUNICIPAL
WATER SUPPLY
ABBREVIATIONS
METER
FPS
RWS
RWS
FPS
DIESEL DRIVEN
FP PUMP
RECIRC LINE
FIRE PROTECTION SYSTEM
RWS
RAW WATER SYSTEM
SWS
SERVICE WATER SYSTEM
SECONDARY
FIRE WATER TANK
FIG 9.5.1-1 SH1
NOTE 2
RWS
PRIMARY
FIRE WATER TANK
FIG 9.5.1-1 SH1
DEMINERALIZED WATER TREATMENT SYSTEM
FPS
LCV
FPS
LCV
DTS
SWS COOLING TOWER
BASIN A
BASIN B
M
NC
GRANULAR MEDIA
FILTER
RWS
NC
SWS
M
LCV
NOTE 1
INTAKE STRUCTURE
BASIN B
ANCILLARY RWS
PUMPS
2-100%
RWS
BACKWASH
TO RIVER
DTS
SUPPLY TO DTS
FCV
CONSTRUCTION
WATER SUPPLY
FCV
BLN SUP 9.2-2
FIGURE 9.2-201 (Sheet 1 of 2)
Raw Water System Flow Diagram
Rev 0
Bellefonte Nuclear Plant, Units 3 & 4
COL Application
Part 2, FSAR
NOTES
M
ABBREVIATIONS
CWS
RWS
TCS
INTAKE STRUCTURE
BASIN A
M
CIRCULATING WATER SYSTEM
RAW WATER SYSTEM
TURBINE BUILDING CLOSED
COOLING WATER SYSTEM
M
CWS COOLING TOWER
RWS
CWS
M
TO CWS FILL
CONNECTION
DCD 10.4.8.2.3
M
FLOATING BOOM
INTAKE STRUCTURE
BASIN B
RWS
INTAKE CHANNEL
CWS
ALTERNATE COOLING
TO TCS HX'S
SLUICE
TO RIVER
SLUICE
TO RIVER
BACKWASH
TO RIVER
BACKWASH
TO RIVER
BLN SUP 9.2-2
TRASH
RAKES
TRAVELING
SCREENS
RWS
PUMPS
AUTOMATIC
STRAINERS
SCREEN WASH
PUMPS
2-100%
2-100%
3-50%
3-50%
2-100%
FIGURE 9.2-201 (Sheet 2 of 2)
Raw Water System Flow Diagram
Rev 0
Fly UP