L-2010-033 C-200, OFFSITE DOSE CALCULATION MANUAL ... MARKED UP PAGES (5 PAGES)
L-2010-033
C-200, OFFSITE DOSE CALCULATION MANUAL REVISIONS 31B
MARKED UP PAGES (5 PAGES)
Procedufe No
ST. LUCIE PLANT
P
o
WFP
L
CHEMISTRY OPERATING
PROCEDURE
evis!Or- [.
Curt
Effective Date
SAFETY RELATED
10/06108
REFERENCE USE
Title:
J o
•OFFSITE DOSE CALCULATION MANUAL
(ODCM)
-N
0
P
4g
Responsible Department: CHEMISTRY
g8
z
REVISION SUMMARY:
,
Revision 31B- Incorporated PCR 08-5161 to correct typo on page 227. (Bruce Vogel,
e
LL0
M
uj
10/03/08)
>L
AND
Incorporated PCR 08-4568 to reflect change of title of COP-05.02. (Bruce Vogel, 09/10/08)
<
Revision 31A - Incorporated MC 08-2706 for CR 08-18187 for minor correction to
Table 4.11-2 for clarification. (Bruce Vogel, 06/04/08)
Revision 31 - Incorporated PCR 08-0367 for CR 07-42134 to make changes due to NP-922
cancellation (EV-AA-01 is replacement) and add 6 perimeter wells to program. (Bruce Voge
04/29/08)
Revision 30- Incorporated PCR 08-0180 to add surveillance of Cask Handling Facility (CHF
exhaust vent. (Glenn Adams, 02/12/08)
AND
Incorporated PCR 07-4244 to add surveillance of Cask Handling Facility (CHF) exhaust ventL
(Glenn Adams, 12/13/07)
Revision 29 - Incorporated PCR 07-0684 to add changes required to implement the industr) Y
initiative under Nuclear Policy, NP-922. (Edwin Burgos, 03/13/07)
Ch
0
#-4
Revision
0
FRG Review Date
04/22/82
Revision
FRG Review Date
31B
04/28/08
AApproval
By
Approved
C. M. Wethy
Plann!General Manager
Approved By
C. Costanzo
Plant General Manager
N/A
Authorized Approver
M an Day
Authorized Approver
(Minor Correction)
Da'te
04127182
Approval Date
04/29/08
S.OPS
DATE
DOCT
PROCEDURE
DOCN
COM
ITM
1c0r03t08
C-200
SYS
COMPLETED
31B
109KL3l
1-794
REVISION NO.:
PROCEDURE TITLE:
31 B
PAGE'K•$•.ý
OFFSITE DOSE CALCULATION MANUAL (ODCM)
PROCEDURE NO.:
C-200
0..
1223 of 230
ST. LUCIE PLANT
APPENDIX B-2
RADIOLOGICAL ENVIRONMENTAL SAMPLING IN SUPPORT OF THE INDUSTRY INITIATIVE
(Page 1 of 2)
ST. LUCIE PLANT
Key to Sample Locations
STATE
ID
H70
H71
H72
H73
H74
H75
PSL ID
GIS-MW-ES
GIS-MW-EI
GIS-MW-SI
GIS-MW-SWS
GIS-MW-SWI
GIS-MW-WI
SAMPLES
COLLECTED
Tritium / Gamma
Tritium /Gamma
Tritium / Gamma
Tritium / Gamma
Tritium / Gamma
Tritium / Gamma
SAMPLE
FREQUENCY
Quarterly
Quarterly
Quarterly
Quarterly
Quarterly
Quarterly
LOCATION DESCRIPTION
West of AlA; between the discharge canal and Gate "B"
West of AlA; between the discharge canal and Gate "B"
South of Intake canal and the adjacent access road
S1W corner of Intake canal and the adjacent access road
S/W corner of Intake canal and the adjacent access road
West of plant site and intake canal; South of switchyard
Y
It is the policy of Florida Power & Light Company (FPL) that the St. Lucie 1 & 2 Radiological Environmental Monitoring Programs are
conducted by the State of Florida Department of Health (DOH) and Bureau of Radiation Control (BRC), pursuant to an Agreement
between FPL and DOH and; that coordination of the Radiological Environmental Monitoring Programs with DOH and compliance with
the Radiological Environmental Monitoring Program Controls are the responsibility of the Nuclear Plant Support Services Department.
North of Simulator; South of Big Mud Creek
East of Barge Slip; By LU bldg
South of North Warehouse
West of AlA and East of Parking Lot
C.')
REVISION NO.:
31B
PAGE.*_u'.,_.
PROCEDURE TITLE:
OFFSITE DOSE CALCULATION MANUAL (ODCM)
ýr,
.f 2,;;13,11-;
--224of
N'
PROCEDURE NO.:
C-200
ST LUCIE PLANT
M2
APPENDIX B-2
RADIOLOGICAL ENVIRONMENTAL SAMPLING INSUPPORT OF THE INDUSTRY
INITIATIVE
(Page 2 of 2)
Specific sample locations and sampling periodicity shall be determined at a later date after
collection of sufficient data to make a location determination
Until further notice, sample collection points, sampling periodicity, and analyses to be
performed in support of the INDUSTRY INITIATIVE NEI 07-07 shall be at the discretion of
) Manager.
'
the Reftý
END OF APPENDIX B-2
NA
06
0
PAGE l.
PROCEDURE TrTLE:
REVISION NO,:
.....of 230
OFFSITE DOSE CALCULATION MANUAL (ODCM)
31B
,
!
,
-
PROCEDURE NO:
,
ST. LUCIE PLANT
C-200
E?
FIGURE 1-3
RADIOLOGICAL ENVIRONMENTAL SAMPLING LOCATIONS IN SUPPORT OFTHE
INDUSTRY INITIATIVE
(Page 1 of 1)
V.
0"1 ... '--0"--+•
;: ::•+'
:
:;"+:;•
"•"+'::':"+=+••,•-
..
.
+;b'•
" "'+'='++: +:,,:;
+.
+.•
0
•
..
'.......
..,..._'
amm
C'
i3i
\,
"%\
IDWATER PROTECTION
PROCEDUR
O\
/.r~47
o-cpo
P
LUCIE PLANT
T
x~-
SIITJJ OIJ~ARY'ýELLS/'
a.
..
I"
,
~.
4~
..
gi/
,:i/
AW
GGW....
,,
SW
N~
-
.FT
'75)
(
..
.
......
.....
.2v
.'gap
-*
. . . . . . . .L
0~~~ 11
Gi-&7
CS..
VOW*bft,%
0)
~~~g%00~V-6
..
~
~
0
~
~O V
.
.4.,,
Fly UP