Comments
Description
Transcript
C . NR Enhanced Shield S
January 22 22, 2014 1 Licensee Assessment of AP1000® Enhanced Shield Building Design for Licensing Basis Compliance Public ub c Sess Session o with t U U.S. S NRC C C. Next Steps - Phase 2 Assessment B. Assessment Results A. Scope of Phase 1 Assessment II. High-Level Summary: Shield Building A Assessment t Results R lt Aff Affecting ti License Li I. Vendor Oversight Process Presentation Topics 2 2 Focus area selection Licensing basis compliance Results of the process to date Next assessments Completed assessments • • Systematic approach Joint effort (Consortium/SCE&G/SNC) Vendor Oversight Process 3 • • • • Experienced E i d team t (>150 years)) Preparation for inspection Inspection Results Shield Building Phase 1 Assessment Vendor Oversight Process 4 – Design g Calculations,, Drawings, g , DCPs,, and E&DCRs Documents Reviewed: – Penetrations in SC Cylindrical y Wall – SC Cylindrical Wall Panels • Auxiliary Building Walls and Roof Connection • Horizontal Connection - Elevation 100 100’, Plant West Side • Vertical Connection – Elevation 100’ to 149’-6” • Horizontal Connection – Elevation 149’-6”, Plant East Side 5 – Reinforced Concrete (RC) to Steel & Concrete Composite (SC) Mechanical Connections November 44-8, 8, 2013 - Phase 1 Assessment: Scope of Phase 1 Assessment High-Level Summary High-Level Summary 6 Incorporate in SNC LAR 13-014 • • All Documented via Issue Reports ((IRs)) in Westinghouse g Corrective Action Program No design changes were identified 6 Design Basis Documentation Issues • 1 Li Licensing i Basis B i Di Discrepancy 57 Requests for Information Generated Phase 1 Assessment Results High-Level Summary 7 • • • • • Air Inlet and Tension Ring SB Roof R f Knuckle Region Compression Ring PCS Tank ( (expected t d 2nd Quarter Q t 2014) Phase 2 Assessment Next Steps 8 Design Change Proposal Engineering and Design Coordination Report License Amendment Request P i Containment Passive C t i t Cooling C li System S t Reinforced Concrete Steel & Concrete Composite DCP: E&DCR: LAR: PCS PCS: RC: SC: Acronym List 9