MTU Mechanical Recommissioning
MTU Mechanical Recommissioning
Building (built
1985)
1
2
3
4
5
6
7
8
9
10
11
12
Food Service
22
23
24
25
clg tons
QTY
14000
100%
1
Food Service
Food Service
100% OA
AHU
5
5
7500
7500
100%
30%
1
1
School
AHU
HV-3
Bakery
Dining
Library/
Offices
1.5
3000
10%
1
School
AHU
HV-1
Classrooms
3
6550
100%
1
School
HV-2
Classrooms
1.5
3200
30%
1
School
AHU
AHU
Aud. AHU
7.5
9000
30%
School
Pump
Auditorium
FTR and
Conv
1.5
84/35
School
Ex fans
Roof Ex. Fans Misc areas
School
Air Cond
School
Air Cond
Split Systems Misc Offices
School
AHU
Ceiling Hung Misc Offices
Vocational
Field House
Field House
Housing unit D, E
21
% OA
7.5
18
20
CFM or
gpm/head
Kitchen
Field House
19
HP
SAF/RAF or
pump
100% OA
16
17
Description Serves
MUAU
MUAU
AHU
Vocational
13
14
15
Equip.
Housing unit D, E
Housing unit D, E
Housing unit A, B, C
Housing unit A, B, C
Housing Unit F
Ex fans
AHU
AHU
AHU
Ex.Fan
AHU
Pump
RTU
Roof Ex. Fans
Misc Offices
Shop area
summer
vent.
Shop area
Gym
H&V 4,5,6,7
(2)AHU
(3) zone
Multizone Lobby/office
AHU
(5) Exhaust
Building
Fans
Common
(5) zone MZ area make
up air
(6) zone
FTR zones
pumps
-
1
2
1600
30%
4
3
2
10
3
1
fract.
5
6300
100%
30%
4
2
5430
45%
1
5
6650
17%
fract.
Cells
5
10760
50%
3
Ex.Fan
(4) exhaust
fans
Cells
fract.
825 to 1580
5
6100
100%
1
5
7000
17%
1
Housing Unit F
Roof Ex. Fans
26
27
28
Administration
Administration
Ex.Fan
AHU
Pump
29
Administration
Ex.Fan
3
3
1
2
12
12
6
6
1
1
5
1
1
3
4
2
4
4
4
3
3
10
6
5
6
(6) zone MZ
Pump
1
1
2
AHU
Housing Unit F
3
2
3
(5) zone MZ
(6) zone
pumps
(5) exhaust
fans
AHU
FTR
1
4 (2 Relief air)
5
0%
Housing Unit F
1
1
1
1
1
1
120 to 1730
AHU
1
Replace Outside,
Replace
Replace
Return air, Exhaust air
zone valve Pump
dampers
10
7.5
2
Fract.
AHU
AHU
1
Replace
F&B
damper
10
Building
Cells
ventilation
Day room
1
1
1
5
(3) Ex. Fan a
Ex.Fan
Replace
Replace Ex
Multizone
fans
dampers
Rebuild
RAF
2
fract.
2
Rebuild
SAF
6
3
4
FTR zones
Fract.
Cells
Fract.
730 to 3100
Building
Building
3
(1)/ ¾
2785
0
30%
0%
2
1
0
0
0
0%
1
18
9
5
1
3
12
1
1
1
5
QTY
Total Estimated Cost
$
5
2
3
1
25
896,828
1
44
36
6
48
20
21