Alternative 1 No-Build
Alternative 2A Widen Existing Bridges
Alternative 2B North of Existing Bridges
Hope to Tryon Crossing Location
Hope to Pine/Hickory Crossing Location
Alternative 3 New Bridge from Hope to Tryon
Alternative 4A New Bridge from Hope to Pine/Hickory
Hope to Pine/Hickory Crossing Location
Add-ons
Alternative 4B New Bridge + Widen Existing Bridges
Alternative 4C New Bridge + connection to Salem Pkwy &OR 22
Alternative 4D New Bridge with shortened Pine/Hickory couplet
Alternative 4E New Bridge, reduced impacts to Wallace Marine Park
Cost Comparisons
No-Build:
2A:
2B:
3:
4A:
4B:
4C:
4D:
4E:
no new costs
$148 million
$388 million
$501 million
$306 million
$451 million
$692 million
$687 million
$708 million