DEIS Alternatives December 17, 2012
DEIS Alternatives December 17, 2012 Existing Crossing Location Alternative 1 No-Build Alternative 2A Widen Existing Bridges Alternative 2B North of Existing Bridges Hope to Tryon Crossing Location Hope to Pine/Hickory Crossing Location Alternative 3 New Bridge from Hope to Tryon Alternative 4A New Bridge from Hope to Pine/Hickory Hope to Pine/Hickory Crossing Location Add-ons Alternative 4B New Bridge + Widen Existing Bridges Alternative 4C New Bridge + connection to Salem Pkwy &OR 22 Alternative 4D New Bridge with shortened Pine/Hickory couplet Alternative 4E New Bridge, reduced impacts to Wallace Marine Park Cost Comparisons No-Build: 2A: 2B: 3: 4A: 4B: 4C: 4D: 4E: no new costs $148 million $388 million $501 million $306 million $451 million $692 million $687 million $708 million