Electric Vehicle Charging Stations – Ready for Business
by user
Comments
Transcript
Electric Vehicle Charging Stations – Ready for Business
FOR IMMEDIATE RELEASE Friday, Sept. 30, 2011 CONTACT: Nicole Miller, Public Information Manager City of Salem – Urban Development Department Tel: 503-588-6178, ext. 7552 Email: [email protected] Website: www.cityofsalem.net Electric Vehicle Charging Stations – Ready for Business 14 public electric vehicle stations now available in Salem Salem, Ore., Fri., Sept. 30, 2011 –– 14 Electric Vehicle (EV) charging stations have been installed at public locations in Salem. They are located at: Salem Public Library (2 stations), Salem Conference Center (2 stations), Marion Parkade (2 stations), West Salem Library (2 stations), Chemeketa Parkade (4 stations), and Riverfront Park (2 stations). The stations were made possible through a cooperative agreement between the City of Salem, ECOtality, and Salem Electric, who donated $3,000 to the program which supported the installation of eight of the 14 stations. The EV charging stations are capable of servicing two vehicles in adjacent parking spots. One parking space at each charging station is restricted to EV parking only. There are currently no plans to establish time limits for parking spots designated for EV charging. However, if there is an existing time limit for the parking space, that limit remains in effect. ECOtality will be begin experimenting with different revenue models, which include using the Blink© network, beginning in 2012. To learn more about the EV Project and the Blink© network, go to www.theevproject.com. For maintenance concerns regarding any of Salem’s charging stations please contact the City of Salem Facilities Division at 503-588-6306. For general questions regarding Salem’s charging stations, please contact Robert Chandler at 503-588-6008 or visit www.cityofsalem.net and refer to the “What’s New” section to view an updated EV fact sheet. ### Electric Vehicles Frequently Asked Questions Salem, Oregon Electric vehicles and electric vehicle charging stations are now in Salem. What is The Electric Vehicle Project? Oregon has been named as one of seven test markets as part of a $99.8 million federally funded effort known as The Electric Vehicle Project (The EV Project). ECOtality North America was awarded the grant and will install nearly 15,000 EV charging stations in test market areas in Oregon, Washington, California, Arizona, Tennessee, Texas, and Washington D.C. In Oregon, approximately 1,100 vehicle charging stations will be installed in partnerships with business owners and public agencies, primarily located in the Portland, Salem, Corvallis, and Eugene metropolitan areas. Between 2011 and 2013, The EV Project will collect and analyze information about the electric vehicles and the charging systems to collect and analyze data from EV users and EV-related infrastructure to evaluate the effectiveness of EV charging infrastructure; and to conduct trials of various revenue systems for commercial and public charging infrastructure. Where are Salem’s EV charging stations located? A total of 14 charging stations are available in six public parking areas: Salem Public Library (2 Stations), Salem Conference Center (2 Stations), Marion Parkade (2 Stations), West Salem Library (2 Stations), Chemeketa Parkade (4 Stations), and Riverfront Park (2 Stations). Will it cost to charge my car? During an introductory period through the summer of 2011, users will be able to charge their vehicles at no cost. After this introductory period ECOtality will begin experimenting with different revenue models, which includes using the Blink© network, as part of the research project. Membership in the Blink© network allows users to schedule charges and facilitate payments. To find out more about the Blink© network go to www.blinknetwork.com. What do the charging stations look like? The charging stations are provided by ECOtality and are built by Rousch Manufacturing. There are two types of charging stations, wall-mounted and pedestal models. Are the charging stations covered? The charging stations located in the City-owned Marion Parkade, Chemeketa Parkade, and Salem Conference Center are covered. The remainder of the stations are uncovered. Is there a time limit on the designated parking spots? There are currently no plans to establish time limits for parking spots designated for EV charging. However, if there is an existing time limit for the parking space, that limit will remain in effect. Blink© pedestal station. 092311 What are the parking restrictions for the spots associated with the EV charging station? One of the parking spaces at each of the 14 charging stations will be restricted to EV parking only. There will be no restrictions on the adjacent parking space. What is the cost of installing the EV charging stations? T total value for these 14 EV charging stations has been estimated by The ECOtality to be approximately $75,000, which includes $40,500 for installation costs. As a result of our partnership with ECOtality and Salem Electric, the City’s cost-share is only $2,500. Who is responsible for the installation and on-going operation and maintenance? ECOtality will be responsible for the on-going operation and maintenance through 2012. If you have any maintenance concerns about any of Salem’s charging stations please contact the Facilities Division at 503-588-6306. What is the long term plan for the EV Charging Stations? ECOtality will retain title and ownership of the charging stations during the term of The EV Project data collection phase, which is scheduled to terminate on December 31, 2012. After the term ends, there are four options available to the City: (1) assume title and ownership of the equipment and continue to use the ECOtality-provided Blink charging network, likely for a fee; (2) keep the equipment in place and use another charging network system, or no system at all; (3) remove the ECOtality-provided charging equipment but keep the mounting, electrical wiring, signs, etc. and install another brand of charging equipment in its place; or (4) direct ECOtality to remove all of the equipment and restore the site to a safe and reasonable condition. Who should I contact if I have other questions about Salem’s charging stations ? For general questions please contact Robert Chandler at 503-588-6008. Where can I find more information about electric vehicles and charging infrastructure? Additional information regarding The EV Project can be found at www.theevproject.com. A fact sheet about charging electrical vehicles at home is available from the Oregon Building Codes Division: www.cbs.state.or.us/bcd/pdf/4905.pdf. Information about electric vehicles, charging infrastructure, tax incentives, and a list of public charging stations is available from the U.S. Department of Energy: www.afdc.energy.gov/afdc/vehicles/electric.html. Information, news, and events related to electric vehicles in Oregon is available from Drive Oregon: www.htdriveoregon.org. Si necesita ayuda para comprender esta información, por favor llame 503-588-6178. 092311 I SILAS KI G WO P IE D M N WIL LIE OD S 3RD R TE NK GE FRA RU N 14T H CH ES LIN ZA 1,500 WB P LA ELM 3RD R O EM OS ER AT EW G ED AV D 2N D 3R M EL Feet NT R E UG H 6T H 7T West Salem Library (2 Stations) TN U VALLEY VIEW T HILLTOP KAREN CA RDI N AL GLEN CREEK 9TH UR 8TH Turnage Brook PO R CA 7TH WA Y PA RK ON T LO TT IE E C AD TH AR VIEW OVERLOOK ELSEA CH ETT ASS ALPINE DORVAL Updated 8/2011 o Salem Library (2 Stations) Salem Conference Center (2 Stations) KEARNEY AS MIS SIO N LES LIE OA K MIL L TR A DE FER RY ETA UN DIV ISIO N EM EK ALL CH SA LEM D BE LLE VU E R SG M DA L LAS MU T LE 1S SA E AV Riverfront Park (2 Stations) B TAYBIN CALICO CALICO CAMEO SAGINAW r Rive mette Willa H HIG ION D DE LE TRA G ES LA 4TH MA R MA R KE T CO UR T JEF FER M ES ISO T Mill R A ace EKE T STA TE CO UR CH EM N AS KA ee k A D E NE BR GA IN FER RY CE NTE R SO N MA D This product is provided as is, without warranty. In no event is the City of Salem liable for damages from the use of this product. This product is subject to license and copyright limitations and further distribution or resale is prohibited. MIL L NO RW AY SH IPP I NG Marion Parkade (2 Stations) NT ION E BE LM O HO OD Chemeketa Parkade (4 Stations) GA IN GE LARKSPUR CH Y LIB ER T R WIN TER City of Salem Electric Vehicle Charging Stations FIR 12T H ER RM WA Y BR OA D 5TH CH UR CH GE CO TTA PIT OL OY MC C H 12T T NE SU MM ER T STE WA R FRO NT CO M ME RC IAL UR LA CO TTA EO CH T ON SEM RO LIA G NO MA WIN TE TE NA SE WA VER LY RTH GE CA N SO 12T H K 13T H TER PAT 13T H L AR r 15T H R MU E 14T H AC GA R LL WA ill C P RI N 092311