Comments
Description
Transcript
Development Bulletin Special Interest
Development Bulletin Special Interest Staffing Changes Assistant Director Robert Chandler started his new duties as Assistant Public Works Director on August 31, 2009. Robert was chosen after a lengthy and rigorous selection process. Robert graduated with a degree in mechanical engineering and served for ten years in the U.S. Navy as a nuclear submarine officer, serving on both fast attack and ballistic missile submarines. After he left active duty, he obtained his master’s and doctoral degrees in civil engineering from the University of Washington. Prior to joining Salem Public Works, he spent the previous 14 years at Seattle Public Utilities, working primarily in the stormwater arena. Beyond his work in the civilian world, Robert has continued to serve in the Navy reserves. Permit Specialist Marci Dumble has joined Public Works Development Services as a permit specialist. She previously worked as a permit specialist in the Engineering Division of Public Works and is quite familiar with permitting development projects in Salem. Volume 2 Development Districts (Continued from page 1) • S alem Alliance Church, a 47,000- square-foot mixed-use building on Broadway Street NE. • “Home Depot,” a 466,000-squarefoot distribution center on Aumsville Highway SE. • Maplewood Estates, a 20-lot subdivision on Skyline Road S. Final Design • First Church of the Nazarene, a 77,000-square-foot building expansion on Market Street NE. • Top to Bottom, a 19,000-square-foot retail clothing store on Lancaster Drive NE. Development Activity Charts NEW Single Family Permits 100 NEW Commercial Permits 30 20 50 10 0 0 Jul - Oct - Jan - Apr - Jul - OctSep '08 Dec '08 Mar '09 Jun '09 Sep '09 Dec '09 Jul - Oct - Jan - Apr - Jul - OctSep '08 Dec '08 Mar '09 Jun '09 Sep '09 Dec '09 Speculation and Land Use • Simpson Hills and Sustainable Fairview mixed-use developments at the 256-acre Fairview Training Center property on Strong Road SE. • Pringle Square mixed-use development at the Boise Cascade property on Commercial Street SE. • Salem Renewable Energy and Technology Center, an 80-acre technology center on Gaffin Road SE. • Mill Creek Corporate Center, a 500acre industrial development between Highway 22, Kuebler Boulevard SE, Turner Road SE, and Deer Park Road SE. • Multiple new schools proposed throughout Salem as part of the Salem/ Keizer School District bond approved by voters. Salem has seen consistent development throughout 2009, despite the reduction in residential development projects. We look forward to new economic opportunities in 2010. a publication of the City of Salem Public Works Development Services Section December 2009 Development Projects Salem has seen some exciting developments in the past year, and we continue to see a steady stream of new projects at all phases of development. Below are several noteworthy projects that are moving forward in the development process: Under Construction • O regon State Hospital renovation on Center Street NE, including a new street connection from Center Street NE to State Street. Site Plan Review (Continued from page 2) • W ater Place, a 41,000-square-foot commercial building on Liberty Road S along Pringle Creek. Credits 4 3 2 1 0 Jul - Oct - Jan - Apr - Jul - Oct-Dec Sep '08 Dec '08 Mar '09 Jun '09 Sep '09 '09 Editor—Glenn Davis Layout/Design—Louise Klukis Articles Contributed by Sara Jondahl, Bryan Colbourne, Bryce Bishop, and Gerry Pappe 503-588-6211 http://www.cityofsalem.net/ 555 Liberty Street SE Room 325 Unified Development Code With the help of a consultant, City staff is working to reorganize and consolidate the zoning code, and other applicable Salem Revised Code chapters relating to development, into a new Unified Development Code (UDC). The overall goal is to create a development code that is more user-friendly and easier to administer. The new code organization and structure is intended to rectify existing inconsistencies in the current development codes. Because the scope of the UDC project is focused primarily on the reorganization and clean-up of the Code, it is not the intent to address major policy issues relating to development. Any major policy issues identified through the process will, however, be catalogued and set aside for consideration through future Code amendments following an update to the City’s Comprehensive Plan. The new Code provisions are scheduled to be available for public review in Spring 2010. If you have any questions about the Unified Development Code, contact Bryce Bishop at [email protected]. Special Development Fees NEW Subdivision Permits 5 Code Revisions (Continued on page 2) • S almon Run Industrial Park, a 61,000-square-foot industrial building on McGilchrist Drive SE. This public meeting is intended to help customers determine what type of SPR their project requires; discuss what sort of conditions of approval, if any, might be expected; and generally promote good communication between City staff and the applicant early in the process. Of course, staff is still available from 8 a.m. to 5 p.m., Monday through Friday to assist you at the site plan review intake counter in the Permit Application Center or by request for a formal preapplication conference. Issue 3 (Continued on page 4) As featured in a previous newsletter, special development fees include development district fees, reimbursement district fees, temporary access fees, and connection fees. Many of these special development fees have successfully enabled development projects to be constructed while also ensuring that infrastructure is adequately funded. The infrastructure constructed using special development fees provides additional capacity for existing users and future development projects. Examples of projects using special development fees are as follows: Development Districts • M ill Creek Corporate Center provides funding for major street, water, stormwater, and sewer infrastructure needed to serve development projects on land previously used by the State of Oregon for agriculture. • Fairview Development District provides funding for major street and water infrastructure needed to serve development projects on the Fairview Training Center property. Reimbursement Districts • B rush College Reimbursement District provides funding for a trunk sewer main constructed in Brush College Road NW that serves approximately 800 acres of land west of Doaks Ferry Road NW in West Salem. • Bailey Ridge Reimbursement District provides funding for a trunk sewer main constructed along River Road S that serves approximately 1,300 acres of land in the Croisan/Illahe area. • Wallace Ridge Reimbursement District provides funding for stormwater improvements constructed along Liberty Road S. Temporary Access Fees • T emporary access fees provide funding for Skyline #2 Reservoir near Davis Road S at Skyline Road S. Approved projects include Bella Cresta Subdivision, VanNatta Place, Mendenhall Heights, Reserve at Red Leaf, Whispering Winds, and Maplewood Estates. • Temporary access fees for Bonaventure provide funding for the Boone Road Pump Station, which serves water to a significant portion of South Salem. Development Community News Procedures Site Plan Review (SPR) On January 1, 2009, the City of Salem began implementing the new Site Plan Review Ordinance. Site plan review applies to most new commercial, industrial, and multi-family development requiring a building permit. So far, the City has processed 174 Type One Site Plan Review applications and 28 Type Two Site Plan Review applications. Site Plan review is a land use application to review and approve site plans associated with new building permits. SPR applications may be submitted prior to or concurrent with a building permit application. It does not apply to single family dwellings or duplex development. Wednesday Site Plan Review Meetings The Salem Planning Division is now offering a new service for SPR applicants and those preparing to submit applications. Planning and Public Works staff are available every Wednesday afternoon at 2 p.m. in the Community Development Department Large Conference Room 305, City Hall, to review, discuss, and assist with SPR questions. There is no fee and no appointment is necessary to attend. (Continued on page 4) Final Plat Reviews The City Surveyor has observed that final plats often require multiple reviews. Developers and surveyors are advised the base fee for final plat reviews provides funding for only the first review and one revision. Additional reviews require extra plan review fees based on actual staff costs. If you have any questions, contact Gerry Pappe, City Surveyor, at [email protected]. Fire Service Plans City staff has observed that applicants have been confused by the City’s process concerning fire service plans. After receiving building plans, City staff will generally review for fire services within the first few days. If a fire service is proposed, then City staff will instruct the applicant to make a supplemental fire service plan submittal to the Public Works Department, including any additional plan review fees. This submittal will be routed to appropriate City departments and coordinated with the building plan review process. If you have any questions about fire service plan reviews, contact Sara Jondahl at [email protected]. A revision to Salem Revised Code Chapter 66 appeared before City Council on December 8, 2009. The revision changes the expiration process for Preliminary Declarations for Urban Growth Area Development Permits. Instead of a two-year expiration period, the Preliminary Declarations are proposed to remain valid as long as other associated development permits remain valid. City Council is still reviewing the proposed Code revision. Design Standards City staff is in the process of modifying all of the Public Works Design Standards. The most significant changes are proposed in the Stormwater Management Design Standards as described in previous newsletters. Once the final draft of the Design Standards is completed, they will be made available for review and comment before adoption through an Administrative Rule process. If you have any questions about the Design Standards, contact Ralph Lambert at [email protected]. Specifications A developer has requested to add high density polyethylene (HDPE) pipe to the approved list of materials for City water mains. Currently, ductile iron pipe is the only authorized pipe material for public water mains in Salem. Public Works staff is reviewing the proposal for cost effectiveness over the life of the facility, which includes factors such as installation cost, watertightness, longevity, safety, and ease of maintenance and operation. For comments or questions regarding the approval process for new materials, contact Ken Roley at kroley@cityofsalem. net. Driveways/Sidewalks on Private Streets (Continued from page 1) SRC Chapter 66 Neighborhood and Environmental Impacts This Code revision would reduce the need for tracking expiration dates and issuing extensions for projects that are moving forward in the development process. Notification of the Code revision was submitted to Neighborhood Association chairs. If you have any questions about the Code revisions, contact Glenn Davis, Chief Development Services Engineer, at gdavis@cityofsalem. net. Applicants may not be aware that Public Works permits are required on private streets. In particular, Public Works staff has observed that contractors often overlook inspection requests for new driveways and sidewalks on private streets. Property owners and contractors making street, sidewalk, or driveway improvements on private streets are advised to contact Public Works Development Services at 503-588-6211 prior to starting work to determine if permits are required. Neighborhood Outreach A property owner in South Salem submitted an application to construct a garage and driveway along Croisan Scenic Trail. Because of the impacts to the trail, City staff requested a public meeting at the Sunnyslope Neighborhood Association. Approximately 30 neighbors participated in the discussion at the Sunnyslope meeting. As a result of the input from neighbors and users of the trail, City staff was able to ensure that the driveway would not have any significant negative impact on the trail. Neighborhood association members are encouraged to contact Public Works Development Services staff with questions about development projects by contacting Glenn Davis at gdavis@ cityofsalem.net. AMANDA Permit System Upgrade City staff is upgrading the AMANDA permit system to improve efficiency and effectiveness of the development process. Benefits of the system upgrades include the following: • New capabilities for web access by applicants to make payments, file applications, schedule inspections, and view project information on-line. • Remote access for field inspectors so inspection results can be viewed by applicants immediately. • More efficient identification of Code requirements so applicants have clear instructions when corrections are required • Improved tracking of public inquiries for better customer service The project schedule for the AMANDA upgrades is still being established. City staff hopes to complete the upgrades by summer 2010. If you have any questions, please contact Leah deVries at ldevries@ cityofsalem.net or Kelly Marshall at [email protected]. Developing in the Floodplain The regulatory floodplain is defined by the Federal Emergency Management Agency (FEMA) as the area inundated during a flood event large enough to have only a 1 percent probability of occurring in any given year. Because water can flow miles away from the actual stream channel during major flood events, properties may be in the regulated floodplain even though miles away from the normal stream channel. Floodplain Development Permits Floodplain development permits (FDPs) are required for most development activities within floodplains. In Salem, contractors and property owners have been surprised when discovering floodplain development permits are required, especially for work not appearing to have any effect on flooding. FDPs are generally divided into two categories—ground-disturbing and nonground-disturbing. Ground-disturbing Activities Ground-disturbing activities that require FDPs include larger projects, such as new structures, exterior building additions, and site grading. However, smaller projects also require FDPs including but not limited to sewer or Peace Plaza The 2009 annual fall Peace Plaza photo is shown at right. For 20 years, Public Works staff has taken an annual fall photo of the Peace Plaza, which can be seen on the City’s Public Works website at www.cityofsalem.net. storm repairs, water line replacement, irrigation system installation, paving, and fence installation or excavation. Nonground-disturbing Activities Nonground-disturbing activities require FDPs when permits are required under the building code. Examples would include replacement of a water heater, electrical system upgrade or repair, interior remodel, or re-roofing. If you question whether or not a permit is required, contact Public Works Development Services in Room 320, 555 Liberty Street SE or at 503-588-6211. Emerging Trends City staff consistently reviews existing codes to determine if any changes are needed. The City’s floodplain code is currently under review for a few potential changes: (1) reducing the number of nonground-disturbing projects that require an FDP; (2) lowering the freeboard requirements for bridge structures; and (3) modifying the setback requirements for new buildings and alterations to existing buildings. Any proposed Code changes will be reviewed by the Planning Commission, City Council, and state agencies before approval. If you would like to provide input on potential revisions, e-mail Sara Jondahl, the City’s Floodplain Manager, at [email protected]. Development Community News Procedures Site Plan Review (SPR) On January 1, 2009, the City of Salem began implementing the new Site Plan Review Ordinance. Site plan review applies to most new commercial, industrial, and multi-family development requiring a building permit. So far, the City has processed 174 Type One Site Plan Review applications and 28 Type Two Site Plan Review applications. Site Plan review is a land use application to review and approve site plans associated with new building permits. SPR applications may be submitted prior to or concurrent with a building permit application. It does not apply to single family dwellings or duplex development. Wednesday Site Plan Review Meetings The Salem Planning Division is now offering a new service for SPR applicants and those preparing to submit applications. Planning and Public Works staff are available every Wednesday afternoon at 2 p.m. in the Community Development Department Large Conference Room 305, City Hall, to review, discuss, and assist with SPR questions. There is no fee and no appointment is necessary to attend. (Continued on page 4) Final Plat Reviews The City Surveyor has observed that final plats often require multiple reviews. Developers and surveyors are advised the base fee for final plat reviews provides funding for only the first review and one revision. Additional reviews require extra plan review fees based on actual staff costs. If you have any questions, contact Gerry Pappe, City Surveyor, at [email protected]. Fire Service Plans City staff has observed that applicants have been confused by the City’s process concerning fire service plans. After receiving building plans, City staff will generally review for fire services within the first few days. If a fire service is proposed, then City staff will instruct the applicant to make a supplemental fire service plan submittal to the Public Works Department, including any additional plan review fees. This submittal will be routed to appropriate City departments and coordinated with the building plan review process. If you have any questions about fire service plan reviews, contact Sara Jondahl at [email protected]. A revision to Salem Revised Code Chapter 66 appeared before City Council on December 8, 2009. The revision changes the expiration process for Preliminary Declarations for Urban Growth Area Development Permits. Instead of a two-year expiration period, the Preliminary Declarations are proposed to remain valid as long as other associated development permits remain valid. City Council is still reviewing the proposed Code revision. Design Standards City staff is in the process of modifying all of the Public Works Design Standards. The most significant changes are proposed in the Stormwater Management Design Standards as described in previous newsletters. Once the final draft of the Design Standards is completed, they will be made available for review and comment before adoption through an Administrative Rule process. If you have any questions about the Design Standards, contact Ralph Lambert at [email protected]. Specifications A developer has requested to add high density polyethylene (HDPE) pipe to the approved list of materials for City water mains. Currently, ductile iron pipe is the only authorized pipe material for public water mains in Salem. Public Works staff is reviewing the proposal for cost effectiveness over the life of the facility, which includes factors such as installation cost, watertightness, longevity, safety, and ease of maintenance and operation. For comments or questions regarding the approval process for new materials, contact Ken Roley at kroley@cityofsalem. net. Driveways/Sidewalks on Private Streets (Continued from page 1) SRC Chapter 66 Neighborhood and Environmental Impacts This Code revision would reduce the need for tracking expiration dates and issuing extensions for projects that are moving forward in the development process. Notification of the Code revision was submitted to Neighborhood Association chairs. If you have any questions about the Code revisions, contact Glenn Davis, Chief Development Services Engineer, at gdavis@cityofsalem. net. Applicants may not be aware that Public Works permits are required on private streets. In particular, Public Works staff has observed that contractors often overlook inspection requests for new driveways and sidewalks on private streets. Property owners and contractors making street, sidewalk, or driveway improvements on private streets are advised to contact Public Works Development Services at 503-588-6211 prior to starting work to determine if permits are required. Neighborhood Outreach A property owner in South Salem submitted an application to construct a garage and driveway along Croisan Scenic Trail. Because of the impacts to the trail, City staff requested a public meeting at the Sunnyslope Neighborhood Association. Approximately 30 neighbors participated in the discussion at the Sunnyslope meeting. As a result of the input from neighbors and users of the trail, City staff was able to ensure that the driveway would not have any significant negative impact on the trail. Neighborhood association members are encouraged to contact Public Works Development Services staff with questions about development projects by contacting Glenn Davis at gdavis@ cityofsalem.net. AMANDA Permit System Upgrade City staff is upgrading the AMANDA permit system to improve efficiency and effectiveness of the development process. Benefits of the system upgrades include the following: • New capabilities for web access by applicants to make payments, file applications, schedule inspections, and view project information on-line. • Remote access for field inspectors so inspection results can be viewed by applicants immediately. • More efficient identification of Code requirements so applicants have clear instructions when corrections are required • Improved tracking of public inquiries for better customer service The project schedule for the AMANDA upgrades is still being established. City staff hopes to complete the upgrades by summer 2010. If you have any questions, please contact Leah deVries at ldevries@ cityofsalem.net or Kelly Marshall at [email protected]. Developing in the Floodplain The regulatory floodplain is defined by the Federal Emergency Management Agency (FEMA) as the area inundated during a flood event large enough to have only a 1 percent probability of occurring in any given year. Because water can flow miles away from the actual stream channel during major flood events, properties may be in the regulated floodplain even though miles away from the normal stream channel. Floodplain Development Permits Floodplain development permits (FDPs) are required for most development activities within floodplains. In Salem, contractors and property owners have been surprised when discovering floodplain development permits are required, especially for work not appearing to have any effect on flooding. FDPs are generally divided into two categories—ground-disturbing and nonground-disturbing. Ground-disturbing Activities Ground-disturbing activities that require FDPs include larger projects, such as new structures, exterior building additions, and site grading. However, smaller projects also require FDPs including but not limited to sewer or Peace Plaza The 2009 annual fall Peace Plaza photo is shown at right. For 20 years, Public Works staff has taken an annual fall photo of the Peace Plaza, which can be seen on the City’s Public Works website at www.cityofsalem.net. storm repairs, water line replacement, irrigation system installation, paving, and fence installation or excavation. Nonground-disturbing Activities Nonground-disturbing activities require FDPs when permits are required under the building code. Examples would include replacement of a water heater, electrical system upgrade or repair, interior remodel, or re-roofing. If you question whether or not a permit is required, contact Public Works Development Services in Room 320, 555 Liberty Street SE or at 503-588-6211. Emerging Trends City staff consistently reviews existing codes to determine if any changes are needed. The City’s floodplain code is currently under review for a few potential changes: (1) reducing the number of nonground-disturbing projects that require an FDP; (2) lowering the freeboard requirements for bridge structures; and (3) modifying the setback requirements for new buildings and alterations to existing buildings. Any proposed Code changes will be reviewed by the Planning Commission, City Council, and state agencies before approval. If you would like to provide input on potential revisions, e-mail Sara Jondahl, the City’s Floodplain Manager, at [email protected]. Development Bulletin Special Interest Staffing Changes Assistant Director Robert Chandler started his new duties as Assistant Public Works Director on August 31, 2009. Robert was chosen after a lengthy and rigorous selection process. Robert graduated with a degree in mechanical engineering and served for ten years in the U.S. Navy as a nuclear submarine officer, serving on both fast attack and ballistic missile submarines. After he left active duty, he obtained his master’s and doctoral degrees in civil engineering from the University of Washington. Prior to joining Salem Public Works, he spent the previous 14 years at Seattle Public Utilities, working primarily in the stormwater arena. Beyond his work in the civilian world, Robert has continued to serve in the Navy reserves. Permit Specialist Marci Dumble has joined Public Works Development Services as a permit specialist. She previously worked as a permit specialist in the Engineering Division of Public Works and is quite familiar with permitting development projects in Salem. Volume 2 Development Districts (Continued from page 1) • S alem Alliance Church, a 47,000- square-foot mixed-use building on Broadway Street NE. • “Home Depot,” a 466,000-squarefoot distribution center on Aumsville Highway SE. • Maplewood Estates, a 20-lot subdivision on Skyline Road S. Final Design • First Church of the Nazarene, a 77,000-square-foot building expansion on Market Street NE. • Top to Bottom, a 19,000-square-foot retail clothing store on Lancaster Drive NE. Development Activity Charts NEW Single Family Permits 100 NEW Commercial Permits 30 20 50 10 0 0 Jul - Oct - Jan - Apr - Jul - OctSep '08 Dec '08 Mar '09 Jun '09 Sep '09 Dec '09 Jul - Oct - Jan - Apr - Jul - OctSep '08 Dec '08 Mar '09 Jun '09 Sep '09 Dec '09 Speculation and Land Use • Simpson Hills and Sustainable Fairview mixed-use developments at the 256-acre Fairview Training Center property on Strong Road SE. • Pringle Square mixed-use development at the Boise Cascade property on Commercial Street SE. • Salem Renewable Energy and Technology Center, an 80-acre technology center on Gaffin Road SE. • Mill Creek Corporate Center, a 500acre industrial development between Highway 22, Kuebler Boulevard SE, Turner Road SE, and Deer Park Road SE. • Multiple new schools proposed throughout Salem as part of the Salem/ Keizer School District bond approved by voters. Salem has seen consistent development throughout 2009, despite the reduction in residential development projects. We look forward to new economic opportunities in 2010. a publication of the City of Salem Public Works Development Services Section December 2009 Development Projects Salem has seen some exciting developments in the past year, and we continue to see a steady stream of new projects at all phases of development. Below are several noteworthy projects that are moving forward in the development process: Under Construction • O regon State Hospital renovation on Center Street NE, including a new street connection from Center Street NE to State Street. Site Plan Review (Continued from page 2) • W ater Place, a 41,000-square-foot commercial building on Liberty Road S along Pringle Creek. Credits 4 3 2 1 0 Jul - Oct - Jan - Apr - Jul - Oct-Dec Sep '08 Dec '08 Mar '09 Jun '09 Sep '09 '09 Editor—Glenn Davis Layout/Design—Louise Klukis Articles Contributed by Sara Jondahl, Bryan Colbourne, Bryce Bishop, and Gerry Pappe 503-588-6211 http://www.cityofsalem.net/ 555 Liberty Street SE Room 325 Unified Development Code With the help of a consultant, City staff is working to reorganize and consolidate the zoning code, and other applicable Salem Revised Code chapters relating to development, into a new Unified Development Code (UDC). The overall goal is to create a development code that is more user-friendly and easier to administer. The new code organization and structure is intended to rectify existing inconsistencies in the current development codes. Because the scope of the UDC project is focused primarily on the reorganization and clean-up of the Code, it is not the intent to address major policy issues relating to development. Any major policy issues identified through the process will, however, be catalogued and set aside for consideration through future Code amendments following an update to the City’s Comprehensive Plan. The new Code provisions are scheduled to be available for public review in Spring 2010. If you have any questions about the Unified Development Code, contact Bryce Bishop at [email protected]. Special Development Fees NEW Subdivision Permits 5 Code Revisions (Continued on page 2) • S almon Run Industrial Park, a 61,000-square-foot industrial building on McGilchrist Drive SE. This public meeting is intended to help customers determine what type of SPR their project requires; discuss what sort of conditions of approval, if any, might be expected; and generally promote good communication between City staff and the applicant early in the process. Of course, staff is still available from 8 a.m. to 5 p.m., Monday through Friday to assist you at the site plan review intake counter in the Permit Application Center or by request for a formal preapplication conference. Issue 3 (Continued on page 4) As featured in a previous newsletter, special development fees include development district fees, reimbursement district fees, temporary access fees, and connection fees. Many of these special development fees have successfully enabled development projects to be constructed while also ensuring that infrastructure is adequately funded. The infrastructure constructed using special development fees provides additional capacity for existing users and future development projects. Examples of projects using special development fees are as follows: Development Districts • M ill Creek Corporate Center provides funding for major street, water, stormwater, and sewer infrastructure needed to serve development projects on land previously used by the State of Oregon for agriculture. • Fairview Development District provides funding for major street and water infrastructure needed to serve development projects on the Fairview Training Center property. Reimbursement Districts • B rush College Reimbursement District provides funding for a trunk sewer main constructed in Brush College Road NW that serves approximately 800 acres of land west of Doaks Ferry Road NW in West Salem. • Bailey Ridge Reimbursement District provides funding for a trunk sewer main constructed along River Road S that serves approximately 1,300 acres of land in the Croisan/Illahe area. • Wallace Ridge Reimbursement District provides funding for stormwater improvements constructed along Liberty Road S. Temporary Access Fees • T emporary access fees provide funding for Skyline #2 Reservoir near Davis Road S at Skyline Road S. Approved projects include Bella Cresta Subdivision, VanNatta Place, Mendenhall Heights, Reserve at Red Leaf, Whispering Winds, and Maplewood Estates. • Temporary access fees for Bonaventure provide funding for the Boone Road Pump Station, which serves water to a significant portion of South Salem.