10% Site Audit of Asbestos Removal Works Overview
10% Site Audit of Asbestos Removal Works ASBESTOS WORK SITE AUDIT FORM V1.0 Overview Project managers should complete a site audit for 10% of their asbestos works. This audit has been designed for use by building professionals without the requirement for specific training. Safety: University staff MUST NOT enter designated respirator zones e.g. contaminated areas, working enclosures, air-lock, bag-lock, waste skips and decontamination units. The audit does not necessitate entry to these areas. The form is appropriate for works that are either licensed or non-licensed (albeit in a reduced capacity). It follows criteria detailed in the ARCA (Asbestos Removal Contractors Association) Site Audit Accreditation Scheme and verifies site works are being undertaken in line with the pre planning stage and on-site method statement/plan of work (PoW). Instruction PMs complete the form for 10% of instructed asbestos works. Comments already provided give further guidance on or what other considerations may be applicable. There should be a named individual in the PoW responsible for the conduct of the site – this supervisor should be able to respond to any questions – if they do not know the answers then assume it is not present/has not been done. Site paperwork can generally be amended on site, as required. It should be accurate at the time of audit – not after it has been requested Completed forms should be held on project file and a copy forwarded to EM Asbestos Team If the site set up appears unsatisfactory or assistance is required, please contact the EM Asbestos Team. Building Name/code Audit Date Name of Auditor Contractor being audited 1.0 Preliminary Requirements 1.1 1.2 Yes No Is there an ASB5 notification form on site for the works to be audited? OR For non-licensable work, is there a full site set up as if it were notifiable work? Is there provision to observe work practices within the enclosure by means of CCTV and / or viewing panel(s)? 10% Audit of Asbestos Removal Works Document A18, February 2015 Comments This is a requirement and should be provided. Job description must match. Please check dates in ASB5 to ensure 14 days has lapsed. This is required – main working area should be viewable. Page 1 1.3 1.4 1.5 Must be available on site and include a sketch plan Is there a job specific method statement / plan of work available on site for the works> Is there a copy of the company standard procedures / generic procedures available on site Is the decontamination unit fully functional in terms of power, ventilation , and the provision of hot and cold running water for showering? Should be in the supervisor’s file on request Do not enter the decontamination unit – ask the supervisor to demonstrate these criteria. The DCU must be fully operational prior to asbestos works starting – including set up. DO NOT CONTINUE WITH THE AUDIT IF THERE ARE ANY ISSUES WITH THE ABOVE & CONTACT EM ASBESTOS TEAM 2.0 ASB5 Notification Form Comments 2.1 Are details of any other licence holders recorded (Section 3 of ASB5) 2.2 What form of asbestos containing material is being worked upon? (Section 4 of ASB5) What is the stated maximum number of employees per shift? (Section 5 of ASB5) 2.3 Please copy them in here, or write NO. Look for licensed scaffolder, supervisory licensed holder, labour-only sub-contractors. How many operatives (including the supervisor) are actually on the site? 3.0 Site documentation 3.1 Is the contract supervisor the same person as specified in the plan of work? Must NOT be a temporary employee (NB if the named individual is not there then this is inadequate supervision unless the name is correctly amended in the PoW. Changing PoW whilst you are there is not good enough) 3.2 Does the plan of work detail when the work is to be carried out? (including start / finish times and weekend variations) Does the plan of work detail the type of asbestos involved? (e.g. amosite, chrysotile, crocidolite) Note times 3.3 3.4 Does the plan of work detail the asbestos removal technique to be used? 3.5 Is there a site specific assessment available for inspection, for hazards other than asbestos? (hot work, work at heights, use of hand tools, confined spaces, electricity, manual handling, COSHH etc) Yes 10% Audit of Asbestos Removal Works Document A18, February 2015 No Must not exceed that on the ASB5 Comments Please record and is it the same as in section 2.2? Risk assessment is a legal requirement. Note – hot works should not be undertaken without EM Asbestos Team authorisation. COSHH required for spraytack, PU foam, surfactant. Page 2 3.6 Is there a copy of the contractor’s current/valid asbestos licence available for inspection? 3.7 Is there documented evidence on site confirming current insurance cover for both employer’s liability and public liability? e.g. Insurance schedule. Is the enclosure’s smoke test record available for inspection? 3.8 Note number. (All licences should be present for licence holders given in the ASB5, See this form section 2.1) Legal requirement to display at place of work - note policy number. If no record, assume not done. Please record reference on certificate. 4.0 Site Supervisor and/or Operative(s) – CHOOSE TWO STAFF AT RANDOM Ensure the following are present and in date Current medical certificate? (NB Do not be put off by ‘trainee’ operatives there to help build enclosure & without medical, training etc. Reasonable to believe will continue into enclosure/ strip it – liable for HSE prohibition Notice) Current training certificate? Training provider Face fit test certificate for RPE in use? (NB There is no expiry date) Examination record for RPE in use? (Daily if in enclosure, current monthly if not) Supervisor / operative(s) clean shaven? (applicable only if randomly selected staff not in enclosure) Further comments Name Name Yes No Yes No Yes No Yes No Yes No Yes No Yes Yes No N/A Yes No N/A See also this form, Section 2.4. All labour must be employed & labour only subcontractors are not permitted. Site Organisation 5.1 Does the sketch plan in the PoW match the site set up, and include the positions of the NPU, air-lock, bag-lock (if applicable), viewing panels / CCTV and DCU? Are there adequate warning signs which comply with the Safety Signs and Signals Regulations? (including the black hand prohibition symbol) Is there a first aid kit available on site? 5.3 No Yes 5.0 5.2 No Yes No 10% Audit of Asbestos Removal Works Document A18, February 2015 Comments Absolutely essential - If No, please provide details Look for signs on air-lock / bag-lock & DCU Requirement – e.g. working at Addenbrooke’s not an excuse for missing kit. Page 3 6.0 Enclosure / Air-lock / Bag-lock 6.1 Is the enclosure in sound condition and constructed to prevent the spread of asbestos? Are the 3 stage air-lock, (& bag-lock as appropriate) located as in the PoW? 6.2 Yes No Comments (DO NOT ACCESS AIR-LOCK) i.e. air-tight – air-lock flaps should be weighted Each stage should be at least 1mx1mx2m (height). 7.0 Air Extraction Equipment 7.1 Is the NPU ducting vented externally to atmosphere where practical? Yes No Comments 8.0 Observed Work Practices 8.1 Does the RPE (including filter) being used match that stated in plan of work? If not, what is being used? 8.2 Are colours of overalls as stated in the plan of work or standard procedures? Colour should match the stage of work being audited. Problematic if not stated. 8.3 Are all items of necessary PPE being properly worn? e.g. overall hood over head straps, overalls not tucked into boots, no lace up trainers etc 8.4 Are disposable working coveralls and transit coveralls same standard as PoW? Request to see unopened pack of overalls to check e.g. ‘type 5/6’? 8.5 Has the water been appropriately bagged? e.g. immediately bagged, and single bagged if still in enclosure. If not, is it possible? If really not possible without extreme measures, is air monitoring contingency in place? Yes No 10% Audit of Asbestos Removal Works Document A18, February 2015 Comments (DO NOT ACCESS ENCLOSURE – Use viewing panel/ CCTV)) Page 4 9.0 Decontamination Unit (DCU) 9.1 Is the unit positioned in relation to the work area as states in the PoW? 9.2 Is the transit route as short as possible and away from occupied areas? 9.3 Is the unit in good condition and clean so far as is reasonably practicable? 10.0 Waste 10.1 Are the waste disposal arrangements as described in the plan of work? Is the waste transit route free from residual or spilt waste? 10.2 11.0 Scaffolding 11.1 Has the asbestos removal contractor any scaffolding on site? Does the scaffold form part of the enclosure or was it liable to disturb asbestos when erected? 11.2 Yes No Comments (DO NOT ACCESS FACILITY) Please circle whether Connected or Unconnected Connected means electricity, water & waste – use of self-contained units acceptable but is there water in the tank/ generator ready to be started? Should be free of asbestos debris Ask supervisor to open clean end door to view without entering -must appear CLEAN with no compromise! Request to see clearance certificate from previous job for dirty/shower end. Yes No Comments Yes No Comments If Yes name the sub-contractor and write down his licence number. See ASB5 Section 4 Further Comments / Clarifications 10% Audit of Asbestos Removal Works Document A18, February 2015 Page 5 • REVIEW THE SUMMARY SHEET WITH THE SITE SUPERVISOR AND OBTAIN THEIR SIGNATURE AS CONFIRMATION. • Copy to be included in the Project Completion File Signatures Auditor’s name: Auditor’s Signature Time of audit: Supervisor’s Signature 10% Audit of Asbestos Removal Works Document A18, February 2015 Page 6 Annex 1 - Example ASB5 Notification Form 10% Audit of Asbestos Removal Works Document A18, February 2015 Page 7 10% Audit of Asbestos Removal Works Document A18, February 2015 Page 8 Annex 2 -Example Consignment Note 10% Audit of Asbestos Removal Works Document A18, February 2015 Page 9 Annex 3 -Example Asbestos Licence Note the above is a consultant’s supervisory licence. All asbestos removal contractors should provide evidence of a “Removal” licence that is similar in appearance. Note the licence should be for 3 years – a 1 year licence should be referred to the EM Asbestos Team. 10% Audit of Asbestos Removal Works Document A18, February 2015 Page 10 Annex 4 - Example Face Fit Certificate Annex 5 - Example Medical Certificate 10% Audit of Asbestos Removal Works Document A18, February 2015 Page 11 10% Audit of Asbestos Removal Works Document A18, February 2015 Page 12