Comments
Description
Transcript
F C P
FAIRFAX C OUNTY PARK AUTHORIT Y M E M O R A N D U M TO: Chairman and Members Park Authority Board VIA: John W. Dargle, Jr., Director FROM: David Bowden, Director Planning and Development Division DATE: February 7, 2013 Agenda Planning and Development Committee Wednesday, February 13, 2013 – 5:30 p.m. Boardroom – Herrity Building Chairman: Kevin J. Fay Vice Chair: Ken Quincy Members: Linwood Gorham, Frank S. Vajda 1. Scope Approval – Twin Lakes Golf Course Infrastructure Improvements – Reallocation of Project Funds to Complete Infrastructure Improvements – Action* 2. Scope Approval – Lake Fairfax Water Mine Expansion – Action* 3. Approval – Bren Mar Park Master Plan – Action* 4. Planning and Development Division FY 2014 – FY 2020 Capital Improvement Program Project Development Schedule – Discussion* 5. Quarterly Project Status Report – Information* 6. Monthly Contract Activity Report – Information* *Enclosures If accommodations and/or alternative formats are needed, please call (703) 324-8563. TTY (703) 803-3354 This page intentionally left blank. Board Agenda Item February 27, 2013 ACTION Scope Approval – Twin Lakes Golf Course Infrastructure Improvements – Reallocation of Project Funds to Complete Infrastructure Improvements (Springfield District) ISSUE: Approval of the project scope for infrastructure improvements at Twin Lakes Golf Course and reallocation of project funds to complete the infrastructure improvements. RECOMMENDATION: The Park Authority Director recommends approval of the project scope to complete infrastructure improvements at Twin Lakes Golf Course and reallocation of project funds to complete the infrastructure improvements. TIMING: Board action is requested on February 27, 2013, to maintain the project schedule. BACKGROUND: Twin Lakes is a 356-acre golf complex with the Park Authority’s only championship 36 hole golf facility located in the Springfield District. The complex includes an approximate 14,700 square foot club house, two 18-hole golf courses, a driving range and related support facilities. The golf course was expanded from 18 holes to 36 holes and a new club house was constructed in 1998. Reconstruction of the golf course north dam to meet new state dam standards was completed in January 2012. The Park Authority Board approved the FY 2013 – FY 2015 Financial Sustainability Plan in December 2011 which includes a business growth initiative for expansion of the club house facility at Twin Lakes Golf Course. The design for the club house expansion is complete and staff is currently preparing the construction bid documents. The Planning and Development Division FY 2013 Work Plan as approved by the Park Authority Board on September 24, 2012, included a staff recommendation to reallocate the remaining funding balance in the recently completed Twin Lakes Golf Course North Dam Reconstruction project in the amount of $357,000 to fund infrastructure improvements associated with the original golf course expansion, the dam reconstruction and club house expansion projects. Sanitary sewer for the club house at Twin Lakes Golf Course is currently provided via a septic system with a drain field. Staff met with the Fairfax County Health Department Board Agenda Item February 27, 2013 (FCHD), the county agency responsible for permitting septic systems, as part of the permit review process for the club house expansion project. FCHD staff advised park staff that the septic system installed as part of the original club house construction had limited capacity and would not meet the requirements for expansion. State requirements for septic systems have also been revised to require additional reserve capacity since the club house was completed. Staff also determined during the design phase that the existing irrigation system in the area of the addition will need to be reconfigured and relocated in advance of club house expansion to maintain necessary irrigation service to the club house and golf course. Staff has been working with the Fairfax County Department of Public Works and Environmental Services (DPWES) and the Virginia Department of Transportation (VDOT) to close out the open site plan for the golf course expansion project. The one remaining punch list item requiring completion to close-out the golf course expansion site plan is installation of street lights along the property frontage at Braddock Road. Finally staff is preparing the necessary plans and documents required to obtain the state operating permit for the recently completed north dam improvements. The project scope for the infrastructure improvements is as follows: • Upgrade the existing septic system to include enlarging the pump chamber from 5,000 gallons to 8,000 gallons, replacement of the force main and other related work as may be determined by the Fairfax County Health Department. • Relocate existing in-ground golf course irrigation lines to accommodate the club house expansion. • Install street lights per approved site plan for golf course expansion. • Obtain state operating permit for north dam. The scope cost estimate for completion of the infrastructure improvements at Twin Lakes Golf Couse is $357,000 as outlined in the table below. Work Item Club House Septic System Upgrade Relocate Irrigation Install Street Lights Obtain State Dam Operating Permit Total Estimated Cost $110,000 $20,000 $90,000 $137,000 $357,000 The proposed timeline for completing the noted scope of work is as follows: Phase Scope Design & Permitting Construction Planned Completion 1st Quarter 2013 2nd Quarter 2013 4th Quarter 2013 Board Agenda Item February 27, 2013 FISCAL IMPACT: Based on the scope cost estimate, funding in the amount of $357,000 is required to complete the necessary infrastructure improvements at Twin Lakes Golf Course. Funds are currently available in the amount of $220,000 in WBS/IO Project PR-000012-006 Twin Lakes Dam Reconstruction in Fund 300-C30400 (Fund 370), 2008 Park Bond Construction for reallocation for infrastructure improvements. A balance of $137,000 will remain available to obtain the dam operating permit for the north dam. ENCLOSED DOCUMENTS: None STAFF: John W. Dargle, Jr., Director Cindy Messinger, Deputy Director/CFO Sara Baldwin, Deputy Director/COO David Bowden, Director, Planning and Development Division Todd Johnson, Director, Park Operations Division Barbara Nugent, Director, Park Services Division Deborah Garris, Manager, Synthetic Turf Branch Eric Inman, Project Manager, Synthetic Turf Branch Peter Furey, Manager, Golf Enterprises Michael P. Baird, Fiscal Administrator This page intentionally left blank. Board Agenda Item February 27, 2013 ACTION Scope Approval – Lake Fairfax Water Mine Expansion (Hunter Mill District) ISSUE: Approval of the project scope to expand the Water Mine at Lake Fairfax Park. RECOMMENDATION: The Park Authority Director recommends approval of the project scope to expand the Water Mine at Lake Fairfax Park. TIMING: Board action is requested on February 27, 2013, to maintain the project schedule. BACKGROUND: Lake Fairfax Park is one of three lakefront parks within the park system. The 479-acre park located in the Reston area of Fairfax County includes an 18-acre lake with boating facilities, the Water Mine Waterpark, campgrounds, picnic areas, party areas, a carousel, trails, playgrounds, lighted athletic fields and a skate park. The Water Mine completed in 1997 replaced an existing in-ground swimming pool at the park. The Water Mine features more than an acre of slides, flumes, sprays, showers, floatables and interactive play features including a lazy river incorporated into an old west theme. Capacity for the Water Mine is set at 776 people per the Fairfax County Health Department code requirement of twenty-seven square feet of water surface per person. This capacity limitation combined with the lack of new features has resulted in stagnated revenue generation over the last six years. A feasibility study for expansion of the Water Mine was completed in January 2003. The study concluded that expansion of the Water Mine should focus on increasing amenities for the pre-school and primary school age children including an enlarged children’s area, and additional slides. The addition of group pavilions, increased shade structures, and multiple concession vendors were also recommended. The recommended expansion did not proceed at that time due to funding limitations. The Park Authority Board approved the FY2013 – FY 2015 Financial Sustainability Plan in on December 14, 2011, which includes a business growth initiative for expansion of the Water Mine Waterpark at Lake Fairfax Park. The Planning and Development Board Agenda Item February 27, 2013 Division FY 2012 Work Plan as approved by the Park Authority Board on July 27, 2011, included a project to design an expansion of the Water Mine to increase visitor capacity to the facility. The Park Authority Board approved funding in the amount of $400,000 from the 2008 Park Bond as part of the FY 2012 Work Plan approval to start the design of the project in advance of anticipated construction funding in the proposed 2012 Park Bond. The 2012 Park Bond approved by the voters in November 2012 includes funding in the amount of $5,155,000 for construction of the expansion. A project team consisting of representatives from Planning and Development, Park Services, Resource Management, and Park Operations Divisions was created to determine the scope for the expansion of the Water Mine. The goals of the project team were to develop a project scope that would overcome capacity limitations of the existing facility, increase visitation and generate additional revenue. Because nine years have passed since the development of the original concept plan, staff contracted with Burgess & Niple through an existing open-end consultant contract to complete a feasibility study using the expertise of an aquatics consultant to validate the original feasibility study and concept plan prepared in 2003, recommend options that would most efficiently increase visitation and generate additional revenue. Burgess & Niple hired Ballard*King Associates of Colorado, a nationally recognized leader in aquatics facility planning to prepare a new feasibility study for expansion of the Water Mine. Ballard*King’s assessment of the previous feasibility study pointed out that the demographic data is old and needed to be updated to account for current demographics; the 5- to12-year-old age group was not evaluated; the attendance increase that was projected from the improvements was optimistic considering the size of the expansion recommended in the 2003 study and the code requirements; and the final net revenue calculations were aggressive. The feasibility study for expansion of the Water Mine facility prepared by Ballard*King summarized the current market opportunities as follows: • With a population of over 632,390 in the Primary Service Area, the market is more than large enough to support a significant expansion to the Water Mine without the need to draw from outside of the area. The population base has a significant number of children and very high household income levels. The population is expected to continue to grow at a strong rate. • The site in Lake Fairfax Park has a number of other important amenities to draw potential pool users. In addition, the site is easily accessible to people throughout the area. Board Agenda Item February 27, 2013 • The current Water Mine facility is frequently operating at capacity with long waiting lines, which indicates that there is already a built-in clientele for an expansion. • Despite the presence of other water parks and pools in the area the demand and market is more than sufficient to allow for an expanded Water Mine facility. In addition to the market opportunities, possible market constraints include: • Water Mine currently has a market focus that is relatively narrow which emphasizes the under-12 age group. • The Water Mine’s fees are already reasonably aggressive and it may be difficult to have much of an increase in the future even with significant additions or improvements. • The opportunities for expansion are limited given the physical constraints of the existing site. The current pool layout is rather elongated making it more difficult to add amenities without providing additional support facilities. • The increased bather load from an expansion may trigger the need to expand support facilities such as the bath house, concession area, and lifeguard room. This could require a significant financial commitment that will subtract from the amount of funding available for expanding the water amenities. Despite the constraints noted above, Ballard*King has determined that the market is outstanding for a significant expansion to the Water Mine. Staff directed Burgess & Niple to prepare a concept plan that was consistent with the findings of the feasibility study. The project team met with the Water Mine staff to identify any capital renovation work to the existing facility that should be included in the expansion project in addition to new features. While the existing attractions are generally in good condition, site staff identified a number of theming materials that should not be used in the expansion due to excessive maintenance requirements. A design charette meeting with Burgess & Niple and their waterpark design subconsultant, Water Technology, was held to discuss both the current facility and desired new features. Based on this discussion and the results of the feasibility study, Water Technology developed a concept plan for the expansion. The project team has completed their evaluation of the concept plan and recommends the following scope of work: Board Agenda Item February 27, 2013 Construct approximately 8,000 square feet of new spray pad (Active and Tot) with a climbable play structure and interactive spray features. Construct a slide tower for two to three body flume slides with dry run-outs. Construct a new restroom/mechanical building with family change rooms, guard room, and filter equipment space. Construct picnic pavilions, shade structures and concrete pads for mobile food vendor facilities. Construct associated site work and supporting infrastructure. The scope cost estimate to design, permit and construct the proposed expansion of the Water Mine is $5,500,000 (Attachment 2). Revenue projections included in the FY2013 – FY 2015 Financial Sustainability Plan projected a possible increase of $300,000 to the net annual return for the Water Mine in the first full year of operation based on the expansion. Staff has reviewed the revenue projections and based on preliminary discussions with Fairfax County Health Department (FCHD) it appears the increase in net revenue is achievable if FCHD staff is willing to approve a request for an increase in the occupancy load based on the features in the expansion. State code currently requires 27 square foot of water surface per occupant while the American National Standards Institute (ANSI) recommends 15 square foot of wet area per occupant for spray parks. Staff will work with FCHD staff throughout the design of the expansion to maximize the allowable occupancy. The proposed timeline for completing the project is as follows: Phase Scope Design & Permit Construction Planned Completion 1st Quarter 2013 1st Quarter 2014 2nd Quarter 2015 FISCAL IMPACT: Based on the scope cost estimate, funding in the amount of $5,500,000 is necessary to fund design, permitting and construction for the project. Funding in the amount of $400,000 in WBS/IO PR-000016-031, Lake Fairfax Water Mine Expansion, Fund 300 C30400, 2008 Park Bond Construction is available to complete the design and permitting phases. The balance of funding required for construction in the amount of $5,100,000 will be appropriated by the Department of Management and Budget in the 2nd Quarter of 2013 from the 2012 Park Bond. Board Agenda Item February 27, 2013 ENCLOSED DOCUMENTS: Attachment 1: Water Mine Expansion Concept A Attachment 2: Scope Cost Estimate – Lake Fairfax Water Mine Expansion STAFF: John W. Dargle, Jr., Director Cindy Messinger, Deputy Director/CFO Sara Baldwin, Deputy Director/COO David Bowden, Director, Planning and Development Division Barbara Nugent, Director, Park Services Division John Lehman, Manager, Project Management Branch Timothy Scott, Supervisor, Project Management Branch Melissa Emory, Project Manager, Project Management Branch Michael Baird, Fiscal Administrator This page intentionally left blank. Attachment 1 MULTI-USE RENTABLE PAVILION E DECK ELEVATION 284.00 FAMILY CHANGE W/ADA FIXTURES / MECHANICAL / GUARD BREAK ROOM FOOD TRUCK CONCESSION PATIO C A RESERVABLE CABANAS DECK ELEVATION 284.00 PLAY STRUCTURE D SPRAY PAD E RENTABLE PAVILION F CABANAS D TOT SPRAY PAD DECK ELEVATION 282.00 ACTIVE SPRAY PAD F A DECK ELEVATION 286.00 LANDSCAPE LANDSCAPE WATERFALL WITH BENCH BELOW B GRASS-CRETE DRIVE B SLIDES SLIDE TOWER APPROXIMATE ELEVATION 301.00 EXISTING MECHANICAL BUILDING APPROXIMATE LOCATION OF RPA LINE C SITTING AREA RENTABLE PAVILION N WATER MINE EXPANSION 0 15' SCALE: CONCEPT A 30' 60' 1" = 30'-0" RESTON, VA Project No.: 12045 Date: NOV. 16, 2012 Drawn By: APP This Document and the ideas, renderings and other contents contained therein are the sole property of Water Technology, Inc. and may not be disseminated, copied, reproduced or otherwise used without prior written consent of Water Technology, Inc. Date: Wednesday, January 16, 2013 Plotted by: Adam Pfister Drawing location: P:\2012\12045 Reston VA Water Mine Waterpark\01 Concept Design\Drawings\Design\concept a.dwg 100 Park Avenue Post Office Box 614 Beaver Dam, Wisconsin 53916 Copyright © 2012 Voice: 920.887.7375 Toll Free: 800.538.8207 Fax: 920.887.7999 www.watertechnologyinc.com This page intentionally left blank. Attachment 2 SCOPE COST ESTIMATE Lake Fairfax Water Mine Expansion DESIGN Design Permits and Fees $300,000 $68,000 Design Administration Subtotal $32,000 $400,000 CONSTRUCTION Sitework and Infrastructure $950,000 Active Spray Pad, Play Structure and Filter System $900,000 Tot Spray Pad, Play Structure and Filter System $600,000 Body Flume Slides $590,000 Restroom and Support Facilities $600,000 Pavilions and Shade Structures Subtotal $340,000 $3,980,000 Utilities Inspections and Testing $300,000 $90,000 Contingency $425,000 Construction Administration $305,000 Total Project Estimate $5,500,000 This page intentionally left blank. Board Agenda Item February 27, 2013 ACTION Approval – Bren Mar Park Master Plan Revision (Mason District) ISSUE: Approval of the Bren Mar Park Master Plan Revision. RECOMMENDATION: The Park Authority Director recommends approval of the Bren Mar Park Master Plan Revision. TIMING: Board action is request on February 27, 2013. BACKGROUND: In 2010 the Park Authority received a request for an off leash dog area (OLDA) in Bren Mar Park. Bren Mar is a 35-acre park located along Edsall Road in the Bren Mar Community in Alexandria (Attachment 1). The master plan was approved in 1975. Staff evaluated the request and determined that if an OLDA were to be recommended for the park, a master plan revision would be required. Revision of the approved master plan would also allow an update to the park boundaries to more accurately reflect the existing uses and conditions that differ from the approved plan. Several parcels have been added to the park that are not reflected in the 1975 approved master plan. Demographic changes in the Bren Mar area since the 1970s were also part of the consideration to revise the master plan. Public input has been a key element in the design development process for Bren Mar Park. The master plan revision process was initiated in 2012 and a public information meeting was held on April 18, 2012. This meeting was attended by over 40 community members. Public comments presented at the meeting included issues related to OLDAs and trails. A main interest of the community was to preserve the natural character of the park while expanding opportunities for the neighborhood to use the park. Based on site analysis and public input, a draft master plan was created and published on the Park Authority website and staff invited public comment on the plan through the web as well as at a Public Comment Meeting held on October 12, 2012. The public meeting was followed by a 30-day open comment period after which the master plan Board Agenda Item February 27, 2013 team reviewed and evaluated all public comments received throughout the master plan process. The Public Comment Meeting was well attended (Attachment 2). While a majority of speakers were in favor of replacing the diamond field with an OLDA there were a few speakers that expressed a desire to convert the ballfield into an open play area for the community. Park Authority staff expressed concerns that any such area might be used overwhelmingly for pick up sports play to the exclusion of open play. In response to this community desire for unprogammed open space, staff reviewed the proposed draft master plan and determined that the meadow area was suitable to be used for open play. Given the topography of this area, it is suitable for open use, but not for league sports practice or play. The Conceptual Development Plan graphic has been modified to include using the meadow area for open play. The Bren Mar Park Master Plan revision (Attachment 3) provides expanded passive recreation opportunities and community uses. The plan provides for an enhanced trail network, additional on-site parking, additional picnic facilities and an OLDA. The proposed new and expanded uses are located in the core of the site close to existing facilities with the majority of the site remaining in a natural state. The plan also recommends allowing the OLDA to be lighted at the sponsor group’s expense. Staff supports the request for lighting of the OLDA due to the location of the park in a densely populated urban neighborhood with the majority of the park users accessing the site by foot. Lighting this OLDA allows for dog owners to have year round use of the facility. Additional facilities in the park that may be lighted include the central trail section in the park which connects the rear of the park to the parking area and OLDA. The trail network is recommended to be expanded to support connections to the adjacent neighborhood and Turkeycock Run Stream Valley Park trails (Attachment 4). This master plan revision removes parking areas, playgrounds and picnic areas that were proposed within the center of the site. These elements have been reduced or relocated closer to the park entry to preserve the interior of the park in a more natural state. The diamond field will be replaced with an OLDA. To facilitate review by the Park Authority Board, substantive changes to the master plan text have been highlighted. If approved, a public use determination approval by the Planning Commission may be required prior to facility installation in accordance with Virginia Code Section 15.2-2232. FISCAL IMPACT: None Board Agenda Item February 27, 2013 ENCLOSED DOCUMENTS: Attachment 1: Vicinity Map Attachment 2: Public Comment Summary Attachment 3: Bren Mar Park Master Plan Revision Attachment 4: Expanded trails network map STAFF: John W. Dargle, Jr., Director Sara Baldwin, Deputy Director/COO Cindy Messinger, Deputy Director/CFO David Bowden, Director, Planning & Development Division Cindy Walsh, Director, Resource Management Division Todd Johnson, Director, Park Operations Division Sandy Stallman, Manager, Park Planning Branch Pat Rosend, Senior Park Planner, Park Planning Branch This page intentionally left blank. Attachment 1 ;i/ .I I C~ y V ICINITY MAP 0 of A lex andria 7SO 1.SOO BREN MAR PARK MASTER PLAN REVISION 6324 EDSALL ROAD. ALEXANDRIA, VA "1PJ 20 12 3.000W* • This page intentionally left blank. Attachment 2 Bren Mar Park Master Plan Revision Public Comment Summary Public Input Meeting- October 12, 2012 Joe Allison-Park Neighbor • He is in support of a dog park. • Likes the proposed revisions to the plan. • He was concerned about parking and glad to see more proposed especially with the dog park. • A second picnic shelter is a good idea. Sometimes there are overflow crowds in the picnic area. • The location of the parking next to the dog area is good. • New trails are welcome for the residents. Site does need more parking. • Good job of adding the things that were requested in the first meeting. George Madill • No objections to a dog park in the park but objects to using the diamond field for it. $50,000 was spent on the field to make it useable. Only field left in the area. No fields left at the school. No other places in the park that kids can kick a ball around and play. • Suggests using the meadow area for the dog park. Doesn’t need to be flat for the dogs like you need for the ball fields. • Feels that ball fields are a much higher need than the dog parks are. Worried that the money was thrown away. Steven Smith • Thank you for the meeting. A neighbor to the park with two small kids. • Feels the dog park will take a lot away from the community. Kids won’t have a place to play. Teeball, Frisbee, soccer etc. Concerned about safety in the park due to the prevalence of dogs off leash in the park. • He has been charged by dogs off leash in the park. Concerned that the dog park will add to the off-leash dogs in the other areas of the park. • Concerned about the pollution created in the watershed next to Turkeycock Run. • The ball fields are used all the times by kids. Wants to expand the play areas, picnic area, and add a basketball court. • Wants to use the meadow area to transition as an ADA access point to Turkeycock Run. Ron Debnam • Wants to know where the park was supposed to be before Bren Mar. (PA response- Dog parks are evaluated in response to specific sponsorship requests.) • In charge of neighborhood watch for the Overlook Community. Concerned about having extra parking and that it would encourage illicit uses. Not in favor of the OLDA for that reason. Michelle Bryce • A lot of people are concerned about the future of the park. • Walks the park everyday twice a day. Has a dog always on leash. Is concerned about all the off leash dogs in the park and concerned that more would come for the OLDA. • Concerned about the wildlife areas. People like to come to the park to de-stress. Wants to see the naturalness of this park preserved. People depend on the nature and do not want to see it lost. Andre Newman • Longtime area resident. Used to play little league baseball on the field. • Concerned about safety if the dog park is built on the ball field site. Concerned that existing fences are too low and the dogs may jump out. (PA response: OLDA would have to meet the standards for a new facility. Existing fence would need to be upgraded with increased height. Would have a double entry gate.) Sara Agan • Was opposed to the dog park at the April 18, 2012 Public Information meeting. • She does take her dogs off leash in the park and will try to be more considerate about that in light of the concerns by other park users. • Feels like the PA has heard what the people said about the park. • Wants to preserve the special feeling of the park. • Concerned that there will be winners and losers. Should be considering areas for all users. • Doesn’t want more people to come to the park to use the dog park. Doesn’t want parking because it will encourage more people to use the park. • Glad that Joe Allison is happy with the proposed plans. Ann Stowe-Overlook resident. • Staff has given a lot of consideration to community concerns. • Where is the closest field after this one? (PA response: Franconia or Trailside) • To echo the concerns of others about safety and additional parking. Can there be lighting in the parking areas. Should also consider security cameras esp. with the off-leash dog problem. More signage would be good to enforce the park regulations. • Can a baseball field be located in other developments being built. • Object to Joe Nilson retiring. He is not allowed. (Overall agreement that Joe Nilson is a great asset to the Park Authority) Joe Allison • Follow up on activities in cars-Franconia police do a great job patrolling the park and ticketing bad behavior. They are very thorough and keep incidences down to a minimum. Suggests that if the plan is approved, the police be encouraged to do additional checks. The police are on top of issues and would continue to do so. Barrett Nixon-local resident. • Organized the Bren Mar Dogs group and submitted the request to look at Bren Mar Park for a OLDA. • Loves the idea of having some lighting. Would the Joe Allison be ok with low impact lighting? (Joe Allison stated he would like to reserve comment until he saw a plan) • The more responsible people you have in a park, the less crime that occurs. Concerned about more parking spaces in the center of the park. Could lead to more crime. • Also concerned with current issue of off leash dogs in the parks. It is primarily because they have no other place to play. • Community of more than 140 dog owners who are looking for a place. Looking for a community centered use for the dog owners to get together and have the dogs and owners socialize. • OLDA reinforces the laws by providing a place for off leash play. Would shift the dogs running around in the park to the OLDA improving the park experience for everyone. Rodney Richardson- longtime resident dog owner and little league coach. • The existing ballfield is a place where families can play. Open/free play is not allowed at schools or scheduled fields. • Doesn’t feel the fields should be removed to put in the dog park. • Suggests the dog park go in at the end of Bren Mar Drive, not at the park. Summary of additional comments received during public comment period. Travis Tedrow-resident of the Lincolnia Park neighborhood. • My friend and Fairfax Parks employee, Steve Groff, recommended I contact you • Improving Turkeycock Stream Run in Lincolnia. A number of neighborhood residents are interested in cleaning the area and having a walking/biking path installed similar to Holmes run. • A path connecting the two parks and meeting Cameron Run would be a huge benefit to the area, both as a usable green space and as a safe place for walking in a neighborhood that is otherwise unwalkable due to lack of sidewalks or safe shoulders. • I realize improvements and planning take time but the residents wanted to reach out to the parks department and learn about how to start the process and/or how to get the currently unused park on the list of future county projects. Nancy Bond –local resident • Other area parks such as Isabella/Monticello Mews and Jefferson Green already have dog walking areas. • If Bren Mar Park is to become a dog park, I suggest that the park be confined to the trails that wind through Pulte Overlook. I think that the dogs must be on a leash at all times for pedestrian safety. • With the influx of residents from Monticello Mews, I think the population is better served by a park for children and active adults, not one confined to dog lovers. • If dog owners are not diligent about cleaning up after the dogs, the smell could be unbearable for those trying to swim at Bren Mar Recreation pool in the Summer. Via Phone- Mr. Won K. Paik-a neighbor at Bren Marr • Consider placing a bathroom at the park. Too many people are urinating in the woods. Via phone-Midge- local resident • Wanted to express concern about keeping the open space at Bren Mar • Wants to have Turkeycock Run in the stream valley tributary dredged due to debris and stone from HOTLanes project. Sarah Agan and Robert Karsch-Bren Mar Park Residents • We visit the park 2 – 3 times per day. The park is primarily used by the immediately surrounding communities; most of whom walk to the park. As such the overall park plan and feel should reflect the actual usage; preserving as much green space as possible and minimizing the development. We appreciate that the current draft of the master plan appears to reflect the prevailing sentiment of the communities surrounding Bren Mar Park. WHAT WE LIKE ABOUT THE PROPOSED PLAN: • Preserving the green space and protecting the mature trees and overall naturalized feel. • That the county listened to the comments provided at the April meeting. • We like the additional proposed natural surface trails. • We support converting the use of the baseball field to an Off Leash Dog Area (OLDA) o Opposition may be generated from a sense of nostalgia and wishing to see that field vigorously used by kids playing o that money was spent to convert the space to a baseball field. o Joe Allison (the sole person living within the park boundaries) noted the field is not used for athletics or other play. o People who take their dogs to dog parks tend to be more responsible in general and as such, the Bren Mar OLDA could serve as the source of a community hub or nucleus from which the greater communities might be strengthened. More sense of ownership not just for the OLDA but for the park overall will be beneficial for all. WHAT WE DON'T LIKE ABOUT THE PROPOSED PLAN: • • • Extension of eight new parking spaces towards the meadow Concerned that it would impact the wildlife in the meadow. "Unwanted" activity conducted from cars might increase as cars would be less visible from Edsall Road/the main parking areas. o additional parking should be concentrated in areas closest to the park entrance • While additional parking is needed, we think 58 spaces is too much • Reduce the number of parking spaces from the proposed total of 58 to 38 which is double the current number. • If the park closes at dark there is no need for lighting unless the dog park will be open past dark. If the dog park is open past dark any lighting must not disrupt the quality of life for the resident within the boundaries of the park. Mary Hasty-local resident • I am a dog lover and have one of my own, but Bren Mar Park is not the right place for it. We have a beautiful, serene, clean park and wetlands that is one of the draw points of living in our area. • Overlook residents as well as neighbors from as far as the end of Stevenson currently enjoy the park daily and we do not want it disrupted by the problems a dog park always brings: dog waste, dog fights, dogs uncontrolled off leash, litter from dog owners, more cars, and more people accessing the park who are not necessarily vested in keeping it clean. • A better location would be the industrial park off Esdall and George Washington. It's easy to get to, there's plenty of room and parking, and no one will be disturbed by barking dogs. In addition, the cluster of businesses there would probably welcome the influx of potential customers. • Please make sure that any future dog park is not located in a either a residential area nor a wetlands that could suffer harm from a huge increase in dogs and humans. Michelle Bryce-Overlook Resident • I own a German Shepherd and walk him twice a day on leash in the park. We are frequently plagued by dogs off leash owned by people who drive to this location to walk their dogs. A dog park has the potential to make this worse as it would attract more people to drive to this location to use the park and then walk their dogs. • My thoughts are the dog park should not be placed in the Bren Mar Park. People enjoy the serene, natural setting and opportunity to enjoy the wildlife. A dog park would change the atmosphere of the park and even threaten the conservation area if placed too close to the creek. • Consider another location for the dog park. One option is the Industrial Park. This location would provide customers to the stores, and provide an option for the many apartments at that end of Edsall. Another option is to put the dog park in Lincolnia Park • If the dog park must be installed in the Bren Mar Park, my recommendation is to put it in-between the baseball field and Edsall Rd. There is enough room, it includes trees for shade, and would minimize the effect on the park. It is also the greatest distance from the wetlands resource protected area/conservation area and the creek. • Regarding future plans for the park, there is a large group of people that enjoy the serene atmosphere of the park, being able to view the wildlife, including the deer, and the protected species--the box turtle. We prefer the park be maintained as natural as possible. Minimize development of hardtop surfaces such as parking lots and other constructed sites such as playgrounds, basketball courts, picnic grill areas etc. Walking trails should be natural foot paths through the woods • Concerns about the impacts from a recent stream stabilization project in Turkeycock Run Stream Valley Park. Visit Bren Mar park Master Plan at http://www.fairfaxcounty.gov/parks/plandev/downloads/bren-mar-mp.pdf. - This page intentionally left blank. Committee Agenda Item February 13, 2013 DISCUSSION Planning and Development Division FY 2014 – FY 2020 Capital Improvement Program Project Development Schedule Staff will present the FY 2014 – FY 2020 Capital Improvement Program (CIP) - Project Development Schedule for projects included as part of the fall 2012 Park Bond Program for discussion. The 2012 Park Bond includes projects in four categories: Facility Expansion, Existing Facility Renovations, Land Acquisition/Stewardship, and Community Parks/New Facilities. Park staff will present project schedules in each of the four categories for discussion with the Board to extend through FY 2020 allowing for project cash flow and expenditures in accordance with DMB’s guidelines. Staff will return this item for Board approval in March 2013 with a recommended FY 2014 – FY 2020 CIP Development Schedule. The Department of Management and Budget (DMB) has provided guidance that park bond funding will continue to be made available in the amount of approximately $13,250,000 annually through expenditure of the remaining balance of $35,148,000 in the 2008 Park Bond as well as the $63,000,000 included in the 2012 Park Bond. Cash flow projections will extend through FY 2020 in order to meet the County’s overall CIP goals and DMB’s financial management strategy for the sale of general obligation bonds based on the current budget outlook and total bond funding available of $98,148,000. ENCLOSED DOCUMENTS: None STAFF: John W. Dargle, Jr., Director Cindy Messinger, Deputy Director/CFO Sara Baldwin, Deputy Director/COO David R. Bowden, Director, Planning and Development Division Todd Johnson, Director, Park Operations Division Barbara Nugent, Director, Park Services Division Cindy Walsh, Director, Resource Management Division Deb Garris, Manager, Synthetic Turf Field Branch Kirk Holley, Manager, Special Projects Branch Committee Agenda Item February 13, 2013 John Lehman, Manager, Project Management Branch Julie Cline, Manager, Land Acquisition and Management Branch Sandra Stallman, Manager, Park Planning Branch Michael Baird, Fiscal Administrator Board Agenda Item February 27, 2013 INFORMATION Quarterly Project Status Report The Project Status Report for the Fourth Quarter of CY 2012 includes projects approved by the Park Authority Board from the Planning and Development FY 2013 Work Plan. The report is grouped by Supervisory District and provides project status updated through December 31, 2012. The Project Status Report is broken down into projects executed with funding prior to the 2008 Park Bond and projects being executed with 2008 Park Bond funds. Staff is able to track and report additional project financial information for projects under the 2008 Park Bond as a result of enhanced project financial tracking procedures implemented with the 2008 Park Bond. ENCLOSED DOCUMENTS: Attachment 1: Project Status Report as of Fourth Quarter of CY 2012 STAFF: John W. Dargle, Jr., Director Cindy Messinger, Deputy Director/CFO Sara Baldwin, Deputy Director/COO David Bowden, Director, Planning and Development Division Deb Garris, Manager, Synthetic Turf Field Branch Kirk Holley, Manager, Special Projects Branch John Lehman, Manager, Project Management Branch Julie Cline, Manager, Land Acquisition and Management Branch Sandra Stallman, Manager, Park Planning Branch This page intentionally left blank. Attachment 1 FAIRFAX C OUNTY PARK AUTHORIT Y 12055 Government Center Parkway, Suite 927 Fairfax, VA 22035-5500 703-324-8700 • Fax: 703-324-3974 • www.fairfaxcounty.gov/parks TO: John W. Dargle, Jr., Director FROM: David R. Bowden, Director Planning and Development Division DATE: January 28, 2013 SUBJECT: Quarterly Project Status Report Attached is the Planning and Development Division’s Quarterly Project Status Report for the Fourth Quarter of CY2012. This report provides the status, updated through December 31, 2012, for all projects that are included in the FY 2013 Work Plan as approved by the Park Authority Board. Recently completed projects include: Supervisory District: Braddock • Rabbit Branch Park – Donation of Kings West Swim Club Property Recordation Date: December 21, 2012 Acquisition Cost: $56,000 • Lake Accotink Park – Sluice Gate Stem Valve Repair Completed: November 2012 Project Cost: $14,842.50 Supervisory District: Dranesville • Great Falls Nike Park – Synthetic Turf Field Installation and Related Stormwater Enhancement Completed: November 2012 Project Cost: $1,190,027 • Great Falls Nike Park – Athletic Field Lighting on Rectangular Field #4 Completed: January 2013 Project Cost: $251,618 • Pimmit Run Stream Valley – Trail Signs Completed: December 2012 Project Cost: $8,000 • Spring Hill Park – Athletic Field #4 Reconstruction Completed: December 2012 Project Cost: $81,856 Memorandum to John W. Dargle, Jr. Planning & Development Division, Quarterly Status Report January 28, 2013 Page 2 Supervisory District: Mason • Martin Property – Demolition of Residential Structures Completed: December 2012 Project Cost: $75,000 • Pinecrest Golf Course – Upper Pond Dam Reconstruction Completed: December 2012 Project Cost: $1,325,000 Supervisory District: Mount Vernon • South Run Stream Valley Park – Magic Leaf Trail Improvements Completed: December 2012 Project Cost: $92,650 • Paul Springs Stream Valley – Donation of Parcels from Mr. McPherson Recordation Date: December 21, 2012 Cost: $3,000 • Cross County Trail – Connection at Pohick Road Completed: December 2012 Project Cost: $71,479 Supervisory District: Providence • Hartland Green Park – Approval of 2232 Application Approval Date: November 8, 2012 • Oakton Community Park – Phase II – Park Playground Completed: November 2012 Project Cost: $103,145 Supervisory District: Springfield • Lincoln Lewis Vannoy – Board of Supervisors Transfer to the Park Authority Recordation Date: December 21, 2012 Acquisition Cost: $25,000 Supervisory District: Sully • E.C. Lawrence Park – Athletic Field Lighting on Field #3 Completed: December 21, 2012 Project Cost: $251,618 Copy: Cindy Messinger, Deputy Director/CFO Sara Baldwin, Deputy Director/COO Barbara Nugent, Director, Park Services Division Todd Johnson, Director, Park Operations Division Memorandum to John W. Dargle, Jr. Planning & Development Division, Quarterly Status Report January 28, 2013 Page 3 Cindy Walsh, Director, Resource Management Division Mike Baird, Fiscal Administrator, Administration Division Ron Kirkpatrick, Director, Planning and Design Division, DPW&ES Randy Bartlett, Director, Stormwater Planning Division, DPW&ES Chris Leonard, Director, Neighborhood and Community Services This page intentionally left blank. ov Braddock District RABBIT BRANCH PARK – PROJECT COMPLETION REPORT Donation – Rabbit Branch Park (Former Kings West Swim Club) Donated by the Kings Park West community, and mostly located within the RPA of Rabbit Branch, the 8.9 acre property will be returned to a natural park through a cooperative effort between the DPWES and the Park Authority. As part of the restoration of the Pohick watershed, DPWES will primarily fund the removal of the existing site improvements, grading of the site to restore the RPA to the natural stream valley contours, construction of a new trail connection from Tapestry Drive to the existing asphalt trail across Rabbit Branch, and planting of native grasses. Native trees will be planted though a volunteer effort within the community. The Park Authority expects to contribute $56,000 to the project. Purchase Price $0 Acquisition Cost $56,000 Project Initiation April 2009 Date of Recordation December 21, 2012 Project Managers Julie Cline & Brian Williams Supervisory District: Braddock Park Authority Board Member: Anthony J. Vellucci Summary: 2008 Park Bond funding was used for the Park Authority’s project costs and for staff costs related to the review of transfer documents and deeds. Planning & Development Division LAKE ACCOTINK PARK – PROJECT COMPLETION REPORT Lake Accotink Dam – Sluice Gate Crank Stem Assembly Repair This project repaired the sluice gate crank stem assembly that raises and lowers the sluice gate used to drain the lake. Over time the stem and supporting guides became worn to the point of needing replacement in order to ensure reliable operation of the gate. Scope Estimate $15,000 Project Cost $15,000 Scheduled Completion May 2012 Actual Completion November 2012 Project Manager Douglas M. Guzman Designer FCPA Supervisory District: Braddock Contractor Accubid Construction Park Authority Board Member: Anthony J. Vellucci Summary: This project was completed using funding from the 1998 Park Bond Program. Planning & Development Division Dranesville District GREAT FALLS NIKE PARK – PROJECT COMPLETION REPORT Synthetic Turf Field Installation and Related Stormwater Enhancements This project converted the existing natural turf field to synthetic turf. In addition, enhanced stormwater controls and measures were installed below and around the field including soil augmentation and a reforestation area. Scope Estimate $825,000 Project Cost $1,190,027* Scheduled Completion November 2012 Actual Completion November 2012 Project Manager Douglas M. Guzman Designer Burgess & Niple Supervisory District: Dranesville Contractor FieldTurf USA, Inc. Park Authority Board Member: Kevin Fay Summary: This project was constructed using funding from 2008 Park Bond, DPWES, DNCS, & Great Falls Lacrosse. *Includes contribution of $365,027 from DPWES for stormwater enhancements. Planning & Development Division GREAT FALLS NIKE PARK – PROEJCT COMPLETION REPORT Athletic Field Lighting on Rectangular Field #4 This project installed a 4-pole athletic field lighting system and related electrical work, including a new electrical enclosure and upgrade to existing service. The installation meets the Park Authority’s lighting performance standard for a type “A” large rectangular field. Scope Estimate $200,000 Project Cost $251,618 Scheduled Completion January 2013 Actual Completion January 2013 Project Manager Wendy Li Designer Burgess & Niple Supervisory District: Dranesville Contractor Dalton Electric Service, Inc. Park Authority Board Member: Kevin Fay Summary: This project was designed and constructed using 2006 and 2008 Park Bond Funds. Planning & Development Division PIMMIT RUN STREAM VALLEY – PROJECT COMPLETION REPORT Trail Signs for Pimmit Run Stream Valley Trail This project provided 14 way-finding signs for the Pimmit Run Stream Valley Trail between Olney Park and Bryan Branch Road. The 12”x18” aluminum signs were designed in-house using the County GIS database and trails layer. Scope Estimate $8,000 Project Cost $8,000 Scheduled Completion September 2012 Actual Completion December 2012 Project Manager Elizabeth Cronauer Designer Elizabeth Cronauer Supervisory District: Dranesville Contractor Fastsigns of Fairfax Park Authority Board Member: Kevin Fay Summary: This project was designed and constructed using proffer funds. Planning & Development Division SPRING HILL PARK – PROJECT COMPLETION REPORT Athletic Field No. 4 Renovation The field renovation project consisted of amending the existing subgrade soils, placing a 4” layer of premium topsoil, laser grading the surface, and placing sod. The project was completed in partnership with McLean Youth Soccer (MYS) who contributed $10,000 and secured a $10,000 Mastenbrook Grant. Scope Estimate $82,000 Project Cost $82,000 Scheduled Completion December 2012 Actual Completion December 2012 Project Manager Isabel Villarroel Designer N/A Supervisory District: Dranesville Contractor Premier Sports Fields, LLC Park Authority Board Member: Kevin Fay Summary: This project was completed using 2008 Park Bond Program Funds and a $10,000 contribution from MYS . Planning & Development Division Mason District MARTIN PROPERTY – PROJECT COMPLETION REPORT Demolition of Residential Structures This project consisted of the demolition of a 2-story single family home, attached garage, and shed which returned the site to a natural state. Scope Estimate $75,000 Project Cost $ 75,000 Scheduled Completion December 2012 Actual Completion December 2012 Project Manager Heather Lynch Contractor Cresco, Inc. Supervisory District: Mason Park Authority Board Member: Frank S. Vajda Summary: This project was completed using funding from the 2008 Park Bond Program. Planning & Development Division PINECREST GOLF COURSE – PROJECT COMPLETION REPORT Upper Pond Dam Reconstruction This project consisted of demolishing the existing upper pond dam embankment, spillway structure, and outfall channel, and constructing a new reinforced concrete spillway structure, stilling basin and outfall channel. Scope Estimate $1,325,000 Project Cost $1,325,000 Scheduled Completion December 2012 Actual Completion December 2012 Project Manager Heather Lynch Designer Burgess & Niple Supervisory District: Mason Contractor Environmental Quality Resources, LLC Park Authority Board Member: Frank S. Vajda Summary: This project was constructed using funding from the 2008 Park Bond Program. Planning & Development Division Mount Vernon District SOUTH RUN STREAM VALLEY – PROJECT COMPLETION REPORT Magic Leaf Trail Improvements – Culvert and Asphalt Trail Improvements This project renovated the existing trail and stream crossing to provide a safer, more accessible route along this branch of the South Run Stream Valley Park. The new trail replaces a section of trail, which was in a severely degraded condition, with a more sustainable surface of 1,350 linear feet of 6 foot wide asphalt trail and a new large double culvert crossing with concrete headwalls and rip rap armoring. This concrete and stone structure along with new trail surface will better withstand the extreme flood conditions present in this tributary of South Run. Scope Estimate $98,500 Project Cost $92,650 Scheduled Completion November 2012 Actual Completion December 2012 Project Manager Thomas McFarland Designer FCPA In-House Supervisory District: Mount Vernon Contractor Southern Asphalt Park Authority Board Member: Linwood Gorham Summary: This project was constructed using funding from the 2004 and 2006 Park Bond Program. Planning & Development Division MCPHERSON – PROJECT COMPLETION REPORT DONATION – MCPHERSON (PAUL SPRINGS STREAM VALLEY) Mr. John McPherson donated five parcels within Paul Springs Stream Valley. All parcels are unimproved RPA within the flood plain. Parcels abut or are proximate to existing Park Authority holdings and will increase connectivity within the stream valley. Purchase Price $0 Acquisition Cost $3,000 Project Initiation September 2011 Date of Recordation December 21, 2012 Project Managers Julie Cline & Brian Williams Supervisory District: Mt. Vernon Park Authority Board Member: Linwood Gorham Summary: This property was acquired using Park Authority Bond funds from the 2008 Park Bond Program. Planning & Development Division CROSS COUNTY TRAIL – PROJECT COMPLETION REPORT Cross County Trail Connection At Pohick Road This project renovated the existing Cross County Trail Connection at Pohick Road to provide a safer, more accessible route. The new trail replaces a section of dirt path, which was in a severely degraded condition, with a more sustainable surface of 200 linear feet of 6 foot wide concrete trail. Scope Estimate $98,200 Project Cost $71,479 Scheduled Completion November 2013 Actual Completion December 2012 Project Manager Bill Boston Designer FCPA In-House Supervisory District: Mount Vernon Contractor Southern Asphalt Company, Inc Park Authority Board Member: Linwood Gorham Summary: This project was constructed using funding from the 2008 Park Bond. Planning & Development Division Providence District HARTLAND GREEN PARK – PROJECT COMPLETION REPORT Approval of 2232 Application Hartland Green Park (formerly Merilee Park) is a two-acre park on Hartland Road, adjacent to the beltway. Subsequent to the approval of the master plan in January 2012, the Planning Commission approved the 2232 Application for Hartland Green Park on November 8, 2012. This approval confirms that development of the approved master plan would be consistent with the Comprehensive Plan with regard to location, character and extent. Scope Estimate N/A Project Cost N/A Project Initiation May 2012 Date of Approval November 8, 2012 Project Manager Gayle Hooper Supervisory District: Providence Park Authority Board Member: Ken Quincy Summary: The approved 2012 Park Bond includes funding for the first phase of park development for Hartland Green Park. Planning & Development Division OAKTON COMMUNITY PARK – PROJECT COMPLETION REPORT Phase II – Park Playground This project consisted of the installation of approximately 125 linear feet of concrete trail and a 1,300 square foot playground for children ages 2 to 12 at Oakton Community Park. Scope Estimate $109,470 Project Cost $103,145 Designer Patton Harris & Rust Associates Supervisory District: Providence Scheduled Completion December 2012 Project Manager Bill Boston Actual Completion November 2012 Contractor Cunningham Recreation Park Authority Board Member: Ken Quincy Summary: This project was constructed using Providence District park proffer funding. Planning & Development Division Springfield District LINCOLN LEWIS VANNOY – PROJECT COMPLETION REPORT Board of Supervisors Transfer to the Park Authority The Lincoln Lewis Vannoy (LLV) facility contains two parcels. The 31 acre parcel was transferred to the Park Authority in 2011, however the second parcel required division prior to transfer as the Board of Supervisors retained 5.2 acres adjacent to Braddock Road. Following the division, 14.7 acres was transferred to the Park Authority and is subject to the Land Bank Agreement with the Board of Supervisors. Purchase Price $0 Acquisition Cost $25,000 Project Initiation June 2008 Date of Recordation December 21, 2012 Project Managers Julie Cline & Brian Williams Supervisory District: Springfield Park Authority Board Member: Michael Thompson, Jr. Summary: This project did not require the use of Park Bond funding except for staff costs related to the review of transfer documents and deeds, and preparation of the division plat by the survey crew. Planning & Development Division Sully District E.C. LAWRENCE PARK – PROJECT COMPLETION REPORT Athletic Field Lighting on Rectangular Field #3 This project included the installation of a 4-pole athletic field lighting system and related electrical work meeting the Park Authority’s lighting performance standard for a type “A” large rectangular field. Scope Estimate $200,000 Project Cost $251,618 Scheduled Completion January 7, 2013 Actual Completion January, 2013 Project Manager Wendy Li Designer Burgess & Niple Supervisory District: Sully Contractor Dalton Electric Service, Inc. Park Authority Board Member: Harold Strickland Summary: This project was designed and constructed using 2006 and 2008 Park Bond Funds. Planning & Development Division This page intentionally left blank. Planning & Development Division Fourth Quarter CY2012 Project Status Report 1 Oct - 31 Dec (2008 Bond Funded Projects) STATUS A W/C FY 2013 Work Plan DISTRICT Braddock PARK Wakefield PROJECT DESCRIPTION Athletic Field Lighting Scope, design, and install Replacement replacement athletic field lighting for synthetic turf field #5 SCHEDULE INDICATOR G Green - On schedule Active Project Warranty/Closeout Project Y Yellow - Schedule delayed by two quarters or more I Inactive Project R Red - Project stopped C Project Complete Actual (7/2012 - 6/2013) Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 2 Design 2008 Bond 3 Construction 2008 Bond 6 Status Start Date Apr-11 End Date May-11 PM Li Jun-11 Aug-11 W/C Sep-11 Feb-12 % Complete 100% Actual Duration (in Mos) 2 Actual vs Planned Duration (in Qtrs) 0 Start Date Apr-11 End Date May-11 Li Jun-11 Aug-11 100% 3 0 Li Sep-11 Mar-12 100% 5 0.25 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding G 08 Bond Funding Other Funding(s) $0.00 Total Project Cost DISTRICT Braddock PARK Wakefield PROJECT DESCRIPTION Skate Park Expansion Scope, design and construct an expansion of the skate park. Original Amount $0.00 Debit/Credit $227,000.00 PAB Approved Cost Revised Funding $227,000.00 $180,492.00 $4,939.00 $185,431.00 82% $41,569.00 Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 6 Design 2008 Bond 6 Construction 2008 Bond 6 Status W/C Start Date Jul-11 End Date Dec-11 PM Fruehauf Start Date Jun-11 End Date Oct-11 % Complete 100% Actual Duration (in Mos) 5 Actual vs Planned Duration (in Qtrs) 0.25 Jan-12 Jun-12 Fruehauf Nov-11 Mar-12 100% 5 0.25 Jul-12 Dec-12 Fruehauf Apr-12 Aug-12 100% 5 0.25 $0.00 Total Project Cost 2008 Bond Fund Projects Debit/Credit $388,000.00 $388,000.00 $0.00 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding $0.00 PAB Approved Cost $388,000.00 Revised Funding $58,873.00 $138,439.00 $197,312.00 51% Schedule Indicator G 08 Bond Funding Original Amount Balance 08 Bond Allocation Remarks: PAB Scope approved May 2011. Sept. 2011 - Contract Award approved by PAB October 2011. Anticipate NTP Nov. 2011. Dec. 2011 NTP was issued mid Nov. Project in the construction phase with anticipated completion by early Feb. 2012. March 2012 - SCI was held in March. Punchlist work underway. June 2012 - Punchlist work complete. Project in 1 yr. warranty period. $227,000.00 Other Funding(s) Schedule Indicator $190,688.00 Balance 08 Bond Allocation $0.00 Remarks: Staff issued a Request for Proposal to GameTime / Spohn Ranch Skate Parks to provide design and installation services under the U.S. Communities contract with Fairfax County . Park Authority sponsored a design forum with Spohn Ranch Skate Parks to enlist the ideas of the skate and bike community. The site plan has been approved. Skate park design is complete. Staff has requested a cost proposal from GameTime for the concrete portion of the skatepark. Staff has requested a cost proposal from Southern Asphalt Co. Inc. to complete the demolition, site grading and utility installation. Groundbreaking is scheduled for April 14, 2012. Construction is scheduled to start within 30 days of groundbreaking. Skate park contractor has completed work on the concrete features. Site contractor has completed installation of the flat concrete, shade structure and drainage system. Project reached substantial completion in August 2012. Project is in warranty phase. Ribbon cutting ceremony was held September 2012. Page 1 of 23 PARK PROJECT DESCRIPTION DISTRICT County Huntley Wetlands Restoration Scope, design and construct a Wide Meadows Park structural feature for retaining and controlling the water level in the wetlands. Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 9 Design 2008 Bond 18 Construction 2008 Bond Status A 12 Start Date Jul-11 End Date Nov-12 % Complete 100% Fruehauf Apr-12 Dec-12 100% Lynch Jan-13 Start Date Jul-11 End Date Mar-12 PM Fruehauf Apr-12 Sep-13 Oct-13 Sep-14 Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) 5% G 08 Bond Funding Other Funding(s) Original Amount $404,800.00 $2,580,200.00 Total Project Cost DISTRICT Countywide PARK Various PROJECT Land Purchases Debit/Credit $0.00 Sub-tasks Funding 2008 Bond Revised Funding $2,985,000.00 Expenditure to Date $146,721.00 Reservation/ Encumbernce $339,777.00 Total Cost to Date $486,498.00 % Expended to Date 16% Balance of Project Funding $2,498,502.00 Phase Duration (in Mos) Status A Start Date Jul-08 End Date Jun-14 PM Cline Start Date Jul-08 End Date % Complete Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) $0.00 Total Project Cost DISTRICT County Wide PARK Various PROJECT Needs Assessment Original Amount Debit/Credit Sub-tasks Funding 2008 Bond PAB Approved Cost Revised Funding $14,385,400.00 $14,385,400.00 Expenditure to Date $12,033,385.00 Reservation/ Encumbernce $185,908.00 Total Cost to Date $12,219,293.00 % Expended to Date 85% Balance of Project Funding $2,166,107.00 Phase Duration (in Mos) 17 Status A Start Date Nov-11 End Date Dec-13 PM Stallman/ Bentley Start Date Nov-11 End Date % Complete 10% Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) Original Amount $0.00 Balance 08 Bond Allocation $0.00 Debit/Credit $300,000.00 PAB Approved Cost Revised Funding Expenditure to Date Reservation/ Encumbernce $300,000.00 Total Cost to Date $0.00 Schedule Indicator G 08 Bond Funding Other Funding(s) Schedule Indicator Remarks: Acquisition of Islamic Foundation Property, Birge Fadoul Property, Turner Farm House, Roysdon Property, Taneja Property, Sappington Property, Enyedi Property, BOS Land Transfer, Ruckstuhl Property, Tapestry Park (formerly Kings West Swim Club), Lincoln Lewis Vannoy Property, McPherson Property. $14,385,400.00 DESCRIPTION Conduct Needs Assessment process to collect and analyze data on park and recreation needs and create a 10-year Capital Improvement Plan. $0.00 G 08 Bond Funding Other Funding(s) Balance 08 Bond Allocation Remarks: The Selection Advisory Committee has completed contract negotiations with the highest rated firm An RFP was issued on October 12, 2011. A fee proposal was received from the consultant and has been determined acceptable. A contract award was presented to the Park Authority Board for approval in January 2012. Contract was awarded to WSSI ion 01/25/12. The kick-off meeting was held on 03/02/12. WSSI has determined that the topographic information is inadequate to complete their analysis and design and submitted a fee proposal to obtain additional information. All topographic surveying has been completed. WSSI presented 2 conceptual plans for review. Following review of the concept plans, it was determined that using a vinyl sheet pile in lieu of the concrete water control structsure will reduce the project cost and be easier to construct. WSSI and Park Authority staff met with DCR and Army COE to resolve federal and state permitting issues. All issues were resolved and the permitting process will proceed as scheduled. Additional geotechnical investigation was performed in order to finalize the water control structure design. WSSI provided a revised cost estimate and schedule with the design development plans. WSSI completed Design Development plans on October 5 2012. Scope Item was approved in November 2012. Permit Plans are scheduled to be complete in late January 2013. Project is being prepared for a January 2013 bid. $2,985,000.00 DESCRIPTION PAB Approved Cost Schedule Indicator % Expended to Date 0% Balance of Project Funding $300,000.00 Balance 08 Bond Allocation $0.00 Remarks: Project team established; Development of project scope underway. Total Project Cost DISTRICT Countywide PARK Various PROJECT Mastenbrook Grant $300,000.00 DESCRIPTION Sub-tasks Funding 2008 Bond Phase Duration (in Mos) Status A Start Date TBD End Date TBD PM TBD Start Date End Date % Complete Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) G 08 Bond Funding Other Funding(s) $0.00 Original Amount Debit/Credit $485,000.00 $0.00 PAB Approved Cost $485,000.00 Revised Funding Schedule Indicator Expenditure to Date $110,839.00 Reservation/ Encumbernce $3,730.00 Total Cost to Date $114,569.00 % Expended to Date 24% Balance of Project Funding $370,431.00 Balance 08 Bond Allocation $0.00 Remarks: Total Project Cost 2008 Bond Fund Projects $485,000.00 Page 2 of 23 DISTRICT Countywide PARK Various PROJECT Natural and Cultural Resource Protection Projects DESCRIPTION TBD Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) Status Start Date TBD End Date TBD PM TBD Start Date End Date % Complete Expenditure to Date Reservation/ Encumbernce Total Cost to Date Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) % Expended to Date Balance of Project Funding Schedule Indicator Design Construction 08 Bond Funding Other Funding(s) $0.00 Original Amount Debit/Credit $970,000.00 $0.00 PAB Approved Cost Revised Funding $970,000.00 $289,681.00 $1,747.00 $291,428.00 30% $678,572.00 Balance 08 Bond Allocation $0.00 Remarks: Total Project Cost DISTRICT Countywide PARK Various PROJECT Rental Properties Improvements $970,000.00 DESCRIPTION Various capital repairs to rental properties. Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 5 Status Start Date Jan-09 End Date Jun-09 PM Sotirchos Start Date Dec-08 42 C Jul-09 Dec-12 Williams Jul-10 End Date % Complete 100% Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) Schedule Indicator Design Construction 100% G 08 Bond Funding Other Funding(s) $0.00 Original Amount $630,500.00 Total Project Cost DISTRICT Countywide PARK Various PROJECT DESCRIPTION Demolition of Rental Demolition of prior residential Houses rental houses and accessory structures. Permit and demolish the Tolson and Royston Properties. Total Project Cost 2008 Bond Fund Projects Debit/Credit $0.00 $630,500.00 Sub-tasks Design Funding 2008 Bond Construction 2008 Bond Phase Duration (in Mos) PAB Approved Cost Revised Funding $630,500.00 Expenditure to Date $405,097.00 Reservation/ Encumbernce $366.00 Total Cost to Date $405,463.00 % Expended to Date 64% Balance of Project Funding $225,037.00 Balance 08 Bond Allocation $0.00 Remarks: Dec. 2008 Project team was established and kick off meeting held. Assessment of needed repairs at rental properties underway. Mar-2009 assessment of needed repairs at rental properties continues. Received Draft report from consultant SWSG on needed repairs/maintenance at Packard Center. Meeting scheduled for mid April to review with Executive Committee. July 2009 - Assessment of rental properties nearing completion including Packard Center. Team will be reconvened to prioritize needed repairs at various properties including Packard Center. June 2010 - Contract Award approved by PAB for Packard Center Improvements. September 2010- Discussion of final disposition of the Rental Program with Board. Packard Center improvements completed December 2010. Residental apartments vacated July 15, 2011. Balance of funds to be applied to demolition of Riverbend Potomac, Key House, Tolson and Roysdon rental homes. Last report. Status Start Date TBD End Date PM Start Date End Date % Complete Expenditure to Date Reservation/ Encumbernce Total Cost to Date Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) % Expended to Date Balance of Project Funding Schedule Indicator TBD 08 Bond Funding Other Funding(s) Original Amount Debit/Credit $0.00 $0.00 $225,037.00 $225,037.00 PAB Approved Cost Revised Funding Balance 08 Bond Allocation Remarks: Page 3 of 23 DISTRICT Countywide PARK Various PROJECT DESCRIPTION Demolition of Houses Permit and demolish houses and Accessory and accessory structures on Structures the Ruckstuhl , Martin, and Birge properties. Sub-tasks Design Funding 2008 Bond Phase Duration (in Mos) 6 Construction 2008 Bond 7 PARK Various Other Funding(s) Original Amount Debit/Credit $0.00 $0.00 $490,000.00 End Date Sep-12 PM Emory Start Date Mar-12 A Oct-12 Apr-13 Emory Aug-12 End Date Aug-12 Actual vs Planned Duration (in Qtrs) PAB Approved Cost Revised Funding Expenditure to Date 70% Reservation/ Encumbernce Total Cost to Date G Balance of Project Funding Start Date May-12 End Date Aug-12 Design 4 A Sep-12 Dec-12 Li Apr-12 50% Construction 4 A Jan-13 Apr-13 Li Aug-12 50% PM Li Start Date Apr-12 % Complete 50% End Date Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) Other Funding(s) Original Amount Debit/Credit $0.00 $0.00 $800,000.00 DISTRICT Countywide PARK Various PROJECT Grouped Trails Sub-tasks Scope Funding 2008 Bond Revised Funding Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Balance 08 Bond Allocation $800,000.00 $0.00 Remarks: September 2012 - Scope and desigh phase completed for Great Falls Nike #4 and EC Lawrence #3. Project was bid and contract awarded with issuance of NTP in August 2012. Installation of lighting at Great Falls Nike is underway. December 2012 - Athletic field lighting for both Great Falls Nike Field #4 and ECL Field #3 are complete. Contractor working on punchlist work. $800,000.00 DESCRIPTION PAB Approved Cost Schedule Indicator G 08 Bond Funding Total Project Cost Balance 08 Bond Allocation $65,000.00 Status A Funding 2006/2008 Bond % Expended to Date $425,000.00 Phase Duration (in Mos) 4 Sub-tasks Scope Schedule Indicator Remarks: SWSG was hired to complete a rough grading plan for the Ruckstuhl Property. Also due to the conservation easement that encompasses the site, a tree preservation plan was developed that will guide the contractor in demolition of the various properties. The plans were approved by Fairfax County. All utility companies have provided "all clear" notification or they have removed their utilities from the site, including, water, sewer, electric, and telephone service. The project was advertised for bid for demolition of the three houses, in-ground swimming pool, various outbuildings, all pavement. J Roberts was the successful bidder. Prior to demolition the three properties needed to be cleared of asbestos materials, including roof, siding, pipe insulation and flooring. In addition, three wells and septic systems had to be abandoned/removed in accordance with Health Dept standards. The Fairfax County Fire Department was granted permission to use the three houses for enclosed space rescue practice. The main Ruckstuhl residence has been demolished. The second property has been demolished. The entire site has been seeded with a native flower seed mix. Errosoion and sediment controls have been left in place until the site is stabilized. The Birge Property was bid for demolition of the house and stand-alone garage in July 2012. J Roberts was the successful bidder. Preparation and submittal of the Rough Grading Plan and Demolition Permit requirements were included as part of the bid. Asbestos and lead paint removal was included as part of this contract's scope of work. All utilities have been disconnected and removed. The Fairfax County Police Department was granted permission to use the property for their tactical unit practice. The Rough Grading Plan was approved in December 2012. A pre-construciton meeting will be held in January 2013. Demolition is anticipated to begin in January 7, 2013. The Martin Property was bid for demolition of the house in June 2012. Cresco Inc. was the successful bidder. Preparation and submittal of the Rough Grading Plan and Demolition Permit requirements were included as part of the bid. Asbestos and lead paint removal was completed under a separate contract. All utilities have been disconnected and removed. Demolition is anticipated to begin in October 2012. The Fairfax County Fire Department was granted permission to use the three houses for enclosed space rescue practice. Approval of the Rough Grading Plan is anticipated in October 2012. Demolition is anticipated to begin in October 2012. Demolition work was completed in December 2012. $490,000.00 PROJECT DESCRIPTION Grouped Athletic Field Install athletic field lighting on Lighting up to four rectangular fields not to-exceed $800,000. Start Date Apr-12 Actual Duration (in Mos) 08 Bond Funding Total Project Cost DISTRICT Countywide Status % Complete 100% Phase Duration (in Mos) Status A Start Date End Date PM Start Date % Complete End Date Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) Schedule Indicator G --------------------> Design Construction 08 Bond Funding Other Funding(s) $0.00 Original Amount Debit/Credit $970,000.00 $0.00 PAB Approved Cost $970,000.00 Revised Funding Expenditure to Date $118,244.28 Reservation/ Encumbernce Total Cost to Date $0.00 $118,244.28 % Expended to Date 12% Balance of Project Funding $851,755.72 Balance 08 Bond Allocation $0.00 Remarks: Due to cash flow for park bond sales, funds for this project not available until 2011. Total Project Cost 2008 Bond Fund Projects $970,000.00 Page 4 of 23 DISTRICT Dranesvill e PARK Dead Run SV PROJECT DESCRIPTION 1150 LF asphalt. Grouped Trails: Churchill to ROW near Ingleside Ave. Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 4 Land Acquisition 2008 Bond 4 Design 2008 Bond 3 Construction 2008 Bond 5 Status A Start Date Nov-11 End Date Jan-12 % Complete 100% Boston Feb-12 12/26/2012 100% Boston Dec-12 Start Date Jan-12 End Date Apr-12 PM Boston Sep-11 Dec-11 N/A May-12 Jul-12 Aug-12 Dec-12 Actual Duration (in Mos) 3 Actual vs Planned Duration (in Qtrs) 0.25 11 -2 8% G 08 Bond Funding Other Funding(s) $0.00 PARK Accotink SV Debit/Credit $140,000.00 $0.00 PROJECT DESCRIPTION Asphalt 1000' new trail to Grouped Trails: Pine Ridge Connector existing sidewalk to park Trail to CCT PAB Approved Cost Revised Funding $220,000.00 Dec-12 $7,330.00 Reservation/ Encumbernce $44,051.67 Total Cost to Date $51,381.67 % Expended to Date 23% Balance of Project Funding $168,618.33 Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 9 Design 2008 Bond Construction 2008 Bond Status A Start Date Jan-11 End Date Oct-11 3 Nov-11 Jan-12 4 Feb-12 May-12 PM Boston Start Date Aug-12 End Date % Complete 75% Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) $0.00 Total Project Cost DISTRICT Sully PARK Flatlick SV PROJECT Grouped Trails: Flatlick SV Original Amount Debit/Credit $130,000.00 PAB Approved Cost Revised Funding Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Sub-tasks Land Acquisition Funding 2008 Bond Status Start Date Feb-11 End Date Jul-11 PM Cline I Cronauer Scope 2008 Bond 4 Sep-10 Jan-11 Design 2008 Bond 6 Feb-11 Jul-11 Construction 2008 Bond 6 Aug-11 Jan-12 Start Date End Date % Complete Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) $0.00 Total Project Cost 2008 Bond Fund Projects Debit/Credit $162,500.00 $162,500.00 PAB Approved Cost Revised Funding Schedule Indicator R 08 Bond Funding Original Amount Balance 08 Bond Allocation Remarks: Grouped Trails was approved by the PAB for scoping on March 24, 2010. Due to cash flow for park bond sales, funds for this project not available until 2011. Team formed and team kickoff meeting held October, 2012. Scope item to PAB for approval January 2013. Pre-propsal meeting held with Burgess & Niple, Inc. January 7, 2013, with proposal for design services expected late-Janurary 2013. To PAB for scope approval 1/23/13. Design scheduled to begin February 2013. Phase Duration (in Mos) 6 Other Funding(s) Schedule Indicator $0.00 $130,000.00 DESCRIPTION Asphalt 1300' new trail to extend new DPWES trail. ($80,000.00) Y 08 Bond Funding Other Funding(s) Balance 08 Bond Allocation Remarks: Project scope redefined as 1,150 LF asphalt trail. Project Team kickoff meeting held Nov. 16,2011. Scope approval expected January 2013, revised project cost for PAB approval is $220,000. PAB approved project scope January 25, 2012. Design Contract Awarded to Burgess & Niple, Inc. February 2012. Multi-agency team met in field March 2012 to consider design options. DPWES denied moving project forward as Minor Site Plan June 2012. PI plans submitted to DPWES June 11, 2012 and Easement Plat submitted to DPWES June 15th, 2012. Plans returned late from DPWES in early Oct. 2nd Submission PI plans submitted to DPWES October 5, 2012. Site Permit and Plan Approval received December 26, 2012. Anticipated VDOT land use permit in mid-January 2013 will complete Design Phase. Revised proposal for contstruction services recieved from Finley Asphalt January 7, 2013. Finley Asphalt to be selected and PO to be issued in January 2013, with construction scheduled to begin early February 2013. $140,000.00 Total Project Cost DISTRICT Mason Original Amount Schedule Indicator Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Balance 08 Bond Allocation $0.00 Remarks: Grouped Trails was approved by the PAB for scoping on March 24, 2010. Due to cash flow for park bond sales, funds for this project not available until 2011. This project will follow a stream bank restoration project by SWMD. That project was delayed because of funding problems. Start scoping process in June 2011 if SWM funding for their project is approved. DPWES confirmed they expect this funded in FY2012. Scope will be initiated when DPWES completes design (currently 65%) and funds construction of their portion. Page 5 of 23 DISTRICT Dranes ville PARK Great Falls Nike PROJECT Infrastructure Completion DESCRIPTION SWM facility, trails, transitional landscaping screening and streetlights. Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 3 Design Construction 11 Actual vs Planned Duration (in Qtrs) 0.00 End Date Sep-08 PM Sheikh Start Date Jul-08 End Date Sep-08 Oct-08 Jan-09 Sheikh Oct-08 Jan-09 100% 4 0.00 Feb-09 Dec-09 Feb-09 Oct-09 100% 9 0.50 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Status Start Date Jul-08 W/C 4 Actual Duration (in Mos) 3 % Complete 100% MendsCole G 08 Bond Funding Other Funding(s) Original Amount $25,000.00 $824,500.00 Total Project Cost DISTRICT Dranes ville PARK Great Falls Nike Debit/Credit $0.00 Revised Funding $849,500.00 $814,881.00 $779,245.00 $1,282.00 $780,527.00 96% $34,354.00 Phase Duration (in Mos) 2 Sub-tasks Scope Funding 2008 Bond/ Partnership Design 2008 Bond/ Partnership 2 Construction 2008 Bond/ Partnership 4 Status W/C Actual Duration (in Mos) 3 Actual vs Planned Duration (in Qtrs) -0.25 Start Date May-12 End Date Jun-12 PM Mends-Cole Start Date May-12 End Date Jul-12 % Complete 100% Jul-12 Aug-12 Mends-Cole May-12 Aug-12 100% 4 -0.50 Sep-12 Dec-12 Guzman Aug-12 Nov-12 100% 6 -0.50 DISTRICT Dranes ville PARK Spring Hill RECenter PROJECT Parking Lot Renovation Other Funding(s) Original Amount Debit/Credit $575,000.00 $0.00 $250,000.00 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding #DIV/0! -$62,841.00 Total Project Cost 2008 Bond Fund Projects Sub-tasks Scope Funding 2008 Bond PAB Approved Cost Revised Funding $ 4,387.00 $ 58,454.00 $ 62,841.00 Phase Duration (in Mos) 6 Design 18 Construction 18 % Complete 100% Actual Duration (in Mos) 18 Actual vs Planned Duration (in Qtrs) -3.00 Status Start Date Oct-08 End Date Mar-09 PM Villarroel Apr-09 Sep-10 Villarroel Feb-10 Jul-10 100% 6 3.00 C Oct-10 Mar-12 Hardee Aug-10 Jul-11 100% 12 1.50 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Start Date Jul-08 End Date Jan-10 Original Amount $95,000.00 $1,935,150.00 Debit/Credit $494,538.00 $2,524,688.00 Balance 08 Bond Allocation $825,000.00 PAB Approved Cost Revised Funding $2,027,460.00 $2,524,688.00 $2,142,705.00 $841.00 $2,143,546.00 85% Schedule Indicator G 08 Bond Funding Other Funding(s) Schedule Indicator Remarks: September 2012 - Scope and design phases were completed. Bidding and contract award with NTP issued in August 2012. Project in the construction phase. Construction has been completed and small punch list remains. Project is under warranty. $825,000.00 DESCRIPTION Design and construction a new RECenter entrance from Lewinsville Road, close entrance from Artnauman Court, add 260 new parking spaces, repave existing parking lot and provide LID stormwater facilities, sidewalks and landscaping. $34,619.00 G 08 Bond Funding Total Project Cost Balance 08 Bond Allocation Remarks: January 2010 - Submitted for VDOT permit for trail installation. Provided payment to VA Dominion Power for street lighting. Awaiting plan revision approval to delete the curb and gutter in parking lot. Mar 2010 - Project will require VDOT Acceptance process. Meeting scheduled with DPWES Site Inspector April to finalize punch list. June 2010 - Waiting for VA Dominion Power to install street lights. Installation of VDOT trail to follow. Sept 2010 - Continue to wait for VA Dominion Virginia Power to install street lights. Next action to request proposal for installation of new asphalt trail. December 2010 - No change in project status. March 2011 VA Dominion VA Power installed street lights. Asphalt trail required re-design due to Rt#7 road alignements. June 2011 RFP for trail issued and contract proposal under review for asphalt and stone dust trails. Sept 2011 - PO was issued and a pre-construction meeting was conducted. Work is underway to construct the asphalt/stone dust trails. Dec 2011 - Trail improvements underway. March 2012 Trail improvements have been completed. Staff working on VDOT acceptance package. June 2012 - Staff working on VDOT acceptance package. December 2012 consultant working on VDOT acceptance package. $849,500.00 PROJECT DESCRIPTION Installation of Scope, design, and construct Synthetic Turf Field in synthetic turf rectangular field Partnership with Great #4. Falls Lacrosse PAB Approved Cost Schedule Indicator $381,142.00 Balance 08 Bond Allocation $0.00 Remarks: Notice to Proceed was issued on August 11, 2010. The contractor has completed the Storm Water Management Pond. Construction of the parking lot improvements is proceeding in phases to allow for adequate parking for RECenter programs and activities. The two underground stormwater storage facilities have been installed. Sidewalk, light pole foundations and curb and gutter work is proceeding. Parking lot base stone has been placed and asphalt paving will start within the next two weeks. Delivery of parking lot lights may be impacted by availability of products shipping from Japan. Project reached substantial completion on July 22, 2011. Remaining landscaping work will not be performed until hot weather ends this fall. All punchlist items have been corrected and the project is now under warranty. One-Year warranty inspection was held and the list of deficiencies was sent to the contractor with the work being scheduled for September 2012. The Park Authority will be partnering with Mclean Youth Association to upgrade the condition of Field #4 to improve playing conditions. This will be completed in fall 2012. In September 2012, DPWES completed the construction of the new park entrance on Lewinsville Rd. funded by the Park Authority. This includes new pavement width to Lewinsville Rd., striping to create a bicycle lane, and a new asphalt trail along Lewinsville Rd. A new traffic signal that controls movements in and out of the park and Spring Hill Elementary School, directly across the street from the park, is now operational . A pedestrian crossing is included at the new park entrance. Staff has installed new stop signs, and speed humps to deter cut-through traffic. Staff is developing a plan to connect a sidewalk from the new park entrance to the RECenter. Last report. Page 6 of 23 DISTRICT Dranes ville PARK Spring Hill RECenter PROJECT DESCRIPTION RECenter Expansion RECenter expansion to include fitness space, multipurpose space, and a gym (design only). Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 6 Status Start Date Aug-11 End Date Feb-12 PM Villarroel Start Date Aug-11 12 A Feb-12 Feb-13 Villarroel Jan-12 Design End Date May-12 % Complete 100% Actual Duration (in Mos) 10 Actual vs Planned Duration (in Qtrs) -1.00 75% G Emory Construction 08 Bond Funding Other Funding(s) $0.00 Total Project Cost DISTRICT Dranes ville PARK Turner Farm PROJECT DESCRIPTION Observatory - Phase I Work with the Analemma Society to advance the design of and support for fundraising efforts for the Observatory at Turner Farm. Construction documents for roll-top Observatory. Conceptual design for Education building. PARK Lake Fairfax PROJECT DESCRIPTION Replacement of 3 Scope, design, permit, and Restroom Facilities for construct restroom facilities at RV, Family Camping, and ADA Compliance Picnic Area. Design only. $0.00 Debit/Credit $600,000.00 PAB Approved Cost Revised Funding $600,000.00 Expenditure to Date $272,003.00 Reservation/ Encumbernce $309,634.00 Total Cost to Date $581,637.00 % Expended to Date 97% Balance of Project Funding $18,363.00 Sub-tasks Design Funding 2004 Bond Construction 2008 Bond 15 Other Funding(s) Original Amount Status A Start Date Jan-06 End Date Dec-07 PM Holley Oct-11 Dec-12 Holley Start Date Jan-06 End Date % Complete 95% Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) 2008 Bond Fund Projects $0.00 08 Bond Funding Debit/Credit $727,500.00 PAB Approved Cost Revised Funding Expenditure to Date Reservation/ Encumbernce Total Cost to Date Schedule Indicator Y % Expended to Date Balance of Project Funding Balance 08 Bond Allocation $0.00 Remarks: Conceptual design for the entire Observatory Park and complete construction plans and specifications for a small Roll Top Observatory Building (RTOB) underway. Construction plans and specifications for RTOB 95% complete. $727,500 funding for construction in 2008 Park Bond available in 2012. Site plan submitted for permitting in December 2009. Site Plan conditionally approved except for final Health Department approval of drainfield. Building plans in permitting review. DPWES requested soils info for critical structure review Nov 11. CPA for soils services sent January 2012. Designer incorporating soils info into permit set. reSubmission for permitting by end of April. Consultant not performing - staff investigating contract enforcement options. Building documents submitted to DPWES for permitting on 9/24/12. Meeting with DPWES on 10/16/12 to resolve Site permit issues. $727,500.00 Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 5 Design 2008 Bond 12 Other Funding(s) Original Amount $162,000.00 $0.00 Status Start Date May-11 End Date Nov-11 PM Duncan Start Date Jul-11 A Dec-11 Oct-12 Duncan Dec-11 End Date Feb-12 % Complete 50% Actual Duration (in Mos) 8 Actual vs Planned Duration (in Qtrs) -0.75 Debit/Credit $150,000.00 $312,000.00 PAB Approved Cost $312,000.00 Revised Funding Expenditure to Date $274,776.00 Schedule Indicator 50% G 08 Bond Funding Total Project Cost Balance 08 Bond Allocation Remarks: Project Team has met on several occasions to develop the programming needs for the new expansion and renovation of existing space. The consultant submitted a fee proposal and following negotiations an acceptable fee proposal was submitted. A Contract Project Assignment has been issued to the Hughes Group Architects (HGA). The kick-off meeting was held in January 2012 to review the program and concept plans. HGA submitted concept plans on 01/18/12. Staff approved a concept plan and provided comments. HGA was directed to proceed to schematic plan development. Schematic plans were submitted on 03/30/12. Project Team met on 04/09/12 to review the schematic plans. Schematic plans were reviewed and approved with comments. HGA submitted a materials and color layout and a LEED checklist. Staff provided comments and HGA provided a revised plan which was approved by staff. The PAB approved the project scope in May 2012. HGA submitted design development plans in July 2012 for the project team to review. HGA was directed to proceed to Construction Document phase. 50% plans will be presented to the project team in October 2012. The site plan was submitted for approval by Fairfax County. First submission comments have been received. The most significant comment is in regard to the installation and/or replacement of street lights on Lewinsville Rd., Spring Hill Rd., and Artnauman Dr. Staff will be requesting a waiver to omit installation of street lights on Artnauman Ct. since the upper entrance has been closed and the lower access is an exit only. The Building Plans are scheduled to be submitted for permit review in January 2013. Phase Duration (in Mos) 23 Total Project Cost DISTRICT Hunter Mill Original Amount $600,000.00 $0.00 Schedule Indicator Reservation/ Encumbernce $20,659.00 Total Cost to Date $295,435.00 % Expended to Date 95% Balance of Project Funding $16,565.00 Balance 08 Bond Allocation $0.00 Remarks: June 2012 - PAB approved the Scope for Bath House "A" in Feb. 2012. Site permit drawings and buidling permit approved Fairfax County. Project has been bid and construction contracts have been executed. Notice-to-Proceed has been issued for Bathhouse "A"and construction is scheduled to begin August 2012 and Completed in March 2013. September 2012 - Bathhouse "A" is in construction phase. Restroom "B" and Bathhouse "C" are currently in the scope/design phase. Scope for both Restroom "B" and Bathhouse "C" will be brought before the PAB for approval once construction funding is identified. December 2012 - Bathouse "A" is under construction. Restroom "B" plans have been submitted for MSP. Restroom "B" is unfunded at this time. Page 7 of 23 DISTRICT Hunter Mill PARK Lake Fairfax PROJECT Skate Park DESCRIPTION Scope, design, and construct a concrete skate park. Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 6 Design 2008 Bond 6 Construction 2008 Bond Status W/C 6 Start Date Jul-11 End Date Dec-11 % Complete 100% Actual Duration (in Mos) 5 Actual vs Planned Duration (in Qtrs) 0.25 PM Fruehauf Start Date Jun-11 End Date Oct-11 Nov-11 Jun-12 100% 8 -0.5 Jul-12 Oct-12 100% 4 0.5 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Jan-12 Jun-12 Fruehauf Jul-12 Dec-12 Fruehauf G 08 Bond Funding Other Funding(s) Original Amount $449,100.00 $727,500.00 Total Project Cost DISTRICT Hunter Mill PARK Lake Fairfax PROJECT Expand Watermine Debit/Credit $0.00 Revised Funding $1,176,600.00 $226,379.00 $864,712.00 $1,091,091.00 93% $85,509.00 Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 6 Design 2008 Bond 12 Construction 2008 Bond Other Funding(s) Original Amount Status A Start Date Aug-11 End Date Feb-12 PM Emory Feb-12 Feb-13 Emory Start Date Jan-12 End Date % Complete 75% Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) $0.00 Total Project Cost DISTRICT Lee PARK Banks PROJECT DESCRIPTION Demolition of Permit and demolish accessory Accessory Structures structures to include an outdoor kitchen, pool, pool house, garage, shed, and fencing. Total Project Cost 2008 Bond Fund Projects Debit/Credit $400,000.00 PAB Approved Cost Revised Funding Expenditure to Date $400,000.00 $28,690.00 Reservation/ Encumbernce $2,490.00 Total Cost to Date $31,180.00 Schedule Indicator % Expended to Date 8% Balance of Project Funding $368,820.00 Balance 08 Bond Allocation $0.00 Remarks: The Project Team has recommended that an analysis be conducted to determine the validity of the 2003 recommendations for expansion. A Request for Proposal was issued to the consultant to obtain services to complete the analysis. A Contract Project Assignment was issued to Burgess & Niple (B&N) for the initial feasibility study of the project. A report has been issued by the subconsultant Ballard/King that includes recommendations for improving the facility. A project team meeting is scheduled for July to discuss the recommendations. The project team reviewed the draft report and requested revisions to include an analysis of the 2003 recommendation, modifications to the demographics, reduction in elements to improve the 2-5 age group play events, increase in elements to encourage use by 10-14 age group. The final draft report was submitted in October 2012. A second Contract Project Assignment was issued to Burgess & Niple to prepare two concept plans. B&N will be working with Water Technologies Inc. to develop the plans and cost estimates. The project team reviewed and approved the final concept plan. A meeting has been scheduled with the Health Department on January 10, 2013 to review the plan. $400,000.00 Sub-tasks Design Funding 2008 Bond Phase Duration (in Mos) 3 Construction 2008 Bond 7 End Date Dec-11 % Complete 100% Actual Duration (in Mos) 4 Actual vs Planned Duration (in Qtrs) -0.25 Schedule Indicator Jan-12 Jul-12 100 7 0 G Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Status Start Date Sep-11 End Date Dec-11 PM Sheikh Start Date Sep-11 W/C Jan-12 Jul-12 Sheikh 08 Bond Funding Other Funding(s) Original Amount Debit/Credit $0.00 $0.00 $0.00 $0.00 $0.00 Y 08 Bond Funding $0.00 Balance 08 Bond Allocation Remarks: A purchase order has been issued to GameTime / Spohn Ranch Skate Parks to provide design and installation services under the U.S. Communities contract with Fairfax County . Park Authority sponsored a design forum in June 2011 with Spohn Ranch Skate Parks to solicit ideas of the skate and bike community. Staff has issued a Contract Project Assignment to a Civil Engineering Consultantl for engineering services to include preparation of permit documents. Staff has evaluated various sites to determine the appropirate location for the facility. A site located adjacent to the existing athletic fields has been selected. A second design forum was held on October 27, 2011 with Spohn Ranch to finalize the skate park design. The site plan has been submitted to DPWES for reiew. Following the public meeting, Spohn Ranch requested permission to prepare a revised layout due to design and cost constraints of the current design. Spohn Ranch presented a revised plan, however the Project Team has requested revisions to the plan to add 1000 square feet of skate surface. GameTime submittea a final plan and cost proposal for the demolition, site grading, utility installation, shade structures, and skatepark . A Purchase Order was issued to GameTime in June 2012 for construction of all phases of the skate park and construction is underway. Construction of the concrete skate features and the concrete flat skate slab were completed in September. Site work to grade the site, install top soil, assemble the two shade structures, install the concrete shelter slab, concrete sidewalk, accessible parking spaces, gravel parking lot, gravel access road, and rain garden are on-going. A bid for installation of sod and landscape planting was advertised in September 2012. Denison Landscape Inc. was the successful bidder. Work was complete on October 20, 2012. A ribbon cutting ceremony was held on October 27, 2012. $1,176,600.00 DESCRIPTION Expand Watermine to include activities for teens. Design only. PAB Approved Cost Schedule Indicator PAB Approved Cost Revised Funding Balance 08 Bond Allocation Remarks: Demolition work was completed July 2012. Page 8 of 23 PARK DISTRICT Lee Historic Huntley PROJECT Historic Huntley Site Restoration - Main House and Historic Dependencies DESCRIPTION Development and preservation of the Huntley Historic site and related buildings. Includes archeological analysis of the buildings, cultural landscape report, site features analysis, site improvements and building renovations. Sub-tasks Scope Funding 2004 Bond Design 2004 Bond 6 Construction 2008 Bond 18 W/C Other Funding(s) Original Amount $708,746.00 $1,886,650.00 Debit/Credit $0.00 Actual vs Planned Duration (in Qtrs) -0.25 Start Date Jan-09 End Date Apr-09 Duncan Apr-09 Aug-09 100% 5 0.25 Duncan Sep-09 Aug-11 100% 24 -1.5 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Start Date Jan-09 End Date Mar-09 PM Duncan Apr-09 Sep-09 Oct-09 Mar-11 Sub-tasks Scope Funding Phase Duration (in Mos) 4 Design PAB Approved Cost Revised Funding $2,500,000.00 $1,845,422.00 $1,697,906.00 $980.00 $1,698,886.00 68% Start Date Dec-12 End Date Apr-13 PM Duncan 2 Apr-13 May-13 Duncan 14 Jun-13 Aug-14 Duncan Construction 2008/2012 Bond Other Funding(s) Original Amount G $146,536.00 Debit/Credit $1,000,000.00 $0.00 $0.00 Status I Start Date End Date % Complete Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) DISTRICT Lee PARK Lee District PROJECT Family Recreation Area 1 Sub-tasks Scope Funding 2008 Bond Design 2008 Bond Construction 2008 Bond PAB Approved Cost Revised Funding Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Actual Duration (in Mos) 2 Actual vs Planned Duration (in Qtrs) 0.25 10 -1.00 Phase Duration (in Mos) 3 Status Start Date Jul-11 End Date Sep-11 PM Fruehauf Start Date Jun-11 End Date Jul-11 % Complete 100% 6 W/C Oct-11 Mar-12 Lynch Aug-11 May-12 100% $0.00 Total Project Cost PARK DISTRICT Mason Pinecrest Golf Course PROJECT DESCRIPTION Reconstruction of the Design and reconstruct the Upper Dam upper and lower dam Embankments embankments. Original Amount $0.00 Debit/Credit $600,000.00 Sub-tasks Scope Funding Fund 371 Phase Duration (in Mos) 18 Design 2008 Bond 36 Construction 2008 Bond 26 PAB Approved Cost Revised Funding $600,000.00 Expenditure to Date $568,755.00 Reservation/ Encumbernce $1,754.00 Total Cost to Date $570,509.00 % Expended to Date 95% Balance of Project Funding $29,491.00 Status W/C % Complete 100% Actual Duration (in Mos) 17 Actual vs Planned Duration (in Qtrs) 0.25 Start Date Jul-07 End Date Dec-08 PM Lehman Start Date Jul-07 Jan-09 Dec-11 Sheikh Jan-09 Jul-12 100% 31 1.25 Jan-12 Mar-14 Lynch Apr-12 Dec-12 100% 9 4.25 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding End Date Dec-08 $65,000.00 $2,551,100.00 Schedule Indicator Balance 08 Bond Allocation $0.00 Debit/Credit $0.00 PAB Approved Cost Revised Funding $2,616,100.00 $1,551,100.00 $359,739.00 $833,640.00 $1,193,379.00 46% Schedule Indicator G 08 Bond Funding Original Amount Balance 08 Bond Allocation Remarks: Equipment and Rubber Surface have been installed. Playground was substantially complete on April 27, 2012. Grand Opening was held on May 19, 2012. Project is under warranty. $600,000.00 Other Funding(s) Schedule Indicator G 08 Bond Funding Other Funding(s) $749,974.00 Remarks: Project to be rescheduled in FY2013-2018 CIP. $1,000,000.00 DESCRIPTION Scope, design, and construct play area I of the accessible playground. Balance 08 Bond Allocation R 08 Bond Funding Total Project Cost Schedule Indicator Remarks: Grand Opening was held on May 19, 2012. Facility has been open to the public during scheduled times. One Year Warranty Inspection August 2012 and contractor is working on warranty items and closing out the project. $2,595,396.00 PROJECT DESCRIPTION Historic Huntley Site Renovate tenant house for Restoration - Phase II visitor center. Tenant House Status Actual Duration (in Mos) 4 % Complete 100% 08 Bond Funding Total Project Cost PARK DISTRICT Lee Historic Huntley Phase Duration (in Mos) 3 $357,721.00 Balance 08 Bond Allocation $0.00 Remarks: Project Substantially Complete as of December 2012. Contractor is working on the punch list. Total Project Cost 2008 Bond Fund Projects $2,616,100.00 Page 9 of 23 PARK DISTRICT Mason Pinecrest Golf Course PROJECT Lower Pond Dam Repair and Stream Restoration DESCRIPTION Repair of the lower pond spillway structures and restoration of the stream segment between the upper and lower ponds. Sub-tasks Scope Funding Phase Duration (in Mos) Design 2008 Bond 36 Construction 2008 Bond 15 Status A Start Date End Date % Complete Sheikh Jan-09 Jan-12 100% TBD Sep-12 Start Date End Date PM Jan-09 Dec-11 Jan-13 Mar-14 Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) 37 -0.25 5% G 08 Bond Funding Other Funding(s) Original Amount Debit/Credit $0.00 $0.00 $1,000,000.00 Total Project Cost DISTRICT Mt. Vernon PARK Laurel Hill PROJECT Sports Complex Sub-tasks Land Acquisition Funding 2004 Bond Revised Funding Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) 14 7 Phase Duration (in Mos) Status Start Date Sep-07 End Date TBD PM TBD Start Date End Date % Complete Jan-05 Jul-08 Holley Aug-07 Sep-08 100% Oct-06 Jul-08 Holley Oct-06 Planning Fund 303 42 2232/SE Fund 303 21 2008 Bond 13 Jan-09 Jan-10 Holley 23 Sep-11 Jan-12 Holley I 88% R Design Construction 08 Bond Funding $0.00 Total Project Cost PROJECT Bunker Renovation Original Amount Debit/Credit $1,940,000.00 PAB Approved Cost Revised Funding Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Remarks: No funding for construction of project. County-wide staff team reviewing partnership with landfill development. Project on hold. County Executive formed multi-agency team to review and conceptually plan shared YCF site with Fire and Rescue in Jan 2012. Sub-tasks Scope Funding 2004 Bond Phase Duration (in Mos) 3 Design 2004 Bond 2 Construction 2004 Bond 5 Status Start Date May-12 W/C End Date Jul-12 % Complete 100% Actual Duration (in Mos) 3 Actual vs Planned Duration (in Qtrs) 0 End Date Jul-12 PM Bhinge Jun-12 Jul-12 Bhinge Jun-12 Jul-12 100% 2 0 Aug-12 Dec-12 Bhinge Aug-12 Oct-12 100% 3 0.5 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Start Date May-12 2008 Bond Fund Projects Other Funding(s) Original Amount Debit/Credit $315,101.00 $164,899.00 $0.00 $480,000.00 PAB Approved Cost Revised Funding Schedule Indicator G 08 Bond Funding Total Project Cost Balance 08 Bond Allocation $0.00 $1,940,000.00 DESCRIPTION Design and renovate the golf course bunkers. Schedule Indicator Scope Other Funding(s) PARK DISTRICT Mt. Laurel Hill Golf Vernon Course Balance 08 Bond Allocation Remarks: Project design work has been completed. Finalizing permit approvals and preparing bid documents. $1,000,000.00 DESCRIPTION Determine Feasibility for developing sports field complex considering use of private venture. Facilities respond to Need Assessment. Phase I development on Youth Detention Site. Concurrently draft and approve SE, 2232. Subphase I development for demolition and construction. PAB Approved Cost Schedule Indicator Balance 08 Bond Allocation $480,000.00 Remarks: Golf Creations was awarded construction contract on August 3, 2012. Field work began on August 8, 2012 and was completed on September 16, 2012. Contract Close out is in process. Project is in the warranty phase. Page 10 of 23 DISTRICT Mt. Vernon PARK McNaughton Fields PROJECT Atheltic Fields DESCRIPTION Athletic field improvements recommended by the community task force. Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 9 Status Start Date Jul-11 End Date Mar-12 PM Emory Start Date Jul-11 15 A Apr-12 Jun-13 Emory May-12 Design End Date % Complete 90% Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) 10% G 08 Bond Funding Other Funding(s) $0.00 Total Project Cost DISTRICT Mt. Vernon PARK Mt. Vernon District PROJECT DESCRIPTION Building Existing Develop scope and budget for Conditions Evaluation; building renewal. Limited Feasibility Study for Expansion Capabilities Original Amount Debit/Credit PAB Approved Cost Pre-scope $0.00 Development $145,500.00 Funding 2008 Bond Expenditure to Date $7,879.00 Reservation/ Encumbernce $0.00 Total Cost to Date $7,879.00 % Expended to Date 5% Balance of Project Funding $137,621.00 Phase Duration (in Mos) 12 Status Start Date May-13 End Date May-14 PM Inman Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) Start Date End Date % Complete Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding End Date May-12 % Complete 100% Actual Duration (in Mos) 10 Actual vs Planned Duration (in Qtrs) -1.00 Design Other Funding(s) Original Amount Debit/Credit $0.00 $970,000.00 $0.00 Total Project Cost PARK Oak Marr PROJECT DESCRIPTION Oak Marr RECenter - Rec Center expansion to Expand Fitness Area provide larger fitness center. Design only. PAB Approved Cost Revised Funding Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 6 Design 2008 Bond 12 Construction 2012 Bond Status Start Date Aug-11 End Date Feb-12 PM Inman Start Date Aug-11 A Feb-12 Feb-13 Inman Feb-12 $0.00 2008 Bond Fund Projects $0.00 Debit/Credit $450,000.00 $450,000.00 PAB Approved Cost $450,000.00 Revised Funding Expenditure to Date $233,297.00 Schedule Indicator 97% G 08 Bond Funding Original Amount Balance 08 Bond Allocation Remarks: $970,000.00 Other Funding(s) Total Project Cost Schedule Indicator Construction 08 Bond Funding DISTRICT Provi dence Balance 08 Bond Allocation Remarks: Park Authority presented several field layout options to Woodlawn Little League at Supv Hyland's office. Woodlawn LL requested the Park Authority to make a presentation to their full board of directors. Staff made a presentation to the Woodlawn LL Board of Directors on 02/06/12. Woodlawn LL BOD has unanimously recommended a plan to redevelop the site with four lighted/irrigated natural surface fields, concession building, playground, and parking. Funding is available to prepare plans to the Design Development phase. An RFP was issued to Burgess & Niple in April 2012. A Contract Project Assignment as issued to B&N in Jne 2012 to redesign the entire site with four new lighted/irrigated ballfields, parking, playground, and batting cages. A concession/restroom building will be sited but not designed. Scope approval is scheduled for March 2013. A new project will be created for construction in the next work plan. $145,500.00 Sub-tasks Scope Revised Funding Schedule Indicator Reservation/ Encumbernce $199,298.00 Total Cost to Date $432,595.00 % Expended to Date 96% Balance of Project Funding $17,405.00 Balance 08 Bond Allocation $0.00 Remarks: Sept 2011 - Project team assembled. RFP issued to design consultant. Jan 2012 - Consultant kickoff on Nov 2011. Concept Design and Schematic design options completed Jan 2012. March 2012 - Design Development mid-point meeting scheduled for 4/13/2012. June 2012 - 50% Project Completion design documents submitted. September 2012 - 95% Project Completion design documents submitted and under review by Project Team. Site Plan and Building Premit Plans being anticipated to be submitted in October. December 2012 - Construction documents are 97% complete and be readied for bidding in April 2013. Permit plans have been submitted for MSP and Building Permit. Page 11 of 23 DISTRICT Providence PARK Oak Marr PROJECT DESCRIPTION Athletic Field Lighting Scope, design, permit and Field #1 & #2 install athletic field lighting on fields #1 & #2. Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 3 Design 5 Construction 7 Status Start Date Jul-10 Oct-10 W/C Mar-11 Actual Duration (in Mos) 4 Actual vs Planned Duration (in Qtrs) -0.25 PM Li Start Date Mar-11 End Date Jun-11 % Complete 100% Feb-11 Li Jun-11 Sep-11 100% 4 0.25 Sep-11 Li Oct-11 Jul-12 100% 10 -0.75 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding End Date Sep-10 08 Bond Funding Other Funding(s) $0.00 Original Amount $451,536.00 PARK Oak Marr $0.00 PROJECT DESCRIPTION Synthetic Turf Scope, design, permit and Conversion Field #1 & install synthetic turf on field #1 & #2 #2 PAB Approved Cost Revised Funding $451,536.00 $321,609.00 $8,824.00 $330,433.00 73% $121,103.00 Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 4 Design 2008 Bond 7 Construction 2008 Bond 5 Status W/C Actual Duration (in Mos) 4 Actual vs Planned Duration (in Qtrs) 0.00 Start Date Jul-10 End Date Oct-10 PM Mends-Cole Start Date Mar-11 End Date Feb-12 % Complete 100% Nov-10 Jul-11 Mends-Cole Jun-11 Feb-12 100% 9 -0.50 Jun-12 Oct-12 Guzman Feb-12 Jul-12 100% 6 -0.25 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding 08 Bond Funding Other Funding(s) Original Amount $19,500.00 $1,689,740.00 Total Project Cost DISTRICT Providence PARK Providence RECenter PROJECT Repair of Structural Damage Debit/Credit $0.00 PAB Approved Cost Revised Funding $1,709,240.00 $1,500,089.00 $101,470.00 $1,601,559.00 94% $107,681.00 Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 6 Design 2008 Bond 5 Construction 2008 Bond 4 Status W/C Actual Duration (in Mos) 6 Actual vs Planned Duration (in Qtrs) 0.00 Start Date Dec-11 End Date May-12 PM Hardee Start Date Dec-12 End Date May-12 % Complete 100% Jan-12 May-12 Hardee Jan-12 May-12 100% 5 0.00 Jun-12 Sep-12 Hardee Jun-12 Sep-12 100% 4 0.00 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding 08 Bond Funding Total Project Cost 2008 Bond Fund Projects Other Funding(s) Original Amount Debit/Credit $0.00 $0.00 $662,000.00 $662,000.00 Balance 08 Bond Allocation $0.00 Schedule Indicator G Balance 08 Bond Allocation $0.00 Remarks: December 2010 - Anticipate project startup in February 2011 for concept layout of fields and lighting. Mar 2011 - Project team assembled. Meeting with consultant to review RFP. Anticipate start of scope/design phase April 2011. June 2011 - Concept plan layout approved for two full size fields by project team and Providence Supervisor Athletic Team Task Force. Design documents underway. Sept 2011 Scope Approval scheduled to go before the PAB Nov. 2011. Anticipate construction in May 2012. Dec. 2011 - Project in for site plan permit approval. RFP was issued in Dec. to open-end contract vendor Atlas Track. Contract Award phase underway. March 2012 Project in construction phase. June 2012 - Project in construction phase. September 2012 - Substantial Completion Inspection held in August 2012. All Punchlist work has been completed. $1,709,240.00 DESCRIPTION Design and construct repairs to the steel rigid frame roof girders located over the pool area. G Remarks: Anticipate project startup in Nov. 2010. Mar 2011 - Project team assembled. Meeting with consultant to review RFP. Anticipate start of scope/design phase April 2011. Construction to be completed Nov 11 - Mar 12. June 2011 - Concept plan layout approved for two full size fields by project team and Providence Supervisor Athletic Team Task Force. Design documents underway. Sept. 2011 PAB approved scope September 2011. Project in the bidding phase. Dec 2011 Contract Award was approved Dec. 2011. NTP will be issued in Jan. 2012. March 2012 project in construction phase. June 2012 project in construction phase. September 2012 - Substantial Completion Inspection held in August 2012. Punchlist work underway. December 2012 - Punchlist work completed. Project in 1 year warranty phase. $451,536.00 Total Project Cost DISTRICT Providence Debit/Credit Schedule Indicator PAB Approved Cost Revised Funding Schedule Indicator G Balance 08 Bond Allocation $662,000.00 Remarks: Structural damage to the 5 rigid steel frame members above the pool at Providence RECenter was discovered during the investigation of the earthquake damage that occurred in August 2011. SWSG PC designed the addition of 32 tons of steel to reinforce the roof to comply with the snow load requirements of the current edition of the International Building Code. The Matthews Group was hired to complete the structural repair work under the County's job order contract. Work began on September 4th and reached substaitial completion on September 30th. The project is in the warranty phase. Page 12 of 23 DISTRICT Providence PARK Providence RECenter PROJECT DESCRIPTION Repair of Earthquake Design and construct repairs to Damage the masonry, floor slabs, and finishes damaged by the earthquake. Sub-tasks Scope Funding 2008 Bond/ Insurance Design 2008 Bond/ Insurance 2008 Bond/ Insurance Construction Phase Duration (in Mos) 5 Status 4 W/C 4 Actual Duration (in Mos) 5 Actual vs Planned Duration (in Qtrs) 0.00 Start Date Dec-11 End Date Apr-12 PM Hardee Start Date Dec-12 End Date Apr-12 % Complete 100% Jan-12 Apr-12 Hardee Jan-12 Apr-12 100% 4 0.00 May-12 Aug-12 Hardee May-12 Aug-12 100% 4 0.00 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding 71% $46,226.00 08 Bond Funding Other Funding(s) Original Amount Debit/Credit $0.00 $0.00 $158,000.00 Total Project Cost DISTRICT Springfield PARK Burke Lake PROJECT Replace Restroom Facility Revised Funding $158,000.00 $ 56,248.00 $ 55,526.00 $ 111,774.00 Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 5 Design 2008 Bond 12 Construction TBD Status A Start Date May-11 End Date Nov-11 PM Duncan Start Date Jul-11 End Date Oct-12 % Complete 100% Dec-11 Oct-12 Duncan 11-Dec Nov-12 100% TBD TBD TBD Actual Duration (in Mos) 4 Actual vs Planned Duration (in Qtrs) 0.25 Original Amount $41,000.00 $0.00 DISTRICT Springfield PARK Burke Lake & Golf Course PROJECT Burke Lake Golf Course - Club House Replacement and Driving Range Expansion. DESCRIPTION Phase I - Develop an overall Conceptual Plan for replacing the club house and expanding the driving range. Design and construct a new 5500 square foot club house and related ammenities. Sub-tasks Scope Funding 2008 Bond PAB Approved Cost Revised Funding $116,000.00 Expenditure to Date $22,625.00 Reservation/ Encumbernce $37,572.00 Total Cost to Date $60,197.00 % Expended to Date 52% Balance of Project Funding $55,803.00 Status A Start Date Apr-11 End Date Dec-11 PM Inman 18 Jan-12 Jun-13 Inman 16 Jul-13 Dec-14 Start Date Oct-11 End Date % Complete 75% Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) Debit/Credit $2,910,000.00 $2,910,000.00 Schedule Indicator Balance 08 Bond Allocation $0.00 $0.00 PAB Approved Cost $2,910,000.00 Revised Funding Expenditure to Date $93,378.00 Reservation/ Encumbernce $327,346.00 Total Cost to Date $420,724.00 Schedule Indicator Y 08 Bond Funding Original Amount $0.00 Remarks: June 2012 - Concept plan approved. Project in design phase. 100% reserve septic field as been approved by Health Dept. September 2012 - Scope Item going to the Park Authority Board for Approval on October 24, 2012. Anticipate submitting for Site Plan and Building Permits in October 2012. December 2012 - Bid set of plans are 99% complete. Project as been submitted for MSP and Building Permit as well as Health Department. Phase Duration (in Mos) 9 Construction $0.00 2008 Bond Fund Projects $75,000.00 Design Other Funding(s) Total Project Cost Debit/Credit $116,000.00 Total Project Cost Balance 08 Bond Allocation G 08 Bond Funding Other Funding(s) G Remarks: On August 23, 2011 an earthquake hit the east coast causing the masonry that covers the columns supporting the roof at Providence RECenter to become loose creating a safety issue for patrons and staff. J. Roberts was contracted to remove the loose block so that the pool area could be reopened. SWSG PC was hired to perform an assessment and analyize the roof structure to determine the extent of damage. The damage was determined to be minimal as only the masonry was damaged. SWSG designed and inspected the repairs and the project is now under a one year warranty. $158,000.00 DESCRIPTION Scope, design, permit, and construct new ADA compliant restroom facility in core area. Design only. PAB Approved Cost Schedule Indicator % Expended to Date 14% Balance of Project Funding $2,489,276.00 Balance 08 Bond Allocation $0.00 Remarks: June 2011 - Anticipate project start up in fall. September 2011 - Project team assembly underway. January 2012 - RFP issued to design consultant. March 2012 - Initial site concept plan presented. June 2012 - Concept Design Package completed. September 2012 - Project on hold pending evaluation of unsolicited PPEA. December 2012 - Project on hold pending review of re-submitted unsolicited PPEA. Page 13 of 23 DISTRICT Spring field PARK Burke Lake & Golf Course PROJECT Train Track Replacement DESCRIPTION Replace train track and related infrastructure Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 6 Design 7 Construction 15 Status C Actual Duration (in Mos) 6 Actual vs Planned Duration (in Qtrs) 0.00 End Date May-10 % Complete 100% Jun-10 Feb-11 100% 9 -0.50 Mar-11 Dec-11 100% 14 0.25 Total Cost to Date % Expended to Date Balance of Project Funding Start Date Dec-09 End Date May-10 PM Sheikh Jun-10 Dec-10 Sheikh Jan-11 Mar-12 Sheikh Expenditure to Date Reservation/ Encumbernce Start Date Dec-09 08 Bond Funding Other Funding(s) $0.00 PARK Rolling Valley West PROJECT DESCRIPTION Athletic Field Lighting Replacement of athletic field and Site Lighting and site lighting. Phase II Debit/Credit $1,455,000.00 $0.00 Sub-tasks Scope Funding 2006 Bond Phase Duration (in Mos) 3 2008 Bond 6 Design Construction PAB Approved Cost Revised Funding $897,000.00 $896,890.00 $4,577.00 $901,467.00 100% -$4,467.00 Actual Duration (in Mos) 2 Actual vs Planned Duration (in Qtrs) 0.25 Status Start Date Apr-11 End Date Jun-11 Jul-11 Sep-11 Li Jun-11 Jul-11 100% 2 0.25 C Oct-11 Mar-12 Li Aug-11 Mar-12 100% 10 -1.00 3 PM Li % Complete 100% Start Date Apr-11 End Date May-11 08 Bond Funding Other Funding(s) $0.00 PARK Twin Lakes Golf Course PROJECT DESCRIPTION Reconstruct North Design and reconstruct the Dam Embankment & north lake dam embankment and outlet structure. Outlet Structures $0.00 Debit/Credit $315,000.00 Sub-tasks Scope Funding 2004 Bond Phase Duration (in Mos) 16 2008 Bond 16 Design Construction PAB Approved Cost Revised Funding $315,000.00 Status 28 Expenditure to Date $218,907.00 Reservation/ Encumbernce $2,354.00 Total Cost to Date $221,261.00 % Expended to Date 70% Balance of Project Funding $93,739.00 W/C % Complete 100% Actual Duration (in Mos) 18 Actual vs Planned Duration (in Qtrs) -0.50 End Date Nov-07 PM Lehman Start Date Jul-06 Dec-07 Mar-10 Sheikh Jan-08 Jun-10 100% 30 -0.50 Oct-12 Mar-14 Lynch Jul-10 Jan-12 100% 19 -0.75 Start Date Jul-06 End Date Dec-07 08 Bond Funding Total Project Cost 2008 Bond Fund Projects Other Funding(s) Original Amount $533,773.00 $1,746,000.00 Debit/Credit $2,279,773.00 Balance 08 Bond Allocation $558,000.00 Schedule Indicator G Balance 08 Bond Allocation $0.00 Remarks: September 2011 - Contract Award approved by PAB Sept. 2011 - NTP issued Oct. 2011 Dec. 2011 - Project in the construction phase. Anticipate completion in early Feb. 2012. March 2012 SCI held in March, punchlist work underway. June 2012 - Punchlist work complete. Project in 1 yr. warranty phase. December 2012 - Warranty Inspection conducted. This will be the last report for this project. $315,000.00 Total Project Cost DISTRICT Springfield Original Amount G Remarks: The scope was approved by PAB on May 26, 2010. The design has been completed . Construction contracts with the exception of Trestle repair are in place. Rails are scheduled to be delivered in August 2011, and replacement of the culverts is proceeding. The project reached substantial completion in December 2011, and the punch list items are being addressed. Project is under warranty. This is the last report. $1,455,000.00 Total Project Cost DISTRICT Springfield Original Amount Schedule Indicator $0.00 PAB Approved Cost $2,279,773.00 Revised Funding Expenditure to Date $1,729,315.00 Reservation/ Encumbernce $22,166.00 Total Cost to Date $1,751,481.00 % Expended to Date 77% Balance of Project Funding $528,292.00 Schedule Indicator G Balance 08 Bond Allocation $0.00 Remarks: Staff is working with a consultant who is preparing technical documents required by the Virginia Department of Conservation & Recreation in order to obtain an operation and maintenance permit for the North Lake. Page 14 of 23 PARK DISTRICT SpringTwin Lakes field Golf Course & Clubhouse PROJECT Golf Course/Clubhouse Expansion DESCRIPTION Enlarge Oaks Room for additional dining capacity. Design only. Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 6 12 Design 2008 Bond Construction 2008 Bond Other Funding(s) Original Amount Status Start Date Aug-11 End Date Feb-12 PM Inman Start Date Jul-11 A Feb-12 Feb-13 Inman Feb-12 End Date Mar-12 % Complete 100% Actual Duration (in Mos) 8 Actual vs Planned Duration (in Qtrs) -0.50 95% G 08 Bond Funding $0.00 Total Project Cost DISTRICT Sully PARK Arrowhead PROJECT DESCRIPTION Infrastructure to Road frontage improvements, support athletic fields streetlights, utilities, trails and landscaping. Complete approved site plan. $0.00 Debit/Credit $154,059.00 Funding Phase Duration (in Mos) 3 Design Construction $154,059.00 Status 6 2008 Bond Revised Funding Expenditure to Date $73,521.00 Reservation/ Encumbernce $62,474.00 Total Cost to Date $135,995.00 % Expended to Date 88% Balance of Project Funding $18,064.00 W/C 6 Start Date Oct-08 End Date Dec-08 PM Holsteen Start Date Oct-08 End Date Nov-08 % Complete 100% Actual Duration (in Mos) 2 Actual vs Planned Duration (in Qtrs) 0.25 Jan-09 Jun-09 Sheikh Dec-08 Jun-10 100% 19 -3.25 Jul-09 Dec-09 Guzman Jul-10 Aug-11 100% 14 -2.00 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding 08 Bond Funding Other Funding(s) Original Amount $18,270.00 $688,700.00 Total Project Cost DISTRICT Sully PARK Sully Woodlands PROJECT DESCRIPTION Conceptual Design for Conceptual design for Stewardship stewardship education center. Education Center Debit/Credit $0.00 Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 6 Design 2008 Bond 12 Other Funding(s) Original Amount PAB Approved Cost Revised Funding $706,970.00 $652,150.00 $574,885.00 $17,781.00 $592,666.00 91% $59,484.00 Status A Start Date Jun-12 End Date Dec-12 PM Inman Dec-12 Nov-13 Inman Start Date Oct-12 End Date % Complete Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) Total Project Cost 2008 Bond Fund Projects Debit/Credit $291,000.00 Schedule Indicator G Balance 08 Bond Allocation $54,820.00 PAB Approved Cost Revised Funding Expenditure to Date Schedule Indicator G 08 Bond Funding $291,000.00 $0.00 Remarks: The project scope was approved by PAB on November 12, 2008. Issues with the utility relocation along Arrowhead Park Drive have been resolved. A request for a construction cost proposal under a County open-end contract was issued, and construction is scheduled to begin in May 2011. Notice to proceed with construction was issued on May 3, 2011. The project reached substantial completion in August. Contractor is correcting punch list items. Staff is finalizing the VDOT post-construction package to secure VDOT acceptance of the road frontage improvements. Project is ready for County Inspections to provide roadway construction complection letter which will then allow the CE-7 package to be submitted. $706,970.00 $0.00 Balance 08 Bond Allocation Remarks: September 2011 - Project Team has been assembled. RFP to Design Consultant issued October 2011. January 2012 - Schematic design concepts presented December 2011. Concept pricing in progress. Scope to PAB for approval in Feb. 2012. March 2012 - 40% submission provided comments returned. June 2012 - Site and Buildings Permits in review process. 95% Construction Documents submitted. September 2012 - 1st submission of permit comments being addressed and prepared for resubmittal for both Site and Building Permits. December 2012 - Site Plan and Building Permit plans were re-submitted for approval. Consultant and staff finalizing bid set of documents. Anticipate bidding this project end of January 2013. $154,059.00 Sub-tasks Scope PAB Approved Cost Schedule Indicator Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Balance 08 Bond Allocation $0.00 Remarks: September 2012-Project Kickoff meeting scheduled 10/23/2012. December 2012 - Project team has met several times to determine self-sustaining program budget. RMD currently developing programming for three probable sites to include operational budget for each senario for team review in late January 2013. Page 15 of 23 DISTRICT Sully PARK Sully Woodlands PROJECT Natural and Cultural Resource Studies DESCRIPTION Sub-tasks CDP Funding 2008 Bond Phase Duration (in Mos) 24 2232 2008 Bond 9 Status A Start Date Apr-10 End Date Mar-12 Mar-12 Dec-12 PM Stallman/ RMD Stallman/ RMD Start Date End Date Expenditure to Date Reservation/ Encumbernce % Complete Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) Total Cost to Date % Expended to Date Balance of Project Funding Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) % Expended to Date Balance of Project Funding 08 Bond Funding Other Funding(s) $0.00 Original Amount Debit/Credit $970,000.00 PAB Approved Cost Revised Funding Schedule Indicator Balance 08 Bond Allocation $0.00 Remarks: Studies underway by RMD. CDPs site analysis and team site visits underway. Total Project Cost $970,000.00 Active Projects - Subtotal $58,206,800.00 $23,136,150.00 $35,070,650.00 2008 Bond Funding - Future Year Projects DISTRICT Mt. Vernon PARK Mt. Vernon District PROJECT Design and Permitting for RECenter Renewal DESCRIPTION Sub-tasks Funding 2008 Bond Phase Duration (in Mos) Status Start Date TBD End Date TBD Start Date End Date % Complete Expenditure to Date Reservation/ Encumbernce Total Cost to Date PM TBD 08 Bond Funding Other Funding(s) Original Amount Debit/Credit PAB Approved Cost Revised Funding $727,500.00 Schedule Indicator Balance 08 Bond Allocation $727,500.00 Total Project Cost $727,500.00 Future Year Projects - Subtotal $727,500.00 Remarks: 2008 Bond Funding - Completed Projects DISTRICT Braddock PARK Kings Park Park PROJECT Park Improvements DESCRIPTION General Park Improvements Sub-tasks MP Funding General Fund Phase Duration (in Mos) 9 Start Date Apr-08 End Date Jan-09 PM Dorlester 6 Mar-09 Sep-09 Galusha 3 Ocr -09 Dec-09 Design 6 Jan-10 Construction 6 Jul-10 2232 Scope 2008 Bond Status C % Complete 100% Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) Start Date End Date Vu Oct-09 Feb-10 100% 5 -0.5 Jun-10 Vu Jan-10 Feb-10 100% 2 1.00 Dec-10 Garris Mar-10 Sep-10 100% 7 -0.25 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding 100% 08 Bond Funding Total Project Cost 2008 Bond Fund Projects Other Funding(s) Original Amount $101,600.00 $97,000.00 Debit/Credit $198,600.00 $0.00 PAB Approved Cost $198,600.00 Revised Funding Schedule Indicator $177,765.50 $0.00 $177,765.50 90% $20,834.50 Balance 08 Bond Allocation $0.00 Remarks: July 2009 - Project Team formation to move forward third quarter. Sept - 2009 Project Team assembled. In-house topo created and survey of tree size and location plotted. Conceptual layout plan developed for a phased project. Next step is to meet with community for scope consensus. January 2010 - Met with HOA and Supervisor Cook on Dec.18, 2010. Gained consensus for the playground layout, trails and ADA parking lot improvements. Anticipate seeking PAB Scope Approval Feb. 2010. Mar 2010 - Scope approved by PAB. Proposals were solicited from two county open end contracts (playground & asphalt pavement/grading). Purchase Orders approved and work scheduled to begin in mid April. June 2010 - Playground equipment installation and associated trail and parking lot improvements completed June. Remaining trail work in the park scheduled to be completed in August. Sept 2010- Completed trail loop and associated site restoration. December 2010 - Project in the 1 yr. warranty phase. Final report. Page 16 of 23 DISTRICT Braddock PARK Ossian Hall PROJECT DESCRIPTION Phase II Revitalization Renovate and expand the parking lot and trail system, relocate the multi-use courts and playground, construct a community plaza area and LID stormwater management facilities. Sub-tasks Scope PARK Ossian Hall PROJECT Phase III - Install Synthetic Turf on Rectangle Field Funding 2008 Bond Design 3 Construction 15 Other Funding(s) Original Amount $49,000.00 $2,813,000.00 Debit/Credit ($257,000.00) Start Date Jan-09 Jul-09 C Oct-09 Actual Duration (in Mos) 7 Actual vs Planned Duration (in Qtrs) -0.25 PM Vu Start Date Jan-09 Sep-09 Vu Mar-09 Sep-09 100% 7 -1.00 Dec-10 Garris Oct-09 Nov-10 100% 13 0.50 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding End Date Jun-09 End Date Jul-09 Sub-tasks Scope Funding 2008 Bond PAB Approved Cost Revised Funding $2,813,000.00 $2,605,000.00 $2,451,634.00 $56,749.00 $2,508,383.00 89% $96,617.00 Phase Duration (in Mos) 3 Design 2008 Bond 2 Construction 2008 Bond 13 Other Funding(s) Original Amount End Date Apr-10 % Complete 100% Actual Duration (in Mos) 3 Actual vs Planned Duration (in Qtrs) 0.00 Status Start Date Jan-10 End Date Mar-10 PM Vu Start Date Jan-10 Apr-10 May-10 Brunner Apr-10 Jun-10 100% 3 -0.25 C Jun-10 Jun-11 Garris Jul-10 Nov-10 100% 5 2 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding 08 Bond Funding Debit/Credit PAB Approved Cost Revised Funding $0.00 PARK PROJECT DESCRIPTION DISTRICT Dranes- Colvin Run Mill Visitor Center Addition Prepare Concept Plan for ville - Renovation Visitor Center Addition Renovation Sub-tasks Scope Funding 2008 Bond Balance 08 Bond Allocation $0.00 Schedule Indicator Balance 08 Bond Allocation $0.00 Remarks: Installation of synthetic turf field was issued as Change Order #5 to the Ossian Hall Park Phase II Improvements. Conversion of field is underway and anticipated to be complete November 2010. December 2010 - Substantial Completion Inspection conducted in Nov. 2010 followed by Ribbon cutting. Project in 1 yr. warranty phase. Dec. 2011 1 Yr. Warranty Inspection Conducted. The is the last report. $0.00 Total Project Cost Schedule Indicator Remarks: Staff reviewed the infiltration trench performance and a contract was executed to connect athletic field outfall piping to storm sewer and replace bio-filtration material. September 2012 - Staff executed a contract for remedial work on the infiltration trench. Remedial work for infiltration trench has been complete except for replacing plant material which will be scheduled during the fall planting season. This is the last report for Ossian Hall. $2,605,000.00 DESCRIPTION Scope, design, permit and install synthetic turf on rectangle field. Status % Complete 100% 08 Bond Funding Total Project Cost DISTRICT Braddock Phase Duration (in Mos) 6 Phase Duration (in Mos) 18 Status C Start Date Jul-09 End Date Dec-10 PM Villarroel Start Date Jul-09 End Date Jan-12 % Complete 100% Expenditure to Date Reservation/ Encumbernce Total Cost to Date Actual Duration (in Mos) 31 Actual vs Planned Duration (in Qtrs) -3.25 % Expended to Date Balance of Project Funding Schedule Indicator Design Construction 08 Bond Funding Other Funding(s) $0.00 Total Project Cost DISTRICT Dranesville PARK Riverbend PROJECT DESCRIPTION Clarks Branch Bridge 90' bridge over Clarks Branch. Original Amount Debit/Credit $97,000.00 PAB Approved Cost Revised Funding $97,000.00 $0.00 $50,222.80 $39,356.70 $89,579.50 92% $7,420.50 Sub-tasks Scope Funding MDS Grant Phase Duration (in Mos) 7 Design 2004 Bond 10 Construction 2008 Bond 6 Status C End Date Sep-08 % Complete 100% Actual Duration (in Mos) 10 Actual vs Planned Duration (in Qtrs) -0.75 End Date Jun-08 PM Cronauer Start Date Dec-07 Jul-08 Apr-09 Cronauer Nov-08 Mar-09 100% 5 1.25 Jul-09 Dec-09 Cronauer Jun-09 Dec-09 100% 6 0.00 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Start Date Dec-07 08 Bond Funding Total Project Cost 2008 Bond Fund Projects Original Amount $200,000.00 $512,451.00 Debit/Credit ($112,515.00) $599,936.00 $0.00 Remarks: The project team made a presentation to the Architectural Review Board on November 10, 2011 and received initial comments on the concept plan. Resource Management Division has been tasked with allocating funds in order to proceed with archaeological investigation of the site. The consultant made a final presentation of the concept plan to the project team. The consultant has provided their final report. Last report. $97,000.00 Other Funding(s) Balance 08 Bond Allocation PAB Approved Cost Revised Funding $269,340.00 $369,874.00 $239,240.16 $0.00 $239,240.16 65% $130,633.84 Schedule Indicator Balance 08 Bond Allocation $230,062.00 Remarks: Contract Award to Harbor Dredge and Dock on June 22, 2009. Contractor mobilized, building permit obtained, bridge delivered on October 7, 2009. One month delay due to weather conditions. Substantial completion inspection held December 17, 2009. Final inspection January 21, 2010. Project is in one-year warranty phase. One Year Warrany inspection held on December 17, 2010. No issues. Final Report. Page 17 of 23 DISTRICT Dranes ville PARK Spring Hill PROJECT DESCRIPTION Spring Hill RECenter Asphalt 500' and bridge over existing footpath Connector Trail Sub-tasks Scope Funding Phase Duration (in Mos) 3 2008 Bond 2 Design Construction Status Start Date Aug-09 C 5 End Date Oct-09 % Complete 100% Actual Duration (in Mos) 3 Actual vs Planned Duration (in Qtrs) 0.00 End Date Oct-09 PM Holley Nov-09 Apr-10 Holley Nov-09 Apr-10 100% 6 -0.25 May-10 Jun-10 Holley May-10 Jun-10 100% 2 0.00 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Start Date Aug-09 08 Bond Funding Other Funding(s) Original Amount $0.00 $0.00 Total Project Cost DISTRICT Dranes ville PARK Spring Hill RECenter Debit/Credit $112,515.00 Sub-tasks Scope Funding 2008 Bond Revised Funding $112,515.00 $112,514.88 $0.00 $112,514.88 100% $0.12 Phase Duration (in Mos) 3 Design 5 Construction 11 Actual Duration (in Mos) 4 Actual vs Planned Duration (in Qtrs) -0.25 Start Date Mar-09 End Date Jun-09 % Complete 100% Hardee Jul-09 Sep-09 100% 3 0.5 Hardee Oct-09 Oct-10 100% 13 -0.5 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Status Start Date Apr-09 End Date Jun-09 PM Hardee Jul-09 Nov-09 C Dec-09 Oct-10 08 Bond Funding Other Funding(s) $0.00 Total Project Cost DISTRICT Dranes ville PARK Spring Hill RECenter Original Amount Debit/Credit $2,580,200.00 $0.00 Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 6 12 Design 2008 Bond Construction TBD Other Funding(s) Original Amount PAB Approved Cost Revised Funding $1,660,000.00 $1,248,254.00 $1,266,096.73 $623.95 $1,266,720.68 101% -$18,466.68 Debit/Credit $0.00 $727,500.00 ($494,538.00) Status C Start Date Aug-11 End Date Feb-12 PM Villarroel Feb-12 Feb-13 Villarroel Start Date End Date % Complete Expenditure to Date Reservation/ Encumbernce Total Cost to Date Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) % Expended to Date Balance of Project Funding 08 Bond Funding Total Project Cost DISTRICT Hunter Mill PARK Frying Pan Farm PROJECT Equestrian Facility Improvements Sub-tasks Scope Funding 2004 Bond Phase Duration (in Mos) 3 2008 Bond 18 Design Construction PAB Approved Cost Revised Funding Status 9 Original Amount C Debit/Credit $485,000.00 Total Project Cost 2008 Bond Fund Projects $485,000.00 Balance 08 Bond Allocation $1,331,946 Schedule Indicator Balance 08 Bond Allocation $232,962.00 Start Date Jul-07 End Date Sep-07 PM Scheib Start Date Mar-07 End Date Sep-07 % Complete 100% Actual Duration (in Mos) 7 Actual vs Planned Duration (in Qtrs) -1.00 Oct-07 Jun-08 Scheib Oct-07 Aug-08 100% 11 -0.50 Jul-08 Dec-09 Guzman Sep-08 Nov-09 100% 13 1.25 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding 08 Bond Funding Other Funding(s) Schedule Indicator Remarks: Dec 2010 - Mclean Community Center has shown no further interest in partnering with Park Authority for construction of Gym. Last report. $232,962.00 DESCRIPTION Phase I - Design and construction of horse stables and related improvements. $0.00 Remarks: The project reached substantial completion on October 17, 2010, and is currently in the one year warranty period.The one year warranty inspection was held in October. Final report. $2,580,200.00 PROJECT DESCRIPTION RECenter Expansion Expand the RECenter to include a new larger fitness room, additional multipurpose rooms, a new gym and related site improvements. Balance 08 Bond Allocation Remarks: Project was completed using the County open end contract for paving. Final report. $112,515.00 PROJECT DESCRIPTION RECenter Mechanical Replace 2 dectron units with System Renovation AC capable units, and replace associated piping and controls. PAB Approved Cost Schedule Indicator $0.00 PAB Approved Cost $485,000.00 Revised Funding $470,473.84 $0.00 $470,473.84 97% $14,526.16 Schedule Indicator Balance 08 Bond Allocation $0.00 Remarks: The project reached substantial completion on November 18, 2009. Punch list items have been corrected and the project is under warranty. This is the final report. Page 18 of 23 DISTRICT Hunter Mill PARK Lake Fairfax Park PROJECT Core Area Picnic Shelter-Phase 2B DESCRIPTION Design and construct rentable lake front picnic shelters. Sub-tasks Scope Funding 2004 Bond Phase Duration (in Mos) 18 Design Status 9 Construction 2008 Bond Other Funding(s) Original Amount $450,000.00 $727,500.00 C 12 % Complete 100% Actual Duration (in Mos) 18 Actual vs Planned Duration (in Qtrs) 0.00 End Date Dec-08 PM Villarroel Start Date Jul-07 End Date Jan-09 Jan-09 Sep-09 Villarroel Jan-09 Feb-09 100% 2 1.75 Oct-09 Sep-10 Lynch Mar-09 Dec-09 100% 10 0.5 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Start Date Jul-07 08 Bond Funding Total Project Cost DISTRICT Lee PARK Amberleigh PROJECT Grouped Trails: Island Creek at Amberleigh Park Debit/Credit $0.00 Construction Access/VDOT ROW Revised Funding $1,111,000.00 $849,900.00 $609,041.56 $0.00 $609,041.56 72% $240,858.44 Sub-tasks Land Acquisition Funding 2008 Bond Phase Duration (in Mos) 9 Status Start Date Nov-11 End Date Jul-12 PM I McFarland Scope 2008 Bond 6 Aug-10 Jan-11 Design 2008 Bond 9 Feb-11 Oct-11 Construction 2008 Bond 10 Aug-12 May-13 Start Date End Date % Complete Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) $0.00 Total Project Cost DISTRICT Lee PARK Huntley Meadows Original Amount Debit/Credit $330,000.00 Sub-tasks Scope Funding 2008 Bond PAB Approved Cost Revised Funding Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding $0.00 Phase Duration (in Mos) 3 Design 3 Construction 12 $0.00 Original Amount Balance 08 Bond Allocation $330,000.00 Status Start Date Apr-10 Jul-10 Sep-10 C Oct-10 Sep-11 End Date Jun-10 Actual Duration (in Mos) 9 Actual vs Planned Duration (in Qtrs) -1.5 Start Date Apr-10 End Date Dec-10 % Complete 100% Duncan Jul-10 Dec-10 100% 6 -0.75 Duncan Jan-11 Sep-11 100% 9 0.75 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding PM Duncan 08 Bond Funding Other Funding(s) Schedule Indicator Remarks: Grouped Trails was approved by the PAB for scoping on March 24, 2010. Due to cash flow for park bond sales, funds for this project not available until 2011. Due to site conditions, project not feasable within current budget and timeline. Staff seeking subsitute project. Last report. $330,000.00 PROJECT DESCRIPTION Boardwalk Renovation Replace decking on existing wetlands boardwalk $327,600.00 R 08 Bond Funding Other Funding(s) Balance 08 Bond Allocation Remarks: The project is complete and closed. This is the final report. $1,177,500.00 DESCRIPTION Asphalt 2600’ new trail. PAB Approved Cost Schedule Indicator Debit/Credit $645,050.00 PAB Approved Cost Revised Funding $40,000.00 $644,200.00 $0.00 $538,518.93 $30,713.14 $569,232.07 88% $74,967.93 Schedule Indicator Balance 08 Bond Allocation $850.00 Remarks: One Year Warranty period ended on October 7, 2012 and no items required correction. This is the last report. Total Project Cost DISTRICT Lee PARK Hooes Road Park PROJECT Road and Parking Lot Improvements, Landscaping and Trails Total Project Cost 2008 Bond Fund Projects $645,050.00 DESCRIPTION Public road improvements, expansion of the parking lot, stormwater management facilities, trails and landscaping. Sub-tasks Scope Funding 2008 Bond End Date Sep-08 % Complete 100% Actual Duration (in Mos) 3 Actual vs Planned Duration (in Qtrs) 0.00 Oct-08 Jun-10 100% 21 -1.50 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Phase Duration (in Mos) 3 Status Start Date Jul-08 End Date Sep-08 PM Duncan Start Date Jul-08 15 C Oct-08 Dec-09 Lynch Construction 08 Bond Funding Other Funding(s) Original Amount $30,000.00 $1,164,000.00 Debit/Credit $1,194,000.00 $0.00 PAB Approved Cost $1,194,000.00 Revised Funding $896,311.55 $8,008.94 $904,320.49 76% $289,679.51 Schedule Indicator Balance 08 Bond Allocation $0.00 Remarks: Board Resolution is being presented to Board of Supervisors on April 10, 2012. The public road frontage improvement have been accepted by VDOT. This is the last report. Page 19 of 23 DISTRICT Lee PARK Lee District RECenter PROJECT Mechanical System Renovation DESCRIPTION Replace 2-pool pac units, 10 rooftop units, 2-energy recovery units, 2-DX units, 2-water pumps, and related piping and controls. Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 3 Design 3 Construction 9 Actual Duration (in Mos) 3 Actual vs Planned Duration (in Qtrs) 0.00 Start Date Jul-08 End Date Sep-08 % Complete 100% Hardee Oct-08 Dec-08 100% 3 0.00 Hardee Jan-09 Sep-09 100% 8 0.25 Balance of Project Funding Status Start Date Jul-08 End Date Sep-08 PM Hardee Oct-08 Dec-08 C Jan-09 Oct-09 08 Bond Funding Other Funding(s) Original Amount $68,000.00 $3,225,250.00 Total Project Cost DISTRICT Lee PARK Lee District PROJECT Family Recreation Area Phase I - Tree House and Supporting Facilities Debit/Credit ($1,642,264.00) Sub-tasks Scope Funding Foundation Revised Funding Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date $2,050,000.00 $1,598,768.00 $1,392,523.65 $0.00 $1,392,523.65 87% $206,244.35 Phase Duration (in Mos) 9 Design Foundation 15 Construction 2008 Bond/ Foundation 15 Status C End Date Mar-09 % Complete 100% Actual Duration (in Mos) 10 Actual vs Planned Duration (in Qtrs) -0.25 End Date Mar-09 PM Fruehauf Start Date Jun-08 Apr-09 Jun-10 Fruehauf Apr-09 Jun-10 100% 15 0.00 Jul-10 Sep-11 Lynch Jul-10 May-11 100% 10 1.25 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Start Date Jul-08 08 Bond Funding Other Funding(s) Original Amount $810,836.00 $436,500.00 DISTRICT Lee PARK Lee District RECenter PROJECT RECenter Roof Replacement Debit/Credit $1,310,964.00 DESCRIPTION Sub-tasks Scope Funding 2008 Bond PAB Approved Cost Revised Funding $2,558,300.00 $2,002,833.52 $7,336.93 $2,010,170.45 79% $548,129.55 End Date Mar-10 % Complete 100% Actual Duration (in Mos) 5 Actual vs Planned Duration (in Qtrs) 0.00 Apr-10 Dec-10 100% 8 -1.25 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding $174,733.63 $0.00 $174,733.63 53% Phase Duration (in Mos) 5 Status Start Date Oct-09 End Date Mar-10 PM Hardee Start Date Oct-09 3 C Apr-10 Jul-10 Hardee Construction 08 Bond Funding Other Funding(s) Original Amount Debit/Credit $331,300.00 Total Project Cost 2008 Bond Fund Projects $331,300.00 $52,218.00 Schedule Indicator Balance 08 Bond Allocation $0.00 Remarks: Construction of the Tree House was completed in December 2010. Construction of Phase 1 was completed in May 2011 to coincide with completion of the Spray Park. The facility was opened to the public on May 21, 2011. The warranty inspection was held in May 2012, and all punch list items have been corrected. This is the last report. $2,558,300.00 Total Project Cost Balance 08 Bond Allocation Remarks: Substantial completion was reached on September 17, 2009, 42 days earlier than the contract completion date. Project is currently under warranty. Oneyear inspection meeting scheduled for October 21, 2010. One year warranty meeting held with no deficiencies noted. This is the final report. $1,650,986.00 DESCRIPTION Develop a Conceptual Plan for the Family Recreation Area. Design and construct the Tree House and supporting facilities. PAB Approved Cost Schedule Indicator PAB Approved Cost $331,300.00 Revised Funding $156,566.37 Schedule Indicator Balance 08 Bond Allocation $0.00 Remarks: SWSG was contracted to scope and design repairs to the roof above the mezzane level of the RECenter. Evaluation report with findings and reccommendations was received February 2010. Start of construction was delayed by DPMS while they put in place an appropriate procurement vehicle for the PUFF roof system. Construction is scheduled to begin in November 2010. Construction was completed in December 2010, and the project is under warranty. This project is complete. Page 20 of 23 DISTRICT Mason PARK Pine Ridge PROJECT Synthetic Turf Conversion for (1) Field DESCRIPTION Scope, design and construct (1) rectangular synthetic turf field Sub-tasks Scope Phase Duration (in Mos) 3 Funding 2008 Bond Design Status 6 Construction C 6 Actual Duration (in Mos) 3 Actual vs Planned Duration (in Qtrs) 0.00 Start Date Sep-09 End Date Nov-09 PM Mends-Cole Start Date Sep-09 End Date Mar-10 % Complete 100% Dec-09 May-10 Mends-Cole Dec-09 Feb-10 100% 3 0.75 Jun-10 Nov-10 Guzman Mar-10 Sep-10 100% 7 -0.25 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding $744,778.90 82% 08 Bond Funding Other Funding(s) $0.00 Total Project Cost DISTRICT Mason PARK Pine Ridge Original Amount Debit/Credit $903,070.00 $0.00 Sub-tasks Scope Phase Duration (in Mos) 3 Funding 2008 Bond Design $903,070.00 Status 4 Construction Revised Funding $744,778.90 $0.00 $158,291.10 C 8 Actual Duration (in Mos) 6 Actual vs Planned Duration (in Qtrs) -0.75 Start Date Sep-09 End Date Nov-09 PM Li Start Date Sep-09 End Date Feb-10 % Complete 100% Dec-09 Mar-10 Li Dec-09 Mar-10 100% 4 0.00 Apr-10 Nov-10 Li Apr-10 Oct-10 100% 7 0.25 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding $944,135.46 73% 08 Bond Funding Other Funding(s) Original Amount $30,000.00 $1,264,104.00 Total Project Cost DISTRICT Mt. Vernon PARK North Hill PROJECT Master Plan Debit/Credit $0.00 Sub-tasks Phase Duration (in Mos) Funding 2008 Bond $0.00 PAB Approved Cost Revised Funding $1,294,104.00 $1,286,000.00 $944,135.46 $0.00 $341,864.54 Schedule Indicator Balance 08 Bond Allocation $8,104.00 Remarks: May 2009 - Project schedule has been revised based on Cash Flow requirements. July 2009 - Project currently approved to start based on FY 2010 Work Plan in April 2011. Sept 2009 - Project Team assembled and kick-off meeting held. Met with civil engineering consultant and initiated RFP. January 2010 - Project in the scope/design phase. Anticipate seeking PAB approval of scope in March 2010. Mar 2010 - PAB approved project scope. Project out to bid. June 2010 - NTP issued June. Contractor installing conduit to pole locations. Sept 2010 - Project was substantial complete Oct 2010 and turned over to NCS for community scheduling. Project is in punchlist and 1 yr. warranty phase. December 2010 - Project in 1 yr. warranty phase. Final report. $1,294,104.00 DESCRIPTION Balance 08 Bond Allocation Remarks: May 2009 - Project schedule has been revised based on Cash Flow requirements. July 2009 - Project currently approved to start based on FY 2010 Work Plan in April 2011. Sept 2009 Project Team assembled and kick-off meeting held. Met with civil engineering consultant and initiated an RFP. January 2010 - Project in the scope/design phase. Anticipate seeking PAB approval of scope in March 2010. Mar 2010 PAB approved scope. RFP issued to county open-end contract for conversion of synthetic turf. Preparation of Purchase Order underway. It is anticipated that construction will begin mid June 2010. June 2010 - Construction NTP was issued. Subgrade preparation, curb and stone installation complete. Sept 2010 - NTP was issued mid June 2010. Substantial completion was held Sept. with turnover to NCS for community scheduling. Ribbon cutting ceremony held on October 16th. Project in punchlist and 1 yr. warranty phase. December 2010 - Project in 1 yr. warranty phase. Final report. $903,070.00 PROJECT DESCRIPTION Athletic Field Lighting Scope, design and permit and for (3) Rectangular install athletic field lighting for Fields and (3) (6) fields. Diamond Fields PAB Approved Cost Schedule Indicator Status C Start Date TBD End Date TBD PM TBD Start Date End Date Expenditure to Date Reservation/ Encumbernce % Complete Actual Duration (in Mos) Actual vs Planned Duration (in Qtrs) % Expended to Date Balance of Project Funding Actual Duration (in Mos) 6 Actual vs Planned Duration (in Qtrs) -0.5 Schedule Indicator Remarks: Total Project Cost Other Funding(s) 08 Bond Funding PAB Approved Cost Revised Funding Total Cost to Date Balance 08 Bond Allocation N/A DISTRICT Providence PARK Accotink SV PROJECT DESCRIPTION Asphalt 500' existing path. Grouped Trails: Barbara Lane Connector to CCT (formerly Karen Drive) Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 4 Design 2008 Bond 2 Construction 2008 Bond 3 Other Funding(s) Original Amount Status C Start Date Dec-10 End Date Apr-11 PM Cronauer Start Date May-10 End Date Nov-10 % Complete 100% May-11 Jun-11 Cronauer Dec-10 Jan-11 100% 1 0.25 Jul-11 Sep-11 Cronauer Jan-11 Jun-11 100% 6 -0.75 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding 08 Bond Funding $0.00 Total Project Cost Debit/Credit $130,000.00 $0.00 $130,000.00 Phase 2008 Bond Fund Projects PAB Approved Cost $54,960.00 Revised Funding $23,414.00 43% $31,546.00 Schedule Indicator Balance 08 Bond Allocation $75,040.00 Remarks: Grouped Trails was approved by the PAB for scoping on March 24, 2010. Due to cash flow for park bond sales, funds for this project not available until 2011. Project scope appproved on November 3, 2010. Construction completed 6/22/2011. Project in warranty phase. Final report. Actual Actual vs Planned Page 21 of 23 DISTRICT Providence PARK Jefferson District PROJECT DESCRIPTION Golf Course Irrigation Replace automated golf course Replacement irrigation system Sub-tasks Scope Funding 2008 Bond Duration (in Mos) 6 Design 3 Construction 9 Status C End Date Apr-10 % Complete 100% Duration (in Mos) 7 Duration (in Qtrs) -0.25 Feb-10 Jun-10 100% 4 -0.25 Jul-10 Mar-11 100% 9 0 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding End Date Mar-10 PM Fruehauf Start Date Oct-09 Apr-10 Jun-10 Fruehauf Jul-10 Mar-11 Fruehauf Start Date Oct-09 08 Bond Funding Other Funding(s) $0.00 Total Project Cost DISTRICT Providence PARK Oak Marr Original Amount Debit/Credit $645,050.00 $0.00 Sub-tasks Scope Funding 2008 Bond Revised Funding $497,000.00 $381,464.00 $362,041.00 $3,259.23 $365,300.23 96% $16,163.77 Phase Duration (in Mos) 6 Design 6 Construction 12 Status C Actual Duration (in Mos) 6 Actual vs Planned Duration (in Qtrs) 0.00 Start Date Oct-09 End Date Mar-10 % Complete 100% Hardee Apr-10 Dec-10 100% 9 -0.75 Hardee Jan-11 Oct-11 100% 10 0.50 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Start Date Oct-09 End Date Mar-10 PM Hardee Apr-10 Sep-10 Oct-10 Oct-11 08 Bond Funding Other Funding(s) $0.00 Total Project Cost DISTRICT Providence PARK Oak Marr PROJECT Oak Marr RECenter Roof & Pool Dive Tower Renovation Original Amount Debit/Credit Sub-tasks Scope Funding 2008 Bond PAB Approved Cost Revised Funding $660,000.00 $2,580,200.00 Phase Duration (in Mos) 6 Design 3 Construction 6 $615,369.00 $9,550.00 $624,919.00 95% $35,081.00 Actual Duration (in Mos) 7 Actual vs Planned Duration (in Qtrs) -0.25 Status Start Date May-10 End Date Jan-11 PM Hardee Start Date May-10 End Date Jan-11 % Complete 100% Feb-11 Apr-11 Hardee Feb-11 May-11 100% 4 -0.25 C May-11 Oct-11 Hardee Jun-11 Oct-11 100% 5 0.25 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding 08 Bond Funding Other Funding(s) $0.00 Total Project Cost DISTRICT Providence PARK Oak Marr PROJECT Oak Marr RECenter Natatorium Lighting and Skylight Renovation Original Amount $0.00 Debit/Credit Sub-tasks Scope Funding 2008 Bond PAB Approved Cost Revised Funding $90,000.00 $892,000 $892,000.00 Phase Duration (in Mos) 2 Design 2 Construction 3 $785,158.00 $30,985.00 $816,143.00 91% $75,857.00 Status Start Date Apr-11 C End Date May-11 % Complete 100% Actual Duration (in Mos) 2 Actual vs Planned Duration (in Qtrs) 0.00 End Date May-11 PM Hardee Jun-11 Jul-11 Hardee Jun-11 Jul-11 100% 2 0.00 Aug-11 Oct-11 Hardee Aug-11 Oct-11 100% 3 0.00 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Start Date Apr-11 08 Bond Funding Other Funding(s) $0.00 Total Project Cost 2008 Bond Fund Projects Original Amount $0.00 Debit/Credit $345,000.00 $345,000.00 Schedule Indicator Balance 08 Bond Allocation $1,920,200.00 Schedule Indicator Balance 08 Bond Allocation $0.00 Remarks: Construction documents for the roof replacement are being prepared. Request for Proposal has been sent to the contractor to repair the dive tower and roof. Construction is scheduled to start on August 22, 2011, concurrent with the bi-annual maintenance shut down. The roof and pool dive tower renovations have been completed and the punch list is being addressed. This project is under warranty. Last report. $892,000.00 DESCRIPTION $263,586.00 Remarks: The project scope was approved on June 23, 2010. A Purchase Request has been circulated for signatures. Notice to Proceed is expected to be issued in April 2011. Bulkheads have been ordered and are scheduled to be shipped in October 2011. New bulkheads have been installed and punch list items are being corrected. This project is under warranty. Last report. $2,580,200.00 DESCRIPTION Balance 08 Bond Allocation Remarks: Contractor was completed in March 2011. The project is now in the Warranty Phase. The contractor is preparing the Operation and Maintenance Manual. One year warranty inspection is scheduled for May 2012. Warranty items have been resolved. This is the last report. $645,050.00 PROJECT DESCRIPTION Oak Marr RECenter - Replace pool bulkheads. Natatorium Renovation PAB Approved Cost Schedule Indicator PAB Approved Cost $345,000.00 Revised Funding $268,321.00 $256,621.00 $524,942.00 152% -$179,942.00 Schedule Indicator Balance 08 Bond Allocation $0.00 Remarks: The lighting and skylights in the natatorium have been replaced and a substantial completion inspection was held for that phase of the project. The punch list has been addressed and the project is in the warranty phase. Last report. Page 22 of 23 DISTRICT Providence PARK Providence RECenter PROJECT Mechanical System Renovation DESCRIPTION Replace 1-multizone unit, 3 rooftop units, 1-DX unit, and related piping and controls. Sub-tasks Scope Funding 2008 Bond Phase Duration (in Mos) 6 Design Status 3 Construction C 14 Actual Duration (in Mos) 8 Actual vs Planned Duration (in Qtrs) -0.5 End Date Dec-08 PM Hardee Start Date Jul-08 End Date Feb-09 % Complete 100% Jan-09 Mar-09 Hardee Mar-09 Aug-09 100% 6 -0.75 Apr-09 Nov-10 Hardee Jul-09 Oct-10 100% 20 -1.5 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Start Date Jul-08 08 Bond Funding Other Funding(s) Original Amount $62,000.00 $1,935,150.00 Total Project Cost DISTRICT Springfield PARK Greenbriar PROJECT DESCRIPTION Synthetic Turf Scope, design and construct Conversion (1) rectangular synthetic turf Rectangular Field #5 field. Debit/Credit ($820,000.00) Funding 2008 Bond Revised Funding $1,138,000.00 $684,201.00 $700,500.26 $913.90 $701,414.16 103% -$17,213.16 Phase Duration (in Mos) 3 Design 5 Construction 4 Status C Start Date Nov-08 End Date Jan-09 Feb-09 May-09 Jun-09 Sep-09 PM MendsCole MendsCole MendsCole Actual Duration (in Mos) 4 Actual vs Planned Duration (in Qtrs) -0.25 End Date Feb-09 % Complete 100% Feb-09 Mar-09 100% 2 0.75 Apr-09 Aug-09 100% 5 -0.25 Expenditure to Date Reservation/ Encumbernce Total Cost to Date % Expended to Date Balance of Project Funding Start Date Nov-08 08 Bond Funding Other Funding(s) $0.00 Total Project Cost Original Amount Debit/Credit $1,115,500.00 $1,115,500.00 Completed Projects - Subtotal $6,065,701.00 2008 Bond Program Total $65,000,001.00 2008 Bond Fund Projects Balance 08 Bond Allocation $492,949 Remarks: The project reached substantial completion on October 17, 2010, and is currently in the one year warranty period. The one year warranty inspection was held in October 2011. Final report. $1,177,150.00 Sub-tasks Scope PAB Approved Cost Schedule Indicator $0.00 PAB Approved Cost $1,115,500.00 Revised Funding $918,305.09 $0.00 $918,305.09 82% $197,194.91 Schedule Indicator Balance 08 Bond Allocation $0.00 Remarks: Dec. 2008 - Project team assembled and kick off meeting held. Design phase is underway. Mar 2009 - Scope approval by PAB Feb. 2009. Design complete and in for permitting. RFP issued to open end contractor Mar. 2009 Anticipate issuing NTP end of May 2009. July 2009 - Substantial Completion Inspection scheduled for Aug. 4, 2009. Sept 2009 contractor has completed punchlist work. Awaiting final approval by site inspector. Project in 1 yr. warranty phase. December 2010 - 1 yr warranty inspection conducted. Final report for this project. Page 23 of 23 This page intentionally left blank. Committee Agenda Item February 13, 2013 INFORMATION Monthly Contract Activity Report The Monthly Contract Activity Report lists all contract activities in support of the Capital Improvement Program (CIP) authorized during the months of January 2013. The report lists professional services and construction activities over $100,000 to include awards made via competitive bidding as well as awards made through the use of open-ended contracts. An activity is reported after award. ENCLOSED DOCUMENTS: Attachment 1: Monthly Contract Activity Report STAFF: John W. Dargle, Jr., Director Cindy Messinger, Deputy Director/CFO Sara Baldwin, Deputy Director/COO David Bowden, Director, Planning and Development Division John Lehman, Manager, Project Management Branch Kirk Holley, Manager, Special Projects Branch Deb Garris, Manager, Synthetic Turf Field Branch Julie Cline, Manager, Land Acquisition and Management Branch Michael P. Baird, Fiscal Administrator This page intentionally left blank. Construction Services: Park Name Company Name Contract Award Total Construction Type of Contract Mt. Vernon District Southern Asphalt, Inc. N/A $277,850.00 Open End Dranesville Finley Asphalt Sealing Co. N/A $118,714.68 Open End Funding Source WBS/IO Number: PR 000008 003 Fund: 300 C30400 WBS/IONumber: PR 000016 032 Fund: 300 C30400 Scope of Work NTP Comments Build 1,350 LF of 8’ asphalt trail and 400 LF of 6’ asphalt trail and related improvements Fort Hunt Road Trail Improvements 2011 Build 1,150 LF of 8’ asphalt trail and related improvements Dead Run Stream Valley/Churchill Road to Ingleside Avenue Trail connector Professional Services: Project Name Firm Name Amount Funding Source Scope of Services NTP Attachmen This page intentionally left blank.