Comments
Description
Transcript
CONNECTOR TRAIL EXISTING
EXISTING CONNECTOR TRAIL BIKE AND PEDESTRIAN IMPROVEMENTS CONNECTOR TRAIL *Taken from USU Bike and Pedestrian Plan EXISTING LAND USE AND TRAILS Legend Contours - 10 m FENCE Lakes Parcels USU Trails Roads Streams Golf Course Logan City Boundary 0 CONNECTOR TRAIL 300 600 1,200 1,800 Feet 2,400 Ü Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community HILL SLOPE Legend 0 CONNECTOR TRAIL Contours - 10 m Cache_roads cache_parcels_041310 Trails Cache_lakes Logan City Boundary FENCE Cache_strms 200 400 800 Slopes 10 - 20% 0 - 5% 20 - 30% 5 - 10% 30 - 40% 1,200 Feet 1,600 Ü NEED AND SAFETY The first priority of the Bike and Pedestrian Plan is a trail connecting USU Logan Campus to Logan Canyon. At the mouth of Logan Canyon trail users have 3 options; Summer Summer Use Road for: Bicyling Walking/ Jogging Bicyling Walking/ Jogging Bonneville Shorline Trail, Canyon Road Canal Trail and the (newly complete) Ray Use Road for: 7:00‐8:00am 7:00‐8:00am 12 12 3 Hugie Trail (which connects to the River Trail). Here they have access to8:00‐9:00am a trail 8:00‐9:00am 10 10 3 network of many continuous miles. The Recreation and Open Space Plan Steering 9:00‐10:00am 9:00‐10:00am 2 2 1 10:00‐11:00am 10:00‐11:00am 3 1 3 Committee met with Logan Country Club President David Clark to discuss this option. 11:00‐12:00pm 3 1 11:00‐12:00pm 3 David approved the concept trail running parallel to highway 89 on the south side of 12:00‐1:00pm 12:00‐1:00pm 1 1 3 the country club and also received a verbal agreement with the Country Club 1:00‐2:00pm Board. 1:00‐2:00pm 2 2 5 2:00‐3:00pm 3:00‐4:00pm the west end of 4:00‐5:00pm connects with the 5:00‐6:00pm access Bonneville 6:00‐7:00pm The proposed Canyon Connector Trail would start on the Mount Aire Park and run east to Highway 89 until it Bonneville Shoreline Trail. At that point trail users can Shoreline Trail, Ray Hugie Trail (going to River Trail) and the Canyon Road Canal Trail. This plan (shown left) shows a conceptual alignment, but a specific alignment will be developed during the trail design and construction. 2:00‐3:00pm 2 3:00‐4:00pm 4:00‐5:00pm 5:00‐6:00pm 5 6:00‐7:00pm *Taken from USU Bike and Pedestrian plan CONNECTOR TRAIL 2 5 0 2 School Year School Year Use Road for: Use Road for: Bicyling 3 7:00‐9:00 am 7:00‐9:00 am 3 1 1 1 12:00‐2:00pm 12:00‐2:00pm 3 5 0 4:00‐5:00pm 4:00‐5:00pm 2 6:00‐7:00pm 6:00‐7:00pm Bicyling Walking/ Jogging Walking/ Jo 9 9 8 9 9 3 1 1 6 3 3 7 LOGAN/USU CANYON CONNECTOR TRAIL - OVERALL PLAN USU WALK (SECTION 1) SITE DEVELOPMENT SYMBOL NOTES QTY MOSTLY FLAT TRAIL 5,415 sf RETAINING WALL/GUARD RAIL 3,858 sf MINIMAL RETAINING 2,078 sf UPPER TRAIL W/ FENCE 10,520 sf UPPER TRAIL W/ RETAINING & GUARD RAIL 2,112 sf USU WALK FLAT 11,959 sf (SECTION 3) UPPER TRAIL 1 LOWER TRAIL UPPER TRAIL ASPHALT OVERLAY 2,980 sf LOWER TRAIL W/ RETAINING & GUARD RAIL 12,140 sf 0 NORTH (SECTION 2) 300 600 900 feet SCALE: 1" = 300' CONNECTOR TRAIL 2 RENDERINGS 13 24 CONNECTOR TRAIL LOGAN/USU CANYON CONNECTOR TRAIL - SECTION 1 USU TRAIL 1500 EAST 1 AGGIE BLVD 2 U.S.HIGHWAY 89 SITE DEVELOPMENT SYMBOL NOTES MOSTLY FLAT TRAIL RETAINING WALL/GUARD RAIL MINIMAL RETAINING UPPER TRAIL W/ FENCE UPPER TRAIL ASPHALT OVERLAY 0 UPPER TRAIL W/ RETAINING & GUARD RAIL 100 LOWER TRAIL W/ RETAINING & GUARD RAIL USU WALK FLAT NORTH SCALE: 1" = 100' CONNECTOR TRAIL 200 300 feet RENDERINGS 1 2 CONNECTOR TRAIL LOGAN/USU CANYON CONNECTOR TRAIL - SECTION 2 MOSTLY FLAT RETAINING WALL/GUARD MINIMAL RETAINING UPPER TRAIL W/ FENCE U.S. HIGHWAY 89 BRIDGE SITE DEVELOPMENT SYMBOL LOWER TRAIL RETAINING WALL WITH GUARD RAIL NOTES MOSTLY FLAT TRAIL RETAINING WALL/GUARD RAIL MINIMAL RETAINING UPPER TRAIL W/ FENCE UPPER TRAIL ASPHALT OVERLAY 0 UPPER TRAIL W/ RETAINING & GUARD RAIL 100 LOWER TRAIL W/ RETAINING & GUARD RAIL USU WALK FLAT NORTH SCALE: 1" = 100' CONNECTOR TRAIL 200 300 feet PRECEDENT IMAGES CONNECTOR TRAIL *Jordan River Trail near the golf course with a fence LOGAN/USU CANYON CONNECTOR TRAIL - SECTION 3 UPPER TRAIL RETAINING/ GUARD RAIL ASPHALT OVERLAY UPPER TRAIL W/ FENCE 2 1 U.S. HIG HWAY 8 9 SITE DEVELOPMENT SYMBOL NOTES MOSTLY FLAT TRAIL RETAINING WALL/GUARD RAIL LOWER TRAIL RETAINING/ GUARD RAIL MINIMAL RETAINING EXISTING TRAIL EXISTING TUNNEL LOWER TRAIL NO WALL UPPER TRAIL W/ FENCE UPPER TRAIL ASPHALT OVERLAY 0 UPPER TRAIL W/ RETAINING & GUARD RAIL 100 LOWER TRAIL W/ RETAINING & GUARD RAIL USU WALK FLAT NORTH SCALE: 1" = 100' CONNECTOR TRAIL 200 300 feet EXISTING TRAIL RENDERINGS 1 2 CONNECTOR TRAIL