CONNECTOR TRAIL EXISTING

by user

on
Category: Documents
16

views

Report

Comments

Transcript

CONNECTOR TRAIL EXISTING
EXISTING
CONNECTOR TRAIL
BIKE AND PEDESTRIAN IMPROVEMENTS
CONNECTOR TRAIL
*Taken from USU Bike and Pedestrian Plan
EXISTING LAND USE AND TRAILS
Legend
Contours - 10 m
FENCE
Lakes
Parcels
USU
Trails
Roads
Streams
Golf Course
Logan City Boundary
0
CONNECTOR TRAIL
300
600
1,200
1,800
Feet
2,400
Ü
Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the
GIS User Community
HILL SLOPE
Legend
0
CONNECTOR TRAIL
Contours - 10 m
Cache_roads
cache_parcels_041310
Trails
Cache_lakes
Logan City Boundary
FENCE
Cache_strms
200
400
800
Slopes
10 - 20%
0 - 5%
20 - 30%
5 - 10%
30 - 40%
1,200
Feet
1,600
Ü
NEED AND SAFETY
The first priority of the Bike and Pedestrian Plan is a trail connecting USU Logan
Campus to Logan Canyon. At the mouth of Logan Canyon trail users have 3 options;
Summer Summer Use Road for:
Bicyling
Walking/ Jogging
Bicyling
Walking/ Jogging
Bonneville Shorline Trail, Canyon Road Canal Trail and the (newly complete)
Ray Use Road for:
7:00‐8:00am 7:00‐8:00am 12
12
3
Hugie Trail (which connects to the River Trail). Here they have access to8:00‐9:00am
a trail 8:00‐9:00am 10
10
3
network of many continuous miles. The Recreation and Open Space Plan Steering
9:00‐10:00am 9:00‐10:00am 2
2
1
10:00‐11:00am 10:00‐11:00am 3
1
3
Committee met with Logan Country Club President David Clark to discuss this option.
11:00‐12:00pm
3
1
11:00‐12:00pm
3
David approved the concept trail running parallel to highway 89 on the south side of
12:00‐1:00pm 12:00‐1:00pm 1
1
3
the country club and also received a verbal agreement with the Country Club 1:00‐2:00pm
Board. 1:00‐2:00pm 2
2
5
2:00‐3:00pm
3:00‐4:00pm
the west end
of
4:00‐5:00pm
connects with the
5:00‐6:00pm
access Bonneville
6:00‐7:00pm
The proposed Canyon Connector Trail would start on
the Mount Aire Park and run east to Highway 89 until it
Bonneville Shoreline Trail. At that point trail users can
Shoreline Trail, Ray Hugie Trail (going to River Trail) and the Canyon Road
Canal Trail. This plan (shown left) shows a conceptual alignment, but a
specific alignment will be developed during the trail design and construction.
2:00‐3:00pm 2
3:00‐4:00pm
4:00‐5:00pm
5:00‐6:00pm 5
6:00‐7:00pm
*Taken from USU Bike and Pedestrian plan
CONNECTOR TRAIL
2
5
0
2
School Year School Year
Use Road for: Use Road for:
Bicyling
3 7:00‐9:00 am 7:00‐9:00 am
3
1
1
1 12:00‐2:00pm 12:00‐2:00pm
3
5
0
4:00‐5:00pm 4:00‐5:00pm
2 6:00‐7:00pm 6:00‐7:00pm
Bicyling
Walking/ Jogging
Walking/ Jo
9
9
8
9
9
3
1
1
6
3
3
7
LOGAN/USU CANYON CONNECTOR TRAIL - OVERALL PLAN
USU WALK (SECTION 1)
SITE DEVELOPMENT
SYMBOL
NOTES
QTY
MOSTLY FLAT TRAIL
5,415 sf
RETAINING WALL/GUARD RAIL
3,858 sf
MINIMAL RETAINING
2,078 sf
UPPER TRAIL W/ FENCE
10,520 sf
UPPER TRAIL W/ RETAINING & GUARD RAIL
2,112 sf
USU WALK FLAT
11,959 sf
(SECTION 3)
UPPER TRAIL
1
LOWER TRAIL
UPPER TRAIL ASPHALT OVERLAY
2,980 sf
LOWER TRAIL W/ RETAINING & GUARD RAIL
12,140 sf
0
NORTH
(SECTION 2)
300
600
900 feet
SCALE: 1" = 300'
CONNECTOR TRAIL
2
RENDERINGS
13
24
CONNECTOR TRAIL
LOGAN/USU CANYON CONNECTOR TRAIL - SECTION 1
USU TRAIL
1500 EAST
1
AGGIE BLVD
2
U.S.HIGHWAY 89
SITE DEVELOPMENT
SYMBOL
NOTES
MOSTLY FLAT TRAIL
RETAINING WALL/GUARD RAIL
MINIMAL RETAINING
UPPER TRAIL W/ FENCE
UPPER TRAIL ASPHALT OVERLAY
0
UPPER TRAIL W/ RETAINING & GUARD RAIL
100
LOWER TRAIL W/ RETAINING & GUARD RAIL
USU WALK FLAT
NORTH
SCALE: 1" = 100'
CONNECTOR TRAIL
200
300 feet
RENDERINGS
1
2
CONNECTOR TRAIL
LOGAN/USU CANYON CONNECTOR TRAIL - SECTION 2
MOSTLY FLAT
RETAINING WALL/GUARD
MINIMAL RETAINING
UPPER TRAIL W/ FENCE
U.S. HIGHWAY 89
BRIDGE
SITE DEVELOPMENT
SYMBOL
LOWER TRAIL
RETAINING WALL
WITH GUARD RAIL
NOTES
MOSTLY FLAT TRAIL
RETAINING WALL/GUARD RAIL
MINIMAL RETAINING
UPPER TRAIL W/ FENCE
UPPER TRAIL ASPHALT OVERLAY
0
UPPER TRAIL W/ RETAINING & GUARD RAIL
100
LOWER TRAIL W/ RETAINING & GUARD RAIL
USU WALK FLAT
NORTH
SCALE: 1" = 100'
CONNECTOR TRAIL
200
300 feet
PRECEDENT IMAGES
CONNECTOR TRAIL
*Jordan River Trail near the golf course with a fence
LOGAN/USU CANYON CONNECTOR TRAIL - SECTION 3
UPPER TRAIL RETAINING/
GUARD RAIL
ASPHALT OVERLAY
UPPER TRAIL W/ FENCE
2
1
U.S. HIG
HWAY 8
9
SITE DEVELOPMENT
SYMBOL
NOTES
MOSTLY FLAT TRAIL
RETAINING WALL/GUARD RAIL
LOWER TRAIL RETAINING/
GUARD RAIL
MINIMAL RETAINING
EXISTING
TRAIL
EXISTING
TUNNEL
LOWER TRAIL
NO WALL
UPPER TRAIL W/ FENCE
UPPER TRAIL ASPHALT OVERLAY
0
UPPER TRAIL W/ RETAINING & GUARD RAIL
100
LOWER TRAIL W/ RETAINING & GUARD RAIL
USU WALK FLAT
NORTH
SCALE: 1" = 100'
CONNECTOR TRAIL
200
300 feet
EXISTING
TRAIL
RENDERINGS
1
2
CONNECTOR TRAIL
Fly UP