MTEP 2009 & JCSP 2008 Preliminary Siting Final Review Jason Schmidt 651-632-8420
by user
Comments
Transcript
MTEP 2009 & JCSP 2008 Preliminary Siting Final Review Jason Schmidt 651-632-8420
MTEP 2009 & JCSP 2008 Preliminary Siting Final Review Jason Schmidt 651-632-8420 [email protected] March 18, 2008 1 Overview This is a final stakeholder review for the siting of the regional resource forecasted (RRF) generation for economic transmission planning of the MTEP 2009 and JCSP 2008 Studies Siting assumptions and methodologies were defined in workshops and reviewed by stakeholders and interested parties. All changes/re-siting based on stakeholder feedback from the initial siting have been completed. This final review provides an opportunity for stakeholder comments on the site selection and powerflow injection points for the sited generation before proceeding to the next step of the transmission planning process 2 What is required This presentation • Contains the spatial representation of the locations of the RRF generation on maps The Siting Spreadsheet • Contains the RRF generation by study region and future with index numbers, fuel type and Maximum Capacity identified 3 Things to keep in mind This is regionally forecasted generation based on assumptions defined by four different futures for the purposes of robust economic transmission planning. The spatial representation of a generator on a map is based on a siting methodology consistently applied to all 4 futures The locations are not meant to be an exact geographic location, but rather a reasonable potential general area for the siting of the RRF generation for transmission planning purposes only • i.e. think of a 10-50 mile buffer around each dot on the map This review is for the RRF generation only. Stakeholder “Planned” generation and locations were previously identified and reviewed. 4 MISO West 20% Wind Future 2008-2024 Generation Siting 73 Preliminary Forecasted Generation Siting for Transmission Planning purposes only Created by the MidwestMidwest ISO for ISO MTEP 09/JCSP 08Energy - using Decisions Global Energy Decisions Inc,©Velocity - using Global Inc, Velocity Suite 2008 Suite © 2008 MISO East 20% Wind Future 2008-2024 Generation Siting 79 Preliminary Forecasted Generation Siting for Transmission Planning purposes only Created by the Midwest ISO ISO for MTEP 08 - using Global Inc, Energy Decisions Inc, Velocity Suite © 2008 Midwest - using09/JCSP Global Energy Decisions Velocity Suite © 2008 MISO Central 20% Wind Future 2008-2024 Generation Siting 85 Preliminary Forecasted Generation Siting for Transmission Planning purposes only CreatedISO by the Midwest ISO for MTEP 09/JCSP - usingSuite Global Energy Decisions Inc, Velocity Suite © 2008 Midwest - using Global Energy Decisions Inc,08 Velocity © 2008