...

MTEP 2009 & JCSP 2008 Preliminary Siting Final Review Jason Schmidt 651-632-8420

by user

on
Category: Documents
7

views

Report

Comments

Transcript

MTEP 2009 & JCSP 2008 Preliminary Siting Final Review Jason Schmidt 651-632-8420
MTEP 2009 & JCSP 2008
Preliminary Siting Final Review
Jason Schmidt
651-632-8420
[email protected]
March 18, 2008
1
Overview
This is a final stakeholder review for the siting of the
regional resource forecasted (RRF) generation for
economic transmission planning of the MTEP 2009
and JCSP 2008 Studies
Siting assumptions and methodologies were defined
in workshops and reviewed by stakeholders and
interested parties. All changes/re-siting based on
stakeholder feedback from the initial siting have
been completed.
This final review provides an opportunity for
stakeholder comments on the site selection and
powerflow injection points for the sited generation
before proceeding to the next step of the
transmission planning process
2
What is required
This presentation
• Contains the spatial representation of the
locations of the RRF generation on maps
The Siting Spreadsheet
• Contains the RRF generation by study region
and future with index numbers, fuel type and
Maximum Capacity identified
3
Things to keep in mind
This is regionally forecasted generation based on
assumptions defined by four different futures for the
purposes of robust economic transmission planning.
The spatial representation of a generator on a map
is based on a siting methodology consistently
applied to all 4 futures
The locations are not meant to be an exact
geographic location, but rather a reasonable
potential general area for the siting of the RRF
generation for transmission planning purposes only
• i.e. think of a 10-50 mile buffer around each dot on the map
This review is for the RRF generation only.
Stakeholder “Planned” generation and locations
were previously identified and reviewed.
4
MISO West 20% Wind Future
2008-2024 Generation Siting
73
Preliminary Forecasted Generation Siting for Transmission Planning purposes only
Created by the MidwestMidwest
ISO for ISO
MTEP
09/JCSP
08Energy
- using Decisions
Global Energy
Decisions
Inc,©Velocity
- using
Global
Inc, Velocity
Suite
2008 Suite © 2008
MISO East 20% Wind Future
2008-2024 Generation Siting
79
Preliminary Forecasted Generation Siting for Transmission Planning purposes only
Created by the Midwest
ISO ISO
for MTEP
08 - using
Global Inc,
Energy
Decisions
Inc,
Velocity Suite © 2008
Midwest
- using09/JCSP
Global Energy
Decisions
Velocity
Suite ©
2008
MISO Central 20% Wind Future
2008-2024 Generation Siting
85
Preliminary Forecasted Generation Siting for Transmission Planning purposes only
CreatedISO
by the
Midwest
ISO
for MTEP
09/JCSP
- usingSuite
Global
Energy Decisions Inc, Velocity Suite © 2008
Midwest
- using
Global
Energy
Decisions
Inc,08
Velocity
© 2008
Fly UP