...

R-APDRP Post Go live Report Format

by user

on
Category: Documents
20

views

Report

Comments

Transcript

R-APDRP Post Go live Report Format
R-APDRP Post Go live Report Format
Total Utilities in State:
UGVCL
Total towns sanctioned (Part-A):
20
Part-A Towns declared Golive:
20
Report-D1: Town AT&C loss report (Town)
20
Billing through the system (%)
100%
Payments through the system (%)
100%
AT&C loss Reduction (Town)
20
Town AT&C loss improvement Utility wise(%-%)
(-3.19%) to(0.31%)
Report-D2 New Connection time status (Town)
20
New connections released (No.)
2,712
Connections released by system (No.)
2,712
Connections released by system (%)
100%
Connections released as per SERC (No.)
2,659
Connections released as per SERC (%)
98%
Report-D3 Customer Grievance redressal (Town)
19
Grievance Handled by system (No.)
757
Grievance closed/redressed by system (No.)
757
Grievance closed/ redressed by system (%)
100%
Grievance redressed as per SERC (No.)
757
Grievance redressed as per SERC (%)
100%
Report-D4 Feeder with highest losses (Town)
20
Total Feeders in town (No.)
228
Feeder (10%) with highest losses (No.)
20
High Loss Fdr Bill Eff improvement (No.)
20
Feeder with Loss >50% (No.)
E-Pay thru WEB/ECS/Net Bank/Mobile/Card (%)
25%
Post Go live Reports- Actions by Utilities of
I - State Summary
UGVCL
Total Part-A towns sanctioned in these Discom:
20
Part-A Towns declared Golive:
20
II -Critical Parameter Report
Town AT&C loss report (Town)
20
Billing Efficiency Improvement (Town)
19
AT&C loss Reduction (Town)
20
Town AT&C loss improvement Utility wise(%-%)
(-3.19%) to(0.31%)
Feeder (Top 10%) with highest losses (No.)
20
High Loss Fdr Bill Eff improvement (No.)
20
Payments through the system (%)
100%
E-Pay thru WEB/ECS/Net Bank/Mobile/Card (%)
25%
New Connection Reports (Town)
20
New connections released (No.)
2,712
New Connections released by system (%)
100%
III-Analytics
Billing through the system (%)
100%
New Connections Pending (No.)
3,675
Total New Connections released (%)
74%
New Connections released as per SERC (%)
98%
Grievance closed/ redressed by system (%)
100%
Grievance redressed as per SERC (%)
100%
Total Feeders in town (No.)
Feeder with Loss >50% (No.)
228
-
Sep-15
R-APDRP Report Format
Town wise AT&C Loss Reduction report
Name of State:
Name of Discom:
Name of town
Level of Monitoring: PFC/MoP
Gujarat
UGVCL
Cumulative Achievement of AT&C Loss Reduction %
Billing Efficiency
B2(2015-16)
B1(2015-16)
(%)
(%)
Baseline Loss
FY 14-15
(%)
up to B5
FY 15-16
up to B6
up to B1
B2
B3
%Billing
thru
system
Payment
thru system
100%
100%
Quarterly
Format:
D1-(A8)
Measures taken
Technical
Administrative
B4
Ahmedabad
95.15
95.12
5.41
4.94
5.74
Bavla
92.19
90.07
12.60
10.67
11.83
9.93
7.81
100%
100%
Deesa
92.74
92.05
18.23
6.58
8.35
7.95
7.26
100%
100%
Dehgam
95.32
93.38
20.54
4.29
7.07
6.62
4.68
100%
100%
Dholka
88.92
87.03
12.48
12.31
12.38
12.97
11.73
100%
100%
Himatnagar
96.52
96.10
5.97
3.61
4.05
3.90
3.48
100%
100%
Idar
94.84
93.02
29.04
8.07
8.39
6.98
5.16
100%
100%
Kadi
94.99
94.08
9.55
3.54
4.24
5.92
5.01
100%
100%
Kalol
92.20
91.47
21.58
8.10
8.88
8.53
7.80
100%
100%
Mehsana
94.86
94.43
9.02
4.78
5.64
5.57
5.14
100%
100%
Modasa
92.57
89.88
14.31
8.91
9.89
10.12
7.43
100%
100%
Palanpur
92.18
91.41
15.01
8.13
9.22
8.59
7.82
100%
100%
Patan
93.42
92.69
14.08
6.71
7.47
7.31
6.58
100%
100%
Radhanpur
89.13
85.93
24.79
14.05
16.17
14.07
10.87
100%
100%
Sanand
86.75
85.11
23.52
16.00
16.20
14.89
13.25
100%
100%
Sidhpur
94.81
94.50
27.90
4.18
6.42
5.50
5.19
100%
100%
Unjha
94.15
92.99
7.11
5.68
6.81
7.01
5.85
100%
100%
Vijapur
93.54
92.08
8.30
6.33
7.44
7.92
6.46
100%
100%
Viramgam
77.29
77.60
39.01
29.47
28.67
22.40
22.71
100%
100%
Visnagar
94.08
93.48
27.70
5.30
6.22
6.52
5.92
100%
100%
40
20
20
20
20
4.88
Frequency:
4.85
40
40
100%
100%
Part B Works are
completed in all
towns. Analysis of
Energy Audit, DTR
Load Survey,Current
im balance,
Utilization factor is
carried out by
RAPDRP
modules.Continuous
updation is in
process.
Web/E-Payment
Part B Works are
completed in all
towns. Analysis of
Energy Audit, DTR
Load Survey,Current
im balance,
Utilization factor is
carried out by
RAPDRP
modules.Continuous
updation is in
process.
25%
R-APDRP Report Format
Consumer New Connection Release Status
Name of State:
Name of Discom:
Sl. No.
TOWN
Gujarat
UGVCL
Period from
New connection
pending from
previous period
New Connection
Applied in current
period
Total New
connection
pending for
release
Total Connection
Connection yet to
released in current
be released
period
1-Sep-2015
Level of Monitoring: PFC/MoP
Frequency:
Monthlly
Format:
D2
To:
30-Sep-2015
Connection
released within
SERC time limit
Connection
released beyond
SERC time limit
% of connection
released with in
SERC time limit
Connections
released by
system (No.)
642
1145
1787
1156
631
1124
32
97%
1156
2 Bavla
7
47
54
49
5
48
1
98%
49
3 Deesa
36
81
117
92
25
89
3
97%
92
4 Dehgam
5
48
53
45
8
45
0
100%
45
5 Dholka
14
45
59
48
11
48
0
100%
48
6 Himmatnagar
22
128
150
122
28
121
1
99%
122
7 Idar
22
42
64
46
18
46
0
100%
46
8 Kadi
8
68
76
69
7
69
0
100%
69
9 Kalol
7
122
129
118
11
118
0
100%
118
10 Mehsana
28
262
290
241
49
236
5
98%
241
11 Modasa
28
54
82
53
29
53
0
100%
53
12 Palanpur
33
185
218
187
31
183
4
98%
187
13 Patan
11
79
90
85
5
85
0
100%
85
14 Radhanpur
23
44
67
46
21
46
0
100%
46
15 Sanand
20
42
62
45
17
42
3
93%
45
16 Sidhpur
12
81
93
88
5
88
0
100%
88
17 Unjha
12
58
70
54
16
54
0
100%
54
18 Vijapur
15
43
58
45
13
45
0
100%
45
19 Viramgam
24
52
76
51
25
47
4
92%
51
5
75
80
974
2701
1 Ahmedabad
20 Visnagar
20 TOTAL
72
3675
8
2712
72
963
0
2659
100%
53
98%
72
2712
% connection with
in SERC limitPrev Month
R-APDRP Report Format
Consumer complaint redressal Status
Name of State:
Name of Discom:
Sl. No.
Name of town
1 Ahmedabad
2 Bavla
3 Deesa
4 Dehgam
5 Dholka
6 Himmatnagar
7 Idar
8 Kadi
9 Kalol
10 Mehsana
11 Modasa
12 Palanpur
13 Patan
14 Radhanpur
15 Sanand
16 Sidhpur
17 Unjha
18 Vijapur
19 Viramgam
20 Visnagar
19 TOTAL
Gujarat
UGVCL
Period from
Level of Monitoring: PFC/MoP
Frequency:
Monthlly
Format:
D3
To:
30-Sep-2015
1-Sep-2015
Complaints
pending from
previous period
Complaints
registered in
current period
Total pending
complaints
Complaints closed
Complaints
pending period
Complaints yet to
be closed
Nos
Nos
Nos
Nos
Hr:min
Nos
0
489
489
489
0
6
0
6
18
0
18
2
0
2
0
15
0
2
2
0
0
7
2
2
0
14
7
2
0
9
14
7
0
9
9
14
0
22
9
9
0
6
22
9
0
54
6
22
0
24
54
6
0
14
24
54
0
5
14
24
0
47
5
14
0
12
47
5
0
2
12
47
0
18
2
12
0
6
0
15
757
15
757
757
0
Complaints closed Complaints closed
within SERC time beyond SERC time
limit
limit
% of complains
closed within
SERC time limit
Nos
%
0
Nos
489
0.00
100%
0
6
0.00
100%
0
18
0.00
100%
0
2
0.00
100%
0
12
0.00
100%
0
47
0.00
100%
0
5
0.00
100%
0
14
0.00
100%
0
24
0.00
100%
0
54
0.00
100%
0
6
0.00
100%
0
22
0.00
100%
0
9
0.00
100%
0
9
0.00
100%
0
14
0.00
100%
0
7
0.00
100%
0
2
0.00
100%
0
2
0.00
100%
0
0
0.00
0%
0
15
0
0.00
757
0
100%
100%
R-APDRP Report Format
10% Feeder with highest AT&C Loss
Name of State:
Name of Discom:
Sl. No.
Name of Town
1 Ahmedabad
2 Bavla
Level of Monitoring: PFC/MoP
Frequency: Monthlly
Format: D4
Period
1-Sep-2015
to
Gujarat
UGVCL
Total
Feeder
Name of feeder1 From Apr.14 to
Dec.14
113 11 KV PRAKSHA
5 BAVLA-1
AT&C
Loss%
Current
Month
AT&C Loss%
Last Month
Jul-15
Base line
data
Billing Efficiency
Jul-15
Name of feeder2
Base line
data
9.65
30.53
90.35
79.90
17.03
17.67
82.97
82.57
81.89
7 11 KV DEESA CITY-4
8.59
30.15
91.41
4 Dehgam
3 11 KV DEHGAM HIGHWAY
7.11
18.58
92.89
81.42
5 Dholka
3 DHOLKA-1
11.09
17.93
88.91
86.20
6.54
11.54
93.46
89.95
7 Idar
1 IDAR (TOWN)
3.63
20.40
96.37
94.10
8 Kadi
7 SHEFALI
8.18
10.79
91.82
89.21
15.36
38.23
84.64
78.78
8.12
17.48
91.88
91.31
1.54
13.70
98.46
89.01
9 Kalol
10 Mehsana
11 Modasa
11 NIKUNJ
10 11KV MARKETYARD
18 GOPINALA
4 GAJAN
12 Palanpur
11 11 KV PLN-2
6.06
12.26
93.94
87.74
13 Patan
10 SUEAJ
8.83
22.66
91.17
83.11
14 Radhanpur
2 11 KV HIGHWAY
3.31
20.37
96.69
91.55
15 Sanand
2 11 KV SOMNATH
17.67
31.65
82.33
74.21
16 Sidhpur
4 11 KV SIDHPUR CT-2
8.04
12.21
91.96
91.61
17 Unjha
4 11 kv Umiya
2.53
7.89
97.47
93.52
18 Vijapur
3 BHAVSOR URBAN
19 Viramgam
3 CITY-3
20 Visnagar
20 TOTAL
7 VSN.CITY-1
228
5.09
42.68
94.91
91.22
33.90
52.52
66.10
54.16
6.75
13.96
93.25
91.31
20
Billing Efficiency
Jul-15
3 Deesa
6 Himmatnagar
AT&C
AT&C Loss%
Loss% Last
Current Month
Month
0
0
0
AT&C Loss%
Current
Month
Name of feeder3
30-Sep-2015
AT&C Loss% Last
Month
Billing Efficiency
Base line
data
Jul-15
0
0
Base line
data
Action Completed
Fly UP