Comments
Transcript
Project Charter for State of Michigan Department of
Project Charter for State of Michigan Department of (insert department name here) (insert department logo here) (insert project name here) State of Michigan (Insert project name here) Project Charter A. General Information Project ID/Acronym: Date: Controlling Agency: Modification Date: Prepared by: Authorized by: 1. Privacy Information This document may contain information of a sensitive nature. This information should not be shared with persons other than those who are involved with this system/project or who will become involved during its lifecycle. 2. Revision History Revision Date Project Charter Author Section(s) 1 Summary PMM-0101 (Rev. 05/2013) Table of Contents A. General Information ...............................................................................................................1 1. Privacy Information ........................................................................................................................ 1 2. Revision History .............................................................................................................................. 1 B. Purpose....................................................................................................................................4 C. Agency Goals and Business Needs .....................................................................................4 D. High Level Project Description .............................................................................................4 E. Measurable Project Objectives .............................................................................................4 F. Project Scope ..........................................................................................................................4 1. In Scope ........................................................................................................................................... 4 2. Out of Scope ................................................................................................................................... 4 3. Assumptions.................................................................................................................................... 4 4. Constraints ...................................................................................................................................... 4 G. Initial High-Level Project Planning .......................................................................................5 1. Estimated Resource Requirements............................................................................................. 5 2. Estimated Project Budget.............................................................................................................. 5 3. Estimated Benefits ......................................................................................................................... 5 4. Estimated Scheduling Dates ........................................................................................................ 5 H. Project Authority ....................................................................................................................5 1. Approval Authority .......................................................................................................................... 5 2. Project Manager ............................................................................................................................. 5 3. Oversight Steering Committee ..................................................................................................... 5 I. Approval Information .............................................................................................................6 Approval Signatures ........................................................................................................................... 6 State of Michigan Project Charter Instructions ..........................................................................7 A. General Information ...............................................................................................................7 1. Privacy Information ........................................................................................................................ 7 2. Revision History .............................................................................................................................. 7 B. Purpose....................................................................................................................................7 C. Agency Goals and Business Needs .....................................................................................7 Project Charter 2 PMM-0101 (Rev. 05/2013) D. High Level Project Description .............................................................................................7 E. Measurable Project Objectives .............................................................................................7 F. Project Scope ..........................................................................................................................8 1. In Scope ........................................................................................................................................... 8 2. Out of Scope: .................................................................................................................................. 8 3. Assumptions.................................................................................................................................... 8 4. Constraints ...................................................................................................................................... 9 G. Initial High-Level Project Planning .......................................................................................9 1. Estimated Resource Requirements............................................................................................. 9 2. Estimated Project Budget.............................................................................................................. 9 3. Estimated Benefits ......................................................................................................................... 9 4. Estimated Scheduling Dates ........................................................................................................ 9 H. Project Authority ....................................................................................................................9 1. Approval Authority ........................................................................................................................ 10 2. Project Manager ........................................................................................................................... 10 3. Oversight (Steering) Committee ................................................................................................ 10 I. Approval Information ........................................................................................................... 10 Project Charter 3 PMM-0101 (Rev. 05/2013) B. Purpose The project charter is the first step in the state’s project management methodology and formally initiates project activities through authorization by the project sponsor. The project charter provides a high level description of the project and initial project planning estimates. C. Agency Goals and Business Needs D. High Level Project Description E. Measurable Project Objectives F. Project Scope 1. In Scope 2. Out of Scope 3. Assumptions 4. Constraints Project Charter 4 PMM-0101 (Rev. 05/2013) G. Initial High-Level Project Planning 1. Estimated Resource Requirements 2. Estimated Project Budget 3. Estimated Benefits 4. Estimated Scheduling Dates Anticipated Start Date: Target Completion Date: H. Project Authority 1. Approval Authority 2. Project Manager 3. Oversight Steering Committee Project Charter 5 PMM-0101 (Rev. 05/2013) I. Approval Information By signing this document you agree to this as the formal charter statement to begin work on the project described within and the commitment of the necessary resources (budget, personnel, etc.) to complete the project. Approval Signatures Role Name/Title Signature Date DTMB Project Sponsor Agency Project Sponsor Project Manager Project Charter 6 PMM-0101 (Rev. 05/2013) State of Michigan Project Charter Instructions The project manager and sponsors may opt to customize a cover sheet for all project documents. A sample of such a cover sheet has been provided in this document. Customized coversheets are available on the EPMO SharePoint site or you may create your own. A. General Information Complete the table. 1. Privacy Information Standard language has been provided. The project manager may modify the language if desired. 2. Revision History This information is used to control and track changes made to this project document throughout its lifecycle. B. Purpose Standard language has been provided. The project manager may modify the language, if desired. C. Agency Goals and Business Needs Refer to agency goals, which are available in candidates entered the enterprise PPM tool. Identify the business need(s) and associated goals that are driving this project. D. High Level Project Description In business language, describe the major project activities required to meet the business need. The description may be as high level or as detailed as the project manager and sponsor determine. E. Measurable Project Objectives Project objectives should tie to agency goals and business needs. Measurable project objectives are outcomes, milestones or deliverables of the major project activities described above. In a general sense, an objective is a description of what will exist at the end of a project. See the SMART objectives table below. Letter S Meaning Specific M Measurable Project Charter Purpose Is the objective clear in terms of what, how, when, and where the situation will be changed? Are the targets measurable? For example, how much of an increase or reduction is desired? How many items should be produced, or how many 7 PMM-0101 (Rev. 05/2013) Letter Meaning A Actionoriented R Realistic T Time-bound Purpose people will be trained? Does the objective specifically state what actions are required to achieve the desired result? In some cases, the A refers to “attainable”. Is the objective something that can be reached by the performers? Are the desired results expressed in a way that the team will be motivated and believe that the required level of involvement will be obtained? Is the description accurate? Does the objective reflect a time period in which it will be accomplished (e.g., end of the first quarter or by end of year)? F. Project Scope Project scope defines the work to be included (in scope), as well as the work not included (out of scope). Definition of the work can be a high level list. 1. In Scope This section contains a complete, but concise, description of project deliverables. For example: Business requirements Application design Application development Quality assurance, including testing and usability evaluations Training Documentation Implementation 2. Out of Scope: This section clearly states deliverables and activities that could be assumed by the customer to be part of the project, but are actually not included. For example: Hardware Software Operation services Maintenance and support 3. Assumptions For planning purposes, an assumption is a factor considered to be true, real, or certain with regards to the project. This section provides the opportunity to document assumptions, such as: The SUITE processes will be used, including all touchpoints If this project is an IT Investment Fund or MILAMP Project, the Benefits Realization tool will be used Project Charter 8 PMM-0101 (Rev. 05/2013) 4. If this projects requires a COTS solution, the COTS Guidebook will be used If this project requires analysis, design and evaluation of user interfaces and interactions to create effective, satisfying and productive experiences for end-users, the end user experience team will be offered as a solution If this project uses the Agile methodology, the SUITE Agile process guide will be used Constraints A constraint is a restriction or limitation, either internal or external to the project that will effect the performance of the project. This section provides the opportunity to document constraints, such as: Schedule – project must be completed by a specific date in order to avoid financial penalties Cost – funding is limited and cost overruns cannot be tolerated Human Resources – system architect is available only in October G. Initial High-Level Project Planning It is recognized that planning is an iterative process that becomes increasingly precise as more detailed information becomes available. High level planning usually has a fairly large margin of error. 1. Estimated Resource Requirements Estimate the types and quantities of resources required to perform the in scope work. 2. Estimated Project Budget Estimate the cost of resources (human, hardware, software, other products and services) to perform the in scope work. 3. Estimated Benefits Refer to estimated benefits which are available in candidates entered in the enterprise PPM tool. If this project is an IT Investment Fund or MiLAMP Project, the Benefits Realization tool will be used and attached to this charter. 4. Estimated Scheduling Dates Anticipated Start Date: Target Completion Date: H. Project Authority This section describes the authority of the individual or organization initiating the project, limitations or initial checkpoint of the authorization, management oversight of the project and the authority of the project manager. Project Charter 9 PMM-0101 (Rev. 05/2013) 1. Approval Authority This section identifies the project initiator by name and title. It ensures that the individual has the authority to apply project resources, expend funds, make decisions and give approvals. 2. Project Manager This section identifies the project manager by name and defines the individual’s level of authority. For example, the project manager may assign resources in a matrix organization, authorize overtime, conduct staff performance appraisals, and take appropriate corrective actions that do not increase schedule or cost. All scope changes must be escalated to the project sponsor. 3. Oversight (Steering) Committee This section describes agency management control over the project. Within the project, internal control should be established to control the day-to-day activities of the project. The project manager should manage internal control. External oversight should be established to ensure that the organization's resources are applied to meet the project and organization's objectives. List Oversight Committee members and their contact information including email and phone number. I. Approval Information At a minimum, the DTMB project sponsor, agency project sponsor, and project manager must sign this charter. Obtain signatures. NOTES: 1. Delete instruction pages when no longer needed. 2. To print, select only those page numbers in body of form (i.e., content is in black font). Project Charter 10 PMM-0101 (Rev. 05/2013)