State of Michigan Installation Plan General Information (Insert System or Project Name Here)
by user
Comments
Transcript
State of Michigan Installation Plan General Information (Insert System or Project Name Here)
State of Michigan (Insert System or Project Name Here) Installation Plan General Information System or Project ID/Acronym: Creation Date: Client Agency: Modification Date: Author(s): DTMB Authorized by: Privacy Information This document may contain information of a sensitive nature. This information should not be given to persons other than those who are involved with this system/project or who will become involved during its lifecycle. Change Control Revision Date Installation Plan Author Section(s) 1 of 4 Summary SEM-0702 (Rev. 07/2012) 1. Project/System Information 1.1 Project Objectives 1.2 System Description 1.3 References 1.4 Outstanding Issues 1.5 Roles and Responsibilities 2. Installation Plan 2.1 Scope 2.2 Installation Environment 2.3 Entry and Exit Criteria Installation Plan 2 of 4 SEM-0702 (Rev. 07/2012) 2.4 Installation Schedule 2.5 Backup Entry and Exit Criteria 2.6 Change Control Procedure 2.7 Installation Test Procedure 2.8 Assumptions, Dependencies, Risk 2.9 Resource Requirements Approval Information The signatures relay an understanding of the purpose and content of the document by those endorsing it. Approve Approve with Modifications Reject Comments: Approval Signatures Installation Plan 3 of 4 SEM-0702 (Rev. 07/2012) Role Name/Title Signature Date Client Sponsor DTMB Sponsor Project Manager Installation Plan 4 of 4 SEM-0702 (Rev. 07/2012)