DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 26, 2004
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 26, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in
the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 4333Mw, 94,729Mw hours, 7-day Avg. 4180Mw
Peak
Generators Returned to Service
South Baghdad 4
South Baghdad 5
Nassirya 3
Qudis 2
Generators Unscheduled Out of Service
PLANT
Type
SP, CP, RP, HP
Dibis 4
SP
* South Baghdad 3
SP
South Baghdad 6
SP
Mussaibe 1
SP
Baiji 2,
CP
Hilla 1
CP
Hilla 2
CP
Mosil 1
CP
Mosil 9
CP
Mosil 12
CP
Old Mulla 1
CP
Old Mulla 2
CP
New Mulla 5
CP
New Mulla 6
CP
Taji 3,
CP
* Taji 4
CP
Taji Mobile, 2
CP
* RED – Denotes out of service since last report
Page 1 of 3
3/8/2004
3/1/2004
2/23/2004
2/16/2004
2/9/2004
2/2/2004
1/26/2004
1/19/2004
1/12/2004
1/5/2004
12/29/2003
12/22/2003
6000
5000
4000
3000
2000
1000
0
12/15/2003
Megawatts
Iraq Peak Output
7-Day Avg.
Fault
Boiler Leak
Boiler Leak
Boiler Leak
Boiler Leak
Lubricating oil leak
Cooling System problems
Servo
Rotor Defect
Rotor Defect
Generator fault
Acc Gear
Servo
Inlet Gate Valve (IGV)
Generator Defect
Compressor
Control card
Software problem
295 Mw
30 Mw
30 Mw
150 Mw
85 Mw
598 Mw
Mw
8
30
30
200
110
20
20
15
15
15
15
15
30
30
15
15
15
Generators Scheduled Out of Service
PLANT
Type
Prog. Maintenance(M)
SP/NG
/ Rehab (R)
Baiji 2
SP
M
Doura 2
CP
M
Doura 3
CP
R
Doura 4
SP
M
Doura 5
SP
R
Doura 6
SP
R
Dibis 3
SP
M
Dibis 4
CP
R
Khor Zubayr 2
CP
M
Mussaibe 4
SP
M
New Mulla 2
CP
M
Old Mulla 5
CP
M
Old Mulla 12
CP
R
Taji 7
CP
R
Shuaiba 1
CP
M
South Baghdad 1
SP
M
South Baghdad 2
SP
M
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP:
CP:
RP:
HP:
Maint.
Org.
Bechtel
ME
GRD/RIE
ME
Bechtel
Bechtel
ME
GRD/RIE
ME
ME
ME
GRD/RIE
GRD/RIE
GRD/RIE
ME
ME
ME
Date outof service
2 Jan 04
21 Feb 04
1 Mar 03
2 Feb 04
Jul 03
Jul 03
30Dec 03
Sep 03
19 Feb 04
7 Feb 04
17 Feb04
1 Nov 03
1 Oct 03
1 Oct 03
14 Feb 04
12 Feb 04
12 Feb 04
816 Mw
Est. InMw
service
Date
4 Mar
100
TBD
20
15 May
20
20 Apr
65
30 Apr
100
31May
100
31 May
8
30 Mar
18
TBD
50
7 Mar
180
TBD
30
15 May
15
15 May
15
TBD
15
31 May
20
12 Apr
30
12 Apr
30
STEAM POWER – These plants use either fuel oil or crude in burners
COMBUSTION POWER
RECIPROCATING POWER
HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Nassiriya-Khor Zubayr
Haditha-Baghd West
Hartha-Qut – Wasit
Baiji - Baghd West #1
Baghd E.-Baghd S. #2
Baghd S. – Diwaniyah
Haditha – Qaim
Baiji – Haditha
Diyala Connection
Dibis/Irbil-Quarqush
Mosul – Mosul East
Shuwaiba-Toba-Hamar
Baghd West – Jamia
Omara-Burzegan
Temim- Tuz
Nejibiya – Hartha
400
400
400
400
400
400
400
400
400
132
132
132
132
132
132
132
Sabotage
Sabotage
Sabotage
Sabotage
New Line
Sabotage
Sabotage
Sabotage
New Line
New Line
Sabotage
Sabotage
Sabotage
Looting
Sabotage
Sabotage
Bechtel
GRD/RIE
GRD/RIE
GRD/RIE
GRD/RIE
GRD/RIE
ME
ME
ME
GRD/RIE
ME
ME
ME
ME
ME
ME
Date
out-of service
Lines Returned to service:
None reported today
Page 2 of 3
Est. Inservice
Date
26 May
20 Apr
7 Mar
14 Mar
28 Feb
Compl. 24 Jan
TBD
TBD
30 Apr
15 May
TBD
28 Feb
TBD
1 May
TBD
TBD
Comments
102 towers complete/212req’d
45 towers complete/236 req’d
287 towers complete/297 req’d
68 towers complete/68 req’d
81 towers complete/81req’d
27 towers complete/27 req’d
No contract awarded
No contract awarded
Contractor on-site 20 Feb
44 towers complete/44 req’d
26 towers complete/126 req’d
Distribution:
Power transferred from North to Middle 850 MW.
Power transferred from South to Middle 180 MW.
GOVERNORATE
Baghdad
Duhok
Naynawa
Tamim
Salah Aldeen
Anbar
Dyala
Babil
Kirbala
Najaf
Kadsya
Wasit
Muthana
Nasirya
Misan
Basra
Peak Load MW
1630
82
342
131
220
215
100
100
121
125
50
90
65
150
65
360
Average Load
MW
1364
86
344
151
215
184
92
105
122
129
54
89
54
115
62
337
MWH
32844
2055
8265
3618
5158
4422
2213
2524
2928
3087
1296
2130
1295
2761
1491
8080
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity
thomast2orha.centcom.mil
Page 3 of 3