Comments
Transcript
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 26, 2004
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 26, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Generation: Peak Power 4333Mw, 94,729Mw hours, 7-day Avg. 4180Mw Peak Generators Returned to Service South Baghdad 4 South Baghdad 5 Nassirya 3 Qudis 2 Generators Unscheduled Out of Service PLANT Type SP, CP, RP, HP Dibis 4 SP * South Baghdad 3 SP South Baghdad 6 SP Mussaibe 1 SP Baiji 2, CP Hilla 1 CP Hilla 2 CP Mosil 1 CP Mosil 9 CP Mosil 12 CP Old Mulla 1 CP Old Mulla 2 CP New Mulla 5 CP New Mulla 6 CP Taji 3, CP * Taji 4 CP Taji Mobile, 2 CP * RED – Denotes out of service since last report Page 1 of 3 3/8/2004 3/1/2004 2/23/2004 2/16/2004 2/9/2004 2/2/2004 1/26/2004 1/19/2004 1/12/2004 1/5/2004 12/29/2003 12/22/2003 6000 5000 4000 3000 2000 1000 0 12/15/2003 Megawatts Iraq Peak Output 7-Day Avg. Fault Boiler Leak Boiler Leak Boiler Leak Boiler Leak Lubricating oil leak Cooling System problems Servo Rotor Defect Rotor Defect Generator fault Acc Gear Servo Inlet Gate Valve (IGV) Generator Defect Compressor Control card Software problem 295 Mw 30 Mw 30 Mw 150 Mw 85 Mw 598 Mw Mw 8 30 30 200 110 20 20 15 15 15 15 15 30 30 15 15 15 Generators Scheduled Out of Service PLANT Type Prog. Maintenance(M) SP/NG / Rehab (R) Baiji 2 SP M Doura 2 CP M Doura 3 CP R Doura 4 SP M Doura 5 SP R Doura 6 SP R Dibis 3 SP M Dibis 4 CP R Khor Zubayr 2 CP M Mussaibe 4 SP M New Mulla 2 CP M Old Mulla 5 CP M Old Mulla 12 CP R Taji 7 CP R Shuaiba 1 CP M South Baghdad 1 SP M South Baghdad 2 SP M LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: CP: RP: HP: Maint. Org. Bechtel ME GRD/RIE ME Bechtel Bechtel ME GRD/RIE ME ME ME GRD/RIE GRD/RIE GRD/RIE ME ME ME Date outof service 2 Jan 04 21 Feb 04 1 Mar 03 2 Feb 04 Jul 03 Jul 03 30Dec 03 Sep 03 19 Feb 04 7 Feb 04 17 Feb04 1 Nov 03 1 Oct 03 1 Oct 03 14 Feb 04 12 Feb 04 12 Feb 04 816 Mw Est. InMw service Date 4 Mar 100 TBD 20 15 May 20 20 Apr 65 30 Apr 100 31May 100 31 May 8 30 Mar 18 TBD 50 7 Mar 180 TBD 30 15 May 15 15 May 15 TBD 15 31 May 20 12 Apr 30 12 Apr 30 STEAM POWER – These plants use either fuel oil or crude in burners COMBUSTION POWER RECIPROCATING POWER HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Nassiriya-Khor Zubayr Haditha-Baghd West Hartha-Qut – Wasit Baiji - Baghd West #1 Baghd E.-Baghd S. #2 Baghd S. – Diwaniyah Haditha – Qaim Baiji – Haditha Diyala Connection Dibis/Irbil-Quarqush Mosul – Mosul East Shuwaiba-Toba-Hamar Baghd West – Jamia Omara-Burzegan Temim- Tuz Nejibiya – Hartha 400 400 400 400 400 400 400 400 400 132 132 132 132 132 132 132 Sabotage Sabotage Sabotage Sabotage New Line Sabotage Sabotage Sabotage New Line New Line Sabotage Sabotage Sabotage Looting Sabotage Sabotage Bechtel GRD/RIE GRD/RIE GRD/RIE GRD/RIE GRD/RIE ME ME ME GRD/RIE ME ME ME ME ME ME Date out-of service Lines Returned to service: None reported today Page 2 of 3 Est. Inservice Date 26 May 20 Apr 7 Mar 14 Mar 28 Feb Compl. 24 Jan TBD TBD 30 Apr 15 May TBD 28 Feb TBD 1 May TBD TBD Comments 102 towers complete/212req’d 45 towers complete/236 req’d 287 towers complete/297 req’d 68 towers complete/68 req’d 81 towers complete/81req’d 27 towers complete/27 req’d No contract awarded No contract awarded Contractor on-site 20 Feb 44 towers complete/44 req’d 26 towers complete/126 req’d Distribution: Power transferred from North to Middle 850 MW. Power transferred from South to Middle 180 MW. GOVERNORATE Baghdad Duhok Naynawa Tamim Salah Aldeen Anbar Dyala Babil Kirbala Najaf Kadsya Wasit Muthana Nasirya Misan Basra Peak Load MW 1630 82 342 131 220 215 100 100 121 125 50 90 65 150 65 360 Average Load MW 1364 86 344 151 215 184 92 105 122 129 54 89 54 115 62 337 MWH 32844 2055 8265 3618 5158 4422 2213 2524 2928 3087 1296 2130 1295 2761 1491 8080 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page 3 of 3