...

Required Fields Optional Fields Total MPO/

by user

on
Category: Documents
20

views

Report

Comments

Transcript

Required Fields Optional Fields Total MPO/
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
2011
ALGER
2011
CHIPPEWA
2011
OCEANA
2011
SANILAC
2011
2011
2011
2011
STATEWIDE
STATEWIDE
STATEWIDE
STATEWIDE
Optional Fields
Responsible
Primary Work
Agency Project Name
Limits
Length
Type
Restore &
Alger
Little Beaver
from H-58 to Little
3.45
rehabilitate
County
Road
Beaver Campground
NW quadrant of I-75
Roadside facility
MDOT
I-75 BL
and 3 Mile Rd
Polk Rd to N Branch of
MDOT
US-31
5.89 Reconstruct
Pntwtr Rvr
M-25 Port Sanilac
Roadside facility
MDOT
M-25
Carpool Lot
MDOT
Regionwide
Various in Bay Region
Roadside facility
MDOT
Section 5309
Transit operations
MDOT
Section 5310
Transit operations
MDOT
Section 5311
Transit operations
Project Description
Rehabilitate
CON
1,000
Install Carpool lot lighting
CON
12
Reconstruction
CON
Pave Carpool Parking Lot
CON
CON
T-Ops
T-Ops
T-Ops
5
3,622
1,000
296
T-Ops
T-Ops
2011
STATEWIDE
MDOT
Section 5316
Transit operations
2011
STATEWIDE
MDOT
Section 5317
Transit operations
Restriping of carpool lots
Capital Bus
Elderly and Disabled
RTAP
Job Access/Reverse
Commute
New Freedom
2011
VAN BUREN
MDOT
M-40
Widen - minor
Two Right Turn Lanes
Miscellaneous
PE for Entrance and
Parking
2012
2012
2012
2013
2013
LAPEER
MDOT
Jordan Rvr.
Nat. Fish
Hatchery
I-69
MANISTEE
MDOT
US-31
ANTRIM
Antrim
County
0.5 miles south of the
Village of Lawton
at Lake Pleasant Road
US-31 at Memorial
Drive
Schoolcraf Seney National Seney National Wildlife
SCHOOLCRAFT
t County Wildlife Refuge Refuge
STATEWIDE
MDOT
Regionwide
TUSCOLA
Mayville
Fulton St
Main Street to Mill
Street, Mayville
2014
STATEWIDE
MDOT
Regionwide
Regionwide
2011
HURON
ALLEGAN
MDOT
M-25
Over White River
Douglas
Blue Star
Highway
At Kalamazoo River,
Douglas & Saugatuck
West of US-131 east to
Florence St. in
Plainwell
2011
ALLEGAN
MDOT
M-89
2011
ALLEGAN
MDOT
US-131
2011
ALPENA
MDOT
M-32
2011
ANTRIM
MDOT
US-31
2011
ARENAC
MDOT
I-75
2011
ARENAC
MDOT
M-61
2011
BAY
MDOT
I-75
0.12
Regionwide
2013
2011
0.27
Jordan River National
Fish Hatchery
under 106th Avenue
Intersection at Ripley
Street in Alpena
from Elk Rapids to
Campbell Road
Sterling Road over I-75
(S07-06111) and US23 Ramp F over I-75
(S13 of 06111)
at I-75
Nine Bridges in Bay
County along I-75
0.50
Phase
80
ST
ST
0.72
10/27/10
1,022
M
2,045
10/27/10
NA
2,045
10/27/10
693
M
1,386
10/27/10
NA
1,386
10/27/10
510
EDA
510 108014
10/27/10
NA
568
10/27/10
100 105498
10/27/10
NA
100
10/27/10
FLH
5
4.70
21,212
5316
CON
Restore &
rehabilitate
Tagged as AC
5317
Restriping of Carpool Lots
Reconstruct
NA
693
Roadside facility
0.46
10/27/10
1,022
FLH
Substructure Repair
20,412 90073
10/27/10
10/27/10
10/27/10
10/27/10
1,095
Bridge restore &
rehabilitate
M
10/27/10
10/27/10
CON
0.44
20,412
15
6
7,372
2,270
296
Miscellaneous
ROW
NA
98
Replace J to H
WCS/Bridge
Reconstruct
10/27/10
NA
NA
NA
NA
ST
1.72
14 107601
10/27/10
NA
HPSL
CON
M
1,000
10/27/10
10/27/10
10/27/10
10/27/10
43
Reconstruct Existing, No
widen
3
Comments
PIRO 15(1)
10/27/10
508
Bridge rehabilitation
NA
6 103389
7,372
2,270
296
CON
Bridge replacement
10/27/10
98 107032
CON
Bridge restore &
rehabilitate
1,000 105168
Federal
Approval
EJ
Date
M
M
M
Resurface Carpool Lot
Superstructure
replacement
Amendment
Air
Type Quality
M
Intersection Improvement
Restriping of Carpool Lots
Local
Fund
Source
1
3,750
1,270
Roadside facility
Roadside facility
Local
Cost
($1000s)
Total
Project
Cost
Local
($1000s) x Priority
18
100
ST
9
M
52 73163
10/27/10
NA
56
10/27/10
113
M
621 86076
10/27/10
NA
675
10/27/10
1,095 110126
10/27/10
NA
1,095
10/27/10
6 107018
10/27/10
NA
6
10/27/10
167
10/27/10
1
90
STL
CON
5
ST
1
CON
972
ST
M
$90,198 ARL funds
in FY2010. $39,842
STL ACC conversion
in FY2013.
1511 Certification
1/25/10.
90 109312
10/27/10
NA
M
6 107017
10/27/10
NA
6
10/27/10
216
M
1,188 104611
10/28/10
NA
1,188
10/29/10
5,054
M
5,321 105337
10/28/10
NA
5,321
12/2/10
5
M
25 90028
10/28/10
NA
9,835
12/2/10
CON
108606
10/28/10
NA
Intersection Reconstruct
CON
74900
10/28/10
NA
Crush and Shape
CON
83592
10/28/10
NA
Bridge restore &
rehabilitate
Deep Overlay
CON
89615
10/28/10
NA
Roadside facility
Bridge restore &
rehabilitate
Lighting
Deep Overlay and
Replacement
CON
CON
ACC
State
Fund
Source
MPO/
Rural
Action
Date
ST
5309
5310
5311
Traffic ops/safety
CON
State
Cost
($1000s)
FLH
AC
PE
Resurface
6.13
Federal
Fund
Source
CON
Resurface
1.01
Federal
Advance
Cost
Construct ($1000s)
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
AC
20
30
AC
ST
ST
266
CITY
7
M
37 110651
10/28/10
NA
6,778
M
6,778 108681
10/28/10
NA
Tagged as AC
Project moved to
Bridge RR GPA.
Project moved to
Hwy RR GPA
Project moved to
Hwy RR GPA
12/2/10
12/2/10
12/2/10
Project moved to
Bridge RR GPA.
Tagged as AC
12/2/10
37
12/2/10
7,461
12/2/10
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
2011
BERRIEN
MDOT
M-140
2011
BERRIEN
MDOT
I-196
2011
BRANCH
MDOT
I-69
Limits
Dan Smith Road to
Watervliet North City
Limits
NB & SB over Coloma
Road
Length
under Jonesville Road
0.37
under M-199 (26 Mile
Road) and 22 1/2 Mile
Road
M-32 from East Jordan
southerly to Rogers
Road
Primary Work
Type
Project Description
Phase
Reconstruct
Pavement Reconstruction.
CON
Bridge restore &
rehabilitate
Bridge restore &
rehabilitate
Deep Overlay, Beam
Repair
Abutment repair, Full
paint
0.31
Bridge restore &
rehabilitate
1.89
2.29
0.28
Federal
Advance
Cost
Construct ($1000s)
Federal
Fund
Source
AC
State
Cost
($1000s)
8,000
State
Fund
Source
M
Local
Cost
($1000s)
Local
Fund
Source
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
MPO/
Rural
Action
Date
Amendment
Air
Type Quality
Comments
Tagged as AC
Total
Project
Cost
Local
($1000s) x Priority
9,500
Federal
Approval
EJ
Date
8,000 87321
10/28/10
NA
CON
106108
10/28/10
NA
CON
108711
10/28/10
NA
Concrete Shallow Overlay
CON
100581
10/28/10
NA
Project moved to
Bridge RR GPA.
12/2/10
Restore &
rehabilitate
Crush and Shape
CON
103023
10/28/10
NA
Project moved to
Hwy RR GPA
12/2/10
Project moved to
Bridge RR GPA.
Project moved to
Bridge RR GPA.
12/2/10
12/2/10
12/2/10
2011
CALHOUN
MDOT
I-94
2011
CHARLEVOIX
MDOT
M-32
2011
CHIPPEWA
MDOT
I-75
Easterday Avenue over
I-75, Sault Ste. Marie
0.25
Bridge restore &
rehabilitate
Bridge Widening for Path
CON
107191
10/28/10
NA
Project moved to
Bridge RR GPA.
12/2/10
2011
CHIPPEWA
MDOT
I-75
Easterday Avenue over
I-75, Sault Ste. Marie
0.25
Bridge restore &
rehabilitate
Deep Overlay
CON
107231
10/28/10
NA
Project moved to
Bridge RR GPA.
12/2/10
0.62
Reconstruct
Participation in City CSO
road
CON
12/2/10
2.72
Resurface
Two Course HMA Overlay
CON
1.22
Traffic ops/safety
Geometric modifications
CON
655
1.11
Reconstruct
Pavement reconstruction
PE
Roadside facility
New Carpool Lot
CON
2011
CHIPPEWA
MDOT
I-75BS
2011
CLARE
MDOT
US-127 BR/M61
2011
EMMET
MDOT
US-31
2011
GOGEBIC
MDOT
US-2
2011
GRAND
TRAVERSE
MDOT
US-31
2011
HOUGHTON
MDOT
M-26
2011
HURON
MDOT
M-142
2011
HURON
MDOT
M-53
I-75BS, Portage
Avenue
County Farm Road
Southeasterly to M-61
East
US-31 from west of
Division to Manvel and
M-119
Tourist Park Rd to
Curry Street
South of Kay Ray Road
on US-31
over Gooseneck Creek,
two branches
M-142 over Pigeon
River
1.33
Bridge replacement
Culvert Replacement
CON
Bridge replacement
Bridge Replacement
CON
Cleveland Street Drain
Miscellaneous
Drainage Outlet
Construction
Crush & Shape, HMA
Overlay
Add Center Left Turn
Lane
AC
3,981 106844
10/28/10
NA
Tagged as AC
4,134
12/2/10
HPP
164
M
819 79065
10/28/10
NA
Moved from FY 2012
1,192
12/2/10
326
NH
72
M
398 110584
10/28/10
NA
4,973
12/2/10
74
ST
16
M
90 109989
10/28/10
NA
100
12/2/10
ST
283
IONIA
MDOT
M-91
M-44 to Ellis Road
1.24
2011
LAPEER
MDOT
M-53
at Hough Road
0.57
Traffic ops/safety
0.82
Restore &
rehabilitate
Crush and Shape
CON
3.45
Resurface
Mill and resurface
CON
AC
6,792
6.50
Resurface
Crush and Shape,
Resurface
CON
AC
5,390
2.85
Restore &
rehabilitate
Crush & Shape &
Resurface
CON
7.96
Restore &
rehabilitate
CRUSH&SHAPE&HMA
RESURFACING
Cold milling, HMA
resurfacing
LEELANAU
MDOT
M-22
2011
LENAWEE
MDOT
US-223
2011
MANISTEE
MDOT
US-31
2011
MARQUETTE
MDOT
M-35
2011
MENOMINEE
MDOT
US-41
2011
MONTCALM
MDOT
M-91
2.12
Resurface
M
CON
2011
2011
CON
CON
CON
340
AC
NA
M
Restore &
rehabilitate
From M-204 north
approx. .82 miles
East of Silberhorn Hwy
to west of Rodesiler
Road
South of Coates
Highway to Maidens
Road
from north of Little
Lake to north of
Marshall
COUNTY ROAD G-12
TO BAGLEY
Ellis Road to Snows
Lake Road
10/28/10
3,981
1,276
CON
107972
Project moved to
Hwy RR GPA
CM
85
4,215
M
110196
10/28/10
NA
1,559 100745
10/28/10
NA
103279
10/28/10
NA
87110
10/28/10
NA
425 111272
10/28/10
NA
Project moved to
Bridge RR GPA.
12/2/10
1,672
Project moved to
Bridge RR GPA.
Project moved to
Hwy RR GPA
12/2/10
12/2/10
12/2/10
456
12/2/10
106843
10/28/10
NA
Project moved to
Hwy RR GPA
M
6,792 84028
10/28/10
NA
Tagged as AC
7,510
12/2/10
M
5,390 87083
10/28/10
NA
Tagged as AC
5,565
12/2/10
110309
10/28/10
NA
Project moved to
Hwy RR GPA
4,215 87551
10/28/10
NA
Tagged as AC
NA
Project moved to
Hwy RR GPA
M
87111
10/28/10
12/2/10
12/2/10
4,360
12/2/10
12/2/10
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
2011
NEWAYGO
Newaygo
State Street
County
2011
OCEANA
MDOT
US-31
2011
OTTAWA
MDOT
Grand Region
Carpool Lots
2011
SCHOOLCRAFT MDOT
2011
SCHOOLCRAFT
2011
SCHOOLCRAFT
2011
M-94
Schoolcraf
t County
Schoolcraf
SCHOOLCRAFT
t County
County Road
434
County Road
433
2011
STATEWIDE
MDOT
I-69
STATEWIDE
MDOT
Regionwide
MDOT
Southwest
Region
2011
STATEWIDE
STATEWIDE
MDOT
2011
STATEWIDE
MDOT
2011
STATEWIDE
MDOT
2011
STATEWIDE
MDOT
Regionwide
CPM CSM
Bridge
Trunkline GPA
DBE Support
Services
Local Tech
Assistance
Program
State Funded
Required
Program
2011
STATEWIDE
MDOT
2011
STATEWIDE
Rural Task Rural Task
Forces
Force
2011
STATEWIDE
2011
STATEWIDE
2011
VAN BUREN
MDOT
2011
VAN BUREN
MDOT
2011
WEXFORD
Cadillac
2011
WEXFORD
Harrietta
Small
Urban
Program
Small
Urban
Program
Length
Project Description
Phase
Roadside facility
Bike/Ped Safety
improvements
CON
Bridge restore &
rehabilitate
Substructure Repair
CON
Roadside facility
Signing Upgrade for
Carpool Lot
CON
Federal
Advance
Cost
Construct ($1000s)
202
69
Federal
Fund
Source
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
ST
15
M
Reconstruct
HMA Reconstruct
CON
0.44
Resurface
resurface
CON
51
EDDF
42
M
1
US 2 to CR 432
3.84
Resurface
resurface
CON
51
EDDF
42
M
US 2 to CR 438
6.12
Resurface
resurface
CON
51
EDDF
42
M
Bridge replacement
Bridge replacement
CON
3,399
Miscellaneous
Install Environmental
Sensors
CON
284
M-71 over I-69,
Shiawassee County
North Region, various
locations
Southwest Region
42.87
AC
1,280
ST
Traffic ops/safety
Freeway Signing Upgrade
PE
North Region
Miscellaneous
Warranty AdminstrationBridge
CON
Statewide
GPA
CPM CSM Bridge
Trunkline
CON
2,976
ST
DBE Support Services
CON
400
ST
Local Techincal
Assistance Program
CON
235
ST
Regionwide
Miscellaneous
Regionwide
State Funded Required
Program
CON
Statewide
Miscellaneous
Rural Task Force Program
- Transit Projects
CON
3,655
ST
Small Urban
Program
Statewide
Miscellaneous
Small Urban Program Transit Projects
CON
115
Small Urban
Program
Statewide
Miscellaneous
Small Urban Program Road Projects
CON
7,061
Traffic ops/safety
Construct two modern
roundabouts
CON
Resurface
Two Course HMA Overlay
Reconstruct
Reconstruct
CON
Reconstruct
Reconstruction
CON
on CR652 at the ramp
terminals N and S of I94 (exit 66)
City of Watervliet to
M-140
CR 378
Third Ave-First Ave,
Seventh Street
Farrar St-Mitchell St
Forest Highway Lake County Line to
37
Forest Highway 38
I-94
7.22
11.00
ACC
PE
AC
Local
Fund
Source
SRSI
0.37
Iron Creek nthly 5.5 mi
Schoolcraf
County Rd 437
to end of pavement
t County
2011
2011
Limits
Velma Matson Upper
Elem. School, City of
Newaygo
NB over US-31
Business Route
(Monroe Road)
Grand Region Carpool
Lots
Fifth Street east to
Chippewa Ave
Primary Work
Type
MPO/
Rural
Action
Date
Amendment
Air
Type Quality
202 111567
10/28/10
NA
106297
10/28/10
NA
84 102951
10/28/10
NA
Comments
Total
Project
Cost
Local
($1000s) x Priority
202
Project moved to
Bridge RR GPA.
Federal
Approval
EJ
Date
12/2/10
12/2/10
84
Project moved to
Hwy RR GPA
12/2/10
12/2/10
110307
10/28/10
NA
CNTY
94 111252
10/28/10
NA
94
12/2/10
1
CNTY
94 111253
10/28/10
NA
94
12/2/10
1
CNTY
94 111254
10/28/10
NA
94
12/2/10
M
3,399 87169
10/28/10
NA
Tagged as AC
3,694
12/2/10
M
1,563 105741
10/28/10
NA
From illustrative list
2,000
12/2/10
109747
10/28/10
NA
2 111877
10/28/10
NA
2
12/2/10
3,680
10/28/10
NA
3,680
12/2/10
400
10/28/10
NA
400
12/2/10
470
10/28/10
NA
470
12/2/10
10,430
12/2/10
2
M
705
M
235
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
M
10,430
M
754
M
10,430
10/28/10
NA
12/2/10
The State Funded
Required Program
was the former NonDiscretionary M
Program
152
CNTY
4,561
10/28/10
NA
4,561
12/2/10
ST
29
CNTY
144
10/28/10
NA
144
12/2/10
ST
2,711
CNTY
9,771
10/28/10
NA
9,771
12/2/10
400 107461
10/28/10
NA
400
12/2/10
400 110107
10/28/10
NA
6,500
12/2/10
188
12/2/10
3,118
12/2/10
400
CMG
327
ST
73
M
150
EDF
38
CITY
188 110962
10/28/10
NA
M
609
CITY
3,046 107752
10/28/10
NA
2,437
Tagged as AC
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
2011
WEXFORD
MDOT
US-131BR
2011
WEXFORD
MDOT
US-131 BR
2011
WEXFORD
MDOT
2012
BARRY
Barry
County
M-37
Finkbeiner Rd
2012
CHIPPEWA
MDOT
I-75BS
2012
IRON
MDOT
US-2
2012
MARQUETTE
MDOT
US-41
2012
MONTCALM
MDOT
US-131
2012
MONTCALM
MDOT
US-131
2012
NEWAYGO
MDOT
M-37
2012
OCEANA
MDOT
US-31 BR
2012
OGEMAW
MDOT
I-75
2012
OGEMAW
MDOT
I-75 BL
2012
2012
2013
2013
2014
Schoolcraf
t County
Area Wide
SCHOOLCRAFT Public
Transit
Transport
ation
DBE Support
STATEWIDE
MDOT
Services
ALLEGAN
MDOT
US-131
DBE Support
STATEWIDE
MDOT
Services
OSCEOLA
MDOT
US-131 NB
DBE Support
Services
Blue Star
Highway
2014
STATEWIDE
MDOT
2014
VAN BUREN
MDOT
2011
ALLEGAN
Allegan
County
11th Street
2011
ALLEGAN
MDOT
I-196
2011
CRAWFORD
MDOT
I-75 NB
2011
GRATIOT
MDOT
US-127
2011
IOSCO
MDOT
US-23
Primary Work
Type
Limits
Length
River Street to North of
2.12 Reconstruct
Boon Road
over Clam River,
0.29 Bridge replacement
Cadillac
M-115 to North of 10
4.00 Resurface
Road
Thornapple Rvr &
0.19 Bridge replacement
Spring Creek
I-75 BS from Easterday
Ave to Power Canal
Project Description
Reconstruct, Mill &
Resurface
Deck Replacement
Crush and Shape and
Resurface
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
MPO/
Rural
Action
Date
CON
87041
10/28/10
NA
CON
87218
10/28/10
NA
PE
90234
10/28/10
NA
Phase
Bridge Replacement
CON
Federal
Advance
Cost
Construct ($1000s)
ACC
2,008
Federal
Fund
Source
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
HPSL
Amendment
Air
Type Quality
2,008 109247
10/28/10
NA
Comments
Project moved to
Hwy RR GPA
Project moved to
Bridge RR GPA.
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
12/2/10
12/2/10
12/2/10
AC $504,569 STL in
2012.
2,982
12/2/10
0.25
Reconstruct
Participation in mainline
rec
CON
104842
10/28/10
NA
12/2/10
0.58
Reconstruct
HMA Reconstruction
CON
87555
10/28/10
NA
12/2/10
Bridge restore &
rehabilitate
Deep Overlay
CON
108364
10/28/10
NA
12/2/10
9.73
Miscellaneous
Temporary HMA Crossovers
CON
90040
10/28/10
NA
12/2/10
0.69
Bridge replacement
Deck Replacement
CON
90209
10/28/10
NA
12/2/10
Culvert Replacement
CON
109691
10/28/10
NA
12/2/10
Culvert Replacement
CON
106096
10/28/10
NA
12/2/10
Bridge replacement
Culvert Replacement
CON
106152
10/28/10
NA
12/2/10
Roadside facility
Resurfacing of exisitng lot
CON
42
ST
9
M
52 110708
10/28/10
NA
56
12/2/10
CON
30
EDDF
8
M
38 102947
10/28/10
NA
38
12/2/10
DBE Support Services
CON
400
ST
10/28/10
NA
400
12/2/10
Resurface Carpool Lot
CON
30
ST
7
M
10/28/10
NA
40
12/2/10
Regionwide
DBE Support Services
CON
400
ST
10/28/10
NA
400
12/2/10
South County Line to
North of US-10
Crush and Shape, HMA
Resurface
10/28/10
NA
10/28/10
NA
83574
10/28/10
NA
133 112174
01/06/11
NA
133
1/24/11
US-2 from 9th Street
to River Street in Iron
River
under Champion
Street, City of
Marquette
Pierson Road north to
Cutler Road
NB over Tamarack
Creek
At Downing Drain,
North of Grant
50' East of Wythe
Street
NB over Br of Laporte
Creek
Restore &
rehabilitate
Restore &
rehabilitate
1.20
on I-75 BL at I-75 and
Cook Road interchange
Schoolcraft Co Transit,
Manistique
0.20
Transit vehicle
additions/replacemen Vehicle Upgrade
ts
Regionwide
at 12th Street
Roadside facility
5.60
Resurface
Regionwide
Baseline Road to 1700'
north of Baseline Road
SB only 130th Avenue
north to US-31
at Grayling Rest Area,
Beaver Creek Twsp
Washington Road to
North of Polk Road
Cresent Dr. to Au
Sable River Bridge
37 110953
400
PE
DBE Support Services
CON
Bridge replacement
Bridge Replacement
CON
0.32
Resurface
Resurface
CON
7.38
Restore &
rehabilitate
Major Rehabilitation
Roadside facility
Replace existing PITWS
2.80
Resurface
4.70
Restore &
rehabilitate
over Black River
400
90219
400
ST
400
100
EDA
33
OLF
12/2/10
400
12/2/10
12/2/10
PE
538
IM
60
M
597 106587
01/06/11
NA
15,133
1/24/11
CON
61
ST
14
M
75 110738
01/06/11
NA
75
1/24/11
Two Course HMA Overlay
PE
724
NH
160
M
884 110485
01/06/11
NA
7,452
1/24/11
HMA Crack Relief Layer
PE
444
NH
98
M
542 105981
01/06/11
NA
5,975
1/24/11
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
2011
LAPEER
MDOT
M-24
2011
LAPEER
MDOT
M-24
LENAWEE
Lenawee
County
Steger
Industrial Drive
Lenawee
County
Treat Highway
2011
2011
LENAWEE
Limits
0.26 miles north of
Newark Road
0.26 miles north of
Newark Road
Project Description
Phase
Federal
Advance
Cost
Construct ($1000s)
Federal
Fund
Source
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
MPO/
Rural
Action
Date
Amendment
Air
Type Quality
Comments
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
Bridge replacement
Replace Culvert
PE
60
HPSL
15
M
75 112269
01/06/11
NA
761
1/24/11
Bridge replacement
Replace Culvert
ROW
9
HPSL
2
M
11 112269
01/06/11
NA
761
1/24/11
Reconstruct
Reconstruct
CON
Treat Highway .40 mile
south of US-223 at
Madison Schools north
driveway
Miscellaneous
Approximately 1100 foot
long passing flair in front
of Madison Schools in
order to alleviate
congestion. CMAQ Grant
#11033
CON
112
Miscellaneous
Pedestrian Bridge
CON
96
Restore &
rehabilitate
Aggr lift w/3 crs HMA
resurf
CON
Roadside facility
Bike/ped safety
improvements
CON
18.00
2011
LENAWEE
Lenawee
County
M-34 (Main
Street)
Findlay Trail are within
the City of Hudson; S.
Maple Grove Ave.
running 4000' parallel
to and south of Main
St. (M-34) to S.
Munson Hwy at the
Northwest corner of
the Industrial Park.
The proposed
pedestrian bridge
crosses the Garrison
Drain West of
McKenzie Dr. to
connect the two trail
halves.
2011
MACKINAC
MDOT
US-2
M-117 to Naubinway
2011
MARQUETTE
Marquette Various
County
locations
2011
MARQUETTE
MDOT
2011
MARQUETTE
MDOT
2011
MENOMINEE
MDOT
US-41
2011
MENOMINEE
MDOT
US-2
2011
MONTCALM
Greenville
Fred Meijer
Pedestrian trail outside
Heartland Trail Greenville City limits
2011
MONTCALM
Greenville
2011
2011
STATEWIDE
STATEWIDE
2011
STATEWIDE
MDOT
MDOT
Michigan
Technolog
Statewide
ical
University
Michigan Iron
Museum Access
Rd
Michigan Iron
Museum Access
Rd
Length
Primary Work
Type
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
5.09
Birchview Elementary
School, City of
Ishpeming
326
109
CNTY
435 112179
01/06/11
NA
435
1/24/11
CM
28
CNTY
140 112412
01/06/11
NA
140
1/24/11
CM
39
OLF
135 112413
01/06/11
NA
135
1/24/11
5,565 87543
01/06/11
NA
5,788
1/24/11
170 112487
01/06/11
NA
170
1/24/11
AC
5,565
170
EDA
M
SRSI
Tagged as AC.
Moved from FY 2013
Michigan Iron Industry
Museum
0.05
Miscellaneous
Drainage Modifications
CON
11
MIR
11 112364
01/06/11
NA
12
1/24/11
Michigan Iron Industry
Museum
0.05
Miscellaneous
Drainage Modifications
PE
1
MIR
1 112364
01/06/11
NA
12
1/24/11
7.96
Restore &
rehabilitate
CRUSH&SHAPE&HMA
RESURFACING
UTL
50
NH
11
M
62 87551
01/06/11
NA
4,360
1/24/11
Traffic ops/safety
Message Sign installation
CON
8
ST
2
M
10 112099
01/06/11
NA
10
1/24/11
Miscellaneous
Complete portion of ped
trail
CON
640
HPSL
160
M
800 102229
01/06/11
NA
860
1/24/11
Miscellaneous
Complete portion of ped
trail
CON
240
HPSL
300 111527
01/06/11
NA
300
1/24/11
Miscellaneous
Roadside facility
Training BOH FY 2011
Pavement Markings
EPE
CON
1,000
12
ST
ST
3
M
1,000 110435
15 110735
01/06/11
01/06/11
NA
NA
1,000
15
1/24/11
1/24/11
Miscellaneous
2011 MERL Program
EPE
73
STT
18
M
92 112265
01/06/11
NA
92
1/24/11
COUNTY ROAD G-12
TO BAGLEY
At the Powers Weigh
Station
Hillcrest to Meijer Drive
Fred Meijer
along Greenville West
Heartland Trail
+
Statewide
Statewide
Regionwide
Various Locations
At LTAP Center at MTU
0.93
60
CITY
Demo ID MI 176,
HPP #1548
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
Jackson
US127-Village of
Jefferson Rd
County
Brooklyn
Length
2012
JACKSON
2011
STATEWIDE
Rural Task Rural Task
Forces
Force
Statewide
2011
BERRIEN
Berrien
County
Areawide
Areawide
2011
CASS
Cass
County
Countywide
Countywide
2011
CHIPPEWA
MDOT
M-28
west of I-75 at Dafter
TST
0.10
2011
HILLSDALE
MDOT
US-12
East of Jonesville
0.01
Iosco
County
Lenawee
County
Lenawee
County
Midland
County
Monument
Road
M-52 and US223
M-52 and US223
Monument and Wilber
Roads (MI PFH 11)
M-52 @ M-34 and US223 @ Division St
M-52 @ M-34 and US223 @ Division St
Bay City Road
Multiple
M-25
Dickerson Road to
Ringle Road
2011
IOSCO
2011
LENAWEE
2011
LENAWEE
2011
MIDLAND
5.50
17.49
Primary Work
Type
CM
15
OLF
75 112683
03/04/11
EPE
56
CM
14
CNTY
70 112678
CON
CON
Reconstruct
Traffic ops/safety
MDOT
Terry and
Fullerton
Streets
2012
MONTCALM
MDOT
US-131
NA
70
3/31/11
110631
03/04/11
NA
3/31/11
110621
03/04/11
NA
3/31/11
03/04/11
NA
710
3/31/11
03/04/11
NA
350
3/31/11
PE
44
CMG
44 112818
03/04/11
NA
350
3/31/11
5,328 112178
03/04/11
NA
5,328
3/31/11
250 90283
03/04/11
NA
4,283
3/31/11
12 112753
03/04/11
NA
12
3/31/11
7 103284
03/04/11
NA
7
3/31/11
6,697 113443
03/17/11
NA
7,279
3/31/11
12
CMG
CON
5
ST
CON
6,697
45
1
EDA
1,697
CNTY
M
M
NRT
107609
03/17/11
NA
Noble and Burns
Elementary Schools,
Detroit
Miscellaneous
Bike/ped safety
improvements
CON
111432
03/17/11
NA
at M-82 SW Quadrant
Roadside facility
2011
LENAWEE
Adrian
LENAWEE
Lenawee
County
MDOT
M-20
MECOSTA
03/04/11
CON
LAPEER
2011
3/31/11
ITS System Modifications
2011
2011
75
Traffic ops/safety
WB I-69, M-24 to
WB I-69
Lapeer/St Clair COL
Treat St-Eastern City
Beecher Street
Limit
Adrian City Limits-Parr
Beecher
Hwy
MDOT
NA
306 112818
EPE
Roadside facility
3/31/11
200 105167
NH
Statewide
29,169
FFH
3,632
CNTY
29,169
CMG
205
40
CNTY
306
ROW
Crack seal carpool lot
surface
Improvements to three
recreational trails plus
program audit costs
6,506
M-20 @ Schrader
Creek
17.16
0.44
Restore &
rehabilitate
Resurface carpool lot with
Minor Widening
Conc Pavt Rprs, Diamond
Grind
Reconstruct
Reconstruct
Reconstruct
Reconstruct
New route/structure
(capacity increase)
New Bridge on Existing
Route
1/24/11
160
Resurface
Roadside facility
M
Comments
Project is in Jackson
MPO.
Cost has been
administratively
reduced 02/16/2011
Federal
Approval
EJ
Date
PE
CON
at I-69
3,984
Amendment
Air
Type Quality
Total
Project
Cost
Local
($1000s) x Priority
CON
HMA Overlay with
Shoulders
I-94 BL
STATEWIDE
Traffic Signal
Modernization
Traffic Signal
Modernization
Resurface
MDOT
2011
Reconstruct
Reconstruct
CALHOUN
1.00
NA
60
2013
Various locations in
Metro Region
02/16/11
EPE
Transit vehicle
additions/replacemen Bus replacement
ts
Transit vehicle
additions/replacemen Bus Replacement
ts
New route/structure
Construct New PITWS
(capacity increase)
Install Wireless
Roadside facility
equipment
Miscellaneous
Regionwide
NA
ST
Countywide
MDOT
01/06/11
18,679
Van Buren
Countywide
County
STATEWIDE
111815
CON
VAN BUREN
2011
Local
Fund
Source
Rural Task Force Program
- Road Projects
2011
MDNR
Local
Cost
($1000s)
Miscellaneous
MDOT
STATEWIDE
State
Fund
Source
CON
TUSCOLA
2011
State
Cost
($1000s)
Resurface
2011
FY 2011
Recreational
Trails Program
Phase
Federal
Fund
Source
MPO/
Rural
Action
Date
Resurface
Traffic ops/safety
5.44
Project Description
Federal
Advance
Cost
Construct ($1000s)
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
4,605
3/31/11
03/18/11
NA
469
3/31/11
03/18/11
NA
375
3/31/11
8,760
5/23/11
9
M
51 102916
03/17/11
NA
PE
94
IM
10
M
105 108689
03/18/11
CON
375
EDF
94
CITY
469 110967
CON
300
EDF
75
CNTY
375 110969
M
7,800 73737
3/31/11
NA
ST
7,800
3/31/11
3/31/11
42
AC
Programmed as a
Statewide project
and should be in
SEMCOG TIP.
Programmed as a
Statewide project
and should be in
SEMCOG TIP.
Year change from FY
2011 to FY 2012
51
CON
CON
MI PFH 11.
04/01/11
NA
Administrative
change on
04/01/2011 to AC
project.
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
Length
Primary Work
Type
Project Description
Phase
Federal
Advance
Cost
Construct ($1000s)
Federal
Fund
Source
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
MPO/
Rural
Action
Date
Amendment
Air
Type Quality
5/23/11
RCWD Project - split
out from JN 101361.
3,339
5/23/11
NA
RCWD Project - split
out from JN 101361.
3,339
5/23/11
04/01/11
NA
Cost increase for
state and local funds
86,277
5/23/11
Moved from FY 2012
to FY 2011
4,120
5/23/11
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
FY 2011 RCWD Program
EPE
834
ST
834 101361
04/01/11
NA
2011
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
FY 2011 CTP (RCWD)
Program
EPE
100
ST
100 113339
04/01/11
NA
2011
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
FY 2011 TRAC (RCWD)
Program
EPE
70
ST
70 113342
04/01/11
2011
STATEWIDE
MDOT
Section 5311
Transit operations
Non-UZA Formula
2011
CHEBOYGAN
MDOT
US-23
6.84
Restore &
rehabilitate
Crush & Shape, HMA
Resurface
CON
2011
CHEBOYGAN
MDOT
US-23
6.84
Restore &
rehabilitate
Crush & Shape, HMA
Resurface
UTL
2011
GLADWIN
Gladwin
County
Judy Mae
Reconstruct
RCNSTRCT
CON
2011
HOUGHTON
MDOT
M-26
2011
IONIA
2011
2011
MDOT
I-96 EB
IOSCO
MDOT
US-23
MIDLAND
Midland
County
Waldo Avenue
from Cheboygan east
county line to
Cordwood
from Cheboygan east
county line to
Cordwood
Blades Rd to Judy Mae
St; M-18 to Von Dale
St
M-26, Houghton
County
at the Saranac Rest
Area #532
AuSable River Bridge
to F-41
Salzburg Road to
3,700 feet north
3.13
Resurface
0.54
Roadside facility
1.85
Reconstruct
Reconstruct
2011
STATEWIDE
MDOT
Statewide
Statewide
2011
STATEWIDE
MDOT
Statewide
Statewide
0.01
Miscellaneous
2011
STATEWIDE
MDOT
Grand Region
Grand Region
56.03
Traffic ops/safety
2011
STATEWIDE
MDOT
2011
STATEWIDE
MDOT
2011
STATEWIDE
MDOT
2011
STATEWIDE
MDOT
2011
STATEWIDE
MDOT
2011
STATEWIDE
CPM Road
Trunkline GPA
Enhancements
Trunkline GPA
Miscellaneous
Mill & Two Course
Overlay
Building Replacement/Site
Work
Hot Mix Asphalt
Reconstruction
RCNSTRCT
FY 11 fed const proj
training
Wetland
Mitigation/Monitoring
Freeway Signing Upgrade
16,759
AC
41
PE
CON
ROW
5311
224
ST
ST
AC
65
NH
CON
30,014
M
3,820
M
3,820 79651
04/20/11
NA
9
M
50 79651
04/20/11
NA
4,727
5/23/11
224 113424
04/20/11
NA
224
5/23/11
274 107008
04/20/11
NA
4,032
5/23/11
4,150
5/23/11
202
EDA
50
M
39,503
22
TRAL
CNTY
86,277
Federal
Approval
EJ
Date
3,339
2011
T-Ops
Comments
Cost reduced to split
out the three new
RCWD JNs - JN
113339, JN 113341,
and JN 113342.
Total
Project
Cost
Local
($1000s) x Priority
Moved from FY 2012
to FY 2011
3,850
M
3,850 101616
04/20/11
NA
15
M
80 90192
04/20/11
NA
7,813
5/23/11
451
EDA
1,002 113421
04/20/11
NA
1,002
5/23/11
551
CNTY
CON
491
ST
109
M
600 112186
04/20/11
NA
1,200
5/23/11
CON
491
ST
109
M
600 113244
04/20/11
NA
600
5/23/11
PE
555
IMG
555 113334
04/20/11
NA
4,810
5/23/11
Statewide
GPA
CPM Road Trunkline
CON
32,074
ST
7,029
M
58
CNTY
39,161
04/20/11
NA
39,161
5/23/11
Statewide
GPA
Enhancements Trunkline
CON
2,257
STE
281
M
738
CNTY
3,276
04/20/11
NA
3,276
5/23/11
Highway Safety
Statewide
Trunkline GPA
GPA
Highway Safety Trunkline
CON
24,304
ST
239
M
24,543
04/20/11
NA
24,543
5/23/11
Regionwide
GPA
Rural Bridge Replacement
and Rehabilitate Trunkline
CON
19,590
ST
4,391
M
98
OLF
24,079
04/20/11
NA
24,079
5/23/11
Regionwide
GPA
Rural Highway Rehab and
Reconstruct Trunkline
CON
20,666
ST
4,460
M
568
CNTY
25,693
04/20/11
NA
25,693
5/23/11
Regionwide
GPA
Enhancements Local
CON
4,200
STE
2,007
CNTY
6,207
04/20/11
NA
6,207
5/23/11
Rural Bridge
Replacement
and
Rehabilitate
Trunkline GPA
Rural Highway
Rehab and
Reconstruct
Trunkline GPA
Enhancements
Local GPA
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
2011
STATEWIDE
2011
TUSCOLA
MDOT
M-25
Bay/Tuscola County
Line to Dickerson Road
2012
CALHOUN
MDOT
I-94
17 1/2 to 23 Mile Road
2012
CALHOUN
MDOT
2011
DICKINSON
Dickinson
Fifth Street
County
2011
MARQUETTE
Negaunee Croix Street
2011
STATEWIDE
MDOT
2012
GOGEBIC
MDOT
2012
GRAND
TRAVERSE
MDOT
2012
GRATIOT
MDOT
2012
IOSCO
MDOT
2012
LAPEER
2012
SANILAC
MDOT
Sanilac
County
2013
2013
I-94
State of Good
Repair FTA
Grant
From US-41 to Maas
Street, City of
Negaunee
CHIPPEWA
MDOT
M-28
Racco Conc Section
IONIA
Ionia
County
Cleveland
Street
Over Grand River,
Ionia Co
6 Mile Rd north to 13
Mile Rd
N. of M-186 south to
US-131
28th Street east to
Kalamazoo Street
23 Mile Road to 29
Mile Road
From County Road 581
to Lerza Road
MECOSTA
MDOT
US-131 SB
GRAND
TRAVERSE
MDOT
M-113
2011
ALLEGAN
MDOT
M-89
2011
CALHOUN
MDOT
I-94 WB
DICKINSON
Dickinson
Leeman Road
County
EMMET
MDOT
US-31
2011
GOGEBIC
MDOT
US-2
2011
GRATIOT
MDOT
US-127
2011
IONIA
MDOT
M-66
Paradise Tr to I-75
US-2 EB, between
Tamarack Street and
Pine Street
North of Polk Road to
North of Van Buren
Road
South of GRE RR north
to M-21
Phase
Federal
Fund
Source
State
Cost
($1000s)
State
Fund
Source
Highway Safety Local
CON
5,567
STH
234
M
5.43
Resurface
HMA Mill & Overlay
ROW
8
NH
2
M
5.30
Resurface
1,382
IM
154
4.45
Resurface
SUB
459
IM
51
0.50
Multiple Course HMA
Overlay
Multiple Course HMA
Overlay
5.09
2.00
1.04
0.38
5.14
7.33
5.09
PE
Roadside facility
Bike/Ped safety
improvements
CON
212
SRSI
Roadside facility
Parking reconstruction
CON
500
OFHWA
Bus
Transit vehicle
additions/replacemen replacements/additions
for 19 transit agencies
ts
Statewide
at Lakeshore Drive in
Wakefield
N. of M-186 south to
M-113
US-131
Northwest quadrant of
M-57
the US-127/M-57
interchange
South of Aster Road
US-23
to north of Point Road
M-24
over Plum Creek
M90 to North City
Maple Valley Rd
Limits
2013
2011
17 1/2 to 21 1/2 Mile
Road
North Elementary
School, City of Iron
Mountain
Project Description
Federal
Advance
Cost
Construct ($1000s)
GPA
US-2
2014
2011
Length
Highway Safety
Statewide
Local GPA
Primary Work
Type
T-Cap
3,834
5309
Local
Cost
($1000s)
990
CNTY
Amendment
Air
Type Quality
Comments
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
NA
6,791
5/23/11
10 86950
04/20/11
NA
4,142
5/23/11
M
1,536 110138
04/20/11
NA
18,900
5/23/11
M
510 110138
04/20/11
NA
510
5/23/11
212 110131
04/21/11
NA
212
5/23/11
713 108731
04/21/11
NA
Funding source DSTP (not available
in drop down menu).
713
5/23/11
04/21/11
NA
State of Good Repair
Grant
4,793
5/23/11
CITY
CTF
6,791
MPO/
Rural
Action
Date
04/20/11
213
959
Local
Fund
Source
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
4,793
Moved from FY 2011
to FY 2012
Roadside facility
New Carpool Lot
CON
34
ST
7
M
41 112331
04/21/11
NA
45
5/23/11
Restore &
rehabilitate
Crush and Shape
ROW
25
ST
5
M
30 103027
04/21/11
NA
4,085
5/23/11
Roadside facility
Resurfacing of existing
Lot
CON
36
ST
8
M
44 113219
04/21/11
NA
44
5/23/11
Restore &
rehabilitate
Bridge replacement
Passing Lane
Rehabilitation
Bridge Replacement
PE
350
NH
78
M
428 109659
04/21/11
NA
4,064
5/23/11
CON
572
BHT
143
M
715 102796
04/21/11
NA
815
5/23/11
Resurface
resurface
CON
113
EDF
141 112606
04/21/11
NA
141
5/23/11
Restore &
rehabilitate
Restore &
rehabilitate
Restore &
rehabilitate
Restore &
rehabilitate
Aggregate lift w/ 3 Crs
HMA
CON
AC
5,923
M
5,923 103229
04/21/11
NA
6,121
5/23/11
Bridge Rehab
CON
AC
4,243
M
4,466 112262
04/21/11
NA
4,466
5/23/11
7.52
Reconstruct
6.20
Resurface
28
223
CNTY
CNTY
Crush & Shape
CON
AC
5,800
M
5,800 109049
04/21/11
NA
6,000
5/23/11
Crush and Shape
CON
AC
3,420
M
3,420 103027
04/21/11
NA
4,085
5/23/11
5,675
5/23/11
14,900
5/23/11
93
5/23/11
4,371
5/23/11
Multi Cse HMA Ovly &
Pavt Repr
Multiple Course HMA
overlay
Pavement marking and
gravel shoulder
CON
3,132
ST
695
M
3,827 87249
05/05/11
NA
CON
10,218
IM
1,135
M
11,353 86970
05/05/11
NA
CON
74
13
M
93 113456
05/05/11
NA
Obligated as regular
federal aid
Obligated as regular
federal aid
7.15
Traffic ops/safety
5.12
Restore &
rehabilitate
Crush & Shape
CON
3,375
NH
748
M
4,123 103443
05/05/11
NA
0.24
Roadside facility
Construct PITWS
CON
84
ST
19
M
103 113409
05/05/11
NA
110
5/23/11
2.69
Resurface
Two Course HMA Overlay
PE
284
NH
63
M
347 112711
05/05/11
NA
7,590
5/23/11
0.53
Reconstruct
Concrete Reconstruction
CON
2,152
ST
477
M
3,764 90033
05/05/11
NA
4,224
5/23/11
HPSL
6
1,135
CNTY
CITY
Obligated as regular
federal aid
Obligated as regular
federal aid
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
2011
MONTCALM
Meijer
Fred Meijer
Drive/Maplewood Drive
Greenville
Heartland Trail
to W Baldwin Lake Dr
2011
ROSCOMMON
MDOT
M-55
Roscommon Co WCL
to US-127
2.21
0.18
2011
HURON
MDOT
M-25
from County Road to
Caseville County Park
2011
IOSCO
Oscoda
County
Arrow Street
Mission Drive-F41
2011
LENAWEE
MDOT
M-50
2011
LENAWEE
Tecumseh Russell Road
2011
MENOMINEE
MDOT
M-35
2011
OCEANA
MDOT
M-20
2011
ROSCOMMON
2011
STATEWIDE
2011
MDOT
M-55
Ridge Hwy to the EVL
of Britton, Lenawee
County
300' W of S Evans StMill Hwy
Jimtown road South
9.42 miles
MDOT
Statewide
2011
TUSCOLA
Tuscola
County
Colling Rd
2012
ALGER
MDOT
M-94
2012
BERRIEN
MDOT
I-94
at Nickerson Ave in
Benton Township
2012
BRANCH
MDOT
US-12
over Michigan
Southern Railroad
I-94 BL
2012
IONIA
MDOT
I-96
2012
IOSCO
MDOT
M-65
2012
IOSCO
MDOT
US-23
2012
IOSCO
MDOT
US-23
2012
2012
MIDLAND
MONTCALM
MDOT
MDOT
US-10
US-131
72
Restore &
rehabilitate
Crush and shape
CON
3,248
ST
720
Widen - minor
Construct shoulder
improvements and HMA
paving to extend the
existing dedicated centerleft turn lane. The `A?
Phase CMAQ grant
number is 11120.
CON
251
CM
Reconstruct
Reconstruct
CON
Resurface
HMA Mill and Resurface
CON
Resurface
Resurface
CON
Restore &
rehabilitate
Coldmilling and
Resurfacing
Crack Sealing - carpool
lot
Restore &
rehabilitate
2.21
Traffic ops/safety
Statewide
Miscellaneous
Gilford Rd-Deckerville
Rd.
at M-67 & 94
intersection in Alger
County
0.19
05/05/11
NA
M
3,969 106683
05/05/11
NA
63
M
314 113532
05/26/11
375
EDF
510 110965
4,380
5/23/11
NA
314
7/11/11
05/26/11
NA
510
7/11/11
3,586 87514
05/26/11
NA
3,959
7/11/11
179 110963
05/26/11
179
7/11/11
433 110682
05/26/11
NA
6,135
7/11/11
CON
87479
05/26/11
NA
ROW
106683
05/26/11
NA
3,586
354
ST
CNTY
M
115
EDF
79
M
64
CITY
EPE
CON
M
181
M
13
M
25 112185
05/26/11
227 110968
05/26/11
NA
69 113745
05/26/11
NA
Roadside facility
Resurface existing lot
CON
103293
05/26/11
NA
Bridge Replacement
CON
108712
05/26/11
NA
Roadside facility
0.74
5.97
Restore &
rehabilitate
Restore &
rehabilitate
Restore &
rehabilitate
Restore &
rehabilitate
Roadside facility
ST
CNTY
NA
CON
57
46
05/26/11
Expand existing lot for
additional parking
Expansion and HMA
Overlay
Joint Repairs & Skip
Patching
AC
25
111293
Roadside facility
Bridge replacement
Comments
Federal
Approval
EJ
Date
5/23/11
PE
90 113481
135
CITY
Amendment
Air
Type Quality
Total
Project
Cost
Local
($1000s) x Priority
90
AC
18
Local
Fund
Source
CON
Restore &
rehabilitate
2.71
2011 Control Room Ops.
WMTMC
FY11 state const proj
training
HPSL
Local
Cost
($1000s)
Resurface
at I-69, Marshall
3.83
Crush and shape
State
Fund
Source
MPO/
Rural
Action
Date
Resurface
at Ionia Weigh Station
Ramps
Turtle Rd to 1200'
North of Sherman
Street
Auelrich Road to
Kirkland Drive
Auelrich Road to
Kirkland Drive
Four bridges along US10 in Midland County
at 22 Mile Road/ M-46
NW Quadrant
3.83
State
Cost
($1000s)
CON
Roadside facility
STATEWIDE
MDOT
9.42
Phase
Federal
Fund
Source
Construct Multi-use path
Roscommon Co WCL
to US-127
Various locations in the
Grand Region
Regionwide
CALHOUN
2.16
Project Description
Federal
Advance
Cost
Construct ($1000s)
Roadside facility
at US-31 NE Quadrant
MDOT
2012
Length
Primary Work
Type
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
Obligated as regular
federal aid
Moved from FY 2012
Moved from FY 2013
7/11/11
7/11/11
Project is in Grand
Rapids TIP
Obligated as AC
7/11/11
50
7/11/11
227
7/11/11
73
7/11/11
Project is now
entirely in the
Benton Harbor - St.
Joseph MPO.
Moved to Illustrative
List
7/11/11
7/11/11
CON
83
ST
19
M
102 113658
05/26/11
NA
113
7/11/11
CON
415
ST
92
M
507 110024
05/26/11
NA
507
7/11/11
ROW
41
ST
9
M
50 79433
05/26/11
NA
4,534
7/11/11
HMA Crack Relief Layer
PE
390
NH
86
M
476 112946
05/26/11
NA
5,517
7/11/11
HMA Crack Relief Layer
ROW
10
M
10 112946
05/26/11
NA
5,517
7/11/11
Crush & Shape, Resurface
Deep Overlay
CON
108695
05/26/11
NA
Crack Sealing - carpool
lot
CON
102922
05/26/11
NA
Moved from FY 2011
Moved to Illustrative
List
7/11/11
7/11/11
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
2012
SCHOOLCRAFT MDOT
M-28
2012
STATEWIDE
Regionwide
2013
2013
2013
ALLEGAN
BRANCH
BRANCH
MDOT
MDOT
MDOT
MDOT
I-196
US-12
I-69 NB
2013
IONIA
MDOT
M-66
2013
LAPEER
MDOT
M-24
2013
MARQUETTE
MDOT
US-41
2013
MECOSTA
MDOT
US-131 NB
Limits
between the Seeney
Rest Area and Seeney
Various Locations in
Superior Region
SB only 130th Avenue
north to US-31
2013
ROSCOMMON
MDOT
US-127
2013
STATEWIDE
MDOT
Regionwide
Various locations in
Bay Region
2013
2014
VAN BUREN
ALLEGAN
MDOT
MDOT
I-94
US-131
2014
BRANCH
MDOT
I-69 NB
DICKINSON
MDOT
US-2
2014
DICKINSON
MDOT
M-69
2014
LIVINGSTON
MDOT
I-96
2014
LUCE
MDOT
M-28
2014
MENOMINEE
MDOT
M-35
2014
2014
ST. JOSEPH
STATEWIDE
MDOT
MDOT
M-60
3.70
at Mattawan
under M-222
at Coldwater Weigh
Station
US-2 from Dawn's
Lake Road to Baler
Road
Project Description
Thickened pavement
section for WIM
Phase
Federal
Advance
Cost
Construct ($1000s)
Federal
Fund
Source
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
MPO/
Rural
Action
Date
Amendment
Air
Type Quality
ST
36
M
200 113746
05/26/11
NA
210
7/11/11
27
ST
6
M
33 113497
05/26/11
NA
36
7/11/11
106587
05/26/11
NA
CON
Major Rehabilitation
CON
Roadside facility
Crack seal carpool lot
surface
CON
6
ST
1
M
8 103283
05/26/11
NA
Roadside facility
Pavement Rehabilitation
CON
443
ST
98
M
541 113731
05/26/11
Roadside facility
Resurface of existing
carpool lot.
CON
49
ST
11
M
60 113528
Miscellaneous
Replace Culvert
CON
540
HPSL
135
M
0.33
Roadside facility
Construct New Carpool
Lot
CON
55
ST
12
7.37
Restore &
rehabilitate
Coldmill, C&S, HMA
Resurface
PE
632
NH
10.75
Restore &
rehabilitate
Crush and shape and
resurface and cold milling
PE
384
NH
Roadside facility
Lighting for Carpool Lots
Roadside facility
Bridge replacement
0.68
0.68
0.95
0.16
0.20
9.42
1.09
Federal
Approval
EJ
Date
164
Sign Upgrades
7.38
Comments
Total
Project
Cost
Local
($1000s) x Priority
CON
Restore &
rehabilitate
at M-95/M-69 south
intersection (Randville)
US-23 NB over I-96
WB
Adjacent to Luce Co
Airport
Jimtown road South
9.42 miles
In the village of
Mendon
Reconstruct
Roadside facility
at I-69
at Coldwater Weigh
Station
at M-44 (Belding Rd)
SW Quadrant
0.26 miles north of
Newark Road
US-41/M-28,
Negaunee, Marquette
County
6 Mile Road north to
13 Mile Road
M-55 to Muskegon
River Bridge
2014
Length
Primary Work
Type
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
7/11/11
8
7/11/11
NA
616
7/11/11
05/26/11
NA
60
7/11/11
675 112269
05/26/11
NA
761
7/11/11
M
68 113713
05/26/11
NA
75
7/11/11
140
M
772 112464
05/26/11
NA
7,257
7/11/11
85
M
469 113455
05/26/11
NA
10,794
7/11/11
CON
103395
05/26/11
NA
Resurface carpool lots
Bridge Replacement
CON
CON
103295
73748
05/26/11
05/26/11
NA
NA
Roadside facility
Scale and Signage
CON
688
ST
152
M
840 113769
05/26/11
NA
960
7/11/11
Reconstruct
Pavt Rem, HMA
reconstruct, Drainage
improvements
PE
409
NH
91
M
500 113708
05/26/11
NA
4,000
7/11/11
Roadside facility
Milling and Resurfacing of
Carpool Lot
CON
54
ST
12
M
66 113722
05/26/11
NA
69
7/11/11
Bridge replacement
Bridge Replacement
CON
112877
05/26/11
NA
In SEMCOG TIP
Moved from FY 2012
New route/structure
(capacity increase)
Restore &
rehabilitate
Construct New PITWS
CON
Coldmilling and
Resurfacing
CON
82
ST
AC
18
M
100 110632
05/26/11
NA
5,465
M
5,465 110682
05/26/11
NA
Reconstruct
Roadway Reconstruction
CON
103154
05/26/11
NA
Traffic ops/safety
Transportation Mgmt
Center
CON
107436
05/26/11
NA
110107
05/26/11
NA
Regionwide
Superior Region
7.22
Resurface
Two Course HMA Overlay
CON
Moved from FY 2012
Project is now
entirely within the
Saginaw MPO
7/11/11
7/11/11
7/11/11
7/11/11
103
7/11/11
6,201
7/11/11
Moved to Illustrative
List
Moved to Illustrative
List
Moved to Illustrative
List
7/11/11
7/11/11
2014
VAN BUREN
MDOT
M-140
City of Watervliet to
CR 378
2012
ALLEGAN
MDOT
US-131
under M-89, Plainwell
0.39
Restore &
rehabilitate
Deep Overlay, Pt, Railing
Repl
CON
1,729
NH
1,729 89306
06/01/11
NA
TLCR - Toll Credit
Amount is $313,771.
1,844
7/11/11
2012
CHARLEVOIX
MDOT
M-66
Hugh Street to
Sequonta Road
8.35
Resurface
Mill and Fill
CON
1,541
NH
1,541 113115
06/01/11
NA
TLCR - Toll Credit
Amount is $279,664.
1,664
7/11/11
2012
CHEBOYGAN
MDOT
M-68
east of King Road to
west of Old 27
2.05
Reconstruct
HMA crack relief layer
CON
3,367
ST
3,367 110536
06/01/11
NA
TLCR - Toll Credit
Amount is $611,174.
3,737
7/11/11
7/11/11
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
Length
Primary Work
Type
Project Description
Phase
Federal
Advance
Cost
Construct ($1000s)
Federal
Fund
Source
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
MPO/
Rural
Action
Date
Resurface
Tru-Pave & Fiber Mat
w/HMA Oly
CON
2,772
NH
2,772 113138
06/01/11
Amendment
Air
Type Quality
Comments
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
NA
TLCR - Toll Credit
Amount is $503,112.
3,001
7/11/11
2012
CHIPPEWA
MDOT
I-75
N of M-28 to 3 Mi Rd.
Exit
2012
HILLSDALE
MDOT
M-34
M-34, M-99 to US-127
10.51
Resurface
Double Microsurface
Treatment
CON
1,060
ST
1,060 113563
06/01/11
NA
TLCR - Toll Credit
Amount is $192,467.
1,091
7/11/11
2012
IONIA
MDOT
M-21
Detmers Rd to Lincoln
Ave
3.25
Resurface
Mill, ASCRL, HMA
Resurface
CON
2,490
ST
2,490 59567
06/01/11
NA
TLCR - Toll Credit
Amount is $451,934.
2,665
7/11/11
2012
IONIA
MDOT
I-96
M-66 east to the Ionia
East County Line
12.99
Restore &
rehabilitate
Concrete Joint Repairs
CON
2,359
IM
2,359 109045
06/01/11
NA
TLCR - Toll Credit
Amount is $235,900.
2,359
7/11/11
2012
IOSCO
MDOT
US-23
AuSable River Bridge
to F-41
1.85
Reconstruct
Hot Mix Asphalt
Reconstruction
CON
7,281
NH
7,281 90192
06/01/11
NA
Moved from FY
2014. TLCR - Toll
Credit Amount is
$1,321,477.
7,420
7/11/11
2012
LENAWEE
MDOT
US-223
over River Raisin
0.24
Bridge replacement
Bridge replacement
CON
2,763
BRT
2,763 102851
06/01/11
NA
TLCR - Toll Credit
Amount is $552,649.
3,004
7/11/11
2012
LENAWEE
MDOT
M-52
South north to Valley
James River Rd to US223
4.11
Resurface
Single Course M&F
CON
2,324
ST
2,324 113164
06/01/11
NA
TLCR - Toll Credit
Amount is $421,728.
2,390
7/11/11
2012
MECOSTA
MDOT
US-131 OLD
19 Mile to
Mecosta/Osceola
County Line
5.02
Resurface
Mill, Fiber Mat &
Resurface
CON
3,500
ST
3,500 88885
06/01/11
NA
TLCR - Toll Credit
Amount is $635,250.
3,782
7/11/11
2012
OGEMAW
MDOT
I-75 BL
I-75 to Woodland Dr
2.08
Restore &
rehabilitate
HMA inlay
CON
5,117
NH
5,117 103442
06/01/11
NA
TLCR - Toll Credit
Amount is 928,723.
5,454
7/11/11
28.64
Resurface
Single Course Chip Seal
CON
1,278
ST
1,278 113337
06/01/11
NA
TLCR - Toll Credit
Amount is $231,895.
1,314
7/11/11
243.19 Roadside facility
ITS applications
CON
2,021
NH
2,021 106682
06/01/11
NA
TLCR - Toll Credit
Amount is $366,821.
2,499
7/11/11
Miscellaneous
Dynamic Message Signs
CON
1,485
HSIP
1,485 109707
06/01/11
NA
TLCR - Toll Credit
Amount is $148,500.
1,710
7/11/11
Resurface
Crack treatment
CON
400
ST
400 113489
06/01/11
NA
411
7/11/11
Resurface
HMA CRACK SEALING
AND OVERBAND
CON
430
ST
430 113544
06/01/11
NA
450
7/11/11
Resurface
HMA Crack Treatment
CON
443
ST
443 113613
06/01/11
NA
450
7/11/11
Reconstruct
Remove and replace
pavement
CON
2,529
NH
2,529 103028
06/01/11
NA
TLCR - Toll Credit
Amount is $459,017.
2,652
7/11/11
296
06/15/11
NA
296
7/11/11
635 103027
06/29/11
NA
Moved from FY 2012
4,085
7/11/11
2012
PRESQUE ISLE MDOT
M-33
M-33, Presque Isle
County
M-72, Alcona County
2012
ROSCOMMON
MDOT
Statewide
Multiple locations on I75
2012
STATEWIDE
MDOT
I-94
Indiana State Line to M40
2012
STATEWIDE
MDOT
TSC Wide
TSC Wide
2012
STATEWIDE
MDOT
Region Wide
LANSING TSC WIDE
2012
STATEWIDE
MDOT
Various
TSC Wide
2012
WEXFORD
MDOT
M-115
45 Road to west of 48
1/2 Road
2012
STATEWIDE
GRAND
TRAVERSE
2011
2011
2011
2011
2012
MDOT
Section 5311
MDOT
M-113
Statewide
N. of M-186 south to
US-131
The Grand River north
to GRE RR
IONIA
MDOT
M-66
LENAWEE
Lenawee
County
US-12
US-12 at M-50
M-94
M-94 over C & NW
RAILROAD
MARQUETTE
ROSCOMMON
MDOT
MDOT
US-127
Muskegon River north
5.63
6.72
4.08
1.49
5.09
0.53
0.04
Transit operations
Restore &
rehabilitate
Restore &
rehabilitate
Pvt Repairs & Diamond
Grinding
CON
109051
06/29/11
NA
Roadside facility
Historic Preservation
CON
112479
06/29/11
NA
CON
112757
06/29/11
NA
502 106863
06/29/11
NA
0.42
Bridge - other
3.75
Restore &
rehabilitate
RTAP
Crush and Shape
Conc Box Beam
Replacement
Cold milling; crush and
shape
T-Ops
296
5311
PE
520
ST
PE
411
NH
115
91
M
M
TLCR - Toll Credit
Amount is $72,599.
TLCR - Toll Credit
Amount is $77,963.
TLCR - Toll Credit
Amount is $80,450.
Project moved to
Hwy RR GPA
Moved to Local
Enhancement GPA
Moved to Trunkline
Crossings GPA
Moved from FY 2011
7/11/11
7/11/11
7/11/11
502
7/11/11
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
At Grand Trunk
Western in Jefferson
Township
2011
CASS
Cass
County
2011
STATEWIDE
MDOT
I-94
Various locations from
MI/IN border to I-69
2011
STATEWIDE
MDOT
I-94
2012
STATEWIDE
MDOT
I-94
2012
STATEWIDE
MDOT
Section 5310
Evan Street
Length
Primary Work
Type
Traffic ops/safety
Project Description
1,760 113689
06/30/11
NA
Actual federal fund
source is TPFD Truck Parking
Federal Discretionary
1,760
7/11/11
60
M
300 113689
06/30/11
NA
Actual federal fund
source is TPFD Truck Parking
Federal Discretionary
300
7/11/11
OFHWA
460
M
2,300 113689
06/30/11
NA
Actual federal fund
source is TPFD Truck Parking
Federal Discretionary
2,300
7/11/11
5310
375
M
1,875
07/01/11
NA
2,770
7/11/11
60
7/11/11
67
8/8/11
1,000
8/8/11
242
8/8/11
118
8/11/11
352
Various locations from
MI/IN border to I-69
104.00 Miscellaneous
Truck Parking & Info
Management System
PE
240
OFHWA
Various locations from
MI/IN border to I-69
104.00 Miscellaneous
Truck Parking & Info
Management System
CON
1,840
T-Ops
1,500
Transit vehicle
Purchase 2 vans. CMAQ
additions/replacemen
Grant# 11111
ts
M-109
Trailway Project,
Leelanau Scenic
Heritage Route
Benzie
County
CON
48
CM
12
CNTY
60 112962
07/06/11
NA
EPE
54
CM
13
OLF
67 112951
08/08/11
NA
Roadside facility
Trail way along M-22 and
M-109 Highways in
Sleeping Bear Dunes
National Lakeshore from
Hunter Road to South
Forest Haven Drive
Admin Change 08/08/2011 updated project
description.
CON
800
SBD
1,000 108626
08/08/11
NA
Admin Change 08/08/2011 updated limits and
project description.
Center LT lane with bike
lane
CON
193
CM
48
OLF
242 112958
08/08/11
NA
T-Cap
95
CM
24
OLF
118 112952
08/10/11
NA
2011
LEELANAU
MDOT
2011
VAN BUREN
from I-94 to Main
Van Buren
S. Center Street Street in City of
County
Hartford
Miscellaneous
2011
MASON
Ludington
Areawide
MTA
Transit vehicle
additions/replacemen Bus replacement
ts
Areawide
3.20
Comments
Federal
Approval
EJ
Date
M
OFHWA
Countywide
BENZIE
Amendment
Air
Type Quality
NA
1,408
Countywide
2011
Local
Fund
Source
06/30/11
EPE
Miscellaneous
Local
Cost
($1000s)
Total
Project
Cost
Local
($1000s) x Priority
112414
Truck Parking & Info
Management System
CMAQ Grant # 11117
Install and construct 400'
of an 8' wide sidewalk on
Red Arrow Highway and
1,800' of a 6' wide
sidewalk along Medical
Park Drive and a public
easement, to alleviate air
emissions and to
complete a connecting
pathway between the
Cobblestone Village
Senior Housing
Development and
downtown area.
State
Fund
Source
MPO/
Rural
Action
Date
Project is included in
the Local Rail GPA
104.00 Miscellaneous
Elderly and Disabled
BERRIEN
State
Cost
($1000s)
CON
Transit operations
2011
Federal
Fund
Source
Install overhead lighting
Commencing at
Watervliet High School
and extending east on
the south side of Red
Arrow Highway (St.
Joseph Avenue) to
Medical Park Drive,
then continuing south
on the west side of
Medical Park Drive to
Cobblestone Village
Senior Housing
Development by way
of a public easement
Red Arrow
Highway (St.
Joseph
Avenue),
City of
Watervliet Medical Park
Drive and
public
easement
Phase
Federal
Advance
Cost
Construct ($1000s)
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
200
M
Admin Change 08/08/2011 updated the cost
information.
Admin Change 08/10/2011 Updated the
Responsible Agency
to Ludington MTA.
CMAQ Grant#
11112.
7/11/11
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
2011
County
LAPEER
Optional Fields
Responsible
Agency Project Name
Limits
Greater
Lapeer
Transport Areawide
Areawide
ation
Authority
2011
STATEWIDE
Michigan
1/4 mile southwest of
Departme
White Pine Trail McKinley Road
nt of
extending 1.6
Natural
Resources
2011
ALLEGAN
MDOT
Length
Primary Work
Type
Project Description
Phase
CMAQ Grant # 11145
Replace one bus with one
Transit vehicle
additions/replacemen medium duty clean diesel T-Cap
bus.
ts
135
CMG
216
HPSL
Roadside facility
Construct multi-use path
CON
0.40
Miscellaneous
Slope Stabilization
CON
Implementation of
marketing and
interpretive kiosks at
Tahquamenon Heritage
Route
EPE
82
SBD
PE
10
HPP
PE
230
FLH
M-222
West of Eastern
Avenue
M-28/M-123 west jct
to M-28/M-123 east jct
62.51
Roadside facility
US-31 @ Manvel Rd
0.29
Widen - minor
Houghton/Ontonagon
CL South 7.8 Mi
7.80
Resurface
3.60
Roadside facility
Restoration of existing
rock walls and rock fence.
3.34
Miscellaneous
Design for a Nonmotorized trail-way
CHIPPEWA
MDOT
M-123
2011
EMMET
MDOT
US-31
2011
HOUGHTON
Houghton Federal Forest
County
Road 16
2011
KEWEENAW
Top of Brockway
Keweena Brockway
Mountain Loop to
w County Mountain Drive
Cooper Harbor
2011
LEELANAU
MDOT
M-22
at Sleeping Bear
Heritage Trail
2011
LENAWEE
Lenawee
County
Treat Highway
at .40 miles south of
US-223 @ Madison
Schools north driveway
Miscellaneous
2011
LENAWEE
Lenawee
County
Treat Highway
at .40 miles south of
US-223 @ Madison
Schools north driveway
2011
STATEWIDE
2011
STATEWIDE
2011
STATEWIDE
2011
STATEWIDE
2011
STATEWIDE
Rail Xings
Trunkline GPA
Program
Development
MDOT
Scoping
Trunkline GPA
PreMDOT
Construction
Phases GPA
On the Job
Training (OJT) Statewide Provide Career
Programs and
Internships
Bridge Local
GPA
Federal
Fund
Source
1.60
2011
MDOT
Federal
Advance
Cost
Construct ($1000s)
Geometric modifications
Replace culverts,
reestablish ditches, widen
lanes
AC
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
54
10,450
CITY
M
25
3
Local
Fund
Source
OLF
M
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
MPO/
Rural
Action
Date
Amendment
Air
Type Quality
Comments
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
135 114114
08/11/11
NA
CMAQ Grant#
11145.
135
8/11/11
270 114101
08/11/11
NA
SAFETEA-LU
Earmark MI229, HPP
3043 (with job
#108733)
270
8/11/11
10,450 107575
08/24/11
NA
10,450
9/14/11
107 102982
08/24/11
NA
107
9/14/11
13 114279
08/24/11
NA
100
9/14/11
230 114368
08/24/11
NA
2,650
9/14/11
113755
08/24/11
360
9/14/11
410
9/14/11
155
9/14/11
CON
Project is an AC
project.
NSBP Grant # SB2007-54096. Admin
Change 08/10/2011 updated the project
description. In-Kind
services amount of
$7,000.
Admin Change $85,000 for in-kind
contributions (07-2911)
$82,000 match is
from the National
Park Service.
PE
328
SBD
82
CNTY
410 114418
08/24/11
NA
signal
upgrade/interconnect
CON
124
CM
31
OLF
155 112956
08/24/11
NA
Miscellaneous
signal
upgrade/interconnect
PE
112956
08/24/11
NA
Regionwide
GPA
Rail Xings Trunkline
CON
1,376
ST
387
M
1,764
08/24/11
NA
1,764
9/14/11
Regionwide
GPA
Program Development
Scoping Trunkline
EPE
1,003
ST
215
M
1,218
08/24/11
NA
1,218
9/14/11
Statewide
GPA
Pre-Construction Phases
Trunkline
17,601
ST
2,217
M
19,819
08/24/11
NA
19,819
9/14/11
Statewide
Miscellaneous
On the Job Training Provide Career Programs
and Internships
EPE
300
ST
300
08/24/11
NA
300
9/14/11
Statewide
GPA
Bridge Local
CON
6,532
12,252
08/24/11
NA
12,252
9/14/11
BRO
5,025
M
0
695
OLF
CNTY
9/14/11
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
2011
County
STATEWIDE
Optional Fields
Responsible
Agency Project Name
Limits
Rail Safety
Regionwide
Local GPA
Length
Primary Work
Type
GPA
Project Description
Rail Safety Local
Phase
Federal
Advance
Cost
Construct ($1000s)
CON
799
2011
TUSCOLA
MDOT
M-46
M-46 over Sucker Cr
and M-25 over Harbor
Beach Cr
Bridge replacement
Bridge Replacement
CON
3,127
2012
GRAND
TRAVERSE
Grand
Traverse
County
Silver Lake
Road
Traverse City West
Middle School,
Traverse City
Roadside facility
Bike/ped safety
improvements
CON
181
2012
HOUGHTON
Houghton Federal Forest
County
Road 16
Houghton/Ontonagon
CL South 7.8 Mi
7.80
Resurface
CON
2012
IOSCO
MDOT
US-23
AuSable River Bridge
to F-41
1.85
Reconstruct
UTL
2012
STATEWIDE
MDOT
Local Tech
Assistance
Program
2011
BAY
MDOT
I-75
North of Pinconning Rd
to Bay/Arenac COL
2011
EMMET
MDOT
US-31
Replace culverts,
reestablish ditches, widen
lanes
Hot Mix Asphalt
Reconstruction
1,332
9/14/11
4,132
9/14/11
2,420
FLH
2,420 114368
08/24/11
NA
2,650
9/14/11
37
NH
285 90192
08/24/11
NA
7,813
9/14/11
470
9/14/11
13,000
9/14/11
2.16
Traffic ops/safety
Geometric modifications
and access management
PE
93
M
240
CNTY
470
M
470
08/24/11
NA
Project will be
obligated as an
Advance Construct
IM
98
M
978 110397
09/08/11
NA
Year and Cost
Changes. Shift from
FY 2012 to FY 2011.
HPP
23
M
116 113442
09/08/11
NA
AC
494
9/14/11
1,625
9/14/11
11,774
9/14/11
4,690
9/14/11
CON
1,330
ST
295
M
1,625 113048
09/08/11
NA
Year and Cost
Changes. Moved
from FY 2014 to FY
2011.
2 course Mill & Resurface
PE
1,163
ST
258
M
1,420 110627
09/08/11
NA
Year and Cost
Changes. Shift from
FY 2012 to FY 2011.
Crush and Shape and
HMA Resurfacing, Partial
realignment at Sherman
Hill, Miscellaneous safety
and drainage
improvements.
ROW
368
NH
82
M
450 90234
09/08/11
NA
Cost and Scope
Changes.
NA
Cost in STIP
administratively
changed - project
costs are split
between the Bay
MPO and the NonMPO area. 02/16/11.
Obligated as regular
federal aid.
33,000
9/14/11
Obligated as regular
federal aid
3,280
9/14/11
RCWD Project - split
out from JN 101361.
Obligated as AC.
3,339
9/14/11
In the NPS between
Pierce Stocking and
Dune Climb
2.23
Miscellaneous
NPS Trailway
Construction
2011
LENAWEE
MDOT
M-34
Hazen Creek to M-52
5.73
Restore &
rehabilitate
Resurface
6.44
Year and Cost
Increases. Project
moved from FY 2012
to FY 2011 per a
discretionary award
for M-25 over Harbor
Beach
9/14/11
US-31 and M-119 in
Petoskey
M-115 to 4 Road
Comments
NA
181
8
M
08/24/11
NA
880
M-109
M-37
1,332
Federal
Approval
EJ
Date
08/24/11
PE
MDOT
MDOT
M
Amendment
Air
Type Quality
181 110132
Rehab, Drainage & Safety
LEELANAU
WEXFORD
Local
Fund
Source
SRSI
Restore &
rehabilitate
693
Local
Cost
($1000s)
NA
3.19
ST
533
State
Fund
Source
Total
Project
Cost
Local
($1000s) x Priority
08/24/11
Miscellaneous
2011
2011
ST
State
Cost
($1000s)
MPO/
Rural
Action
Date
3,820 100622
Local Techincal
Assistance Program
CON
Federal
Fund
Source
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
2011
BAY
MDOT
I-75
Linwood Rd to
Pinconning Rd
9.95
Restore &
rehabilitate
Rubblize & HMA
Resurface
CON
6,510
IM
1,628
M
8,138 106856
09/09/11
2011
BERRIEN
MDOT
I-94 EB
Park Road to Hennesey
2.14
Reconstruct
Two Course HMA Overlay
CON
2,952
IM
328
M
3,280 106483
09/09/11
2011
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
FY 2011 YDMP (RCWD)
Program
EPE
2,335
M
2,335 113341
09/09/11
AC
NA
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
2012
GOGEBIC
MDOT
US-2
2012
GOGEBIC
MDOT
US-2
2012
2011
HOUGHTON
HOUGHTON
MDOT
MDOT
M-26
US-41
Limits
Tourist Park Rd to
Curry Street
Curry Street to
Roosevelt Road
M-26, Houghton
County
Length
BRANCH
MDOT
US-12
Tibbits Opera House,
Coldwater
2011
STATEWIDE
MDOT
Statewide
2012
STATEWIDE
MDOT
2012
STATEWIDE
2012
Project Description
Phase
Federal
Advance
Cost
Construct ($1000s)
Federal
Fund
Source
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
MPO/
Rural
Action
Date
Amendment
Air
Type Quality
NA
4,526
9/14/11
NA
4,032
9/14/11
76
9/14/11
1,470
11/21/11
276
11/21/11
89,735
11/21/11
1,140
10/28/11
1,900
11/21/11
70
11/21/11
Pavement reconstruction
ROW
164
NH
36
M
200 110584
09/09/11
NA
0.96
Reconstruct
Pavement reconstruction
ROW
164
NH
36
M
200 110585
09/09/11
ROW
123
ST
27
M
150 107008
09/09/11
3.13
Resurface
Miscellaneous
0.16
EPE
61
SBD
Roadside facility
Building restoration
CON
500
SBD
Statewide
Miscellaneous
Enhance outreach and
recruitment efforts about
DBE
CON
276
BOWD
Section 5311
Statewide
Transit operations
Non-UZA Formula
MDOT
Statewide
Statewide
Miscellaneous
ALLEGAN
MDOT
US-131
114th Avenue north to
120th Avenue
Resurface
2012
BENZIE
Benzie
Transport
Countywide
ation
Authority
2012
CLARE
Clare
County
2012
GOGEBIC
MDOT
3.40
970
1,470 105383
09/21/11
NA
276 114468
09/21/11
NA
09/21/11
NA
1,140
ST
1,140 114983
10/25/11
NA
Cold Mill and HMA
resurface
CON
1,900
NH
1,900 113037
10/25/11
NA
EPE
56
CM
70 115064
10/25/11
NA
CON
435
SRSI
435 112501
10/25/11
NA
shift from FY 2011
435
11/21/11
PE
502
NH
613 110585
10/25/11
NA
11.21.11 - FHWA
reviewed admin
mods during next
amendment cycle.
4,526
11/21/11
Roadside facility
Bike/ped safety
improvements
US-2
Curry Street to
Roosevelt Road
Reconstruct
Pavement reconstruction
111
M
TRAL
89,735
SB-2008-MI-04
Administrative
modification on
09.21.11 - changed
phase from EPE to
CON. 11.21.11 FHWA reviewed
admin mods during
next amendment
cycle.
Administrative
modification on
09.21.11 - changed
phase from EPE to
CON.
11.21.11 FHWA reviewed
admin mods during
next amendment
cycle.
Administrative
modification on
09/21/2011 to add
$821,000.
EPE
14
TRAL
NA
Fiscal year 2012 Bureau
of Highways training
Farwell Elementary
and Middle Schools,
Farwell
40,682
09/13/11
5311
Various
locations
M
CITY
76 114805
18,142
Transit vehicle
Bus Purchase: Replace
additions/replacemen one less than 30' bus
ts
(replace bus #16)
30,911
OLF
Copper Country
Preserviation, Inc is
providing $15,243 in
cash match. JN
changed from JN
114421 to JN
114805 due to
technical problems.
T-Ops
Benzie County
0.96
15
Federal
Approval
EJ
Date
9/14/11
Reconstruct
Mill & Two Course
Overlay
Historic Resource
Preservation Plan for
Copper Country that
identifies historic
properties within the
byway region that are
eligible for listing on the
National Register of
Historic Places.
Comments
Moved from FY 2011
to FY 2012
Total
Project
Cost
Local
($1000s) x Priority
4,973
1.11
US-41, M-26 Houghton County,
various locations
within boundaries of
Copper Country Trail
National Byway
2011
Primary Work
Type
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
TLCR - Toll Credit
Amount is $344,850.
Shift from FY 2011.
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
Remove and replace
an existing
deteriorated box
culvert at Tobeco
Creek. A detour will
be required for the
project and the
effected road area will
need to be rebuilt /
reconstructed.
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
Amendment
Air
Type Quality
Comments
Federal
Approval
EJ
Date
Reconstruct
Culvert Replacement
CON
1,965
NH
1,965 103007
10/25/11
NA
1.22
Reconstruct
HMA RECONSTRUCTION
CON
2,228
NH
2,228 87569
10/25/11
NA
TLCR - Toll Credit
Amount is $404,328.
2,228
11/21/11
Heritage routes
Trails, Rest Area, and
Signage
CON
253
SBD
OLF
253
10/25/11
NA
SB-2011-MI-02. Inkind contribution
amount is $60,164.
253
11/21/11
Heritage routes
The development and
implementation of an
interpretive program for
six counties along the US23 Herigate Route. The
Scenic Byways grant will
fund an asset inventory,
guidebook, and maps.
EPE
184
SBD
OLF
184 115222
10/25/11
NA
SB-2010-MI-02. Inkind contribution
amount is $36,814.
185
11/21/11
US-2 Iron
County
US-2 Iron County
Heritage Trail Heritage Trail NonNon-motorized motorized Pathway
Pathway
Heritage routes
US-2 Iron County
Heritage Trail Nonmotorized Pathway
CON
1,118
SBD
10/25/11
NA
SB-2011-MI-04. Inkind contribution
amount is $122,250.
1,618
11/21/11
M-24
at Sutton Road
Roadside facility
Construct New Carpool
Lot
CON
10/25/11
NA
Restore &
rehabilitate
2 course Mill & Resurface
ROW
Roadside facility
Construct New Carpool lot
CON
59
ST
Restore &
rehabilitate
Reconstruction
CON
4,512
NH
Roadside facility
Bike/ped safety
improvements
CON
138
SRSI
Miscellaneous
Construction of nonmotor path - Fred Meijer
Trail
CON
185
HPSL
1.10
Widen - major
(capacity increase)
Add center left turn lane
CON
1,316
HSIP
6.24
Resurface
Resurface
CON
760
HPSL
MDOT
US-31
2012
HOUGHTON
MDOT
M-26
HOUGHTON
Western
Upper
Peninsula
Planning US-41 Copper
and
Country Trail
Developm
ent
Region
HURON
US-23 through
Northeast Huron Shores
Cheboygan, Alpena,
Council of Heritage Route
Arenac, Alcona, Iosco,
Governme Interpretive
and Presque Isle
Program
nts
counties.
2012
IRON
Iron
County
Road
Commissi
on
2012
LAPEER
MDOT
TAMARACK TO
HUBBEL
US-41 Copper Country
Trail
2012
LENAWEE
MDOT
M-34
Hazen Creek to M-52
2012
LUCE
MDOT
M-28
0.1 mile west of CR
399 intersection
2012
MARQUETTE
MDOT
US-41/M-28
Bayout St to the Carp
River
2012
MISSAUKEE
Missaukee
Russell Street
County
2012
MONTCALM
From Grove Street to
Montcalm Fred Meijer
County
Heartland Trail Flat River Trail
2012
OGEMAW
MDOT
ONTONAGON
Ontonago Federal Forest
n County Highway 16
2012
Phase
Federal
Fund
Source
Total
Project
Cost
Local
($1000s) x Priority
0.11
2012
2012
Project Description
Federal
Advance
Cost
Construct ($1000s)
MPO/
Rural
Action
Date
Year and Cost
Changes. Shift from
FY 2014. TLCR Toll Credit Amount is
$356,607.
GRAND
TRAVERSE
2012
Length
Primary Work
Type
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
M-55/I-75 BL
5.73
2.29
Lake City Lower, Upper
Elem. and Middle
School
I-75 BL from Husted to
Gray Road
M-38 to Houghton
County Line
500
OLF
1,618
75892
13
M
73
146
CNTY
M
190
CNTY
1,965
11/21/11
11/21/11
110627
10/25/11
NA
72 110737
10/25/11
NA
shift from FY 2011
11/21/11
4,512 80147
10/25/11
NA
TLCR - Toll Credit
Amount is $819,000.
Shift from FY 2011
to FY 2012.
138 115148
10/25/11
259 115042
76
11/21/11
4,512
11/21/11
NA
138
11/21/11
10/25/11
NA
259
11/21/11
1,462 109229
10/25/11
NA
1,597
11/21/11
950 103212
10/25/11
NA
950
11/21/11
Shift from FY 2011
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
Emerald Elem. and
Manistique Mid. Sch.,
Manistique
Length
Primary Work
Type
Project Description
2012
Schoolcraf
Maple Street
SCHOOLCRAFT
t County
2012
ST. JOSEPH
MDOT
US-131
St. Joseph County
2012
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
2012
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
2012
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
2012
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
2012
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
MDOT
Enhancements
Trunkline GPA
Regionwide
GPA
Enhancements Trunkline
2.00
Reconstruct
Repair Existing and
Multiple Course HMA
Overlay
0.10
Roadside facility
4.45
56.03
2012
STATEWIDE
2012
VAN BUREN
MDOT
I-94
2013
MARQUETTE
MDOT
M-553
2014
CALHOUN
MDOT
I-94
2014
STATEWIDE
MDOT
Grand Region
2012
ALLEGAN
Allegan
Grove Street
2012
ALLEGAN
Allegan
M-40
2012
ANTRIM
MDOT
US-131
2012
BERRIEN
MDOT
US-12
2012
CHEBOYGAN
Cheboyga
M-68
n County
2012
GOGEBIC
Gogebic
County
County Road
519
Berrien County Line to
0.8 miles east of CR
681
M-553/US-41 City of
Marquette, Marquette
County
17 1/2 to 21 1/2 Mile
Road
Grand Region
Hillside Learning and
Behavior Center,
Allegan
Hillside Learning and
Behavior Center,
Allegan
North Junction of M-32
to south of Boyne Falls
Red Arrow Highway to
the Galien River
Inland Lakes Elem. and
Mid. Schools,
Tuscarora Twp
M-28 to Orvana
Mineral Site Access
Road
2012
HURON
MDOT
M-25
Richie Road to
Campground Access
2012
HURON
Thumb
Area
Transit
Areawide
Areawide
Roadside facility
10.29
New route/structure
(capacity increase)
Bike/ped safety
improvements
Design & Construction of
PA-5
C & T Indirect Testing FY
2012
C & T Indirect Testing FY
2012
Drain Assessments FY
2012
FY 12 state construction
project training
FY12 federal aid eligable
const proj training
Phase
Federal
Advance
Cost
Construct ($1000s)
CON
261
UTL
1,842
Federal
Fund
Source
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
SRSI
NH
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
MPO/
Rural
Action
Date
Amendment
Air
Type Quality
Comments
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
261 115152
10/25/11
NA
261
11/21/11
408
M
2,250 46269
10/25/11
NA
40,124
11/21/11
CON
3,000
M
3,000 114829
10/25/11
NA
4,500
11/21/11
PE
1,500
M
1,500 114829
10/25/11
NA
4,500
11/21/11
CON
4,125
M
4,125 114833
10/25/11
NA
4,125
11/21/11
CON
20
M
20 115103
10/25/11
NA
20
11/21/11
500 115105
10/25/11
NA
500
11/21/11
10/25/11
NA
1,889
11/21/11
11,900
11/21/11
80
11/21/11
CON
409
ST
91
M
CON
1,476
STE
289
M
PE
810
IM
90
M
900 114292
10/25/11
NA
New Carpool Lot
CON
59
ST
13
M
72 113715
10/25/11
NA
Resurface
Multiple Course HMA
Overlay
CON
110138
10/25/11
NA
11/21/11
Traffic ops/safety
Freeway Signing Upgrade
CON
113334
10/25/11
NA
11/21/11
Roadside facility
Bike/Ped safety
improvements
CON
367
SRSI
367 114136
12/06/11
NA
0.45
Roadside facility
Bike/Ped safety
improvements
CON
214
SRSI
214 115403
12/06/11
NA
6.40
Reconstruct
Crack Relief Layer
PE
82
NH
18
M
100 109982
12/06/11
NA
1.64
Restore &
rehabilitate
Roadway Reconstruction
SUB
35
ST
8
M
43 45662
12/06/11
NA
0.84
Roadside facility
Bike/Ped safety
improvements
CON
156
SRSI
156 111482
12/06/11
NA
12.82
Resurface
Rsrfc, Grdrail, Drainage,
Site Access Road, Bridge
CON
3,502 115234
12/06/11
176 115248
150 112751
0.16
Construct shoulder
improvements and HMA
Widen - minor
paving provide a
dedicated center-left turn
lane.
Replace one 2002 model
year INTERNATIONAL
444E bus with one 2012
Transit vehicle
model year medium duty
additions/replacemen
mid-size CLEAN DIESEL
ts
cut away 28-passenger
bus.
2,311
CON
141
CM
EPE
112
CM
35
EDA
124
1,191
OLF
CNTY
M
38
TRAL
1,889
shift from FY 2014
Shift from FY 2011
367
12/20/11
214
12/20/11
6,000
12/20/11
8,993
12/20/11
156
12/20/11
NA
3,502
12/20/11
12/06/11
NA
176
12/20/11
12/06/11
NA
150
12/20/11
Shift from FY 2014
Shift from FY 2011
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
2012
LENAWEE
Lenawee
Transport Countywide
ation
Lenawee County
2012
LENAWEE
Lenawee
Transport Countywide
ation
Lenawee County
2012
LENAWEE
MDOT
MARQUETTE
Marquette
CR 565
County
2012
MASON
Ludington
Mass
Transport Areawide
ation
Authority
2012
STATEWIDE
MDOT
2012
STATEWIDE
2012
STATEWIDE
2012
US-223
over River Raisin
Length
0.24
Primary Work
Type
Project Description
Replace 2003 mediumduty diesel bus with new
Transit vehicle
diesel engine bus. The
additions/replacemen
old bus currently meets
ts
FTA useful life criteria of
7 years.
Replace 2005 mediumduty diesel bus with new
Transit vehicle
diesel engine bus. The
additions/replacemen
old bus currently meets
ts
FTA useful life criteria of
7 years.
Bridge replacement Bridge replacement
133
12/20/11
EPE
106
CM
27
TRAL
133 115246
12/06/11
NA
133
12/20/11
UTL
50
BRT
63 102851
12/06/11
NA
3,266
12/20/11
1,920
12/20/11
123
12/20/11
6
12/20/11
1,493
12/20/11
5
12/20/11
Roadside facility
Restriping and Signing of
Carpool Lots
CON
5
ST
MDOT
Regionwide
Various locations in
Superior Region
Traffic ops/safety
Design, Install approx. 10
ESS
CON
1,493
ST
MDOT
Regionwide
University Regionwide
Miscellaneous
Warranty Admin - Bridge
CON
STATEWIDE
MDOT
Regionwide
Various locations in
Superior Region
2012
STATEWIDE
MDOT
Statewide
Michigan Technological
University (MTU)
2012
STATEWIDE
MDOT
Section 5304
Transit operations
2012
STATEWIDE
MDOT
Section 5316
Transit operations
MDOT
US-31
US-31 and M-119 in
Petoskey
1.00
2.16
EMMET
MDOT
US-31
Townsend to Eppler
2.89
2013
2013
2013
EMMET
HOUGHTON
HOUGHTON
MDOT
MDOT
MDOT
US-31
US-41
US-41
0.29
0.93
0.93
2013
IONIA
MDOT
I-96
2013
MARQUETTE
MDOT
M-35
2013
VAN BUREN
MDOT
M-140
US-31 @ Manvel Rd
US-41, Hancock
US-41, Hancock
at Jordan Lake Road
NW quadrant
at CR-492 and Empire
Mine Ent. Road,
Marquette Co.
City of Watervliet to
CR 378
M-115 to North of 10
Road
MDOT
M-37
Miscellaneous
Miscellaneous
2013
WEXFORD
NA
Various locations in
Bay Region
2012
2013
12/06/11
Regionwide
Miscellaneous
Traffic ops/safety
Widen - major
(capacity increase)
Widen - minor
Reconstruct
Reconstruct
Roadside facility
Statewide Transportation
Planning
Job Access/Reverse
Commute
Geometric modifications
and access management
Widening for center left
turn lane FY 2015
Geometric modifications
Reconstruct
Reconstruct
Crack treatment of lot
surface
CON
925
EDA
1
M
995
CNTY
1,920 115231
12/06/11
NA
25
TRAL
123 115289
12/06/11
NA
6 103393
12/06/11
NA
1,493 107425
12/06/11
NA
5
M
5 114183
12/06/11
NA
CMAQ eligible
determined by FHWA
on 11/3/11. - E
Fowler
TLCR - Toll Credit
Amount is $544,492.
STT
18
M
92 115071
12/06/11
NA
CON
1,211
ST
269
M
1,479 115175
12/06/11
NA
1,507
12/20/11
EPE
560
STL
140
M
700 115412
12/06/11
NA
700
12/20/11
T-Cap
637
5304
159
CTF
796
12/06/11
NA
1,904
12/20/11
T-Ops
1,057
5316
847
M
1,904
12/06/11
NA
1,904
12/20/11
CON
222
HPP
56
M
12/06/11
NA
278
12/20/11
278 113442
12/20/11
PE
18
HSIP
2
M
20 113598
12/06/11
NA
3,522
12/20/11
CON
PE
ROW
70
368
16
HPP
ST
ST
17
82
4
M
M
M
87 114279
450 110594
20 110594
12/06/11
12/06/11
12/06/11
NA
NA
NA
100
5,742
5,742
12/20/11
12/20/11
12/20/11
CON
2
ST
1
M
3 106326
12/06/11
NA
3
12/20/11
EDA
886 114943
12/06/11
NA
1,154
12/20/11
5
M
25 110107
12/06/11
NA
Shift from FY 2012
6,500
12/20/11
6,241
M
6,241 90234
12/06/11
NA
Tagged as AC
6,241
12/20/11
Resurface
Two Course HMA Overlay
ROW
Resurface
Crush and Shape and
Resurface
CON
7.22
M
73
CON
Traffic ops/safety
13
EPE
Re-align Intersection &
Add Pass Flare
0.60
4.00
2012 RoadSoft contract
Comments
Federal
Approval
EJ
Date
133 115245
Mason County
Michigan Technological
University (MTU)
Amendment
Air
Type Quality
TRAL
CM
Statewide
Local
Fund
Source
27
98
MDOT
Local
Cost
($1000s)
CM
EPE
2012 Michigan Engineer's
Resource Library (MERL)
Program
Install environmental
Sensors
State
Fund
Source
Total
Project
Cost
Local
($1000s) x Priority
106
Purchase one less than
Transit vehicle
30' medium duty
additions/replacemen
replacement bus (replace
ts
bus #4)
RCNSTRCT
State
Cost
($1000s)
MPO/
Rural
Action
Date
EPE
Reconstruct
STATEWIDE
EMMET
Federal
Fund
Source
M-35 to CR476/CR 565
to 9150 W of CR 565
2012
2013
Phase
Federal
Advance
Cost
Construct ($1000s)
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
886
20
AC
ST
Shift from FY 2012
Shift from FY 2012
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
2014
IOSCO
MDOT
US-23
2014
MECOSTA
MDOT
US-131
2014
OSCEOLA
MDOT
US-131 SB
2014
OTTAWA
MDOT
M-104
2014
STATEWIDE
MDOT
Regionwide
2014
VAN BUREN
MDOT
I-196
2014
VAN BUREN
MDOT
I-94
2011
MARQUETTE
Marquette
S Bridge St
County
2012
ALLEGAN
MDOT
M-89
2012
BERRIEN
MDOT
US-12
2012
CHIPPEWA
MDOT
M-129
2012
IRON
MDOT
US-2
2012
2012
LAPEER
LENAWEE
Lapeer
County
Lenawee
County
Village West
Drive
US-223
Limits
Cresent Dr. to Au
Sable River Bridge
at Jefferson Road NE
Quadrant
South County Line to
North of US-10
at Pine Street NE
Quadrant
One Location in Bay
Region
4 bridges on I-196/US31, south of South
Haven
Berrien County Line to
0.8 miles east of CR
681
Primary Work
Length
Type
Restore &
4.70
rehabilitate
Roadside facility
5.63
Restore &
rehabilitate
Roadside facility
Roadside facility
Project Description
Phase
HMA Crack Relief Layer
CON
Carpool lot resurfacing
CON
Crush & Shape, Resurface
CON
Crack Sealing - carpool
lot
Solar Lighting - Carpool
Lots
Federal
Advance
Cost
Construct ($1000s)
Federal
Fund
Source
AC
37
ST
AC
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
15
ST
Amendment
Air
Type Quality
Comments
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
5,924
M
5,924 105981
12/06/11
NA
6,466
12/20/11
8
M
45 106349
12/06/11
NA
45
12/20/11
3,705
M
3,705 103041
12/06/11
NA
3,705
12/20/11
106352
12/06/11
NA
CON
CON
MPO/
Rural
Action
Date
12/20/11
3
M
18 107019
12/06/11
NA
18
12/20/11
1.31
Restore &
rehabilitate
Concrete ovly, Bm &
Substr repair
CON
AC
3,698
M
3,698 113251
12/06/11
NA
4,053
12/20/11
2.00
Reconstruct
Repair Existing and
Multiple Course HMA
Overlay
CON
AC
11,000
M
11,000 114292
12/06/11
NA
11,900
12/20/11
0.14
Resurface
Reconstruct
CON
112139
02/02/12
NA
0.20
Bridge replacement
Bridge Replacement
CON
319
M
1,594 100217
02/02/12
NA
1,594
3/27/12
0.17
Widen - minor
Left Turn Lane
CON
108015
02/02/12
NA
3/27/12
0.10
Roadside facility
Construct new carpool lot
CON
113571
02/02/12
NA
3/27/12
Roadside facility
Construct new carpool
lot.
CON
12
ST
15 113723
02/02/12
75
3/27/12
Roadside facility
Construction of 4,520 feet
10' wide bituminous
walk/bike path to link an
existing walk/bike path to
a series of existing
sidewalks. Project will link
existing residential area
to large commericial
institutional area.
CON
487
CM
114
CNTY
601 115581
02/02/12
601
3/27/12
at Cadmus Road
Intersection
Traffic ops/safety
Extension of passing lane
to reduce congestion and
improve traffic flow from
the intersection of US223/M-52 west past the KMart Drive
CON
259
CM
65
OLF
324
02/02/12
NA
324
3/27/12
T-Cap
32
CM
40
02/02/12
NA
40
3/27/12
02/02/12
NA
400
3/27/12
Scott to Jenne
over Kalamazoo River
Mill Race, Plainwell
US-23 Ramp F over I75 (S13 of 06111)
Arenac County
and M-48 North in the
northwest quadrant
US-2 in Iron River 0.16
miles west of M-73
In the praries and
ponds area
0.86
2012
LENAWEE
Lenawee
County
Countywide
Lenawee County
Replace (1) 2008 gaspowered mini-van with
one (1) new gas powered
Transit vehicle
additions/replacemen accessible mini-van. The
old vehicle currently
ts
meets the FTA useful life
criteria of 4 years.
2012
MANISTEE
Manistee
County
Filer City Road
Nelson-Falleen, FalleenFiler Ave, FilerStronach
Reconstruct
Reconstruct
CON
1,275
BRT
3
8
320
M
M
EDF
80
CNTY
400 110972
3/27/12
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
2012
2012
2012
2012
2012
2012
2012
2012
Optional Fields
Responsible
Primary Work
Agency Project Name
Limits
Length
Type
County
Mason
Washington Avenue to
Reconstruct
MASON
Dowland Street
County
Rath Avenue
US-131 over Muskegon
MECOSTA
MDOT
US-131
2.10 Bridge - other
River
US-131 over Muskegon
MECOSTA
MDOT
US-131
2.10 Bridge - other
River
Midland
Saginaw Road to
Reconstruct
MIDLAND
Salzburg Street
County
Waldo Avenue
Grant Prim., Elem. and
Newaygo
Elder St
Mid. School, City of
Roadside facility
NEWAYGO
County
Grant
Fremont M.S, Daisy
Newaygo
Division Avenue Brook E.S. and
Roadside facility
NEWAYGO
County
Pathfinder E.S.
Restore &
South County Line to
5.63
OSCEOLA
MDOT
US-131 SB
rehabilitate
North of US-10
Presque
Rogers City Elementary
PRESQUE ISLE Isle
W Huron Ave
and Middle/High
Roadside facility
County
School
Roscommon
Elementary and Middle
Schools, Roscommon
Project Description
Reconstruct
Epoxy Overlay, joint
replacement
Epoxy Overlay, joint
replacement
Phase
Federal
Advance
Cost
Construct ($1000s)
CON
519
BHN
130
M
649 115159
02/02/12
9,988
3/27/12
360
EDF
450 114407
02/02/12
450
3/27/12
Reconstruct
CON
Bike/ped safety
improvements
CON
247
SRSI
247 115452
02/02/12
247
3/27/12
Bike/ped safety
improvements
CON
330
SRSI
330 115453
02/02/12
330
3/27/12
PE
209
NH
255 103041
02/02/12
4,569
3/27/12
Bike/ped safety
improvements
CON
364
SRSI
364 115465
02/02/12
364
3/27/12
Bike/Ped safety
improvements
CON
276
SRSI
276 114144
02/02/12
NA
276
3/27/12
State Funded Required
Program
CON
2,880
3/27/12
8,310
3/27/12
219
3/27/12
300
3/27/12
Crush & Shape, Resurface
Purchase Backpacker Bus
Transit vehicle
in Pictured Rocks National
T-Cap
additions/replacemen
Lakeshore for ALTRAN
ts
Public Transit
On the Job
Training (OJT) Statewide Provide Career Statewide
Programs and
Internships
Campbell Elem. and
Tuscola
West Street
Cass City Middle
County
School
2012
STATEWIDE
2012
TUSCOLA
2012
VAN BUREN
S Williams St to
Van Buren
Bronson Street
George St
County
2013
GRAND
TRAVERSE
MDOT
US-31
2013
GRATIOT
MDOT
US-127
2013
MECOSTA
MDOT
US-131
3-mile to Holiday Hills
Road
Washington Road to
North of Polk Road
US-131 over Muskegon
River
FY 2013 to FY 2012
FY 2011 to FY 2012
02/02/12
NA
5309
1,662
CTF
8,310
02/02/12
NA
Section 5309 Bus
and Bus Facilities
State of Good Repair
175
5320
44
CTF
219
02/02/12
NA
Section 5320 Transit in Parks
Discretionary
Program
300
02/02/12
NA
199 111566
02/02/12
NA
FY 2011 to FY 2012
199
3/27/12
300
ST
Roadside facility
Bike/ped Safety
improvements
CON
199
SRSI
Reconstruct
RCSTRCT and WDN
CON
1.48
Restore &
rehabilitate
Roadway Rehabilitation
ROW
205
2.80
Resurface
Two Course HMA Overlay
ROW
2
CON
NA
2,880
EPE
Epoxy Overlay, joint
replacement
M
CNTY
M
On the Job Training Provide Career Programs
and Internships
Bridge - other
46
90
2,880
Miscellaneous
2.10
3/27/12
SUB
6,648
Section 5320 Transit in Parks
Statewide
Discretionary
Program
450
3/27/12
T-Cap
MDOT
02/02/12
9,988
Bus Facility for Thunder
Bay Transportation
Transit vehicle
additions/replacemen Authority; Statewide
equipment projects for
ts
transit agencies.
STATEWIDE
Comments
450 114409
02/02/12
State Funded
Required
Program
2012
CNTY
Federal
Approval
EJ
Date
150 115159
MDOT
MDOT
90
Amendment
Air
Type Quality
M
STATEWIDE
STATEWIDE
EDF
Local
Fund
Source
30
2012
2012
360
Local
Cost
($1000s)
BHN
Roscomm
Sunset Drive
on
Bus and Bus
Facilities State
Statewide
of Good Repair
Program
State
Fund
Source
Total
Project
Cost
Local
($1000s) x Priority
120
ROSCOMMON
Regionwide
State
Cost
($1000s)
MPO/
Rural
Action
Date
PE
2012
Roadside facility
Federal
Fund
Source
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
7,351
400
EDA
400 113929
02/02/12
NA
FY 2011 to FY 2012
400
3/27/12
NH
45
M
250 109985
02/02/12
NA
FY 2012 to FY 2013
8,961
3/27/12
NH
1
M
3 110485
02/02/12
NA
FY 2012 to FY 2013
7,452
3/27/12
NA
Cost and Year
Changes. FY 2014
to FY 2013
9,988
3/27/12
BHN
1,838
M
9,189 115159
02/02/12
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
On the Job
Training (OJT) Statewide Provide Career Statewide
Programs and
Internships
at 68th Avenue SE
MDOT
I-96
Quadrant
On the Job
Training (OJT) Statewide Provide Career Statewide
Programs and
Internships
Length
Primary Work
Type
Project Description
On the Job Training Provide Career Programs
and Internships
EPE
300
ST
Roadside facility
Crack Sealing - carpool
lot
CON
3
ST
Miscellaneous
On the Job Training Provide Career Programs
and Internships
EPE
300
ST
EPE
700
EPE
STATEWIDE
2014
OTTAWA
2014
STATEWIDE
2012
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
2012
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
2012
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
Rural Berrien
County
Rural Berrien County
replace 1 medium duty
Transit vehicle
diesel engine bus with 1
additions/replacemen
newer diesel engine
ts
medium duty bus
Rural Berrien
County
Rural Berrien County
Replace 1 cutaway diesel
Transit vehicle
engine bus with 1 newer
additions/replacemen
gas engine extended
ts
cutaway bus
2012
BERRIEN
2012
BERRIEN
2012
BERRIEN
MDOT
US-12
Red Arrow Highway to
Hoder Road
2012
CALHOUN
Albion
Areawide
City of Albion and
surrounding area
2012
CASS
Dowagiac N. Paul Street
M-51/62 to 300' east
of Lowe St intersection
2012
CHIPPEWA
JKL Bahweting
Chippewa
Anishnabe
County
School
JKL Bahweting
Anishnabe School
2012
CHIPPEWA
MDOT
between Trout Lake
and M-28
2012
CHIPPEWA
Sault Ste. East Spruce
Marie
Street
2012
EMMET
Emmet
County
Hoyt Road
2012
GRATIOT
MDOT
Countywide
M-123
2012
LAPEER
MDOT
M-24
2012
LAPEER
MDOT
M-24
2012
LAPEER
MDOT
M-53
Johnston Street to
Easterday, Sault Ste
Marie
Blackbird & Shay Elem.
& Harbor Springs Mid.
Sch.
at Bowers Rd
02/02/12
NA
12
3/27/12
300
02/02/12
NA
300
3/27/12
ST
700 116076
04/06/12
NA
4,068
4/9/12
3,268
ST
3,268 116078
04/06/12
NA
4,068
4/9/12
EPE
100
ST
100 116079
04/06/12
NA
4,068
4/9/12
EPE
108
CM
27
TRAL
135 115793
04/10/12
NA
135
5/4/12
EPE
52
CM
13
TRAL
65 115794
04/10/12
NA
65
5/4/12
7,080
ST
8,650 45662
04/10/12
NA
9,293
5/4/12
40
CM
1
CON
Roadside facility
Bike/ped safety
improvements
CON
1.30
Miscellaneous
Restoration of road slope
(MDNR Grant 12-036).
CON
0.50
Resurface
Resurfacing
CON
220
HPSL
Roadside facility
Bike/ped safety
improvements
CON
237
SRSI
CON
523
ST
116
CON
2,179
BRT
UTL
5
PE
40
0.60
Bridge replacement
0.24
Traffic ops/safety
Comments
Federal
Approval
EJ
Date
3/27/12
Resurface
Bridge replacement
Amendment
Air
Type Quality
300
Resurface
0.60
Local
Fund
Source
Total
Project
Cost
Local
($1000s) x Priority
NA
CON
Wetland Mitigation Bank
Site
Rem structure repl w/
culvert
Rem structure repl w/
culvert
Add Center Left Turn
Lane
Local
Cost
($1000s)
MPO/
Rural
Action
Date
02/02/12
Transit vehicle
replacement
Wetland mitigation
State
Fund
Source
300
CON
0.78
Restore &
rehabilitate
Transit vehicle
additions/replacemen
ts
FY 2012 RCAR (RCWD)
Program
FY 2012 YDMP (RCWD)
Program
FY 2012 TRAC (RCWD)
Program
State
Cost
($1000s)
Recycle Exisiting Conc
Pavt
1.64
Maple River Watershed
over Abandoned CR
Railroad
over Abandoned CR
Railroad
Federal
Fund
Source
Miscellaneous
2013
Berrien
County
Transport
ation
Authority
Berrien
County
Transport
ation
Authority
Phase
Federal
Advance
Cost
Construct ($1000s)
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
AC
1,570
184
148
M
4 106351
M
EDA
10
CITY
50 115745
04/10/12
NA
50
5/4/12
36
CITY
220 115818
04/10/12
NA
220
5/4/12
148 112489
04/10/12
NA
148
5/4/12
SRSI
FY 2011 to FY 2012
39
CNTY
39 115507
04/10/12
NA
39
5/4/12
55
CITY
275 116075
04/10/12
NA
275
5/4/12
237 112493
04/10/12
NA
FY 2011 to FY 2012
237
5/4/12
M
639 107962
04/10/12
NA
FY 2014 to FY 2012
735
5/4/12
545
M
2,723 90239
04/10/12
NA
2,723
5/4/12
BRT
1
M
6 90239
04/10/12
NA
1,339
5/4/12
CM
10
M
50 115233
04/10/12
NA
490
5/4/12
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
2012
LEELANAU
MDOT
M-22
2012
LENAWEE
MDOT
US-223
2012
LENAWEE
MDOT
US-223
2012
MARQUETTE
Negaunee Croix St
OCEANA
Oceana
County
2012
2012
OTSEGO
2012
ROSCOMMON
2012
ST. JOSEPH
MDOT
Winston Road
I-75 NB
Limits
Pierce Stocking Drive
to Empire
Length
Primary Work
Type
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
Amendment
Air
Type Quality
Comments
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
1,094
ST
243
M
1,337 115927
04/10/12
NA
1,337
5/4/12
Extension of passing lane
to reduce congestion and
improve traffic flow
CON
259
CM
65
M
324 115709
04/10/12
NA
354
5/4/12
Traffic ops/safety
Extension of passing lane
to reduce congestion and
improve traffic flow
PE
24
CM
6
M
30 115709
04/10/12
NA
354
5/4/12
Roadside facility
Bike/Ped safety
improvements
CON
136
SRSI
136 114137
04/10/12
NA
136
5/4/12
Resurface
Resurface
CON
1,020 115873
04/10/12
NA
1,020
5/4/12
0.36
Roadside facility
Building Replacement/Site
Work
400 101606
04/10/12
NA
4,327
5/4/12
0.00
Resurface
RSFCE
Reconstruct
Miscellaneous
at Cadmus Road
0.39
Traffic ops/safety
at Cadmus Road
0.39
Roscomm Old 27 (North
M-55 to Bradford Drive
on County Harrison Road)
N Centerville Rd to
St. Joseph
Lafeyette Street Broadus/Lafayette to
County
Dresser
Phase
Federal
Fund
Source
MPO/
Rural
Action
Date
CON
1.69
Lakeview Elementary
School, Negaunee
US-31 to 4200' east of
80th Avenue
at the Gaylord Rest
Area #405
Project Description
2.7 miles of NPS Trailway
Construction
Federal
Advance
Cost
Construct ($1000s)
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
0.00
1,020
PE
360
IM
EDA
FY 2011 to FY 2012
40
M
CON
375
EDF
120
CNTY
495 114935
04/10/12
NA
495
5/4/12
Reconstruct
CON
375
EDF
118
CNTY
493 114411
04/10/12
NA
493
5/4/12
Miscellaneous
Acquire software that will
integrate MDOT traffic,
incident, construction,
weather data and other
traffic information.
EPE
500 116131
04/10/12
NA
500
5/4/12
57 116229
04/10/12
NA
57
5/4/12
04/10/12
NA
580
5/4/12
04/10/12
NA
90
5/4/12
4,152
5/4/12
2012
STATEWIDE
MDOT
Statewide
All trunkline freeways
in non-attainment
areas
2012
STATEWIDE
MDOT
STATEWIDE
Statewide
Miscellaneous
FY 2012 Heritage Route
Program Administration
EPE
Regionwide
GPA
Program Development
Scoping Trunkline
EPE
790
ST
Miscellaneous
FY 2012 NSTI - National
Summer Transportation
Institute
EPE
90
SST
500
CMG
57
M
175
M
2012
STATEWIDE
MDOT
Program
Development
Scoping
Trunkline GPA
2012
STATEWIDE
MDOT
Statewide
At Michigan
Technological
University and Ferris
State University
2012
TUSCOLA
MDOT
M-25
Bay/Tuscola County
Line to Dickerson Road
5.43
Resurface
HMA Mill & Overlay
CON
AC
3,178
NH
704
M
3,882 86950
04/10/12
NA
2012
TUSCOLA
MDOT
M-25
Dickerson Road to Bay
Park Road
5.44
Resurface
HMA Mill & Overlay
CON
AC
3,046
NH
675
M
3,721 90283
04/10/12
NA
2012
TUSCOLA
MDOT
M-25
over Quanicassee River
0.76
Bridge replacement
Bridge Replacement
CON
AC
4,442
BRT
1,110
M
5,552 102952
04/10/12
NA
5,900
5/4/12
Roadside facility
Construct 10' wide
concrete non-motoized
path on the west side of
S. Williams Street. The
path will provide an
oppporunity for residents
and employees to visit
and conduct business
without compromising
safety or impacting
vehicular traffic along
South Williams Street
CON
144
CM
180 115848
04/10/12
NA
180
5/4/12
2012
VAN BUREN
Decatur
South Williams From Beers Street to
Street
Special-Lite, Inc.
0.07
965
90
36
CITY
116693/
116694
5/4/12
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
2012
VAN BUREN
Southwest
Michigan
Planning Countywide
Commissi
on
2012
VAN BUREN
Van Buren
Public
Countywide
Transit
2013
CALHOUN
MDOT
Limits
Van Buren County
Municipal Transit Bus
Service Area
Length
Primary Work
Type
Project Description
Phase
EPE
12
CMG
Replcaement of one 2005
Transit vehicle
additions/replacemen medium duty model
diesel bus
ts
EPE
101
CM
CON
I-69
at N Drive North
Roadside facility
Roadside facility
2013
EMMET
MDOT
I-75 NB
at Cadillac Street
extension
2013
TUSCOLA
MDOT
M-25
Ringle Road to the
Huron County Line
2014
BAY
MDOT
M-13
2014
BAY
MDOT
US-10
2014
DELTA
MDOT
US-2
2014
DELTA
MDOT
US-2
2014
IONIA
MDOT
I-96
4.18
over Johnson Creek
M-47 NB and SB over
US-10
over the Escanaba
River
over the Escanaba
River
I-96 under Cutler Road
Federal
Fund
Source
SW MI Planning
Commission Rideshare
Program works to effect
behavioral change among
citizens and businesses to
reduce traffic congestion
and improve air quality
Miscellaneous
0.00
Federal
Advance
Cost
Construct ($1000s)
Resurface
New Carpool Lot
Construct safe
enforcement site with
PITWS
HMA Overlay and
Shoulders
State
Cost
($1000s)
29
State
Fund
Source
0.02
Bridge replacement
Bridge Removal and
Replacement
CON
3,476
BHN
869
0.36
Bridge replacement
Bridge Replacement
PE
44
BRT
0.36
Bridge replacement
Bridge Replacement
SUB
296
0.60
Bridge replacement
Bridge Replacement
PE
34
M
55 115866
04/10/12
NA
19,875
5/4/12
BRT
74
M
370 115866
04/10/12
NA
19,875
5/4/12
IM
4
M
38 115817
04/10/12
NA
4,047
5/4/12
IM
18
M
675
M
2014
LAPEER
MDOT
M-53
at Bowers Rd
0.24
Traffic ops/safety
CON
352
CM
88
M
M-22
Westman Rd to Port
Oneida Rd.
3.34
Miscellaneous
CON
1,646
FLH
US-2
2012
GRATIOT
MDOT
US-127
2012
LAPEER
MDOT
I-69 EB
2012
LEELANAU
MDOT
M-22
2012
LENAWEE
Tecumseh
Rogers
Highway
M-50 to Russell Road
0.95
Reconstruct
3.41
17.19
2.42
5/4/12
11
BRT
MDOT
1,896
5/4/12
165
DICKINSON
5/4/12
4,608
3,600
2012
4,251
NA
SUB
Multiple Course Hot Mix
Asphalt Overlay
Pavt Rem, HMA
reconstruct, Drainage
improvements
FY 2012 to FY 2013
TLCR - Toll Credit
Amount is $379,143.
FY 2012 to FY 2014.
04/10/12
CON
Resurface
NA
4,346 108778
Bridge Replacement
7.12
5/4/12
M
Bridge Replacement
Add Center Left Turn
Lane
3.8 miles of NPS Trailway
Construction
On I-94 WB from I-196
to M-140
US-2 from Dawn's
Lake Road to Baler
Road
Van Buren Road to
Begole Road
M-24 to Lapeer/St Clair
COL
from Thoreson Rd to
0.9 miles east of Basch
Rd
107
NA
Bridge replacement
3,199
FY 2012 to FY 2013
04/10/12
Bridge replacement
CON
5/4/12
1,896 84909
0.60
I-94
NA
04/10/12
0.00
MDOT
04/10/12
50 109334
I-96 under Cutler Road
BERRIEN
113668
M
over Maple River
2013
5/4/12
9
BHT
Bridge Replacement
130
ST
1,896
Bridge replacement
NA
41
CON
0.10
04/10/12
ROW
I-96
over Cass River
130 115849
NA
Prairie Street
M-15
5/4/12
04/10/12
MDOT
MDOT
12
97 113792
Muir
TUSCOLA
NA
M
Bridge Replacement
Federal
Approval
EJ
Date
04/10/12
18
Bridge replacement
Comments
Total
Project
Cost
Local
($1000s) x Priority
12 115847
ST
IONIA
2014
Amendment
Air
Type Quality
79
IONIA
MDOT
MPO/
Rural
Action
Date
CON
2014
LEELANAU
Local
Fund
Source
M
2014
2014
Local
Cost
($1000s)
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
225
197
CITY
CNTY
BHT
184 115817
04/10/12
NA
4,047
5/4/12
4,500 115684
04/10/12
NA
4,500
5/4/12
440 115233
04/10/12
NA
490
5/4/12
1,843 115983
04/10/12
NA
1,843
5/4/12
3,399
5/4/12
28,000
6/11/12
4,000
6/11/12
3,199 102456
04/10/12
NA
TLCR - Toll Credit
Amount is $639,774.
FY 2012 to FY 2014.
PE
990
IM
110
M
1,100 115751
05/14/12
NA
ROW
82
NH
18
M
100 113708
05/22/12
NA
Two Course HMA Overlay
PE
302
NH
67
M
370 115805
05/22/12
NA
8,131
6/11/12
Conc Pavt Rprs, Diamond
Grinding
PE
32
IM
4
M
35 115855
05/22/12
NA
4,200
6/11/12
Restore &
rehabilitate
New 5 ft paved shoulders
CON
409
ST
91
M
500 116658
05/22/12
NA
500
6/11/12
Resurface
Resurface/Widen/Turn
Lane/Flares
CON
412
EDA
466 116546
05/22/12
NA
466
6/11/12
Restore &
rehabilitate
Restore &
rehabilitate
54
OLF
FY 2013 to FY 2012
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
2012
MACKINAC
MDOT
I-75
2012
MARQUETTE
Marquette
CR 492
County
2012
ST. JOSEPH
MDOT
US-131
2012
STATEWIDE
MDOT
Statewide
2012
VAN BUREN
Mattawan Murray Street
2013
ANTRIM
MDOT
M-88
Limits
From N of M-123 to N
of M-134
US-41 to Brookton
Rd/Commerce Dr
from Broadway Road
to Coon Hollow Road
Statewide
Length
Primary Work
Type
Project Description
Phase
PE
7.30
Resurface
Single Crs HMA Overlay
w/ crack relief interlayer.
0.00
Reconstruct
RCNSTRCT & WDN
1.17
Reconstruct
0.01
Miscellaneous
Mattawan Early and
Later Elem. Schools,
Mattawan
BELLAIRE TO
CENTRAL LAKE
Parish Road to
Linwood Road
at Joyfield Road
at Joyfield Road
0.10
0.10
Restore &
rehabilitate
Restore &
rehabilitate
Widen - minor
Widen - minor
Roadside facility
5.54
2.81
Reconstruct existing, no
widening
Perform in house
corrective actions at
various wetland
mitigation sites
throughout the state.
Corrective actions will
include planting, minor
regrading, invasive
species control.
Federal
Advance
Cost
Construct ($1000s)
124
Federal
Fund
Source
NH
CON
28
M
375
EDF
Local
Cost
($1000s)
125
Local
Fund
Source
CNTY
Amendment
Air
Type Quality
Comments
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
152 116383
05/22/12
NA
4,250
6/11/12
500 114936
05/22/12
NA
500
6/11/12
8,500
6/11/12
NH
128
M
703 116377
05/22/12
NA
CON
1,056
ST
234
M
1,290 115826
05/22/12
NA
FY 2014 to FY 2012
1,290
6/11/12
Bike/Ped safety
improvements.
CON
380
380 114142
05/22/12
NA
FY 2011 to FY 2012
380
6/11/12
CRUSH & SHAPE, HMA
RESURF
CON
NA
4,835
6/11/12
AC
270
IM
PE
ROW
18
10
CMG
CMG
CON
497
CM
BAY
MDOT
I-75
2013
2013
BENZIE
BENZIE
MDOT
MDOT
US-31
US-31
2013
HURON
MDOT
M-142
Nugent Rd to Joyce Dr
0.78
Traffic ops/safety
5.97
Restore &
rehabilitate
CRUSH & SHAPE,
RESURFACE,
CON
Construct right turn lane
Construct right turn lane
Add Center Left Turn
Lane
SRSI
PE
2013
NA
4,534
6/11/12
AC
3,670
M
3,670 100329
05/22/12
NA
4,060
6/11/12
9
M
48 116657
05/22/12
NA
51
6/11/12
420 116717
05/22/12
NA
420
6/11/12
126 116715
05/22/12
NA
126
6/11/12
11,218 48945
05/22/12
NA
12,383
6/11/12
HMA RECONSTRUCTION
CON
2013
KALKASKA
MDOT
US-131
from 500 ft south to
1500 ft south of
Wallace Rd
0.19
Resurface
Cold milling, HMA
resurfacing
CON
40
ST
LAPEER
Lapeer
County
Various
Various intersections in
Lapeer County
Traffic ops/safety
The intersections of
Saginaw and Nepessing,
Saginaw and Genesee,
Saginaw and McCormick,
and Genesee and Court.
CON
420
CMG
CON
76
CM
CON
M-24
I-69 to Nepessing
Street, Lapeer
2.06
Reconstruct
HMA Reconstruct
6/11/12
6/11/12
05/22/12
Reconstruct
MDOT
6/11/12
150
150
4,191 79433
1.12
LAPEER
12,683
NA
NA
M
NORTH OF HIAWATHA
ROAD TO US-2
2013
NA
05/22/12
05/22/12
4,191
M-189
Widen - minor
05/22/12
18 116331
10 116331
AC
MDOT
0.03
300 116087
6/11/12
IRON
Imlay City Road at
Myers Road
M
622
2013
Imlay City Rd
30
NA
M65
Lapeer
County
05/22/12
05/22/12
MDOT
LAPEER
4,511 75082
622 115822
IOSCO
2013
M
M
2013
Add right-turn lanes to
the north and east legs of
the Imlay City/Myers
Road intersection. Work
shall include hot mix
asphalt paving, curb and
gutter installation,
sidewalk ramps, and
minor drainage work; and
all together with
necessary related work.
4,511
124
TURTLE RD TO 1200'
NORTH OF SHERMAN
STREET
2013
State
Fund
Source
MPO/
Rural
Action
Date
575
Major Rehabilitation
PE
State
Cost
($1000s)
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
AC
50
11,218
M
CNTY
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
Length
Primary Work
Type
2013
LAPEER
MDOT
M-53
at Hunters Creek Road
0.87
Traffic ops/safety
2013
LAPEER
MDOT
M-53
at Hunters Creek Road
0.87
Traffic ops/safety
2013
LAPEER
MDOT
I-69 EB
M-24 to Lapeer/St Clair
COL
17.19
Restore &
rehabilitate
2013
MACKINAC
MDOT
I-75
From N of M-123 to N
of M-134
7.30
Resurface
2013
MARQUETTE
MDOT
US-41
2.91
2013
MASON
MDOT
US-10
2013
MIDLAND
MDOT
US-10
2013
OSCEOLA
MDOT
US-131
2013
ST. JOSEPH
MDOT
US-131
2013
STATEWIDE
MDOT
Statewide
2013
STATEWIDE
MDOT
Regionwide
US-41, Marquette
County
US-10 (LUDINGTON)
@ NELSON
Midland/Isabella
County Line Easterly to
M-18
at US-10 interchange.
Reed City
from Broadway Road
to Coon Hollow Road
University, Bay, North,
and Metro Regions
North Region, various
locations
6.84
Phase
Federal
Fund
Source
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
MPO/
Rural
Action
Date
Amendment
Air
Type Quality
Comments
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
PE
32
CM
8
M
40 115814
05/22/12
NA
675
6/11/12
SUB
12
CM
3
M
15 115814
05/22/12
NA
675
6/11/12
CON
AC
4,165
M
4,165 115855
05/22/12
NA
4,200
6/11/12
Single Crs HMA Overlay
w/ crack relief interlayer.
CON
AC
4,098
M
4,098 116383
05/22/12
NA
4,250
6/11/12
Reconstruct
Resurfacing & Restoration
ROW
16
NH
4
M
Traffic ops/safety
Radio Interconnect &
Modernization
CON
200
CMG
Restore &
rehabilitate
Rubblize and HMA
Resurfacing
CON
AC
20 116378
05/22/12
NA
6,060
6/11/12
200 111324
05/22/12
NA
240
6/11/12
20,925
M
20,925 106848
05/22/12
NA
21,275
6/11/12
Construct new carpool
parking lot
Reconstruct existing, no
widening
Intelligent Transport.
System
CON
349
ST
77
M
426 115249
05/22/12
NA
453
6/11/12
ROW
61
NH
14
M
75 116377
05/22/12
NA
8,500
6/11/12
CON
1,310
ST
290
M
1,600 106928
05/22/12
NA
1,948
6/11/12
Miscellaneous
ITS DMS and detection
CON
1,467
ST
325
M
1,793 107598
05/22/12
NA
2,288
6/11/12
EPE
400
CM
100
M
500 116272
05/22/12
NA
500
6/11/12
CMG
633 116275
05/22/12
NA
633
6/11/12
Roadside facility
1.17
Project Description
Add Center Left Turn
Lane and widen
Western/Weston Drain
structure (B02) to the
east to accomodate the
turn lane
Add Center Left Turn
Lane and widen
Western/Weston Drain
structure (B02) to the
east to accomodate the
turn lane
Conc Pavt Rprs, Diamond
Grinding
Federal
Advance
Cost
Construct ($1000s)
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
Reconstruct
Miscellaneous
2013
STATEWIDE
MDOT
Regionwide
Various locations in the
Grand Region
Miscellaneous
FY 2013 Control Room
Operations contract for
the West Michigan
Transportation Operations
Center.
2013
STATEWIDE
MDOT
Regionwide
Various locations in
Grand Region
Miscellaneous
FY 2013 ITS device
maintenance and
operations in multiple
counties in Grand Region.
EPE
633
2013
STATEWIDE
MDOT
Regionwide
GPA
CPM CSM Bridge
Trunkline
CON
1,940
ST
485
M
2,425
05/22/12
NA
2,425
6/11/12
2013
STATEWIDE
MDOT
Regionwide
GPA
CPM Road Trunkline
CON
34,742
ST
7,425
M
42,167
05/22/12
NA
42,167
6/11/12
2013
STATEWIDE
MDOT
Regionwide
GPA
Enhancements Trunkline
CON
788
STE
170
M
985
05/22/12
NA
985
6/11/12
2013
STATEWIDE
MDOT
Highway Safety
Regionwide
Trunkline GPA
GPA
Highway Safety Trunkline
CON
23,301
ST
372
M
23,673
05/22/12
NA
23,673
6/11/12
2013
STATEWIDE
MDOT
Rail Xings
Trunkline GPA
GPA
Rail Xings Trunkline
CON
308
ST
34
M
342
05/22/12
NA
342
6/11/12
CPM CSM
Bridge
Trunkline GPA
CPM Road
Trunkline GPA
Enhancements
Trunkline GPA
Regionwide
27
OLF
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Responsible
Agency Project Name
Rural Bridge
Replacement
and
MDOT
Rehabilitate
Trunkline GPA
Rural Highway
Rehab and
MDOT
Reconstruct
Trunkline GPA
Program
Development
MDOT
Scoping
Trunkline GPA
PreMDOT
Construction
Phases GPA
Bridge Local
GPA
Enhancements
Local GPA
Limits
Length
Primary Work
Type
Project Description
Phase
Federal
Advance
Cost
Construct ($1000s)
Federal
Fund
Source
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
Regionwide
GPA
Rural Bridge Replacement
and Rehabilitate Trunkline
CON
9,719
ST
3,485
M
Regionwide
GPA
Rural Highway Rehab and
Reconstruct Trunkline
CON
10,740
ST
2,381
Regionwide
GPA
Program Development
Scoping Trunkline
EPE
800
ST
Regionwide
GPA
Pre-Construction Phases
Trunkline
3,785
ST
Regionwide
GPA
Bridge Local
CON
17,959
BRO
1,670
OLF
33,396
Regionwide
GPA
Enhancements Local
CON
889
STE
444
OLF
1,333
STATEWIDE
Highway Safety
Regionwide
Local GPA
GPA
Highway Safety Local
CON
2,523
ST
250
OLF
2,773
STATEWIDE
Rail Safety
Local GPA
GPA
Rail Safety Local
CON
800
2013
STATEWIDE
2013
STATEWIDE
2013
STATEWIDE
2013
STATEWIDE
2013
STATEWIDE
2013
STATEWIDE
2013
2013
2014
Optional Fields
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
ALLEGAN
MDOT
I-196 SB
2014
BAY
MDOT
I-75
2014
BENZIE
MDOT
M-115
2014
BENZIE
MDOT
M-115
2014
2014
BENZIE
BERRIEN
MDOT
MDOT
M-22
I -94 EB
2014
CALHOUN
MDOT
I-94 BL
2014
CALHOUN
MDOT
M-99
2014
CALHOUN
MDOT
M-99
Regionwide
at the Saugatuck Rest
Area #727
Pinconning Road to
Bay/Arenac COL
from Bridge Street east
4 miles
from Bridge Street east
4 miles
over Platte River
Watervliet Township
29 Mile Road/Clark
Street to I-94
0.59
3.27
4.11
4.11
0.07
Roadside facility
Restore &
rehabilitate
Restore &
rehabilitate
Restore &
rehabilitate
Bridge replacement
Roadside facility
1.96
Resurface
M-99 (Superior Street)
0.37
Reconstruct
M-99 (Superior Street)
0.37
Reconstruct
Building Replacement/Site
Work
Rubblize and HMA
Overlay
Crush and Shape,
Resurface
Crush and Shape,
Resurface
Bridge Replacement
New facility
Multilple course HMA
Overlay
Brick Paver
Reconstruction.
Brick Paver
Reconstruction.
STR
47
OLF
MPO/
Rural
Action
Date
Amendment
Air
Type Quality
Comments
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
13,251
05/22/12
NA
13,251
6/11/12
M
13,121
05/22/12
NA
13,121
6/11/12
200
M
1,000
05/22/12
NA
1,000
6/11/12
676
M
4,461
05/22/12
NA
4,461
6/11/12
13,767
M
05/22/12
NA
33,396
6/11/12
05/22/12
NA
1,333
6/11/12
05/22/12
NA
2,773
6/11/12
200
M
1,000
05/22/12
NA
1,000
6/11/12
CON
AC
4,097
M
4,097 101615
05/22/12
NA
4,397
6/11/12
CON
AC
12,453
M
12,453 110397
05/22/12
NA
13,431
6/11/12
156
M
859 79645
05/22/12
NA
6,779
6/11/12
PE
703
ST
ROW
8
ST
2
M
10 79645
05/22/12
NA
6,779
6/11/12
CON
CON
1,627
ST
AC
361
3,997
M
M
1,988 106168
3,997 51268
05/22/12
05/22/12
NA
NA
2,163
5,063
6/11/12
6/11/12
CON
AC
4,102
M
4,102 86969
05/22/12
NA
4,452
6/11/12
PE
ROW
305
ST
68
M
372 116324
05/22/12
NA
6,250
6/11/12
1
ST
0
M
1 116324
05/22/12
NA
6,250
6/11/12
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
2014
County
Optional Fields
Responsible
Agency Project Name
CRAWFORD
I-75
2014
CRAWFORD
I-75
2014
GOGEBIC
MDOT
US-2
2014
GRATIOT
MDOT
US-127
2014
HOUGHTON
MDOT
M-26
2014
LAPEER
Lapeer
County
Bowers Rd
Limits
Length
at North Down River
Road
at North Down River
Road
Primary Work
Type
Project Description
Phase
Miscellaneous
Completion of the
interchange at I-75 at
North Down River Road
from a partial interchange
to a full interchange by
adding two ramps to
allow for southbound
access and northbound
exiting, replace the
bridges on North Down
River road over I-75 and
over the East Branch
AuSable River, and
reconstruct and widen
North Down River road
from just east of I-75
westward to M-93.
CON
Miscellaneous
Completion of the
interchange at I-75 at
North Down River Road
from a partial interchange
to a full interchange by
adding two ramps to
allow for southbound
access and northbound
exiting, replace the
bridges on North Down
River road over I-75 and
over the East Branch
AuSable River, and
reconstruct and widen
North Down River road
from just east of I-75
westward to M-93.
PE
Tourist Park Rd to
Curry Street
Washington Road to
North of Polk Road
M-26, Houghton
County
1.11
Reconstruct
Pavement reconstruction
CON
2.80
Resurface
Two Course HMA Overlay
CON
3.13
Resurface
Bowers road at Roods
Lake Road
0.04
Widen - minor
Mill & Two Course
Overlay
Add a passing flare for
eastbound traffic at the
Bowers/Roods Lake
intersection. Work shall
include hot mix asphalt
paving, curb and gutter
installation, and minor
drainage work; and all
together with necessary
related work.
CON
CON
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
MPO/
Rural
Action
Date
Amendment
Air
Type Quality
Total
Project
Cost
Local
($1000s) x Priority
Federal
Advance
Cost
Construct ($1000s)
Federal
Fund
Source
7,840
OFHWA
1,960
OLF
9,800
05/22/12
NA
TIGER IV Grant
10,800
6/11/12
800
OFHWA
200
OLF
1,000
05/22/12
NA
TIGER IV Grant
10,800
6/11/12
4,653 110584
05/22/12
NA
5,529
6/11/12
110485
05/22/12
NA
3,608 107008
05/22/12
NA
4,032
6/11/12
144 116711
05/22/12
NA
144
6/11/12
AC
4,653
AC
3,608
144
CMG
M
M
Comments
Federal
Approval
EJ
Date
6/11/12
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
Length
Primary Work
Type
2014
LAPEER
MDOT
M-53
at Hunters Creek Road
0.87
Traffic ops/safety
2014
LEELANAU
MDOT
M-22
from M-201 to Omena
5.04
Restore &
rehabilitate
2014
MASON
MDOT
US-10
2014
MECOSTA
MDOT
US-131
2014
NEWAYGO
MDOT
M-82
US10 (LUDINGTON) @
JACKSON ST
S Mecosta Co Line to 6
Mile Rd
M-120 east to
Industrial Drive
3.14
Restore &
rehabilitate
Resurface
Mill, ASCRL, HMA Overlay
Restore &
rehabilitate
Bridge replacement
Cold milling; crush and
shape
Bridge Replacement
Design & Install approx. 8
ESS
ITS System
Modernizations
I-94 CCTV and Detectors
FY 2014 Control Room
Operations contract for
the West Michigan
Transportation Operations
Center.
2014
ROSCOMMON
MDOT
US-127
Muskegon River north
3.75
2014
SANILAC
MDOT
M-25
0.12
2014
STATEWIDE
MDOT
Regionwide
2014
STATEWIDE
MDOT
Regionwide
2014
STATEWIDE
MDOT
Regionwide
M-25 over Mill Creek
Various locations in
Superior Region
Various locations in
Metro Region
Southwest Region
2014
STATEWIDE
MDOT
Regionwide
Various locations in the
Grand Region
Miscellaneous
2014
STATEWIDE
MDOT
Regionwide
Various locations in
Grand Region
Miscellaneous
2014
STATEWIDE
MDOT
Regionwide
2014
WEXFORD
MDOT
US-131
2012
HOUGHTON
Western
Upper
Peninsula
Planning
US-41
and
Developm
ent
Region
2012
LUCE
MDOT
M-123
2012
ALLEGAN
MDOT
M-89
2012
ALPENA
MDOT
M-65
2012
ANTRIM
MDOT
M-88
2012
BARRY
MDOT
M-43
Traffic ops/safety
2.00
Intersection of US-41
and No. 9 Road
(Houghton County Hwy
F22) to intersection of
US-41 and Airpark
Blvd.
from Newberry to
Eckerman
West of US-131 east to
Florence St. in
Plainwell
over North Branch of
Thunder Bay River
BELLAIRE TO
CENTRAL LAKE
M-37/M-43 (State
Street) to North Street
Traffic ops/safety
Miscellaneous
Various (I-69, I-96, I496, US-127)
at M-55 Interchange
Crush and Shape
Radio Interconnect &
Modernization
Coldmill, C&S, HMA
Resurface
Traffic ops/safety
6.06
Project Description
Add Center Left Turn
Lane and widen
Western/Weston Drain
structure (B02) to the
east to accomodate the
turn lane
Miscellaneous
Roadside facility
FY 2014 ITS device
maintenance and
operations in multiple
counties in Grand Region.
Addition of ITS devices
(DMS and CCTV).
New Carpool Parking Lot
Phase
Federal
Advance
Cost
Construct ($1000s)
CON
CON
496
Federal
Fund
Source
CM
AC
CON
170
State
Cost
($1000s)
State
Fund
Source
Local
Cost
($1000s)
Local
Fund
Source
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
MPO/
Rural
Action
Date
Amendment
Air
Type Quality
Comments
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
124
M
620 115814
05/22/12
NA
675
6/11/12
4,334
M
4,334 83588
05/22/12
NA
4,656
6/11/12
170 111325
05/22/12
NA
204
6/11/12
CMG
CON
AC
12,992
M
12,992 105524
05/22/12
NA
13,600
6/11/12
CON
AC
5,152
M
5,152 105535
05/22/12
NA
5,542
6/11/12
CON
AC
6,382
M
6,382 106863
05/22/12
NA
6,884
113232
05/22/12
NA
CON
6/11/12
6/11/12
CON
1,637
ST
363
M
2,000 107426
05/22/12
NA
2,215
6/11/12
CON
682
ST
151
M
833 107612
05/22/12
NA
953
6/11/12
CON
2,047
ST
454
M
2,501 107965
05/22/12
NA
3,001
6/11/12
EPE
500
CMG
500 116277
05/22/12
NA
500
6/11/12
EPE
650
CMG
650 116278
05/22/12
NA
650
6/11/12
PE
150
CMG
150 116407
05/22/12
NA
1,250
6/11/12
CON
101
ST
123 107459
05/22/12
NA
FY 2013 to FY 2014
132
6/11/12
SBD# SB-2011-MI56748. Local Other
Funds - $42,564
cash and $5,600 inkind contributions.
Was originally MDOT
JN 115853. This
was changed to
MDOT JN 117251.
241
6/11/12
70
6/11/12
10,415
8/23/12
3,179
8/23/12
4,935
8/23/12
5,221
8/23/12
10.17
Heritage routes
This project will remove
blighted structures and
debris, construct viewing
platforms for pedestrians,
pit toilets, interpretive
signs and a covered
pavilion.
63.00
Roadside facility
Non-Motorized Trail Plan
EPE
56
1.72
Reconstruct
Reconstruct Existing, No
widen
CON
8,494
0.49
Bridge replacement
Bridge Replacement
CON
5.54
Restore &
rehabilitate
CRUSH & SHAPE, HMA
RESURF
ROW
1.33
Restore &
rehabilitate
Reconstruction &
Resurfacing
CON
22
M
CON
193
SBD
48
OLF
241 117251
06/07/12
NA
SBD
14
CNTY
70 116551
06/07/12
NA
8,494 90028
08/06/12
NA
ST
AC
3,642
ST
3,003
M
3,003 102987
08/06/12
NA
150
M
150 75082
08/06/12
NA
3,642 83975
08/06/12
NA
SBD# SB-2010-MI56001
TLCR - Toll Credit
Amount is
$1,716,990.
FY 2013 to FY 2012
TLCR - Toll Credit
Amount is $838,742.
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
Limits
2012
BARRY
MDOT
M-43
over Thornapple River
in Hastings
2012
BENZIE
MDOT
US-31
from Beulah Bridge to
M-115
at Carlton Dr, east
then north to Colony
Bay Dr
Project Description
Phase
Federal
Advance
Cost
Construct ($1000s)
Federal
Fund
Source
8/23/12
08/06/12
NA
TLCR - Toll Credit
Amount is $362,751.
2,229
8/23/12
106 116925
08/06/12
NA
106
8/23/12
71 116926
08/06/12
NA
71
8/23/12
2,598 113596
08/06/12
NA
3,420
8/23/12
86 117052
08/06/12
NA
86
8/23/12
868 90130
08/06/12
NA
868
8/23/12
5 113442
08/06/12
NA
394
8/23/12
1,554 113136
08/06/12
NA
TLCR - Toll Credit
Amount is $396,396.
1,554
8/23/12
258 112483
08/06/12
NA
FY 2011 to FY 2012
258
8/23/12
151 116934
08/06/12
NA
151
8/23/12
2,674 90210
08/06/12
NA
TLCR - Toll Credit
Amount is $335,300.
3,553
8/23/12
3,000
8/23/12
08/06/12
0.61
Resurface
Crack Relief Layer and
Overlay
CON
1,621
NH
1,621 87355
New route/structure
(capacity increase)
0.60 mi mulity-use
pathway construction
with hot mix asphalt
paving, aggregate base
and shoulders, clearing,
and grading from Eagle
Point Road to Colony Bay
Drive.
CON
85
CM
Replace one (1) 2007
cutaway bus with one (1)
new 2012 or newer gas
Transit vehicle
additions/replacemen engine cutaway bus. The
old bus will exceed the
ts
FTA useful life criteria of
5 years or 150,000 miles.
EPE
57
CM
Restore &
rehabilitate
Full depth concrete pavt
repairs FY 2012
CON
2,598
NH
Resurface
Resurface roadway
including shoulder work.
CON
Countywide
2012
CHEBOYGAN
MDOT
I-75 NB & SB
Levering to US-31
Ramp
2012
DELTA
Delta
County
North 9th
Street
North 5th Street to
North Lakeshore Drive
2012
EMMET
MDOT
M-68
over Crooked River
0.26
Bridge replacement
Deck Repl w/shoulder
widening
CON
868
BHT
2012
EMMET
MDOT
US-31
US-31 in Petoskey
0.63
Traffic ops/safety
Geometric modifications
and access management
ROW
4
HPP
2012
GOGEBIC
MDOT
US-2
US-2 Marenisco to
Gogebic Station
10.24
Resurface
HMA Mill and Resurface
CON
1,554
NH
2012
HURON
Huron
County
Various routes
Bad Axe Intermediate
and Junior High School
Roadside facility
Bike/ped safety
improvements
CON
258
SRSI
Areawide
Areawide
EPE
121
CM
I-96
EB and WB over
abandoned CSX
Railroad
Transit vehicle
Purchase one medium
additions/replacemen duty bus to expand
ts
transit service.
0.03
Bridge replacement
CON
2,674
IM
MDOT
1,573
743 100132
9.03
Bridge Replacement
2012
IOSCO
Iosco
County
Monument
Road
Monument and Wilber
Roads
17.49
Reconstruct
Reconstruct
2012
IOSCO
MDOT
US-23
Tawas Beach Road to
Aulerich Road
1.83
Reconstruct
Total Reconstruction
2012
LAPEER
MDOT
WB I-69
WB I-69, M-24 to
Lapeer/St Clair COL
17.16
Restore &
rehabilitate
Conc Pavt Rprs, Diamond
Grind
CON
PE
CON
21
14
69
2,760
FLH
464
NH
3,738
IM
1
30
CNTY
M
EDF
M
M
17
CNTY
M
TLCR - Toll Credit
Amount is $620,730.
TLCR - Toll Credit
Amount is $318,081.
105167
&
117737
08/06/12
NA
JN 117737 was
programmed to
utilize left over
money from JN
105167. The total
dollar amounts and
scope remains the
same.
567 103019
08/06/12
NA
FY 2013 to FY 2012
5,923
8/23/12
3,738 108689
08/06/12
NA
TLCR - Toll Credit
Amount is $450,000.
4,605
8/23/12
2,760
103
Comments
Federal
Approval
EJ
Date
NA
BHT
0.60
Amendment
Air
Type Quality
Total
Project
Cost
Local
($1000s) x Priority
TLCR - Toll Credit
Amount is $290,731.
743
CASS
IONIA
Local
Fund
Source
CON
2012
2012
Local
Cost
($1000s)
0.17
Cass
County
Transport Countywide
ation
Authority
HURON
State
Fund
Source
Deep Overlay, Beam
Repair
Cass
County
2012
State
Cost
($1000s)
MPO/
Rural
Action
Date
Restore &
rehabilitate
CASS
2012
Eagle Point
Road
Length
Primary Work
Type
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
County
Optional Fields
Responsible
Agency Project Name
2012
LAPEER
MDOT
I-69
2012
LAPEER
MDOT
M-24
Limits
at Lake Nepessing
Road
I-69 to Nepessing
Street, Lapeer
Length
Primary Work
Type
Roadside facility
2.06
Reconstruct
HMA Reconstruct
Construction of 4800ft. of
non-motorized pathway
to provide a direct and
shorter route to and from
downtown Hudson and
reduce heavy traffic
congestion and emissions
along M34 (Main Street)
and Maple Grove Ave,
which is the current
vehicle route to the north
section of town.
Phase
NA
60
8/23/12
ROW
8
ST
2
M
10 48945
08/06/12
NA
12,383
8/23/12
CON
131
CM
182 117122
08/06/12
NA
182
8/23/12
5,646 87522
08/06/12
NA
8,187
8/23/12
3,882 83545
08/06/12
NA
TLCR - Toll Credit
Amount is $882,992.
4,878
8/23/12
175 114145
08/06/12
NA
FY 2011 to FY 2012
175
8/23/12
3,297 117106
08/06/12
NA
3,297
8/23/12
1,630
8/23/12
5,206
8/23/12
6,084
8/23/12
10,267
8/23/12
7,023
8/23/12
8,785
8/23/12
MDOT
M-52
US-223 North to South
of M-34
0.78
Reconstruct
HMA Reconstruction
CON
2012
MACKINAC
MDOT
US-2
Borgstrum Road to
Hiawatha Trail
8.69
Resurface
HMA Overlay
CON
3,882
2012
MARQUETTE
Marquette Tierney Street
Roadside facility
Bike/Ped safety
improvements
CON
175
MARQUETTE
Marquette
Triple A Road
County
Reconstruct
Reconstruct
CON
2012
MENOMINEE
MDOT
M-35
2012
MENOMINEE
MDOT
M-35
NCL of Menominee
North 6 miles
US-41 north to 48th
Ave.
Comments
Federal
Approval
EJ
Date
08/06/12
LENAWEE
Leelanau
County
Amendment
Air
Type Quality
134 103307
2012
MDOT
Local
Fund
Source
M
areawide
2012
Local
Cost
($1000s)
27
areawide
starts at Port Oneida
Road and ends at
Leelanau County Road
669/Bohemian Road all
within Cleveland
Township
State
Fund
Source
ST
Hudson
Sleeping Bear
Heritage Trail
Segment 8 in
Sleeping Bear
Dunes National
Lakeshore
State
Cost
($1000s)
Total
Project
Cost
Local
($1000s) x Priority
107
LENAWEE
Bothwell Middle
School, Marquette
Triple A Road; M-95;
County Road 601
Federal
Fund
Source
MPO/
Rural
Action
Date
CON
2012
2012
Miscellaneous
Project Description
Expand, pave carpool lot
and add lighting
Federal
Advance
Cost
Construct ($1000s)
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
3.17
Miscellaneous
Construct an ADA
compliant non-motorized
path
6.00
Restore &
rehabilitate
HMA Coldmilling and
Resurface
PE
0.95
Reconstruct
Reconstruct Existing
CON
CON
AC
51
5,646
M
NH
SRSI
2,638
1,630
CITY
EDA
659
CNTY
OFHWA
1,630
368
ST
82
M
2,979
NH
661
M
2,251
CITY
08/06/12
NA
450 110684
08/06/12
NA
5,891 103311
08/06/12
NA
This project is
utilzing PLHD funds.
The original grant is
for $1,620,000.
Another $10,000 is
included for signage the signage money
and project will
eventually be split
into a separate JN.
Moved from FY
2014. TLCR - Toll
Credit Amount is
$1,728,424.
TLCR - Toll Credit
Amount is $
$1,274,674.
2012
MONTCALM
MDOT
US-131 SB
North of Cannonsville
Road to South of M-46
5.39
Restore &
rehabilitate
Concrete Inlay
CON
7,775
NH
7,775 87108
08/06/12
NA
2012
MONTCALM
MDOT
US-131 NB
N of Cannonsville Rd
to S of M-46
5.45
Restore &
rehabilitate
Concrete Inlay
CON
5,984
NH
5,984 90035
08/06/12
NA
2012
OCEANA
MDOT
5.37
Resurface
313
NH
69
382 112158
08/06/12
NA
2012
ONTONAGON
5.00
Resurface
CON
1,000
STL
0
250
CNTY
1,250 78909
08/06/12
NA
1,250
8/23/12
2012
ONTONAGON
CON
974
STL
0
244
CNTY
1,218 78872
08/06/12
NA
1,218
8/23/12
Fruitvale Road north to
Winston Road
Summit Park Rd Ontonago SOUTH
n County BOUNDARY RD Gogebic County Line
Ontonago
Boundary Rd
Summit Park - M107
n County
US-31
Reconstruct
Cold Mill, Joint Repairs,
HMA Resurfacing
MILLING AND
RESURFACING
RECONSTRUCT
PE
M
FY 2013 to FY 2012
FY 2011 - 2014 STIP Project Data
09.20.12
Required Fields
Fiscal
Year
2012
2012
2012
2012
2012
2012
2012
Optional Fields
Responsible
Agency Project Name
Limits
County
West 638
Presque
West 638
Highway/Glasier
PRESQUE ISLE Isle
Highway
Road/Petersville Road
County
from Ogemaw CL to
ROSCOMMON MDOT
I-75
Maple Valley Road
CPM Road
STATEWIDE
MDOT
Regionwide
Trunkline GPA
CPM CSM
STATEWIDE
MDOT
Bridge
Regionwide
Trunkline GPA
Rail Xings
STATEWIDE
MDOT
Regionwide
Trunkline GPA
Rural Bridge
Replacement
and
STATEWIDE
MDOT
Regionwide
Rehabilitate
Trunkline GPA
Rural Highway
Rehab and
STATEWIDE
MDOT
Regionwide
Reconstruct
Trunkline GPA
Length
12.57
Primary Work
Type
Project Description
Phase
Federal
Advance
Cost
Construct ($1000s)
Reconstruct
Reconstruct
CON
Restore &
rehabilitate
Crush & Shape, HMA
resurface
CON
GPA
CPM Road Trunkline
CON
27,352
GPA
CPM CSM Bridge
Trunkline
CON
GPA
Rail Xings Trunkline
GPA
Federal
Fund
Source
EDA
8,816
M
ST
6,270
M
3,650
ST
933
CON
1,253
ST
Rural Bridge Replacement
and Rehabilitate Trunkline
CON
9,929
GPA
Rural Highway Rehab and
Reconstruct Trunkline
CON
CON
8,816 83288
08/06/12
NA
33,884
08/06/12
M
4,583
597
M
ST
2,074
M
7,126
ST
1,672
M
755
22,371
ST
192
M
6,957
ST
1,670
M
RP
28
M
7,969
M
793
OLF
M
1,110
1,497
Highway Safety
Regionwide
Trunkline GPA
GPA
Highway Safety Trunkline
2012
STATEWIDE
MDOT
PreConstruction
Phases GPA
Regionwide
GPA
Pre-Construction Phases
Trunkline
2012
STATEWIDE
MDOT
Statewide
Statewide
Miscellaneous
Purchase Enterprise Ver.
of the DARWin-ME
Software
EPE
4
2012
STATEWIDE
Bridge Local
GPA
Regionwide
GPA
Bridge Local
CON
6,159
BRO
2012
STATEWIDE
Highway Safety
Regionwide
Local GPA
GPA
Highway Safety Local
CON
3,577
ST
2012
STATEWIDE
Regionwide
GPA
Enhancements Local
CON
1,714
STE
2012
STATEWIDE
Regionwide
GPA
Rail Safety Local
CON
1,194
STR
MDOT
US-131 NB
at the new Martin
Township Rest Area
0.79
Roadside facility
New Rest Area
Construction
CON
4,512
NH
522
MRR
Comments
Total
Project
Cost
Local
($1000s) x Priority
Federal
Approval
EJ
Date
1,948
8/23/12
10,521
8/23/12
NA
33,884
8/23/12
08/06/12
NA
4,583
8/23/12
1,850
08/06/12
NA
1,850
8/23/12
12,003
08/06/12
NA
12,003
8/23/12
OLF
9,553
08/06/12
NA
13,016
8/23/12
22
OLF
22,585
08/06/12
NA
22,585
8/23/12
708
OLF
9,335
08/06/12
NA
9,335
8/23/12
08/06/12
NA
32
8/23/12
14,922
08/06/12
NA
22,105
8/23/12
OLF
4,687
08/06/12
NA
4,687
8/23/12
OLF
3,211
08/06/12
NA
3,211
8/23/12
1,716
08/06/12
NA
1,716
8/23/12
5,612
8/23/12
261
CNTY
Amendment
Air
Type Quality
NA
AC
464
Local
Fund
Source
08/06/12
MDOT
ALLEGAN
Local
Cost
($1000s)
MPO/
Rural
Action
Date
1,948 117107
STATEWIDE
2013
State
Fund
Source
1,484
2012
Enhancements
Local GPA
Rail Safety
Local GPA
State
Cost
($1000s)
Total
Phase
Cost
MDOT Local ID
($1000s) Job No.
No.
OLF
32 117051
4,512 81685
08/06/12
NA
Tagged as AC
TLCR - Toll Credit
Amount is $818,919.
FY 2012 to FY 2013
Fly UP