Comments
Transcript
Required Fields Optional Fields Total MPO/
FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County 2011 ALGER 2011 CHIPPEWA 2011 OCEANA 2011 SANILAC 2011 2011 2011 2011 STATEWIDE STATEWIDE STATEWIDE STATEWIDE Optional Fields Responsible Primary Work Agency Project Name Limits Length Type Restore & Alger Little Beaver from H-58 to Little 3.45 rehabilitate County Road Beaver Campground NW quadrant of I-75 Roadside facility MDOT I-75 BL and 3 Mile Rd Polk Rd to N Branch of MDOT US-31 5.89 Reconstruct Pntwtr Rvr M-25 Port Sanilac Roadside facility MDOT M-25 Carpool Lot MDOT Regionwide Various in Bay Region Roadside facility MDOT Section 5309 Transit operations MDOT Section 5310 Transit operations MDOT Section 5311 Transit operations Project Description Rehabilitate CON 1,000 Install Carpool lot lighting CON 12 Reconstruction CON Pave Carpool Parking Lot CON CON T-Ops T-Ops T-Ops 5 3,622 1,000 296 T-Ops T-Ops 2011 STATEWIDE MDOT Section 5316 Transit operations 2011 STATEWIDE MDOT Section 5317 Transit operations Restriping of carpool lots Capital Bus Elderly and Disabled RTAP Job Access/Reverse Commute New Freedom 2011 VAN BUREN MDOT M-40 Widen - minor Two Right Turn Lanes Miscellaneous PE for Entrance and Parking 2012 2012 2012 2013 2013 LAPEER MDOT Jordan Rvr. Nat. Fish Hatchery I-69 MANISTEE MDOT US-31 ANTRIM Antrim County 0.5 miles south of the Village of Lawton at Lake Pleasant Road US-31 at Memorial Drive Schoolcraf Seney National Seney National Wildlife SCHOOLCRAFT t County Wildlife Refuge Refuge STATEWIDE MDOT Regionwide TUSCOLA Mayville Fulton St Main Street to Mill Street, Mayville 2014 STATEWIDE MDOT Regionwide Regionwide 2011 HURON ALLEGAN MDOT M-25 Over White River Douglas Blue Star Highway At Kalamazoo River, Douglas & Saugatuck West of US-131 east to Florence St. in Plainwell 2011 ALLEGAN MDOT M-89 2011 ALLEGAN MDOT US-131 2011 ALPENA MDOT M-32 2011 ANTRIM MDOT US-31 2011 ARENAC MDOT I-75 2011 ARENAC MDOT M-61 2011 BAY MDOT I-75 0.12 Regionwide 2013 2011 0.27 Jordan River National Fish Hatchery under 106th Avenue Intersection at Ripley Street in Alpena from Elk Rapids to Campbell Road Sterling Road over I-75 (S07-06111) and US23 Ramp F over I-75 (S13 of 06111) at I-75 Nine Bridges in Bay County along I-75 0.50 Phase 80 ST ST 0.72 10/27/10 1,022 M 2,045 10/27/10 NA 2,045 10/27/10 693 M 1,386 10/27/10 NA 1,386 10/27/10 510 EDA 510 108014 10/27/10 NA 568 10/27/10 100 105498 10/27/10 NA 100 10/27/10 FLH 5 4.70 21,212 5316 CON Restore & rehabilitate Tagged as AC 5317 Restriping of Carpool Lots Reconstruct NA 693 Roadside facility 0.46 10/27/10 1,022 FLH Substructure Repair 20,412 90073 10/27/10 10/27/10 10/27/10 10/27/10 1,095 Bridge restore & rehabilitate M 10/27/10 10/27/10 CON 0.44 20,412 15 6 7,372 2,270 296 Miscellaneous ROW NA 98 Replace J to H WCS/Bridge Reconstruct 10/27/10 NA NA NA NA ST 1.72 14 107601 10/27/10 NA HPSL CON M 1,000 10/27/10 10/27/10 10/27/10 10/27/10 43 Reconstruct Existing, No widen 3 Comments PIRO 15(1) 10/27/10 508 Bridge rehabilitation NA 6 103389 7,372 2,270 296 CON Bridge replacement 10/27/10 98 107032 CON Bridge restore & rehabilitate 1,000 105168 Federal Approval EJ Date M M M Resurface Carpool Lot Superstructure replacement Amendment Air Type Quality M Intersection Improvement Restriping of Carpool Lots Local Fund Source 1 3,750 1,270 Roadside facility Roadside facility Local Cost ($1000s) Total Project Cost Local ($1000s) x Priority 18 100 ST 9 M 52 73163 10/27/10 NA 56 10/27/10 113 M 621 86076 10/27/10 NA 675 10/27/10 1,095 110126 10/27/10 NA 1,095 10/27/10 6 107018 10/27/10 NA 6 10/27/10 167 10/27/10 1 90 STL CON 5 ST 1 CON 972 ST M $90,198 ARL funds in FY2010. $39,842 STL ACC conversion in FY2013. 1511 Certification 1/25/10. 90 109312 10/27/10 NA M 6 107017 10/27/10 NA 6 10/27/10 216 M 1,188 104611 10/28/10 NA 1,188 10/29/10 5,054 M 5,321 105337 10/28/10 NA 5,321 12/2/10 5 M 25 90028 10/28/10 NA 9,835 12/2/10 CON 108606 10/28/10 NA Intersection Reconstruct CON 74900 10/28/10 NA Crush and Shape CON 83592 10/28/10 NA Bridge restore & rehabilitate Deep Overlay CON 89615 10/28/10 NA Roadside facility Bridge restore & rehabilitate Lighting Deep Overlay and Replacement CON CON ACC State Fund Source MPO/ Rural Action Date ST 5309 5310 5311 Traffic ops/safety CON State Cost ($1000s) FLH AC PE Resurface 6.13 Federal Fund Source CON Resurface 1.01 Federal Advance Cost Construct ($1000s) Total Phase Cost MDOT Local ID ($1000s) Job No. No. AC 20 30 AC ST ST 266 CITY 7 M 37 110651 10/28/10 NA 6,778 M 6,778 108681 10/28/10 NA Tagged as AC Project moved to Bridge RR GPA. Project moved to Hwy RR GPA Project moved to Hwy RR GPA 12/2/10 12/2/10 12/2/10 Project moved to Bridge RR GPA. Tagged as AC 12/2/10 37 12/2/10 7,461 12/2/10 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name 2011 BERRIEN MDOT M-140 2011 BERRIEN MDOT I-196 2011 BRANCH MDOT I-69 Limits Dan Smith Road to Watervliet North City Limits NB & SB over Coloma Road Length under Jonesville Road 0.37 under M-199 (26 Mile Road) and 22 1/2 Mile Road M-32 from East Jordan southerly to Rogers Road Primary Work Type Project Description Phase Reconstruct Pavement Reconstruction. CON Bridge restore & rehabilitate Bridge restore & rehabilitate Deep Overlay, Beam Repair Abutment repair, Full paint 0.31 Bridge restore & rehabilitate 1.89 2.29 0.28 Federal Advance Cost Construct ($1000s) Federal Fund Source AC State Cost ($1000s) 8,000 State Fund Source M Local Cost ($1000s) Local Fund Source Total Phase Cost MDOT Local ID ($1000s) Job No. No. MPO/ Rural Action Date Amendment Air Type Quality Comments Tagged as AC Total Project Cost Local ($1000s) x Priority 9,500 Federal Approval EJ Date 8,000 87321 10/28/10 NA CON 106108 10/28/10 NA CON 108711 10/28/10 NA Concrete Shallow Overlay CON 100581 10/28/10 NA Project moved to Bridge RR GPA. 12/2/10 Restore & rehabilitate Crush and Shape CON 103023 10/28/10 NA Project moved to Hwy RR GPA 12/2/10 Project moved to Bridge RR GPA. Project moved to Bridge RR GPA. 12/2/10 12/2/10 12/2/10 2011 CALHOUN MDOT I-94 2011 CHARLEVOIX MDOT M-32 2011 CHIPPEWA MDOT I-75 Easterday Avenue over I-75, Sault Ste. Marie 0.25 Bridge restore & rehabilitate Bridge Widening for Path CON 107191 10/28/10 NA Project moved to Bridge RR GPA. 12/2/10 2011 CHIPPEWA MDOT I-75 Easterday Avenue over I-75, Sault Ste. Marie 0.25 Bridge restore & rehabilitate Deep Overlay CON 107231 10/28/10 NA Project moved to Bridge RR GPA. 12/2/10 0.62 Reconstruct Participation in City CSO road CON 12/2/10 2.72 Resurface Two Course HMA Overlay CON 1.22 Traffic ops/safety Geometric modifications CON 655 1.11 Reconstruct Pavement reconstruction PE Roadside facility New Carpool Lot CON 2011 CHIPPEWA MDOT I-75BS 2011 CLARE MDOT US-127 BR/M61 2011 EMMET MDOT US-31 2011 GOGEBIC MDOT US-2 2011 GRAND TRAVERSE MDOT US-31 2011 HOUGHTON MDOT M-26 2011 HURON MDOT M-142 2011 HURON MDOT M-53 I-75BS, Portage Avenue County Farm Road Southeasterly to M-61 East US-31 from west of Division to Manvel and M-119 Tourist Park Rd to Curry Street South of Kay Ray Road on US-31 over Gooseneck Creek, two branches M-142 over Pigeon River 1.33 Bridge replacement Culvert Replacement CON Bridge replacement Bridge Replacement CON Cleveland Street Drain Miscellaneous Drainage Outlet Construction Crush & Shape, HMA Overlay Add Center Left Turn Lane AC 3,981 106844 10/28/10 NA Tagged as AC 4,134 12/2/10 HPP 164 M 819 79065 10/28/10 NA Moved from FY 2012 1,192 12/2/10 326 NH 72 M 398 110584 10/28/10 NA 4,973 12/2/10 74 ST 16 M 90 109989 10/28/10 NA 100 12/2/10 ST 283 IONIA MDOT M-91 M-44 to Ellis Road 1.24 2011 LAPEER MDOT M-53 at Hough Road 0.57 Traffic ops/safety 0.82 Restore & rehabilitate Crush and Shape CON 3.45 Resurface Mill and resurface CON AC 6,792 6.50 Resurface Crush and Shape, Resurface CON AC 5,390 2.85 Restore & rehabilitate Crush & Shape & Resurface CON 7.96 Restore & rehabilitate CRUSH&SHAPE&HMA RESURFACING Cold milling, HMA resurfacing LEELANAU MDOT M-22 2011 LENAWEE MDOT US-223 2011 MANISTEE MDOT US-31 2011 MARQUETTE MDOT M-35 2011 MENOMINEE MDOT US-41 2011 MONTCALM MDOT M-91 2.12 Resurface M CON 2011 2011 CON CON CON 340 AC NA M Restore & rehabilitate From M-204 north approx. .82 miles East of Silberhorn Hwy to west of Rodesiler Road South of Coates Highway to Maidens Road from north of Little Lake to north of Marshall COUNTY ROAD G-12 TO BAGLEY Ellis Road to Snows Lake Road 10/28/10 3,981 1,276 CON 107972 Project moved to Hwy RR GPA CM 85 4,215 M 110196 10/28/10 NA 1,559 100745 10/28/10 NA 103279 10/28/10 NA 87110 10/28/10 NA 425 111272 10/28/10 NA Project moved to Bridge RR GPA. 12/2/10 1,672 Project moved to Bridge RR GPA. Project moved to Hwy RR GPA 12/2/10 12/2/10 12/2/10 456 12/2/10 106843 10/28/10 NA Project moved to Hwy RR GPA M 6,792 84028 10/28/10 NA Tagged as AC 7,510 12/2/10 M 5,390 87083 10/28/10 NA Tagged as AC 5,565 12/2/10 110309 10/28/10 NA Project moved to Hwy RR GPA 4,215 87551 10/28/10 NA Tagged as AC NA Project moved to Hwy RR GPA M 87111 10/28/10 12/2/10 12/2/10 4,360 12/2/10 12/2/10 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name 2011 NEWAYGO Newaygo State Street County 2011 OCEANA MDOT US-31 2011 OTTAWA MDOT Grand Region Carpool Lots 2011 SCHOOLCRAFT MDOT 2011 SCHOOLCRAFT 2011 SCHOOLCRAFT 2011 M-94 Schoolcraf t County Schoolcraf SCHOOLCRAFT t County County Road 434 County Road 433 2011 STATEWIDE MDOT I-69 STATEWIDE MDOT Regionwide MDOT Southwest Region 2011 STATEWIDE STATEWIDE MDOT 2011 STATEWIDE MDOT 2011 STATEWIDE MDOT 2011 STATEWIDE MDOT Regionwide CPM CSM Bridge Trunkline GPA DBE Support Services Local Tech Assistance Program State Funded Required Program 2011 STATEWIDE MDOT 2011 STATEWIDE Rural Task Rural Task Forces Force 2011 STATEWIDE 2011 STATEWIDE 2011 VAN BUREN MDOT 2011 VAN BUREN MDOT 2011 WEXFORD Cadillac 2011 WEXFORD Harrietta Small Urban Program Small Urban Program Length Project Description Phase Roadside facility Bike/Ped Safety improvements CON Bridge restore & rehabilitate Substructure Repair CON Roadside facility Signing Upgrade for Carpool Lot CON Federal Advance Cost Construct ($1000s) 202 69 Federal Fund Source State Cost ($1000s) State Fund Source Local Cost ($1000s) ST 15 M Reconstruct HMA Reconstruct CON 0.44 Resurface resurface CON 51 EDDF 42 M 1 US 2 to CR 432 3.84 Resurface resurface CON 51 EDDF 42 M US 2 to CR 438 6.12 Resurface resurface CON 51 EDDF 42 M Bridge replacement Bridge replacement CON 3,399 Miscellaneous Install Environmental Sensors CON 284 M-71 over I-69, Shiawassee County North Region, various locations Southwest Region 42.87 AC 1,280 ST Traffic ops/safety Freeway Signing Upgrade PE North Region Miscellaneous Warranty AdminstrationBridge CON Statewide GPA CPM CSM Bridge Trunkline CON 2,976 ST DBE Support Services CON 400 ST Local Techincal Assistance Program CON 235 ST Regionwide Miscellaneous Regionwide State Funded Required Program CON Statewide Miscellaneous Rural Task Force Program - Transit Projects CON 3,655 ST Small Urban Program Statewide Miscellaneous Small Urban Program Transit Projects CON 115 Small Urban Program Statewide Miscellaneous Small Urban Program Road Projects CON 7,061 Traffic ops/safety Construct two modern roundabouts CON Resurface Two Course HMA Overlay Reconstruct Reconstruct CON Reconstruct Reconstruction CON on CR652 at the ramp terminals N and S of I94 (exit 66) City of Watervliet to M-140 CR 378 Third Ave-First Ave, Seventh Street Farrar St-Mitchell St Forest Highway Lake County Line to 37 Forest Highway 38 I-94 7.22 11.00 ACC PE AC Local Fund Source SRSI 0.37 Iron Creek nthly 5.5 mi Schoolcraf County Rd 437 to end of pavement t County 2011 2011 Limits Velma Matson Upper Elem. School, City of Newaygo NB over US-31 Business Route (Monroe Road) Grand Region Carpool Lots Fifth Street east to Chippewa Ave Primary Work Type MPO/ Rural Action Date Amendment Air Type Quality 202 111567 10/28/10 NA 106297 10/28/10 NA 84 102951 10/28/10 NA Comments Total Project Cost Local ($1000s) x Priority 202 Project moved to Bridge RR GPA. Federal Approval EJ Date 12/2/10 12/2/10 84 Project moved to Hwy RR GPA 12/2/10 12/2/10 110307 10/28/10 NA CNTY 94 111252 10/28/10 NA 94 12/2/10 1 CNTY 94 111253 10/28/10 NA 94 12/2/10 1 CNTY 94 111254 10/28/10 NA 94 12/2/10 M 3,399 87169 10/28/10 NA Tagged as AC 3,694 12/2/10 M 1,563 105741 10/28/10 NA From illustrative list 2,000 12/2/10 109747 10/28/10 NA 2 111877 10/28/10 NA 2 12/2/10 3,680 10/28/10 NA 3,680 12/2/10 400 10/28/10 NA 400 12/2/10 470 10/28/10 NA 470 12/2/10 10,430 12/2/10 2 M 705 M 235 Total Phase Cost MDOT Local ID ($1000s) Job No. No. M 10,430 M 754 M 10,430 10/28/10 NA 12/2/10 The State Funded Required Program was the former NonDiscretionary M Program 152 CNTY 4,561 10/28/10 NA 4,561 12/2/10 ST 29 CNTY 144 10/28/10 NA 144 12/2/10 ST 2,711 CNTY 9,771 10/28/10 NA 9,771 12/2/10 400 107461 10/28/10 NA 400 12/2/10 400 110107 10/28/10 NA 6,500 12/2/10 188 12/2/10 3,118 12/2/10 400 CMG 327 ST 73 M 150 EDF 38 CITY 188 110962 10/28/10 NA M 609 CITY 3,046 107752 10/28/10 NA 2,437 Tagged as AC FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name 2011 WEXFORD MDOT US-131BR 2011 WEXFORD MDOT US-131 BR 2011 WEXFORD MDOT 2012 BARRY Barry County M-37 Finkbeiner Rd 2012 CHIPPEWA MDOT I-75BS 2012 IRON MDOT US-2 2012 MARQUETTE MDOT US-41 2012 MONTCALM MDOT US-131 2012 MONTCALM MDOT US-131 2012 NEWAYGO MDOT M-37 2012 OCEANA MDOT US-31 BR 2012 OGEMAW MDOT I-75 2012 OGEMAW MDOT I-75 BL 2012 2012 2013 2013 2014 Schoolcraf t County Area Wide SCHOOLCRAFT Public Transit Transport ation DBE Support STATEWIDE MDOT Services ALLEGAN MDOT US-131 DBE Support STATEWIDE MDOT Services OSCEOLA MDOT US-131 NB DBE Support Services Blue Star Highway 2014 STATEWIDE MDOT 2014 VAN BUREN MDOT 2011 ALLEGAN Allegan County 11th Street 2011 ALLEGAN MDOT I-196 2011 CRAWFORD MDOT I-75 NB 2011 GRATIOT MDOT US-127 2011 IOSCO MDOT US-23 Primary Work Type Limits Length River Street to North of 2.12 Reconstruct Boon Road over Clam River, 0.29 Bridge replacement Cadillac M-115 to North of 10 4.00 Resurface Road Thornapple Rvr & 0.19 Bridge replacement Spring Creek I-75 BS from Easterday Ave to Power Canal Project Description Reconstruct, Mill & Resurface Deck Replacement Crush and Shape and Resurface Total Phase Cost MDOT Local ID ($1000s) Job No. No. MPO/ Rural Action Date CON 87041 10/28/10 NA CON 87218 10/28/10 NA PE 90234 10/28/10 NA Phase Bridge Replacement CON Federal Advance Cost Construct ($1000s) ACC 2,008 Federal Fund Source State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source HPSL Amendment Air Type Quality 2,008 109247 10/28/10 NA Comments Project moved to Hwy RR GPA Project moved to Bridge RR GPA. Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date 12/2/10 12/2/10 12/2/10 AC $504,569 STL in 2012. 2,982 12/2/10 0.25 Reconstruct Participation in mainline rec CON 104842 10/28/10 NA 12/2/10 0.58 Reconstruct HMA Reconstruction CON 87555 10/28/10 NA 12/2/10 Bridge restore & rehabilitate Deep Overlay CON 108364 10/28/10 NA 12/2/10 9.73 Miscellaneous Temporary HMA Crossovers CON 90040 10/28/10 NA 12/2/10 0.69 Bridge replacement Deck Replacement CON 90209 10/28/10 NA 12/2/10 Culvert Replacement CON 109691 10/28/10 NA 12/2/10 Culvert Replacement CON 106096 10/28/10 NA 12/2/10 Bridge replacement Culvert Replacement CON 106152 10/28/10 NA 12/2/10 Roadside facility Resurfacing of exisitng lot CON 42 ST 9 M 52 110708 10/28/10 NA 56 12/2/10 CON 30 EDDF 8 M 38 102947 10/28/10 NA 38 12/2/10 DBE Support Services CON 400 ST 10/28/10 NA 400 12/2/10 Resurface Carpool Lot CON 30 ST 7 M 10/28/10 NA 40 12/2/10 Regionwide DBE Support Services CON 400 ST 10/28/10 NA 400 12/2/10 South County Line to North of US-10 Crush and Shape, HMA Resurface 10/28/10 NA 10/28/10 NA 83574 10/28/10 NA 133 112174 01/06/11 NA 133 1/24/11 US-2 from 9th Street to River Street in Iron River under Champion Street, City of Marquette Pierson Road north to Cutler Road NB over Tamarack Creek At Downing Drain, North of Grant 50' East of Wythe Street NB over Br of Laporte Creek Restore & rehabilitate Restore & rehabilitate 1.20 on I-75 BL at I-75 and Cook Road interchange Schoolcraft Co Transit, Manistique 0.20 Transit vehicle additions/replacemen Vehicle Upgrade ts Regionwide at 12th Street Roadside facility 5.60 Resurface Regionwide Baseline Road to 1700' north of Baseline Road SB only 130th Avenue north to US-31 at Grayling Rest Area, Beaver Creek Twsp Washington Road to North of Polk Road Cresent Dr. to Au Sable River Bridge 37 110953 400 PE DBE Support Services CON Bridge replacement Bridge Replacement CON 0.32 Resurface Resurface CON 7.38 Restore & rehabilitate Major Rehabilitation Roadside facility Replace existing PITWS 2.80 Resurface 4.70 Restore & rehabilitate over Black River 400 90219 400 ST 400 100 EDA 33 OLF 12/2/10 400 12/2/10 12/2/10 PE 538 IM 60 M 597 106587 01/06/11 NA 15,133 1/24/11 CON 61 ST 14 M 75 110738 01/06/11 NA 75 1/24/11 Two Course HMA Overlay PE 724 NH 160 M 884 110485 01/06/11 NA 7,452 1/24/11 HMA Crack Relief Layer PE 444 NH 98 M 542 105981 01/06/11 NA 5,975 1/24/11 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name 2011 LAPEER MDOT M-24 2011 LAPEER MDOT M-24 LENAWEE Lenawee County Steger Industrial Drive Lenawee County Treat Highway 2011 2011 LENAWEE Limits 0.26 miles north of Newark Road 0.26 miles north of Newark Road Project Description Phase Federal Advance Cost Construct ($1000s) Federal Fund Source State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source MPO/ Rural Action Date Amendment Air Type Quality Comments Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date Bridge replacement Replace Culvert PE 60 HPSL 15 M 75 112269 01/06/11 NA 761 1/24/11 Bridge replacement Replace Culvert ROW 9 HPSL 2 M 11 112269 01/06/11 NA 761 1/24/11 Reconstruct Reconstruct CON Treat Highway .40 mile south of US-223 at Madison Schools north driveway Miscellaneous Approximately 1100 foot long passing flair in front of Madison Schools in order to alleviate congestion. CMAQ Grant #11033 CON 112 Miscellaneous Pedestrian Bridge CON 96 Restore & rehabilitate Aggr lift w/3 crs HMA resurf CON Roadside facility Bike/ped safety improvements CON 18.00 2011 LENAWEE Lenawee County M-34 (Main Street) Findlay Trail are within the City of Hudson; S. Maple Grove Ave. running 4000' parallel to and south of Main St. (M-34) to S. Munson Hwy at the Northwest corner of the Industrial Park. The proposed pedestrian bridge crosses the Garrison Drain West of McKenzie Dr. to connect the two trail halves. 2011 MACKINAC MDOT US-2 M-117 to Naubinway 2011 MARQUETTE Marquette Various County locations 2011 MARQUETTE MDOT 2011 MARQUETTE MDOT 2011 MENOMINEE MDOT US-41 2011 MENOMINEE MDOT US-2 2011 MONTCALM Greenville Fred Meijer Pedestrian trail outside Heartland Trail Greenville City limits 2011 MONTCALM Greenville 2011 2011 STATEWIDE STATEWIDE 2011 STATEWIDE MDOT MDOT Michigan Technolog Statewide ical University Michigan Iron Museum Access Rd Michigan Iron Museum Access Rd Length Primary Work Type Total Phase Cost MDOT Local ID ($1000s) Job No. No. 5.09 Birchview Elementary School, City of Ishpeming 326 109 CNTY 435 112179 01/06/11 NA 435 1/24/11 CM 28 CNTY 140 112412 01/06/11 NA 140 1/24/11 CM 39 OLF 135 112413 01/06/11 NA 135 1/24/11 5,565 87543 01/06/11 NA 5,788 1/24/11 170 112487 01/06/11 NA 170 1/24/11 AC 5,565 170 EDA M SRSI Tagged as AC. Moved from FY 2013 Michigan Iron Industry Museum 0.05 Miscellaneous Drainage Modifications CON 11 MIR 11 112364 01/06/11 NA 12 1/24/11 Michigan Iron Industry Museum 0.05 Miscellaneous Drainage Modifications PE 1 MIR 1 112364 01/06/11 NA 12 1/24/11 7.96 Restore & rehabilitate CRUSH&SHAPE&HMA RESURFACING UTL 50 NH 11 M 62 87551 01/06/11 NA 4,360 1/24/11 Traffic ops/safety Message Sign installation CON 8 ST 2 M 10 112099 01/06/11 NA 10 1/24/11 Miscellaneous Complete portion of ped trail CON 640 HPSL 160 M 800 102229 01/06/11 NA 860 1/24/11 Miscellaneous Complete portion of ped trail CON 240 HPSL 300 111527 01/06/11 NA 300 1/24/11 Miscellaneous Roadside facility Training BOH FY 2011 Pavement Markings EPE CON 1,000 12 ST ST 3 M 1,000 110435 15 110735 01/06/11 01/06/11 NA NA 1,000 15 1/24/11 1/24/11 Miscellaneous 2011 MERL Program EPE 73 STT 18 M 92 112265 01/06/11 NA 92 1/24/11 COUNTY ROAD G-12 TO BAGLEY At the Powers Weigh Station Hillcrest to Meijer Drive Fred Meijer along Greenville West Heartland Trail + Statewide Statewide Regionwide Various Locations At LTAP Center at MTU 0.93 60 CITY Demo ID MI 176, HPP #1548 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits Jackson US127-Village of Jefferson Rd County Brooklyn Length 2012 JACKSON 2011 STATEWIDE Rural Task Rural Task Forces Force Statewide 2011 BERRIEN Berrien County Areawide Areawide 2011 CASS Cass County Countywide Countywide 2011 CHIPPEWA MDOT M-28 west of I-75 at Dafter TST 0.10 2011 HILLSDALE MDOT US-12 East of Jonesville 0.01 Iosco County Lenawee County Lenawee County Midland County Monument Road M-52 and US223 M-52 and US223 Monument and Wilber Roads (MI PFH 11) M-52 @ M-34 and US223 @ Division St M-52 @ M-34 and US223 @ Division St Bay City Road Multiple M-25 Dickerson Road to Ringle Road 2011 IOSCO 2011 LENAWEE 2011 LENAWEE 2011 MIDLAND 5.50 17.49 Primary Work Type CM 15 OLF 75 112683 03/04/11 EPE 56 CM 14 CNTY 70 112678 CON CON Reconstruct Traffic ops/safety MDOT Terry and Fullerton Streets 2012 MONTCALM MDOT US-131 NA 70 3/31/11 110631 03/04/11 NA 3/31/11 110621 03/04/11 NA 3/31/11 03/04/11 NA 710 3/31/11 03/04/11 NA 350 3/31/11 PE 44 CMG 44 112818 03/04/11 NA 350 3/31/11 5,328 112178 03/04/11 NA 5,328 3/31/11 250 90283 03/04/11 NA 4,283 3/31/11 12 112753 03/04/11 NA 12 3/31/11 7 103284 03/04/11 NA 7 3/31/11 6,697 113443 03/17/11 NA 7,279 3/31/11 12 CMG CON 5 ST CON 6,697 45 1 EDA 1,697 CNTY M M NRT 107609 03/17/11 NA Noble and Burns Elementary Schools, Detroit Miscellaneous Bike/ped safety improvements CON 111432 03/17/11 NA at M-82 SW Quadrant Roadside facility 2011 LENAWEE Adrian LENAWEE Lenawee County MDOT M-20 MECOSTA 03/04/11 CON LAPEER 2011 3/31/11 ITS System Modifications 2011 2011 75 Traffic ops/safety WB I-69, M-24 to WB I-69 Lapeer/St Clair COL Treat St-Eastern City Beecher Street Limit Adrian City Limits-Parr Beecher Hwy MDOT NA 306 112818 EPE Roadside facility 3/31/11 200 105167 NH Statewide 29,169 FFH 3,632 CNTY 29,169 CMG 205 40 CNTY 306 ROW Crack seal carpool lot surface Improvements to three recreational trails plus program audit costs 6,506 M-20 @ Schrader Creek 17.16 0.44 Restore & rehabilitate Resurface carpool lot with Minor Widening Conc Pavt Rprs, Diamond Grind Reconstruct Reconstruct Reconstruct Reconstruct New route/structure (capacity increase) New Bridge on Existing Route 1/24/11 160 Resurface Roadside facility M Comments Project is in Jackson MPO. Cost has been administratively reduced 02/16/2011 Federal Approval EJ Date PE CON at I-69 3,984 Amendment Air Type Quality Total Project Cost Local ($1000s) x Priority CON HMA Overlay with Shoulders I-94 BL STATEWIDE Traffic Signal Modernization Traffic Signal Modernization Resurface MDOT 2011 Reconstruct Reconstruct CALHOUN 1.00 NA 60 2013 Various locations in Metro Region 02/16/11 EPE Transit vehicle additions/replacemen Bus replacement ts Transit vehicle additions/replacemen Bus Replacement ts New route/structure Construct New PITWS (capacity increase) Install Wireless Roadside facility equipment Miscellaneous Regionwide NA ST Countywide MDOT 01/06/11 18,679 Van Buren Countywide County STATEWIDE 111815 CON VAN BUREN 2011 Local Fund Source Rural Task Force Program - Road Projects 2011 MDNR Local Cost ($1000s) Miscellaneous MDOT STATEWIDE State Fund Source CON TUSCOLA 2011 State Cost ($1000s) Resurface 2011 FY 2011 Recreational Trails Program Phase Federal Fund Source MPO/ Rural Action Date Resurface Traffic ops/safety 5.44 Project Description Federal Advance Cost Construct ($1000s) Total Phase Cost MDOT Local ID ($1000s) Job No. No. 4,605 3/31/11 03/18/11 NA 469 3/31/11 03/18/11 NA 375 3/31/11 8,760 5/23/11 9 M 51 102916 03/17/11 NA PE 94 IM 10 M 105 108689 03/18/11 CON 375 EDF 94 CITY 469 110967 CON 300 EDF 75 CNTY 375 110969 M 7,800 73737 3/31/11 NA ST 7,800 3/31/11 3/31/11 42 AC Programmed as a Statewide project and should be in SEMCOG TIP. Programmed as a Statewide project and should be in SEMCOG TIP. Year change from FY 2011 to FY 2012 51 CON CON MI PFH 11. 04/01/11 NA Administrative change on 04/01/2011 to AC project. FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits Length Primary Work Type Project Description Phase Federal Advance Cost Construct ($1000s) Federal Fund Source State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source Total Phase Cost MDOT Local ID ($1000s) Job No. No. MPO/ Rural Action Date Amendment Air Type Quality 5/23/11 RCWD Project - split out from JN 101361. 3,339 5/23/11 NA RCWD Project - split out from JN 101361. 3,339 5/23/11 04/01/11 NA Cost increase for state and local funds 86,277 5/23/11 Moved from FY 2012 to FY 2011 4,120 5/23/11 STATEWIDE MDOT Statewide Statewide Miscellaneous FY 2011 RCWD Program EPE 834 ST 834 101361 04/01/11 NA 2011 STATEWIDE MDOT Statewide Statewide Miscellaneous FY 2011 CTP (RCWD) Program EPE 100 ST 100 113339 04/01/11 NA 2011 STATEWIDE MDOT Statewide Statewide Miscellaneous FY 2011 TRAC (RCWD) Program EPE 70 ST 70 113342 04/01/11 2011 STATEWIDE MDOT Section 5311 Transit operations Non-UZA Formula 2011 CHEBOYGAN MDOT US-23 6.84 Restore & rehabilitate Crush & Shape, HMA Resurface CON 2011 CHEBOYGAN MDOT US-23 6.84 Restore & rehabilitate Crush & Shape, HMA Resurface UTL 2011 GLADWIN Gladwin County Judy Mae Reconstruct RCNSTRCT CON 2011 HOUGHTON MDOT M-26 2011 IONIA 2011 2011 MDOT I-96 EB IOSCO MDOT US-23 MIDLAND Midland County Waldo Avenue from Cheboygan east county line to Cordwood from Cheboygan east county line to Cordwood Blades Rd to Judy Mae St; M-18 to Von Dale St M-26, Houghton County at the Saranac Rest Area #532 AuSable River Bridge to F-41 Salzburg Road to 3,700 feet north 3.13 Resurface 0.54 Roadside facility 1.85 Reconstruct Reconstruct 2011 STATEWIDE MDOT Statewide Statewide 2011 STATEWIDE MDOT Statewide Statewide 0.01 Miscellaneous 2011 STATEWIDE MDOT Grand Region Grand Region 56.03 Traffic ops/safety 2011 STATEWIDE MDOT 2011 STATEWIDE MDOT 2011 STATEWIDE MDOT 2011 STATEWIDE MDOT 2011 STATEWIDE MDOT 2011 STATEWIDE CPM Road Trunkline GPA Enhancements Trunkline GPA Miscellaneous Mill & Two Course Overlay Building Replacement/Site Work Hot Mix Asphalt Reconstruction RCNSTRCT FY 11 fed const proj training Wetland Mitigation/Monitoring Freeway Signing Upgrade 16,759 AC 41 PE CON ROW 5311 224 ST ST AC 65 NH CON 30,014 M 3,820 M 3,820 79651 04/20/11 NA 9 M 50 79651 04/20/11 NA 4,727 5/23/11 224 113424 04/20/11 NA 224 5/23/11 274 107008 04/20/11 NA 4,032 5/23/11 4,150 5/23/11 202 EDA 50 M 39,503 22 TRAL CNTY 86,277 Federal Approval EJ Date 3,339 2011 T-Ops Comments Cost reduced to split out the three new RCWD JNs - JN 113339, JN 113341, and JN 113342. Total Project Cost Local ($1000s) x Priority Moved from FY 2012 to FY 2011 3,850 M 3,850 101616 04/20/11 NA 15 M 80 90192 04/20/11 NA 7,813 5/23/11 451 EDA 1,002 113421 04/20/11 NA 1,002 5/23/11 551 CNTY CON 491 ST 109 M 600 112186 04/20/11 NA 1,200 5/23/11 CON 491 ST 109 M 600 113244 04/20/11 NA 600 5/23/11 PE 555 IMG 555 113334 04/20/11 NA 4,810 5/23/11 Statewide GPA CPM Road Trunkline CON 32,074 ST 7,029 M 58 CNTY 39,161 04/20/11 NA 39,161 5/23/11 Statewide GPA Enhancements Trunkline CON 2,257 STE 281 M 738 CNTY 3,276 04/20/11 NA 3,276 5/23/11 Highway Safety Statewide Trunkline GPA GPA Highway Safety Trunkline CON 24,304 ST 239 M 24,543 04/20/11 NA 24,543 5/23/11 Regionwide GPA Rural Bridge Replacement and Rehabilitate Trunkline CON 19,590 ST 4,391 M 98 OLF 24,079 04/20/11 NA 24,079 5/23/11 Regionwide GPA Rural Highway Rehab and Reconstruct Trunkline CON 20,666 ST 4,460 M 568 CNTY 25,693 04/20/11 NA 25,693 5/23/11 Regionwide GPA Enhancements Local CON 4,200 STE 2,007 CNTY 6,207 04/20/11 NA 6,207 5/23/11 Rural Bridge Replacement and Rehabilitate Trunkline GPA Rural Highway Rehab and Reconstruct Trunkline GPA Enhancements Local GPA FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits 2011 STATEWIDE 2011 TUSCOLA MDOT M-25 Bay/Tuscola County Line to Dickerson Road 2012 CALHOUN MDOT I-94 17 1/2 to 23 Mile Road 2012 CALHOUN MDOT 2011 DICKINSON Dickinson Fifth Street County 2011 MARQUETTE Negaunee Croix Street 2011 STATEWIDE MDOT 2012 GOGEBIC MDOT 2012 GRAND TRAVERSE MDOT 2012 GRATIOT MDOT 2012 IOSCO MDOT 2012 LAPEER 2012 SANILAC MDOT Sanilac County 2013 2013 I-94 State of Good Repair FTA Grant From US-41 to Maas Street, City of Negaunee CHIPPEWA MDOT M-28 Racco Conc Section IONIA Ionia County Cleveland Street Over Grand River, Ionia Co 6 Mile Rd north to 13 Mile Rd N. of M-186 south to US-131 28th Street east to Kalamazoo Street 23 Mile Road to 29 Mile Road From County Road 581 to Lerza Road MECOSTA MDOT US-131 SB GRAND TRAVERSE MDOT M-113 2011 ALLEGAN MDOT M-89 2011 CALHOUN MDOT I-94 WB DICKINSON Dickinson Leeman Road County EMMET MDOT US-31 2011 GOGEBIC MDOT US-2 2011 GRATIOT MDOT US-127 2011 IONIA MDOT M-66 Paradise Tr to I-75 US-2 EB, between Tamarack Street and Pine Street North of Polk Road to North of Van Buren Road South of GRE RR north to M-21 Phase Federal Fund Source State Cost ($1000s) State Fund Source Highway Safety Local CON 5,567 STH 234 M 5.43 Resurface HMA Mill & Overlay ROW 8 NH 2 M 5.30 Resurface 1,382 IM 154 4.45 Resurface SUB 459 IM 51 0.50 Multiple Course HMA Overlay Multiple Course HMA Overlay 5.09 2.00 1.04 0.38 5.14 7.33 5.09 PE Roadside facility Bike/Ped safety improvements CON 212 SRSI Roadside facility Parking reconstruction CON 500 OFHWA Bus Transit vehicle additions/replacemen replacements/additions for 19 transit agencies ts Statewide at Lakeshore Drive in Wakefield N. of M-186 south to M-113 US-131 Northwest quadrant of M-57 the US-127/M-57 interchange South of Aster Road US-23 to north of Point Road M-24 over Plum Creek M90 to North City Maple Valley Rd Limits 2013 2011 17 1/2 to 21 1/2 Mile Road North Elementary School, City of Iron Mountain Project Description Federal Advance Cost Construct ($1000s) GPA US-2 2014 2011 Length Highway Safety Statewide Local GPA Primary Work Type T-Cap 3,834 5309 Local Cost ($1000s) 990 CNTY Amendment Air Type Quality Comments Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date NA 6,791 5/23/11 10 86950 04/20/11 NA 4,142 5/23/11 M 1,536 110138 04/20/11 NA 18,900 5/23/11 M 510 110138 04/20/11 NA 510 5/23/11 212 110131 04/21/11 NA 212 5/23/11 713 108731 04/21/11 NA Funding source DSTP (not available in drop down menu). 713 5/23/11 04/21/11 NA State of Good Repair Grant 4,793 5/23/11 CITY CTF 6,791 MPO/ Rural Action Date 04/20/11 213 959 Local Fund Source Total Phase Cost MDOT Local ID ($1000s) Job No. No. 4,793 Moved from FY 2011 to FY 2012 Roadside facility New Carpool Lot CON 34 ST 7 M 41 112331 04/21/11 NA 45 5/23/11 Restore & rehabilitate Crush and Shape ROW 25 ST 5 M 30 103027 04/21/11 NA 4,085 5/23/11 Roadside facility Resurfacing of existing Lot CON 36 ST 8 M 44 113219 04/21/11 NA 44 5/23/11 Restore & rehabilitate Bridge replacement Passing Lane Rehabilitation Bridge Replacement PE 350 NH 78 M 428 109659 04/21/11 NA 4,064 5/23/11 CON 572 BHT 143 M 715 102796 04/21/11 NA 815 5/23/11 Resurface resurface CON 113 EDF 141 112606 04/21/11 NA 141 5/23/11 Restore & rehabilitate Restore & rehabilitate Restore & rehabilitate Restore & rehabilitate Aggregate lift w/ 3 Crs HMA CON AC 5,923 M 5,923 103229 04/21/11 NA 6,121 5/23/11 Bridge Rehab CON AC 4,243 M 4,466 112262 04/21/11 NA 4,466 5/23/11 7.52 Reconstruct 6.20 Resurface 28 223 CNTY CNTY Crush & Shape CON AC 5,800 M 5,800 109049 04/21/11 NA 6,000 5/23/11 Crush and Shape CON AC 3,420 M 3,420 103027 04/21/11 NA 4,085 5/23/11 5,675 5/23/11 14,900 5/23/11 93 5/23/11 4,371 5/23/11 Multi Cse HMA Ovly & Pavt Repr Multiple Course HMA overlay Pavement marking and gravel shoulder CON 3,132 ST 695 M 3,827 87249 05/05/11 NA CON 10,218 IM 1,135 M 11,353 86970 05/05/11 NA CON 74 13 M 93 113456 05/05/11 NA Obligated as regular federal aid Obligated as regular federal aid 7.15 Traffic ops/safety 5.12 Restore & rehabilitate Crush & Shape CON 3,375 NH 748 M 4,123 103443 05/05/11 NA 0.24 Roadside facility Construct PITWS CON 84 ST 19 M 103 113409 05/05/11 NA 110 5/23/11 2.69 Resurface Two Course HMA Overlay PE 284 NH 63 M 347 112711 05/05/11 NA 7,590 5/23/11 0.53 Reconstruct Concrete Reconstruction CON 2,152 ST 477 M 3,764 90033 05/05/11 NA 4,224 5/23/11 HPSL 6 1,135 CNTY CITY Obligated as regular federal aid Obligated as regular federal aid FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits 2011 MONTCALM Meijer Fred Meijer Drive/Maplewood Drive Greenville Heartland Trail to W Baldwin Lake Dr 2011 ROSCOMMON MDOT M-55 Roscommon Co WCL to US-127 2.21 0.18 2011 HURON MDOT M-25 from County Road to Caseville County Park 2011 IOSCO Oscoda County Arrow Street Mission Drive-F41 2011 LENAWEE MDOT M-50 2011 LENAWEE Tecumseh Russell Road 2011 MENOMINEE MDOT M-35 2011 OCEANA MDOT M-20 2011 ROSCOMMON 2011 STATEWIDE 2011 MDOT M-55 Ridge Hwy to the EVL of Britton, Lenawee County 300' W of S Evans StMill Hwy Jimtown road South 9.42 miles MDOT Statewide 2011 TUSCOLA Tuscola County Colling Rd 2012 ALGER MDOT M-94 2012 BERRIEN MDOT I-94 at Nickerson Ave in Benton Township 2012 BRANCH MDOT US-12 over Michigan Southern Railroad I-94 BL 2012 IONIA MDOT I-96 2012 IOSCO MDOT M-65 2012 IOSCO MDOT US-23 2012 IOSCO MDOT US-23 2012 2012 MIDLAND MONTCALM MDOT MDOT US-10 US-131 72 Restore & rehabilitate Crush and shape CON 3,248 ST 720 Widen - minor Construct shoulder improvements and HMA paving to extend the existing dedicated centerleft turn lane. The `A? Phase CMAQ grant number is 11120. CON 251 CM Reconstruct Reconstruct CON Resurface HMA Mill and Resurface CON Resurface Resurface CON Restore & rehabilitate Coldmilling and Resurfacing Crack Sealing - carpool lot Restore & rehabilitate 2.21 Traffic ops/safety Statewide Miscellaneous Gilford Rd-Deckerville Rd. at M-67 & 94 intersection in Alger County 0.19 05/05/11 NA M 3,969 106683 05/05/11 NA 63 M 314 113532 05/26/11 375 EDF 510 110965 4,380 5/23/11 NA 314 7/11/11 05/26/11 NA 510 7/11/11 3,586 87514 05/26/11 NA 3,959 7/11/11 179 110963 05/26/11 179 7/11/11 433 110682 05/26/11 NA 6,135 7/11/11 CON 87479 05/26/11 NA ROW 106683 05/26/11 NA 3,586 354 ST CNTY M 115 EDF 79 M 64 CITY EPE CON M 181 M 13 M 25 112185 05/26/11 227 110968 05/26/11 NA 69 113745 05/26/11 NA Roadside facility Resurface existing lot CON 103293 05/26/11 NA Bridge Replacement CON 108712 05/26/11 NA Roadside facility 0.74 5.97 Restore & rehabilitate Restore & rehabilitate Restore & rehabilitate Restore & rehabilitate Roadside facility ST CNTY NA CON 57 46 05/26/11 Expand existing lot for additional parking Expansion and HMA Overlay Joint Repairs & Skip Patching AC 25 111293 Roadside facility Bridge replacement Comments Federal Approval EJ Date 5/23/11 PE 90 113481 135 CITY Amendment Air Type Quality Total Project Cost Local ($1000s) x Priority 90 AC 18 Local Fund Source CON Restore & rehabilitate 2.71 2011 Control Room Ops. WMTMC FY11 state const proj training HPSL Local Cost ($1000s) Resurface at I-69, Marshall 3.83 Crush and shape State Fund Source MPO/ Rural Action Date Resurface at Ionia Weigh Station Ramps Turtle Rd to 1200' North of Sherman Street Auelrich Road to Kirkland Drive Auelrich Road to Kirkland Drive Four bridges along US10 in Midland County at 22 Mile Road/ M-46 NW Quadrant 3.83 State Cost ($1000s) CON Roadside facility STATEWIDE MDOT 9.42 Phase Federal Fund Source Construct Multi-use path Roscommon Co WCL to US-127 Various locations in the Grand Region Regionwide CALHOUN 2.16 Project Description Federal Advance Cost Construct ($1000s) Roadside facility at US-31 NE Quadrant MDOT 2012 Length Primary Work Type Total Phase Cost MDOT Local ID ($1000s) Job No. No. Obligated as regular federal aid Moved from FY 2012 Moved from FY 2013 7/11/11 7/11/11 Project is in Grand Rapids TIP Obligated as AC 7/11/11 50 7/11/11 227 7/11/11 73 7/11/11 Project is now entirely in the Benton Harbor - St. Joseph MPO. Moved to Illustrative List 7/11/11 7/11/11 CON 83 ST 19 M 102 113658 05/26/11 NA 113 7/11/11 CON 415 ST 92 M 507 110024 05/26/11 NA 507 7/11/11 ROW 41 ST 9 M 50 79433 05/26/11 NA 4,534 7/11/11 HMA Crack Relief Layer PE 390 NH 86 M 476 112946 05/26/11 NA 5,517 7/11/11 HMA Crack Relief Layer ROW 10 M 10 112946 05/26/11 NA 5,517 7/11/11 Crush & Shape, Resurface Deep Overlay CON 108695 05/26/11 NA Crack Sealing - carpool lot CON 102922 05/26/11 NA Moved from FY 2011 Moved to Illustrative List 7/11/11 7/11/11 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name 2012 SCHOOLCRAFT MDOT M-28 2012 STATEWIDE Regionwide 2013 2013 2013 ALLEGAN BRANCH BRANCH MDOT MDOT MDOT MDOT I-196 US-12 I-69 NB 2013 IONIA MDOT M-66 2013 LAPEER MDOT M-24 2013 MARQUETTE MDOT US-41 2013 MECOSTA MDOT US-131 NB Limits between the Seeney Rest Area and Seeney Various Locations in Superior Region SB only 130th Avenue north to US-31 2013 ROSCOMMON MDOT US-127 2013 STATEWIDE MDOT Regionwide Various locations in Bay Region 2013 2014 VAN BUREN ALLEGAN MDOT MDOT I-94 US-131 2014 BRANCH MDOT I-69 NB DICKINSON MDOT US-2 2014 DICKINSON MDOT M-69 2014 LIVINGSTON MDOT I-96 2014 LUCE MDOT M-28 2014 MENOMINEE MDOT M-35 2014 2014 ST. JOSEPH STATEWIDE MDOT MDOT M-60 3.70 at Mattawan under M-222 at Coldwater Weigh Station US-2 from Dawn's Lake Road to Baler Road Project Description Thickened pavement section for WIM Phase Federal Advance Cost Construct ($1000s) Federal Fund Source State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source MPO/ Rural Action Date Amendment Air Type Quality ST 36 M 200 113746 05/26/11 NA 210 7/11/11 27 ST 6 M 33 113497 05/26/11 NA 36 7/11/11 106587 05/26/11 NA CON Major Rehabilitation CON Roadside facility Crack seal carpool lot surface CON 6 ST 1 M 8 103283 05/26/11 NA Roadside facility Pavement Rehabilitation CON 443 ST 98 M 541 113731 05/26/11 Roadside facility Resurface of existing carpool lot. CON 49 ST 11 M 60 113528 Miscellaneous Replace Culvert CON 540 HPSL 135 M 0.33 Roadside facility Construct New Carpool Lot CON 55 ST 12 7.37 Restore & rehabilitate Coldmill, C&S, HMA Resurface PE 632 NH 10.75 Restore & rehabilitate Crush and shape and resurface and cold milling PE 384 NH Roadside facility Lighting for Carpool Lots Roadside facility Bridge replacement 0.68 0.68 0.95 0.16 0.20 9.42 1.09 Federal Approval EJ Date 164 Sign Upgrades 7.38 Comments Total Project Cost Local ($1000s) x Priority CON Restore & rehabilitate at M-95/M-69 south intersection (Randville) US-23 NB over I-96 WB Adjacent to Luce Co Airport Jimtown road South 9.42 miles In the village of Mendon Reconstruct Roadside facility at I-69 at Coldwater Weigh Station at M-44 (Belding Rd) SW Quadrant 0.26 miles north of Newark Road US-41/M-28, Negaunee, Marquette County 6 Mile Road north to 13 Mile Road M-55 to Muskegon River Bridge 2014 Length Primary Work Type Total Phase Cost MDOT Local ID ($1000s) Job No. No. 7/11/11 8 7/11/11 NA 616 7/11/11 05/26/11 NA 60 7/11/11 675 112269 05/26/11 NA 761 7/11/11 M 68 113713 05/26/11 NA 75 7/11/11 140 M 772 112464 05/26/11 NA 7,257 7/11/11 85 M 469 113455 05/26/11 NA 10,794 7/11/11 CON 103395 05/26/11 NA Resurface carpool lots Bridge Replacement CON CON 103295 73748 05/26/11 05/26/11 NA NA Roadside facility Scale and Signage CON 688 ST 152 M 840 113769 05/26/11 NA 960 7/11/11 Reconstruct Pavt Rem, HMA reconstruct, Drainage improvements PE 409 NH 91 M 500 113708 05/26/11 NA 4,000 7/11/11 Roadside facility Milling and Resurfacing of Carpool Lot CON 54 ST 12 M 66 113722 05/26/11 NA 69 7/11/11 Bridge replacement Bridge Replacement CON 112877 05/26/11 NA In SEMCOG TIP Moved from FY 2012 New route/structure (capacity increase) Restore & rehabilitate Construct New PITWS CON Coldmilling and Resurfacing CON 82 ST AC 18 M 100 110632 05/26/11 NA 5,465 M 5,465 110682 05/26/11 NA Reconstruct Roadway Reconstruction CON 103154 05/26/11 NA Traffic ops/safety Transportation Mgmt Center CON 107436 05/26/11 NA 110107 05/26/11 NA Regionwide Superior Region 7.22 Resurface Two Course HMA Overlay CON Moved from FY 2012 Project is now entirely within the Saginaw MPO 7/11/11 7/11/11 7/11/11 7/11/11 103 7/11/11 6,201 7/11/11 Moved to Illustrative List Moved to Illustrative List Moved to Illustrative List 7/11/11 7/11/11 2014 VAN BUREN MDOT M-140 City of Watervliet to CR 378 2012 ALLEGAN MDOT US-131 under M-89, Plainwell 0.39 Restore & rehabilitate Deep Overlay, Pt, Railing Repl CON 1,729 NH 1,729 89306 06/01/11 NA TLCR - Toll Credit Amount is $313,771. 1,844 7/11/11 2012 CHARLEVOIX MDOT M-66 Hugh Street to Sequonta Road 8.35 Resurface Mill and Fill CON 1,541 NH 1,541 113115 06/01/11 NA TLCR - Toll Credit Amount is $279,664. 1,664 7/11/11 2012 CHEBOYGAN MDOT M-68 east of King Road to west of Old 27 2.05 Reconstruct HMA crack relief layer CON 3,367 ST 3,367 110536 06/01/11 NA TLCR - Toll Credit Amount is $611,174. 3,737 7/11/11 7/11/11 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits Length Primary Work Type Project Description Phase Federal Advance Cost Construct ($1000s) Federal Fund Source State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source Total Phase Cost MDOT Local ID ($1000s) Job No. No. MPO/ Rural Action Date Resurface Tru-Pave & Fiber Mat w/HMA Oly CON 2,772 NH 2,772 113138 06/01/11 Amendment Air Type Quality Comments Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date NA TLCR - Toll Credit Amount is $503,112. 3,001 7/11/11 2012 CHIPPEWA MDOT I-75 N of M-28 to 3 Mi Rd. Exit 2012 HILLSDALE MDOT M-34 M-34, M-99 to US-127 10.51 Resurface Double Microsurface Treatment CON 1,060 ST 1,060 113563 06/01/11 NA TLCR - Toll Credit Amount is $192,467. 1,091 7/11/11 2012 IONIA MDOT M-21 Detmers Rd to Lincoln Ave 3.25 Resurface Mill, ASCRL, HMA Resurface CON 2,490 ST 2,490 59567 06/01/11 NA TLCR - Toll Credit Amount is $451,934. 2,665 7/11/11 2012 IONIA MDOT I-96 M-66 east to the Ionia East County Line 12.99 Restore & rehabilitate Concrete Joint Repairs CON 2,359 IM 2,359 109045 06/01/11 NA TLCR - Toll Credit Amount is $235,900. 2,359 7/11/11 2012 IOSCO MDOT US-23 AuSable River Bridge to F-41 1.85 Reconstruct Hot Mix Asphalt Reconstruction CON 7,281 NH 7,281 90192 06/01/11 NA Moved from FY 2014. TLCR - Toll Credit Amount is $1,321,477. 7,420 7/11/11 2012 LENAWEE MDOT US-223 over River Raisin 0.24 Bridge replacement Bridge replacement CON 2,763 BRT 2,763 102851 06/01/11 NA TLCR - Toll Credit Amount is $552,649. 3,004 7/11/11 2012 LENAWEE MDOT M-52 South north to Valley James River Rd to US223 4.11 Resurface Single Course M&F CON 2,324 ST 2,324 113164 06/01/11 NA TLCR - Toll Credit Amount is $421,728. 2,390 7/11/11 2012 MECOSTA MDOT US-131 OLD 19 Mile to Mecosta/Osceola County Line 5.02 Resurface Mill, Fiber Mat & Resurface CON 3,500 ST 3,500 88885 06/01/11 NA TLCR - Toll Credit Amount is $635,250. 3,782 7/11/11 2012 OGEMAW MDOT I-75 BL I-75 to Woodland Dr 2.08 Restore & rehabilitate HMA inlay CON 5,117 NH 5,117 103442 06/01/11 NA TLCR - Toll Credit Amount is 928,723. 5,454 7/11/11 28.64 Resurface Single Course Chip Seal CON 1,278 ST 1,278 113337 06/01/11 NA TLCR - Toll Credit Amount is $231,895. 1,314 7/11/11 243.19 Roadside facility ITS applications CON 2,021 NH 2,021 106682 06/01/11 NA TLCR - Toll Credit Amount is $366,821. 2,499 7/11/11 Miscellaneous Dynamic Message Signs CON 1,485 HSIP 1,485 109707 06/01/11 NA TLCR - Toll Credit Amount is $148,500. 1,710 7/11/11 Resurface Crack treatment CON 400 ST 400 113489 06/01/11 NA 411 7/11/11 Resurface HMA CRACK SEALING AND OVERBAND CON 430 ST 430 113544 06/01/11 NA 450 7/11/11 Resurface HMA Crack Treatment CON 443 ST 443 113613 06/01/11 NA 450 7/11/11 Reconstruct Remove and replace pavement CON 2,529 NH 2,529 103028 06/01/11 NA TLCR - Toll Credit Amount is $459,017. 2,652 7/11/11 296 06/15/11 NA 296 7/11/11 635 103027 06/29/11 NA Moved from FY 2012 4,085 7/11/11 2012 PRESQUE ISLE MDOT M-33 M-33, Presque Isle County M-72, Alcona County 2012 ROSCOMMON MDOT Statewide Multiple locations on I75 2012 STATEWIDE MDOT I-94 Indiana State Line to M40 2012 STATEWIDE MDOT TSC Wide TSC Wide 2012 STATEWIDE MDOT Region Wide LANSING TSC WIDE 2012 STATEWIDE MDOT Various TSC Wide 2012 WEXFORD MDOT M-115 45 Road to west of 48 1/2 Road 2012 STATEWIDE GRAND TRAVERSE 2011 2011 2011 2011 2012 MDOT Section 5311 MDOT M-113 Statewide N. of M-186 south to US-131 The Grand River north to GRE RR IONIA MDOT M-66 LENAWEE Lenawee County US-12 US-12 at M-50 M-94 M-94 over C & NW RAILROAD MARQUETTE ROSCOMMON MDOT MDOT US-127 Muskegon River north 5.63 6.72 4.08 1.49 5.09 0.53 0.04 Transit operations Restore & rehabilitate Restore & rehabilitate Pvt Repairs & Diamond Grinding CON 109051 06/29/11 NA Roadside facility Historic Preservation CON 112479 06/29/11 NA CON 112757 06/29/11 NA 502 106863 06/29/11 NA 0.42 Bridge - other 3.75 Restore & rehabilitate RTAP Crush and Shape Conc Box Beam Replacement Cold milling; crush and shape T-Ops 296 5311 PE 520 ST PE 411 NH 115 91 M M TLCR - Toll Credit Amount is $72,599. TLCR - Toll Credit Amount is $77,963. TLCR - Toll Credit Amount is $80,450. Project moved to Hwy RR GPA Moved to Local Enhancement GPA Moved to Trunkline Crossings GPA Moved from FY 2011 7/11/11 7/11/11 7/11/11 502 7/11/11 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits At Grand Trunk Western in Jefferson Township 2011 CASS Cass County 2011 STATEWIDE MDOT I-94 Various locations from MI/IN border to I-69 2011 STATEWIDE MDOT I-94 2012 STATEWIDE MDOT I-94 2012 STATEWIDE MDOT Section 5310 Evan Street Length Primary Work Type Traffic ops/safety Project Description 1,760 113689 06/30/11 NA Actual federal fund source is TPFD Truck Parking Federal Discretionary 1,760 7/11/11 60 M 300 113689 06/30/11 NA Actual federal fund source is TPFD Truck Parking Federal Discretionary 300 7/11/11 OFHWA 460 M 2,300 113689 06/30/11 NA Actual federal fund source is TPFD Truck Parking Federal Discretionary 2,300 7/11/11 5310 375 M 1,875 07/01/11 NA 2,770 7/11/11 60 7/11/11 67 8/8/11 1,000 8/8/11 242 8/8/11 118 8/11/11 352 Various locations from MI/IN border to I-69 104.00 Miscellaneous Truck Parking & Info Management System PE 240 OFHWA Various locations from MI/IN border to I-69 104.00 Miscellaneous Truck Parking & Info Management System CON 1,840 T-Ops 1,500 Transit vehicle Purchase 2 vans. CMAQ additions/replacemen Grant# 11111 ts M-109 Trailway Project, Leelanau Scenic Heritage Route Benzie County CON 48 CM 12 CNTY 60 112962 07/06/11 NA EPE 54 CM 13 OLF 67 112951 08/08/11 NA Roadside facility Trail way along M-22 and M-109 Highways in Sleeping Bear Dunes National Lakeshore from Hunter Road to South Forest Haven Drive Admin Change 08/08/2011 updated project description. CON 800 SBD 1,000 108626 08/08/11 NA Admin Change 08/08/2011 updated limits and project description. Center LT lane with bike lane CON 193 CM 48 OLF 242 112958 08/08/11 NA T-Cap 95 CM 24 OLF 118 112952 08/10/11 NA 2011 LEELANAU MDOT 2011 VAN BUREN from I-94 to Main Van Buren S. Center Street Street in City of County Hartford Miscellaneous 2011 MASON Ludington Areawide MTA Transit vehicle additions/replacemen Bus replacement ts Areawide 3.20 Comments Federal Approval EJ Date M OFHWA Countywide BENZIE Amendment Air Type Quality NA 1,408 Countywide 2011 Local Fund Source 06/30/11 EPE Miscellaneous Local Cost ($1000s) Total Project Cost Local ($1000s) x Priority 112414 Truck Parking & Info Management System CMAQ Grant # 11117 Install and construct 400' of an 8' wide sidewalk on Red Arrow Highway and 1,800' of a 6' wide sidewalk along Medical Park Drive and a public easement, to alleviate air emissions and to complete a connecting pathway between the Cobblestone Village Senior Housing Development and downtown area. State Fund Source MPO/ Rural Action Date Project is included in the Local Rail GPA 104.00 Miscellaneous Elderly and Disabled BERRIEN State Cost ($1000s) CON Transit operations 2011 Federal Fund Source Install overhead lighting Commencing at Watervliet High School and extending east on the south side of Red Arrow Highway (St. Joseph Avenue) to Medical Park Drive, then continuing south on the west side of Medical Park Drive to Cobblestone Village Senior Housing Development by way of a public easement Red Arrow Highway (St. Joseph Avenue), City of Watervliet Medical Park Drive and public easement Phase Federal Advance Cost Construct ($1000s) Total Phase Cost MDOT Local ID ($1000s) Job No. No. 200 M Admin Change 08/08/2011 updated the cost information. Admin Change 08/10/2011 Updated the Responsible Agency to Ludington MTA. CMAQ Grant# 11112. 7/11/11 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year 2011 County LAPEER Optional Fields Responsible Agency Project Name Limits Greater Lapeer Transport Areawide Areawide ation Authority 2011 STATEWIDE Michigan 1/4 mile southwest of Departme White Pine Trail McKinley Road nt of extending 1.6 Natural Resources 2011 ALLEGAN MDOT Length Primary Work Type Project Description Phase CMAQ Grant # 11145 Replace one bus with one Transit vehicle additions/replacemen medium duty clean diesel T-Cap bus. ts 135 CMG 216 HPSL Roadside facility Construct multi-use path CON 0.40 Miscellaneous Slope Stabilization CON Implementation of marketing and interpretive kiosks at Tahquamenon Heritage Route EPE 82 SBD PE 10 HPP PE 230 FLH M-222 West of Eastern Avenue M-28/M-123 west jct to M-28/M-123 east jct 62.51 Roadside facility US-31 @ Manvel Rd 0.29 Widen - minor Houghton/Ontonagon CL South 7.8 Mi 7.80 Resurface 3.60 Roadside facility Restoration of existing rock walls and rock fence. 3.34 Miscellaneous Design for a Nonmotorized trail-way CHIPPEWA MDOT M-123 2011 EMMET MDOT US-31 2011 HOUGHTON Houghton Federal Forest County Road 16 2011 KEWEENAW Top of Brockway Keweena Brockway Mountain Loop to w County Mountain Drive Cooper Harbor 2011 LEELANAU MDOT M-22 at Sleeping Bear Heritage Trail 2011 LENAWEE Lenawee County Treat Highway at .40 miles south of US-223 @ Madison Schools north driveway Miscellaneous 2011 LENAWEE Lenawee County Treat Highway at .40 miles south of US-223 @ Madison Schools north driveway 2011 STATEWIDE 2011 STATEWIDE 2011 STATEWIDE 2011 STATEWIDE 2011 STATEWIDE Rail Xings Trunkline GPA Program Development MDOT Scoping Trunkline GPA PreMDOT Construction Phases GPA On the Job Training (OJT) Statewide Provide Career Programs and Internships Bridge Local GPA Federal Fund Source 1.60 2011 MDOT Federal Advance Cost Construct ($1000s) Geometric modifications Replace culverts, reestablish ditches, widen lanes AC State Cost ($1000s) State Fund Source Local Cost ($1000s) 54 10,450 CITY M 25 3 Local Fund Source OLF M Total Phase Cost MDOT Local ID ($1000s) Job No. No. MPO/ Rural Action Date Amendment Air Type Quality Comments Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date 135 114114 08/11/11 NA CMAQ Grant# 11145. 135 8/11/11 270 114101 08/11/11 NA SAFETEA-LU Earmark MI229, HPP 3043 (with job #108733) 270 8/11/11 10,450 107575 08/24/11 NA 10,450 9/14/11 107 102982 08/24/11 NA 107 9/14/11 13 114279 08/24/11 NA 100 9/14/11 230 114368 08/24/11 NA 2,650 9/14/11 113755 08/24/11 360 9/14/11 410 9/14/11 155 9/14/11 CON Project is an AC project. NSBP Grant # SB2007-54096. Admin Change 08/10/2011 updated the project description. In-Kind services amount of $7,000. Admin Change $85,000 for in-kind contributions (07-2911) $82,000 match is from the National Park Service. PE 328 SBD 82 CNTY 410 114418 08/24/11 NA signal upgrade/interconnect CON 124 CM 31 OLF 155 112956 08/24/11 NA Miscellaneous signal upgrade/interconnect PE 112956 08/24/11 NA Regionwide GPA Rail Xings Trunkline CON 1,376 ST 387 M 1,764 08/24/11 NA 1,764 9/14/11 Regionwide GPA Program Development Scoping Trunkline EPE 1,003 ST 215 M 1,218 08/24/11 NA 1,218 9/14/11 Statewide GPA Pre-Construction Phases Trunkline 17,601 ST 2,217 M 19,819 08/24/11 NA 19,819 9/14/11 Statewide Miscellaneous On the Job Training Provide Career Programs and Internships EPE 300 ST 300 08/24/11 NA 300 9/14/11 Statewide GPA Bridge Local CON 6,532 12,252 08/24/11 NA 12,252 9/14/11 BRO 5,025 M 0 695 OLF CNTY 9/14/11 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year 2011 County STATEWIDE Optional Fields Responsible Agency Project Name Limits Rail Safety Regionwide Local GPA Length Primary Work Type GPA Project Description Rail Safety Local Phase Federal Advance Cost Construct ($1000s) CON 799 2011 TUSCOLA MDOT M-46 M-46 over Sucker Cr and M-25 over Harbor Beach Cr Bridge replacement Bridge Replacement CON 3,127 2012 GRAND TRAVERSE Grand Traverse County Silver Lake Road Traverse City West Middle School, Traverse City Roadside facility Bike/ped safety improvements CON 181 2012 HOUGHTON Houghton Federal Forest County Road 16 Houghton/Ontonagon CL South 7.8 Mi 7.80 Resurface CON 2012 IOSCO MDOT US-23 AuSable River Bridge to F-41 1.85 Reconstruct UTL 2012 STATEWIDE MDOT Local Tech Assistance Program 2011 BAY MDOT I-75 North of Pinconning Rd to Bay/Arenac COL 2011 EMMET MDOT US-31 Replace culverts, reestablish ditches, widen lanes Hot Mix Asphalt Reconstruction 1,332 9/14/11 4,132 9/14/11 2,420 FLH 2,420 114368 08/24/11 NA 2,650 9/14/11 37 NH 285 90192 08/24/11 NA 7,813 9/14/11 470 9/14/11 13,000 9/14/11 2.16 Traffic ops/safety Geometric modifications and access management PE 93 M 240 CNTY 470 M 470 08/24/11 NA Project will be obligated as an Advance Construct IM 98 M 978 110397 09/08/11 NA Year and Cost Changes. Shift from FY 2012 to FY 2011. HPP 23 M 116 113442 09/08/11 NA AC 494 9/14/11 1,625 9/14/11 11,774 9/14/11 4,690 9/14/11 CON 1,330 ST 295 M 1,625 113048 09/08/11 NA Year and Cost Changes. Moved from FY 2014 to FY 2011. 2 course Mill & Resurface PE 1,163 ST 258 M 1,420 110627 09/08/11 NA Year and Cost Changes. Shift from FY 2012 to FY 2011. Crush and Shape and HMA Resurfacing, Partial realignment at Sherman Hill, Miscellaneous safety and drainage improvements. ROW 368 NH 82 M 450 90234 09/08/11 NA Cost and Scope Changes. NA Cost in STIP administratively changed - project costs are split between the Bay MPO and the NonMPO area. 02/16/11. Obligated as regular federal aid. 33,000 9/14/11 Obligated as regular federal aid 3,280 9/14/11 RCWD Project - split out from JN 101361. Obligated as AC. 3,339 9/14/11 In the NPS between Pierce Stocking and Dune Climb 2.23 Miscellaneous NPS Trailway Construction 2011 LENAWEE MDOT M-34 Hazen Creek to M-52 5.73 Restore & rehabilitate Resurface 6.44 Year and Cost Increases. Project moved from FY 2012 to FY 2011 per a discretionary award for M-25 over Harbor Beach 9/14/11 US-31 and M-119 in Petoskey M-115 to 4 Road Comments NA 181 8 M 08/24/11 NA 880 M-109 M-37 1,332 Federal Approval EJ Date 08/24/11 PE MDOT MDOT M Amendment Air Type Quality 181 110132 Rehab, Drainage & Safety LEELANAU WEXFORD Local Fund Source SRSI Restore & rehabilitate 693 Local Cost ($1000s) NA 3.19 ST 533 State Fund Source Total Project Cost Local ($1000s) x Priority 08/24/11 Miscellaneous 2011 2011 ST State Cost ($1000s) MPO/ Rural Action Date 3,820 100622 Local Techincal Assistance Program CON Federal Fund Source Total Phase Cost MDOT Local ID ($1000s) Job No. No. 2011 BAY MDOT I-75 Linwood Rd to Pinconning Rd 9.95 Restore & rehabilitate Rubblize & HMA Resurface CON 6,510 IM 1,628 M 8,138 106856 09/09/11 2011 BERRIEN MDOT I-94 EB Park Road to Hennesey 2.14 Reconstruct Two Course HMA Overlay CON 2,952 IM 328 M 3,280 106483 09/09/11 2011 STATEWIDE MDOT Statewide Statewide Miscellaneous FY 2011 YDMP (RCWD) Program EPE 2,335 M 2,335 113341 09/09/11 AC NA FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name 2012 GOGEBIC MDOT US-2 2012 GOGEBIC MDOT US-2 2012 2011 HOUGHTON HOUGHTON MDOT MDOT M-26 US-41 Limits Tourist Park Rd to Curry Street Curry Street to Roosevelt Road M-26, Houghton County Length BRANCH MDOT US-12 Tibbits Opera House, Coldwater 2011 STATEWIDE MDOT Statewide 2012 STATEWIDE MDOT 2012 STATEWIDE 2012 Project Description Phase Federal Advance Cost Construct ($1000s) Federal Fund Source State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source MPO/ Rural Action Date Amendment Air Type Quality NA 4,526 9/14/11 NA 4,032 9/14/11 76 9/14/11 1,470 11/21/11 276 11/21/11 89,735 11/21/11 1,140 10/28/11 1,900 11/21/11 70 11/21/11 Pavement reconstruction ROW 164 NH 36 M 200 110584 09/09/11 NA 0.96 Reconstruct Pavement reconstruction ROW 164 NH 36 M 200 110585 09/09/11 ROW 123 ST 27 M 150 107008 09/09/11 3.13 Resurface Miscellaneous 0.16 EPE 61 SBD Roadside facility Building restoration CON 500 SBD Statewide Miscellaneous Enhance outreach and recruitment efforts about DBE CON 276 BOWD Section 5311 Statewide Transit operations Non-UZA Formula MDOT Statewide Statewide Miscellaneous ALLEGAN MDOT US-131 114th Avenue north to 120th Avenue Resurface 2012 BENZIE Benzie Transport Countywide ation Authority 2012 CLARE Clare County 2012 GOGEBIC MDOT 3.40 970 1,470 105383 09/21/11 NA 276 114468 09/21/11 NA 09/21/11 NA 1,140 ST 1,140 114983 10/25/11 NA Cold Mill and HMA resurface CON 1,900 NH 1,900 113037 10/25/11 NA EPE 56 CM 70 115064 10/25/11 NA CON 435 SRSI 435 112501 10/25/11 NA shift from FY 2011 435 11/21/11 PE 502 NH 613 110585 10/25/11 NA 11.21.11 - FHWA reviewed admin mods during next amendment cycle. 4,526 11/21/11 Roadside facility Bike/ped safety improvements US-2 Curry Street to Roosevelt Road Reconstruct Pavement reconstruction 111 M TRAL 89,735 SB-2008-MI-04 Administrative modification on 09.21.11 - changed phase from EPE to CON. 11.21.11 FHWA reviewed admin mods during next amendment cycle. Administrative modification on 09.21.11 - changed phase from EPE to CON. 11.21.11 FHWA reviewed admin mods during next amendment cycle. Administrative modification on 09/21/2011 to add $821,000. EPE 14 TRAL NA Fiscal year 2012 Bureau of Highways training Farwell Elementary and Middle Schools, Farwell 40,682 09/13/11 5311 Various locations M CITY 76 114805 18,142 Transit vehicle Bus Purchase: Replace additions/replacemen one less than 30' bus ts (replace bus #16) 30,911 OLF Copper Country Preserviation, Inc is providing $15,243 in cash match. JN changed from JN 114421 to JN 114805 due to technical problems. T-Ops Benzie County 0.96 15 Federal Approval EJ Date 9/14/11 Reconstruct Mill & Two Course Overlay Historic Resource Preservation Plan for Copper Country that identifies historic properties within the byway region that are eligible for listing on the National Register of Historic Places. Comments Moved from FY 2011 to FY 2012 Total Project Cost Local ($1000s) x Priority 4,973 1.11 US-41, M-26 Houghton County, various locations within boundaries of Copper Country Trail National Byway 2011 Primary Work Type Total Phase Cost MDOT Local ID ($1000s) Job No. No. TLCR - Toll Credit Amount is $344,850. Shift from FY 2011. FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits Remove and replace an existing deteriorated box culvert at Tobeco Creek. A detour will be required for the project and the effected road area will need to be rebuilt / reconstructed. State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source Amendment Air Type Quality Comments Federal Approval EJ Date Reconstruct Culvert Replacement CON 1,965 NH 1,965 103007 10/25/11 NA 1.22 Reconstruct HMA RECONSTRUCTION CON 2,228 NH 2,228 87569 10/25/11 NA TLCR - Toll Credit Amount is $404,328. 2,228 11/21/11 Heritage routes Trails, Rest Area, and Signage CON 253 SBD OLF 253 10/25/11 NA SB-2011-MI-02. Inkind contribution amount is $60,164. 253 11/21/11 Heritage routes The development and implementation of an interpretive program for six counties along the US23 Herigate Route. The Scenic Byways grant will fund an asset inventory, guidebook, and maps. EPE 184 SBD OLF 184 115222 10/25/11 NA SB-2010-MI-02. Inkind contribution amount is $36,814. 185 11/21/11 US-2 Iron County US-2 Iron County Heritage Trail Heritage Trail NonNon-motorized motorized Pathway Pathway Heritage routes US-2 Iron County Heritage Trail Nonmotorized Pathway CON 1,118 SBD 10/25/11 NA SB-2011-MI-04. Inkind contribution amount is $122,250. 1,618 11/21/11 M-24 at Sutton Road Roadside facility Construct New Carpool Lot CON 10/25/11 NA Restore & rehabilitate 2 course Mill & Resurface ROW Roadside facility Construct New Carpool lot CON 59 ST Restore & rehabilitate Reconstruction CON 4,512 NH Roadside facility Bike/ped safety improvements CON 138 SRSI Miscellaneous Construction of nonmotor path - Fred Meijer Trail CON 185 HPSL 1.10 Widen - major (capacity increase) Add center left turn lane CON 1,316 HSIP 6.24 Resurface Resurface CON 760 HPSL MDOT US-31 2012 HOUGHTON MDOT M-26 HOUGHTON Western Upper Peninsula Planning US-41 Copper and Country Trail Developm ent Region HURON US-23 through Northeast Huron Shores Cheboygan, Alpena, Council of Heritage Route Arenac, Alcona, Iosco, Governme Interpretive and Presque Isle Program nts counties. 2012 IRON Iron County Road Commissi on 2012 LAPEER MDOT TAMARACK TO HUBBEL US-41 Copper Country Trail 2012 LENAWEE MDOT M-34 Hazen Creek to M-52 2012 LUCE MDOT M-28 0.1 mile west of CR 399 intersection 2012 MARQUETTE MDOT US-41/M-28 Bayout St to the Carp River 2012 MISSAUKEE Missaukee Russell Street County 2012 MONTCALM From Grove Street to Montcalm Fred Meijer County Heartland Trail Flat River Trail 2012 OGEMAW MDOT ONTONAGON Ontonago Federal Forest n County Highway 16 2012 Phase Federal Fund Source Total Project Cost Local ($1000s) x Priority 0.11 2012 2012 Project Description Federal Advance Cost Construct ($1000s) MPO/ Rural Action Date Year and Cost Changes. Shift from FY 2014. TLCR Toll Credit Amount is $356,607. GRAND TRAVERSE 2012 Length Primary Work Type Total Phase Cost MDOT Local ID ($1000s) Job No. No. M-55/I-75 BL 5.73 2.29 Lake City Lower, Upper Elem. and Middle School I-75 BL from Husted to Gray Road M-38 to Houghton County Line 500 OLF 1,618 75892 13 M 73 146 CNTY M 190 CNTY 1,965 11/21/11 11/21/11 110627 10/25/11 NA 72 110737 10/25/11 NA shift from FY 2011 11/21/11 4,512 80147 10/25/11 NA TLCR - Toll Credit Amount is $819,000. Shift from FY 2011 to FY 2012. 138 115148 10/25/11 259 115042 76 11/21/11 4,512 11/21/11 NA 138 11/21/11 10/25/11 NA 259 11/21/11 1,462 109229 10/25/11 NA 1,597 11/21/11 950 103212 10/25/11 NA 950 11/21/11 Shift from FY 2011 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits Emerald Elem. and Manistique Mid. Sch., Manistique Length Primary Work Type Project Description 2012 Schoolcraf Maple Street SCHOOLCRAFT t County 2012 ST. JOSEPH MDOT US-131 St. Joseph County 2012 STATEWIDE MDOT Statewide Statewide Miscellaneous 2012 STATEWIDE MDOT Statewide Statewide Miscellaneous 2012 STATEWIDE MDOT Statewide Statewide Miscellaneous 2012 STATEWIDE MDOT Statewide Statewide Miscellaneous 2012 STATEWIDE MDOT Statewide Statewide Miscellaneous MDOT Enhancements Trunkline GPA Regionwide GPA Enhancements Trunkline 2.00 Reconstruct Repair Existing and Multiple Course HMA Overlay 0.10 Roadside facility 4.45 56.03 2012 STATEWIDE 2012 VAN BUREN MDOT I-94 2013 MARQUETTE MDOT M-553 2014 CALHOUN MDOT I-94 2014 STATEWIDE MDOT Grand Region 2012 ALLEGAN Allegan Grove Street 2012 ALLEGAN Allegan M-40 2012 ANTRIM MDOT US-131 2012 BERRIEN MDOT US-12 2012 CHEBOYGAN Cheboyga M-68 n County 2012 GOGEBIC Gogebic County County Road 519 Berrien County Line to 0.8 miles east of CR 681 M-553/US-41 City of Marquette, Marquette County 17 1/2 to 21 1/2 Mile Road Grand Region Hillside Learning and Behavior Center, Allegan Hillside Learning and Behavior Center, Allegan North Junction of M-32 to south of Boyne Falls Red Arrow Highway to the Galien River Inland Lakes Elem. and Mid. Schools, Tuscarora Twp M-28 to Orvana Mineral Site Access Road 2012 HURON MDOT M-25 Richie Road to Campground Access 2012 HURON Thumb Area Transit Areawide Areawide Roadside facility 10.29 New route/structure (capacity increase) Bike/ped safety improvements Design & Construction of PA-5 C & T Indirect Testing FY 2012 C & T Indirect Testing FY 2012 Drain Assessments FY 2012 FY 12 state construction project training FY12 federal aid eligable const proj training Phase Federal Advance Cost Construct ($1000s) CON 261 UTL 1,842 Federal Fund Source State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source SRSI NH Total Phase Cost MDOT Local ID ($1000s) Job No. No. MPO/ Rural Action Date Amendment Air Type Quality Comments Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date 261 115152 10/25/11 NA 261 11/21/11 408 M 2,250 46269 10/25/11 NA 40,124 11/21/11 CON 3,000 M 3,000 114829 10/25/11 NA 4,500 11/21/11 PE 1,500 M 1,500 114829 10/25/11 NA 4,500 11/21/11 CON 4,125 M 4,125 114833 10/25/11 NA 4,125 11/21/11 CON 20 M 20 115103 10/25/11 NA 20 11/21/11 500 115105 10/25/11 NA 500 11/21/11 10/25/11 NA 1,889 11/21/11 11,900 11/21/11 80 11/21/11 CON 409 ST 91 M CON 1,476 STE 289 M PE 810 IM 90 M 900 114292 10/25/11 NA New Carpool Lot CON 59 ST 13 M 72 113715 10/25/11 NA Resurface Multiple Course HMA Overlay CON 110138 10/25/11 NA 11/21/11 Traffic ops/safety Freeway Signing Upgrade CON 113334 10/25/11 NA 11/21/11 Roadside facility Bike/Ped safety improvements CON 367 SRSI 367 114136 12/06/11 NA 0.45 Roadside facility Bike/Ped safety improvements CON 214 SRSI 214 115403 12/06/11 NA 6.40 Reconstruct Crack Relief Layer PE 82 NH 18 M 100 109982 12/06/11 NA 1.64 Restore & rehabilitate Roadway Reconstruction SUB 35 ST 8 M 43 45662 12/06/11 NA 0.84 Roadside facility Bike/Ped safety improvements CON 156 SRSI 156 111482 12/06/11 NA 12.82 Resurface Rsrfc, Grdrail, Drainage, Site Access Road, Bridge CON 3,502 115234 12/06/11 176 115248 150 112751 0.16 Construct shoulder improvements and HMA Widen - minor paving provide a dedicated center-left turn lane. Replace one 2002 model year INTERNATIONAL 444E bus with one 2012 Transit vehicle model year medium duty additions/replacemen mid-size CLEAN DIESEL ts cut away 28-passenger bus. 2,311 CON 141 CM EPE 112 CM 35 EDA 124 1,191 OLF CNTY M 38 TRAL 1,889 shift from FY 2014 Shift from FY 2011 367 12/20/11 214 12/20/11 6,000 12/20/11 8,993 12/20/11 156 12/20/11 NA 3,502 12/20/11 12/06/11 NA 176 12/20/11 12/06/11 NA 150 12/20/11 Shift from FY 2014 Shift from FY 2011 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits 2012 LENAWEE Lenawee Transport Countywide ation Lenawee County 2012 LENAWEE Lenawee Transport Countywide ation Lenawee County 2012 LENAWEE MDOT MARQUETTE Marquette CR 565 County 2012 MASON Ludington Mass Transport Areawide ation Authority 2012 STATEWIDE MDOT 2012 STATEWIDE 2012 STATEWIDE 2012 US-223 over River Raisin Length 0.24 Primary Work Type Project Description Replace 2003 mediumduty diesel bus with new Transit vehicle diesel engine bus. The additions/replacemen old bus currently meets ts FTA useful life criteria of 7 years. Replace 2005 mediumduty diesel bus with new Transit vehicle diesel engine bus. The additions/replacemen old bus currently meets ts FTA useful life criteria of 7 years. Bridge replacement Bridge replacement 133 12/20/11 EPE 106 CM 27 TRAL 133 115246 12/06/11 NA 133 12/20/11 UTL 50 BRT 63 102851 12/06/11 NA 3,266 12/20/11 1,920 12/20/11 123 12/20/11 6 12/20/11 1,493 12/20/11 5 12/20/11 Roadside facility Restriping and Signing of Carpool Lots CON 5 ST MDOT Regionwide Various locations in Superior Region Traffic ops/safety Design, Install approx. 10 ESS CON 1,493 ST MDOT Regionwide University Regionwide Miscellaneous Warranty Admin - Bridge CON STATEWIDE MDOT Regionwide Various locations in Superior Region 2012 STATEWIDE MDOT Statewide Michigan Technological University (MTU) 2012 STATEWIDE MDOT Section 5304 Transit operations 2012 STATEWIDE MDOT Section 5316 Transit operations MDOT US-31 US-31 and M-119 in Petoskey 1.00 2.16 EMMET MDOT US-31 Townsend to Eppler 2.89 2013 2013 2013 EMMET HOUGHTON HOUGHTON MDOT MDOT MDOT US-31 US-41 US-41 0.29 0.93 0.93 2013 IONIA MDOT I-96 2013 MARQUETTE MDOT M-35 2013 VAN BUREN MDOT M-140 US-31 @ Manvel Rd US-41, Hancock US-41, Hancock at Jordan Lake Road NW quadrant at CR-492 and Empire Mine Ent. Road, Marquette Co. City of Watervliet to CR 378 M-115 to North of 10 Road MDOT M-37 Miscellaneous Miscellaneous 2013 WEXFORD NA Various locations in Bay Region 2012 2013 12/06/11 Regionwide Miscellaneous Traffic ops/safety Widen - major (capacity increase) Widen - minor Reconstruct Reconstruct Roadside facility Statewide Transportation Planning Job Access/Reverse Commute Geometric modifications and access management Widening for center left turn lane FY 2015 Geometric modifications Reconstruct Reconstruct Crack treatment of lot surface CON 925 EDA 1 M 995 CNTY 1,920 115231 12/06/11 NA 25 TRAL 123 115289 12/06/11 NA 6 103393 12/06/11 NA 1,493 107425 12/06/11 NA 5 M 5 114183 12/06/11 NA CMAQ eligible determined by FHWA on 11/3/11. - E Fowler TLCR - Toll Credit Amount is $544,492. STT 18 M 92 115071 12/06/11 NA CON 1,211 ST 269 M 1,479 115175 12/06/11 NA 1,507 12/20/11 EPE 560 STL 140 M 700 115412 12/06/11 NA 700 12/20/11 T-Cap 637 5304 159 CTF 796 12/06/11 NA 1,904 12/20/11 T-Ops 1,057 5316 847 M 1,904 12/06/11 NA 1,904 12/20/11 CON 222 HPP 56 M 12/06/11 NA 278 12/20/11 278 113442 12/20/11 PE 18 HSIP 2 M 20 113598 12/06/11 NA 3,522 12/20/11 CON PE ROW 70 368 16 HPP ST ST 17 82 4 M M M 87 114279 450 110594 20 110594 12/06/11 12/06/11 12/06/11 NA NA NA 100 5,742 5,742 12/20/11 12/20/11 12/20/11 CON 2 ST 1 M 3 106326 12/06/11 NA 3 12/20/11 EDA 886 114943 12/06/11 NA 1,154 12/20/11 5 M 25 110107 12/06/11 NA Shift from FY 2012 6,500 12/20/11 6,241 M 6,241 90234 12/06/11 NA Tagged as AC 6,241 12/20/11 Resurface Two Course HMA Overlay ROW Resurface Crush and Shape and Resurface CON 7.22 M 73 CON Traffic ops/safety 13 EPE Re-align Intersection & Add Pass Flare 0.60 4.00 2012 RoadSoft contract Comments Federal Approval EJ Date 133 115245 Mason County Michigan Technological University (MTU) Amendment Air Type Quality TRAL CM Statewide Local Fund Source 27 98 MDOT Local Cost ($1000s) CM EPE 2012 Michigan Engineer's Resource Library (MERL) Program Install environmental Sensors State Fund Source Total Project Cost Local ($1000s) x Priority 106 Purchase one less than Transit vehicle 30' medium duty additions/replacemen replacement bus (replace ts bus #4) RCNSTRCT State Cost ($1000s) MPO/ Rural Action Date EPE Reconstruct STATEWIDE EMMET Federal Fund Source M-35 to CR476/CR 565 to 9150 W of CR 565 2012 2013 Phase Federal Advance Cost Construct ($1000s) Total Phase Cost MDOT Local ID ($1000s) Job No. No. 886 20 AC ST Shift from FY 2012 Shift from FY 2012 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name 2014 IOSCO MDOT US-23 2014 MECOSTA MDOT US-131 2014 OSCEOLA MDOT US-131 SB 2014 OTTAWA MDOT M-104 2014 STATEWIDE MDOT Regionwide 2014 VAN BUREN MDOT I-196 2014 VAN BUREN MDOT I-94 2011 MARQUETTE Marquette S Bridge St County 2012 ALLEGAN MDOT M-89 2012 BERRIEN MDOT US-12 2012 CHIPPEWA MDOT M-129 2012 IRON MDOT US-2 2012 2012 LAPEER LENAWEE Lapeer County Lenawee County Village West Drive US-223 Limits Cresent Dr. to Au Sable River Bridge at Jefferson Road NE Quadrant South County Line to North of US-10 at Pine Street NE Quadrant One Location in Bay Region 4 bridges on I-196/US31, south of South Haven Berrien County Line to 0.8 miles east of CR 681 Primary Work Length Type Restore & 4.70 rehabilitate Roadside facility 5.63 Restore & rehabilitate Roadside facility Roadside facility Project Description Phase HMA Crack Relief Layer CON Carpool lot resurfacing CON Crush & Shape, Resurface CON Crack Sealing - carpool lot Solar Lighting - Carpool Lots Federal Advance Cost Construct ($1000s) Federal Fund Source AC 37 ST AC State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source Total Phase Cost MDOT Local ID ($1000s) Job No. No. 15 ST Amendment Air Type Quality Comments Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date 5,924 M 5,924 105981 12/06/11 NA 6,466 12/20/11 8 M 45 106349 12/06/11 NA 45 12/20/11 3,705 M 3,705 103041 12/06/11 NA 3,705 12/20/11 106352 12/06/11 NA CON CON MPO/ Rural Action Date 12/20/11 3 M 18 107019 12/06/11 NA 18 12/20/11 1.31 Restore & rehabilitate Concrete ovly, Bm & Substr repair CON AC 3,698 M 3,698 113251 12/06/11 NA 4,053 12/20/11 2.00 Reconstruct Repair Existing and Multiple Course HMA Overlay CON AC 11,000 M 11,000 114292 12/06/11 NA 11,900 12/20/11 0.14 Resurface Reconstruct CON 112139 02/02/12 NA 0.20 Bridge replacement Bridge Replacement CON 319 M 1,594 100217 02/02/12 NA 1,594 3/27/12 0.17 Widen - minor Left Turn Lane CON 108015 02/02/12 NA 3/27/12 0.10 Roadside facility Construct new carpool lot CON 113571 02/02/12 NA 3/27/12 Roadside facility Construct new carpool lot. CON 12 ST 15 113723 02/02/12 75 3/27/12 Roadside facility Construction of 4,520 feet 10' wide bituminous walk/bike path to link an existing walk/bike path to a series of existing sidewalks. Project will link existing residential area to large commericial institutional area. CON 487 CM 114 CNTY 601 115581 02/02/12 601 3/27/12 at Cadmus Road Intersection Traffic ops/safety Extension of passing lane to reduce congestion and improve traffic flow from the intersection of US223/M-52 west past the KMart Drive CON 259 CM 65 OLF 324 02/02/12 NA 324 3/27/12 T-Cap 32 CM 40 02/02/12 NA 40 3/27/12 02/02/12 NA 400 3/27/12 Scott to Jenne over Kalamazoo River Mill Race, Plainwell US-23 Ramp F over I75 (S13 of 06111) Arenac County and M-48 North in the northwest quadrant US-2 in Iron River 0.16 miles west of M-73 In the praries and ponds area 0.86 2012 LENAWEE Lenawee County Countywide Lenawee County Replace (1) 2008 gaspowered mini-van with one (1) new gas powered Transit vehicle additions/replacemen accessible mini-van. The old vehicle currently ts meets the FTA useful life criteria of 4 years. 2012 MANISTEE Manistee County Filer City Road Nelson-Falleen, FalleenFiler Ave, FilerStronach Reconstruct Reconstruct CON 1,275 BRT 3 8 320 M M EDF 80 CNTY 400 110972 3/27/12 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year 2012 2012 2012 2012 2012 2012 2012 2012 Optional Fields Responsible Primary Work Agency Project Name Limits Length Type County Mason Washington Avenue to Reconstruct MASON Dowland Street County Rath Avenue US-131 over Muskegon MECOSTA MDOT US-131 2.10 Bridge - other River US-131 over Muskegon MECOSTA MDOT US-131 2.10 Bridge - other River Midland Saginaw Road to Reconstruct MIDLAND Salzburg Street County Waldo Avenue Grant Prim., Elem. and Newaygo Elder St Mid. School, City of Roadside facility NEWAYGO County Grant Fremont M.S, Daisy Newaygo Division Avenue Brook E.S. and Roadside facility NEWAYGO County Pathfinder E.S. Restore & South County Line to 5.63 OSCEOLA MDOT US-131 SB rehabilitate North of US-10 Presque Rogers City Elementary PRESQUE ISLE Isle W Huron Ave and Middle/High Roadside facility County School Roscommon Elementary and Middle Schools, Roscommon Project Description Reconstruct Epoxy Overlay, joint replacement Epoxy Overlay, joint replacement Phase Federal Advance Cost Construct ($1000s) CON 519 BHN 130 M 649 115159 02/02/12 9,988 3/27/12 360 EDF 450 114407 02/02/12 450 3/27/12 Reconstruct CON Bike/ped safety improvements CON 247 SRSI 247 115452 02/02/12 247 3/27/12 Bike/ped safety improvements CON 330 SRSI 330 115453 02/02/12 330 3/27/12 PE 209 NH 255 103041 02/02/12 4,569 3/27/12 Bike/ped safety improvements CON 364 SRSI 364 115465 02/02/12 364 3/27/12 Bike/Ped safety improvements CON 276 SRSI 276 114144 02/02/12 NA 276 3/27/12 State Funded Required Program CON 2,880 3/27/12 8,310 3/27/12 219 3/27/12 300 3/27/12 Crush & Shape, Resurface Purchase Backpacker Bus Transit vehicle in Pictured Rocks National T-Cap additions/replacemen Lakeshore for ALTRAN ts Public Transit On the Job Training (OJT) Statewide Provide Career Statewide Programs and Internships Campbell Elem. and Tuscola West Street Cass City Middle County School 2012 STATEWIDE 2012 TUSCOLA 2012 VAN BUREN S Williams St to Van Buren Bronson Street George St County 2013 GRAND TRAVERSE MDOT US-31 2013 GRATIOT MDOT US-127 2013 MECOSTA MDOT US-131 3-mile to Holiday Hills Road Washington Road to North of Polk Road US-131 over Muskegon River FY 2013 to FY 2012 FY 2011 to FY 2012 02/02/12 NA 5309 1,662 CTF 8,310 02/02/12 NA Section 5309 Bus and Bus Facilities State of Good Repair 175 5320 44 CTF 219 02/02/12 NA Section 5320 Transit in Parks Discretionary Program 300 02/02/12 NA 199 111566 02/02/12 NA FY 2011 to FY 2012 199 3/27/12 300 ST Roadside facility Bike/ped Safety improvements CON 199 SRSI Reconstruct RCSTRCT and WDN CON 1.48 Restore & rehabilitate Roadway Rehabilitation ROW 205 2.80 Resurface Two Course HMA Overlay ROW 2 CON NA 2,880 EPE Epoxy Overlay, joint replacement M CNTY M On the Job Training Provide Career Programs and Internships Bridge - other 46 90 2,880 Miscellaneous 2.10 3/27/12 SUB 6,648 Section 5320 Transit in Parks Statewide Discretionary Program 450 3/27/12 T-Cap MDOT 02/02/12 9,988 Bus Facility for Thunder Bay Transportation Transit vehicle additions/replacemen Authority; Statewide equipment projects for ts transit agencies. STATEWIDE Comments 450 114409 02/02/12 State Funded Required Program 2012 CNTY Federal Approval EJ Date 150 115159 MDOT MDOT 90 Amendment Air Type Quality M STATEWIDE STATEWIDE EDF Local Fund Source 30 2012 2012 360 Local Cost ($1000s) BHN Roscomm Sunset Drive on Bus and Bus Facilities State Statewide of Good Repair Program State Fund Source Total Project Cost Local ($1000s) x Priority 120 ROSCOMMON Regionwide State Cost ($1000s) MPO/ Rural Action Date PE 2012 Roadside facility Federal Fund Source Total Phase Cost MDOT Local ID ($1000s) Job No. No. 7,351 400 EDA 400 113929 02/02/12 NA FY 2011 to FY 2012 400 3/27/12 NH 45 M 250 109985 02/02/12 NA FY 2012 to FY 2013 8,961 3/27/12 NH 1 M 3 110485 02/02/12 NA FY 2012 to FY 2013 7,452 3/27/12 NA Cost and Year Changes. FY 2014 to FY 2013 9,988 3/27/12 BHN 1,838 M 9,189 115159 02/02/12 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits On the Job Training (OJT) Statewide Provide Career Statewide Programs and Internships at 68th Avenue SE MDOT I-96 Quadrant On the Job Training (OJT) Statewide Provide Career Statewide Programs and Internships Length Primary Work Type Project Description On the Job Training Provide Career Programs and Internships EPE 300 ST Roadside facility Crack Sealing - carpool lot CON 3 ST Miscellaneous On the Job Training Provide Career Programs and Internships EPE 300 ST EPE 700 EPE STATEWIDE 2014 OTTAWA 2014 STATEWIDE 2012 STATEWIDE MDOT Statewide Statewide Miscellaneous 2012 STATEWIDE MDOT Statewide Statewide Miscellaneous 2012 STATEWIDE MDOT Statewide Statewide Miscellaneous Rural Berrien County Rural Berrien County replace 1 medium duty Transit vehicle diesel engine bus with 1 additions/replacemen newer diesel engine ts medium duty bus Rural Berrien County Rural Berrien County Replace 1 cutaway diesel Transit vehicle engine bus with 1 newer additions/replacemen gas engine extended ts cutaway bus 2012 BERRIEN 2012 BERRIEN 2012 BERRIEN MDOT US-12 Red Arrow Highway to Hoder Road 2012 CALHOUN Albion Areawide City of Albion and surrounding area 2012 CASS Dowagiac N. Paul Street M-51/62 to 300' east of Lowe St intersection 2012 CHIPPEWA JKL Bahweting Chippewa Anishnabe County School JKL Bahweting Anishnabe School 2012 CHIPPEWA MDOT between Trout Lake and M-28 2012 CHIPPEWA Sault Ste. East Spruce Marie Street 2012 EMMET Emmet County Hoyt Road 2012 GRATIOT MDOT Countywide M-123 2012 LAPEER MDOT M-24 2012 LAPEER MDOT M-24 2012 LAPEER MDOT M-53 Johnston Street to Easterday, Sault Ste Marie Blackbird & Shay Elem. & Harbor Springs Mid. Sch. at Bowers Rd 02/02/12 NA 12 3/27/12 300 02/02/12 NA 300 3/27/12 ST 700 116076 04/06/12 NA 4,068 4/9/12 3,268 ST 3,268 116078 04/06/12 NA 4,068 4/9/12 EPE 100 ST 100 116079 04/06/12 NA 4,068 4/9/12 EPE 108 CM 27 TRAL 135 115793 04/10/12 NA 135 5/4/12 EPE 52 CM 13 TRAL 65 115794 04/10/12 NA 65 5/4/12 7,080 ST 8,650 45662 04/10/12 NA 9,293 5/4/12 40 CM 1 CON Roadside facility Bike/ped safety improvements CON 1.30 Miscellaneous Restoration of road slope (MDNR Grant 12-036). CON 0.50 Resurface Resurfacing CON 220 HPSL Roadside facility Bike/ped safety improvements CON 237 SRSI CON 523 ST 116 CON 2,179 BRT UTL 5 PE 40 0.60 Bridge replacement 0.24 Traffic ops/safety Comments Federal Approval EJ Date 3/27/12 Resurface Bridge replacement Amendment Air Type Quality 300 Resurface 0.60 Local Fund Source Total Project Cost Local ($1000s) x Priority NA CON Wetland Mitigation Bank Site Rem structure repl w/ culvert Rem structure repl w/ culvert Add Center Left Turn Lane Local Cost ($1000s) MPO/ Rural Action Date 02/02/12 Transit vehicle replacement Wetland mitigation State Fund Source 300 CON 0.78 Restore & rehabilitate Transit vehicle additions/replacemen ts FY 2012 RCAR (RCWD) Program FY 2012 YDMP (RCWD) Program FY 2012 TRAC (RCWD) Program State Cost ($1000s) Recycle Exisiting Conc Pavt 1.64 Maple River Watershed over Abandoned CR Railroad over Abandoned CR Railroad Federal Fund Source Miscellaneous 2013 Berrien County Transport ation Authority Berrien County Transport ation Authority Phase Federal Advance Cost Construct ($1000s) Total Phase Cost MDOT Local ID ($1000s) Job No. No. AC 1,570 184 148 M 4 106351 M EDA 10 CITY 50 115745 04/10/12 NA 50 5/4/12 36 CITY 220 115818 04/10/12 NA 220 5/4/12 148 112489 04/10/12 NA 148 5/4/12 SRSI FY 2011 to FY 2012 39 CNTY 39 115507 04/10/12 NA 39 5/4/12 55 CITY 275 116075 04/10/12 NA 275 5/4/12 237 112493 04/10/12 NA FY 2011 to FY 2012 237 5/4/12 M 639 107962 04/10/12 NA FY 2014 to FY 2012 735 5/4/12 545 M 2,723 90239 04/10/12 NA 2,723 5/4/12 BRT 1 M 6 90239 04/10/12 NA 1,339 5/4/12 CM 10 M 50 115233 04/10/12 NA 490 5/4/12 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name 2012 LEELANAU MDOT M-22 2012 LENAWEE MDOT US-223 2012 LENAWEE MDOT US-223 2012 MARQUETTE Negaunee Croix St OCEANA Oceana County 2012 2012 OTSEGO 2012 ROSCOMMON 2012 ST. JOSEPH MDOT Winston Road I-75 NB Limits Pierce Stocking Drive to Empire Length Primary Work Type State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source Amendment Air Type Quality Comments Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date 1,094 ST 243 M 1,337 115927 04/10/12 NA 1,337 5/4/12 Extension of passing lane to reduce congestion and improve traffic flow CON 259 CM 65 M 324 115709 04/10/12 NA 354 5/4/12 Traffic ops/safety Extension of passing lane to reduce congestion and improve traffic flow PE 24 CM 6 M 30 115709 04/10/12 NA 354 5/4/12 Roadside facility Bike/Ped safety improvements CON 136 SRSI 136 114137 04/10/12 NA 136 5/4/12 Resurface Resurface CON 1,020 115873 04/10/12 NA 1,020 5/4/12 0.36 Roadside facility Building Replacement/Site Work 400 101606 04/10/12 NA 4,327 5/4/12 0.00 Resurface RSFCE Reconstruct Miscellaneous at Cadmus Road 0.39 Traffic ops/safety at Cadmus Road 0.39 Roscomm Old 27 (North M-55 to Bradford Drive on County Harrison Road) N Centerville Rd to St. Joseph Lafeyette Street Broadus/Lafayette to County Dresser Phase Federal Fund Source MPO/ Rural Action Date CON 1.69 Lakeview Elementary School, Negaunee US-31 to 4200' east of 80th Avenue at the Gaylord Rest Area #405 Project Description 2.7 miles of NPS Trailway Construction Federal Advance Cost Construct ($1000s) Total Phase Cost MDOT Local ID ($1000s) Job No. No. 0.00 1,020 PE 360 IM EDA FY 2011 to FY 2012 40 M CON 375 EDF 120 CNTY 495 114935 04/10/12 NA 495 5/4/12 Reconstruct CON 375 EDF 118 CNTY 493 114411 04/10/12 NA 493 5/4/12 Miscellaneous Acquire software that will integrate MDOT traffic, incident, construction, weather data and other traffic information. EPE 500 116131 04/10/12 NA 500 5/4/12 57 116229 04/10/12 NA 57 5/4/12 04/10/12 NA 580 5/4/12 04/10/12 NA 90 5/4/12 4,152 5/4/12 2012 STATEWIDE MDOT Statewide All trunkline freeways in non-attainment areas 2012 STATEWIDE MDOT STATEWIDE Statewide Miscellaneous FY 2012 Heritage Route Program Administration EPE Regionwide GPA Program Development Scoping Trunkline EPE 790 ST Miscellaneous FY 2012 NSTI - National Summer Transportation Institute EPE 90 SST 500 CMG 57 M 175 M 2012 STATEWIDE MDOT Program Development Scoping Trunkline GPA 2012 STATEWIDE MDOT Statewide At Michigan Technological University and Ferris State University 2012 TUSCOLA MDOT M-25 Bay/Tuscola County Line to Dickerson Road 5.43 Resurface HMA Mill & Overlay CON AC 3,178 NH 704 M 3,882 86950 04/10/12 NA 2012 TUSCOLA MDOT M-25 Dickerson Road to Bay Park Road 5.44 Resurface HMA Mill & Overlay CON AC 3,046 NH 675 M 3,721 90283 04/10/12 NA 2012 TUSCOLA MDOT M-25 over Quanicassee River 0.76 Bridge replacement Bridge Replacement CON AC 4,442 BRT 1,110 M 5,552 102952 04/10/12 NA 5,900 5/4/12 Roadside facility Construct 10' wide concrete non-motoized path on the west side of S. Williams Street. The path will provide an oppporunity for residents and employees to visit and conduct business without compromising safety or impacting vehicular traffic along South Williams Street CON 144 CM 180 115848 04/10/12 NA 180 5/4/12 2012 VAN BUREN Decatur South Williams From Beers Street to Street Special-Lite, Inc. 0.07 965 90 36 CITY 116693/ 116694 5/4/12 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name 2012 VAN BUREN Southwest Michigan Planning Countywide Commissi on 2012 VAN BUREN Van Buren Public Countywide Transit 2013 CALHOUN MDOT Limits Van Buren County Municipal Transit Bus Service Area Length Primary Work Type Project Description Phase EPE 12 CMG Replcaement of one 2005 Transit vehicle additions/replacemen medium duty model diesel bus ts EPE 101 CM CON I-69 at N Drive North Roadside facility Roadside facility 2013 EMMET MDOT I-75 NB at Cadillac Street extension 2013 TUSCOLA MDOT M-25 Ringle Road to the Huron County Line 2014 BAY MDOT M-13 2014 BAY MDOT US-10 2014 DELTA MDOT US-2 2014 DELTA MDOT US-2 2014 IONIA MDOT I-96 4.18 over Johnson Creek M-47 NB and SB over US-10 over the Escanaba River over the Escanaba River I-96 under Cutler Road Federal Fund Source SW MI Planning Commission Rideshare Program works to effect behavioral change among citizens and businesses to reduce traffic congestion and improve air quality Miscellaneous 0.00 Federal Advance Cost Construct ($1000s) Resurface New Carpool Lot Construct safe enforcement site with PITWS HMA Overlay and Shoulders State Cost ($1000s) 29 State Fund Source 0.02 Bridge replacement Bridge Removal and Replacement CON 3,476 BHN 869 0.36 Bridge replacement Bridge Replacement PE 44 BRT 0.36 Bridge replacement Bridge Replacement SUB 296 0.60 Bridge replacement Bridge Replacement PE 34 M 55 115866 04/10/12 NA 19,875 5/4/12 BRT 74 M 370 115866 04/10/12 NA 19,875 5/4/12 IM 4 M 38 115817 04/10/12 NA 4,047 5/4/12 IM 18 M 675 M 2014 LAPEER MDOT M-53 at Bowers Rd 0.24 Traffic ops/safety CON 352 CM 88 M M-22 Westman Rd to Port Oneida Rd. 3.34 Miscellaneous CON 1,646 FLH US-2 2012 GRATIOT MDOT US-127 2012 LAPEER MDOT I-69 EB 2012 LEELANAU MDOT M-22 2012 LENAWEE Tecumseh Rogers Highway M-50 to Russell Road 0.95 Reconstruct 3.41 17.19 2.42 5/4/12 11 BRT MDOT 1,896 5/4/12 165 DICKINSON 5/4/12 4,608 3,600 2012 4,251 NA SUB Multiple Course Hot Mix Asphalt Overlay Pavt Rem, HMA reconstruct, Drainage improvements FY 2012 to FY 2013 TLCR - Toll Credit Amount is $379,143. FY 2012 to FY 2014. 04/10/12 CON Resurface NA 4,346 108778 Bridge Replacement 7.12 5/4/12 M Bridge Replacement Add Center Left Turn Lane 3.8 miles of NPS Trailway Construction On I-94 WB from I-196 to M-140 US-2 from Dawn's Lake Road to Baler Road Van Buren Road to Begole Road M-24 to Lapeer/St Clair COL from Thoreson Rd to 0.9 miles east of Basch Rd 107 NA Bridge replacement 3,199 FY 2012 to FY 2013 04/10/12 Bridge replacement CON 5/4/12 1,896 84909 0.60 I-94 NA 04/10/12 0.00 MDOT 04/10/12 50 109334 I-96 under Cutler Road BERRIEN 113668 M over Maple River 2013 5/4/12 9 BHT Bridge Replacement 130 ST 1,896 Bridge replacement NA 41 CON 0.10 04/10/12 ROW I-96 over Cass River 130 115849 NA Prairie Street M-15 5/4/12 04/10/12 MDOT MDOT 12 97 113792 Muir TUSCOLA NA M Bridge Replacement Federal Approval EJ Date 04/10/12 18 Bridge replacement Comments Total Project Cost Local ($1000s) x Priority 12 115847 ST IONIA 2014 Amendment Air Type Quality 79 IONIA MDOT MPO/ Rural Action Date CON 2014 LEELANAU Local Fund Source M 2014 2014 Local Cost ($1000s) Total Phase Cost MDOT Local ID ($1000s) Job No. No. 225 197 CITY CNTY BHT 184 115817 04/10/12 NA 4,047 5/4/12 4,500 115684 04/10/12 NA 4,500 5/4/12 440 115233 04/10/12 NA 490 5/4/12 1,843 115983 04/10/12 NA 1,843 5/4/12 3,399 5/4/12 28,000 6/11/12 4,000 6/11/12 3,199 102456 04/10/12 NA TLCR - Toll Credit Amount is $639,774. FY 2012 to FY 2014. PE 990 IM 110 M 1,100 115751 05/14/12 NA ROW 82 NH 18 M 100 113708 05/22/12 NA Two Course HMA Overlay PE 302 NH 67 M 370 115805 05/22/12 NA 8,131 6/11/12 Conc Pavt Rprs, Diamond Grinding PE 32 IM 4 M 35 115855 05/22/12 NA 4,200 6/11/12 Restore & rehabilitate New 5 ft paved shoulders CON 409 ST 91 M 500 116658 05/22/12 NA 500 6/11/12 Resurface Resurface/Widen/Turn Lane/Flares CON 412 EDA 466 116546 05/22/12 NA 466 6/11/12 Restore & rehabilitate Restore & rehabilitate 54 OLF FY 2013 to FY 2012 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name 2012 MACKINAC MDOT I-75 2012 MARQUETTE Marquette CR 492 County 2012 ST. JOSEPH MDOT US-131 2012 STATEWIDE MDOT Statewide 2012 VAN BUREN Mattawan Murray Street 2013 ANTRIM MDOT M-88 Limits From N of M-123 to N of M-134 US-41 to Brookton Rd/Commerce Dr from Broadway Road to Coon Hollow Road Statewide Length Primary Work Type Project Description Phase PE 7.30 Resurface Single Crs HMA Overlay w/ crack relief interlayer. 0.00 Reconstruct RCNSTRCT & WDN 1.17 Reconstruct 0.01 Miscellaneous Mattawan Early and Later Elem. Schools, Mattawan BELLAIRE TO CENTRAL LAKE Parish Road to Linwood Road at Joyfield Road at Joyfield Road 0.10 0.10 Restore & rehabilitate Restore & rehabilitate Widen - minor Widen - minor Roadside facility 5.54 2.81 Reconstruct existing, no widening Perform in house corrective actions at various wetland mitigation sites throughout the state. Corrective actions will include planting, minor regrading, invasive species control. Federal Advance Cost Construct ($1000s) 124 Federal Fund Source NH CON 28 M 375 EDF Local Cost ($1000s) 125 Local Fund Source CNTY Amendment Air Type Quality Comments Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date 152 116383 05/22/12 NA 4,250 6/11/12 500 114936 05/22/12 NA 500 6/11/12 8,500 6/11/12 NH 128 M 703 116377 05/22/12 NA CON 1,056 ST 234 M 1,290 115826 05/22/12 NA FY 2014 to FY 2012 1,290 6/11/12 Bike/Ped safety improvements. CON 380 380 114142 05/22/12 NA FY 2011 to FY 2012 380 6/11/12 CRUSH & SHAPE, HMA RESURF CON NA 4,835 6/11/12 AC 270 IM PE ROW 18 10 CMG CMG CON 497 CM BAY MDOT I-75 2013 2013 BENZIE BENZIE MDOT MDOT US-31 US-31 2013 HURON MDOT M-142 Nugent Rd to Joyce Dr 0.78 Traffic ops/safety 5.97 Restore & rehabilitate CRUSH & SHAPE, RESURFACE, CON Construct right turn lane Construct right turn lane Add Center Left Turn Lane SRSI PE 2013 NA 4,534 6/11/12 AC 3,670 M 3,670 100329 05/22/12 NA 4,060 6/11/12 9 M 48 116657 05/22/12 NA 51 6/11/12 420 116717 05/22/12 NA 420 6/11/12 126 116715 05/22/12 NA 126 6/11/12 11,218 48945 05/22/12 NA 12,383 6/11/12 HMA RECONSTRUCTION CON 2013 KALKASKA MDOT US-131 from 500 ft south to 1500 ft south of Wallace Rd 0.19 Resurface Cold milling, HMA resurfacing CON 40 ST LAPEER Lapeer County Various Various intersections in Lapeer County Traffic ops/safety The intersections of Saginaw and Nepessing, Saginaw and Genesee, Saginaw and McCormick, and Genesee and Court. CON 420 CMG CON 76 CM CON M-24 I-69 to Nepessing Street, Lapeer 2.06 Reconstruct HMA Reconstruct 6/11/12 6/11/12 05/22/12 Reconstruct MDOT 6/11/12 150 150 4,191 79433 1.12 LAPEER 12,683 NA NA M NORTH OF HIAWATHA ROAD TO US-2 2013 NA 05/22/12 05/22/12 4,191 M-189 Widen - minor 05/22/12 18 116331 10 116331 AC MDOT 0.03 300 116087 6/11/12 IRON Imlay City Road at Myers Road M 622 2013 Imlay City Rd 30 NA M65 Lapeer County 05/22/12 05/22/12 MDOT LAPEER 4,511 75082 622 115822 IOSCO 2013 M M 2013 Add right-turn lanes to the north and east legs of the Imlay City/Myers Road intersection. Work shall include hot mix asphalt paving, curb and gutter installation, sidewalk ramps, and minor drainage work; and all together with necessary related work. 4,511 124 TURTLE RD TO 1200' NORTH OF SHERMAN STREET 2013 State Fund Source MPO/ Rural Action Date 575 Major Rehabilitation PE State Cost ($1000s) Total Phase Cost MDOT Local ID ($1000s) Job No. No. AC 50 11,218 M CNTY FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits Length Primary Work Type 2013 LAPEER MDOT M-53 at Hunters Creek Road 0.87 Traffic ops/safety 2013 LAPEER MDOT M-53 at Hunters Creek Road 0.87 Traffic ops/safety 2013 LAPEER MDOT I-69 EB M-24 to Lapeer/St Clair COL 17.19 Restore & rehabilitate 2013 MACKINAC MDOT I-75 From N of M-123 to N of M-134 7.30 Resurface 2013 MARQUETTE MDOT US-41 2.91 2013 MASON MDOT US-10 2013 MIDLAND MDOT US-10 2013 OSCEOLA MDOT US-131 2013 ST. JOSEPH MDOT US-131 2013 STATEWIDE MDOT Statewide 2013 STATEWIDE MDOT Regionwide US-41, Marquette County US-10 (LUDINGTON) @ NELSON Midland/Isabella County Line Easterly to M-18 at US-10 interchange. Reed City from Broadway Road to Coon Hollow Road University, Bay, North, and Metro Regions North Region, various locations 6.84 Phase Federal Fund Source State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source MPO/ Rural Action Date Amendment Air Type Quality Comments Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date PE 32 CM 8 M 40 115814 05/22/12 NA 675 6/11/12 SUB 12 CM 3 M 15 115814 05/22/12 NA 675 6/11/12 CON AC 4,165 M 4,165 115855 05/22/12 NA 4,200 6/11/12 Single Crs HMA Overlay w/ crack relief interlayer. CON AC 4,098 M 4,098 116383 05/22/12 NA 4,250 6/11/12 Reconstruct Resurfacing & Restoration ROW 16 NH 4 M Traffic ops/safety Radio Interconnect & Modernization CON 200 CMG Restore & rehabilitate Rubblize and HMA Resurfacing CON AC 20 116378 05/22/12 NA 6,060 6/11/12 200 111324 05/22/12 NA 240 6/11/12 20,925 M 20,925 106848 05/22/12 NA 21,275 6/11/12 Construct new carpool parking lot Reconstruct existing, no widening Intelligent Transport. System CON 349 ST 77 M 426 115249 05/22/12 NA 453 6/11/12 ROW 61 NH 14 M 75 116377 05/22/12 NA 8,500 6/11/12 CON 1,310 ST 290 M 1,600 106928 05/22/12 NA 1,948 6/11/12 Miscellaneous ITS DMS and detection CON 1,467 ST 325 M 1,793 107598 05/22/12 NA 2,288 6/11/12 EPE 400 CM 100 M 500 116272 05/22/12 NA 500 6/11/12 CMG 633 116275 05/22/12 NA 633 6/11/12 Roadside facility 1.17 Project Description Add Center Left Turn Lane and widen Western/Weston Drain structure (B02) to the east to accomodate the turn lane Add Center Left Turn Lane and widen Western/Weston Drain structure (B02) to the east to accomodate the turn lane Conc Pavt Rprs, Diamond Grinding Federal Advance Cost Construct ($1000s) Total Phase Cost MDOT Local ID ($1000s) Job No. No. Reconstruct Miscellaneous 2013 STATEWIDE MDOT Regionwide Various locations in the Grand Region Miscellaneous FY 2013 Control Room Operations contract for the West Michigan Transportation Operations Center. 2013 STATEWIDE MDOT Regionwide Various locations in Grand Region Miscellaneous FY 2013 ITS device maintenance and operations in multiple counties in Grand Region. EPE 633 2013 STATEWIDE MDOT Regionwide GPA CPM CSM Bridge Trunkline CON 1,940 ST 485 M 2,425 05/22/12 NA 2,425 6/11/12 2013 STATEWIDE MDOT Regionwide GPA CPM Road Trunkline CON 34,742 ST 7,425 M 42,167 05/22/12 NA 42,167 6/11/12 2013 STATEWIDE MDOT Regionwide GPA Enhancements Trunkline CON 788 STE 170 M 985 05/22/12 NA 985 6/11/12 2013 STATEWIDE MDOT Highway Safety Regionwide Trunkline GPA GPA Highway Safety Trunkline CON 23,301 ST 372 M 23,673 05/22/12 NA 23,673 6/11/12 2013 STATEWIDE MDOT Rail Xings Trunkline GPA GPA Rail Xings Trunkline CON 308 ST 34 M 342 05/22/12 NA 342 6/11/12 CPM CSM Bridge Trunkline GPA CPM Road Trunkline GPA Enhancements Trunkline GPA Regionwide 27 OLF FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Responsible Agency Project Name Rural Bridge Replacement and MDOT Rehabilitate Trunkline GPA Rural Highway Rehab and MDOT Reconstruct Trunkline GPA Program Development MDOT Scoping Trunkline GPA PreMDOT Construction Phases GPA Bridge Local GPA Enhancements Local GPA Limits Length Primary Work Type Project Description Phase Federal Advance Cost Construct ($1000s) Federal Fund Source State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source Regionwide GPA Rural Bridge Replacement and Rehabilitate Trunkline CON 9,719 ST 3,485 M Regionwide GPA Rural Highway Rehab and Reconstruct Trunkline CON 10,740 ST 2,381 Regionwide GPA Program Development Scoping Trunkline EPE 800 ST Regionwide GPA Pre-Construction Phases Trunkline 3,785 ST Regionwide GPA Bridge Local CON 17,959 BRO 1,670 OLF 33,396 Regionwide GPA Enhancements Local CON 889 STE 444 OLF 1,333 STATEWIDE Highway Safety Regionwide Local GPA GPA Highway Safety Local CON 2,523 ST 250 OLF 2,773 STATEWIDE Rail Safety Local GPA GPA Rail Safety Local CON 800 2013 STATEWIDE 2013 STATEWIDE 2013 STATEWIDE 2013 STATEWIDE 2013 STATEWIDE 2013 STATEWIDE 2013 2013 2014 Optional Fields Total Phase Cost MDOT Local ID ($1000s) Job No. No. ALLEGAN MDOT I-196 SB 2014 BAY MDOT I-75 2014 BENZIE MDOT M-115 2014 BENZIE MDOT M-115 2014 2014 BENZIE BERRIEN MDOT MDOT M-22 I -94 EB 2014 CALHOUN MDOT I-94 BL 2014 CALHOUN MDOT M-99 2014 CALHOUN MDOT M-99 Regionwide at the Saugatuck Rest Area #727 Pinconning Road to Bay/Arenac COL from Bridge Street east 4 miles from Bridge Street east 4 miles over Platte River Watervliet Township 29 Mile Road/Clark Street to I-94 0.59 3.27 4.11 4.11 0.07 Roadside facility Restore & rehabilitate Restore & rehabilitate Restore & rehabilitate Bridge replacement Roadside facility 1.96 Resurface M-99 (Superior Street) 0.37 Reconstruct M-99 (Superior Street) 0.37 Reconstruct Building Replacement/Site Work Rubblize and HMA Overlay Crush and Shape, Resurface Crush and Shape, Resurface Bridge Replacement New facility Multilple course HMA Overlay Brick Paver Reconstruction. Brick Paver Reconstruction. STR 47 OLF MPO/ Rural Action Date Amendment Air Type Quality Comments Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date 13,251 05/22/12 NA 13,251 6/11/12 M 13,121 05/22/12 NA 13,121 6/11/12 200 M 1,000 05/22/12 NA 1,000 6/11/12 676 M 4,461 05/22/12 NA 4,461 6/11/12 13,767 M 05/22/12 NA 33,396 6/11/12 05/22/12 NA 1,333 6/11/12 05/22/12 NA 2,773 6/11/12 200 M 1,000 05/22/12 NA 1,000 6/11/12 CON AC 4,097 M 4,097 101615 05/22/12 NA 4,397 6/11/12 CON AC 12,453 M 12,453 110397 05/22/12 NA 13,431 6/11/12 156 M 859 79645 05/22/12 NA 6,779 6/11/12 PE 703 ST ROW 8 ST 2 M 10 79645 05/22/12 NA 6,779 6/11/12 CON CON 1,627 ST AC 361 3,997 M M 1,988 106168 3,997 51268 05/22/12 05/22/12 NA NA 2,163 5,063 6/11/12 6/11/12 CON AC 4,102 M 4,102 86969 05/22/12 NA 4,452 6/11/12 PE ROW 305 ST 68 M 372 116324 05/22/12 NA 6,250 6/11/12 1 ST 0 M 1 116324 05/22/12 NA 6,250 6/11/12 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year 2014 County Optional Fields Responsible Agency Project Name CRAWFORD I-75 2014 CRAWFORD I-75 2014 GOGEBIC MDOT US-2 2014 GRATIOT MDOT US-127 2014 HOUGHTON MDOT M-26 2014 LAPEER Lapeer County Bowers Rd Limits Length at North Down River Road at North Down River Road Primary Work Type Project Description Phase Miscellaneous Completion of the interchange at I-75 at North Down River Road from a partial interchange to a full interchange by adding two ramps to allow for southbound access and northbound exiting, replace the bridges on North Down River road over I-75 and over the East Branch AuSable River, and reconstruct and widen North Down River road from just east of I-75 westward to M-93. CON Miscellaneous Completion of the interchange at I-75 at North Down River Road from a partial interchange to a full interchange by adding two ramps to allow for southbound access and northbound exiting, replace the bridges on North Down River road over I-75 and over the East Branch AuSable River, and reconstruct and widen North Down River road from just east of I-75 westward to M-93. PE Tourist Park Rd to Curry Street Washington Road to North of Polk Road M-26, Houghton County 1.11 Reconstruct Pavement reconstruction CON 2.80 Resurface Two Course HMA Overlay CON 3.13 Resurface Bowers road at Roods Lake Road 0.04 Widen - minor Mill & Two Course Overlay Add a passing flare for eastbound traffic at the Bowers/Roods Lake intersection. Work shall include hot mix asphalt paving, curb and gutter installation, and minor drainage work; and all together with necessary related work. CON CON State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source Total Phase Cost MDOT Local ID ($1000s) Job No. No. MPO/ Rural Action Date Amendment Air Type Quality Total Project Cost Local ($1000s) x Priority Federal Advance Cost Construct ($1000s) Federal Fund Source 7,840 OFHWA 1,960 OLF 9,800 05/22/12 NA TIGER IV Grant 10,800 6/11/12 800 OFHWA 200 OLF 1,000 05/22/12 NA TIGER IV Grant 10,800 6/11/12 4,653 110584 05/22/12 NA 5,529 6/11/12 110485 05/22/12 NA 3,608 107008 05/22/12 NA 4,032 6/11/12 144 116711 05/22/12 NA 144 6/11/12 AC 4,653 AC 3,608 144 CMG M M Comments Federal Approval EJ Date 6/11/12 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits Length Primary Work Type 2014 LAPEER MDOT M-53 at Hunters Creek Road 0.87 Traffic ops/safety 2014 LEELANAU MDOT M-22 from M-201 to Omena 5.04 Restore & rehabilitate 2014 MASON MDOT US-10 2014 MECOSTA MDOT US-131 2014 NEWAYGO MDOT M-82 US10 (LUDINGTON) @ JACKSON ST S Mecosta Co Line to 6 Mile Rd M-120 east to Industrial Drive 3.14 Restore & rehabilitate Resurface Mill, ASCRL, HMA Overlay Restore & rehabilitate Bridge replacement Cold milling; crush and shape Bridge Replacement Design & Install approx. 8 ESS ITS System Modernizations I-94 CCTV and Detectors FY 2014 Control Room Operations contract for the West Michigan Transportation Operations Center. 2014 ROSCOMMON MDOT US-127 Muskegon River north 3.75 2014 SANILAC MDOT M-25 0.12 2014 STATEWIDE MDOT Regionwide 2014 STATEWIDE MDOT Regionwide 2014 STATEWIDE MDOT Regionwide M-25 over Mill Creek Various locations in Superior Region Various locations in Metro Region Southwest Region 2014 STATEWIDE MDOT Regionwide Various locations in the Grand Region Miscellaneous 2014 STATEWIDE MDOT Regionwide Various locations in Grand Region Miscellaneous 2014 STATEWIDE MDOT Regionwide 2014 WEXFORD MDOT US-131 2012 HOUGHTON Western Upper Peninsula Planning US-41 and Developm ent Region 2012 LUCE MDOT M-123 2012 ALLEGAN MDOT M-89 2012 ALPENA MDOT M-65 2012 ANTRIM MDOT M-88 2012 BARRY MDOT M-43 Traffic ops/safety 2.00 Intersection of US-41 and No. 9 Road (Houghton County Hwy F22) to intersection of US-41 and Airpark Blvd. from Newberry to Eckerman West of US-131 east to Florence St. in Plainwell over North Branch of Thunder Bay River BELLAIRE TO CENTRAL LAKE M-37/M-43 (State Street) to North Street Traffic ops/safety Miscellaneous Various (I-69, I-96, I496, US-127) at M-55 Interchange Crush and Shape Radio Interconnect & Modernization Coldmill, C&S, HMA Resurface Traffic ops/safety 6.06 Project Description Add Center Left Turn Lane and widen Western/Weston Drain structure (B02) to the east to accomodate the turn lane Miscellaneous Roadside facility FY 2014 ITS device maintenance and operations in multiple counties in Grand Region. Addition of ITS devices (DMS and CCTV). New Carpool Parking Lot Phase Federal Advance Cost Construct ($1000s) CON CON 496 Federal Fund Source CM AC CON 170 State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source Total Phase Cost MDOT Local ID ($1000s) Job No. No. MPO/ Rural Action Date Amendment Air Type Quality Comments Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date 124 M 620 115814 05/22/12 NA 675 6/11/12 4,334 M 4,334 83588 05/22/12 NA 4,656 6/11/12 170 111325 05/22/12 NA 204 6/11/12 CMG CON AC 12,992 M 12,992 105524 05/22/12 NA 13,600 6/11/12 CON AC 5,152 M 5,152 105535 05/22/12 NA 5,542 6/11/12 CON AC 6,382 M 6,382 106863 05/22/12 NA 6,884 113232 05/22/12 NA CON 6/11/12 6/11/12 CON 1,637 ST 363 M 2,000 107426 05/22/12 NA 2,215 6/11/12 CON 682 ST 151 M 833 107612 05/22/12 NA 953 6/11/12 CON 2,047 ST 454 M 2,501 107965 05/22/12 NA 3,001 6/11/12 EPE 500 CMG 500 116277 05/22/12 NA 500 6/11/12 EPE 650 CMG 650 116278 05/22/12 NA 650 6/11/12 PE 150 CMG 150 116407 05/22/12 NA 1,250 6/11/12 CON 101 ST 123 107459 05/22/12 NA FY 2013 to FY 2014 132 6/11/12 SBD# SB-2011-MI56748. Local Other Funds - $42,564 cash and $5,600 inkind contributions. Was originally MDOT JN 115853. This was changed to MDOT JN 117251. 241 6/11/12 70 6/11/12 10,415 8/23/12 3,179 8/23/12 4,935 8/23/12 5,221 8/23/12 10.17 Heritage routes This project will remove blighted structures and debris, construct viewing platforms for pedestrians, pit toilets, interpretive signs and a covered pavilion. 63.00 Roadside facility Non-Motorized Trail Plan EPE 56 1.72 Reconstruct Reconstruct Existing, No widen CON 8,494 0.49 Bridge replacement Bridge Replacement CON 5.54 Restore & rehabilitate CRUSH & SHAPE, HMA RESURF ROW 1.33 Restore & rehabilitate Reconstruction & Resurfacing CON 22 M CON 193 SBD 48 OLF 241 117251 06/07/12 NA SBD 14 CNTY 70 116551 06/07/12 NA 8,494 90028 08/06/12 NA ST AC 3,642 ST 3,003 M 3,003 102987 08/06/12 NA 150 M 150 75082 08/06/12 NA 3,642 83975 08/06/12 NA SBD# SB-2010-MI56001 TLCR - Toll Credit Amount is $1,716,990. FY 2013 to FY 2012 TLCR - Toll Credit Amount is $838,742. FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name Limits 2012 BARRY MDOT M-43 over Thornapple River in Hastings 2012 BENZIE MDOT US-31 from Beulah Bridge to M-115 at Carlton Dr, east then north to Colony Bay Dr Project Description Phase Federal Advance Cost Construct ($1000s) Federal Fund Source 8/23/12 08/06/12 NA TLCR - Toll Credit Amount is $362,751. 2,229 8/23/12 106 116925 08/06/12 NA 106 8/23/12 71 116926 08/06/12 NA 71 8/23/12 2,598 113596 08/06/12 NA 3,420 8/23/12 86 117052 08/06/12 NA 86 8/23/12 868 90130 08/06/12 NA 868 8/23/12 5 113442 08/06/12 NA 394 8/23/12 1,554 113136 08/06/12 NA TLCR - Toll Credit Amount is $396,396. 1,554 8/23/12 258 112483 08/06/12 NA FY 2011 to FY 2012 258 8/23/12 151 116934 08/06/12 NA 151 8/23/12 2,674 90210 08/06/12 NA TLCR - Toll Credit Amount is $335,300. 3,553 8/23/12 3,000 8/23/12 08/06/12 0.61 Resurface Crack Relief Layer and Overlay CON 1,621 NH 1,621 87355 New route/structure (capacity increase) 0.60 mi mulity-use pathway construction with hot mix asphalt paving, aggregate base and shoulders, clearing, and grading from Eagle Point Road to Colony Bay Drive. CON 85 CM Replace one (1) 2007 cutaway bus with one (1) new 2012 or newer gas Transit vehicle additions/replacemen engine cutaway bus. The old bus will exceed the ts FTA useful life criteria of 5 years or 150,000 miles. EPE 57 CM Restore & rehabilitate Full depth concrete pavt repairs FY 2012 CON 2,598 NH Resurface Resurface roadway including shoulder work. CON Countywide 2012 CHEBOYGAN MDOT I-75 NB & SB Levering to US-31 Ramp 2012 DELTA Delta County North 9th Street North 5th Street to North Lakeshore Drive 2012 EMMET MDOT M-68 over Crooked River 0.26 Bridge replacement Deck Repl w/shoulder widening CON 868 BHT 2012 EMMET MDOT US-31 US-31 in Petoskey 0.63 Traffic ops/safety Geometric modifications and access management ROW 4 HPP 2012 GOGEBIC MDOT US-2 US-2 Marenisco to Gogebic Station 10.24 Resurface HMA Mill and Resurface CON 1,554 NH 2012 HURON Huron County Various routes Bad Axe Intermediate and Junior High School Roadside facility Bike/ped safety improvements CON 258 SRSI Areawide Areawide EPE 121 CM I-96 EB and WB over abandoned CSX Railroad Transit vehicle Purchase one medium additions/replacemen duty bus to expand ts transit service. 0.03 Bridge replacement CON 2,674 IM MDOT 1,573 743 100132 9.03 Bridge Replacement 2012 IOSCO Iosco County Monument Road Monument and Wilber Roads 17.49 Reconstruct Reconstruct 2012 IOSCO MDOT US-23 Tawas Beach Road to Aulerich Road 1.83 Reconstruct Total Reconstruction 2012 LAPEER MDOT WB I-69 WB I-69, M-24 to Lapeer/St Clair COL 17.16 Restore & rehabilitate Conc Pavt Rprs, Diamond Grind CON PE CON 21 14 69 2,760 FLH 464 NH 3,738 IM 1 30 CNTY M EDF M M 17 CNTY M TLCR - Toll Credit Amount is $620,730. TLCR - Toll Credit Amount is $318,081. 105167 & 117737 08/06/12 NA JN 117737 was programmed to utilize left over money from JN 105167. The total dollar amounts and scope remains the same. 567 103019 08/06/12 NA FY 2013 to FY 2012 5,923 8/23/12 3,738 108689 08/06/12 NA TLCR - Toll Credit Amount is $450,000. 4,605 8/23/12 2,760 103 Comments Federal Approval EJ Date NA BHT 0.60 Amendment Air Type Quality Total Project Cost Local ($1000s) x Priority TLCR - Toll Credit Amount is $290,731. 743 CASS IONIA Local Fund Source CON 2012 2012 Local Cost ($1000s) 0.17 Cass County Transport Countywide ation Authority HURON State Fund Source Deep Overlay, Beam Repair Cass County 2012 State Cost ($1000s) MPO/ Rural Action Date Restore & rehabilitate CASS 2012 Eagle Point Road Length Primary Work Type Total Phase Cost MDOT Local ID ($1000s) Job No. No. FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year County Optional Fields Responsible Agency Project Name 2012 LAPEER MDOT I-69 2012 LAPEER MDOT M-24 Limits at Lake Nepessing Road I-69 to Nepessing Street, Lapeer Length Primary Work Type Roadside facility 2.06 Reconstruct HMA Reconstruct Construction of 4800ft. of non-motorized pathway to provide a direct and shorter route to and from downtown Hudson and reduce heavy traffic congestion and emissions along M34 (Main Street) and Maple Grove Ave, which is the current vehicle route to the north section of town. Phase NA 60 8/23/12 ROW 8 ST 2 M 10 48945 08/06/12 NA 12,383 8/23/12 CON 131 CM 182 117122 08/06/12 NA 182 8/23/12 5,646 87522 08/06/12 NA 8,187 8/23/12 3,882 83545 08/06/12 NA TLCR - Toll Credit Amount is $882,992. 4,878 8/23/12 175 114145 08/06/12 NA FY 2011 to FY 2012 175 8/23/12 3,297 117106 08/06/12 NA 3,297 8/23/12 1,630 8/23/12 5,206 8/23/12 6,084 8/23/12 10,267 8/23/12 7,023 8/23/12 8,785 8/23/12 MDOT M-52 US-223 North to South of M-34 0.78 Reconstruct HMA Reconstruction CON 2012 MACKINAC MDOT US-2 Borgstrum Road to Hiawatha Trail 8.69 Resurface HMA Overlay CON 3,882 2012 MARQUETTE Marquette Tierney Street Roadside facility Bike/Ped safety improvements CON 175 MARQUETTE Marquette Triple A Road County Reconstruct Reconstruct CON 2012 MENOMINEE MDOT M-35 2012 MENOMINEE MDOT M-35 NCL of Menominee North 6 miles US-41 north to 48th Ave. Comments Federal Approval EJ Date 08/06/12 LENAWEE Leelanau County Amendment Air Type Quality 134 103307 2012 MDOT Local Fund Source M areawide 2012 Local Cost ($1000s) 27 areawide starts at Port Oneida Road and ends at Leelanau County Road 669/Bohemian Road all within Cleveland Township State Fund Source ST Hudson Sleeping Bear Heritage Trail Segment 8 in Sleeping Bear Dunes National Lakeshore State Cost ($1000s) Total Project Cost Local ($1000s) x Priority 107 LENAWEE Bothwell Middle School, Marquette Triple A Road; M-95; County Road 601 Federal Fund Source MPO/ Rural Action Date CON 2012 2012 Miscellaneous Project Description Expand, pave carpool lot and add lighting Federal Advance Cost Construct ($1000s) Total Phase Cost MDOT Local ID ($1000s) Job No. No. 3.17 Miscellaneous Construct an ADA compliant non-motorized path 6.00 Restore & rehabilitate HMA Coldmilling and Resurface PE 0.95 Reconstruct Reconstruct Existing CON CON AC 51 5,646 M NH SRSI 2,638 1,630 CITY EDA 659 CNTY OFHWA 1,630 368 ST 82 M 2,979 NH 661 M 2,251 CITY 08/06/12 NA 450 110684 08/06/12 NA 5,891 103311 08/06/12 NA This project is utilzing PLHD funds. The original grant is for $1,620,000. Another $10,000 is included for signage the signage money and project will eventually be split into a separate JN. Moved from FY 2014. TLCR - Toll Credit Amount is $1,728,424. TLCR - Toll Credit Amount is $ $1,274,674. 2012 MONTCALM MDOT US-131 SB North of Cannonsville Road to South of M-46 5.39 Restore & rehabilitate Concrete Inlay CON 7,775 NH 7,775 87108 08/06/12 NA 2012 MONTCALM MDOT US-131 NB N of Cannonsville Rd to S of M-46 5.45 Restore & rehabilitate Concrete Inlay CON 5,984 NH 5,984 90035 08/06/12 NA 2012 OCEANA MDOT 5.37 Resurface 313 NH 69 382 112158 08/06/12 NA 2012 ONTONAGON 5.00 Resurface CON 1,000 STL 0 250 CNTY 1,250 78909 08/06/12 NA 1,250 8/23/12 2012 ONTONAGON CON 974 STL 0 244 CNTY 1,218 78872 08/06/12 NA 1,218 8/23/12 Fruitvale Road north to Winston Road Summit Park Rd Ontonago SOUTH n County BOUNDARY RD Gogebic County Line Ontonago Boundary Rd Summit Park - M107 n County US-31 Reconstruct Cold Mill, Joint Repairs, HMA Resurfacing MILLING AND RESURFACING RECONSTRUCT PE M FY 2013 to FY 2012 FY 2011 - 2014 STIP Project Data 09.20.12 Required Fields Fiscal Year 2012 2012 2012 2012 2012 2012 2012 Optional Fields Responsible Agency Project Name Limits County West 638 Presque West 638 Highway/Glasier PRESQUE ISLE Isle Highway Road/Petersville Road County from Ogemaw CL to ROSCOMMON MDOT I-75 Maple Valley Road CPM Road STATEWIDE MDOT Regionwide Trunkline GPA CPM CSM STATEWIDE MDOT Bridge Regionwide Trunkline GPA Rail Xings STATEWIDE MDOT Regionwide Trunkline GPA Rural Bridge Replacement and STATEWIDE MDOT Regionwide Rehabilitate Trunkline GPA Rural Highway Rehab and STATEWIDE MDOT Regionwide Reconstruct Trunkline GPA Length 12.57 Primary Work Type Project Description Phase Federal Advance Cost Construct ($1000s) Reconstruct Reconstruct CON Restore & rehabilitate Crush & Shape, HMA resurface CON GPA CPM Road Trunkline CON 27,352 GPA CPM CSM Bridge Trunkline CON GPA Rail Xings Trunkline GPA Federal Fund Source EDA 8,816 M ST 6,270 M 3,650 ST 933 CON 1,253 ST Rural Bridge Replacement and Rehabilitate Trunkline CON 9,929 GPA Rural Highway Rehab and Reconstruct Trunkline CON CON 8,816 83288 08/06/12 NA 33,884 08/06/12 M 4,583 597 M ST 2,074 M 7,126 ST 1,672 M 755 22,371 ST 192 M 6,957 ST 1,670 M RP 28 M 7,969 M 793 OLF M 1,110 1,497 Highway Safety Regionwide Trunkline GPA GPA Highway Safety Trunkline 2012 STATEWIDE MDOT PreConstruction Phases GPA Regionwide GPA Pre-Construction Phases Trunkline 2012 STATEWIDE MDOT Statewide Statewide Miscellaneous Purchase Enterprise Ver. of the DARWin-ME Software EPE 4 2012 STATEWIDE Bridge Local GPA Regionwide GPA Bridge Local CON 6,159 BRO 2012 STATEWIDE Highway Safety Regionwide Local GPA GPA Highway Safety Local CON 3,577 ST 2012 STATEWIDE Regionwide GPA Enhancements Local CON 1,714 STE 2012 STATEWIDE Regionwide GPA Rail Safety Local CON 1,194 STR MDOT US-131 NB at the new Martin Township Rest Area 0.79 Roadside facility New Rest Area Construction CON 4,512 NH 522 MRR Comments Total Project Cost Local ($1000s) x Priority Federal Approval EJ Date 1,948 8/23/12 10,521 8/23/12 NA 33,884 8/23/12 08/06/12 NA 4,583 8/23/12 1,850 08/06/12 NA 1,850 8/23/12 12,003 08/06/12 NA 12,003 8/23/12 OLF 9,553 08/06/12 NA 13,016 8/23/12 22 OLF 22,585 08/06/12 NA 22,585 8/23/12 708 OLF 9,335 08/06/12 NA 9,335 8/23/12 08/06/12 NA 32 8/23/12 14,922 08/06/12 NA 22,105 8/23/12 OLF 4,687 08/06/12 NA 4,687 8/23/12 OLF 3,211 08/06/12 NA 3,211 8/23/12 1,716 08/06/12 NA 1,716 8/23/12 5,612 8/23/12 261 CNTY Amendment Air Type Quality NA AC 464 Local Fund Source 08/06/12 MDOT ALLEGAN Local Cost ($1000s) MPO/ Rural Action Date 1,948 117107 STATEWIDE 2013 State Fund Source 1,484 2012 Enhancements Local GPA Rail Safety Local GPA State Cost ($1000s) Total Phase Cost MDOT Local ID ($1000s) Job No. No. OLF 32 117051 4,512 81685 08/06/12 NA Tagged as AC TLCR - Toll Credit Amount is $818,919. FY 2012 to FY 2013