AGENDA PETROLEUM TANK RELEASE COMPENSATION BOARD MEETING
by user
Comments
Transcript
AGENDA PETROLEUM TANK RELEASE COMPENSATION BOARD MEETING
AGENDA PETROLEUM TANK RELEASE COMPENSATION BOARD MEETING February 2, 2015 Teleconference Business Meeting 10:00 a.m. Metcalf Building Room 111, 1520 East 6th Avenue Helena, MT NOTE: Individual agenda items are not assigned specific times. For public notice purposes, the Board will begin the meeting at the time specified. However, the Board might not address the specific agenda items in the order they are scheduled. The Board may take action on any of the items on the agenda. For disability accommodation, please contact DEQ Personnel at 444-4218. 9:30 Executive Session 10:00 Board Meeting I. ADMINISTRATIVE AGENDA ITEMS Approval of October 20, 2014 Board Minutes – ACTION ITEM ....................................................... 1 II. ACTION ITEMS Eligibility Ratification .......................................................................................................................... 5 Ratification of Weekly Reimbursements and Denied Claims.............................................................. 6 Board Claims ...................................................................................................................................... 30 III. DISCUSSION ITEMS Petroleum Release Business Plan Biennial Report IV. REPORT ITEMS – INFORMATIONAL (DISCUSSED AT THE REQUEST OF INTERESTED PARTIES) Board Attorney Report ....................................................................................................................... 50 Fiscal Report ...................................................................................................................................... 51 Board Staff Report ............................................................................................................................. 55 DEQ Petroleum Tank Cleanup Section Report.................................................................................. 60 V. Public Forum Under this item, members of the public may comment on any public matter within the jurisdiction of the Board that is not otherwise on the agenda of the meeting. Individual contested case proceedings are not public matters on which the public may comment. VI. Next Proposed Board Meeting date: April 20, 2015 VII. Adjournment PETROLEUM TANK RELEASE COMPENSATION BOARD MINUTES Teleconference Business Meeting October 20, 2014 Department of Environmental Quality Metcalf Building Room 111, 1520 East 6th Avenue Helena, MT Board members in attendance were Jerry Breen, Kate Cassidy, Tim McDermott, Roy Morris, and Susan Quigley. Also, in attendance were Terry Wadsworth, Executive Director; the Board’s Attorney, Paul Johnson, and Ann Root, Board staff. Vice-Presiding Officer Roy Morris, in the absence of Presiding Officer, Roger Noble, called the tele-conference meeting to order at 10:02 a.m. Approval of Minutes – October 20, 2014 Mr. McDermott moved to approve the minutes of the August 11, 2014 meeting with one typographical correction. Ms. Cassidy seconded the motion. The motion was unanimously approved with a roll call vote. Election of Presiding Officer for 2015 Mr. Morris moved to nominate Mr. Roger Noble as the Presiding Officer. The motion was seconded by Ms. Cassidy. The motion was unanimously approved by a roll call vote. Election of Vice-Presiding Officer for 2015 Ms. Cassidy moved to nominate Mr. Roy Morris as the Vice-Presiding Officer. The motion was seconded by Mr. McDermott. The motion was unanimously approved by a roll call vote. Proposed Meeting Dates for 2015 Mr. McDermott moved to accept the proposed 2015 meeting dates as presented. The motion was seconded by Mr. Breen. The motion was unanimously approved by a roll call vote. Eligibility Ratification Mr. Wadsworth informed the Board of the applications for eligibility that were before the Board (See table below). There were five eligibility applications, all recommended to be eligible. Board Staff Recommendations Pertaining to Eligibility From August 12, 2014 through October 20, 2014 Location Site Name Facility ID # Billings Lockwood Cenex Truck Stop Former Magruder Motor Co 56-08208 Former Treasurer Formal Wear Lynch Flying Service 60-15238 Former Firestone Expert Tire 32-09726 Glasgow Billings Billings Missoula 60-15228 56-07797 DEQ Release # Release Year 4920 August 2012 4934 July 2013 5001 June 2014 5026 July 2014 4987 May 2014 Eligibility Determination – Staff Recommendation Date Eligible – 8/19/14 Eligible – 8/27/14 Eligible – 9/11/14 Eligible – 9/30/14 Eligible – 9/30/14 Ms. Cassidy moved to ratify the application recommendations presented in the table. Ms. Quigley seconded. The motion was unanimously approved with a roll call vote. 1 Weekly Reimbursements and Denied Claims Mr. Wadsworth presented the summary of weekly claim reimbursements for the weeks of July 30, 2014 through October 1, 2014, and recommended that the Board ratify the reimbursements. These 191 claims totaled $1,202,450.18. (See table below). RATIFICATION OF WEEKLY REIMBURSEMENTS Board Meeting October 20, 2014 Week of Number of Claims Funds Reimbursed 7/30/2014 35 $175,609.75 8/6/2014 17 $115,756.13 8/13/2014 1 $255,763.76 8/20/2014 19 $125,351.51 8/27/2014 1 $119,852.83 9/3/2014 26 $86,537.06 9/10/2014 20 $76,450.58 9/17/2014 20 $77,063.18 9/24/2014 23 $90,325.01 10/1/2014 29 $79,740.37 Total 191 $1,202,450.18 In addition, there were two claims that the staff denied: 20140923A (Ben Taylor Inc., Cut Bank) – the invoice was claimed on a previous claim; and 201040923B (Morton Cardtrol & Bulk Plant, Polson) - the invoice was claimed on a previous claim. Mr. Morris moved to accept the weekly claims and denied claims as provided in the packet. The motion was seconded by Mr. McDermott. The motion was passed unanimously by a roll call vote. Claims over $25,000 Mr. Wadsworth presented the Board with the claims for an amount greater than $25,000 that had been reviewed by Board staff since the last Board meeting (See table below). There were two claims with an estimated total reimbursement of $73,745.18. Mr. Wadsworth recommended ratification of these claims. Location Facility Name FacilityRelease ID Numbers Claim# Claimed Amount Adjustments Penalty Co-pay Estimated Reimbursement Lambert Nortana Grain Co Park Super Service 42003174742 20140707Z $74,989.06 -0- -0- $17,500.00 $57,489.06 38050464162 20140811A $32,512.24 -0- -0- $16,256.12 $16,256.12 Broadus Total $73,745.18 After some discussion regarding the Board staff work plan and claim review processes, a motion was made by Ms. Cassidy to accept the staff’s recommendation to ratify the claims greater than $25,000, as listed in the table. Mr. McDermott seconded the motion. The motion was unanimously approved by a roll call vote. 2 Board Attorney Report Paul Johnson presented the Board Attorney’s Report. Mr. Johnson indicated that Andres Haladay, the Agency Legal Services attorney representing the Board in the Miles City Short Stop case, was unable to be in attendance to give an update. Mr. Johnson indicated that the DEQ was served a complaint in the Miles City Short Stop matter and is now a party to the proceedings and it is becoming more complex. In the Cascade County matter, Mr. Johnson stated that the owner-operator has asked for a MAPA hearing and is waiting for approval of the minutes of August 11, 2014 meeting. Location Facility Facility # & Release # 09-04443 Release #4800 Disputed/ Appointment Date Dispute of reduced reimbursement Miles City Miles City Short Stop Billings Crane Building 99-95132 Release #4894 Release ineligibility contested – Sept 20, 2012 Great Falls Cascade County Shops 07-05708 Release 3051-C1, C2, C3 & C4 Denial of applications Status Hearing date has been extended to November 12, 2015. Board granted extension of time for hearing to February 28, 2015. DEQ has closed site; anticipate stipulated motion for dismissal. Hearings Examiner Appointed September 5, 2014. Awaiting Scheduling Order. Fiscal Report Mr. Wadsworth presented the fiscal report for the period ending September 30, 2014. There were no questions on the report. Board Staff Report Mr. Wadsworth presented the Board Staff report. The report indicated there was one release recommended to be ineligible that is still pending a final determination. This facility is in White Sulphur Springs and there are noncompliance issues at the site that are being discussed with the owner. Mr. Wadsworth also pointed out the report of eligible facilities that have claims suspended due to system violations. Ronna Alexander, Executive Director of the Petroleum Marketers Association, asked if issues with these sites were the result of missing inventory control records. Mr. Wadsworth indicated he did not have that information at this time. Trent Biggers, representing Town Pump, asked how an owner removes a site from the list if a compliance matter is resolved, and why the Rocker Flying J was still on the report. Mr. Wadsworth indicated that normally, once the Administrative Order has been resolved, the issue is with the adjustment to reimbursement recommended by the Board staff. Once that issue is resolved with the Board, the site is removed from the list. He stated that he would check into the records on the Flying J site and correct the list if necessary. Petroleum Tank Cleanup Section Report (formerly Petroleum Technical Section Rebecca Ridenour, Petroleum Tank Cleanup Section manager, presented a report of Section activities for the period August 11, 2014 to October 7, 2014. There were 5 confirmed releases, 8 closures submitted, 11 closures approved and 17 releases resolved. Between January 1, 2014 and October 7, 2014 there were 27 confirmed releases, 77 closures submitted, 80 approved closures, 3 closure requests denied, and 69 releases resolved. The Section currently has 1,246 active releases, of which 365 are Fund eligible. 3 Ms. Ridenour briefly spoke about the EPA Tier II Fund Soundness Report and the Strategic Planning efforts that are leading to new work strategies. There is an effort to balance the work being requested by DEQ with the funds available through the Petroleum Fund. Ms. Ridenour discussed corrective action plans for estimated amounts greater than $100,000. These included the Short Stop Store in Miles City, Facility ID #09-04443, DEQ Release #4800, and the Daum Ranch, Facility ID #5606973, DEQ Release #1666 in Pryor. The Short Stop Store, Fac ID 09-04443, Rel #4800, Miles City, WPID 407037 DEQ started working on the Short Stop Store on October 2010. Olympus Technical Services was hired to do emergency abatement measures and investigation activities. Olympus installed and SVE system and monitoring wells. A chemical oxidant and oxygen release compound was injected to remediate residual petroleum hydrocarbons in the soil and groundwater in April 2013. In June 2014, groundwater monitoring data showed a declining trend in dissolved-phase petroleum hydrocarbon concentrations across the site. The August 2014 indoor air sampling detected naphthalene and 1, 2, dichloroethane (1,2, DCA) above screening levels for the first time. Neither constituent appeared to be related to Release #4800 at the Short Stop Store. Follow-up vapor monitoring will be conducted in the winter. Chemicals found in petroleum products are also found in many other products, such as cleaning products, carpet, and smoking. They are unsure of the source of the contaminants at this time. If it was from the contaminants in the groundwater and soils, it should have shown up before now. Daum Ranch, Fac ID 56-06973, Rel #1666, Pryor, WPID #7347 With regard to the Daum Ranch site, a review of the petroleum release file indicated that 3 underground storage tanks (USTs) were removed from the facility in 1993. A remedial investigation was completed in 2013. It was determined that the most effective and safest alternative to reduce the petroleum hydrocarbon impacting the groundwater was to excavate and dispose of the petroleum impacted soils. Mr. Wadsworth stated that the Board staff had done their review of the plan and had no comment for the Board. Public Forum Ronna Alexandra asked about the status of the budget for the program for the upcoming legislation session. Mr. Wadsworth informed the Board he would look into the matter and email the information to the Board and to Ms. Alexander. Mr. Wadsworth emailed the Biennium 2016/2017 Budget Request to the Board and to Ms. Alexander on November 4, 2014. The details of the request can be found in Section C of the Governor’s 2017 Biennium Executive Budget. The next Board meeting will be held on Monday, February 2, 2015. The meeting adjourned at 11:21am. Roy Morris – Acting Presiding Officer 4 February 2, 2015 Action Item ELIGIBILITY RATIFICATION Location Bozeman Billings Board Staff Recommendations Pertaining to Eligibility From October 21, 2014 through February 2, 2015 Site Name Facility DEQ Release # Eligibility Determination – ID # Release Year Staff Recommendation Date Town Pump #1 16-08674 5031 Eligible – 10/30/14 Aug 2014 Hoggies Truck 5606598 5023 Eligible – 01/21/2015 Wash Inc. Back to the top 5 February 2, 2015 Action Item Petroleum Tank Release Compensation Board RATIFICATION OF WEEKLY REIMBURSEMENTS Board Meeting February 2, 2015 Week of 08-Oct-14 Number of Claims 4 Funds Reimbursed $94,036.60 15-Oct-14 28 $84,429.08 22-Oct-14 21 $107,193.37 29-Oct-14 14 $68,561.39 05-Nov-14 31 $79,291.15 12-Nov-14 23 $82,546.23 19-Nov-14 9 $80,939.22 26-Nov-14 1 $148,689.80 03-Dec-14 21 $43,116.27 10-Dec-14 1 $110,333.48 17-Dec-14 34 $87,585.94 24-Dec-14 20 $88,121.12 07-Jan-15 32 $92,303.85 14-Jan-15 11 $90,783.38 250 $1,257,930.88 Back to the top 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Petroleum Tank Release Compensation Board Claims Denied Between 01/01/2014 and 01/21/2015 and Not Ratified Facility ID/Alt ID: 1502330 / 15-02330 ClaimID Facility Name: Amount Date Denied 20140210J $1,125.00 1/12/2015 Total: $1,125.00 Kalispell, City Service West Reason Denied Justification has not been provided to allow additional project management time for work plan ID 6863. ------------------------------------------------------------------------------Facility ID/Alt ID: 1505069 / 15-05069 ClaimID Facility Name: Amount Date Denied 20141014H $1,350.00 1/12/2015 Total: $1,350.00 Kalispell, Equity Supply Convenience Store Reason Denied DEQ approved 2 reports. This is the third report. Costs not approved. ------------------------------------------------------------------------------Facility ID/Alt ID: 4600762 / 46-00762 ClaimID Amount 20150102B $785.09 Total: $785.09 Facility Name: Date Denied 1/12/2015 Dagmar, Prairie States Coop Terminal Reason Denied As set forth in Administrative Rule of Montana 17.58.336(7) and the 476 days the administrative order was open, the staff is permitted to reimbursement 0% of future claims on release #3619. ------------------------------------------------------------------------------Facility ID/Alt ID: 5603658 / 56-03658 ClaimID Facility Name: Amount Date Denied 20141208O $3,480.00 1/12/2015 Total: $3,480.00 Billings, Yellowstone County Public Works Dept Reason Denied Ineligible release per DEQ's noted violation of ARM 17.56.402(2)(iii). ------------------------------------------------------------------------------Grand Total: TOTAL NUMBER OF CLAIMS FOR THIS REPORT: 4 $6,740.09 Reviewed By: Date: Board Approval By: Date: Wednesday, January 21, 2015 Page 1 of 1 Board Reports _ Claims Denied 29 CLAIMS OVER $25,000.00 * February 2, 2015 Location Facility Name Helena Noons 438 Malta Packys #4957 Flying J Inc Miles City Malta Ezzies Wholesale FacilityRelease ID Numbers 25039184063 36023594957 9086614365 36066714468 Claim# Claimed Amount Adjustments Penalty Co-pay Estimated Reimbursement 20141103D $29,242.99 -0- -0- -0- $29,242.99 20141114H $26,846.61 $219.80 -0- $13,313.40 $13,313.41 20141124G $26,437.39 $6,591.14 -0- -0- $19,846.25 20141204C $46,375.20 $1,915.20 -0- $6,424.51 $38,035.49 Total $100,438.14 * In accordance with Board communication of delegation to the Executive Director signed on December 8, 2003, the Board staff will review the claims for the Board. If the dollar amount of the claim is above $25,000.00 the claim must be approved and ratified by the Board at a regularly scheduled meeting before reimbursement can be made. **In the event other non-Board claims are paid between this Board meeting and payment of the claim listed above, the amount of co-payment remaining may differ from that estimated at this time. Reviewed for Reimbursement by: _______________________ Date____________________ February 2, 2015 Action Item Board Approval by: _______________________ Date____________________ 30 Back to the top 31 32 33 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 2503918 Release ID: 4063 FacilityName: Noons 438 WP ID: 7600 Task # Task Name City: Helena WP Name: R-B-SB/WI/GWM/S Phase Estimated Cost Actual Cost WP Complete: Work Plan $1,519.36 $1,139.52 $379.84 2 Project Management $3,418.56 $2,041.64 $1,376.92 3 Mobilization $104.10 $104.10 $0.00 4 Fieldwork Monitoring Well Installation 05/13/2014 Balance Comment 1 5 WP Date: req1519.36,CAP_AC-07 [email protected], form 8 m$6.94/mfor15miles (well install) $4,937.92 $4,937.92 $0.00 $31,963.68 $29,242.99 $2,720.69 4w,70d,2",$b68.41/ft,$w27.12/ft,R o, equipment, form 8s 6 Miscellaneous $1,645.19 $370.80 $1,274.39 7 8 Survey Miscellaneous $2,568.00 $1,181.48 $716.17 $465.31 9 Miscellaneous $136.40 $1,200.32 $200.00 [email protected], [email protected] 8's o, soil cutting disposal, Form 8-waste water disposal o, utility locates 10 Mobilization $1,336.72 11 Monitoring $7,480.00 12 Remediation System $4,429.20 $1,320.82 $3,108.38 om,labor (40@$86.99), form 8 (10@$94.96) 13 Miscellaneous $6,000.00 $77.88 $5,922.12 o, utilities (24mo@$250.00/mo) 14 Laboratory Analysis w/fee $10,720.00 $2,305.50 $8,414.50 4a,52w,12s, 2 BTEX, form 8 15 Report $2,339.00 $2,339.00 $0.00 16 Report $3,384.00 17 Miscellaneous Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost 4e,11w,70d,2",$170.00/well $83,601.71 1r,4w,req2339,RPT_AR-03, 2r,11w,req1692,RPT_MR-01 $374.50 Total: m$6.82/mfor196miles (GWM & O&M) o, electrician, form 8 $44,732.74 $38,868.97 Page 1 of 1 34 Petroleum Tank Release Compensation Board PO Box 200902 Helena, MT 59620-0902 (406) 841-5090 Website: www.deq.mt.gov/pet/default.mcpx December 01, 2014 Adams Convenience Store Inc (OWNER) David Adams Location Malta 1627 West Main, Suite 332 Facility ID 3602359 Bozeman, MT 59715 Facility Name Packys #4957 SUBJECT: Recommended Adjustment(s) to Claim for Reimbursement The Board staff has proposed the following adjustment(s) to this claim and has temporarily suspended it to allow an opportunity for you to comment on the proposed adjustment(s). Review the adjustments and contact me by phone or email within 14 calendar days of this date to discuss the specifics of any issue(s) you may have with the adjustment(s). After 14 days, the suspended claim will be released for processing. If the adjustment can’t be resolved at the staff level, you may dispute the proposed adjustment(s) at the next Board meeting. Should this be necessary, please notify me via email so that I may request to have this matter placed on the agenda of the meeting. Once the Board has made a determination, any dispute will be conducted according to Montana Code Annotated and compliant with the Montana Administrative Procedures Act. _______________________________________________________________________________________________ Claim ID: 20141114H Release ID: 4957 Claim Amount: $26,846.61 Ordinal: 3 Reimbursement To-date: $1,086.43 Adjustments: Action Reduced Total Adjustments: Amount $219.80 Comment Reimbursement for Lab Analysis based on actual invoices $219.80 JoAnne Adydan Correspondence _ Recommended Adjustments 35 36 326.33 T9 $3.50 T10 3,140.00 per actual invoices $26,626.81 37 38 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 3602359 Release ID: 4957 FacilityName: Packys #4957 WP ID: 7550 Task # Task Name City: Malta WP Name: C-B-SB/WI/GWM/S Phase Estimated Cost Actual Cost WP Complete: WP Date: Balance Comment 1 Work Plan $1,165.00 $1,165.00 $0.00 2 Project Management $4,243.60 $2,333.99 $1,909.61 [email protected] 3 Mobilization $3,180.00 $1,596.16 $1,583.84 m$2.12/mfor1500miles 4 Fieldwork $7,124.22 $4,869.72 $2,254.50 5 Monitoring $2,040.00 6 Monitoring Well Installation 7 Miscellaneous req2404.01,CAP_RI-02 [email protected] 2e,6w,35d,2",$170.00/well $18,535.61 $15,353.99 $3,181.62 $956.45 $10.98 $945.47 $326.33 $3,143.50 2b,6w,35d,2",$b28.00/ft,$w26.00/ft,H o, equipment 8 9 10 Survey Lodging/Per Diem Laboratory Analysis w/fee $2,675.00 $276.00 $8,600.00 11 Report $1,692.00 1r,6w,req1692,RPT_MR-01 12 Report $2,765.00 1r,6w,req2765,RPT_RIR-02 Total: Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost $53,252.88 04/29/2014 $28,799.67 ($50.33) $5,456.50 12w,16s $24,453.21 Page 1 of 1 39 Petroleum Tank Release Compensation Board PO Box 200902 Helena, MT 59620-0902 (406) 841-5090 Website: www.deq.mt.gov/pet/default.mcpx December 09, 2014 Flying J Inc/ FJ Management (OWNER) Molly Gregersen 333 West Center Street N Salt Lake City, UT 84054 Location Miles City Facility ID 908661 Facility Name Flying J Inc - Miles City SUBJECT: Recommended Adjustment(s) to Claim for Reimbursement The Board staff has proposed the following adjustment(s) to this claim and has temporarily suspended it to allow an opportunity for you to comment on the proposed adjustment(s). Review the adjustments and contact me by phone or email within 14 calendar days of this date to discuss the specifics of any issue(s) you may have with the adjustment(s). After 14 days, the suspended claim will be released for processing. If the adjustment can’t be resolved at the staff level, you may dispute the proposed adjustment(s) at the next Board meeting. Should this be necessary, please notify me via email so that I may request to have this matter placed on the agenda of the meeting. Once the Board has made a determination, any dispute will be conducted according to Montana Code Annotated and compliant with the Montana Administrative Procedures Act. _______________________________________________________________________________________________ Claim ID: 20141124G Release ID: 4365 Claim Amount: $26,437.39 Ordinal: 9 Reimbursement To-date: $173,474.69 Adjustments: Action Amount Reduced $34.77 Reduced $1,234.00 Denied $954.00 Denied $1,924.62 Denied $167.75 Denied $113.00 Denied $1,071.00 Denied $828.00 Denied $264.00 Total Adjustments: Comment 3f - Two invoices are split in half and the other split into a third. Pet charge reimbursement declined. 3c - Rental charge for Geoprobe has no supporting documenation or receipt. 8 - Outside the scope of the original work plan and no form 8 or other work plan. 7 - Outside the scope of the original work plan and no form 8 or other work plan. 6d - Outside the scope of the original work plan and no form 8 or other work plan. 6c - Outside the scope of the original work plan and no form 8 or other work plan. 6b - Outside the scope of the original work plan and no form 8 or other work plan. 6 - Outside the scope of the original work plan and no form 8 or other work plan. 5b - Outside the scope of the original work plan and no form 8 or other work plan. $6,591.14 Correspondence _ Recommended Adjustments 40 41 Outside the scope of the original work plan and no form 7. Board Claim 42 43 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 908661 Release ID: 4365 FacilityName: Flying J Inc - Miles City WP Name: F-B-OI/WI WP ID: 7159 Task # Task Name City: Miles City WP Complete: Phase Estimated Cost Actual Cost WP Date: 03/22/2013 Balance Comment 1 Work Plan F $534.00 $534.00 $0.00 2 Project Management F $849.00 $838.50 $10.50 75%,req712,CAP_MR-01 75%, 14.0@$78.00,1.0@$40.00 3 Miscellaneous F $234.00 $224.00 $10.00 4 Project Management F $708.00 $589.00 $119.00 5 Fieldwork F $2,754.00 $2,754.00 $0.00 6 Fieldwork F $9,541.73 $8,080.90 $1,460.83 7 Monitoring Well Installation F $4,656.64 $4,003.94 $652.70 100% 1w,24d,2",$i56.00/ft,H 8 Miscellaneous F $316.25 $60.00 $256.25 75% - 100% equipment/supplies 9 Lodging/Per Diem F $339.00 $292.76 $46.24 Mobilization F $253.69 $253.00 $0.69 11 Laboratory Analysis w/fee F $500.00 $270.15 $229.85 12 Report F $1,965.00 $1,950.00 $15.00 $22,651.31 $19,850.25 $2,801.06 10 Total: Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost 100% Permits p 75% WI/LIF 8.0@$78.00,5.0@$48.00,2.0@$40.00 75% 54.0@$68.00 75% LIF 40b,24d,$i10275 75% 75% m$0.615/mfor550miles 100% 1w 75% 1r,req2706,WI/LIF,RPT_RIR-02 Page 1 of 1 44 Petroleum Tank Release Compensation Board PO Box 200902 Helena, MT 59620-0902 (406) 841-5090 Website: www.deq.mt.gov/pet/default.mcpx December 12, 2014 Ezzies Wholesale Inc (OWNER) Lawrence Poulton Location Malta 47259 US Highway 2 Facility ID 3606671 Malta, MT 59538 - 1770 Facility Name Ezzies Wholesale Inc SUBJECT: Recommended Adjustment(s) to Claim for Reimbursement The Board staff has proposed the following adjustment(s) to this claim and has temporarily suspended it to allow an opportunity for you to comment on the proposed adjustment(s). Review the adjustments and contact me by phone or email within 14 calendar days of this date to discuss the specifics of any issue(s) you may have with the adjustment(s). After 14 days, the suspended claim will be released for processing. If the adjustment can’t be resolved at the staff level, you may dispute the proposed adjustment(s) at the next Board meeting. Should this be necessary, please notify me via email so that I may request to have this matter placed on the agenda of the meeting. Once the Board has made a determination, any dispute will be conducted according to Montana Code Annotated and compliant with the Montana Administrative Procedures Act. _______________________________________________________________________________________________ Claim ID: 20141204C Release ID: 4468 Claim Amount: $46,375.20 Ordinal: 9 Reimbursement To-date: $5,076.58 Adjustments: Action Denied Total Adjustments: Amount Comment $1,915.20 Supplier is not allowed 7% markup on product provided to self $1,915.20 JoAnne Adydan Correspondence _ Recommended Adjustments 45 46 T7 not allowed - Essie's is not a sub contractor jla T10 T7 T10 27,360.00 17,100.00 Total $ 44,460.00 Board Claim 47 48 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 3606671 Release ID: 4468 FacilityName: Ezzies Wholesale Inc WP Name: C-S-SR WP ID: 7591 Task # Task Name City: Malta WP Complete: Phase Estimated Cost Actual Cost Work Plan $1,005.00 $1,005.00 $0.00 reqxxxx,CAP_xx-xx 2 Fieldwork $2,940.00 $2,940.00 $0.00 30@98 3 Mobilization $2,619.50 $2,619.50 $0.00 m$4.03/mfor650miles 4 Miscellaneous $216.00 $216.00 $0.00 o,HNU 5 6 Lodging/Per Diem Laboratory Analysis w/fee $340.00 $2,810.00 $387.32 $3,580.00 7 Soil Removal $35,985.00 $27,360.00 8 Report 9 Project Management Total: Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost ($47.32) ($770.00) $8,625.00 $2,723.00 Soil Removal 02/11/2014 Balance Comment 1 10 6T WP Date: 16s 2400lcy@$12.50lcy,E,L.H,B,C,D/Form 8 - addl 3.50/yd3 1r,0w,req2599.5,RPT_AR-04, $1,250.00 $1,250.00 $0.00 $18,500.00 $17,100.00 $1,400.00 $68,388.50 $56,457.82 $11,930.68 10@125 1700lcy@$10.00/B/F8/11-17-14 incl 1,400.00 for land farm tilling Page 1 of 1 49 February 2, 2015 Report Item Informational BOARD ATTORNEY REPORT PTRCB Case Status Report as of January 21, 2015 Location Facility Facility # & Release # Miles City Miles City Short Stop 09-04443 Release #4800 Billings Crane Building 99-95132 Release #4894 Great Falls Cascade County Shops 07-05708 Release 3051C1,3051C2,3051-C3 AND 3051-C4 Disputed/ Appointment Date Dispute of reduced reimbursement Release ineligibility contested – Sept 20, 2012 Denial of applications Status Hearing date has been extended to November 12, 2015. Board granted extension of time for hearing to February 28, 2015. Owner requested dismissal. Jan 19, 2015 Scheduling order is in effect and informal proceedings are ongoing Back to the top 50 February 2, 2015 Report Item Informational Petroleum Tank Release Compensation Fund Budget Status Report Operating Statement December 31, 2014 Legislative Approp. Standard Budget Rev/Exp through 12/31/2014 Total FY15 Projected Rev/Exp Projected Rev/Exp Projected Fiscal Year End Balance Revenues: MDT Fee Revenue Estimate Estimated STIP interest earnings Misc Revenue- Settlements Total Revenues: 7,196,700 3,000 410,750 7,610,450 7,196,700 3,000 410,750 7,610,450 3,315,454 249 20,000 3,335,703 Expenditures: (Includes current year expenses only) Board Personal Services Contracted Services Contingent Contract Services Operating Subtotal 389,621 225,000 1,000,000 236,868 1,851,489 389,563 225,000 1,000,000 236,868 1,851,431 169,485 8,249 0 52,054 229,788 Personal Services Contracted Services Operating & Equipment Subtotal 1,023,167 50,000 340,379 1,413,546 1,023,167 50,000 340,379 1,413,546 Long Term Database Funding Approved Under HB10 240,000 240,000 4,071,324 536 0 4,071,860 7,386,778 785 20,000 7,407,562 190,078 (2,215) (390,750) (202,888) 223,500 216,751 0 81,392 521,643 392,985 225,000 0 133,446 751,431 (3,422) 0 1,000,000 103,422 1,100,000 442,313 11,027 185,189 638,528 622,513 29,175 123,330 775,018 1,064,826 40,202 308,519 1,413,546 (41,659) 9,798 31,860 (0) 13,500 0 13,500 DEQ Regulatory Administrative Budget Remaining 226,500 1,326,500 Claims/Loan Regular Claim Payments Accrual - FY15 for use in FY16 Loan Repayment (All loans paid in full) Subtotal Total Expenses: 5,483,243 16,757 5,500,000 5,105,000 395,000 0 5,500,000 1,968,254 0 0 1,968,254 2,353,194 395,000 0 2,748,194 4,321,448 395,000 0 4,716,448 783,552 0 0 783,552 9,005,035 9,004,977 2,850,070 4,044,855 6,894,925 2,110,052 $485,632 $27,005 $512,637 Increase/(Decrease) of Revenues over Exp as of December 31, 2014 Accrual Information Accrued in FY2014 for use in FY2015 Total Payments Accrual Balance Claims 592,725 384,939 207,786 Accrued in FY2014 for use in FY2015 Total Payments Accrual Balance Database 100,100 0 100,100 Average Monthly Claims FY15 to 12/31/14 - Current Year Only FY15 to 12/31/14 - Current Year + Accruals Actual Claims Paid in FY 2015 (Current Year + FY 14 Accruals) 328,042 392,199 2,353,193 59% of goal Beginning Balance Revenues Expenditures (affecting balance) Projected Balance at 6/30/15 Fund Balance 205,557 7,407,562 6,589,652 1,023,467 Revenue Revenue & Transportation Interim Committee Revenue Estimate set 11/19/12 for FY15 Biennial Report Revenue Estimate for FY15 MDT FY15 Revenue Estimate MDT FY15 Revenues Collected 46% Settlements Settlements received during FY2015 Settlements received to date Cash Balance 798,282 7,407,562 6,887,477 1,318,367 6,979,000 7,200,000 7,196,700 3,315,454 20,000 2,122,623 0.59 At $.0075 per gallon sold, the revenue collected this year is equivalent to 442.1 million gallons sold. Back to the top 51 1/12/2015 REPORT ITEM INFORMATIONAL Cash Flow Analysis - FY15 Beginning Cash Balance Revenue MDT Revenue ($.0075/gallon) STIP Earnings Settlements Other Misc Revenue Total Revenue Expenditures Petro Board Claims Petro Board Staff Prior Year Adj & Accrual Payments HB10 Database Expenditures Remediation Total Expenditures Ending Cash Balance Actuals September-14 October-14 311,456.53 419,124.69 July-14 798,282.25 August-14 722,203.13 November-14 524,449.50 December-14 684,935.88 672.44 0.00 620,491.75 17.88 728,638.78 59.10 710,575.94 44.49 634,001.79 58.72 621,072.95 68.78 0.00 672.44 0.00 620,509.63 0.00 728,697.88 0.00 710,620.43 0.00 634,060.51 20,000.00 641,141.73 0.00 16,876.09 888.50 221,839.86 56,123.58 186,825.75 252.00 155,988.53 621,029.72 439,252.35 40,838.39 419.00 6,948.00 117,837.88 605,295.62 291,445.73 42,750.16 35,275.39 302,139.55 30,641.78 0.00 58,986.97 76,751.56 713,576.91 42,557.72 164,143.17 6,300.00 104,678.43 1,031,256.23 104,102.85 473,574.13 96,933.71 429,715.04 722,203.13 311,456.53 419,124.69 524,449.50 684,935.88 896,362.57 52 1/12/2015 REPORT ITEM INFORMATIONAL Cash Flow Analysis - FY15 Beginning Cash Balance Revenue MDT Revenue ($.0075/gallon) STIP Earnings Settlements Other Misc Revenue Total Revenue Expenditures Petro Board Claims Petro Board Staff Prior Year Adj & Accrual Payments HB10 Database Expenditures Remediation Total Expenditures Ending Cash Balance Projected March-15 April-15 921,369.21 945,705.21 January-15 896,362.57 February-15 897,033.21 May-15 896,228.21 June-15 920,564.21 561,323.86 85.78 585,000.00 75.00 585,000.00 75.00 585,000.00 75.00 585,000.00 75.00 1,170,000.00 150.00 0.00 561,409.64 0.00 585,075.00 0.00 585,075.00 0.00 585,075.00 0.00 585,075.00 0.00 1,170,150.00 392,199.00 60,500.00 0.00 392,199.00 60,500.00 0.00 392,199.00 60,500.00 0.00 392,199.00 81,000.00 0.00 392,199.00 60,500.00 0.00 392,199.00 198,643.00 0.00 108,040.00 560,739.00 108,040.00 560,739.00 108,040.00 560,739.00 161,353.00 634,552.00 108,040.00 560,739.00 181,505.00 772,347.00 897,033.21 921,369.21 945,705.21 896,228.21 920,564.21 1,318,367.21 53 Petroleum Tank Release Compensation Fund Budget Status Report Monthly Expenditure/Projection Summary December 31, 2014 EXPENDITURE SUMMARY PERIOD ENDING 07/31/14 PERIOD ENDING 08/31/14 PERIOD ENDING 09/30/14 PERIOD ENDING 10/31/14 PERIOD ENDING 11/30/14 PERIOD ENDING 12/31/14 PERIOD ENDING 01/31/15 PERIOD ENDING 02/28/15 PERIOD ENDING 03/31/15 PERIOD ENDING 04/30/15 PERIOD ENDING 05/31/15 PERIOD ENDING 06/30/15 FY15 TOTALS REVENUE MDT Fees Stip Earnings Misc Revenue Total Revenue 672.44 620,491.75 17.88 728,638.78 59.10 710,575.94 634,001.79 44.49 58.72 672.44 620,509.63 728,697.88 710,620.43 634,060.51 Personal Services Contracted Services Contingent Contract Services Operating Subtotal 13,692.57 0.00 30,300.22 3,966.84 45,774.82 708.33 28,041.00 1,316.28 33,232.65 1,673.33 18,444.10 583.87 3,183.52 16,876.09 8,290.66 42,557.72 9,640.43 56,123.58 11,481.11 40,838.39 7,844.18 42,750.16 11,613.81 30,641.78 0.00 0.00 0.00 Regular CY Claim Payments Subtotal 0.00 0.00 713,576.91 713,576.91 221,839.86 221,839.86 439,252.35 291,445.73 439,252.35 291,445.73 302,139.55 302,139.55 0.00 0.00 0.00 Personal Services Contracted Services Operating Subtotal 34,960.85 0.00 24,026.12 58,986.97 75,484.10 334.86 28,859.47 104,678.43 115,838.64 1,958.80 38,191.09 155,988.53 67,817.27 74,862.36 3,730.31 3,070.78 46,290.30 26,169.71 117,837.88 104,102.85 73,349.38 1,931.83 21,652.50 96,933.71 0.00 0.00 0.00 CURRENT YEAR EXPENDITURE TOTALS PRIOR YEAR EXPENDITURES TOTAL EXPENDITURES Board & DEQ Non-Claim costs Claims Accrual Payments Database Accrual Payments 75,863.06 860,813.06 433,951.97 597,928.62 438,298.74 429,715.04 0.00 0.00 888.50 76,751.56 1,724.38 862,537.44 433,951.97 597,928.62 438,298.74 429,715.04 0.00 158,676.27 146,853.01 127,575.49 0.00 621,072.95 68.78 20,000.00 641,141.73 0.00 0.00 3,315,453.65 248.97 20,000.00 0.00 3,335,702.62 0.00 0.00 0.00 169,485.36 8,248.65 0.00 52,053.71 229,787.72 0.00 0.00 1,968,254.40 0.00 1,968,254.40 0.00 0.00 0.00 442,312.60 11,026.58 185,189.19 638,528.37 0.00 0.00 0.00 0.00 2,836,570.49 0.00 0.00 0.00 0.00 2,612.88 0.00 2,839,183.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 BOARD CLAIMS DEQ Regulatory PROJECTION SUMMARY 75,863.06 147,236.15 212,112.11 162,418.79 186,825.75 PERIOD ENDING 08/31/14 PERIOD ENDING 09/30/14 419.00 35,275.39 868,316.09 384,938.93 0.00 PERIOD ENDING 07/31/14 PERIOD ENDING 10/31/14 PERIOD ENDING 11/30/14 PERIOD ENDING 12/31/14 PERIOD ENDING 01/31/15 PERIOD ENDING 02/28/15 PERIOD ENDING 03/31/15 PERIOD ENDING 04/30/15 PERIOD ENDING 05/31/15 PERIOD ENDING 06/30/15 561,323.86 85.78 561,409.64 585,000.00 75.00 585,075.00 585,000.00 585,000.00 75.00 75.00 585,075.00 585,075.00 31,500.00 18,750.00 31,500.00 18,750.00 31,500.00 18,750.00 47,250.00 18,750.00 31,500.00 18,750.00 50,250.00 123,001.00 10,250.00 60,500.00 10,250.00 60,500.00 10,250.00 60,500.00 15,000.00 81,000.00 10,250.00 60,500.00 25,392.00 198,643.00 392,199.00 392,199.00 392,199.00 392,199.00 392,199.00 0.00 392,199.00 392,199.00 392,199.00 392,199.00 392,199.00 392,199.00 2,353,194.00 395,000.00 395,000.00 787,199.00 2,748,194.00 86,625.00 4,165.00 17,250.00 108,040.00 86,625.00 129,938.00 4,165.00 4,165.00 17,250.00 27,250.00 108,040.00 161,353.00 86,625.00 4,165.00 17,250.00 108,040.00 146,075.00 8,350.00 27,080.00 181,505.00 560,739.00 560,739.00 634,552.00 560,739.00 FY15 TOTALS REVENUE MDT Fees Stip Earnings TOTAL REVENUE PROJECTED 0.00 0.00 0.00 0.00 0.00 0.00 585,000.00 75.00 585,075.00 1,170,000.00 4,071,323.86 150.00 535.78 1,170,150.00 4,071,859.64 BOARD Personal Services Contracted Services Contingent Contract Services Operating Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 223,500.00 216,751.00 0.00 81,392.00 521,643.00 CLAIMS Regular CY Claim Payments Anticipated FYE14 Accrual Subtotal 0.00 0.00 0.00 0.00 0.00 DEQ Regulatory Personal Services Contracted Services Operating Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 86,625.00 4,165.00 17,250.00 108,040.00 PROJECTION TOTALS 0.00 0.00 0.00 0.00 0.00 0.00 560,739.00 622,513.00 29,175.00 123,330.00 775,018.00 1,167,347.00 4,044,855.00 54 Board Staff Eligibility Graph Release Counts 5 E P Oct Nov Qtr4 2013 Dec Jan Feb Qtr1 Mar May Jun Qtr2 Jul Sep Qtr3 2014 Eligibility Status (Blue=Eligible, Red=Ineligible, Yellow=Pending) Oct Dec Qtr4 February 2, 2015 Board Staff Report Informational 0 55 Back to the top Board Staff Claim Count Graph 180 Total Claim and Reimbursement Counts 160 140 120 100 80 60 40 20 Jul Aug Sep Oct Qtr3 Nov Qtr4 2013 Dec Jan Feb Qtr1 Mar Apr May Jun Jul Qtr2 Aug Qtr3 2014 Claims for Reimbursement (blue=Claims, red=Reimbursements) Sep Oct Nov Qtr4 Dec February 2, 2015 Board Staff Report Informational 0 56 Board Staff Claim Value Graph Total Claim and Reimbursement Amounts $1,200,000.00 $1,000,000.00 $800,000.00 $600,000.00 $400,000.00 $200,000.00 Oct Nov Qtr4 2013 Dec Jan Feb Qtr1 Mar Apr May Jun Jul Qtr2 Aug Qtr3 2014 Claim Activity (blue=Claims, red=Reimbursements) Sep Oct Nov Qtr4 Dec February 2, 2015 Board Staff Report Informational $0.00 57 Petroleum Tank Release Compensation Board Work Plans Reviewed and Owner Informed Funds NOT Obligated by Priority as of 1/21/2015 FACILITY WORKPLAN NAME DATE ID RECEIVED 9/29/2014 10/24/2014 RELEASE PRIORITY ID (Proj Officer) COST EST. FACILITY NAME WORKPLAN REGION DATE 5608671 F-B-WI/OI/GWM 7511 2007 1.3 (Shearer) $186,586.64 Town Pump Inc Billings 2 9/26/2014 3 1608674 C-S-SR 9461 5031 1.3 (Bergum) $214,549.00 Town Pump Inc Bozeman 1 10/7/2014 2 3689 1.4 (Pool Helena) $82,890.90 Farmers Union Oil Co Circle 11/6/2014 3 Total $401,135.64 1/14/2015 WP ID SubTotal Number of Workplans: 2 2906376 R-B- SB/GWM Total $82,890.90 9621 SubTotal Number of Workplans: 1 12/21/2014 3802464 C-B-SR/LF/GWM 7639 432 2.0 (Shearer) $110,185.00 Broadus Truck & Supply #432 10/31/2014 3 12/24/2014 3803413 C-B-GWM/SR/LF 8201 341 2.0 (Shearer) $130,167.00 Former True Value Hardware 10/31/2014 3 3765 3.0 (Raty) $35,524.05 Langs Cemetery Service Inc 11/26/2014 3 407037 4800 4.0 (Skibicki) $876,476.05 Total $240,352.00 12/22/2014 SubTotal Number of Workplans: 2 5605323 C-S-SR Total $35,524.05 7635 SubTotal Number of Workplans: 1 6/27/2014 904443 C--B-SVE 8/23/2014 9995030 F-W-GWM 8301 4486 4.0 (Bergum) $3,013.70 Scotts Auto Body 8/4/2014 2 9/17/2014 2804835 F-W-GWM 8841 2814 4.0 (Bergum) $5,069.00 Ennis Office Park 9/10/2014 2 9/30/2014 507633 F-W-WA 8861 333 4.0 (Shearer) $3,076.15 Rockvale Travel Plaza 9/29/2014 3 10/1/2014 3708692 F-W-GWM 8981 1277 4.0 (Bergum) $8,418.59 Town Pump Inc Conrad 9/30/2014 1 8901 333 4.0 (Shearer) $32,565.00 Rockvale Travel Plaza 10/24/2014 3 4598 5.0 (Pool Helena) 7/29/2014 1 1/13/2015 507633 C-S-SR Total $928,618.49 8/5/2014 7613 $7,061.00 Auto Service Center SubTotal Number of Workplans: 1 Total $1,695,582.08 Wednesday, January 21, 2015 Manager Reports _ WP Reviewed and O/O Informed NOT ObligatedByPriority Page 1 of 1 February 2, 2015 Board Staff Report Informational Total Number of Workplans: 13 3 SubTotal Number of Workplans: 6 708809 F-W-GWM Total $7,061.00 The Short Stop Store 58 February 2, 2015 Board Staff Report Informational PTRCB ELIGIBLE FACILITIES THAT MAY HAVE SUSPENDED OR ADJUSTED CLAIMS DUE TO SYSTEM VIOLATIONS As of January 21, 2015 FID City 643 Dillon Facility Number 01-05401 984 Kalispell 15-09820 1105 Billings 56-05491 1118 Missoula 32-01356 1123 Hysham 52-01905 1469 Wibaux 55-02446 1638 Dagmar 46-00762 1775 Billings Ryegate 56-04951 19-05338 2281 Fairview 42-03914 2301 2301 2301 Billings Billings Billings 56-06609 56-04839 56-05074 Site Name Dietrich’s College Exxon Mulligan’s Conoco Dons Car Wash Grand Ave Frontier Gas and Grocery Farmers Union Oil Wibaux County Shop Prairie States COOP Terminal SOCO Express 10 Ryegate Conoco Mini Mart 714 (Loaf N Jug) Short Stop Stockton Oil Co Lockwood Interstate Exxon G:\PTRC\PET\BOARDMTG\AGENDADOCS02-02-15\Board Staff Report\5ViolationsTable02022015.docx Order Date Order Resolved date 10/25/05 Suspension Letter date 8/8/06 10/14/05 8/22/06 11/13/07 6/12/06 6/12/06 12/8/06 10/25/06 10/30/06 9/12/08 9/1/06 9/6/06 1/11/07 7/2/08 3/6/09 10/10/08 11/12/08 1/29/10 6/15/09 Violation letter 8/4/03 8/25/2014 6/17/09 8/4/03 DEQ letter 9/4/2014 10/5/09 11/8/11 7/25/2014 7/25/2014 7/25/2014 9/8/2014 9/8/2014 9/8/2014 9/9/2014 59 Montana Department of Environmental Quality Petroleum Tank Cleanup Activity Report Jan 20, 2015 The number of confirmed, active, and resolved petroleum releases, the number of releases approved for closure, and the total number of releases evaluated for closure are summarized below. Petroleum Release Activity since Last Board Meeting - Oct 20, 2014 to Jan 20, 2015 Release Status Confirmed Releases Closure Submitted Closure Approved Releases Resolved (Closed) Activity 10 12 10 18 Petroleum Release Activity from - Jan 01, 2015 to Jan 20, 2015 Release Status Confirmed Releases Closure Submitted Closure Approved Closure Denied Releases Resolved (Closed) Activity 1 1 0 0 1 Summary of All Petroleum Release Activity to Jan 20, 2015 Total Confirmed Releases Total Resolved Releases Total Active Releases Total Active and Eligible Active Ineligible Active Undetermined 4,637 3,414 1,240 762 108 358 Back to the top 60 Facility Name:Oie Motor Company Physical Address: 119 E. First Street, Big Timber, Montana Facility ID: 49-05153 Release Number: 104, 4213 Priority: 1.3 – High Priority Remediation Work Plan This Work Plan (WP) is required to cleanup Releases 104 and 4213 and move toward closure. The approved work plan consists of installation, operation, and maintenance of an in-situ ozone treatment system. The Ozone injection system will be designed to optimize the removal of diesel-range hydrocarbons from the groundwater. The local geology consists primarily of gravels, cobbles, and boulders. The estimated cost for this work plan is $167,091. On July 9, 2013, AJM Inc. submitted a Remedial Alternatives Analysis Report to DEQ. The RAA report compared and discussed cleanup alternatives for the residual petroleum hydrocarbons in the groundwater at the facility and determines which of the alternatives is the most cost-effective and reasonable to achieve remediation goals while being protective of human health and safety and the environment. Four alternatives were compared: No action, Enhanced Bioremediation, Ozone Injection Technology, and Insitu Treatment of Contamination using Fenton’s Reagent. Based upon review of the criteria included in ARM 17.56.605(3), AJM recommended ozone injection, as the most reasonable of the four alternatives. AJM completed an Ozone bench test to help determine if the proposed ozone injection will be successful in remediating the high diesel and gasoline contamination within the groundwater at the facility. In addition, the laboratory bench test was able to determine if mobile metals will become an issue using Ozone injection. Soil and groundwater were analyzed; the degradation rate of petroleum hydrocarbons, from the start of the project to the end of the project was significant. Site History Petroleum release #104 was reported on October 3, 1989, when the removal of five underground storage tanks (USTs). During removal it was discovered that the 500-gallon unleaded gasoline tank showed evidence of leakage. Up to 90 cubic yards of contaminated soil were excavated from beneath the tank. A second release #4213 occurred on the west side of the facility due to normal fuel spills, primarily diesel. In October 2001 the excavation and installation of SVE/biovent remedial systems began at each of the release sites. For release 4213, 300 cubic yards of soil were removed. Due to location of the impacted soils beneath existing utilities and roadways, significant hydrocarbons impacts were left in place. The SVE/biovent did not successfully cleanup the diesel release. Additional wells were installed in 2002 and 2003, significant downgradient hydrocarbon impacts were observed during the well installation. A slug test was conducted in 2004. The hydrocarbon plume had migrated over 450 feet from the source area was indicative that natural attenuation was not sufficient to limit the expansion of the plume. See Map for proposed ozone well and system locations. 61 62 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 4905153 Release ID: 104 FacilityName: Oie Motor Co Inc WP Name: C-B-OX/GWM WP ID: 7640 Task # Task Name City: Big Timber Phase Estimated Cost Actual Cost WP Complete: WP Date: 09/09/2014 Balance Comment 1 Work Plan C $720.00 2 Remediation System C $1,800.00 50% Project Management 40.0@$90.00,d,ev 3 Remediation System C $1,375.00 50% Clearwater Group 25.0@$110.00,d,ev 4 Project Management C $900.00 50% Ozone System 20.0@$90.00 5 Project Management C $217.50 50% Contracts/Insurance Review 5.0@$87.00 6 Mobilization C $448.20 50% Staff Scientist 360@$2.49 7 Fieldwork C $1,660.00 8 Remediation System C $12,133.80 9 Miscellaneous C $412.20 10 Lodging/Per Diem C $1,966.50 50% well install,connect laterals,sys install, monitoring 11 Project Management C $2,205.00 50% Engineer II connect laterals, system install & monitoring 49.0@$90.00 12 Fieldwork C $1,580.00 50% install laterals [email protected],[email protected], is,su,mo 13 Fieldwork C $5,350.00 50% Trench Work 200ft@$50.00/ft 14 Miscellaneous C $1,160.00 50% Field Materials/Supplies 15 Mobilization C $3,624.00 50% Tech III [email protected] ,connect laterals,sys install,monitoring 16 Remediation System C $2,360.00 50% System Startup 20.0@$80.00,40.0@$78.00,is,su,mo 17 Remediation System C $17,500.00 18 Remediation System C $2,400.00 50% Well Points 8.0@$600.00/point,is 19 Miscellaneous C $2,250.00 50% NW energy pole, meter, and connection 20 Fieldwork C $212.50 21 Remediation System C $1,610.00 50% Test System 20.0@$161.00,su,mo, 22 Report C $1,080.00 50% 1r,24.0@$90.00,RPT_AR-07 23 Fieldwork C $3,400.00 50% GWM 4e,10.0@$90.00 24 Fieldwork C $3,510.00 50% 90hrs@$78.00 system maint ck 25 Miscellaneous C $1,500.00 50% GWM Equip & Tools Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost 50% 16.0@$90.00,CAP_AC-07 50% Boring Install Oversight 40.0@$83.00 50% Boring Install 8b,6",45d,i$63.00/ft, H 50% Equipment 50% Shed/Trailer/Generator/Valves/Equipment,su 50% Electrician 5.0@$85.00 Page 1 of 2 63 Task # Task Name Phase Estimated Cost Actual Cost Balance Comment 26 Miscellaneous C $2,400.00 50% Utility Cost 24@$200.00 27 Miscellaneous C $1,800.00 50% Land Rental 24@$150.00 28 Laboratory Analysis w/fee C $2,600.00 50% 4e,10w 29 Report C $1,692.00 50% 2r,10w,1692,RPT_MR-01 Total: Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost $79,866.70 Page 2 of 2 64 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 4905153 Release ID: 4213 FacilityName: Oie Motor Co Inc WP Name: C-B-OX/GWM WP ID: 7641 Task # Task Name City: Big Timber Phase Estimated Cost Actual Cost 10/07/2014 Balance Comment Work Plan 2 Remediation System 72018 $1,800.00 50% Project Management 40.0@$90.00d,ev 3 Remediation System C $1,375.00 50% Clearwater Group 25.0@$110.00,d,ev 4 Project Management C $900.00 50% Ozone System 20.0@$90.00 5 Project Management C $217.50 50% Contracts/Insurance Review 5.0@$87.00 6 Mobilization C $448.20 50% Staff Scientist 360@$2.49 7 Fieldwork C $1,660.00 8 Remediation System C $12,133.80 9 Miscellaneous C $412.20 10 Lodging/Per Diem C $1,966.50 50% well install, connect laterals, sys install, monitoring 11 Project Management C $2,205.00 50% Connect Laterals 49.0@$90.00 12 Fieldwork C $1,580.00 50% Laterals Install 20.0@$80.00,20.0@$78.00,is,su,mo 13 Fieldwork C $5,350.00 50% Trench Work 200ft@$50.00/ft 14 Miscellaneous C $1,160.00 50% Field Materials/Supplies 15 Mobilization C $3,624.00 50% Tech III [email protected], connect laterals, sys install, monitoring 16 Remediation System C $2,360.00 50% system Startup 20.0@$80.00, 20@$78.00, is,su,mo 17 Remediation System C $17,500.00 18 Remediation System C $2,400.00 50% Well Points 8.0@$600.00/point,is 19 Miscellaneous C $2,250.00 50% NW energy pole, meter, and connection 20 Fieldwork C $212.50 21 Remediation System C $1,610.00 50% Test System 20.0@$161.00,su,mo 22 Report C $1,080.00 50% 1r,24.0@$90.00,RPT_AR-07 23 Fieldwork C $3,400.00 50% GWM 4e,10.0@$90.00 24 Fieldwork C $3,510.00 50% 90.0@$78.00 system maint ck 25 Miscellaneous C $1,500.00 50% Equipment Repair/Supplies/Materials Wednesday, January 21, 2015 $720.00 WP Date: 1 General Reports _ Work Plan Task Cost C WP Complete: 50% 16.0@$90.00,CAP_AC-07 50% Boring Install Oversight 40.0@$83.00 50% Boring Install 8b,6",45d,i$63.00/ft,H 50% Equipment 50% Shed/Trailer/Generator/Valves/Equipment,is 50% Electrician 5.0@$85.00 Page 1 of 2 65 Task # Task Name Phase Estimated Cost Actual Cost Balance Comment 26 Miscellaneous C $2,400.00 50% Utility Cost 24@$200.00 27 Miscellaneous C $1,800.00 50% Land Rental 24@$150.00 28 Laboratory Analysis w/fee C $2,600.00 50% 4e,10w` 29 Report C $1,692.00 50%2r,10w,1692,RPT_MR-01 Total: Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost $79,866.70 Page 2 of 2 66 Facility Name: Physical Address: Facility ID: Release Number: Priority: Harold Miller Store (former Standard Station) 202 South Park Avenue, Broadus, Powder River County 38-03413 Release 341, Work Plan 8201 2.0 – Medium Priority Work Plan This work plan (WP-8201) is required to move Release 341 toward closure. WP-8201 includes excavation of petroleum-source areas and establishment/operation of a single-use landfarm for soil remediation. Removal of the petroleum-source is expected to accelerate the natural attenuation of the persistent groundwater plume. The total estimated cost to complete this WP is $127,132.25. Remediation Alternatives DEQ and the owner’s consultant discussed the results of the remedial investigation (RI) for Release 341 and determined that excavation of petroleum-impacted soil was the best remediation alternative based on consideration of the following: site conditions; remediation performance; cost; and effectively meeting cleanup goals. History The Facility – located in a mixed commercial and residential area of Broadus – operated as a service station circa 1950-1982 storing and dispensing gasoline. The Release was confirmed on July 17, 1990, during removal and decommissioning of the underground storage tank (UST) system. The Facility is currently an automobile repair shop and office. The RI demonstrated that the clay-rich soil underlying the former dispensers and UST areas on the western and northern sides of the Facility’s building remains a persistent petroleum source for the groundwater plume that extends east/northeastward. 67 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 3803413 Release ID: 341 FacilityName: Former True Value Hardware WP ID: 8201 Task # Task Name WP Name: C-B-GWM/SR/LF Phase Estimated Cost Actual Cost City: Broadus WP Complete: WP Date: 10/31/2014 Balance Comment 1 Work Plan $1,005.00 req1005,CAP_AC-04 2 Project Management $2,140.00 [email protected], [EX], [LF] 3 Mobilization $812.00 m$2.32/mfor350miles 4 Fieldwork $4,700.00 [email protected], [EX], [LF] 5 Soil Removal $4,050.00 Concrete, 50cy@$81.00/cy,(E,L.H,D) 6 Soil Removal $2,750.00 Overburden,500bcy@$5.50/bcy, (E,B,C) 7 Soil Removal $55,875.00 8 Miscellaneous $4,387.25 Soil Removal mark up of 7% 9 Soil Removal $6,255.00 1500lcy@$4.17/lcy (L), backfill material 10 Miscellaneous $300.00 11 Lodging/Per Diem $615.00 12 Laboratory Analysis w/fee $10,515.00 33s 13 Soil Removal $27,000.00 Landfarm , first 500bcy@$20.00/bcy, next 1000bcy@$17.00/bcy, (D) 14 Project Management $321.00 [email protected], [GWM] 15 Mobilization $374.50 1e,m$2.14/mfor175miles, [GWM] 16 Monitoring $680.00 1e,4w,20d,2",$170.00/well 17 Lodging/Per Diem 18 Laboratory Analysis w/fee $1,420.00 4w 19 Report $2,723.00 1r,4w,req2723,RPT_AR-04 Contaminated,first 500bcy@$43.50/bcy, second 500bcy@$36.00/bcy, third 500bcy@$32.25/bcy,(E,L.H,B,C) PID rental $300/wk for one week $57.00 Total: $125,979.75 Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost Page 1 of 1 68 Facility Name: Physical Address: Facility ID: Release Number: Priority: Former Broadus Truck and Supply 201 East Holt Street, Broadus, Powder River County 38-02464 Release 432, Work Plan 7639 2.0 – Medium Priority Work Plan This work plan (WP-7639) is required to move Release 432 toward closure. WP-7639 includes excavation of petroleum-source areas and establishment/operation of a single-use landfarm for soil remediation. Removal of the petroleum-source is expected to accelerate the natural attenuation of the persistent groundwater plume. The total estimated cost to complete this WP is $107,150.25. Remediation Alternatives DEQ and the owner’s consultant discussed the results of the remedial investigation (RI) for Release 432 and determined that excavation of petroleum-impacted soil was the best remediation alternative based on consideration of the following: site conditions; remediation performance; cost; and effectively meeting cleanup goals. History The Facility – located in a mixed commercial and residential area on the eastern edge of downtown Broadus – was a car/truck dealership that operated a fueling station circa 1960-1990 storing and dispensing gasoline. The Release was confirmed on July 18, 1990, during removal and decommissioning of the underground storage tank (UST) system. The Facility currently operates the offices and garage for Broadus Emergency Medical Services, an ambulance service. The RI demonstrated that the clay-rich soil underlying the former dispensers and UST areas on the southern side of the Facility remains a persistent petroleum source for the groundwater plume that extends eastward along Holt Street. 69 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 3802464 Release ID: 432 FacilityName: Broadus Truck & Supply #432 WP ID: 7639 Task # Task Name WP Name: C-B-SR/LF/GWM Phase Estimated Cost Actual Cost City: Broadus WP Complete: WP Date: 10/31/2014 Balance Comment 1 Work Plan $1,005.00 req1005,CAP_AC-04 2 Project Management $2,140.00 [email protected], soil removal, raa matrix, LF app 3 Mobilization 4 Fieldwork 5 Soil Removal $12,150.00 6 Soil Removal $4,400.00 7 Soil Removal $39,750.00 8 Miscellaneous $3,941.00 Muggli excavation mark-up 9 Soil Removal $4,170.00 1000lcy@$4.17/lcy, (L,B), backfill material 10 Miscellaneous $300.00 11 Lodging/Per Diem $615.00 12 Laboratory Analysis w/fee 13 Soil Removal 14 Project Management $321.00 [email protected] [GWM] 15 Mobilization $374.50 1e,m$2.14/mfor175miles, [GWM] 16 Monitoring $680.00 1e,4w,20d,2",$170.00/well 17 Lodging/Per Diem 18 Laboratory Analysis w/fee $1,420.00 4w 19 Report $2,723.00 1r,4w,req2723,RPT_AR-04 $812.00 $3,948.00 $6,750.00 $18,500.00 $57.00 1e, m$2.32/mfor350miles, staff scientist [email protected], [EX], staff scientist 150cy@$81.00/cy, (E,L,H,D), + concrete disposal 800bcy@$5.50/bcy (E,B,C) overburden 500bcy@$43.50/bcy (E,L,H), contaminated soil equipment, PID estimated @ $300/wk for one wk 21s, 5 LF, 16 SR 500bcy@$20.00/bcy (D),500bcy@$17.00/bcy (D), Landfarm split with release 341 WP 8201 Total: $104,056.50 Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost Page 1 of 1 70 Facility Name: Conoco C Store-Former Physical Address: 153 First Street, Chinook, Blaine County Facility ID: 03-06024 Release Number: 1547 Priority: 1.4 High Priority Work Plan: The estimated cost for this work plan is $247,701.68. The work plan consists of the excavation of up to 2,500 cubic yards of gasoline contaminated soils. This work plan is intended to remove as much of the source mass as possible, in the area around the former UST system, and aid in the remediation of the site. In addition, as part of the soil excavation, the Bear Paw Motel sign will be dismantled and reinstalled so that soil excavation can be completed and address soil contamination under said sign. The work plan also includes vapor intrusion sampling, monitor well reinstall, sampling and analysis. Alternatives Analysis: A brief Alternatives Analysis was conducted and submitted to DEQ on July 14, 2014, for the subject site. Excavation was deemed to be the best method of soil remediation since the soils at the site, in the proposed excavation area, run from sandy to silty clay to clay with depth. Site History: The Conoco C Store was first developed as a gasoline station in 1970 with the installation of three 1,000-gallon USTs and an additional 2,000-gallon UST was reportedly installed in 1980, which dispensed gasoline. The facility was operated by Mr. Shawn Nelson who leased the property from Mr. John Holm. A monitor well, as part of a LUST Trust investigation, was installed at the site in 1993 and was found to contain Benzene. Mr. Nelson ceased gasoline service operations in 1996 and Mr. Holm had the four USTs removed in 1997. The onsite store is currently leased from Mr. Holm and utilized as an ice cream store called The Creamery. Included as an attachment is the September 26, 2014, work plan for Release #1547 71 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 306204 Release ID: 1547 FacilityName: Conoco C Store #1547 WP ID: 8461 Task # Task Name WP Name: C-B-SR/LF Phase Estimated Cost Actual Cost City: Chinook WP Complete: WP Date: 09/26/2014 Balance Comment 1 Work Plan $1,005.00 req1005,CAP_AC-04 2 Project Management $4,028.60 [email protected],[email protected] 3 Mobilization 4 Fieldwork 5 Lodging/Per Diem 6 Mobilization 7 Miscellaneous 8 Fieldwork $27,160.50 [email protected],[email protected],[email protected],[SR][RS] 9 Soil Removal $57,500.00 2500bcy@$23.00,E,C, 10 Miscellaneous $5,396.00 11 12 Lodging/Per Diem Soil Removal 13 Miscellaneous $7,696.65 14 Miscellaneous $27,820.00 15 Fieldwork $6,904.06 [email protected],[email protected],[LF]includes $4,800 one time LF fee 16 Mobilization $2,016.80 1m$2.28/mfor460miles,[email protected]/mfor460miles,[LF] 17 Laboratory Analysis w/fee $2,940.00 14s,[LF] 18 Report 19 Mobilization $1,048.80 1m$2.28/mfor460miles,[GWM] 20 Fieldwork $2,279.04 [email protected],[WI], replacing 3 well destroyed during excavation 21 Lodging/Per Diem $269.00 [WI] 22 Miscellaneous $289.50 3w,[WI] 23 Miscellaneous $4,163.37 3w,[WI] 24 Mobilization $976.52 1m$2.12/mfor460miles 25 Monitoring $928.00 1e,5w,40d,2",$170.00/well,1e,2w,SWL Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost $976.52 $2,966.96 $269.00 $11,950.80 $3,424.00 $3,828.00 $59,891.75 $500.00 1m$2.12/mfor460miles, [VI] [email protected],[VI] [VI] 4m$2.28/mfor460miles,4m$2.12/mfor460miles,[email protected]/mfor460miles,[EX][ RS] o,equip rental, SR,compaction PID, security fence, Passive Vent Sys(if necessary) 2500bcy@$6.75/bcy2500bcy@$10.50/bcy,H,B,D UL,sign dismantle, storage & reinstall replace asphalt 1r,req500RPT_Land Farm Operation Page 1 of 2 72 Task # Task Name Phase Estimated Cost Actual Cost $146.00 Balance Comment 26 Lodging/Per Diem 27 Laboratory Analysis w/fee $7,650.00 [GWM] 3a,7w,20s 28 Report $2,723.00 1r,7w,req2723,RPT_AR-04 Total: $246,747.87 Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost Page 2 of 2 73 Facility Name: Physical Address: Facility ID: Release Number: Priority: Korner Stop (former Town Pump #2) 942 Broadwater Avenue, Billings, Yellowstone County, Montana 56-08671 Release 2007, Work Plan 7511 1.3 – High Priority Remediation Work Plan This work plan (WP-7511) is required to move Release 2007 toward closure. WP-7511 includes installation and operation of an in-situ hydrogen-peroxide remediation system and groundwater monitoring to evaluate the system performance. The remediation system will enhance dissolvedoxygen levels in groundwater and is expected to accelerate the natural attenuation of the persistent groundwater plume. The total estimated cost to complete this WP is $186,586.64. Remediation Alternatives DEQ and the owner’s consultant determined that the in-situ hydrogen-peroxide system was the best remediation alternative based on consideration of the following: protection of health and the environment; site conditions; remediation performance; cost; and effectively meeting cleanup goals. History The Facility – located in a mixed commercial and residential area of Billings – has remained in continuous operation as a service station since the 1960s storing and dispensing motor fuels. Town Pump formerly owned and operated the Facility and remains the responsible party for Release 2007. The Release was confirmed on December 7, 1993, during closure of three gasoline underground storage tanks. The Facility has been owned/operated by other parties since the release was confirmed. The groundwater plume emanating from the Facility – defined by 14 monitoring wells installed both on-site and on nearby properties – extended beneath Broadwater Ave and at least 300 feet beyond the Facility’s property boundaries. Petroleum compounds remain persistent at two on-site wells and three off-site wells. Analysis of monitoring data (1994-2013) indicates that Risked-Based Screening Levels will not be achieved for several decades in the groundwater plume even with continued operation of the soil-vapor extraction system. 74 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 5608671 Release ID: 2007 FacilityName: Town Pump Inc Billings 2 WP Name: F-B-WI/OI/GWM WP ID: 7511 Task # Task Name Phase Estimated Cost Actual Cost City: Billings WP Complete: WP Date: 09/26/2014 Balance Comment 1 Work Plan F $1,726.50 15.0@$115.50,CAP_AC-07 2 Remediation System F $4,495.20 15.0@$115.10,20.0@$94.96,10.0@$86.99,d 3 Project Management F $4,620.00 40.0@$115.50 4 Mobilization F $160.80 5 Fieldwork F $3,418.56 6 Miscellaneous F $425.70 7 Monitoring Well Installation F $11,045.08 8 Miscellaneous F $414.28 9 Wells Install 3e,m$5.36/mfor10miles [email protected], [WI] PID @ $79.20/day, interface probe @ $62.70/day for three days 7w,25d,2",$b18.50/ft,$w34.60/ft,H,+ [email protected], [WI], includes 30 miles @ $0.61/mile, dump trailer @ $110.00/day, 3.5 tons @ $32.00/ton Laboratory Analysis w/fee F $1,920.00 10 Mobilization F $42.70 11 Remediation System F $15,887.78 12 Remediation System F $4,091.00 13 Remediation System F $200.00 14 Remediation System F $9,994.12 15 Miscellaneous F $105.00 16 Mobilization F $61.00 17 Remediation System F $10,333.20 su,7w,10e,$1,033.32/event,fieldwork,40.0@$94.96,40.0@$86.99,40.0@$76.3 8 18 Remediation System F $10,000.00 su,7w,10e,$1,000.00/event,euipment/supplies 19 Mobilization F $475.80 20 Remediation System F $17,398.00 om,7w,78e,$223.05/event, fieldwork,200.00@$86.99 21 Remediation System F $34,200.00 om,7w,78e,$438.46/event,drums,72d,$475.00/drum 22 Remediation System F $4,860.00 om,7w,electricity,36m,$135.00/month 23 Remediation System F $9,000.00 om,water,36m,$250.00/month Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost 7s, 3 fractions, 1 pb is,7e,m$0.61/mfor70miles is,7w,7e,$2,269.68/event,fieldwork,40.0@$94.96,74.0@$86.99,74.0@$76.38 is,7w,7e,$584.43/event,equipment/supplies,light plant, Cat excavator, euipment trailer, ramp compactor, trench box, metal plating is,7w,1e,$200.00/event,trenching, backfill is,7w,trenching,daylighting,asphalt/concrete,plumbing,electrical City Hookup Fee su,10e,m$0.61/mfor100miles om,7w,78e,m$0.61/mfor780miles Page 1 of 2 75 Task # Task Name Phase Estimated Cost Actual Cost Balance Comment 24 Mobilization F $132.90 GWM 3e,m$4.43/mfor10miles 25 Water Level Measurements F $234.00 3e,3w,20d,2",$39.00/well 26 Monitoring F $6,120.00 3e,12w,20d,2",$170.00/well 27 Laboratory Analysis w/fee F $8,730.00 36w 28 Report F $4,547.88 2015 1r,14w,System Install/GWM,RPT_AR-07 29 Report F $3,526.56 2016 1r,14w,System O&M/GWM,RPT_AR-07 30 Report F $3,526.56 2017 1r,14w,System O&M/GWM,RPT_AR-07 Total: $171,692.62 Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost Page 2 of 2 76 2007 77 Facility Name: Physical Address: Facility ID: Release Number: Priority: Zip Trip 54 (former Lockwood CENEX Truck Stop) 151 Rosebud Lane, Billings, Yellowstone County 56-08208 Release 4920, Work Plan 7644 1.4 – High Priority Characterization Work Plan The total estimated cost for this work plan (WP-7644) is $185,046.77. This work plan is required to resolve Release 4920. WP-7644 includes excavation of petroleum-impacted soil in source areas and disposal at the Billings Regional Landfill. Soil excavation is coordinated with a Facility demolition/rebuilding and underground storage tank (UST) removal/replacement project. Completion of this work plan is expected to resolve Release 4920. Remediation Alternatives DEQ and the owner’s consultant discussed Release 4920, and previous releases at the Facility, and determined excavation of petroleum-impacted soil was the best remediation alternative based on consideration of the following: excavation opportunity; site conditions; cost; and effectively meeting cleanup goals. History The Facility – CENEX has owned this property and operated a commercial fueling facility here since the mid 1970’s. Release 4920 was confirmed on August 2, 2012 when a diesel line was found leaking during a system functionality test. About 200 gallons of fuel was released within the diesel UST basin. The Facility has four other documented releases dating back to 1992. The previous releases include two surface spills, contaminated soil found during piping upgrades, and a gasket failure on a dispenser. These releases were resolved by the DEQ, but petroleum-impacted soils were known to remain in some of these areas. 78 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 5608208 Release ID: 4920 FacilityName: Lockwood Cenex Truck Stop aka Zip Trip 5 WP Name: C-S-SR WP ID: 7644 Task # Task Name Phase Estimated Cost Actual Cost City: Billings WP Complete: WP Date: 07/23/2014 Balance Comment 1 Work Plan C $1,005.00 CAP_AC-04 2 Fieldwork C $2,000.00 Traffic Control & Security 3 Project Management C $3,063.00 24@$112.00, 5@$75.00, Soil Removal 4 Mobilization C $30.50 5 Fieldwork C $6,004.00 6 Soil Removal C $84,321.60 1227.6bcy@$66.00,E,L.H,B,C,+ 7 Soil Removal C $72,747.86 [email protected]/ton,D 8 Miscellaneous C $275.00 9 Laboratory Analysis w/fee C $5,580.00 26s 10 Fieldwork C $1,788.00 Compaction Test 20.0@$65.00 11 Report C $2,723.00 req5650,RPT_AR-04 m$0.61/mfor50miles [email protected],[email protected], [EX] PID @ 5 days Total: $179,537.96 Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost Page 1 of 1 79 Facility Name: Physical Address: Facility ID: Release Number: Priority: Zeiler Farm 1236 Mullowney Lane, Billings Montana 56-04962 (old number 99-95144) 4959 (Work Plan 7437) 1.4 – High Priority Work Plan 7436 Modification Form 8 dated October 16, 2014 The scope of the original work plan (WP) 7436 was to excavate about 1,000 yd3 of impacted soil and 1,000 yd3 of clean overburden from the former underground storage tank (UST) basin at the Zeiler Farm facility. The soil volumes were based on results of a limited Phase II Environmental Assessment (EA) conducted by the Owner/Operator completed in August 2013. The EA was done outside of DEQ authority by the O/O and was used to confirm the petroleum release. DEQ reviewed the EA in relation to the WP and concurred that the excavation area was defined and that the cleanup alternative was reasonable. The planned excavation area was 90 by 60 feet based on the location of the underground storage tank (UST) basin and soil borings (see attached Figure 1 for soil boring locations). The excavation depth was based on laboratory analytical results of soil samples collected from the five borings during the EA. The EA indicated most of the petroleum impacts to the soil were at the water table smear zone (about 10 to 15 feet below ground surface). During excavation it was discovered impacted soils were far deeper than anticipated based on the data from the EA. The depth of contamination extended beneath the water table to about 22 feet below ground surface. Unexpected increased contamination was also found to the north northeast (see attached Figure 2 for the final excavation boundary). ECS Engineering was in full communication with DEQ and the PTCRB during the excavation of soils at the facility. The Corrective Plan Modification Form 8, dated September 16, 2014, included the removal and disposal of an additional 623 bank cubic yards (yd3) of petroleum-impacted soil from the facility for an estimated cost of $109,897.97. The actual additional volume of impacted soils removed was about 726 yd3 and the cost was $96,917.23. DEQ approved the removal of the additional soils because of pending redevelopment of the site. A summary of the Corrective Plan Form 8 claims was completed by the consultant, ECS Engineering, and was provided to Ross Eaton with the PTCRB on December 29, 2014. Site and Petroleum Release History Zeiler Farm is a 64 acre farm located in southwest Billings, near the I90/94 King Avenue interchange. The property is currently being redeveloped for commercial and residential purposes. Elizabeth Zeiler is the property owner and responsible party for the petroleum release. Ben Smith, with Plante Moran CRESA, is the property developer. According to the DEQ UST program one 550 gallon UST was installed in 1972, out-of-use in 1986, and removed from the ground in 1993. The database also indicates the UST was used to store kerosene. However, soil and groundwater data collected during an environmental site assessment (ESA), conducted in 2013, indicate the UST also stored gasoline. The 24-Hour Initial Release Response Report indicates release 4959 was confirmed by laboratory analytical results on August 8, 2013. The cause, volume, and petroleum type of the release is unknown. Based on information provided in the ESA, release location, hydraulic gradient, and soil type, DEQ determined excavation and disposal of petroleum-impacted soils as the most feasible, effective, fastest, and safest alternative to reduce the mass of hydrocarbons impacting the groundwater quality at the site. 80 81 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 5604962 Release ID: 4959 FacilityName: Zeiler Property #4959 WP Name: C-S-SR WP ID: 7437 Task # Task Name City: Billings WP Complete: Phase Estimated Cost Actual Cost WP Date: 12/30/2013 Balance Comment 1 Work Plan C $995.00 2 Project Management C $1,501.50 $1,501.50 $0.00 3 Mobilization C $1,074.44 $219.04 $855.40 4 Soil Removal C $16,705.91 $5,248.75 $11,457.16 consultant oversight 160.0@$95.00, Form 8 15.85@$95.00 5 Soil Removal C $103,279.01 $34,219.94 $69,059.07 1000bcy@$49.35/bcy,E,L.H,B,C,+, Form 8 934bcy@$49.35/bcy, E,L,H,B,C,+ 6 Fieldwork C $1,043.25 $294.25 $749.00 7 Soil Removal C $113,377.47 $65,700.00 $47,677.47 8 Laboratory Analysis w/fee C $9,395.00 $8,150.00 $1,245.00 9 Report C $2,723.00 Total: $250,094.58 Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost req995,CAP_AC-04 13.0@$115.50 10.0@$95.00,20trip,m$0.61/mfor0.8miles, Form 8 additional $26.84 density testing, Form 8 increased by $374.50 1500tons@$43.80/ton,D, Form 8 1088.53tons@$43.80/ton 25s, Form 8 9s 1r,req6160,RPT_AR-04 $115,333.48 $134,761.10 Page 1 of 1 82 Town Pump #1 803 East Main Street Bozeman, MT FID 16-08674 Release 5031 Priority 1.3 – High Priority Remediation The estimated cost for this work plan is $159,010.00 and is for excavation and disposal of petroleum contaminated soil. The release was discovered during culvert upgrades to the irrigation ditch adjacent to the Town Pump. The contaminated soil was in contact with the irrigation ditch. Excavations were completed in August, September, and October for a total of 1900 cubic yards of petroleum impacted soil removal. Immediate excavation was the best alternative because the contamination was in contact with surface water and the equipment was on-site. Petroleum contaminated soil in the areas of the previous UST basin and dispenser islands was also remove any further threats and progress this release towards closure. The overburden removed was stockpiled onsite and held until backfilling was performed. This work plan removed much of the source mass which will aid in remediation and prevent any impacts to the newly installed irrigation ditch culvert. A pre-excavation investigation used PID headspace readings to determine where to excavate. The extent of the removed soil was determined based upon field observations (PID readings) taken at the base and along the sidewalls of the excavated area. These values were confirmed with analytical samples taken post excavation. The source of the contamination has been removed with the excavation of the soil surrounding the previous tank basin and north dispenser island. 83 84 Petroleum Tank Release Compensation Board Work Plan Task Costs Facility ID: 1608674 Release ID: 5031 FacilityName: Town Pump Inc Bozeman 1 WP ID: 9461 Task # Task Name WP Name: C-S-SR Phase Estimated Cost Actual Cost City: Bozeman WP Complete: WP Date: 10/07/2014 Balance Comment 1 Work Plan $1,005.00 req1005,CAP_AC-04 2 Project Management $2,700.00 30@90 3 Fieldwork $6,855.00 [email protected],[email protected] 4 Soil Removal $47,300.00 [email protected]/ton,E,L.H, 5 Soil Removal $12,000.00 [email protected]/ton,E,L,H,Clean overburdon removed from site 6 Soil Removal $80,500.00 [email protected]/ton,H,B,C 7 Soil Removal $59,400.00 [email protected]/ton,D, 8 Miscellaneous 9 Laboratory Analysis w/fee $3,825.00 15s Report $2,723.00 1r,0w,req2700,RPT_AR-04 10 $964.00 o, PID and gloves, baggies Total: $217,272.00 Wednesday, January 21, 2015 General Reports _ Work Plan Task Cost Page 1 of 1 85