Colonel Ruby Bradley Bridge State Project U344-33-12.76 00 Federal Project STP-0033(243) D
by user
Comments
Transcript
Colonel Ruby Bradley Bridge State Project U344-33-12.76 00 Federal Project STP-0033(243) D
DESIGN STUDY REPORT Final Submission May 6, 2015 Colonel Ruby Bradley Bridge State Project U344-33-12.76 00 Federal Project STP-0033(243) D Spencer, Roane County, West Virginia Prepared by: Prepared For: West Virginia Department of Transportation 1900 Kanawha Blvd., East Building 5, Room A-317 Charleston, WV 25305 4424 Emerson Avenue Parkersburg, West Virginia, 26104 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 TABLE OF CONTENTS TABLE OF CONTENTS PAGE TABLE OF CONTENTS ............................................................................................................... i 1.0 PROJECT DESCRIPTION & PURPOSE ............................................................................. 1 2.0 PROJECT REQUIREMENTS ............................................................................................... 2 2.1 Existing Conditions .................................................................................................... 2 2.2 Design Criteria ............................................................................................................ 2 2.3 Geotechnical Overview ............................................................................................. 2 2.4 Environmental Overview .......................................................................................... 3 3.0 PROPOSED ALTERNATIVES............................................................................................. 3 3.1 No Build Option ......................................................................................................... 3 3.2 Description of Build Alternatives Considered ....................................................... 3 3.3 Utilities ......................................................................................................................... 5 3.4 Major Drainage Requirements ................................................................................. 6 3.5 Constructability Issues .............................................................................................. 6 3.6 Temporary Traffic Control........................................................................................ 6 3.7 Pedestrian Facilities ................................................................................................... 6 3.8 Bicycle Facilities .......................................................................................................... 7 3.9 Proposed Right-of-way ............................................................................................. 7 3.10 Hydraulic Performance ............................................................................................. 7 3.11 Bridge Aesthetics and Lighting ................................................................................ 7 3.12 Other Considerations................................................................................................. 7 4.0 CONCLUSIONS ................................................................................................................. 10 APPENDICES Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Site Photographs Design Criteria Preliminary Cost Estimate Exhibits Alternative Plans Comment and Response from Field Review LIST OF TABLES PAGE Table 1 Table 2 Project No. 52354 Design Criteria Comparison of Alternatives 2 9 i Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 1.0 PROJECT DESCRIPTION & PURPOSE 1.0 PROJECT DESCRIPTION & PURPOSE This project involves the study, preparation, and submission of a Design Study Report for the Colonel Ruby Bradley Bridge which carries US Route 33 over Spring Creek in Roane County and is located approximately 0.02 mile east of US Route 119. LOCATION MAP Possible temporary detour (not feasible) This structure, which is eligible for registration for the National Register of Historic Places, was built in 1932 and was rehabilitated in 1996. Since that time, the bridge has experienced substantial deterioration. A “Condition Assessment Report” is submitted under a separate cover which rates the deck of the structure in poor condition and in need of replacement. Both the original plans and rehabilitation drawings are included in the appendices of that report. The existing bridge has a 30-foot roadway and was originally designed for two-lanes of traffic, but was converted to three-lanes in the 2000’s (see cover photo). Traffic congestion has increased with recent development of large retailers, strip malls, medical facilities, and restaurants. Traffic volumes are estimated to increase to an ADT of 13,800 on US Route 33 by 2033 (Photos 1 & 2, Appendix A), as compared to current ADT of 10,300. Intersections with US Route 119 and Williams Drive introduce the need for turning lanes on the bridge (Photos 3 & 4). The results of a traffic study performed by WVDOT in July 2013 indicate the bridge should accommodate four lanes of traffic and that expansion of the adjacent intersection with US Route 119 is needed (See sketch in Appendix D). Spring Creek The purpose of this Design Study Report is to compare various alternatives for replacement or widening of the existing bridge. Temporary traffic control during construction is a primary concern, as no reasonable detours appear to be available for vehicular or pedestrian traffic. The goal of the design study is to select an alternative that meets the following criteria: Minimizes impact to traffic during construction; Economically feasible to construct; Accommodates 2033 traffic volumes; Maintains hydraulic performance of the stream; Minimizes in-stream work; Addresses the historical significance; Creates a long-term, durable solution; and Provides acceptable level of aesthetics and lighting. Project No. 53313 Goff Run Colonel Ruby Bradley Bridge STATE PROJECT U344-33-12.76 00 PROJECT LOCATION 1 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 2.0 PROJECT REQUIREMENTS 2.0 PROJECT REQUIREMENTS 2.1 Existing Conditions 2.3 The existing bridge consists of five spans of cast-in-place concrete T-beams supported on threecolumn piers and wall-type abutments (Photo 5). The bridge carries three lanes of traffic and two sidewalks with an overall deck width of 42 feet and overall length of 227 feet. The profile grade is a constant -4 percent over the bridge transitioning to vertical curves on the approaches. The US Route 33 typical section on the west approach is downtown Main Street of Spencer (Photo 6). Main Street is composed of three lanes with an overall roadway width of 39 feet with sidewalks on each side. The east approach roadway to the bridge expands to four lanes at the intersection with Williams Drive (Photo 7). Traffic signals are present at each intersection. 2.2 Design Criteria The geometric design follows the guidelines established in the American Association of State Highway and Transportation Officials’ (AASHTO) A Policy on Geometric Design of Highways and Streets, 6th Edition, 2011, or when applicable, AASHTO’s Geometric Design of Very LowVolume Local Roads (ADT 400), AASHTO, Washington, D.C., 2001. The design will be in accordance to the Public Rights-of-Way Accessibility Guidelines (PROWAG) 2014. The study of the bridge structure will be based on Load and Resistance Factor Design (LRFD) in accordance with the AASHTO “LRFD Bridge Design Specifications, 2012” and latest interim revisions, and the WVDOT Bridge Design Manual, dated March 1, 2004, with any revisions. The US Route 33 mainline roadway typical section over the bridge will include two 12’ through lanes, two 11’ inside lanes, 2' shoulders and two 5’-6” sidewalks. The extension of Williams Drive will assume two 12’ lanes, 3’ shoulders, and one 5’-6” sidewalk. Detailed typical sections can be found in Appendix E. Table 1 Design Criteria Roadway Classification Design Speed Maximum Grade US Route 33 Williams Drive Urban Collector Urban Local Street 35 mph 25 mph No Change 12% Design criteria tables are included in Appendix B. No design exceptions are required. Project No. 53313 Geotechnical Overview A professional engineer visited the bridge site and performed limited research of the readily available information, including evaluating the geologic setting and previous mining for potential problems within the project area. Core borings have not been obtained, but borings from the existing plans encountered three-layers of underlying bedrock: broken shale, solid red rock, and solid sandstone. Each layer is respectively deeper. Approximately 15 feet of sandy loam overburden was also encountered and is visible along the stream banks (Photo 8). No bedrock outcrops were observed in the vicinity of the existing bridge. Rock outcropping was observed near the Williams Drive Extension but no handson observation of the rock was made. No major slope instabilities were observed. The existing bridge is founded on spread footings at elevations ranging from 699 feet to 706 feet, corresponding to broken shale layer. No apparent signs of settlement, rotation, or undermining have been observed in recent inspections. Local scouring around the piers has been noted. Stream channel profiles show up to 5 feet of change in the stream bank elevations from 1977 to 2011. The stream invert has remained the same. The DS-34 scour evaluation summary prepared in 2003, classifies the structure as low risk. Four core borings were obtained by WVDOT for the replacement of the North Market Street Bridge in November of 2007 (Photo 9). North Market Street Bridge is located approximately 1,000 feet north of Ruby Bradley Bridge. The borings encountered a medium hard, grey-red shale or medium hard, grey sandstone at elevations ranging from 696 feet to 699 feet. The overburden consisted of 17 to 20 feet of redbrown, brown, and grey sandy clay. The geotechnical competence of the rock allowed the full structural capacity of the steel H-piles to be used during the design. Based on the West Virginal Geologic Economic Survey web page, this project is located in the Appalachian Low Plateau Physiographic Province. The province is characterized by relatively level strata that were deeply eroded after the last stage of mountain building during the Appalachian Orogeny. Based on information from the USGS Mineral Resources Online Spatial Data, the project is in the Dunkard Group. This group consists of non-marine cyclic sequences of sandstone, siltstone, red and gray shale, limestone, and coal. Contains the Greene, Washington and Waynesburg Formations. Extends from the top of the exposed bed rock section to the top of the Waynesburg coal. Includes the Washington coals and limestones. Palynological evidence favors a Pennsylvanian age, at least for the lower portion. Based on our review of the WVDEP Interactive Mapping web page, and the WVGES Interactive Coal Bed Mapping web pages, no evidence of permitted coal mines was found near the project area. Based on our review of the WVDEP Oil and Gas Well Information Mapping web page, no evidence of permitted oil or gas wells was found near the project area. 2 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 3.0 PROPOSED ALTERNATIVES Based on our overview, we did not observe unusual or significant geotechnical problems that would negatively impact these bridge alternatives as planned, nor do we anticipate unusual mining, geological, or geotechnical hazards within the project area. Generally, cut side slopes are shown at 1½:1 and fill slopes are shown at 2:1 for this submission. It is anticipated that the abutments will be semi-integral or integral for the alternatives which propose a new structure. 2.4 anticipated that proposed work will be eligible for authorization under one or more Nationwide Permits. Public Entities will be asked to provide any comments they believe are pertinent to any potential effects to historic or archaeological resources that may assist with the decisionmaking. Environmental Justice/Title VI Community Review Roane county is considered a distressed county by the Appalachian Regional Commission (ARC). Environmental Overview The project requires National Environmental Policy Act (NEPA) documentation. B&N will determine the appropriate level of NEPA review, and prepare associated NEPA documentation during the next phase of the project, in cooperation with the West Virginia Division of Highways (WVDOH). Based on information to date, this will include, but may not necessarily be limited to, review and consultation with the: State Historic Preservation Office. The existing bridge is eligible for registration for the National Register of Historic Places. In depth coordination with the West Virginia Division of Culture and History is anticipated, including additional field studies. Mitigative measures to avoid, minimize, or compensate for potential adverse impacts to the bridge or other affected historic properties may be required. U.S. Fish & Wildlife Service and West Virginia Division of Natural Resources regarding potential effects to rare, threatened, or endangered species. Impacts to Spring Creek are expected to be limited to temporary access and cofferdams. A mussel survey in accordance with 2014 West Virginia Mussel Survey Protocols is anticipated, based on upstream drainage area at the project site (> 10 mi2). The Williams Drive Extension site (Alternative 3) will include the removal of some trees. Proposed tree clear areas will be screened for potential summer habitat characteristics for Indiana bat (endangered), and northern long-eared bat (proposed endangered). WV Department of Environmental Protection and other state and local environmental regulatory agencies regarding the potential for legacy impacts from petroleum or hazardous substances in the project area, including properties proposed for right-of way (ROW) acquisition. A Phase I Environmental Site Assessment covering the project area and any proposed ROW acquisitions is anticipated. The total impacted area at each site appears to be less than 3 acres which will qualify for a NPDES notice of intent letter, rather than a general stormwater permit. U.S. Army Corps of Engineers regarding requirements associated with obtaining permits under Section 404 of the Clean Water Act. B&N will prepare required permit application documents, in cooperation with WVDOH. Jurisdictional impacts to Spring Creek are, at this time, expected to be limited to temporary access structures and cofferdams. It is Project No. 53313 3.0 PROPOSED ALTERNATIVES 3.1 No Build Option Due to the deteriorated condition of the bridge and forecasted traffic volumes, the No Build Alternative would result in eventual failure due to traffic congestion of the existing intersections and roadways. The structure would also continue to deteriorate until complete replacement was unavoidable. The No Build Alternative is not a viable option. Therefore, no further investigation was performed. 3.2 Description of Build Alternatives Considered Various alternatives were reviewed during the development of this design study. Each alternative was carried forward to the point at which it was no longer feasible. Appendix A includes site photographs. Appendix C includes preliminary cost estimates. Appendix E includes plans, typical sections, and details of the alternatives. The proposed alternatives include: Alternative 1A: Alternative 1B: Alternative 2A: Alternative 2B: Alternative 3: Alternative 4: Rehabilitate Bridge using Upstream Temporary Detour; Replace Bridge using Phased Construction; Replace Bridge using Downstream Temporary Detour; Replace Bridge using Upstream Temporary Detour; Replace Bridge using Williams Drive Detour; and Replace Bridge using ABC -Lateral Slide. ALTERNATIVE 1A: REHABILITATE BRIDGE Build Alternative 1A proposes to replace the reinforced concrete deck and maintain the current configuration of three 10-foot lanes. The existing substructure and remaining portions of the existing superstructure will be rehabilitated and re-used. Visible existing and proposed concrete will be coated for protection. A 175-foot long, single-span temporary bridge to the upstream side 3 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 3.0 PROPOSED ALTERNATIVES will be installed to maintain traffic. The temporary bridge will include a minimum of two 10’ lanes and a 5’ sidewalk. Reverse curves will be needed on the approach which meet a 25-mph design speed. The profile of the temporary detour is set to 5 percent max. to accommodate ADA requirements. B&N consulted with representatives from Mabey Bridge to prepare this report and more information is included in Appendix D. ALTERNATIVE 1B: REPLACE BRIDGE USING PHASED CONSTRUCTION Recent bridge inspection reports rated the existing beams in fair condition but noted that areas that had been repaired with epoxy injection of cracks and grouting of spalls were in good condition. Chloride ion sampling and testing was performed by WVDOT to determine the level of chloride contamination on the substructure units. The testing was summarized in a memorandum dated January 15, 2015 by Clifford J. Skeens. The testing indicated that advanced contamination is present, averaging 3.6 to 17.4 lb/cy. In this case, extraction of the chlorides will not be feasible. The depth of the patching repairs cannot be reasonably set to remove the contaminated concrete. Ongoing corrosion of the reinforcing steel will likely result in additional deterioration adjacent to the new repairs. The durability of the structure would be short-term. The existing upstream beam and sidewalk will be demolished, making room for the construction of three new beams that support 23 feet of bridge deck, a 5’-6” sidewalk and a 1-foot combo rail. The new beams would be supported by integral abutments and multi-column piers which will also be constructed in phases. The new three-span structure will allow for placement of the piers between the existing pier locations. The proposed abutments will be set behind the existing wall type abutments and feature 2:1 spill through slopes with 3’ thick foundation protection material. Two 10’-9½” travel lanes will be available on the existing structure throughout this phase. A temporary barrier will be anchored 1’-0” from the edge of construction to provide safety to motorists during construction. The existing pier caps will need to be notched at the ends to allow for construction of one of the new beams. Particular care would have to be taken during the removal of the existing bridge deck, both to prevent debris from falling into Spring Creek and to protect the underlying concrete beams. A strip approximately 3 feet wide centered along each beam would need to be removed with hydro demolition or other controlled methods to preserve the existing reinforcing steel in the beams. The original design plans do not indicate the presence of any reinforcing steel in the top of the diaphragms. The demolition method used away from the beams lines could be used over the diaphragms, provided that the top surface of the diaphragms are sufficiently roughened to facilitated the bonding of the new deck to the existing concrete. If this alternative is selected, structural analysis of the beams with deck removed is required and likelihood of passing is unknown at this time. The load rating of the existing bridge is 41 tons for the HS inventory rating, as calculated by District 3 in 2011. Build Alternative 1B will provide two 11-foot and two 12-foot travel lanes, two 2-foot shoulders, and two 5’-6” sidewalks. A portion of the existing structure will be utilized for temporary traffic control before being replaced. Upon completion of the first phase of construction, the two travel lanes will be shifted to the newly constructed bridge deck. In this phase the temporary lanes will be 10-feet wide. The remainder of the existing bridge will be removed, and three new beams will be constructed. This phase includes the addition of 31 feet of bridge, which includes a 5’-6” sidewalk and 1-foot rail. A temporary barrier will be anchored 1’-0” from the edge of construction to provide safety to motorists during construction. A 2’-6” closure pour will tie the two phases of construction together. The downstream curb line will not change in this alternative, which is less desirable than the other alternatives due to the offset that is already present in the existing curb line. The completed 3-span structure will have a 63’ out-to-out width and 250’ length. Alternative 1A does not provide additional lanes; therefore, this option would not accommodate forecasted traffic volumes. This alternative would also result in significant, ongoing maintenance costs as compared to other alternatives since the original structure, built in 1932, would remain. This alternative does not meet the purpose and need of the project. Alternative 1B has an estimated construction cost of $5,417,000. A cost premium of $275,000 was included for the challenges faced during phased construction. Alternative 1A has an estimated construction cost of $2,020,000. The 175 foot-long, temporary detour bridge was estimated at $100 per square foot for a total cost of $522,000. Additional cost may arise during design and construction phases that could not be anticipated in advance. Build Alternative 2A proposes to replace the bridge on the existing alignment (full width construction). The new 3-span structure will have a 63’ out-to-out width and 250’ length. The completed structure will provide two 11’-0” lanes, two 12’-0” lanes, two 2’-0” shoulders, two 5’-6” sidewalks, and two 1’-0” rails. A 175-foot long, single-span temporary bridge to the downstream side will be installed to maintain traffic. Embankment will be placed in the Save-A-Lot parking lot (Photo 10). The temporary bridge will include a minimum of two 10’ lanes and a 5’ sidewalk. Reverse curves will be needed on the approach which meet a 25-mph design speed. The profile of the temporary detour is set to 5 percent max. to accommodate ADA requirements. B&N consulted Project No. 53313 ALTERNATIVE 2A: REPLACE BRIDGE USING DOWNSTREAM TEMPORARY DETOUR 4 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 3.0 PROPOSED ALTERNATIVES with representatives from Mabey Bridge to prepare this report and more information is included in Appendix D. Alternative 2A has an estimated construction cost of $5,730,000. The 175 foot-long, temporary detour bridge was estimated at $100 per square foot for a total cost of $522,000. ALTERNATIVE 2B: REPLACE BRIDGE USING UPSTREAM TEMPORARY DETOUR Build Alternative 2B proposes to replace the bridge on the existing alignment (full width construction). The new 3-span structure will have a 63’ out-to-out width and 250’ length. The completed structure will provide two 11’-0” lanes, two 12’-0” lanes, two 2’-0” shoulders, two 5’-6” sidewalks, and two 1’-0” rails. A 175-foot long, single-span temporary bridge to the upstream side will be installed to maintain traffic. The temporary bridge will include a minimum of two 10’ lanes and a 5’ sidewalk. Reverse curves will be needed on the approach which meet a 25-mph design speed. The profile of the temporary detour is set to 5 percent max. to accommodate ADA requirements. B&N consulted with representatives from Mabey Bridge to prepare this report and more information is included in Appendix D. Alternative 2B has an estimated construction cost of $5,728,000,. The 175 foot-long, temporary detour bridge was estimated at $100 per square foot for a total cost of $525,000. ALTERNATIVE 3: REPLACE BRIDGE USING WILLIAMS DRIVE DETOUR Build Alternative 3 also proposes to replace the bridge on existing alignment (full width construction). The new 3-span structure will have a 63’ out-to-out width and 250’ length. The completed structure will provide two 11’-0” lanes, two 12’-0” lanes, two 2’-0” shoulders, two 5’-6” sidewalks, and two 1’-0” rails. A new 80 foot long bridge is proposed on the south end of Williams Drive at Market Street intersection with US 119 (Photos 11 & 12). The bridge will assume two 12’ lanes, 3’ shoulders, and one 5’-6” sidewalk. For the temporary condition, it can be striped as three 10’ lanes and 5’-6” sidewalk. The profile uses a maximum 12 percent roadway grade. A permanent traffic signal and temporary left turn lane on US Route 119 will be needed at the new intersection. The southbound through lane is shifted onto the southbound shoulder to make room for the temporary turn lane (Photo 13). Alternative 3 has an estimated construction cost of $7,613,000, of which approximately $2,500,000 is related to the cost of the Williams Drive Extension. Project No. 53313 ALTERNATIVE 4: REPLACE BRIDGE USING ABC - LATERAL SLIDE Build Alternative 4 proposes to construct the full-width bridge upstream of existing on temporary bents (Photo 14). The new 3-span superstructure will have a 63’ out-to-out width and 250’ length. While supported by the temporary bents, the bridge will be used to maintain traffic during demolition of the existing bridge and construction of the new piers and abutments. The contractor will slide the new bridge into place using lateral jacking operations during night time closures. An incentive/disincentive clause will be used for this alternative. The completed structure will provide two 11’-0” lanes, two 12’-0” lanes, two 2’-0” shoulders, two 5’-6” sidewalks, and two 1’-0” rails. This Accelerated Bridge Construction (ABC) technique has been used on various structures in the United States. FHWA has guidance for lateral slides on their website. WVDOT is proposing to use a similar procedure on the Basnettville Bridge in Marion County. Compared to most bridge replacement projects in West Virginia, the Ruby Bradley Bridge site is particularly well-suited for sliding: a practical detour does not exist, high traffic volumes, the framing is square, the existing alignment is preferred, a staging area is present adjacent to the bridge, and temporary foundations are feasible. Temporary low speed shift in traffic lanes is anticipated. Emergency vehicles should be allowed to interrupt or cross during the slide. The approach slabs will be partially constructed on top of geotextile reinforced fill during the initial phase. A 2 foot gap will remain to allow for the abutment diaphragm to slide into place. Traffic will be maintained using steel plates until the closure pour can be made (see abutment section in Appendix D). The grade of US Route 119 will be accommodated by adjusting the bearing height down while in the temporary position. Alternative 4 has an estimated construction cost of $5,464,000. This includes a cost of $142,500 for equipment and labor to perform the slide. The temporary bents are estimated at $316,800 and premium for additional engineering and construction services related issues of $185,000. 3.3 Utilities Several utilities are located within the project area all around the existing bridge. The overhead electric, telephone, and cable lines paralleling the upstream edge of deck will conflict with the proposed construction and will need relocated (Photo 15). Underground telephone and signal poles on the southwest corner of the bridge will be in conflict. The sanitary sewer line below Span 2 will conflict with all alternatives except Alternative 1A. Various sanitary sewer lines and manholes below Span 5 will need relocated (Photo 16). A gas line is located at the upstream end of Abutment 2 and will be impacted by the proposed alternatives. An exposed sewer line in the creek parallels the downstream side of the bridge and would be affected by the Alternative 2A detour (Photo 17). However, this pipe is not in service and should be demolished. 5 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 3.0 PROPOSED ALTERNATIVES The Williams Drive Extension project area for Alternative 3 also includes various utilities. Relocations will be required for water, gas, overhead electric, and overhead and underground fiber-optic telephone (Photos 18-20). The bridge will span over the sanitary sewer line which should not be affected. Utility relocation costs have been provided by WVDOT and are included in the cost estimate. 3.4 Major Drainage Requirements No pipes 36” or larger are required for this project. 3.5 Constructability Issues A three-span bridge has been proposed to limit the girder lengths to 100 feet which should be deliverable to the site. Although the piers are proposed out of the normal flow of Spring Creek, cofferdams and de-watering will be required. Alternative 1A will not accommodate forecasted traffic volumes and will present ongoing maintenance issues due to rehabilitation and re-use of the existing structure. Temporary shoring will be required on both approaches during the phased construction of Alternative 1B. Closure pours are included in Alternative 1B to allow for splicing the rebar and differential deflection of the decks. Prior to the bridge construction, adequate time should be allowed for the relocation of various utilities. The Williams Drive Extension Bridge will have complex framing due to the flared edges of the bridge needed for the turning radius of trucks combined with curved horizontal and vertical alignment. Construction of the temporary detour on the downstream side of the bridge will allow time for the overhead utilities to be relocated. Construction of the temporary detour on the upstream side of the bridge will allow time for the building demolition. 3.6 Temporary Traffic Control Schematic plans which apply for all alternatives are included in Appendix E. It has been suggested that there is a 10-mile detour over County Routes that most people would use if this bridge was out of service. However, the official detour for truck traffic would be US 33 to Ripley, I-77 to Charleston, I-79 to US Route 119, which is approximately 97 miles, on a bridge with a 10,300 ADT. Another local detour option would include using the North Market Street Bridge, Front Street, George Street, Prospect Street, Hill Street, and Pike Street (See dashed line on Location Map). This local detour would be considered single-lane two-way traffic in some locations. It has very steep vertical grade and through low income residential areas, but is all paved. Using a series of flaggers might make it viable for short-term, night closures for cars and small emergency vehicles. Likewise, no feasible detour is available for the duration of bridge construction. Project No. 53313 The Williams Drive Extension detour route is approximately 5,000 feet long (Photos 21-27) and includes the construction of a new permanent bridge over Spring Creek (Photo 28). Adding another crossing provides redundancy to the transportation system. There is an existing two-lane bridge on Williams Drive crossing Goff Run. This bridge should handle the detour traffic as it is a modern pre-cast slab bridge and is currently accommodating commercial truck traffic to WalMart and other businesses. All of the alternatives propose a minimum of two-lanes for the temporary condition. B&N has proposed to close the north leg (North Main Street) of the intersection (Photo 29). This will allow re-phasing of the signal and eliminate the turn lane on the bridge during construction. The remaining three legs of the intersection will utilize a two-phase signal. Eastbound and westbound traffic will receive a green signal simultaneously. All westbound left turning traffic will have to yield to eastbound traffic. Traffic leaving Wendy’s, the US Post Office, and the Hardman’s hardware store and wanting to go Eastbound would be detoured to Court Street then to Market Street to make a left onto US Route 33 East. B&N performed a capacity analysis of the temporary condition which was submitted on March 27, 2015. The results of the analysis indicate that the 2phase signal operation will provide an overall level of service B, similar to the current condition. The signal timing should be adjusted in the field and be set to maximize the green time for the eastbound/westbound phase. The northbound approach has over 2,000 feet of storage space available and if necessary, operation on this approach should be sacrificed in the peak hour to ensure the westbound queues will not extend to the Williams Drive intersection. The turning radius from US Route 119 onto the bridge will be tight. B&N evaluated this turning radius and found it to be feasible. The turning radius during the construction of Alternative 1B will be an issue for trucks coming from US 119. The proposed structure would need to be flared to accommodate this, increasing the cost of the alternative. 3.7 Pedestrian Facilities A 5’-0” wide sidewalk will remain in service throughout construction in Alternatives 1, 2 and 4 with two 5’-6” sidewalks available on the completed structure. During construction of Alternative 3, temporary pedestrian access can be provided on the Williams Drive Extension; however, the steep grade will not comply with ADA requirements and is a long detour for pedestrians. An existing concrete pedestrian bridge is located 1200’ upstream (Photo 30). However, the east approach is an unimproved hill side (Photo 31). It may be possible to install a temporary elevator/lift system at this location for approximately $150,000, as well as a pedestrian walkway between Tractor Supply Co. and Tudors Biscuit World to connect this pedestrian bridge with the sidewalk along Williams Drive. Another option would be to provide a temporary pedestrian bridge that meets ADA grades for estimated cost of $300,000. 6 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 3.8 3.0 PROPOSED ALTERNATIVES Bicycle Facilities Bicycle lanes have not been required for this project. Although dedicated bicycle lanes have not been included, the bicycles are accommodated within the proposed typical section per DD-813 by using wider 12-foot lanes and 2-foot shoulders. This is similar to the other streets in Spencer, although large shoulders do exist on US Route 119 (Photo 13). 3.9 Proposed Right-of-Way Proposed right-of-way takes will be required for the construction of the bridge. The Richard’s Tractor Sales property will be acquired for all alternatives to allow the addition of the North Main Street turn lane (Photo 32). There are also large cracks in the foundation of this building that is in contact with bridge abutment (Photos 33 and 34). Many of the alternatives require acquisition of a portion of the Save-A-Lot parking lot and the temporary detour will require temporary construction easement (TCE) in this area (Photo 35). Alternative 3 will require takes from the Roane County Economic Development Authority and Roane County Family Health Care, Inc. (Photo 36). The construction of the cut slope in the front yard of the Joint Base, West Virginia National Guard, ASL Operation will render the existing loading dock driveway unusable (Photo 37). B&N evaluated the addition of a retaining wall to minimize cut, but this retaining wall still did not provide the turning radii necessary to accommodate large trucks. Likewise, an alternate loading dock layout is provided. Alternative 4 requires TCE from the Sisters Properties, LLC for the temporary construction staging of the bridge before the slide (Photo 38). If development of this property occurs before the project is advertised, the feasibility of the TCE will be impacted. See Appendix E for the ownership index and property map. 3.10 Hydraulic Performance The reach of Spring Creek throughout the project site is part of a detail FEMA flood insurance study zoned AE. According to the flood insurance rate map (included in Appendix D), the 100year flood elevation near the Col. Ruby Bradley Bridge is Elev. 725. The low steel of all alternatives have excess freeboard over this elevation. The existing abutments are wall-type, but it was observed that approach fill wraps around the abutment and reduces the waterway opening just upstream and downstream of the bridge. As a result, many of the alternatives propose spill through slopes, which are estimated to have little impact on the hydraulic openings. The hydraulic data that B&N prepared for the North Market Street Bridge has been displayed on the situation plans for an approximation of the anticipated flood elevations. Flooding occurred in June 2013, which may have peaked near the top of the arch on North Market Street (Photos 39 & 40) near Elevation 717. The Williams Drive Bridge over Golf Run was overtopped (Photo 41). This magnitude of flooding may occur on less than a 10-year frequency. Alternative 1A will have the smallest waterway opening with all four piers remaining. Project No. 53313 The 100-year flood elevation near the Market Street intersection with US Route 119 is 726 and encroaches onto the roadway. The deck of the proposed William Drive Extension Bridge will be below this elevation. Although a larger opening at Ruby Bradley may help reduce the impact upstream, private residential property is within 100’ of the bridge limits and would likely be impacted. The previous truss bridge located downstream of the existing bridge has been removed. The new development of Sisters Properties, LLC has placed fill below the 100-year flood plain. Both change affect the hydraulic performance of the stream in the area and should be accounted for in the modeling. 3.11 Bridge Aesthetics and Lighting The location of bridge is highly visible from all sides to restaurants, shopping areas, and commuters. The demolition of the Richard’s Tractor Sales building would further increase the visibility of the bridge to the post office area. The existing bridge has ornamental light posts at each end of the perforated concrete barrier (Photo 42). The bridge fascia contains curved outriggers at the diaphragm locations. The piers have arched caps. The proposed structures will include black aluminum ornamental street lights similar to those found throughout downtown Spencer (Photo 43). The lights would be mounted to the top of the bridge combo rail at six locations on each side of the bridge. The concrete barrier will be formlined to provide an architectural surface to the concrete. The texture of the formliner will be selected to resemble the local architectural theme of the buildings in the downtown area. The exposed concrete will be sealed with a protective coating with a color selected to accentuate the details. Other options to enhance the structure could include: black steel or aluminum fence-type railing, staining the formlined areas with multiple colors, extending combination railing or fencing onto the approaches, rather than using standard guardrail, and pier design to replicate the details of the existing bridge. Upon request of the Division, further discussion and exhibits of these options can be provided. 3.12 Other Considerations The following should be considered during the review of this office review submission. A detour route behind Save-A-Lot was considered in the previous location of an old truss bridge, which has since been demolished. This detour option was found to be non-viable due to impacts to Save-A-Lot and the lumber facility. Additionally, a portion of this detour route would only accommodate a single lane. Access management improvements to the Wendy’s parking lot may be considered to 7 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 3.0 PROPOSED ALTERNATIVES further enhance the function and safety of the intersection. The addition of turn lanes on US Route 119 and North Main Street was suggested in the lane schematic from WVDOT Traffic Section. The addition of these turn lanes was considered beyond the scope of this study. Should the turn lanes be requested, additional evaluation of the intersection turning radius would be required to determine the needed pavement width. If additional pavement width is needed along US Route 119, the fill will impact the 100 year flood plain and hydraulic analysis would be required to determine the impacts. The use of a retaining wall to mitigate this impact may be a possible solution. Project No. 53313 8 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 3.0 PROPOSED ALTERNATIVES Table 2 Comparison of Alternatives Number Alternative 1A Rehabilitate Bridge using Upstream Detour 1B Replace Bridge using Phased Construction 2A Replace Bridge using Downstream Temporary Detour 2B Replace Bridge using Upstream Temporary Detour 3 Replace Bridge using Williams Drive Detour 4 Replace Bridge using ABC Lateral Slide Project No. 53313 Bridge Width (feet) 42 63 63 63 63 63 Bridge Length (feet) # of Spans & Span Lengths (ft) 227 5 Spans @ 40, 40, 50, 40, 40 250 3 Spans @ 75, 100, 75 250 3 Spans @ 75, 100, 75 250 3 Spans @ 75, 100, 75 250 3 Spans @ 75, 100, 75 250 3 Spans @ 75, 100, 75 Impact to Traffic During Construction Moderate High Re-use of Existing Structure Hydraulic Performance Redundancy of Transportation System Utility Impacts Right-of-Way Impacts Right-ofWay Costs Construction Costs 1 Business Displaced, Necessary TCE in Development Pad $580,000 $2,001,000 1 Business Displaced $550,000 $5,397,000 $600,000 $5,703,000 $580,000 $5,704,000 $940,000 $7,702,000 $580,000 $5,452,000 Re-use of beams, piers and abutments Acceptable, Most Piers in Stream Lacking High (less one sewer) All new construction Best, Less impact from Temporary Structure Lacking High All new construction Better, Temporary Impact needs Evaluation Lacking High Moderate All new construction Better, Temporary Impact needs Evaluation Lacking High Longer Detour All new construction New Structure in Floodway needs Evaluation Two Bridges, Alternate Access Extreme All new construction Best, Less impact from Temporary Structure Lacking High Moderate Low; due to shorter Duration 1 Business Displaced, TCE will impact parking area of Business 1 Business Displaced, Necessary TCE in Development Pad 1 Business Displaced, Loading Dock Drive Affected to WVARNG 1 Business Displaced, Necessary TCE in Development Pad 9 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 4.0 CONCLUSIONS 4.0 CONCLUSIONS A preferred alternative will not be selected at this time. The following conclusions may be inferred from this report: The No Build Alternative is not feasible. The least cost option, Alternative 1A, would only provide a short-term structural solution and offers no relief for traffic congestion. Phased construction in Alternative 1B increases the length of the project and duration of two-lane temporary traffic control. The additional joints provide a less durable structure. It is the 2nd least cost and better hydraulic performance during construction. Benefits of Alternative 2A include a faster start-up for the contractor not being delayed with the overhead utility relocations and a slightly improved alignment to the intersection. In a significant flood event, there may be benefits of having the temporary bridge on the downstream side. It is economically feasible. The upstream detour used Alternative 2B has less impact on the Save-A-Lot parking area. Alternative 3 is the only solution that provides additional redundancy in the transportation system. This is the highest cost alternative. Hydraulic modeling of the Williams Drive Extension Bridge is needed to determine if it is a viable solution. Additional alignments could be investigated to raise the bridge, all of which will likely increase the cost. Lateral bridge sliding of Alternative 4 will have the least impact on traffic and will perform better hydraulically during construction. A higher level of risk is associated with the slide. Project No. 53313 10 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 APPENDIX A SITE PHOTOGRAPHS Project No. 53313 Page A1 of A12 Appendix A Photo 1: Typical traffic condition on existing bridge. Photo 2: Intersection of US33 and Williams Drive at south end of bridge. Note recent development of adjacent properties. Photo 3: Aerial view of bridge and intersection of US33, US119 and North Main Street. Photo 4: Turning lanes at intersection of US33 and Williams Drive. Page A2 of A12 Appendix A Photo 5: Existing bridge consists of CIP concrete T-beams and three-column piers. Photo 7: East approach to bridge and turning lanes at US33 intersection with Williams Drive. Photo 6: Downtown Main Street. Spencer, WV. Photo 8: Sandy loam overburden along the banks of Spring Creek. Page A3 of A12 Appendix A Photo 9: North Market Street Bridge. Photo 11: Proposed location of the Williams Extension, Alternative 3. Photo 10: Save-A-Lot parking lot, adjacent to Ruby Bradley Bridge. Photo 12: Looking toward Market Street from the parking lot at the WV National Guard building. Page A4 of A12 Appendix A Photo 13: Typical wide shoulder along US Route 119, just north of the proposed intersection with Market Street. Photo 15: Overhead utility lines which parallel the upstream side of the existing bridge. Photo 14: Upstream of existing bridge. Proposed location for Alternatives 1A, 2B and 4 temporary condition. Photo 16: Sanitary manhole below Span 5 of the existing bridge. Page A5 of A12 Appendix A Photo 17: Abandoned aerial sewer crossing paralleling the downstream side of the existing bridge. Photo 19: Gas pipeline within the proposed alignment of the Williams Extension, Alternative 3. Photo 18: Utilities within the proposed alignment of the Williams Extension, Alternative 3. Photo 20: Overhead lines within the proposed alignment of the Williams Extension, Alternative 3. Page A6 of A12 Appendix A Photo 21: Looking north near match existing point on Williams Drive Extension. Photo 23: Looking north at Williams Drive detour route in front of Roane County Family Medical. Note head-in parking along route will need to be eliminated. Photo 22: Looking south near match existing point on Williams Drive Extension. Photo 24: Looking south at Williams Drive detour route in front of Roane County Family Medical. Note head-in parking along route will need to be eliminated. Page A7 of A12 Appendix A Photo 25: Looking south at Williams Drive detour route in front of Walmart. Photo 27: Bridge and aerial gas line crossing Goff Run along the Williams Drive detour route. Photo 26: Section of Williams Drive detour route with poor asphalt condition. Photo 28: Spring Creek at the location of the proposed permanent bridge for the Williams Drive Extension. Page A8 of A12 Appendix A Photo 29: Looking along the southbound lane of North Main Street at the intersection of US33 and US119. Photo 31: East approach to the existing pedestrian bridge. Note steep grade. Photo 30: Pedestrian bridge adjacent to Walmart, approximately 1200’ upstream from Ruby Bradley Bridge. Photo 32: Looking from North Main Street at Richard’s Tractor Sales. Page A9 of A12 Appendix A Photo 33: Large cracks in the foundation of the Richard’s Tractor Sales building. Photo 35: Looking northwest through Save-A-Lot parking lot, adjacent to Ruby Bradley Bridge. Photo 36: Sections of property owned by Roane County EDA and Roane County Family Health Care, Inc. Photo 34: Foundation of Richard’s Tractor Sales in contact with Abutment 1 of Ruby Bradley Bridge. Page A10 of A12 Appendix A Photo 37: Loading dock at the Joint Base, West Virginia National Guard, ASL Operation. Photo 39: Flooding at North Market Street Bridge in June 2013. Photo 38: Upstream side of bridge. Location of required TCE for Alternatives 1A, 2B and 4, from Sisters Properties, LLC. Photo 40: Flooding at North Market Street Bridge in June 2013. Page A11 of A12 Appendix A Photo 41: Flooding over Williams Drive in June 2013. Photo 43: Typical light pole along North Main Street in Spencer. Photo 44: Examples of possible aesthetic enhancements. Note street lights at 50 foot spacings Photo 42: Existing typical lighting on Ruby Bradley Bridge. Page A12 of A12 Appendix A Photo 45: Elevation view of Three Springs Bridge over US 22 in Weirton, WV. Photo 47: View of concrete stamping on the deck barrier and wingwall of Three Springs Bridge. Photo 46: View of concrete stamping on the deck barrier of Three Springs Bridge. Photo 48: Close-up view of concrete stamping on Three Springs Bridge. Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 APPENDIX B DESIGN CRITERIA Project No. 53313 APPENDIX B SHEET 1 OF 3 STATE PROJECT U344-33-12.76 COLONEL RUBY BRADLEY BRIDGE REPLACEMENT Design Study - Final Submission US ROUTE 33 2013 ADT: 10,200 2033 ADT: 13,800 DESIGN CRITERIA CHART DESIGN PARAMETER WVDOH DESIGN CRITERIA PROVIDED DESIGN Roadway Classification: Urban Collector -- DD-610 Terrain Mountainous -- observed Design Speed: 35 MPH 35 MPH Assumed posted speed Lane Width: 10' Lanes 10' min. lane width 12' max. lane width DD-610 Outside Shoulder Width: 2' Curb and Gutter curb and gutter with 2' gutter pan Inside Shoulder Width: N/A -- Horizontal Alignment: (Min. Radius "ft") 371' (35 MPH; emax 4%) N/A (GDHS 2011, pg 3-32) Vertical Alignment: (Minimum K) 29 (crest) 35 MPH 49 (Sag) 35 MPH no crest curves no sag curves (GDHS 2011, pg 3-155,3-161) Grade: 12% max 3.70% DD-610 Cross Slopes: 2% (traveled way normal crown) 2% (traveled way normal crown) (GDHS 2011, pg 10-93) Superelevation: 4% (max) N/A DD-610 Vertical Bridge Clearance 14' n/a DD-610 REQUIRES DESIGN EXCEPTION Design Criteria - US33 REFERENCE REMARKS CENTERLINE IS HELD TANGENT AND LANES WILL SHIFT TO ACCOMMODATE APPENDIX B SHEET 2 OF 3 STATE PROJECT U344-33-12.76 COLONEL RUBY BRADLEY BRIDGE REPLACEMENT Design Study - Final Submission WILLIAMS DRIVE EXTENSION 2013 ADT: 5700 2033 ADT: N/A DESIGN CRITERIA CHART DESIGN PARAMETER WVDOH DESIGN CRITERIA PROVIDED DESIGN Roadway Classification: Urban Local Street -- Terrain Mountainous -- observed Design Speed: 20 MPH to 30 MPH 25 MPH DD-610 Lane Width: 10' Lanes 12' max. lane width DD-610 Outside Shoulder Width: 2' Curb and Gutter 3' Paved Shoulder DD-610 Inside Shoulder Width: N/A -- DD-610 REQUIRES DESIGN EXCEPTION REFERENCE Horizontal Alignment: (Min. Radius "ft") 198' (25 MPH; normal crown) Vertical Alignment: (Minimum K) 12 (crest) 25 MPH 26 (Sag) 25 MPH 12 (crest) 26 (sag) DD-610 Grade: 12% max 11.5% DD-610 Cross Slopes: 2% (traveled way normal crown) 2% (traveled way normal crown) (GDHS 2011, pg 10-93) Superelevation: 8% (max) Normal Crown DD-610 Vertical Bridge Clearance 14' n/a DD-610 198' 198' Design Criteria - Williams (GDHS 2011, pg 3-55) REMARKS APPENDIX B SHEET 3 OF 3 STATE PROJECT U344-33-12.76 COLONEL RUBY BRADLEY BRIDGE REPLACEMENT Design Study - Final Submission Clear Zone Table PROVIDED DESIGN Alignment Design Speed ADT Clear Zone Width Foreslope* Backslope** US Route 33 35 mph 10,200 (2013) 13,800 (2033) 16'-18' in fill (4:1 max) 16'-18' in cut (3:1 max) 4:1 3:1 Williams Drive Extension 25 mph 5,700 (2013) N/A (2033) 12'-14' in fill (4:1 max) 12'-14' in cut (3:1 max) 4:1 3:1 *Column lists maximum slope found within the clear zone; slopes steeper than 4:1 will be protected with guardrail or other barrier **Column lists maximum slope found within the clear zone; slopes steeper than 3:1 will be protected with guardrail or other barrier Clear Zone Info Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 APPENDIX C PRELIMINARY COST ESTIMATE Project No. 53313 APPENDIX C SHEET 1 OF 3 COLONEL RUBY BRADLEY BRIDGE DESIGN STUDY COST COMPARISON OF ALTERNATIVES ALT 1A = Rehabilitate Bridge and Replace Deck ALT 1B = Replace Bridge using Phased Construction ALT 2A = Replace Bridge using Downstream Temporary Detour WVDOT ALT 2B = Replace Bridge using Upstream Temporary Detour Prepared By: MWL 7/31/14 Revised By: ASG/MWL 5/5/15 ALT 3 = Replace Bridge using Williams Drive Detour ALT 4 = Replace Bridge using ABC -Lateral Slide SUMMARY OF ESTIMATED QUANTITIES ITEM DESCRIPTION COST INFORMATION QUANTITY UNITS ITEM COST UNIT COST ALT 1A ALT 1B ALT 2A ALT 2B ALT 3 ALT 4 ALT 1A ALT 1B ALT 2A ALT 2B ALT 3 ALT 4 ROADWAY 201001-000 201002-001 CLEARING AND GRUBBING EXISTING PAVEMENT REMOVAL LS SY 1 0 1 0 1 0 1 0 1 0 1 807 VARIES $15.00 $10,000 $0 $10,000 $0 $12,000 $0 $10,000 $0 $22,000 $0 $12,000 $12,200 204001-000 MOBILIZATION LS 1 1 1 1 1 1 VARIES $45,420 $72,530 $76,680 $76,660 $91,850 $72,910 207001-001 211001-001 UNCLASSIFIED EXCAVATION UNCLASSIFIED BORROW EXCAVATION CY CY 0 1,062 0 691 0 2,823 0 2,583 19,566 1,062 0 2,135 $10.00 $20.00 $0 $21,300 $0 $13,900 $0 $56,500 $0 $51,700 $195,700 $21,300 $0 $42,700 307001-000 AGGREGATE BASE COURSE, CLASS CY 0 50 100 100 150 100 $38.00 $0 $1,900 $3,800 $3,800 $5,700 $3,800 SF SF 8,111 10,686 10,008 2,000 15,391 2,000 16,299 2,000 $100,100 $8,000 $154,000 $8,000 $163,000 $8,000 280 280 280 280 $44,500 $70,000 $70,000 $70,000 $197,700 $12,000 $87,400 $96,800 $152,400 $8,000 178 $10.00 $4.00 $2.00 $250.00 $81,200 $42,800 SY 19,768 3,000 43,680 387 15,235 2,000 502001-012 ROADWAY PAVING AND SUBGRADE (SF) ROADWAY OVERLAY (SF) ROADWAY OVERLAY (WILLIAMS DRIVE ONLY) (SF) 12 INCH PORTLAND CEMENT CONCRETE APPROACH SLAB DRAINAGE LS 1 1 1 1 1 1 VARIES $5,000 $2,000 $5,000 $5,000 $10,000 $5,000 606029-001 606030-001 FREE DRAINING BASE TRENCH OUTLET PIPE LF LF 1,000 100 1,000 100 1,000 100 1,000 100 1,700 170 1,000 100 $10.00 $15.00 $10,000 $1,500 $10,000 $1,500 $10,000 $1,500 $10,000 $1,500 $17,000 $2,600 $10,000 $1,500 607001-001 607006-001 607037-001 607065-001 TYPE 1 GUARDRAIL, CLASS THRIE BEAM GUARDRAIL BRIDGE TRANSITION BUFFER END SECTION FLARED END TERMINAL LF EA EA EA 100 0 0 0 325 4 4 3 425 4 4 3 313 4 4 3 413 8 4 3 363 4 4 3 $10.00 $800.00 $75.00 $1,200.00 $1,000 $0 $0 $0 $3,300 $3,200 $300 $3,600 $4,300 $3,200 $300 $3,600 $3,200 $3,200 $300 $3,600 $4,200 $6,400 $300 $3,600 $3,700 $3,200 $300 $3,600 CONCRETE SIDEWALK SY 100 311 252 252 480 252 $55 $5,500 $17,200 $13,900 $13,900 $26,400 $13,900 610003-002 COMBINATION CONCRETE CURB AND GUTTER, TYPE II LF 190 488 417 417 791 417 $50 $9,500 $24,400 $20,900 $20,900 $39,600 $20,900 636 ITEMS 636005-001 636017-001 636018-001 TEMPORARY TRAFFIC CONTROL TEMPORARY STRUCTURE FOR MAINTAINING TRAFFIC TEMPORARY CONCRETE BARRIER REMOVE AND RESET TEMPORARY CONCRETE BARRIER LS SF LF LF 1 5,250 100 100 1 0 850 850 1 5,250 100 100 1 5,250 100 100 1 0 0 0 1 0 100 100 VARIES $100 $40 $10 $35,000 $525,000 $4,000 $1,000 $60,000 $0 $34,000 $8,500 $35,000 $525,000 $4,000 $1,000 $35,000 $525,000 $4,000 $1,000 $3,000 $0 $0 $0 $35,000 $0 $4,000 $1,000 637001-001 WATER FOR DUST PALLIATIVE MG 1,000 1,000 1,000 1,000 1,000 1,000 $20.50 $20,500 $20,500 $20,500 $20,500 $20,500 $20,500 638002-001 638003-001 RIGHT OF WAY MARKER SURVEY MARKER EA EA 15 4 15 4 15 4 15 4 30 8 15 4 $74.00 $205.00 $1,200 $900 $1,200 $900 $1,200 $900 $1,200 $900 $2,300 $1,700 $1,200 $900 639001-001 CONSTRUCTION LAYOUT STAKE LS 1 1 1 1 2 1 $10,000.00 $10,000 $10,000 $10,000 $10,000 $20,000 $10,000 640006-001 640003-001 SMALL FIELD OFFICE BUILDING EQUIPMENT MO LS 9 1 18 1 12 1 12 1 18 1 12 1 $2,000.00 $9,000.00 $18,000 $9,000 $36,000 $9,000 $24,000 $9,000 $24,000 $9,000 $36,000 $9,000 $24,000 $9,000 642 ITEMS TEMPORARY EROSION AND SEDDIMENT CONTROL LS 1 1 1 1 2 1 $5,000 $5,000 $5,000 $5,000 $5,000 $10,000 $5,000 652 ITEMS PERMANENT SEEDING AND MULCHING LS 1 1 1 1 2 1 $20,000 $20,000 $20,000 $20,000 $20,000 $40,000 $20,000 660 ITEMS TRAFFIC SIGNALS EA 0 0 0 0 1 0 $105,000.00 $0 $0 $0 $0 $105,000 $0 LS 1 1 1 1 1 1 $10,000.00 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $938,000 $558,000 $1,110,000 $1,111,000 $1,099,000 $577,000 609001-001 640004-001 COMPUTER SYSTEM COMPUTER SYSTEM FOR FIELD OFFICE TOTAL ROADWAY COST Burgess Niple, Inc. - Parkersburg Printed 5/5/2015 $70,000 APPENDIX C SHEET 2 OF 3 COLONEL RUBY BRADLEY BRIDGE DESIGN STUDY COST COMPARISON OF ALTERNATIVES ALT 1A = Rehabilitate Bridge and Replace Deck ALT 1B = Replace Bridge using Phased Construction ALT 2A = Replace Bridge using Downstream Temporary Detour WVDOT ALT 2B = Replace Bridge using Upstream Temporary Detour Prepared By: MWL 7/31/14 Revised By: ASG/MWL 5/5/15 ALT 3 = Replace Bridge using Williams Drive Detour ALT 4 = Replace Bridge using ABC -Lateral Slide SUMMARY OF ESTIMATED QUANTITIES ITEM DESCRIPTION COST INFORMATION QUANTITY UNITS ITEM COST UNIT COST ALT 1A ALT 1B ALT 2A ALT 2B ALT 3 ALT 4 ALT 1A ALT 1B ALT 2A ALT 2B ALT 3 ALT 4 BRIDGE 203001-001 DISMANTLING STRUCTURE LS 1 1 1 1 1 1 VARIES $120,000 $80,000 $60,000 $60,000 $55,000 $60,000 212001-000 212002-000 212004-000 212005-000 218006-000 STRUCTURE EXCAVATION WET EXCAVATION COFFERDAM SELECT MATERIAL FOR BACKFILLING FOUNDATION PROTECTION CY CY EA CY CY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 868 760 2 59 1,147 $55 $150 $20,000 $80 $65 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $47,800 $114,000 $40,000 $4,800 $74,600 601002-001 601009-001 601019-001 601030-001 CLASS B CONCRETE CLASS H CONCRETE CONCRETE PROTECTIVE COATING PATCHING CONCRETE STRUCTURES CY CY SF SF 0 169 8,965 593 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 536 0 0 0 $850 $1,000 $8 $150 $0 $169,000 $71,800 $89,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $455,600 $0 $0 $0 602001-001 602002-001 REINFORCING STEEL BAR EPOXY COATED REINFORCING STEEL BAR LB LB 0 47,341 0 0 0 0 0 0 0 0 55,744 0 $1.35 $1.40 $0 $66,300 $0 $0 $0 $0 $0 $0 $0 $0 $75,300 $0 614001-003 HP10X42 STEEL PILE LF 0 0 0 0 0 865 $55.00 $0 $0 $0 $0 $0 $47,600 615039-001 615075-001 JACKING STEEL SUPERSTRUCTURE MISCELLANEOUS BRIDGE WORK, BEAM REPAIRS LS LS 0 1 0 0 0 0 0 0 0 0 1 0 $142,500 $170,000 $0 $170,000 $0 $0 $0 $0 $0 $0 $0 $142,500 $0 TEMPORARY BENTS SLIDING PREMIUM FOR DESIGN AND INSPECTION NEW STRUCTURE NEW SUPERSTRUCTURE FORMLINER PHASED CONSTRUCTION PREMIUM BRIDGE LIGHTING LS LS SF SF SF LS LS 0 0 0 0 0 0 1 0 0 15,750 0 975 1 1 0 0 15,750 0 975 0 1 0 0 15,750 0 975 0 1 0 0 23,250 0 1,376 0 1 1 1 0 15,750 975 0 1 $316,780 $185,000 $225 $150 $22 VARIES $56,000.00 $0 $0 $0 $0 $0 $0 $56,000 $0 $0 $3,543,800 $0 $21,500 $275,000 $56,000 $0 $0 $3,543,800 $0 $21,500 $0 $56,000 $0 $0 $3,543,800 $0 $21,500 $0 $56,000 $0 $0 $5,231,300 $0 $30,300 $0 $56,000 $316,800 $185,000 $0 $2,362,500 $21,500 $0 $56,000 TOTAL BRIDGE COST SUBTOTAL CONSTRUCTION COST CONSTRUCTION CONTINGENCY (19%) Note: Williams Drive Extension is approximately $2,500,000 of the total for Alternative 3. TOTAL CONSTRUCTION COST PERCENT DIFFERENCE FROM LOWEST Burgess Niple, Inc. - Parkersburg Printed 5/5/2015 $743,000 $3,977,000 $3,682,000 $3,682,000 $5,373,000 $4,004,000 $1,681,000 $4,535,000 $4,792,000 $4,793,000 $6,472,000 $4,581,000 $320,000 $862,000 $911,000 $911,000 $1,230,000 $871,000 $2,001,000 $5,397,000 $5,703,000 $5,704,000 $7,702,000 $5,452,000 0% 170% 185% 185% 285% 172% APPENDIX C SHEET 3 OF 3 COLONEL RUBY BRADLEY BRIDGE DESIGN STUDY COST COMPARISON OF ALTERNATIVES ALT 1A = Rehabilitate Bridge and Replace Deck ALT 1B = Replace Bridge using Phased Construction ALT 2A = Replace Bridge using Downstream Temporary Detour WVDOT ALT 2B = Replace Bridge using Upstream Temporary Detour Prepared By: MWL 7/31/14 Revised By: ASG/MWL 5/5/15 ALT 3 = Replace Bridge using Williams Drive Detour ALT 4 = Replace Bridge using ABC -Lateral Slide SUMMARY OF ESTIMATED QUANTITIES ITEM DESCRIPTION COST INFORMATION QUANTITY UNITS ALT 1A ALT 1B ALT 2A ALT 2B ALT 3 ALT 4 ALT 1A ALT 1B ALT 2A ALT 2B ALT 3 ALT 4 MONPOWER2 FRONTIER SPENCER WATER COMMISION SPENCER SANITARY BOARD CONSUMER GAS COMPANY LUMOS NETWORKS LS LS LS LS LS LS 0 0 0 0 0 0 0 0 0 50,000 0 0 0 5,000 0 50,000 10,000 0 0 0 0 50,000 10,000 0 60,000 35,000 25,000 60,000 15,000 35,000 0 0 0 60,000 0 0 VARIES VARIES VARIES VARIES VARIES VARIES $0 $0 $0 $0 $0 $0 $0 $0 $0 $50,000 $0 $0 $0 $5,000 $0 $50,000 $10,000 $0 $0 $0 $0 $50,000 $10,000 $0 $60,000 $35,000 $25,000 $60,000 $15,000 $35,000 $0 $0 $0 $60,000 $0 $0 RIGHT-OF-WAY COSTS2 LS 1 1 1 1 1 1 VARIES $580,000 $550,000 $600,000 $580,000 $940,000 $580,000 $0 $50,000 $65,000 $60,000 $230,000 $60,000 $2,581,000 $5,997,000 $6,368,000 $6,344,000 $8,872,000 $6,092,000 $259,000 $600,000 $637,000 $635,000 $888,000 $610,000 $2,840,000 0% $6,597,000 132% $7,005,000 147% $6,979,000 146% $9,760,000 244% $6,702,000 136% TOTAL UTILITY COST PROJECT SUBTOTAL 1 Miscellaneous includes Engineering, Construction Services, Legal, Permits,etc. MISCELLANEOUS 1 (10%) 2 Utility and R/W costs are adjusted based on new alternative layout and using estimates provide by WVDOT. TOTAL PROJECT COST PERCENT DIFFERENCE FROM LOWEST Burgess Niple, Inc. - Parkersburg ITEM COST UNIT COST Printed 5/5/2015 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 APPENDIX D EXHIBITS Project No. 53313 Appendix D - Sheet D1 of 6 Appendix D - Sheet D2 of 6 Appendix D - Sheet D3 of 6 Appendix D - Sheet D4 of 6 Appendix D - Sheet D5 of 6 PROJECT NUMBERS STATE 12" PORTLAND CEMENT CONCRETE APPROACH INCREASE DEPTH OF CONCRETE PAVEMENT SUCH THAT PAVEMENT IS 12" THICK SEE 20'-0" ROADWAY RDWY. PVMT. TRANSITION SLAB ITEM 502001-012 (SEE NOTE C3, SHT 5 OF 5) 20'-0" (MEASURED ALONG PGL) DETAILS 16'-0" 4'-0" MIN. SEE DETAIL A, SHT 5 OF 5 (ALONG PGL) SEE DETAIL B BELOW FABRIC FOR SEPARATION, F ON O G AND I T A ALL FIN E INST RPROO R TO B HT U E WAT URE PO ITH NIG W S CLO LETED ILE OF P COM URE WH 2 LANES S CLO TAINING MAIN FIC. F TRA FEDERAL 2 LAYERS ITEM 207034-000 TOTAL Appendix D - Sheet D5 of 6 12" PORTLAND CEMENT CONCRETE APPROACH SLAB ITEM 502001-012 (SEE NOTE C3, SHT 5 OF 5) SEE DETAIL B BELOW FABRIC FOR SEPARATION, 2 LAYERS ITEM 207034-000 4'-0" CLOSURE POUR TO ATE 4' L P EL R STE GE OVE IDE L BRID AFTER S GAP BEFORE R U AND URE PO S CLO SEE DETAILS SHT 4 OF 5. INCIDENTAL TO APPROACH SLAB ITEM 502001-014 MAX. MAX. 1 2" MAX. MAX. 1 8" 1 2" SLEEPER SLAB ALTERNATIVES, IF FREE DRAINING BASE COURSE THEN ADD OUTLET TO INTERCEPT ANY POTENTIAL FLOW INTO ABUTMENT BACKFILL 1 8" 1 2" 1 2" SEE DETAIL B, SHT 5 OF 5 SHEET NO. COUNTY DISTRICT EPS EPS MATERIAL MATERIAL WOVEN GEOTEXTILE (TYP.) S ES ACC W ALLO N OF O T 2'-0" ATIO USE INSTALL ATERDE FOR RENE W TER SLI P F NEO FING A O PRO SEE NOTE C2 ON SHEET 5 OF 5 INCREASE THICK. OF AGGREGATE BASE COURSE TO 12" 1 • : 1 OR LIMITS OF REINFORCED BRIDGE APPROACH FILL FABRIC WALL F LA T T E R LOW E B " 8 PS 1 E D OW EN EXT TO ALL OF N T SEA LLATIO ATERA DE INST RENE W TER SLI P F NEO FING A O PRO PART NOT SHOWN IS SAME AS INTEGRAL ABUTMENT SEE DETAIL A BELOW CLASS I AGGREGATE TYP. ALL LAYERS PER SECTION 704.6 OF THE STANDARD SPECIFICATION SEE DETAIL A BELOW LIMITS OF STRUCTURE EXCAVATION LIMITS OF STRUCTURE EXCAVATION 5'-0" MIN. LIMITS OF IMPERMEABLE 5'-0" MIN. GEOMEMBRANE INCIDENTAL TO ITEM 645001-001 LIMITS OF IMPERMEABLE GEOMEMBRANE INCIDENTAL TO ITEM 645001-001 SEE NOTE C2 ON SHEET 5 OF 5 WOVEN FABRIC C L 4% SLOPE IMPERMEABLE GEOMEMBRANE TO I TEM 645001 -001 TYPICAL LONGITUDINAL SECTION THROUGH SLEEPER SLAB AND APPROACH SLAB 3/4" FILL WITH SILICONE JOINT FILLER IMPERMEABLE GEOMEMBRANE FILTER FABRIC ~ APPROACH SLAB DDMMMYYYY HH: MM 6" DIA. PERFORATED NON-CORROSIVE UNDERDRAIN SURROUNDED BY CRUSHED STONE AND FABRIC FOR SEPARATION ABUTMENT DETAIL A 3/4" EXPANSION JOINT MATERIAL DETAIL B DESIGNED DATE CHECKED WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ENGINEERING DIVISION NO. REVISION DATE BY DRAWN DATE REVIEWED SHEET DATE DATE SAMPLE DRAWINGS FOR SLEEPER SLAB, JOINTS AND ABUTMENT BACKFILL 2 OF 5 DESIGN NUMBER $USERNAM E$ 1 2" 6" 1 0" MI N. 6" I NCI DENTAL C L GEOMEMBRANE CLASS 1 AGGREGATE FOR SEMI-INTEGRAL ABUTMENTS WITH THERMAL MOVEMENTS GREATER THAN 2" FOR INTEGRAL ABUTMENTS WITH THERMAL MOVEMENTS GREATER THAN 2" 1 8" MAX. 1'-6" LI MI TS OF I MPERMEABLE 4'-0" MIN. LAP Appendix D - Sheet D6 of 6 Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 APPENDIX E ALTERNATIVE PLANS Project No. 53313 Public State State Roads Dist. Project Div. No. W.V. 3 HANCOCK NEW CUMBERLAND WEST VIRGINIA Federal Fiscal Project No. Year Sheet Total No. Sheets E1 E86 County No. BROOKE WELLSBURG U344-33- STP-0033- 12.76 00 243 (D) ROANE 2014 OHIO WHEELING DEPARTMENT OF TRANSPORTATION MOUNDSVILLE DIVISION OF HIGHWAYS MARSHALL PENNSYLVANIA WETZEL NEW MARTINSVILLE PLANS FOR CONSTRUCTION MONONGALIA MARYLAND MORGANTOWN O H I O TYLER OF 6 MARION MIDDLEBOURNE MORGAN KINGWOOD FAIRMONT MINERAL 4 MARTINSBURG KEYSER HARRISON ST. MARYS WEST UNION RITCHIE BURLINGTON CLARKSBURG DODDRIDGE JEFFERSON TAYLOR GRAFTON 5 ROMNEY BARBOUR PARKERSBURG HARRISVILLE STATE HIGHWAY BERKELEY HAMPSHIRE PLEASANTS WOOD BERKELEY SPRINGS PRESTON CHARLES TOWN GRANT TUCKER PHILLIPPI LEWIS 3 HARDY PARSONS GILMER ELIZABETH MOOREFIELD WESTON PETERSBURG FEDERAL PROJECT NO.STP-0033-243 (D) WIRT GLENVILLE ROANE MASON STATE PROJECT NO. U344-33-12.76 00 RANDOLPH BUCKHANNON CALHOUN GRANTSVILLE JACKSON 7 ELKINS UPSHUR RIPLEY 8 BRAXTON SPENCER PT PLEASANT PENDLETON SUTTON WEBSTER SPRINGS WINFIELD CLAY CABELL 1 WAYNE HAMLIN NICHOLAS POCAHONTAS WAYNE PROJECT SITE COLONEL RUBY BRADLEY BRIDGE DESIGN STUDY V I KY UC NT KE COUNTY LINCOLN 2 BOONE DISTRICT NUMBER R SUMMERSVILLE CHARLESTON ROANE G I N I A KANAWHA HUNTINGTON SPENCER CORP. DISTRICT FRANKLIN WEBSTER CLAY PUTNAM US ROUTE 33 / US ROUTE 119 MARLINTON FAYETTE DISTRICT OFFICE MADISON FAYETTEVILLE MINGO LOGAN 9 GREENBRIER LOGAN RALEIGH WILLIAMSON LEWISBURG BECKLEY WEST VIRGINIA WYOMING MONROE HINTON PINEVILLE 10 SUMMERS DEPARTMENT OF TRANSPORTATION UNION DIVISION OF HIGHWAYS MERCER WELCH US 1/2 MILE EY PL RI SPENCER SANITARY BOARD - (SANITARY SEWER) SPENCER WATER COMMISSION -(WATER) MON-POWER COMPANY -(ELECTRIC) FRONTIER- (TELEPHONE) CONSUMERS GAS UTILITY COMPANY - (GAS) SUDDENLINK - (TV CABLE) LUMOS NETWORKS - (FIBER OPTIC COMMUICATIONS) DISTRICTS AND 33 TO 1 1 SHT. UTILITIES DISTRICT HEADQUARTERS SPENCER M M M M H M M M M H M E DESIGN STUDY OFFICE REVIEW H H E M E M E 2049 1049 .00 9+00 40 00 1. .00 + a 9 t 4 S 20 OT . P Sta POT E E H M E M M E E v 2 0 1 M H H H 50 M E 2050 1050 4 0 1 E E E E E 9 1 1 US 2051 52 2052 1052 ta. PC S 6 76.7 6 + 7 2 . 5 6 0 7 1 + 2052 ta. PC S E E E E E H E E PRELIMINARY NOT FOR CONSTRUCTION 1051 EK CRE G N I SPR E E E 3 205 53 10 E E S t P a. R C r E TYPE OF CONSTRUCTION M H E PRINCETON 2 0 S 5 3 t + a 6 . 6 . 1 9 0 4 5 3 + 5 4 . 4 4 O MCDOWELL P R C M E E M M E H E E E M 9 1 T. H S H Prop cor E E E M E E E E H US E WORK LI MI TS H M 42 +28. 1054 ta. PT S M M M M .96 +52 2054 ta. PT S M M M 54 4 54 10 5 0 2 E M 9 1 1 6 M E E E E E E E M E M E E M H E 4 M M M HH M M E 2 H M H E E E " 8 r M H M M s H E H H H H PARKERSBURG, WV H 2 1 SHT. NG RI P S H J 2 VE 33/ DRI CR S M A LLI WI M r M M US M E E E E US M M & PLAN HOR. WORK LI MI TS STATE LINE 0 CORPORATION LINE 9 1 1 COUNTY LINE 5 ft. 200 ft. PROPOSED R/W & EASEMENT LINE INDEX TO SHEETS EXISTING R/W LINE P L VERT. PROFILE O O HOR. 20 ft. X X =) A . D . T(.2033 TITLE SHEET EDGE OF STREAM E2 TYPICAL SECTIONS PROPOSED GUARD RAIL E3 - E7 TRAFFIC SKETCH MAPS EXISTING GUARD RAIL E8 PROPERTY MAP AND OWNERSHIP INDEX RAILROAD E10 - E23 ALTERNATIVE 1A G GAS LINE E24 - E36 ALTERNATIVE 1B W WATER LINE E37 - E48 ALTERNATIVE 2A T TELEPHONE LINE D . H . V . = 714 E49 - E58 ALTERNATIVE 2B E ELECTRIC LINE E59 - E71 ALTERNATIVE 3 E72 - E86 ALTERNATIVE 4 XX TELEPHONE POLE D . T . = = 55/45 NOTES: STANDARD DETAIL BOOK VOL. I DATED DESCRIPTION E1 10,200 13,800 X NO. EXISTING FENCE PROPOSED FENCE XX DESIGN DESIGNATION A . D . T(.2013 =) PROPERTY LINE G UR SB LD NO AR 20 ft. TO M CONVENTIONAL SIGNS O 33 SCALES SIGNED......................................DATE:.................WV REG. P.E.............. - E9 JANUARY 1, 2000 & VOLUME II DATED JANUARY 1, 1994, SHALL APPLY TO THIS PROJECT. RECOMMENDED POWER POLE COMBINED POWER AND TELEPHONE POLE REVISION NUMBER SHEET NUMBER DATE REVISIONS V . PROJECT MANAGER BY 2% TREE = 35 MPH RECOMMENDED 2014 SHRUB RIGHT OF WAY MARKER FOR APPROVAL STATE HIGHWAY ENGINEER I HEREBY CERTIFY THAT THIS IS A CORRECT COPY OF THE PLANS OF PROJECT U344-33-12.76 00, STP-0033-243 (D) APPROVED COMMISSIONER OF HIGHWAYS PROJECT NO. U344-33-12.76 00, STP-0033-243 (D) J05C30C08-TITLE f P: \PR5331 3\cadd\RDY_TTL_CRBB.DGN.dgn 119 H 60 T O 58 W A L T O N H DD-MMM-YYYY HH: MM M K EE R C EXECUTIVE SECRETARY $USERNAME$ rr PLANS PREPARED BY BURGESS & NIPLE, INC. 56 E H Public State State Roads Dist. Project Federal No. W.V. 3 Fiscal Sheet Total No. Sheets E2 E86 County Project No. Div. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) { EXISTING US ROUTE 33 6'-3" { EXISTING WILLIAMS DRIVE 14'-0" 12'-6" LANE LANE 6'-0" 12'-6" TURN LANE 8'-6" SIDEWALK SIDEWALK 2'-0" 2'-0" SHOULDER 10'-0" TURN LANE 12'-0" 13'-0" LANE LANE 5'-0" SIDEWALK TYPICAL SECTION EXISTING US ROUTE 33 @ STA. 48+50.00 TYPICAL SECTION EXISTING WILLIAMS DRIVE @ STA. 2+00.00 { EXISTING US ROUTE 33 42'-0" 1'-0" 5'-0" 10'-0" SIDEWALK 10'-0" LANE 10'-0" TURN LANE 5'-0" 1'-0" SIDEWALK LANE EXISTING BRIDGE { EXISTING WILLIAMS DRIVE 5'-0" 2'-0" 2 LANES @ 12'-0" = 24'-0" SHOULDER 2'-0" SHOULDER SIDEWALK ON BRIDGE 4'-8" 3 SPA. @ 8'-2" = 32'-8" 4'-8" TYPICAL BRIDGE SECTION TYPICAL SECTION EXISTING WILLIAMS DRIVE @ STA. 3+00.00 { EXISTING US ROUTE 33 { EXISTING US ROUTE 119 8" 5'-0" SIDEWALK 2'-0" SHOULDER 12'-0" TURN LANE 12'-0" 18'-0" LANE LANE 1'-0" 15'-0" 15'-0" LANE LANE SHOULDER 9'-0" 5'-0" SIDEWALK 1'-0" SHOULDER SHOULDER 3'-0" 4'-0" TYPICAL SECTION EXISTING US ROUTE 33 @ STA. 52+50.00 TYPICAL SECTION EXISTING US ROUTE 119 @ STA. 101+00.00 NOTE: ALL DIMENSIONS ARE APPROXIMATE. DD-MMM-YYYY HH: MM { EXISTING US ROUTE 33 { EXISTING US ROUTE 119 2'-0" 16'-0" 1'-0" 2 LANES @ 12'-0" = 24'-0" 9'-0" 1'-6" 1'-6" SHOULDER 11'-0" 5'-0" 12'-6" SIDEWALK SIDEWALK 11'-0" 12'-6" $USERNAME$ 5'-0" LANE TURN LANE THROUGH LANE SHOULDER TURN LANE 1'-0" SHOULDER SHOULDER TYPICAL SECTION EXISTING US ROUTE 33 @ STA. 54+00.00 EXISTING US ROUTE 119 @ STA. 104+00.00 PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS EXISTING J04C23C03-PLAN e REVISION SHEET NUMBER NUMBER REVISION DATE BY PLAN SHEET TYPICAL SECTIONS P: \PR5331 3\cadd\RDY_TYP_CRBB.dgn TYPICAL SECTION Public State State Roads Dist. Project Div. No. W.V. 3 Federal Fiscal Sheet Total No. Sheets E3 E86 County Project No. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) HARDMAN'S DO IT BEST CITY BUILDING INTERSECTION MAIN ST (US33/US119) CAPITOL ST (US119) AND NORTH MAIN STREET SAVE A-LOT GROCERY INTERSECTION AI N ST R OFFICE EE T POST RICHARD'S ASPHALT TRACTOR PARKING TH M WENDY'S STAATS O R SALES N PHARMACY COUNTY COURTHOUSE 9 1 E1 USROUT 3/ E3 USROUT / . NST MAI INSURANCE GRAVEL PARKING GOFF RUN EMERGENCY PARKING SEVICES WI LLI AM S DRI VE ERIE 3 3 TE OU R US / T. S N I MA ASPHALT BALL FIELD TUDOR'S GINO'S BISCUIT M AR WORLD O UTE /US R NG CREEK SPRI T TO L S CAPI ST. KET MOVIE PEKING GALLERY BUFFET ADVANCED INTERSECTION MAIN ST (US 33/ US 119) AND WILLIAMS DRIVE AUTO COLONEL RUBY BRADLEY BRIDGE 119 TRACTOR $USERNAME$ DD-MMM-YYYY HH: MM SUPPLY PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS REVISION TRAFFIC SKETCH MAPS SHEET REVISION NUMBER J04C23C03-PLAN e NUMBER DATE BY P: \PR5331 3\cadd\Traffi c Sketch Map01 .dgn WAL-MART Public State State Roads Dist. Project Div. No. W.V. 3 Federal MAIN ST (US 33/US 119) Sheet Total No. Sheets E4 E86 No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 1290 150 700 150 MAIN ST (US 33/US 119) 450 6900 50 5100 2500 3250 6650 4650 3750 2700 13800 70 6900 3400 4420 7720 $USERNAME$ 3800 DD-MMM-YYYY HH: MM 750 70 3920 2800 5700 3100 WI LLI AM S DRI VE 950 550 50 2900 2300 700 WI LLI AM S DRI VE 9070 PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS TRAFFIC SKETCH MAPS REVISION SHEET NUMBER NUMBER REVISION J04C23C03-PLAN e DATE BY P: \PR5331 3\cadd\Traffi c Sketch Map02.dgn 3400 2750 2000 10200 400 MAIN ST (US 33/US 119) 350 5100 590 SHOPPI NG ACCESS 100 100 300 500 450 SHOPPI NG ACCESS MAIN ST (US 33/US 119) Year ADT 2033 950 ADT 2013 Fiscal County Project No. Public State State Roads Dist. Project Div. No. W.V. 3 Federal Fiscal MAIN ST (US 33/US 119) Sheets E5 E86 No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 450 250 150 850 1450 MAIN ST (US 33) MAIN ST (US 33/US 119) 350 250 5100 6000 3650 2100 11450 Total No. 2300 NORTH M AI N STREET 350 200 100 650 1050 MAIN ST (US 33) Year ADT 2033 1700 NORTH M AI N STREET ADT 2013 Sheet County Project No. 550 3400 5100 5450 6900 8150 4950 10200 2850 15550 7400 4600 6900 1550 PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS TRAFFIC SKETCH MAPS REVISION SHEET NUMBER NUMBER REVISION J04C23C03-PLAN e DATE BY P: \PR5331 3\cadd\Traffi c Sketch Map03.dgn $USERNAME$ DD-MMM-YYYY HH: MM 9150 4650 1500 350 4500 2650 CAPI TOL ST ( US 119) 3450 1100 6750 3300 250 1950 1150 CAPI TOL ST ( US 119) 13800 750 Public State State Roads Dist. Project Div. No. W.V. 3 Federal Fiscal Sheet Total No. Sheets E6 E86 County Project No. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) ROANE COUNTY FAMILY HEALTH CARE STORAGE VE AM S DRI LLI WI BUILDING WV NATIONAL GUARD INTERSECTION CAPITOL ST (US 119) AND WILLIAMS DRIVE AND MARKET STREET BUILDING PARKING POCA VALLEY BANK M R A EEK NG CR SPRI T E K R T S T E E S T /U S R O U T E 11 9 PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS TRAFFIC SKETCH MAPS REVISION SHEET REVISION NUMBER J04C23C03-PLAN e NUMBER DATE BY P: \PR5331 3\cadd\Traffi c Sketch Map04.dgn $USERNAME$ DD-MMM-YYYY HH: MM C A P I T O L Public State State Roads Dist. Project Div. No. W.V. 3 Federal WILLIAMS DRIVE Sheet Total No. Sheets E7 E86 No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) - - - - WILLIAMS DRIVE - 235 1188 - MARKET STREET 250 485 - CAPI TOL ST ( US 119) - 2647 3018 372 2852 CAPI TOL ST ( US 119) MARKET STREET Year ADT 2033 5871 ADT 2013 Fiscal County Project No. - -- 704 - - - - - - - - PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS TRAFFIC SKETCH MAPS REVISION SHEET NUMBER NUMBER REVISION J04C23C03-PLAN e DATE BY P: \PR5331 3\cadd\Traffi c Sketch Map05.dgn $USERNAME$ DD-MMM-YYYY HH: MM - - 5816 - CAPI TOL ST ( US 119) 2881 332 2935 2602 - - - CAPI TOL ST ( US 119) - - Public State State Roads Dist. Project Federal No. W.V. 3 48 EX. R/W 1052 52 EX. R/W 6 6 . 9 4 2 0 5 3 + S t a . P R C 3 3 2 R/W EX. 33 2 5 EX.R/W 55 VE AMS DRI LLI WI ( STR EA M ) 4 2 3 EX. R/W EX. R/W GOFF RUN E X . 6 56 R / W R / W EX.R/W E X . 2 .42 PT Sta. 1054+28 EX. R/W E86 52.96 PT Sta. 2054+ 3 E8 54 6 DR I V E . a t S C R P 54 10 5 4 5 0 2 MARK ET 53 3 105 2053 7 4 4 . 4 5 + 3 5 0 1 9 1 US ROUTE 33 & 1 EX. R/W 51 2052 E X . E R X / . W R / W 1051 4 EX.R/W ROANE 1 PC Sta. PC Sta. 2052+76.76 1052+76.76 EX.R/W 2014 243 (D) PROJECT LOCATION ALTERNATES 1-4 R / E W X . R / W 50 2051 9 1 1 TE U O R US EK CRE G N I SPR 12.76 00 49 1050 2050 EEK SPRING CR W R/ . X E U344-33- STP-0033- 3 E 3 UT RO US 1049 2049 ( STR EA M ) W I LL I A MS No. E X . /W EX.R 3 EX.R/W Sheets 100 104 EX.R/W Total No. 101 102 /W .R EX Sheet POT Sta. POT 2049+00.00 Sta. 1049+00.00 /W EX.R 103 T E E R T S Year R/W EX. R/W EX. 9 1 1 UTE O R US Div. Fiscal County Project No. /W EX. R 58 /W EX. R R/W EX. R/W EX. 57 ALTERNATE 3 ADDITIONAL WORK 62 $USERNAME$ 61 DD-MMM-YYYY HH: MM 60 9 1 & 1 33 E T ROU US 59 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 0 PROPERTY MAP PLAN SHEET 100 ft. SCALE : J04C23C03-PLAN e REVISION SHEET NUMBER NUMBER REVISION DATE BY P: \PR5331 3\cadd\ROW_OWN_CRBB_PropertyMap.dgn 63 PARKERSBURG, WV Public State State Roads Dist. Project Federal ALTERNATE 1A, 2B, &4 OWNERSHIP INDEX RECORDED PARCEL TITLEHOLDER NO. 1 DEED PAGE RICHARD B. JUFTES AND BOOK NO. 300 360 WETTERAU FINANCE COMPANY TYPE C/A 1 2 301 109 1 STATE OF WEST VIRGINIA DEPARTMENT OF COMMERCE, DIVISION AREA LEFT 12104 9505 (0.218 AC.) TSRE 564 (0.013 AC.) 86643 TCE N/A N/A PE 448 418 TCE 5118 (0.117 AC.) RIGHT TOTAL 0 12104 (0.278 AC.) 6779 (0.156 AC.) 2 3 REMAINING EASEMENT NONNO. CATHERINE M. JUFTES 2 AREA - Sq. Ft. (Unless noted otherwise) TRACT TAKEN TOTAL 21609 (0.218 AC.) 86643 (1.989 AC.) PARCEL 9505 (0.278 AC.) 0 TOTAL 93422 (0.156 AC.) (2.145 AC.) 6324 N/A 6324 W.V. 3 Year Sheet Total No. Sheets E9 E86 No. U344-33- STP-0033- 12.76 00 2014 ROANE 243 (D) GRAVELY DEALERSHIP (0.496 AC.) 6779 (1.989 AC.) REMARKS No. Fiscal County Project No. Div. SAV-A-LOT GROCERY STORE SPRING CREEK OF NATURAL RESOURCES, OFFICE OF LAND AND STREAMS 4 SISTERS PROPERTIES, LLC 24890 (0.571 AC.) 0 101266 101266 (2.325 AC.) 101266 0 (2.325 AC.) TUTOR'S & GENO'S RESTAURANTS (2.325 AC.) ALTERNATE 1B OWNERSHIP INDEX RECORDED TITLEHOLDER NO. 1 DEED PAGE RICHARD B. JUFTES AND BOOK NO. 300 360 WETTERAU FINANCE COMPANY TYPE C/A 1 2 301 109 1 STATE OF WEST VIRGINIA DEPARTMENT OF COMMERCE, DIVISION AREA LEFT 12104 9505 (0.218 AC.) TSRE 564 (0.013 AC.) 87429 TCE N/A N/A PE 448 418 TCE 5903 (0.136 AC.) RIGHT TOTAL 0 12104 (0.278 AC.) 5993 (0.138 AC.) 2 3 REMAINING EASEMENT NONNO. CATHERINE M. JUFTES 2 AREA - Sq. Ft. (Unless noted otherwise) TRACT PARCEL TAKEN TOTAL 21609 (0.218 AC.) 87429 (2.007 AC.) PARCEL 9505 (0.278 AC.) 0 TOTAL 93422 (0.138 AC.) (2.145 AC.) 6324 N/A 6324 GRAVELY DEALERSHIP (0.496 AC.) 5993 (2.007 AC.) REMARKS SAV-A-LOT GROCERY STORE SPRING CREEK OF NATURAL RESOURCES, OFFICE OF LAND AND STREAMS 4 SISTERS PROPERTIES, LLC 16565 (0.380 AC.) 0 101266 101266 (2.325 AC.) 101266 0 (2.325 AC.) TUTOR'S & GENO'S RESTAURANTS (2.325 AC.) ALTERNATE 2A OWNERSHIP INDEX RECORDED TITLEHOLDER NO. 1 DEED PAGE RICHARD B. JUFTES AND BOOK NO. 300 360 WETTERAU FINANCE COMPANY 301 109 TYPE C/A 1 STATE OF WEST VIRGINIA DEPARTMENT OF COMMERCE, DIVISION AREA 12104 2 TSRE 564 (0.013 AC.) 3 TCE 2418 (0.056 AC.) 1 LEFT 9505 (0.218 AC.) 85155 TCE N/A N/A PE 448 418 TCE 13794 (0.317 AC.) RIGHT TOTAL 0 12104 (0.278 AC.) 8267 (0.190 AC.) 2 3 REMAINING EASEMENT NONNO. CATHERINE M. JUFTES 2 AREA - Sq. Ft. (Unless noted otherwise) TRACT PARCEL TAKEN TOTAL 21609 (0.218 AC.) 85155 (1.955 AC.) PARCEL 9505 (0.278 AC.) 0 TOTAL 93422 (0.190 AC.) (2.145 AC.) 6324 N/A 6339 GRAVELY DEALERSHIP (0.496 AC.) 8267 (1.955 AC.) REMARKS SAV-A-LOT GROCERY STORE SPRING CREEK OF NATURAL RESOURCES, OFFICE OF LAND AND STREAMS 4 SISTERS PROPERTIES, LLC 16565 (0.380 AC.) 0 101266 101266 (2.325 AC.) 101266 0 (2.325 AC.) TUTOR'S & GENO'S RESTAURANTS (2.325 AC.) ALTERNATE 3 OWNERSHIP INDEX RECORDED RICHARD B. JUFTES AND BOOK NO. 300 360 3 WETTERAU FINANCE COMPANY STATE OF WEST VIRGINIA DEPARTMENT OF COMMERCE, DIVISION 301 N/A 109 N/A OF NATURAL RESOURCES, OFFICE OF LAND AND STREAMS 4 SISTERS PROPERTIES, LLC C/A 1 448 1 TYPE AREA TSRE 564 (0.013 AC.) 2 TCE 1 PE 6339 2 PE 7810 TCE 4257 (0.100 AC.) 6026 (0.138 AC.) RIGHT TOTAL 0 12104 (0.278 AC.) 85155 8267 (0.190 AC.) 418 LEFT 12104 9505 (0.218 AC.) 2 CATHERINE M. JUFTES 2 REMAINING EASEMENT NONNO. 0 5 ROANE COUNTY FAMILY HEALTH CARE, INC. 383 744 1 2 6 ROANE COUNTY DEVELOPMENT AUTHORITY 363 677 1 2 0 6909 (0.159 AC.) TCE 2445 (0.056 AC.) TCE 25097 (0.576 AC.) 532946 6324 N/A 101266 0 GRAVELY DEALERSHIP SAV-A-LOT GROCERY STORE SPRING CREEK TUTOR'S & GENO'S RESTAURANTS (2.325 AC.) 59851 6909 (1.215 AC.) (0.159 AC.) 532946 (12.234 AC.) 93422 (2.325 AC.) REMARKS (0.496 AC.) (2.145 AC.) 52942 (1.215 AC.) 0 20330 (0.467 AC.) 52942 21609 (0.190 AC.) 101266 (2.325 AC.) TOTAL 8267 (1.955 AC.) 101266 TAKEN (0.218 AC.) 85155 (1.955 AC.) PARCEL 9505 (0.278 AC.) 0 TOTAL DD-MMM-YYYY HH: MM PAGE $USERNAME$ DEED (1.374 AC.) 553276 20330 (12.234 AC.) (0.467 AC.) (12.701 AC.) NATIONAL GUARD BUILDING PARKERSBURG, WV LEGEND THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS R/W = NON CONTROLLED ACCESS RIGHT OF WAY PE = PERMANENT EASEMENT OWNERSHIP PLAN SHEET INDEX TCE = TEMPORARY CONSTRUCTION EASEMENT TE = TEMPORARY EASEMENT J04C23C03-PLAN e 0 SCALE : 20 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY P: \PR5331 3\cadd\ROW_OWN-CRBB_I NDEX.dgn TITLEHOLDER NO. 1 AREA - Sq. Ft. (Unless noted otherwise) TRACT PARCEL Public State State Roads Dist. Project Federal No. W.V. 3 Fiscal Sheet Total No. Sheets County Project No. Div. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) E10 E86 { TEMP. DETOUR ALTERNATIVE 1A EXISTING US ROUTE 33 2'-0" 2'-0" DRUMS DRUMS 5'-0" 10'-0" MIN. 10'-0" MIN. 10'-0" MIN. SIDEWALK LANE LANE LANE 1 . 5 : 1 2: 1 PROPOSED TYPICAL SECTION $USERNAME$ DD-MMM-YYYY HH: MM US ROUTE 33 TEMPORARY DETOUR, ALTERNATIVE 1A END BRIDGE TO END PROJECT NOTES: PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 1A J04C23C03-PLAN e REVISION SHEET NUMBER NUMBER REVISION DATE BY PLAN SHEET TYPICAL SECTIONS P: \PR5331 3\cadd\RDY_TYP_CRBB.dgn SEE TYPICAL SHEET E2 FOR EXISTINGTYPICAL SECTION DIMENSIONS Public State State Roads Dist. Project Federal S . A R G K R M HARDMAN'S DETOUR BUSINESS TRAFFIC TO COURT No. W.V. 3 Fiscal Sheet Total No. Sheets E11 E86 County Project No. Div. Year No. U344-33- STP-003312.76 00 ROANE 2014 243 (D) S . A R G K R M E X.R/ W DO IT BEST STREET THEN TO MARKET STREET EX.R /W . ST RT U CO CITY R/W EX. R/W EX. BUILDING 1 STORY GROCERY ASPHALT C O N C . R /W E X . RICHARD'S Y ONL EX.R/W EX.R/W PARKING 2 /W .R X E SEVICES LEGEND BALL S . A R G K R M WORK ZONE A S P H A L T . R/ W 1 STORY WI LLI AM S D RI VE EX S . A R G K R M EEK SPRING CR /W EX. R /W EX. R PARKING FIELD BUILDING USING EXISTING TRAFFIC PATTERNS EX. R/W EX. R/W 9 1 E 1 OUT US R 33 LT HA P AS OFFICE 1. PHASE 1: CONSTRUCT TEMPORARY BRIDGE AND REMOVE TEMPORARY DETOUR USING CASE A4. EMERGENCY GOFF RUN NOTES 3. PHASE 3: CONSTRUCT REMAINING PORTION OF SIDEWALK GRAVEL ON TEMPORARY BRIDGE S Y T R N O A T R S U A 1 T S E R TRAFFIC CONTROL AS SHOWN ON THIS SHEET. EX. R/W MAINTAIN TWO 12' LANES ASPHALT GV LT ASPHA EACH REMAINING W / .R EX EX.R/W GE NE RA TO EX. CONR/W R C. WAL K EX.R/W INSURANCE 2. PHASE 2: REHABILITATE EXISTING BRIDGE USING TEMPORARY W R/ . X PUMP E STATION SAN. DEDICATED GREEN FOR THREE LEGS W / .R EX R / W EX. R/W ERIE R/W EX. CON C. WAL K /W EX. R Y PLE RI O T CONC. WALK ASPHALT /W EX. R R/W EX EX. . R/W EX. 33 TE U O R US EX.R/W ASPHALT T HAL ASP RE-PHASE SIGNAL TO /W .R X E /W EX.R CONVERT TO ONE WAY R/W EX. TO PHARMACY EX. R/W COURTHOUSE /W EX.R 1 STORY URG DSB L O ARN WORK ZONE TRACTOR SALES COUNTY T HAL ASP R/W EX. TRAFFIC FLOW PEKING ADVANCED BUFFET AUTO MOVIE PARKERSBURG, WV GALLERY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 0 SCALE : J04C23C03-PLAN e 50 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY TEMPORARY TRAFFIC CONTROL PLAN SHEET ALTERNATIVE 1A DD-MMM-YYYY HH: MM WENDY'S R/W EX. R/W EX. $USERNAME$ INTERSECTION P: \PR5331 3\cadd\TRF_PLN_Al t1 A.dgn APPROACH TO PARKING R/W EX. W A L K CLOSE NORTH A E S X P . H A R / L W T E X . R / W OFFICE R/W EX. ROAD CLOSED R/W EX. POST R/W EX. MA I N ST . STORES Public State State Roads Dist. Project Federal Fiscal 71 0' 72 0' PE 6" VCP p ipe Ve nt D 6" STL. GAS PE 71 0' H 73 0 ' H PE PE D H 6" VCP PE G u y BI G u y I PE V. C. 12 " F. M. 6" M. F. 1052 3 71 0' 6" M. F. PE PE P DI EX.R/W 5 6 1 2 9 MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E13 12 " PE 71 0' PE 6" 29') 90. S39°48'E 1 ( 4 720' 730' 740' 73 0 ' D DD-MMM-YYYY HH: MM .45') 71 TCE ' 0 1 7 $USERNAME$ (S47°06'W 0' 71 720' 730' 7 1 0 ' PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 0 SCALE : 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY BEGIN PROJECT TO STA. 52+50 P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t1 A_01 .dgn 0' 71 7 20 ' 71 0' 12" V.C. 720' 730' T 740' WES P I 7 20 ' E TC TIER C. FRON , IN INIA G R I V 740' EX. R/W SMH Gu y LT ASPHA SMH P DI ALTERNATIVE 1A J04C23C03-PLAN e E86 { TEMPORARY DETOUR BRIDGE /W EX. R 101 END BRIDGE STA. 52+27.18 8" 0' 71 H GM CONSUMERS GAS UTILITY CO. V. C. SP RI NG 71 0' CR EE K (S 72 °W 720' TS RE D /W EX. R GM GM 52 1051 IN C. GM TRACT 1 51 8" HHHH ERIE INSURANCE E12 71 0' 16 5' ) ' 730 P 720' 72 0' 73 0' 1050 EX.R/W { US ROUTE 119 (N 71 °3 44 0'E ') 72 0' E X . G A S H H 740' WEST VIRGINIA, INC. TMH 7 88 33 10 TIC LAS P " 8 J H VI RG IN IA , 2 H 11 HJ WE ST Sig pole PJB M B 73 0' ' 740 J H 1 BJ H 1 H H H M H R / 1049 W FRONTIER H H D D TMH SMH F. M. H M 6 " 1 100 4 " W A H H M M P H B E X . ROANE 720' 00 -1 T7 1 / 6 92 H H H P L A S T I C PI 1 1 1 1 1 H H FR ON TI ER WM WM M P WM R/W EX.R/W 71 0' H 4"W TIC LAS P 6" PJB 4 6 1 2 9 GV GV TRACT 2 R/ W { BRIDGE Sig pole M SMH P VC 8" WM 0' 71 PE PJB A D D SMH WV R/W EX. 6" H R /W E X . M H H H H 8"VCP S {U 33 TE ROU N39°W 70') ( STA. 49+27.83 RT.33 STA. 100+00.00 RT.119 50 BEGIN BRIDGE STA. 49+98.68 2014 243 (D) ' 0 1 7 B P H 48 12.76 00 2 PJB BEGIN PROJECT STA. 49+58.48 U344-33- STP-0033- ' 0 1 7 03 -1 T7 T HAL ASP TRACT 1 71 0' D WV SMH H . Sta HH H H B 1 H H H H GV GV ASPHALT Sheets No. TCE PE 12" CI (AB AND ONE D) EX.R/W 49 WM R/ W 1 WM POT Sta. 1049+00.00 WM M 2 6.6 1 + 49 M M H H . Sta T PO 3 B 3 6 1 2 9 R/W EX. M B H H H HH HH M 06 -1 T7 SALES Sig pole GV WM TRACTOR M H 0 0.0 0 + 48 HHH WM RICHARD'S 1 ' 720 WM 2 GM L ERA LAT N A S ON ATI Y LOC CIT Y B WN O N UNK 71 0 ' WM . ST PL R/ W 7 (N6 20' 9° E 5 1 720 ') ' 69 '(S ) BB 1 / 9 Lpole WM .2 TR 9 0 1 7 2 H H v PJB 1 TSR E 720' C MA I T Y I N W O A F T E S R P E W N O C R E K R 74 S 0' J H R/ W NO RT H C O N C . M W A L K ST . E C O N S U M E R S E A S P H A L T E X . E H HH WENDY'S TS RE ( N2 0° W 47 ') Lpole 73 0' (N R / 7 8 E W ° 3 0 ' E R /J W E H 4 " E PJB GM 3 Total No. 6 " C . I . WV (S 5 ° 5 30 3 ' 'E ) W.V. Year 71 0' H E 7 4 0 ' 2 / 9 W P L A S T I 9 C 4 H ' ) E H E AE M 0 1 1 7 T No. Sheet County Project No. Div. Public State State Roads Dist. Project Federal No. W.V. 3 Fiscal Sheet Total No. Sheets County Project No. Div. Year No. U344-33- STP-003312.76 00 2014 ROANE E13 E86 243 (D) 0' 75 CURVE 33-1 DATA P.I. Sta. 58+11.90 PARKING DELTA R = 3,997.39' °40'W N51 ( T = 535.14' D W °E) (N39 (S) 37' . I . C WV 08') 0'W 1 N45°1 ( R/W EX. 13 .9 'D EE P R/W EX. SMH D SMH SMH D 8"W R/W EX. ) 64' °E (N39 PHARMACY ' 0 4 7 H 1 1 6" STL. GAS CONSUMERS GAS UTILITY CO. W / .R EX { TEMPORARY DETOUR 6 6 1 2 9 B ') 1 1 82. CHORD S40°55'E 1 ( 3890' R) ( H SMH D ' 0 2 7 D H T WES J H ER . NTI INC FRO A, INI G R VI PJB J 6" F.M . W R/ X. E Sept tnk HSAN. u 10" VCP PUMP STATION Sept tnk u 1D "W 12 W / .R EX P.I. Sta. 1053+17.41 STMH DELTA R = 107.00' PJB J CURVE 33/2-1 DATA T = 40.64' P.I. Sta. 1+80.94 L = 77.68' PJB PJB J 4 GRAVEL (S50°1 3'W 90.55') PARKING PT Sta. 2+29.37 7 20 ' ASPHALT R = 2,000.00' SMH D P C V " 8 EX. R/W E TC E ' 0 72 C = 75.98' PARKING T = 48.44' L = 96.87' CURVE DET-2 DATA E = 0.59' C = 96.86' P.I. Sta. 1053+92.98 DELTA E TC TCE E = 7.46' DELTA ) E ' 3 ) 3 ' E 7. 8 2 7 . E ) 2 ' 2 1' 8 2 ° .8 W 2 6 ' 1 7 9 (S 0 W ° ' 1 2 3 2 ° { WILLIAMS DRIVE (S 8 8 (N (CR 33/2) TCE 6 1 2 9 J E E CURVE DET-1 STMH D GV H B Phone ped Phone ped Sig pole Sig pole PJB J B J -7 H H WV CURVE DET-1 DATA SMH 730' BLOCK WALL B R = 107.00' T = 38.53' L = 73.97' CURVE 33/2-1 DD-MMM-YYYY HH: MM A P 8"VC 24" RC P 6" F.M . 1 12"W 72 0' ' 0 3 7 ' 3 . 5 1 SMH D CER F SPEN CITY O S K R WO WATER EX. R/W J 1 1 P E E D CURVE 33-1 72 0' PJB FRONT IER WEST VIRGI NIA, END PROJECT STA. 54+35.47 2 3 105 ING L. CAS 20" ST 730' ASPHALT CON C. WAL K C R P 1 54 10 CON C. WAL K FRON TIER WEST VIRG (3-F INIA , IN .O. 7 C. 3 & 1 0 ' -COP PER) 8"VCP 55 54 GE NE RA TO R . a t S 1 57 STA. 55+20.82 RT. 33 STA. 1+03.31 WILLIAMS DR. 56 CONC. WALK { US ROUTE 33 INC. H HH Sig pole H 12"W + 3 5 0 1 EX.R/W Sig pole Lpole H PJB J 18" RCP 4 4 . 4 5 7 3 0 ' /W EX.R A B 4') 64. N45°W 2 ( R / W 53 PC Sta. 1052+76.76 ' 30 7 2.50 PC Sta. 1+3 PC Sta. 52+76.76 H ' 30 7 A C T1 2 TR 9 1 1 7 T 30') 30'W S28° ( ' 0 4 7 CURVE DET-2 R / W ' 0 5 7 $USERNAME$ TR A C T2 7') . E 76 S50° ( 7 5 0 ' C 6"PV MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E12 D TCE PT Sta. 1054+28.42 5 6 1 2 9 R/W EX. 73 06°E 52') S ( ' 1 STORY TCE 2 ER PENC OF S Y T I C RKS R WO WATE SMH TCE R / W W 8" WM H ' 0 4 7 ') °30'E 4 1 S1 ( T HAL ASP C = 1,060.82' H P C V " 8 Lpole H E = 35.66' " 8 0' 74 0' 73 Lpole H L = 1,063.96' W ' 0 3 ° 11 (S D ) ' 0 6 9') 85. 7 60 ' E = 6.73' C = 72.51' E SMH ( S37°37'51 "E 297. 63') 71 0' PARKERSBURG, WV PC Sta. 2+86.96 GOFF RUN 0' 1 7 SMH D THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 1A 0 SCALE : J04C23C03-PLAN e 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY STA. 52+50 TO END PROJECT P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t1 A_02.dgn EXPOSED SMH D GV 7 1 0' 71 0' D E S O P X E 7 2 0 ' ' 20 7 7 20' D Public State State Roads Dist. Project Federal W.V. 3 Year Sheet Total No. Sheets E14 E86 No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 735.63 No. 736.56 737.50 738.43 739.36 740.30 741.23 742.17 743.10 744.04 744.97 745.88 746.78 Div. Fiscal County Project No. 775 775 770 770 765 765 760 760 755 755 -3.1 1 % 745 -3.7 4 % 740 -3.7 4 % 735 SEE ALTERNATIVE SITUATION PLANS FOR STRUCTURE DETAILS -3.7 4 % V.P.I. Sta. 52+25.72 730 Elev. = 736.535 725 EXISTING GROUND 745 740 735 730 725 48+00 49+00 50+00 51+00 735.66 733.13 713.55 713.74 713.66 707.99 704.92 708.54 717.01 719.67 736.00 700 745.48 705 746.63 705 747.63 710 748.20 710 748.65 715 748.40 715 747.75 720 747.01 720 52+00 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 5 ft. DIVISION OF HIGHWAYS SCALES 0 US 33 - ALL ALTERNATIVES 0 PARKERSBURG, WV J04C30C03-PROFILE c PROFILE SHEET 20 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY BEGIN PROJECT TO STA. 52+50 DD-MMM-YYYY HH: MM PROFILE GRADE LINE US 33 750 $USERNAME$ Elev. = 745.02 BEGIN PROJECT STA. 49+58.48 700 P: \PR5331 3\cadd\RDY_PRO_US33_ALT1 A_01 .dgn 750 MATCH LINE STA. 52+50 US 33 SEE SHEET E15 V.P.I. Sta. 49+98.65 Public State State Roads Dist. Project Federal No. W.V. 3 Year Sheet Total No. Sheets E15 E86 No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 730.03 730.96 731.89 732.83 733.76 734.69 765 760 760 755 755 750 750 745 745 740 740 725 720 715 735 END PROJECT STA. 54+35.47 -3.7 4 % 730 725 EXISTING GROUND 720 715 53+00 54+00 55+00 56+00 724.33 724.38 724.97 725.04 725.10 725.26 725.43 725.62 725.97 726.07 726.81 727.46 728.21 690 719.10 695 730.08 695 731.10 700 732.08 700 733.07 705 733.99 705 734.85 710 735.66 710 57+00 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 5 ft. DIVISION OF HIGHWAYS SCALES 0 US 33 - ALL ALTERNATIVES 0 PARKERSBURG, WV J04C30C03-PROFILE c PROFILE SHEET 20 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY STA. 52+50 TO END PROJECT DD-MMM-YYYY HH: MM 730 PROFILE GRADE LINE US 33 $USERNAME$ 735 MATCH LINE STA. 52+50 US 33 SEE SHEET E14 765 690 P: \PR5331 3\cadd\RDY_PRO_US33_ALT1 A_02.dgn 735.63 Div. Fiscal County Project No. Public State State Roads Dist. Project Federal No. W.V. 3 Year Sheet Total No. Sheets E16 E86 No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 731.79 731.69 731.77 732.09 732.65 733.46 734.50 735.74 736.99 738.24 739.49 740.74 741.99 743.24 744.49 745.74 Div. Fiscal County Project No. 770 770 765 765 760 760 755 755 750 750 175.00' 745 745 PROFILE GRADE LINE TEMPORARY DETOUR BRIDGE V.P.I. Sta. 1053+57.98 Elev. = 731.889 740 740 34' V.C. K = 12 735 735 +0.754 % -5. 000 % 730 -2.081 % 730 +0.754 % 1 .5: 1 725 725 V.P.I. Sta. 1052+65.84 EXISTING GROUND 150' V.C. 1 .5: 1 720 1050+00 1051+00 1052+00 1053+00 730.60 731.53 732.07 730.78 728.39 728.58 728.39 724.54 715.96 715.80 717.07 695 716.12 695 1054+00 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 5 ft. DIVISION OF HIGHWAYS SCALES 0 ALTERNATIVE 1A - TEMPORARY DETOUR BRIDGE 0 PARKERSBURG, WV J04C30C03-PROFILE c PROFILE SHEET 20 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY $USERNAME$ 700 709.18 700 708.71 705 717.15 705 720.29 710 734.55 710 744.76 715 747.05 715 DD-MMM-YYYY HH: MM K = 26 STA. 249+50 TO STA. 254+20 P: \PR5331 3\cadd\RDY_PRO_TEMPDETOUR_Al t_1 A.dgn 720 Elev. = 731.194 Public State State Roads Dist. Project Federal Div. No. W.V. 3 Fiscal Sheet Total No. Sheets E17 E86 County Project No. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 770 770 765 765 760 760 755 755 750 750 700 100+00 101+00 102+00 103+00 695 104+00 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 5 ft. DIVISION OF HIGHWAYS SCALES 0 US 119 NORTH 0 PARKERSBURG, WV J04C30C03-PROFILE c PROFILE SHEET 20 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY STA. 100+00 TO STA. 104+40 P: \PR5331 3\cadd\RDY_PRO_US1 1 9N_01 .dgn 695 $USERNAME$ 700 735.84 705 736.88 705 737.86 710 738.84 710 739.84 715 740.83 715 741.77 720 742.68 720 743.49 725 744.28 725 745.03 730 745.73 730 746.45 735 747.01 735 747.47 740 747.64 740 747.55 745 747.55 745 DD-MMM-YYYY HH: MM EXISTING GROUND Public State State Roads Dist. Project Federal Div. No. W.V. 3 Fiscal Sheet Total No. Sheets E18 E86 County Project No. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 770 770 765 765 760 760 755 755 750 750 745 745 740 740 735 735 EXISTING GROUND 400+00 401+00 402+00 403+00 404+00 727.10 727.01 726.98 726.97 726.99 727.00 726.97 726.87 726.77 726.63 726.45 695 726.34 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS SCALES US 119 SOUTH PARKERSBURG, WV J04C30C03-PROFILE c PROFILE SHEET 20 ft. 0 REVISION SHEET NUMBER NUMBER REVISION 695 404+00 5 ft. 0 $USERNAME$ 700 726.32 700 726.25 705 726.08 705 725.93 710 725.86 710 725.79 715 725.72 715 725.59 720 725.46 720 725.36 725 725.27 725 DD-MMM-YYYY HH: MM 730 DATE BY STA. 400+00 TO STA. 404+50 P: \PR5331 3\cadd\RDY_PRO_US1 1 9S_01 .dgn 730 Public State State Roads Dist. Project Federal Div. No. W.V. 3 Fiscal Sheet Total No. Sheets E19 E86 County Project No. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 770 770 765 765 760 760 755 755 750 750 745 745 740 740 735 735 730 730 725 725 720 720 EXISTING GROUND 100+00 101+00 102+00 103+00 104+00 740.93 738.97 737.09 735.31 733.67 732.26 730.66 728.93 727.10 725.27 723.67 722.52 721.73 721.26 721.06 712.11 721.72 695 722.23 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS SCALES WILLIAMS DRIVE PARKERSBURG, WV J04C30C03-PROFILE c PROFILE SHEET 20 ft. 0 REVISION SHEET NUMBER NUMBER REVISION 695 105+00 5 ft. 0 $USERNAME$ 700 723.18 700 724.09 705 725.30 705 726.58 710 726.08 710 DD-MMM-YYYY HH: MM 715 DATE BY STA. 100+00 TO STA. 105+50 P: \PR5331 3\cadd\RDY_PRO_WI LLI AMS_01 .dgn 715 H 6" VCP p ipe Ve n t D 1 1 C R P 730' END PROJECT STA. 54+35.47 1 CONSUMERS GAS UTILITY CO. EXIST. R/W ') 1 1 82. CHORD S40°55'E 1 ( 29') 90. S39°48'E 1 ( 3890' R) ( 4 720' P DI 6 6 1 2 9 H 6" F.M . SAN. Sept tnk 10" VCP .45') 71 (S47°06'W 0' 71 Sept tnk PUMP STATION Sept tnk Sept tnk ) ' 3 ) 3 . ' 7 8 2 7 . E ) 2 ' 2 1' 8 8 2 . ° W ' 16 72 9 (S 0 W ° 1' 2 3 2 ° 8 (S 8 (N { TEMPORARY DETOUR BRIDGE D 7 20 ' GRAVEL 735.63 736.56 737.50 738.43 739.36 740.30 741.23 742.17 PARKING 743.10 720' 744.04 HJ J PJB WV E 71 0' B 6" STL. GAS Sig pole PJB BLOCK WALL u u ' 0 3 7 6" F.M . ' 0 3 7 E 3 105 PJB u uH G uy ASPHALT CON C. WAL K FRON TIER WEST VIRG INIA (3-F , IN .O. 7 C. 0 &3 ' 1-CO PPER ) I H . a t S 54 54 10 A G uy BI H H CONC. WALK J H 6" VCP H Sig pole M. F. PE H H 4 4 . 4 5 PE 71 0' PE V. C. 12 " F. M. 6" M. F. ST.R/W EXI Lpole + 3 5 0 1 H H PC Sta. 52+76.76 73 0 ' H PE PE D 73 0 ' 5 6 1 2 9 PC Sta. 1052+76.76 PE 71 0' PE 73 0' 730' 740' SMH P DI R / W SMH 744.97 746.78 800 CONSUMERS GAS UTILITY CO. CR EE K 71 0' SP RI NG V. C. 12 " F. M. 6" STL. GAS 16 5' ) (S 72 °W 720' 72 0' J D R/W ST. EXI 101 H GM 7 3 0 ' 53 1052 0' 71 HHHH GM END BRIDGE STA. 52+27.18 2 TRACT 1 9 1 1 7 T 3 8" GM R / W { BEARINGS PIER 4 52 6" PE E86 TRACT 2 2 8" 6" E20 R/W 1051 IN C. EXIST. R/W GM 2 H H H H 740' 1050 U344-33- STP-03312.76 00 243 (D) 13 .9 'D EE P ROANE 2014 R / W 720' R/W ST. EXI WEST VIRGINIA, INC. TMH ERIE TRACT 2 R/ W 71 0' H VI RG IN IA , 745.88 HJ WE ST FRONTIER No. TCE 51 1 H H 1 H HH BJ A H 4 6 1 2 9 Sheets TCE 42 PT Sta. 1054+28. FR ON TI ER Sig pole PJB INSURANCE 720' 730 ' ' 740 J H 1 4 " W 100 11 PJB Total No. T HAL ASP { BRIDGE PJB WM 1049 TS RE H H H P L A S T I C 6 " 1 1 1 1 1 PE 3 Sheet County Year END APPROACH SLAB STA. 52+47.18 TCE TRACT 1 { BEARINGS PIER 3 0' 71 Sig pole BEGIN BRIDGE STA. 49+98.68 WM N39°W 70') ( STA. 49+27.83 RT.33 STA. 100+00.00 RT.119 50 BEGIN APPROACH SLAB STA. 49+78.68 WM { BEARINGS PIER 2 Fiscal { BEARINGS ABUTMENT 2 2 { BEARINGS PIER 1 Federal Project No. W.V. TCE PE 12" CI (AB AND ONE D) { BEARINGS ABUTMENT 1 EXIST. R/W BEGIN PROJECT STA. 49+58.48 GV GV TRACT 1 M SALES R/ W PE TRACTOR 1 PE RICHARD'S 6" BB H R / W 2 71 0' POT Sta. 1049+00.00 GM E X I S T . H PI HH H H H E X I S T . M H H M 2 6.6 1 + 9 . 4 Sta H M H M M H B DRAULIC HY DATA AT NORTH MARKET ST. SPRING CREEK 780 HWE 228'-6" OUT TO OUT OF PAVING NOTCH 226'-6" C/C BEARINGS { PIER 1 43'-6" { PIER 2 { PIER 3 43'-6" 53'-6" { PIER 4 43'-0" { ABUTMENT 2 740 721.61 723.11 2.63 3950 Q25 722.45 723.95 2.06 4500 Q50 723.90 725.40 2.64 5430 Q100 725.02 726.52 2.64 6200 DRAINAGE AREA = 39.6 SQ. MI. WATERWAY OPENING = 575 SF PROPOSED GRADE BASED ON SLOPE OF *ESTIMATED STREAM FOR RUBY BRADLEY. EXISTING Q50 Q100 720 Q10 Q25 $USERNAME$ GROUND Q(CFS) Q10 EXISTING AND 3. 74 % V(FPS) DD-MMM-YYYY HH: MM { ABUTMENT 1 43'-0" * HWE NORMAL POOL 700 ESTIMATED TOP SPRING CREEK OF ROCK. TYP. EW EW 20 ft. PROPOSED PIER WIDENING, TYP. EXISTING SUBSTRUCTURES REHABILITATED 0 20 ft. DESIGNED DATE MWL 7/14 50+00 51+00 52+00 733.7 734.9 735.6 734.4 713.6 713.7 713.7 708.0 705.0 708.5 717.3 736.0 745.3 746.5 747.8 748.2 49+00 53+00 NUMBER DRAWN ASG DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 7/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT SITUATION PLAN ALTERNATIVE 1A SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV J04C22C03 - BRIDGE b REVISION DIVISION OF HIGHWAYS 0 640 SHEET NUMBER SCALES 680 660 REVISION P: \PR5331 3\cadd\str_l ay_si tpl an Al t. 1 A.dgn 760 719.6 1 . ST PL WM 72 0' (N6 9° E 5 1 720 ') ' 69 '(S ) L ERA LAT SAN N O ATI LOC ITY Y C N B W O N UNK PJB ASPHALT { US ROUTE 119 P MA NO RT H R/ W State Lpole Project No. Div. Lpole ' 720 49 ' 730 I C N I T ST Y W O . A F T E S R P E N 74 WO C R E 0' K R S W A L K C O N C . J H H v R / W H 1 / 9 720' 9 0 1 7 2 71 0 ' 3 B 3 6 1 2 9 .2 TR Dist. PT Sta. 2+29.37 PJB State Roads 32.50 PC Sta. 1+ ( N2 0° W 47 ') R/ W Lpole Sig pole 1 TSR E Public Public State State Roads Dist. Project Federal { EXISTING US ROUTE 33 Div. No. W.V. 3 Fiscal Sheet Total No. Sheets E21 E86 County Project No. Year No. U344-33 STP-0033 12.76 00 (243)D 2014 ROANE { TEMP. DETOUR ALTERNATIVE 1A 51'-6" 38'-9" 4'-11‚" 42'-0" 5'-0" 3 LANES @ 10'-0" = 30'-0" 5'-0" EXISTIING BRIDGE 1'-0" SIDEWALK 24'-1•" ROAD WIDTH NEW 8" REINFORCED CONCRETE DECK 3 SPA. @ 8'-2" = 32'-8" 4'-8" 5/4/201 5 1 0: 09: 1 2 AM COMPLETED TYPICAL SECTION $USERNAME$ 4'-8" REVISION SHEET NUMBER NUMBER REVISION DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DESIGNED DATE MWL 6/14 DRAWN ASG 6/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT COMP.TYPICAL SECTION ALTERNATIVE 1A SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV P: \PR5331 3\cadd\str_typ_phased const.dgn 1'-0" 26'-3" Public State State Roads Dist. Project Federal 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 Div. No. W.V. 3 130 Fiscal Sheet Total No. Sheets E22 E86 County Project No. Year No. U344-33- STP-003312.76 00 140 2014 ROANE 243 (D) 150 160 750 750 731.77 740 2: 1 730 728.39 E. P. 730 E. P. 740 EX.R/W 760 EX.R/W 760 720 720 / / / / / / / / / / 710 710 700 700 760 760 750 750 AREAS CHECKED NO. AREAS NOTE BOOK SURVEY / / / / / / / / / / 740 720 720 1052+50 710 710 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 1A - US 33 SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 1052+50 TO STA. 1053+00 P: \PR5331 3\cadd\RDY_XSC_US33_ALT1 A_01 .dgn 700 700 J05C07C03-XSECT2 b DD-MMM-YYYY HH: MM 730 728.39 E. P. E. P. 2: 1 $USERNAME$ 1 : 5 : 1 730 EX.R/W 740 732.65 EX.R/W AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY DATE FI NAL SURVEYED PLOTTED TEMPLATE BY DATE 1053+00 Public State State Roads Dist. Project Federal 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 Div. No. W.V. 3 130 Fiscal Year U344-33- STP-003312.76 00 140 2014 E23 E86 150 160 750 EX.R/W 750 EX.R/W 740 730 720 BY 720 E. P. 730.60 / / ROANE 243 (D) 760 E. P. / / / / / / / Sheets No. 730 / Total No. 760 740 DATE Sheet County Project No. 750 750 AREAS CHECKED 760 NO. AREAS 760 / / / / / / / / / / NOTE BOOK SURVEY 710 EX.R/W 2: 1 720 730 E. P. 732.07 E. P. 730 720 DD-MMM-YYYY HH: MM 740 $USERNAME$ 740 731.80 EX.R/W 1053+50 710 710 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 1A - US 33 SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 1053+50 TO STA. 1054+00 P: \PR5331 3\cadd\RDY_XSC_US33_ALT1 A_01 .dgn AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY DATE FI NAL SURVEYED PLOTTED TEMPLATE 1054+00 710 Public State State Roads Dist. Project Federal No. W.V. 3 Fiscal Sheet Total No. Sheets County Project No. Div. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) E24 E86 { US ROUTE 33 2'-0" VARIES SHLDR SHLDR 5'-6" 12'-0" 11'-0" 11'-0" 12'-0" 5'-6" SIDEWALK LANE TURN LANE TURN LANE LANE SIDEWALK 2: 1 1 2: PROPOSED TYPICAL SECTION US ROUTE 33, ALTERNATIVE 1B END BRIDGE TO END PROJECT PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 1B J04C23C03-PLAN e REVISION SHEET NUMBER NUMBER REVISION DATE BY PLAN SHEET TYPICAL SECTIONS P: \PR5331 3\cadd\RDY_TYP_CRBB.dgn $USERNAME$ DD-MMM-YYYY HH: MM LT_FILL Public State State Roads Dist. Project Federal S . A R G K R M HARDMAN'S DETOUR BUSINESS TRAFFIC TO COURT No. W.V. 3 Fiscal Sheet Total No. Sheets E25 E86 County Project No. Div. Year No. U344-33- STP-003312.76 00 ROANE 2014 243 (D) S . A R G K R M E X.R/ W DO IT BEST STREET THEN TO MARKET STREET EX.R /W . ST RT U CO CITY R/W EX. R/W EX. BUILDING 1 STORY GROCERY ASPHALT C O N C . MAINTAIN TWO 10'-9•" LANES R /W E X . RICHARD'S Y ONL EX.R/W EX.R/W /W .R X E W / .R EX R / W EX.R/W WORK ZONE GRAVEL PARKING EMERGENCY PARKING SEVICES 33 LT HA P AS 2 LEGEND BALL FIELD EX. R/W BUILDING A S P H A L T EEK SPRING CR S . A R G K R M WORK ZONE . R/ W 1 STORY WI LLI AM S D RI VE EX S . A R G K R M OFFICE /W EX. R EX. R/W EX. R/W 9 1 E 1 OUT US R GOFF RUN S Y T R N O A T R S U A 1 T S E R /W EX. R ASPHALT GV LT ASPHA INSURANCE W / .R EX EX.R/W EX. R/W W R/ . X PUMP E STATION SAN. EX. R/W ERIE R/W EX. CON C. WAL K /W EX. R Y PLE RI O T CONC. WALK ASPHALT /W EX. R R/W EX EX. . R/W EX. 33 TE U O R US EX.R/W ASPHALT T HAL ASP RE-PHASE SIGNAL TO DEDICATED GREEN FOR EACH REMAINING THREE LEGS /W .R X E /W EX.R CONVERT TO ONE WAY R/W EX. TO PHARMACY GE NE RA TO EX. CONR/W R C. WAL K COURTHOUSE /W EX.R 1 STORY URG DSB L O ARN TRACTOR SALES COUNTY T HAL ASP ON EXISTING BRIDGE R/W EX. TRAFFIC FLOW PEKING ADVANCED BUFFET AUTO MOVIE PARKERSBURG, WV GALLERY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 0 SCALE : J04C23C03-PLAN e 50 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY TEMPORARY TRAFFIC CONTROL PLAN SHEET ALTERNATIVE 1B PHASE I DD-MMM-YYYY HH: MM WENDY'S R/W EX. R/W EX. $USERNAME$ INTERSECTION P: \PR5331 3\cadd\TRF_PLN_Al t1 B_01 .dgn APPROACH TO PARKING R/W EX. W A L K CLOSE NORTH A E S X P . H A R / L W T E X . R / W OFFICE R/W EX. ROAD CLOSED R/W EX. POST R/W EX. MA I N ST . STORES Public State State Roads Dist. Project Federal S . A R G K R M HARDMAN'S DETOUR BUSINESS TRAFFIC TO COURT No. W.V. 3 Fiscal Sheet Total No. Sheets E26 E86 County Project No. Div. Year No. U344-33- STP-003312.76 00 ROANE 2014 243 (D) S . A R G K R M E X.R/ W DO IT BEST STREET THEN TO MARKET STREET EX.R /W . ST RT U CO CITY R/W EX. R/W EX. BUILDING 1 STORY GROCERY C O N C . R /W E X . RICHARD'S TRACTOR CONVERT TO SALES Y ONL EX.R/W EX.R/W W / .R EX EX.R/W EX. R/W MAINTAIN TWO 10' LANES ON NEW BRIDGE GRAVEL ASPHALT EMERGENCY PARKING SEVICES GV PARKING 33 LT HA P AS 2 LEGEND BALL FIELD EX. R/W BUILDING A S P H A L T EEK SPRING CR S . A R G K R M WORK ZONE . R/ W 1 STORY WI LLI AM S D RI VE EX S . A R G K R M OFFICE /W EX. R EX. R/W EX. R/W 9 1 E 1 OUT US R GOFF RUN S Y T R N O A T R S U A 1 T S E R /W EX. R EX. R/W W R/ . X PUMP E STATION SAN. LT ASPHA THREE LEGS R/W EX. W / .R EX R / W RE-PHASE SIGNAL TO EACH REMAINING US ROUTE 33 CON C. WAL K INSURANCE DEDICATED GREEN FOR EX.R/W R/W EX. CONC. WALK ASPHALT /W EX. R ERIE /W .R X E /W EX.R ASPHALT /W EX. R Y PLE RI O T /W .R X E WORK ZONE T HAL ASP R/W EX EX. . TO URG DSB L O ARN PHARMACY ONE WAY EX.R/W R/W EX. /W EX.R 1 STORY GE NE RA TO EX. CONR/W R C. WAL K COUNTY COURTHOUSE T HAL ASP R/W EX. TRAFFIC FLOW PEKING ADVANCED BUFFET AUTO MOVIE PARKERSBURG, WV GALLERY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 0 SCALE : J04C23C03-PLAN e 50 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY TEMPORARY TRAFFIC CONTROL PLAN SHEET ALTERNATIVE 1B PHASE 2 DD-MMM-YYYY HH: MM WENDY'S R/W EX. R/W EX. $USERNAME$ INTERSECTION P: \PR5331 3\cadd\TRF_PLN_Al t1 B_02.dgn APPROACH TO PARKING R/W EX. W A L K CLOSE NORTH A E S X P . H A R / L W T E X . R / W OFFICE R/W EX. ROAD CLOSED R/W EX. POST R/W EX. MA I N ST . STORES Public State State Roads Dist. Project Federal Fiscal 71 0' 72 0' PE 71 0' 6" VCP p ipe Ve nt D H 73 0 ' H PE 6" VCP PE H D G u y BI Gu y I 29') 90. S39°48'E 1 ( 4 720' 730' 740' P DI EX.R/W MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E28 PE PE PE 71 0' PE PE 5 6 1 2 9 E TC D TCE DD-MMM-YYYY HH: MM 7 20 ' ' 0 1 7 $USERNAME$ 0' 71 720' 730' 7 1 0 ' 0' 71 12" V.C. 730' 720' 71 0' 7 20 ' PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 1B 0 SCALE : J04C23C03-PLAN e 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY BEGIN PROJECT TO STA. 52+50 P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t1 B_01 .dgn 740' P I T 740' WES TIER C. FRON , IN INIA G R I V .45') 71 SMH Gu y LT ASPHA M. F. TCE /W EX. R 101 H GM 73 0 ' M. F. (S47°06'W /W EX. R GM CONSUMERS GAS UTILITY CO. 71 0' SP RI NG V. C. 12 " F. M. PE 71 0' V. C. F. M. 6" 12 " 6" 8" HHHH INSURANCE CR EE K (S 72 °W 720' TS RE 72 0' PE 73 0' 740' D EX.R/W GM P DI 3 IN C. GM SMH 6" 0' 71 TIC LAS P " 8 ERIE { BRIDGE 8" M B 7 88 33 10 6" STL. GAS 16 5' ) ' 730 P 720' H H WEST VIRGINIA, INC. TMH { US ROUTE 119 (N 71 °3 44 0'E ') 72 0' E X . G A S 73 0' ' 740 H J BJ M Sig pole PJB VI RG IN IA , TRACT 1 51 EX. R/W D TMH SMH 6" H M J H 11 1 100 4 " W H M HJ WE ST FRONTIER H D H 00 -1 T7 1 / 6 92 H H H P L A S T I C 6 " H 1 H H H H H M M P H B R / W H H FR ON TI ER WM WM 2 720' H WM E X . 7 (N6 20' 9° E 5 1 720 ') ' 69 '(S ) H R /W E X . H PI 1 1 1 1 1 A 4 6 1 2 9 GV GV W / R W / R END BRIDGE STA. 52+38.54 52 71 0' P VC 8" WM M SMH PJB PJB A D D SMH WV R/W EX. 4"W TIC LAS P 6" P 8"VCP S {U 33 TE ROU TRACT 2 EX.R/W PE Sig pole H P H 48 E86 ' 0 1 7 B T HAL ASP ROANE 243 (D) ' 0 1 7 03 -1 T7 M H H . Sta HH H H B 1 H H H H D WV SMH 2014 12.76 00 R/ W 71 0' BEGIN PROJECT STA. 49+58.48 BEGIN BRIDGE STA. 49+86.54 GV U344-33- STP-0033- 2 0' 71 STA. 49+27.83 RT.33 STA. 100+00.00 RT.119 50 H WM E27 No. TCE PE PJB ASPHALT GV TRACT 1 N39°W 70') ( 1 HH HH M WM M 2 6.6 1 + 49 M M H H . Sta T PO H 49 WM R/ W 63'-0" B H H H M R/W EX. 1 12" CI (AB AND ONE D) OUT TO OUT 06 -1 T7 TRACTOR EX.R/W GV WM RICHARD'S M H 0 0.0 0 + 48 HHH WM L ERA LAT N A S ON ATI Y LOC CIT Y B WN O N UNK SALES Sig pole 3 B 3 6 1 2 9 GM R/ W ' 720 WM . ST PL Sheets 71 0' ST . BB J H H H C I T MA Y W O I A N F T E S R P E W N O C R E K R 74 S 0' 1 / 9 71 0 ' WM 2 .2 TR 9 0 1 7 2 Lpole WM 1 TSR E 720' v PJB R/ W NO RT H C O N C . M W A L K E C O N S U M E R S E A S P H A L T E X . E H HH WENDY'S TS RE ( N2 0° W 47 ') Lpole 73 0' (N R / 7 8 E W ° 3 0 ' E R /J W E H 4 " E PJB GM 3 Total No. 6 " C . I . WV (S 5 ° 5 30 3 ' 'E ) W.V. Year 71 0' H E 7 4 0 ' 2 / 9 W P L A S T I 9 C 4 H ' ) E H E AE M 0 1 1 7 T No. Sheet County Project No. Div. Public State State Roads Dist. Project Federal No. W.V. 3 Fiscal Sheet Total No. Sheets E28 E86 County Project No. Div. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 0' 75 CURVE 33-1 DATA P.I. Sta. 58+11.90 DELTA PARKING R = 3,997.39' T = 535.14' °40'W N51 ( D W °E) (N39 (S) 37' . I . C WV H P C V " 8 08') 0'W 1 N45°1 ( Lpole H C = 1,060.82' " 8 0' 74 0' 73 Lpole H E = 35.66' W ' 0 3 ° 11 (S D ) ' 0 6 9') 85. R/W EX. 13 .9 'D EE P R/W EX. SMH D SMH SMH D 8"W R/W EX. D PHARMACY ) 64' °E (N39 ' 0 4 7 ' 30 7 TR A C T2 ' 30 7 H R / W 1 1 H 55 54 1 ASPHALT 730' { US ROUTE 33 CON C. WAL K ' 3 . 5 1 1 ' 0 2 7 D T WES Sig pole PJB J H ER . NTI INC FRO A, INI G R VI PJB J W R/ X. E HSAN. PUMP STATION PJB E E 4 (CR 33/2) GRAVEL (S50°1 3'W 90.55') PARKING PT Sta. 2+29.37 TCE DELTA PJB J ) E ' 3 ) 3 ' E 7. 8 2 7 . E ) 2 ' 2 1' 8 2 ° .8 W 2 6 ' 1 7 9 (S 0 W ° ' 1 2 3 2 ° (S 8 8 (N { WILLIAMS DRIVE TCE P.I. Sta. 1+80.94 PJB Sept tnk 3890' R) ( CURVE 33/2-1 DATA J u ') 1 1 82. CHORD S40°55'E 1 ( W / .R EX J R = 2,000.00' T = 48.44' EX. R/W u 10" VCP GV H B "W 12 E TC P C V " 8 E TC SMH D EX. R/W TCE E ASPHALT ' 0 72 PARKING L = 96.87' E = 0.59' C = 96.86' 72 0' B Sept tnk 2 W / .R EX 6 6 1 2 9 1D 6 1 2 9 STMH CON C. WAL K CONSUMERS GAS UTILITY CO. 6" F.M . GE NE RA TO R 6" STL. GAS STMH D C 6"PV BLOCK WALL A Phone ped Phone ped H ' 0 3 7 J B J -7 H Sig pole WV 7 20 ' H SMH H 6" F.M . B SMH D 72 0' J 12"W CER F SPEN CITY O S K R WO WATER P 8"VC 730' PJB SMH D 12"W FRON TIER WEST VIRG (3-F INIA , IN .O. 7 C. 3 & 1 0 ' -COP PER) 1 1 P E E D CURVE 33-1 $USERNAME$ 53 FRONT IER WEST VIRGI NIA, 1 ING L. CAS 20" ST END PROJECT STA. 54+35.47 57 STA. 55+20.82 RT. 33 STA. 1+03.31 WILLIAMS DR. 56 CONC. WALK 24" RC P HH Sig pole H INC. EX.R/W Sig pole 18" RCP H PJB J A C T1 2 TR 8"VCP PC Sta. 52+76.76 H /W EX.R A B 4') 64. N45°W 2 ( 2.50 PC Sta. 1+3 5 6 1 2 9 R / W Lpole 30') 30'W S28° ( ' 0 4 7 W / R 7 3 0 ' ' 0 5 7 7 5 0 ' TCE R / W 7') . E 76 S50° ( DD-MMM-YYYY HH: MM MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E27 R/W EX. 73 06°E 52') S ( ' 1 STORY TCE 9 1 1 7 T ER PENC OF S Y T I C RKS R WO WATE SMH TCE 2 W 8" WM H ' 0 4 7 ') °30'E 4 1 S1 ( T HAL ASP 7 60 ' L = 1,063.96' CURVE 33/2-1 E SMH ( S37°37'51 "E 297. 63') 71 0' PARKERSBURG, WV PC Sta. 2+86.96 GOFF RUN 0' 1 7 SMH D THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 1B 0 SCALE : J04C23C03-PLAN e 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY STA. 52+50 TO END PROJECT P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t1 B_02.dgn EXPOSED SMH D GV 7 1 0' 71 0' D E S O P X E 7 2 0 ' ' 20 7 7 20' D 71 0' PE H 6" VCP p ipe Ve nt D H H H H H PE PE PC Sta. 52+76.76 73 0 ' H CONC. WALK END PROJECT STA. 54+35.47 { US ROUTE 33 54 ' 0 3 7 I 6" F.M . PE 6" F.M . CONSUMERS GAS UTILITY CO. EXIST. R/W Sept tnk ') 1 1 82. CHORD S40°55'E 1 ( 29') 90. S39°48'E 1 ( ) ' 3 ) 3 . ' 7 8 2 7 . E ) 2 ' 2 1' 8 8 2 . ° W ' 16 72 9 (S 0 W ° 1' 2 3 2 ° 8 (S 8 (N 3890' R) ( 4 E TC 735.63 736.56 738.43 739.36 740.30 741.23 742.17 743.10 744.04 TCE 737.50 730' 720' P DI 6 6 1 2 9 DRAULIC HY DATA AT NORTH MARKET ST. SPRING CREEK 780 HWE 250'-0" C/C BEARINGS { ABUTMENT 1 { PIER 1 { ABUTMENT 2 { PIER 2 75'-0" 100'-0" 75'-0" 721.61 723.11 2.63 3950 722.45 723.95 2.06 4500 Q50 723.90 725.40 2.64 5430 Q100 725.02 726.52 2.64 6200 DRAINAGE AREA = 39.6 SQ. MI. I NTEGRAL Q50 Q100 WATERWAY OPENING = 575 SF BASED ON SLOPE OF *ESTIMATED STREAM FOR RUBY BRADLEY. EXISTING GROUND 2: 1 Q(CFS) Q25 PROPOSED GRADE 3. 74 % V(FPS) Q10 EXISTING AND I NTEGRAL * HWE DD-MMM-YYYY HH: MM PE PE Sept tnk 10" VCP u 71 0' 6" B 6" STL. GAS M. F. t Q10 Q25 1 2: $USERNAME$ 720 NORMAL POOL 700 ESTIMATED TOP SPRING CREEK OF ROCK. TYP. EW EW 20 ft. EXISTING SUBSTRUCTURES TO BE DEMOLISHED IN PHASE 2. 0 t - 3'-0" FOUNDATION PROTECTION TYP. 20 ft. DESIGNED DATE MWL 7/14 51+00 52+00 733.7 734.9 735.7 733.2 713.6 713.9 713.7 708.0 705.0 708.6 717.1 719.7 736.0 745.5 746.7 747.7 748.2 660 50+00 NUMBER 53+00 DRAWN ASG DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 7/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT SITUATION PLAN ALTERNATIVE 1B SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV J04C22C03 - BRIDGE b REVISION DIVISION OF HIGHWAYS 0 49+00 SHEET NUMBER SCALES 680 640 REVISION P: \PR5331 3\cadd\str_l ay_si tpl an Al t. 1 B.dgn V. C. ' 0 3 7 PJB u FRON TIER WEST VIRG INIA (3-F , IN .O. C. 3 0 & 7 ' 1COPP ER) A M. F. J BI G uy 73 0 ' 5 6 1 2 9 G u y PE 6" 12 " F. M. 6" CON C. WAL K H P DI 730' 6" VCP END APPROACH SLAB STA. 52+58.54 D 72 0' 71 0' 8" TCE 744.97 740' ST.R/W EXI Lpole 53 SMH PHASED C.J. 8" 745.88 R / W { BRIDGE PE 63'-0" 73 0' D EXIST. R/W R/W ST. EXI 7 3 0 ' 720' 746.78 E86 2 TRACT 1 9 1 1 7 T 252'-0" OUT TO OUT OF PAVING NOTCH 740 ROANE TRACT 2 3 IN C. 760 2014 R / W END BRIDGE STA. 52+38.54 52 71 0' HH PE 720' 730 ' J WEST VIRGINIA, INC. TMH 800 { PIER 2 H H H H BJ FRONTIER 740' VI RG IN IA , R/W ST. EXI Sig pole PJB WE ST OUT TO OUT J H 1 11 H FR ON TI ER WM WM 2 R / W TRACT 1 51 U344-33- STP-03312.76 00 243 (D) TCE 2 71 0' H ' 740 P L A S T I C 100 1 4 " W H 1 H HH A 4 6 1 2 9 WM W / R W / R { PIER 1 E29 No. ASPHALT PJB PJB GV GV TRACT 2 R/ W 71 0' Sig pole BEGIN BRIDGE STA. 49+86.54 PE Sheets TCE { BEARINGS ABUTMENT 2 0' 71 { BEARINGS ABUTMENT 1 Total No. 13 .9 'D EE P TCE 2 N39°W 70') ( 3 Sheet County Year Lpole TCE PE 12" CI (AB AND ONE D) 50 BEGIN APPROACH SLAB STA. 49+66.54 CONSUMERS GAS UTILITY CO. CR EE K 71 0' SP RI NG V. C. F. M. 12 " R/ W H H 6" STL. GAS 16 5' ) (S 72 °W 720' TRACT 1 M SALES STA. 49+27.83 RT.33 STA. 0+00.00 RT.119 BEGIN PROJECT STA. 49+58.48 HJ P TRACTOR 1 PE E X I S T . RICHARD'S 6" BB H L ERA LAT SAN N O ATI Y LOC CIT BY N W O N UNK 72 0' (N6 9° E 5 1 720 ') ' 69 '(S ) H R/ W PJB ASPHALT H TS RE C I T Y W O A F T E S R P E W N O C R E K R 74 S 0' MA I N R / W GM EXIST. R/W 6 " 1 1 1 1 1 49 { US ROUTE 119 ' 730 W A L K ST . C O N C . J NO RT H E X I S T . H PI HH H 72 0' C O N S U M E R S G A S A S P H A L T E H H v R / W H M H H M 2 6.6 1 + 9 . 4 Sta H M H M M H 1 / 9 W.V. ' 720 B 9 0 1 7 2 71 0 ' 3 B 3 6 1 2 9 .2 TR No. Fiscal 32.50 PC Sta. 1+ Sig pole 2 1 TSR E R/ W . ST PL Project Federal TS RE WM State Dist. Div. 720' Lpole State Roads Project No. ( N2 0° W 47 ') PJB Public Public State State Roads Dist. Project Federal Div. No. W.V. 3 Fiscal Sheet Total No. Sheets E30 E86 County Project No. Year No. U344-33 STP-0033 12.76 00 (243)D 2014 ROANE { EXISTING US ROUTE 33 42'-0" 11'-4" DEMOLISH 1'-0" 1'-0" 5'-0" 2 LANES @ 10'-9•" = 21'-7" 5'-0" MAINTAIN TRAFFIC EXISTIING BRIDGE PHASE I - DEMOLITION { EXISTING US ROUTE 33 29'-6" 2'-6" PHASE 1 CONSTRUCTION 1'-0" 2 LANES @ 10'-9•" = 21'-7" 2'-0" 23'-0" 5'-6" 1'-0" COMBO RAIL 1 '-6" MAINTAIN TRAFFIC EXISTIING BRIDGE 8" REINFORCED CONCRETE DECK 9•" 6" 2 % 2'-0" 66" AASHTO TYPE IV MOD. 4'-5" $USERNAME$ 5/4/201 5 2 SPA. @ 10'-10" = 21'-8" 1 0: 09: 20 AM (TYP.) PHASE I - CONSTRUCTION REVISION SHEET NUMBER NUMBER REVISION DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DESIGNED DATE MWL 6/14 DRAWN ASG 6/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT PHASE 1 ALTERNATIVE NO. 1B SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV P: \PR5331 3\cadd\str_typ_phased const.dgn 5'-0" Public State State Roads Dist. Project Federal 1'-0" 2 LANES @ 10'-0" = 20'-0" { EXISTING 5'-6" No. W.V. 3 Year Sheet Total No. Sheets E31 E86 No. U344-33 STP-0033 12.76 00 (243)D 2014 ROANE 1'-0" 1 '-6" MAINTAIN TRAFFIC US ROUTE 33 PHASE 2 DEMOLITION 8" REINFORCED 9•" 6" CONCRETE DECK Div. Fiscal County Project No. 2'-0" 2 % 66" AASHTO TYPE IV MOD. (TYP.) 2 SPA. @ 10'-10" = 21'-8" 4'-5" PHASE 2 - DEMOLITION { EXISTING US ROUTE 33 2'-6" 2 LANES @ 10'-0" = 20'-0" 5'-6" 1'-0" MAINTAIN TRAFFIC CLOSURE 1 '-6" 31'-0" POUR PHASE 2 CONSTRUCTION CONCRETE DECK 2 % 9•" 6" 6" 8" REINFORCED 2'-0" 2 % 66" AASHTO TYPE IV MOD. 2 SPA. @ 10'-10" = 21'-8" 4'-5" 5/4/201 5 3 SPA. @ 10'-10" = 32'-6" $USERNAME$ PHASE 2 - CONSTRUCTION REVISION SHEET NUMBER NUMBER REVISION DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DESIGNED DATE MWL 6/14 DRAWN ASG 6/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT PHASE 2 ALTERNATIVE NO. 1B SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV P: \PR5331 3\cadd\str_typ_phased const.dgn 4'-5" 1 0: 09: 21 AM (TYP.) Public State State Roads Dist. Project Federal Div. No. W.V. 3 Fiscal Sheet Total No. Sheets E32 E86 County Project No. Year No. U344-33 STP-0033 12.76 00 (243)D 2014 ROANE 63'-0" { EXISTING US ROUTE 33 2'-0" 2'-0" 11'-0" 11'-0" 12'-0" LANE LANE LANE LANE 2'-6" 12'-10•" SHOULDER 5'-6" 8" REINFORCED CONCRETE DECK CLOSURE 1'-0" 1 '-6" 12'-0" 9•" 6" SHOULDER 5'-6" 6" POUR 2 % 2 % 2'-0" 5 SPA. @ 10'-10" = 54'-2" 4'-5" 5/4/201 5 1 0: 09: 21 AM COMPLETED TYPICAL SECTION $USERNAME$ 4'-5" REVISION SHEET NUMBER NUMBER REVISION DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DESIGNED DATE MWL 6/14 DRAWN ASG 6/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT COMP.TYPICAL SECTION ALTERNATIVE NO. 1B SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV P: \PR5331 3\cadd\str_typ_phased const.dgn 1'-0" Public State State Roads Dist. Project Federal { EXISTING Div. No. W.V. 3 US ROUTE 33 Fiscal Sheet Total No. Sheets E33 E86 County Project No. Year No. U344-33 STP-0033 12.76 00 (243)D 2014 ROANE DEMOLISH TOP OF $USERNAME$ 5/4/201 5 1 0: 09: 21 AM EXISTING CAP. REVISION SHEET NUMBER NUMBER REVISION DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION PIER ELEVATION - PHASE 1 CONSTRUCTION DESIGNED MWL DATE 6/14 DRAWN ASG 6/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT PIER ELEVATION 1 ALTERNATIVE NO. 1B SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV P: \PR5331 3\cadd\str_typ_phased const.dgn DIVISION OF HIGHWAYS Public State State Roads Dist. Project Federal Div. No. W.V. 3 Fiscal Sheet Total No. Sheets E34 E86 County Project No. Year No. U344-33 STP-0033 12.76 00 (243)D 2014 ROANE { EXISTING US ROUTE 33 $USERNAME$ 5/4/201 5 1 0: 09: 21 AM 14'-10•" 18'-0" REVISION SHEET NUMBER NUMBER REVISION DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION PIER ELEVATION AFTER COMPLETION DESIGNED DATE MWL 6/14 DRAWN ASG 6/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT PIER ELEVATION 2 ALTERNATIVE NO. 1B SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV P: \PR5331 3\cadd\str_typ_phased const.dgn DIVISION OF HIGHWAYS Public State State Roads Dist. Project Federal 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 Div. No. W.V. 3 130 Fiscal Sheet Total No. Sheets E35 E86 County Project No. Year No. U344-33- STP-003312.76 00 140 2014 ROANE 243 (D) 150 160 760 750 750 E. P. 1 2: EX.R/W 730 E. P. 730 740 2: 1 733.99 740 733.76 EX.R/W 760 720 720 / / / / / / / / / / 710 710 700 700 760 760 750 750 AREAS CHECKED NO. AREAS NOTE BOOK SURVEY / / / / / / / / / / EX.R/W E. P. 720 52+50 710 710 700 700 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 1B - US 33 SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 52+50 TO STA. 53+00 $USERNAME$ 720 DD-MMM-YYYY HH: MM 730 P: \PR5331 3\cadd\RDY_XSC_US33_ALT1 B_01 .dgn E. P. 1 2: 730 740 2: 1 735.66 740 753.63 EX.R/W AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY DATE FI NAL SURVEYED PLOTTED TEMPLATE BY DATE 53+00 Public State State Roads Dist. Project Federal Fiscal 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 100 110 120 130 U344-33- STP-00332014 12.76 00 140 ROANE E86 243 (D) 150 160 BY 730 E. P. 720 740 EX.R/W EX.R/W 730.02 1 : 5 : 1 730.08 / / 90 E36 No. 750 E. P. / / / / / / / / 80 3 Sheets 750 1 2: DATE 70 W.V. Total No. 760 730 720 760 760 750 750 AREAS CHECKED 710 NO. AREAS 710 / / / / / NOTE BOOK SURVEY SURVEYED PLOTTED TEMPLATE 54+00 EX.R/W 732.08 E. P. 720 730 SEE ALTERNATIVE 1A 720 DD-MMM-YYYY HH: MM 2: 1 1 2: $USERNAME$ 730 740 E. P. 740 731.89 EX.R/W FOR US 33 53+50 PROFILE SHEET 710 50 60 70 80 90 100 110 120 130 140 150 710 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 1B - US 33 SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 53+50 TO STA. 54+00 P: \PR5331 3\cadd\RDY_XSC_US33_ALT1 B_01 .dgn AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY / / / / / FI NAL 60 No. Year 760 740 DATE 50 Div. Sheet County Project No. Public State State Roads Dist. Project Federal No. W.V. 3 Fiscal Sheet Total No. Sheets County Project No. Div. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) E37 E86 { US ROUTE 33 { TEMPORARY DETOUR ALTERNATIVE 2A 2'-0" SHLDR 2'-0" 2'-0" DRUMS DRUMS 5'-0" 12'-0" 12'-0" SIDEWALK LANE LANE 5'-6" 12'-0" 11'-0" 11'-0" 12'-0" SIDEWALK LANE TURN LANE TURN LANE LANE VARIES 5'-6" SHLDR SIDEWALK 2: 1 1 2: PROPOSED TYPICAL SECTION 1 2: PROPOSED TYPICAL SECTION US ROUTE 33, ALTERNATIVE 2A END BRIDGE TO END PROJECT PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 2A J04C23C03-PLAN e REVISION SHEET NUMBER NUMBER REVISION DATE BY PLAN SHEET TYPICAL SECTIONS P: \PR5331 3\cadd\RDY_TYP_CRBB.dgn $USERNAME$ DD-MMM-YYYY HH: MM US ROUTE 33 TEMPORARY DETOUR, ALTERNATIVE 2A END BRIDGE TO END PROJECT 2: 1 Public State State Roads Dist. Project Federal S . A R G K R M HARDMAN'S DETOUR BUSINESS TRAFFIC TO COURT No. W.V. 3 Fiscal Sheet Total No. Sheets E38 E86 County Project No. Div. Year No. U344-33- STP-003312.76 00 ROANE 2014 243 (D) S . A R G K R M E X.R/ W DO IT BEST STREET THEN TO MARKET STREET EX.R /W . ST RT U CO CITY R/W EX. R/W EX. BUILDING 1 STORY GROCERY A E S X P . H R A / L W T E X . R / W CONVERT TO ONE WAY MAINTAIN TWO 12' LANES ON TEMPORARY BRIDGE R /W WENDY'S T HAL ASP E X . RICHARD'S TRACTOR Y ONL EX.R/W W / .R EX EX.R/W EX. R/W WORK ZONE GRAVEL PARKING /W .R X E ASPHALT EMERGENCY PARKING SEVICES GV LT ASPHA THREE LEGS W R/ . X PUMP E STATION SAN. RE-PHASE SIGNAL TO EACH REMAINING W / .R EX R / W EX.R/W R/W EX. R/W EX. CON C. WAL K INSURANCE DEDICATED GREEN FOR /W EX.R US ROUTE 33 ASPHALT /W EX. R ERIE PHARMACY CONC. WALK ASPHALT /W EX. R Y PLE RI O T TO URG DSB L O ARN EX.R/W EX.R/W T HAL ASP R/W EX EX. . /W EX.R 1 STORY EX. R/W R/W EX. R/W EX. GE NE RA TO EX. CONR/W R C. WAL K COUNTY R/W EX. R/W EX. ROAD CLOSED SALES COURTHOUSE /W .R X E PARKING R/W EX. C O N C . W A L K OFFICE R/W EX. ROAD CLOSED R/W EX. POST R/W EX. MA I N ST . STORES A S P H A L T PEKING ADVANCED BUFFET AUTO MOVIE PARKERSBURG, WV GALLERY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 0 SCALE : J04C23C03-PLAN e 50 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY TEMPORARY TRAFFIC CONTROL PLAN SHEET ALTERNATIVE 2A DD-MMM-YYYY HH: MM $USERNAME$ TRAFFIC FLOW P: \PR5331 3\cadd\TRF_PLN_Al t2A.dgn S . A R G K R M WORK ZONE W 1 STORY WI LLI AMS DRI EX. VE R/ S . A R G K R M BUILDING /W EX. R /W EX. R LEGEND BALL FIELD OFFICE 3. PHASE 3: CONSTRUCT REMAINING PORTION OF SIDEWALK AND REMOVE TEMPORARY DETOUR USING CASE A4. 2 EX. R/W 2. PHASE 2: CONSTRUCT PROPOSED BRIDGE USING TEMPORARY TRAFFIC CONTROL AS SHOWN ON THIS SHEET. 33 T AL PH S A EEK SPRING CR 1. PHASE 1: CONSTRUCT TEMPORARY BRIDGE USING EXISTING TRAFFIC PATTERNS 9 1 E 1 OUT US R NOTES S Y T R N O A T R S U A 1 T S E R EX. R/W EX. R/W GOFF RUN Public State State Roads Dist. Project Federal Fiscal (N 71 °3 0' E E86 71 0' 72 0' 71 0' H 73 0 ' H 6" VCP H D G u y BI Gu y I P DI EX.R/W 5 6 1 2 9 MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E40 PE PE PE PE PC Sta. 252+76.76 6" VCP p ipe Ve nt D 6" STL. GAS CR EE K CONSUMERS GAS UTILITY CO. 71 0' 16 5' ) 71 0' PE PE PE 71 0' PE 29') 90. S39°48'E 1 ( 720' 730' 740' M. F. 4 E TC E TC D /W EX. R TCE DD-MMM-YYYY HH: MM .45') 71 7 20 ' ' 0 1 7 $USERNAME$ 0' 71 720' 7 1 0 ' WEST PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 2A 0 SCALE : J04C23C03-PLAN e 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY BEGIN PROJECT TO STA. 52+50 P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t2A_01 .dgn 730' 740' (S47°06'W SMH TIER C. FRON , IN INIA G R I V LT ASPHA 73 0 ' M. F. 8" 101 GM P DI PE F. M. V. C. 12 " 6" EX. R/W /W EX. R HHHH GM H B SP RI NG V. C. 12 " F. M. PE 71 0' 72 0' 73 0' D EX.R/W GM SMH 8" M INSURANCE (S 72 °W 720' TS RE ' 730 P 720' H H J IN C. GM END BRIDGE STA. 52+39.00 52 { BRIDGE 51 0' 71 TIC LAS P " 8 ERIE E39 ' 0 1 7 7 88 33 10 TRACT 1 3 H H D { US ROUTE 119 ROANE 720' D TMH SMH 2 EX.R/W 71 0' 00 -1 T7 1 / 6 92 WEST VIRGINIA, INC. TMH M SMH 72 0' E X . 73 0' ' 740 H H BJ M Sig pole PJB VI RG IN IA , TC E 252 FRONTIER 6" M HJ WE ST T C E R / W 6" 740' H H 1 H H H H R / W H H FR ON TI ER WM WM M M P H B WM E X . 6" H M J H 11 A 4 6 1 2 9 A P 4"W TIC LAS P 6" PJB PJB GV GV 2014 243 (D) R / W 251 H H 6 " 1 100 4 " W H WM R / W H P L A S T I C PI 1 1 1 1 1 G A S C O N S U M E R S H H Sig pole H H P D D SMH P VC 8" R/W EX. PE PE 50 BEGIN BRIDGE STA 49+87.00 12.76 00 ' 0 1 7 B 8"VCP S {U 33 TE ROU 72 0 (N6 9° ' E 5 1 720 ') ' 69 '(S ) H M H H . Sta HH H H B 1 H H H H H D 48 TRACT 1 71 0' 03 -1 T7 T HAL ASP U344-33- STP-0033- R/ W 0' 71 WV SMH { TEMPORARY DETOUR BRIDGE N39°W 70') ( STA. 49+27.83 RT.33 STA. 0+00.00 RT.119 BEGIN PROJECT STA. 49+58.48 GV TRACT 2 PJB ASPHALT GV 1 2 12" CI (AB AND ONE D) 1 WM M 2 6.6 1 + 49 WM GM L ERA LAT N A S ON ATI Y LOC CIT Y B WN O N UNK TRACTOR M M H H . Sta T PO M HH HH M 06 -1 T7 . ST PL R/ W RICHARD'S M H 0 0.0 0 + 48 HHH B H H H 49 WM .3 TR 63'-0" R/W EX. 1 E TC 1 / 9 EX.R/W GV WM 9 0 1 7 2 OUT TO OUT WM .2 TR 250SALES Sig pole 3 B 3 6 1 2 9 1 ' 720 WM 2 E TC 71 0 ' WM WM R/ W BB PJB v H Y W O A F T E S R P E W N O C R E K R 74 S 0' M Lpole TS RE 720' E 249+50.00 H NO POT Sta. J C RT O N H C . MA W A E I N X L . K S R /W T. C I T E A S P H A L T E X . E H HH WENDY'S Sheets No. T C E E TC ( N2 0° W 47 ') Lpole 73 0' (N R / 7 8 E W ° 3 0 ' E R /J W E H 4 " E PJB GM 3 Total No. 6 " C . I . WV (S 5 ° 5 30 3 ' 'E ) W.V. Year 71 0' H E 7 4 0 ' 2 / 9 W P L A S T I 9 C 4 H ' ) E H E A 0 1 1 7 T No. Sheet County Project No. Div. Public State State Roads Dist. Project Federal No. W.V. 3 Fiscal Sheet Total No. Sheets E40 E86 County Project No. Div. Year No. U344-33- STP-00332014 12.76 00 ROANE 243 (D) CURVE 33-1 DATA P.I. Sta. 58+11.90 PARKING DELTA R = 3,997.39' °40'W N51 ( D R/W EX. ) 64' °E (N39 PHARMACY ' 0 4 7 ' 30 7 R / W PJB PJB J 1 INC. H ' 0 2 7 SMH SMH D ER . NTI INC FRO A, INI G R VI PJB PJB J W R/ X. E PUMP STATION Sept Sept tnk tnk u ') 1 1 82. CHORD S40°55'E 1 ( P.I. Sta. 1+80.94 PJB PJB J ASPHALT 2 R = 2,000.00' DRIVE (CR 33/2) 4 GRAVEL (S50°1 3'W 90.55') PARKING PT Sta. 2+29.37 TCE E TC SMH SMH D P C V " 8 E TC EX. R/W TCE L = 69.07' DELTA ) E ' 3 ) 3 ' E 7. 8 2 7 . E ) 2 ' 2 1' 8 2 ° .8 W ' 16 72 9 (S 0 W ° 1' 2 3 2 ° S ( 8 8 { WILLIAMS (N TCE T = 35.98' PJB PJB J E E 3890' R) ( R = 100.00' CURVE 33/2-1 DATA PJB PJB J E 24" RC P u 10" VCP GV GV H B P.I. Sta. 253+12.74 DELTA EX. R/W B HSAN. D CURVE DET-3 DATA W / .R EX ' 0 72 E = 6.28' EMERGENCY C = 67.71' PARKING SEVICES T = 48.44' L = 96.87' E = 0.59' CURVE DET-4 DATA C = 96.86' P.I. Sta. 253+82.74 DELTA 72 0' W / .R EX 6 6 1 2 9 1D 1 "W 12 STMH STMH CON C. WAL K CONSUMERS GAS UTILITY CO. Sept Sept tnk tnk GE NE RA TO R 6" STL. GAS STMH STMH 6 1 2 9 R = 100.00' T = 36.90' CURVE 33/2-1 L = 70.71' DD-MMM-YYYY HH: MM J H Phone Phone ped ped Phone Phone ped ped $USERNAME$ T WES Sig Sig pole pole PJB PJB J B J -7 H 72 0' H WV WV B CER F SPEN CITY O S K R O W WATER H 6" F.M . 12"W D SMH SMH Sig Sig pole pole BLOCK WALL R/W EX. SMH SMH D ' 0 3 7 A CURVE 33-1 P 8"VC 730' PJB PJB J 6" F.M . 7 20 ' 1 1 P E E D ' 3 . 5 1 2.50 PC Sta. 1+3 FRON TIER WEST VIRG (3-F INIA , IN .O. C. 3 0 & 7 ' 1COPP ER) FRONT IER WEST VIRGI NIA, END PROJECT STA. 54+35.47 57 STA. 55+20.82 RT. 33 STA. 1+03.31 WILLIAMS DR. 56 ING L. CAS 20" ST 730' { US ROUTE 33 8"VCP 1 58 Sig Sig pole pole H 55 CURVE DET-4 /W EX.R A B 4') 64. N45°W 2 ( CURVE DET-3 CON C. WAL K ' 0 3 7 30') 0'W 3 ° 8 S2 ( ' 30 7 1 ASPHALT ' 0 5 7 ' 0 4 7 1 1 54 /W EX.R 7') 6. °E 7 0 5 S ( 7 5 0 ' H 53 D 73 06°E 52') S ( ' 1 STORY CONC. WALK 254 R/W EX. SMH SMH EX.R/W HH ER PENC OF S CITY RKS R WO WATE 12"W H 8"W Sig Sig pole pole Lpole Lpole H D W 8" WM WM H 750' R/W EX. H SMH SMH 18" RCP 7 3 0 ' 9 1 1 7 T TC E SMH SMH ') °30'E 4 1 S1 ( POT Sta. 254+60.63 A C T1 2 TR PT Sta. 254+16.54 2 5 3 + 4 5 . 8 3 S t a . P R C R / W PC Sta. 52+76.76 °E) (N39 (S) 37' PC Sta. 252+76.76 253 SMH SMH D C 6"PV MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E39 R / W A C T2 2 TR R/W EX. ' 0 4 7 { TEMPORARY DETOUR T HAL ASP W TC E . I . C TC E C = 1,060.82' 08') 0'W 1 N45°1 ( 13 .9 'D EE P TC E 5 6 1 2 9 WV WV H P C V " 8 Lpole Lpole H E = 35.66' " 8 0' 74 0' 73 TC E Lpole Lpole L = 1,063.96' W ' 0 3 ° 11 (S D ) ' 0 6 9') 85. H 7 60 ' T = 535.14' E = 6.59' C = 69.24' E SMH SMH D ( S37°37'51 "E 297. 63') SMH D 71 0' PC Sta. 2+86.96 GOFF RUN 0' 1 7 D PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 2A 0 SCALE : J04C23C03-PLAN e 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY STA. 52+50 TO END PROJECT P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t2A_02.dgn 71 0' D E S O P X E 7 2 0 ' GV 7 1 0' ' 20 7 7 20' Public State State Roads Dist. Project Federal No. W.V. 3 Year Sheet Total No. Sheets E41 E86 No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 731.53 731.86 732.28 732.94 733.84 734.99 736.24 737.49 738.74 739.99 741.24 742.49 743.74 744.98 745.93 Div. Fiscal County Project No. 770 770 765 765 760 760 V.P.I. Sta. 250+09.18 Elev. = 745.777 36' V.C. 755 755 K = 12 SSD = 240' 750 750 175.00' +1.157 % -2.000 % 745 PROFILE GRADE LINE TEMPORARY BRIDGE DETOUR -5. 000 % 745 740 740 735 735 -5. 000 % 1 .5: 1 -1.325 % 730 730 725 725 V.P.I. Sta. 252+74.07 Elev. = 732.533 EXISTING GROUND 720 720 96' V.C. 1 .5: 1 K = 26 715 715 SEE ALTERNATIVE 1A PROFILE SHEET 705 250+00 251+00 252+00 253+00 728.58 729.5 730.46 731.1 731.68 726.3 724.52 724.4 724.30 724.1 717.24 711.5 708.74 705.3 710.76 717.4 718.85 720.9 736.28 745.9 695 700 745.79 700 254+00 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 5 ft. DIVISION OF HIGHWAYS SCALES 0 ALTERNATIVE 2A - TEMPORARY DETOUR BRIDGE PARKERSBURG, WV PROFILE SHEET 20 ft. 0 J04C30C03-PROFILE c 705 REVISION SHEET NUMBER NUMBER REVISION DATE BY STA. 249+50 TO STA. 254+60 $USERNAME$ FOR US 33 DD-MMM-YYYY HH: MM 710 695 P: \PR5331 3\cadd\RDY_PRO_TEMPDETOUR_Al t_2A.dgn 710 C O N S U M E R S PE OUT TO OUT PC Sta. 252+76.76 H 4 5 . 8 3 2 5 3 + 6" VCP p ipe Ve nt D H R / W H H H PC Sta. 52+76.76 73 0 ' H E86 CONC. WALK END APPROACH SLAB STA. 52+59.00 254 54 ' 0 3 7 6" F.M . PE CONSUMERS GAS UTILITY CO. EXIST. R/W P DI Sept tnk ') 1 1 82. CHORD S40°55'E 1 ( 29') 90. S39°48'E 1 ( ) ' 3 ) 3 . ' 7 8 2 7 . E ) 2 ' 2 1' 8 8 2 . ° W ' 16 72 9 (S 0 W ° 1' 2 3 2 ° 8 (S 8 (N 3890' R) ( 4 E TC 735.63 736.56 737.50 739.36 740.30 .45') 71 (S47°06'W 741.23 742.17 743.10 TCE DRAULIC HY DATA AT NORTH MARKET ST. SPRING CREEK 780 HWE 250'-0" C/C BEARINGS { ABUTMENT 1 { PIER 1 { ABUTMENT 2 { PIER 2 75'-0" 100'-0" 75'-0" 721.61 723.11 2.63 3950 722.45 723.95 2.06 4500 Q50 723.90 725.40 2.64 5430 Q100 725.02 726.52 2.64 6200 DRAINAGE AREA = 39.6 SQ. MI. Q100 WATERWAY OPENING = 575 SF BASED ON SLOPE OF *ESTIMATED STREAM FOR RUBY BRADLEY. EXISTING GROUND 2: 1 Q(CFS) Q25 PROPOSED GRADE 3. 74 % V(FPS) Q10 EXISTING AND I NTEGRAL * HWE DD-MMM-YYYY HH: MM PE 6 6 1 2 9 I NTEGRAL Q50 t Q10 Q25 1 2: $USERNAME$ 720 NORMAL POOL 700 ESTIMATED TOP SPRING CREEK OF ROCK. TYP. EW EW 20 ft. EXISTING STRUCTURE TO BE DEMOLISHED IN PHASE 2 0 t - 3'-0" FOUNDATION PROTECTION TYP. 20 ft. DESIGNED DATE MWL 7/14 51+00 52+00 733.7 734.9 735.7 733.2 713.6 733.8 713.7 708.0 705.0 708.6 717.1 719.7 736.0 745.5 746.7 747.7 748.2 660 50+00 NUMBER 53+00 DRAWN ASG DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 7/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT SITUATION PLAN ALTERNATIVE 2A SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV J04C22C03 - BRIDGE b REVISION DIVISION OF HIGHWAYS 0 49+00 SHEET NUMBER SCALES 680 640 REVISION P: \PR5331 3\cadd\str_l ay_si tpl an Al t. 2A.dgn PE Sept tnk 10" VCP u 71 0' 6" B 6" STL. GAS u I ' 0 3 7 PJB A FRON TIER WEST VIRG INIA (3-F , IN .O. C. 3 0 & 7 ' 1COPP ER) G u y M. F. 5 6 1 2 9 J BI G uy 73 0 ' PE V. C. 12 " F. M. 6" CON C. WAL K H D P DI END PROJECT STA. 54+35.47 730' 6" VCP { US ROUTE 33 M. F. 720' 744.04 POT Sta. 254+60.63 71 0' 71 0' 72 0' PE 63'-0" 73 0' D 730' ROANE ST.R/W EXI 252'-0" OUT TO OUT OF PAVING NOTCH 740 2014 Lpole 6" F.M . E TC 744.97 TC E 3 8" 740' U344-33- STP-03312.76 00 243 (D) PT Sta. 254+16.54 PE PE PE 720' 730 ' H H J BJ 8" FRONTIER EXIST. R/W 745.88 9 1 1 7 T 53 SMH 6" WEST VIRGINIA, INC. 760 E42 No. { PIER 2 738.43 J H H H H PJB IN C. R/W ST. EXI 51 7 3 0 ' { BEARINGS ABUTMENT 2 720' 746.78 END BRIDGE STA. 52+39.00 52 71 0' HH 2 TRACT 1 { BRIDGE Sheets ASPHALT TMH 800 253 2 TRACT 2 2 H H 1 11 VI RG IN IA , R/W ST. EXI Sig pole PJB WE ST R / W TRACT 1 { PIER 1 740' FR ON TI ER WM WM ' 740 P L A S T I C 6 " H 1 H HH A WM 252 71 0' GV GV R / W 0' 71 { BEARINGS ABUTMENT 1 4 6 1 2 9 TC E R / W N39°W 70') ( Sig pole TC E R / W 251 Total No. TC E S t a . R / W Sheet County Year 13 .9 'D EE P P R C PE TRACT 1 PE PJB TC E 3 Fiscal Lpole { TEMPORARY DETOUR PE 12" CI (AB AND ONE D) 50 BEGIN BRIDGE STA 49+87.00 6" STL. GAS { TEMPORARY DETOUR BRIDGE CONSUMERS GAS UTILITY CO. 71 0' CR EE K SP RI NG 71 0' V. C. 12 " F. M. TRACT 2 H H 2 T C E No. W.V. R/ W M 250 1 16 5' ) (S 72 °W 720' TS RE ' 730 P SALES 6" BB H 72 0' (N6 9° E 5 1 720 ') ' 69 '(S ) H M L ERA LAT SAN N O ATI Y LOC CIT BY N W O N UNK TRACTOR BEGIN APPROACH SLAB STA. 49+67.00 72 0' G A S A S P H A L T W A L K C O N C . J C AI I T N Y ST W O A F T . E S R P E W N O C R E K R 74 S 0' .3 TR R/ W RICHARD'S EXIST. R/W BEGIN PROJECT STA. 49+58.48 HJ 1 E TC 1 / 9 STA. 49+27.83 RT.33 STA. 0+00.00 RT.119 1 100 ASPHALT H .2 TR PJB 4 " W 1 1 1 1 1 H 1 9 0 1 7 2 E X I S T . R / W E X I S T . H PI HH H NO RT H v H E 249+50.00 POT Sta. H R / W H M H H M 2 6.6 1 + 9 . 4 Sta H M H M M 49 { US ROUTE 119 E TC ' 720 B 2 Project 32.50 PC Sta. 1+ R/ W . ST PL State Dist. Federal 71 0 ' 3 B 3 6 1 2 9 TS RE GM State Roads Project No. ( N2 0° W 47 ') Sig pole WM Public Div. 720' Lpole PJB T C E E TC Public State State Roads Dist. Project Federal 120 110 100 90 80 70 60 50 40 30 / / 10 20 30 40 50 60 70 80 90 100 110 120 3 130 Total No. Sheets E43 E86 No. U344-33- STP-003312.76 00 140 2014 ROANE 243 (D) 150 160 750 EX.R/W 740 2: 1 730 E. P. E. P. 1 2: 733.76 EX.R/W 750 733.99 / / / / / / / 0 W.V. Sheet 760 730 / 10 No. Year 760 740 DATE 20 Div. Fiscal County Project No. 720 720 760 750 750 AREAS CHECKED 760 NO. AREAS 710 / / / / / / / / / / NOTE BOOK SURVEY 710 EX.R/W DD-MMM-YYYY HH: MM 730 ALT2_33-RT_FILL 720 720 $USERNAME$ ALT2_33-LT_FILL E. P. E. P. 1 2: 730 740 2: 1 735.66 740 735.63 EX.R/W 52+50 710 710 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 2A, 2B & 3 - US 33 SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 52+50 TO STA. 53+00 P: \PR5331 3\cadd\RDY_XSC_US33_ALT3_01 .dgn AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY DATE FI NAL SURVEYED PLOTTED TEMPLATE BY 53+00 Public State State Roads Dist. Project Federal Fiscal 120 110 100 90 80 70 60 50 40 30 20 10 50 60 70 80 90 100 110 120 130 U344-33- STP-00332014 12.76 00 140 ROANE E86 243 (D) 150 160 EX.R/W 730.03 EX.R/W BY 720 740 730 E. P. 730.08 / / 40 E44 No. 750 E. P. / / / / / / / / 30 3 Sheets 750 1 2: DATE 20 W.V. Total No. 760 730 720 760 760 750 750 AREAS CHECKED 710 NO. AREAS 710 / / / / / NOTE BOOK SURVEY SURVEYED PLOTTED TEMPLATE 54+00 SEE ALTERNATIVE 1A 720 $USERNAME$ 720 730 E. P. E. P. 1 2: DD-MMM-YYYY HH: MM 740 2: 1 732.08 730 EX.R/W 740 731.89 EX.R/W FOR US 33 53+50 PROFILE SHEET 710 710 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 2A, 2B & 3 - US 33 SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 53+50 TO STA. 54+00 P: \PR5331 3\cadd\RDY_XSC_US33_ALT3_01 .dgn AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY / / / / / FI NAL 10 No. Year 760 740 DATE 0 Div. Sheet County Project No. Public State State Roads Dist. Project Federal Fiscal { TEMP. DETOUR Div. No. W.V. 3 Sheet Total No. Sheets E45 E86 County Project No. Year No. U344-33 STP-0033 12.76 00 (243)D 2014 ROANE { EXISTING ALTERNATIVE 2A US ROUTE 33 50'-0" 63'-0" 38'-9" 2'-0" 26'-3" 5'-6" 1'-0" 5'-6" 12'-0" 11'-0" LANE 24'-1•" LANE 16'-9" ROAD WIDTH 11'-0" 12'-0" LANE LANE 1 '-6" 29'-3" 8" REINFORCED CONCRETE DECK 9•" 2 % 2'-0" 2 % 66" AASHTO TYPE IV MOD. (TYP.) 5 SPA. @ 10'-10" = 54'-2" 4'-5" 5/4/201 5 1 0: 09: 31 AM COMPLETED TYPICAL SECTION $USERNAME$ 4'-5" REVISION SHEET NUMBER NUMBER REVISION DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DESIGNED DRAWN DATE COL. RUBY BRADLEY BRIDGE REPLACEMENT COMP.TYPICAL SECTION ALTERNATIVE NO. 2A SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV P: \PR5331 3\cadd\str_typ_phased const.dgn 1'-0" SHOULDER 6" SIDEWALK SHOULDER 6" 4'-11‚" 2'-0" Public State State Roads Dist. Project Federal 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 Div. No. W.V. 3 130 Fiscal Sheet Total No. Sheets E46 E86 County Project No. Year No. U344-33- STP-003312.76 00 140 2014 ROANE 243 (D) 150 160 760 750 750 733.84 EX.R/W 760 740 740 / / E. P. 1 2: BY 720 AREAS CHECKED NO. AREAS 715 252+50 / / / / / NOTE BOOK SURVEY 720 770 760 760 EX.R/W 2: 1 1 2: 740 736.28 $USERNAME$ 740 730 730 250+00 720 720 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 2A - TEMPORARY DETOUR BRIDGE SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b DD-MMM-YYYY HH: MM 750 REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 250+00 TO STA. 252+50 P: \PR5331 3\cadd\RDY_XSC_DETOUR_ALT_2A-2B.dgn EX.R/W 750 745.92 770 E. P. AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY / / / / / FI NAL SURVEYED PLOTTED TEMPLATE 715 DATE 730 724.30 / / / / / / / / DATE 730 E. P. 2: 1 Public State State Roads Dist. Project Federal 120 110 100 90 80 70 60 50 40 30 20 10 / / / / / / / 40 50 60 70 80 90 100 110 120 130 Sheets E47 E86 No. U344-33- STP-003312.76 00 140 2014 ROANE 243 (D) 150 160 740 1 : 5 : 1 730 E. P. E. P. 731.68 1 2: 731.52 EX.R/W 750 720 253+50 710 710 760 760 750 750 AREAS CHECKED NO. AREAS NOTE BOOK SURVEY / / / / / / / / / / EX.R/W 732.28 740 2: 1 1 2: 730 710 $USERNAME$ 720 710 253+00 700 700 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 2A - TEMPORARY DETOUR BRIDGE SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 253+00 TO STA. 253+50 P: \PR5331 3\cadd\RDY_XSC_DETOUR_ALT_2A-2B.dgn 720 DD-MMM-YYYY HH: MM E. P. 730 E. P. 740 724.52 AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY DATE FI NAL SURVEYED PLOTTED TEMPLATE BY / 30 3 Total No. 750 720 / 20 W.V. Sheet 760 730 / 10 No. Year 760 740 DATE 0 Div. Fiscal County Project No. Public State State Roads Dist. Project Federal Fiscal 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 3 130 Sheets E48 E86 No. U344-33- STP-00332014 12.76 00 140 ROANE 243 (D) 150 160 / 100 W.V. Total No. / / / / / AREAS / / / / 110 No. Year AREAS CHECKED NO. NOTE BOOK SURVEY / / / / / / / / / / 760 760 750 750 2: 1 730 730 730.46 1 2: 720 DD-MMM-YYYY HH: MM 740 $USERNAME$ 740 730.35 EX.R/W SEE ALTERNATIVE 1A 720 FOR US 33 254+00 PROFILE SHEET 710 710 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 2A - TEMPORARY DETOUR BRIDGE SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 254+00 P: \PR5331 3\cadd\RDY_XSC_DETOUR_ALT_2A-2B.dgn AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY DATE FI NAL BY SURVEYED PLOTTED TEMPLATE DATE 120 Div. Sheet County Project No. Public State State Roads Dist. Project Federal No. W.V. 3 Fiscal Sheet Total No. Sheets County Project No. Div. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) E49 E86 { TEMP. DETOUR ALTERNATIVE 2B { US ROUTE 33 2'-0" 2'-0" SHLDR 2'-0" DRUMS 5'-6" 12'-0" 11'-0" 11'-0" 12'-0" VARIES 5'-6" 5'-0" SIDEWALK LANE TURN LANE TURN LANE LANE SHLDR SIDEWALK SIDEWALK DRUMS 10'-0" MIN. 10'-0" MIN. 10'-0" MIN. LANE LANE LANE 2: 1 1 2: 1 2: 2: 1 PROPOSED TYPICAL SECTION US ROUTE 33, ALTERNATIVE 2B END BRIDGE TO END PROJECT PROPOSED TYPICAL SECTION PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 2B J04C23C03-PLAN e REVISION SHEET NUMBER NUMBER REVISION DATE BY PLAN SHEET TYPICAL SECTIONS P: \PR5331 3\cadd\RDY_TYP_CRBB.dgn $USERNAME$ DD-MMM-YYYY HH: MM US ROUTE 33 TEMPORARY DETOUR, ALTERNATIVE 2B END BRIDGE TO END PROJECT Public State State Roads Dist. Project Federal S . A R G K R M HARDMAN'S DETOUR BUSINESS TRAFFIC TO COURT No. W.V. 3 Fiscal Sheet Total No. Sheets E50 E86 County Project No. Div. Year No. U344-33- STP-003312.76 00 ROANE 2014 243 (D) S . A R G K R M E X.R/ W DO IT BEST STREET THEN TO MARKET STREET EX.R /W . ST RT U CO CITY R/W EX. R/W EX. BUILDING 1 STORY GROCERY APPROACH TO C O N C . INTERSECTION ROAD CLOSED R /W WENDY'S E X . RICHARD'S TRACTOR /W .R X E /W .R X E PARKING T HAL ASP WORK ZONE CONVERT TO R/W EX. /W EX.R 1 STORY Y ONL ONE WAY /W EX.R EX.R/W EX.R/W MAINTAIN TWO 12' LANES GRAVEL ON TEMPORARY BRIDGE PARKING ASPHALT EMERGENCY PARKING SEVICES GV THREE LEGS W / .R EX EX.R/W LT ASPHA RE-PHASE SIGNAL TO EACH REMAINING W R/ . X PUMP E STATION SAN. INSURANCE DEDICATED GREEN FOR W / .R EX R / W EX. R/W ERIE R/W EX. CON C. WAL K /W EX. R Y PLE RI O T US ROUTE 33 ASPHALT /W EX. R R/W EX EX. . EX.R/W ASPHALT T HAL ASP R/W EX. CONC. WALK EX. R/W R/W EX. EX.R/W GE NE RA TO EX. CONR/W R C. WAL K COUNTY TO URG DSB L O ARN PHARMACY SALES COURTHOUSE R/W EX. R/W EX. R/W EX. W A L K CLOSE NORTH A E S X P . H R A / L W T E X . R / W OFFICE R/W EX. ROAD CLOSED R/W EX. POST R/W EX. MA I N ST . STORES A S P H A L T PEKING ADVANCED BUFFET AUTO MOVIE PARKERSBURG, WV GALLERY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 0 SCALE : J04C23C03-PLAN e 50 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY TEMPORARY TRAFFIC CONTROL PLAN SHEET ALTERNATIVE 2B DD-MMM-YYYY HH: MM $USERNAME$ TRAFFIC FLOW P: \PR5331 3\cadd\TRF_PLN_Al t2B.dgn S . A R G K R M WORK ZONE W 1 STORY WI LLI AMS DRI EX. VE R/ S . A R G K R M BUILDING /W EX. R /W EX. R LEGEND BALL FIELD OFFICE 3. PHASE 3: CONSTRUCT REMAINING PORTION OF SIDEWALK AND REMOVE TEMPORARY DETOUR USING CASE A4. 2 EX. R/W 2. PHASE 2: CONSTRUCT PROPOSED BRIDGE USING TEMPORARY TRAFFIC CONTROL AS SHOWN ON THIS SHEET. 33 T AL PH S A EEK SPRING CR 1. PHASE 1: CONSTRUCT TEMPORARY BRIDGE USING EXISTING TRAFFIC PATTERNS 9 1 E 1 OUT US R NOTES S Y T R N O A T R S U A 1 T S E R EX. R/W EX. R/W GOFF RUN Public State State Roads Dist. Project Federal Fiscal (N 71 °3 0' E 72 0' 6" VCP p ipe Ve nt D H 73 0 ' H 6" VCP H 73 0 ' I Gu y M. F. PE V. C. 12 " F. M. BI G u y P DI 6" M. F. 2051 PE PE P DI 2052 EX.R/W 5 6 1 2 9 PC Sta. 2052+76.76 PE 71 0' PE PE 6" PE 73 0' 29') 90. S39°48'E 1 ( 4 720' 730' D PE 71 0' 72 0' J 740' D /W EX. R DD-MMM-YYYY HH: MM { TEMPORARY DETOUR BRIDGE .45') 71 7 20 ' E TC TCE ' 0 1 7 $USERNAME$ (S47°06'W 0' 71 720' 7 1 0 ' WEST PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 2B 0 SCALE : J04C23C03-PLAN e 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY BEGIN PROJECT TO STA. 52+50 P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t2B_01 .dgn 730' 740' EX. R/W SMH TIER C. FRON , IN INIA G R I V LT ASPHA SMH 8" 0' 71 H GM 101 GM END BRIDGE STA. 52+39.00 52 MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E52 PE PE H H /W EX. R HHHH GM TRACT 1 { BRIDGE 8" GM CONSUMERS GAS UTILITY CO. 71 0' SP RI NG V. C. 12 " F. M. CR EE K (S 72 °W TS RE 6" STL. GAS 16 5' ) ' 730 P 720' 73 0' ' 740 J H H H H D H M ERIE 2 51 { US ROUTE 119 INSURANCE E86 71 0' 72 0' E X . 720' 6" H 7 (N6 20' 9° E 5 1 720 ') ' 69 '(S ) BB M H H H 1 11 2050 EX.R/W 7 88 33 10 TIC LAS P " 8 H P L A S T I C 1 TMH 2049 R/W 3 IN C. M H D B WEST VIRGINIA, INC. 71 0' M Sig pole PJB VI RG IN IA , ROANE 720' D TMH SMH R /W E X . H 100 4 " W HJ WE ST 2014 243 (D) TRACT 2 R/ W EX.R/W 71 0' 00 -1 T7 1 / 6 92 C I T Y W O A F T E S R P E W N O C R E K R 74 S 0' MA I N NO RT H H M H PI 1 1 R / W FRONTIER 6" M M M P H B FR ON TI ER WM H H 4 6 1 2 9 A D D SMH PJB PJB WM E X . Sig pole 740' H WM 0' 71 50 BEGIN BRIDGE STA 49+87.00 12.76 00 2 PE BJ GV GV WM 4"W TIC LAS P 6" G A S W A L K J H H v H 1 H H H R/W EX. TRACT 1 N39°W 70') ( STA. 49+27.83 RT.33 STA. 0+00.00 RT.119 BEGIN PROJECT STA. 49+58.48 U344-33- STP-0033- TCE PE 12" CI (AB AND ONE D) 6 " H A H 33 TE ROU P 8"VCP SMH P VC 8" H . Sta 1 1 1 H H B P H 48 R/ W PJB ASPHALT E51 No. ' 0 1 7 D T HAL ASP 1 71 0' POT Sta. 2049+00.00 HH HH M HH H H B 1 H H H 49 WM WV S {U M 2 6.6 1 + 49 M M H H . Sta T PO R/W EX. M B H H H 3 B 3 6 1 2 9 GV 03 -1 T7 TRACTOR EX.R/W GV SMH RICHARD'S M H 0 0.0 0 + 48 HHH WM GM L ERA LAT N A S ON ATI Y LOC CIT Y B WN O N UNK 63'-0" WM . ST PL R/ W OUT TO OUT 06 -1 T7 1 / 9 SALES Sig pole GV WM 9 0 1 7 2 ' 720 WM 2 .2 TR 71 0 ' WM WM 1 TSR E 720' Lpole R/ W ST . C O N C . M PJB Sheets 71 0' E C O N S U M E R S E A S P H A L T E X . E H HH WENDY'S WM TS RE ( N2 0° W 47 ') Lpole 73 0' (N R / 7 8 E W ° 3 0 ' E R /J W E H 4 " E PJB GM 3 Total No. 6 " C . I . WV (S 5 ° 5 30 3 ' 'E ) W.V. Year 71 0' H E 7 4 0 ' 2 / 9 W P L A S T I 9 C 4 H ' ) E H E A 0 1 1 7 T No. Sheet County Project No. Div. Public State State Roads Dist. Project Federal No. W.V. 3 Fiscal Sheet Total No. Sheets E52 E86 County Project No. Div. Year No. U344-33- STP-00332014 12.76 00 ROANE 243 (D) CURVE 33-1 DATA PARKING P.I. Sta. 58+11.90 DELTA R = 3,997.39' °40'W N51 ( R/W EX. R/W EX. SMH D SMH SMH D 8"W R/W EX. ) 64' °E (N39 PHARMACY ' 30 7 H END PROJECT STA. 54+35.47 3890' R) ( { TEMPORARY DETOUR CURVE DET-5 Sept tnk W R/ X. E HSAN. u PUMP STATION Sept tnk u D P.I. Sta. 2053+24.73 DELTA CURVE 33/2-1 DATA PJB J R = 107.00' T = 47.96' PJB J E E P.I. Sta. 1+80.94 PJB J ) E ' 3 ) 3 ' E 7. 8 2 7 . E ) 2 ' 2 1' 8 2 ° .8 W ' 16 72 9 (S 0 W ° 1' 2 3 2 ° S ( 8 { WILLIAMS 8 (N R = 2,000.00' GRAVEL (S50°1 3'W 90.55') PARKING PT Sta. 2+29.37 SMH D P C V " 8 EX. R/W E TC E = 10.26' E C = 87.53' PARKING ' 20 7 SEVICES T = 48.44' L = 96.87' E = 0.59' CURVE DET-6 DATA C = 96.86' DELTA R = 107.00' T = 45.48' CURVE 33/2-1 L = 86.01' E = 9.27' E C = 83.72' SMH 7 1 0' 7 20' EMERGENCY P.I. Sta. 2054+12.43 E TC TCE ' 0 72 ASPHALT DRIVE (CR 33/2) 7 20 ' L = 90.18' DELTA 4 TCE CURVE DET-5 DATA STMH GV H B W / .R EX D 7 E 2 0 ' S O P X E D ( S37°37'51 "E 297. 63') PC Sta. 2+86.96 PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 2B 0 SCALE : J04C23C03-PLAN e DD-MMM-YYYY HH: MM ') 1 1 82. CHORD S40°55'E 1 ( J WV 6" F.M . 10" VCP 1D 72 0' B PJB STMH "W 12 $USERNAME$ W / .R EX 6 6 1 2 9 H ER . NTI INC FRO A, INI G R VI 6 1 2 9 12"W CONSUMERS GAS UTILITY CO. T WES Sig pole PJB J Phone ped Phone ped H H J B J -7 H 72 0' 3 205 D 18" RCP 6" STL. GAS ' 0 2 7 SMH EX. R/W A B H Sig pole BLOCK WALL D CER F SPEN CITY O S K R O W WATER 2 6" F.M . 12"W D 2.50 PC Sta. 1+3 ' 0 3 7 1 R/W EX. SMH P 8"VC CON C. WAL K P R C 730' PJB J ' 3 . 5 1 CURVE 33-1 SMH GE NE RA TO R S t a . CON C. WAL K 1 1 P E E D 24" RC P 730' { US ROUTE 33 57 FRONT IER WEST VIRGI NIA, 1 ASPHALT FRON TIER WEST VIRG (3-F INIA , IN .O. 3 C. 0 & 7 ' 1COPP ER) 8"VCP 55 54 4 5 0 2 Sig pole H STA. 55+20.82 RT. 33 STA. 1+03.31 WILLIAMS DR.56 ING L. CAS 20" ST 1 2 0 5 3 + 53 PC Sta. 2052+76.76 1 1 H HH H 58 INC. EX.R/W CONC. WALK 6 6 . 9 4 PC Sta. 52+76.76 H PJB J Sig pole Lpole /W EX.R A B 4') 64. N45°W 2 ( R / W 7 3 0 ' ' 0 3 7 30') 0'W 3 ° 8 S2 ( ' 30 7 A C T1 2 TR 9 1 1 7 T ' 0 5 7 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY STA. 52+50 TO END PROJECT P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t2B_02.dgn R / W 7') 6. °E 7 0 5 S ( ' 0 4 7 CURVE DET-6 TR A C T2 /W EX.R ' 0 4 7 TCE 2 ' 0 4 7 7 5 0 ' C 6"PV MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E39 D 73 06°E 52') S ( ' 1 STORY TCE 96 PT Sta. 2054+52. 5 6 1 2 9 R/W EX. SMH TCE R / W ER PENC OF S CITY RKS R WO WATE ' 0 4 7 ') °30'E 4 1 S1 ( W 8" WM H 750' °E) (N39 (S) 37' W 08') 0'W 1 N45°1 ( 13 .9 'D EE P T HAL ASP C = 1,060.82' . I . C WV H P C V " 8 Lpole H E = 35.66' " 8 0' 74 0' 73 Lpole H L = 1,063.96' W ' 0 3 ° 11 (S D ) ' 0 6 D 9') 85. 7 60 ' T = 535.14' Public State State Roads Dist. Project Federal Fiscal No. W.V. 3 Year Total No. Sheets E53 E86 No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 728.94 729.86 730.78 731.41 731.96 732.61 733.25 734.00 734.97 735.97 736.97 737.97 738.97 739.97 740.97 741.97 742.97 743.97 744.97 745.97 Div. Sheet County Project No. 765 765 760 760 755 755 PROFILE GRADE LINE TEMPORARY DETOUR BRIDGE 745 -4.0 00 % 740 735 750 Elev. = 733.098 175.00' Elev. = 734.820 750 V.P.I. Sta. 2053+06.01 770 V.P.I. Sta. 2052+53.71 770 -4.0 01 % -2.58 6 % 745 740 735 -2.58 7 % -0.784 % -3.6 75 % Elev. = 733.775 37' V.C. 1 .5: 1 EXISTING GROUND 720 K = 26 715 730 Elev. = 731.325 V.P.I. Sta. 2052+79.83 V.P.I. Sta. 2053+85.22 V.P.I. Sta. 2053+69.92 725 Elev. = 731.445 -2.58 7 % 1 .5: 1 730 725 720 715 FOR US 33 705 705 PROFILE SHEET 250+00 251+00 252+00 253+00 728.94 729.9 730.81 731.4 729.75 728.0 728.18 728.4 728.16 725.2 717.52 716.1 717.16 715.7 710.25 708.1 716.81 719.1 733.65 744.8 695 700 747.08 700 254+00 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 5 ft. DIVISION OF HIGHWAYS SCALES 0 ALTERNATIVE 2B - TEMPORARY DETOUR BRIDGE 0 PARKERSBURG, WV J04C30C03-PROFILE c PROFILE SHEET 20 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY STA. 249+50 TO STA. 254+60 $USERNAME$ SEE ALTERNATIVE 1A DD-MMM-YYYY HH: MM 710 695 P: \PR5331 3\cadd\RDY_PRO_TEMPDETOUR_Al t_2B.dgn 710 6" VCP p ipe V en t D H ' 0 3 7 6" F.M . 6" F.M . 6" STL. GAS 3 205 CONSUMERS GAS UTILITY CO. EXIST. R/W 10" VCP 6 6 1 2 9 ') 1 1 82. CHORD S40°55'E 1 ( 3890' R) ( 4 .45') 71 7 1 0 ' 735.63 737.50 738.43 739.36 DRAULIC HY DATA AT NORTH MARKET ST. SPRING CREEK 780 HWE 250'-0" C/C BEARINGS 760 { PIER 1 { ABUTMENT 2 { PIER 2 75'-0" 100'-0" 75'-0" 740 721.61 723.11 2.63 3950 722.45 723.95 2.06 4500 Q50 723.90 725.40 2.64 5430 Q100 725.02 726.52 2.64 6200 DRAINAGE AREA = 39.6 SQ. MI. Q100 WATERWAY OPENING = 575 SF BASED ON SLOPE OF *ESTIMATED STREAM FOR RUBY BRADLEY. EXISTING GROUND 2: 1 Q(CFS) Q25 PROPOSED GRADE 3. 74 % V(FPS) Q10 EXISTING AND I NTEGRAL * HWE DD-MMM-YYYY HH: MM 740.30 741.23 742.17 743.10 7 20 ' 736.56 (S47°06'W 0' 71 720' 744.04 TCE 252'-0" OUT TO OUT OF PAVING NOTCH { ABUTMENT 1 ) ' 3 ) 3 ' 7. 8 2 .7 E ) 2 ' 2 1' 8 2 .8 ° W ' 16 72 9 (S 0 W ° 1' 2 3 2 ° S 8 ( 8 (N 4 7 20 ' ' 0 1 7 Sept tnk I NTEGRAL Q50 t Q10 Q25 1 2: $USERNAME$ 720 NORMAL POOL 700 ESTIMATED TOP SPRING CREEK OF ROCK. TYP. EW EW 20 ft. EXISTING STRUCTURE TO BE DEMOLISHED IN PHASE 2 0 t - 3'-0" FOUNDATION PROTECTION TYP. 20 ft. DESIGNED DATE MWL 7/14 51+00 52+00 733.7 734.9 735.7 733.2 713.6 713.8 713.7 708.0 705.0 708.6 717.1 719.7 736.0 745.2 746.7 747.7 748.2 660 50+00 NUMBER 53+00 DRAWN ASG DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 7/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT SITUATION PLAN ALTERNATIVE 2B SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV J04C22C03 - BRIDGE b REVISION DIVISION OF HIGHWAYS 0 49+00 SHEET NUMBER SCALES 680 640 REVISION P: \PR5331 3\cadd\str_l ay_si tpl an Al t. 2B.dgn D { TEMPORARY DETOUR { TEMPORARY DETOUR BRIDGE Sept tnk (S50°1 3'W 90.55') 730' 730' 744.97 740' ' 0 3 7 PJB u 71 0' CON C. WAL K 29') 90. S39°48'E 1 ( E TC WEST TIER C. FRON , IN INIA G R I V 745.88 746.78 END PROJECT STA. 54+35.47 720' P DI 4 5 0 2 B Gu y BI G u y I V. C. F. M. 6" 740' 12 " PE PE ASPHALT FRON TIER WEST VIRG INIA (3-F , IN .O. C. 3 0 & 7 ' 1 -COP PER) 2052 2051 PC Sta. 2052+76.76 H M. F. M. F. 8" 101 800 54 730' 6" VCP D 73 0 ' 5 6 1 2 9 3 0' 71 H GM { US ROUTE 33 END APPROACH SLAB STA. 52+59.00 SMH GM H CONC. WALK u H H PC Sta. 52+76.76 73 0 ' H H PE 71 0' PE 71 0' 72 0' 73 0' 8" ST.R/W EXI Lpole A OUT TO OUT 63'-0" J SMH P DI WEST VIRGINIA, INC. 740' 7 3 0 ' 53 52 FRONTIER 6" E86 R / W J PE PE H H H H BJ D R/W ST. EXI HHHH END BRIDGE STA. 52+39.00 6" 2050 EXIST. R/W E54 2 TRACT 1 9 1 1 7 T 720' GM TRACT 1 R / W { PIER 2 IN C. ROANE TRACT 2 { BEARINGS ABUTMENT 2 51 TMH GM 2 2 71 0' H VI RG IN IA , R/W ST. EXI Sig pole PJB 2049 720' 730 ' ' 740 J H 1 11 H HJ WE ST CONSUMERS GAS UTILITY CR EE K 71 0' SP RI NG V. C. 12 " F. M. M H H H 6" STL. GAS 16 5' ) (S 72 °W 720' 6" BB H 72 0' (N6 9° E 5 1 720 ') ' 69 '(S ) H R / W E X I S T . P L A S T I C 6 " 1 100 4 " W POT Sta. 2049+00.00 1 1 1 1 1 H H 1 H HH C I T Y W O A F T E S R P E W N O C R E K R 74 S 0' ST . MA I N H v E X I S T . H PI HH H NO RT H R / W H M H H M 2 6.6 1 + 9 . 4 Sta H M H M M B FR ON TI ER WM PJB 2014 PT Sta. 2+29.37 A 4 6 1 2 9 BEGIN BRIDGE STA 49+87.00 U344-33- STP-03312.76 00 243 (D) R/W { PIER 1 PJB Sheets R / W P R C Sig pole Total No. No. 2.96 PT Sta. 2054+5 BEGIN APPROACH SLAB STA. 49+67.00 Sheet County Year TCE TRACT 2 R/ W { BRIDGE 50 3 Fiscal TCE 0' 71 { BEARINGS ABUTMENT 1 STA. 49+27.83 RT.33 STA. 0+00.00 RT.119 BEGIN PROJECT STA. 49+58.48 TCE S t a . EXIST. R/W N39°W 70') ( No. W.V. 2 12" CI (AB AND ONE D) Project 32.50 PC Sta. 1+ SALES TRACT 1 State Dist. Project No. TCE PE State Roads Div. 2 0 5 3 + 6 6 . 9 4 TRACTOR R/ W PJB ASPHALT WM { US ROUTE 119 RICHARD'S 1 71 0' WM 2 GM L ERA LAT N A S ON ATI LOC ITY Y C B N W NO UNK Public Federal ' 720 49 GV GV . ST PL R/ W 71 0 ' 3 B 3 6 1 2 9 ( N2 0° W 47 ') Sig pole WM 1 / 9 720' Lpole 9 0 1 7 2 13 .9 'D EE P Public State State Roads Dist. Project Federal Div. No. W.V. 3 Fiscal Sheet Total No. Sheets E55 E86 County Project No. Year No. U344-33 STP-0033 12.76 00 (243)D 2014 ROANE { TEMP. DETOUR ALTERNATIVE 2B { EXISTING US ROUTE 33 68'-6" 63'-0" 38'-9" 2'-0" 2'-0" SHOULDER 5'-6" 26'-3" 1'-0" SIDEWALK 11'-0" LANE LANE 16'-9" 11'-0" 12'-0" LANE LANE 29'-3" 8" REINFORCED CONCRETE DECK 6" 12'-0" 1 '-6" 5'-6" 6" 24'-1•" ROAD WIDTH 9•" 2 % 2 % 2'-0" 66" AASHTO TYPE IV MOD. (TYP.) 5 SPA. @ 10'-10" = 54'-2" 4'-5" 5/4/201 5 1 0: 09: 41 AM COMPLETED TYPICAL SECTION $USERNAME$ 4'-5" REVISION SHEET NUMBER NUMBER REVISION DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DESIGNED MWL DATE 7/14 DRAWN ASG 7/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT COMP.TYPICAL SECTION ALTERNATIVE NO. 2B SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV P: \PR5331 3\cadd\str_typ_phased const.dgn 1'-0" 4'-11‚" SHOULDER Public State State Roads Dist. Project Federal 110 100 90 80 70 60 50 40 30 20 10 EX.R/W 750 / / / / / / / / 30 40 50 60 70 80 90 100 110 120 W.V. 3 130 Sheet Total No. Sheets E56 E86 No. U344-33- STP-003312.76 00 140 2014 ROANE 243 (D) 150 160 750 740 730 1 . 5 : 1 720 2052+50 710 710 700 700 770 770 760 760 AREAS CHECKED NO. AREAS NOTE BOOK SURVEY / / / / / / / / / / EX.R/W 744.92 740 733.66 730 720 730 720 2050+00 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 2B - TEMPORARY DETOUR BRIDGE SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b DD-MMM-YYYY HH: MM 1 . 5 : 1 $USERNAME$ 1 : 5 . 1 740 750 REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 2050+00 TO STA. 2052+50 P: \PR5331 3\cadd\RDY_XSC_DETOUR_ALT_2A-2B.dgn 750 EX.R/W AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY DATE FI NAL SURVEYED PLOTTED TEMPLATE BY / 720 / 20 728.14 730 DATE 10 1 2: E. P. E. P. 740 0 No. Year EX.R/W 734.92 120 Div. Fiscal County Project No. Public State State Roads Dist. Project Federal 120 110 100 90 80 70 60 50 40 30 20 10 50 60 70 80 90 100 110 120 130 E57 E86 No. U344-33- STP-003312.76 00 140 2014 ROANE 243 (D) 150 160 EX.R/W 731.95 EX.R/W 740 E. P. 2: 1 730 729.75 / / 40 Sheets 750 E. P. / / / / / / / / 30 3 Total No. 750 730 DATE 20 W.V. Sheet 760 1 : 5 : 1 720 720 750 750 AREAS CHECKED 710 NO. AREAS 710 / / / / / NOTE BOOK SURVEY SURVEYED PLOTTED TEMPLATE BY 2053+50 EX.R/W 2: 1 1 2: 730 720 $USERNAME$ DD-MMM-YYYY HH: MM 740 728.18 E. P. 730 E. P. 740 733.25 EX.R/W AREAS CHECKED 720 2053+00 710 710 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 2B - TEMPORARY DETOUR BRIDGE SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 2053+00 TO STA. 2053+50 P: \PR5331 3\cadd\RDY_XSC_DETOUR_ALT_2A-2B.dgn NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY / / / / / FI NAL 10 No. Year 760 740 DATE 0 Div. Fiscal County Project No. Public State State Roads Dist. Project Federal Fiscal / / / / / / / / / / 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 No. W.V. 3 130 Year Total No. Sheets E58 E86 No. U344-33- STP-00332014 12.76 00 140 ROANE 243 (D) 150 160 760 760 750 750 740 740 730 730 720 720 715 715 AREAS CHECKED NO. AREAS NOTE BOOK SURVEY / / / / / / / / / / 1 : 5 : 1 SEE ALTERNATIVE 2A CROSS SECTION SHEETS 2054+00 $USERNAME$ 720 SEE ALTERNATIVE 1A 710 DD-MMM-YYYY HH: MM 730 FOR US 33 730.81 E. P. 720 EX.R/W 1 : 5 : 1 730 740 E. P. 740 730.74 EX.R/W AREAS CHECKED 710 FOR US 33 PROFILE SHEET 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 2B - TEMPORARY DETOUR BRIDGE SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 2054+00 P: \PR5331 3\cadd\RDY_XSC_DETOUR_ALT_2A-2B.dgn NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY DATE FI NAL SURVEYED PLOTTED TEMPLATE BY DATE 120 Div. Sheet County Project No. Public State State Roads Dist. Project Federal No. W.V. 3 Fiscal Sheet Total No. Sheets County Project No. Div. Year No. U344-33- STP-003312.76 00 2014 243 (D) ROANE E59 E86 { US ROUTE 33 2'-0" SHLDR 5'-6" 12'-0" 11'-0" 11'-0" 12'-0" SIDEWALK LANE TURN LANE TURN LANE LANE VARIES 5'-6" SHLDR SIDEWALK 1 2: 2: 1 PROPOSED TYPICAL SECTION US ROUTE 33, ALTERNATIVE 3 END BRIDGE TO END PROJECT { WILLIAMS DRIVE 1'-0" 2'-0" 1 . 5 : 1 8'-0" MIN 3'-0" @ 4:1 TREATED SHLDR 12'-0" 12'-0" 3'-0" 5'-6" LANE LANE SHLDR SIDEWALK 8'-0" MIN @ 4:1 2'-0" DITCH 1 : 5 . 1 4: 1 1 4: DD-MMM-YYYY HH: MM DITCH PROPOSED TYPICAL SECTION PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 3 J04C23C03-PLAN e REVISION SHEET NUMBER NUMBER REVISION DATE BY PLAN SHEET TYPICAL SECTIONS P: \PR5331 3\cadd\RDY_TYP_CRBB.dgn $USERNAME$ WILLIAMS DRIVE EXTENSION, ALTERNATIVE 3 Public State State Roads Dist. Project Federal W.V. 3 Year Sheet Total No. Sheets E60 E86 No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) GRA VEL No. Fiscal County Project No. Div. NEW LOADING DOCK CONSTRUCTED AT 90°TO EXISTING LOADING DOCK r S GA . KR R M SPRING CREEK r AC R/W EX. EX .R /W EX .R /W J S GA . KR MR EX.R/W EX.R/W EX. R/W EX.R/W S GA . KR MR / A SPH ALT S GA . KR R M CON CRE TE H l el Ww S GA . KR MR CON CRE TE EX .R /W TJB TEMPORARY STRIPING EX.R/W FOR THREE 10-FOOT EX.R/W LANES. PROPOSED SIGNAL PHASED FOR TURN C I T P O R E R B E I K F R A M EX.R/W LANES DURING DETOUR PHASE EEK SPRING CR R/W EX. T AL PH S A S GA . KR R M S GA . KR MR R/W EX. R/W EX. EX.R/W US ROUTE 119 /W EX.R r r AC PA RK IN G AC EX . S GA . KR R M ORY 1 ST BANK AS PH AL T AC R/ W W R/ r EX.R/W . EX S GA . KR MR ASPHALT W / R EX .R /W W / R EX .R /W s CAT CH BAS IN . X E EX .R /W T L A H P S A S GA . KR MR CON CRE TE GRA VEL CAT CH BAS IN 2 . X E EX .R /W W / R 33 . X E A S PH AL T WI LLI AM SD RI VE AC W / R CAT CH BAS IN . X E EX .R /W CAT CH 8" BASI N WES T V IRG NAT INI ION A AL 1 S G TOR UAR Y B D UIL DIN G H . T S W R/ . EX S GA . KR MR W R/ . EX Prop cor r DD-MMM-YYYY HH: MM T E K R A M E $USERNAME$ AC NOTES 1. PHASE 1: CONSTRUCT NEW PERMANENT BRIDGE USING CASE A4. S GA . KR R M IP 2. PHASE 2: DETOUR TRAFFIC DURING CONSTRUCTION OF THE NEW PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 0 SCALE : J04C23C03-PLAN e 50 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY TEMPORARY TRAFFIC CONTROL PLAN SHEET ALTERNATIVE 3 P: \PR5331 3\cadd\TRF_PLN_Al t3_01 .dgn RUBY BRADLEY BRIDGE, USING TEMPORARY TRAFFIC CONTROL AS SHOWN ON THIS SHEET (NOTE TURN LANE ADDED USING EXISTING SHOULDERS) Public State State Roads Dist. Project Federal S . A R G K R M HARDMAN'S No. W.V. 3 Fiscal Sheet Total No. Sheets E61 E86 County Project No. Div. Year No. U344-33- STP-003312.76 00 ROANE 2014 243 (D) S . A R G K R M E X.R/ W DO IT BEST EX.R /W . ST RT U CO CITY R/W EX. R/W EX. BUILDING 1 STORY GROCERY A E S X P . H A R / L W T E X . R / W RICHARD'S E X . /W .R X E R/W EX. /W EX.R 1 STORY PHARMACY TRACTOR /W EX.R SALES EX.R/W EX.R/W COURTHOUSE GRAVEL ASPHALT EMERGENCY PARKING SEVICES GV PARKING GOFF RUN LEGEND BALL FIELD 1 STORY BUILDING A S P H A L T EEK SPRING CR S . A R G K R M WORK ZONE W S . A R G K R M TRAFFIC FLOW PEKING ADVANCED BUFFET AUTO MOVIE PARKERSBURG, WV GALLERY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 0 SCALE : J04C23C03-PLAN e 50 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY TEMPORARY TRAFFIC CONTROL PLAN SHEET ALTERNATIVE 3 DD-MMM-YYYY HH: MM 2 OFFICE /W EX. R EX. R/W 33 LT HA P AS WI LLI AMS DRI VE EX. R/ 9 1 E 1 OUT US R S Y T R N O A T R S U A 1 T S E R RU N EX. R/W GO LF /W EX. R EX. R/W EX. R/W LT ASPHA THREE LEGS W / .R EX EX.R/W GE NE RA TO EX. CONR/W R C. WAL K EX.R/W RE-PHASE SIGNAL TO EACH REMAINING W R/ . X PUMP E STATION SAN. INSURANCE DEDICATED GREEN FOR W / .R EX R / W /W EX. R ERIE CON C. WAL K /W EX. R Y PLE RI O T R/W EX. ASPHALT ASPHALT T HAL ASP R/W EX EX. . ROAD CLOSED EX. R/W R/W EX. US ROUTE 33 EX.R/W CONC. WALK R/W EX. $USERNAME$ COUNTY TO URG DSB L O ARN P: \PR5331 3\cadd\TRF_PLN_Al t3_02.dgn ROAD CLOSED T HAL ASP R/W EX. R/W EX. R/W EX. WORK ZONE R /W WENDY'S /W .R X E R/W EX. PARKING C O N C . W A L K OFFICE R/W EX. POST R/W EX. MA I N ST . STORES POST Public State State Roads Dist. Project Federal E AE M C . I . PE H 73 0 ' G u y BI 29') 90. S39°48'E 1 ( 4 E TC D E TC DD-MMM-YYYY HH: MM $USERNAME$ 0' 71 720' 730' 740' 7 20 ' ' 0 1 7 7 1 0 ' 0' 71 730' 720' 12" V.C. 7 20 ' 71 0' H P I T 740' WES TIER C. FRON , IN INIA G R I V .45') 71 SMH G u y LT ASPHA P DI 5 6 1 2 9 EX.R/W 720' 730' 740' /W EX. R 101 H B H G u y PE PE (S47°06'W /W EX. R HHHH GM PE M. F. M GM M. F. I V. C. 6" 8" GM 73 0 ' TRACT 1 12 " F. M. EX.R/W GM 6" VCP 6" VCP PE PE 73 0' 6" 0' 71 TIC LAS P " 8 ERIE INSURANCE SMH P DI ' 0 1 7 7 88 33 10 D PE 71 0' 72 0' H H 740' D TMH { US ROUTE 119 H H END BRIDGE STA. 52+37.00 52 8" 3 IN C. H H D D TMH SMH pi pe TRACT 1 51 EX. R/W Sig pole PJB VI RG IN IA , WEST VIRGINIA, INC. 71 0' HJ WE ST FRONTIER 6" H 1 H H H M H R / W V ent 2 720' 00 -1 T7 1 / 6 92 J H BJ A H H M M P H B E X . D R / W 71 0' PE PE 720' 73 0' ' 740 J H 1 11 H H FR ON TI ER WM M P WM PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS J04C23C03-PLAN e P 102 J B ALTERNATIVE 3 Phone ped E86 MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E63 R / W EX.R/W 71 0' H 4"W TIC LAS P 6" GV GV E62 71 0' PE TRACT 2 { BRIDGE PJB 4 6 1 2 9 WM M SMH P VC 8" WM ROANE 72 0' G A S M 6 " 100 1 4 " W 0' 71 PE Sig pole PJB A D D SMH WV R/W EX. CONSUMERS GAS UTILITY CO. 6" STL. GAS CR EE K SP RI NG 71 0' V. C. 12 " F. M. 6" TRACT 1 H P L A S T I C PI 1 1 H H P 8"VCP S {U 33 TE ROU 2014 243 (D) ' 0 1 7 B BEGIN BRIDGE STA 49+87.00 12.76 00 71 0' 16 5' ) (S 72 °W ' 730 TS RE 720' R / W N39°W 70') ( 50 H D 48 U344-33- STP-0033- 72 0' E X . 73 0' E TC PE 71 0' 03 -1 T7 T HAL ASP Sheets E TC H H R/ W WV SMH Total No. No. 12" CI (AB AND ONE D) STA. 49+27.83 RT.33 STA. 0+00.00 RT.119 BEGIN PROJECT STA. 49+58.48 GV GV 1 2 PJB ASPHALT H 7 (N6 20' 9° E 5 1 720 ') ' 69 '(S ) BB H R /W E X . H MA I N NO RT H H . Sta 1 1 1 49 WM P C I T Y W O A F T E S R P E W N O C R E K R 74 S 0' W A L K J H H v H H M H M 2 6.6 1 + 49 HH H H B 1 H H H R/W EX. M WM TRACTOR M M H H . Sta T PO 3 B 3 6 1 2 9 L ERA LAT N A S ON ATI Y LOC CIT Y B WN O N UNK RICHARD'S M H 0 0.0 0 + 48 B H H H HH HH M WM 2 GM R/ W 63'-0" 06 -1 T7 . ST PL EX.R/W GV WM 1 / 9 OUT TO OUT HHH WM 9 0 1 7 2 ' 720 WM .2 TR 71 0 ' WM WM 1TSRE SALES Sig pole 3 720' Lpole R/ W ST . C O N C . M HH E C O N S U M E R S E A S P H A L T E X . E H PJB W.V. TS RE ( N2 0° W 47 ') WENDY'S No. Sheet County Year 6 " (N R / 7 8 E W ° 3 0 ' E R /J W E H 4 " E PJB Lpole (S 5 ° 5 30 3 ' 'E ) ( S1 4 55 °E ') Div. 71 0' H E WV 2 / 9 W P L A S T I 9 C 4 H ' ) H E E 7 4 0 ' GM 2 / 0 9 1 1 7 T Fiscal Project No. 72 0' H WV 73 (N 0' 71 °3 44 0'E ') H 0 1 1 7 T WV 0 SCALE : 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY BEGIN PROJECT TO STA. 52+50 P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t3_01 .dgn E OFFICE Public State State Roads Dist. Project Federal No. W.V. 3 Fiscal Sheet Total No. Sheets E63 E86 County Project No. Div. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 0' 75 CURVE 33-1 DATA P.I. Sta. 58+11.90 DELTA PARKING R = 3,997.39' T = 535.14' °40'W N51 ( D W °E) (N39 (S) 37' . I . C WV H P C V " 8 08') 0'W 1 N45°1 ( Lpole H C = 1,060.82' " 8 0' 74 0' 73 Lpole E = 35.66' W ' 0 3 ° 11 (S D ) ' 0 6 9') 85. H R/W EX. 13 .9 'D EE P R/W EX. SMH D SMH SMH D 8"W D ) 64' PHARMACY 7') . E 76 S50° ( ' 0 5 7 7 5 0 ' ' 0 4 7 TC E ' 30 7 R / W ' 30 7 R / W H R / W 1 1 H 1 730' { US ROUTE 33 END PROJECT STA. 54+35.47 CON C. WAL K ' 3 . 5 1 1 H SMH ' 0 2 7 SMH D T WES Sig pole PJB J H ER . NTI INC FRO A, INI G R VI PJB J W R/ X. E WV W / .R EX 6 6 1 2 9 B 1D Sept tnk HSAN. u 10" VCP PUMP STATION Sept tnk u ') 1 1 82. CHORD S40°55'E 1 ( 4 TC E W / .R EX CURVE 33/2-1 DATA PJB J PJB P.I. Sta. 1+80.94 PJB J DELTA ) E ' 3 ) 3 ' E 7. 8 2 7 . E ) 2 ' 2 1' 8 2 ° .8 W 2 6 ' 1 7 9 (S 0 W ° ' 1 2 3 2 ° (S 8 { WILLIAMS 8 (N E TC "W 12 J E E 3890' R) ( GV H B 6 1 2 9 STMH ASPHALT R = 2,000.00' EX. R/W CONSUMERS GAS UTILITY CO. 6" F.M . STMH D 2 6" STL. GAS Phone ped Phone ped H ' 0 3 7 J B J -7 H Sig pole BLOCK WALL B CER F SPEN CITY O S K R WO WATER D H A 12"W D PT Sta. 2+29.37 SMH D P C V " 8 EX. R/W 7 20 ' E T = 48.44' L = 96.87' E = 0.59' C = 96.86' 12"W (S50°1 3'W 90.55') PARKING PARKING 72 0' TC E 18" RCP GRAVEL CON C. WAL K DRIVE (CR 33/2) ' 0 72 $USERNAME$ J SMH P 8"VC 730' PJB 6" F.M . E TC 1 1 P E E D CURVE 33-1 DD-MMM-YYYY HH: MM ASPHALT FRON TIER WEST VIRG (3-F INIA , IN .O. 7 C. 3 & 1 0 ' -COP PER) FRONT IER WEST VIRGI NIA, 8"VCP 55 54 53 ING L. CAS 20" ST 1 57 STA. 55+20.82 RT. 33 STA. 1+03.31 WILLIAMS DR.56 CONC. WALK 24" RC P HH 72 0' H Sig pole H INC. EX.R/W Sig pole GE NE RA TO R PC Sta. 52+76.76 PJB J 9 1 1 7 T Lpole H /W EX.R A B 4') 64. N45°W 2 ( A C T1 2 TR 7 3 0 ' 30') 30'W S28° ( ' 0 4 7 C 6"PV MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E62 TC E TR A C T2 R/W EX. 73 06°E 52') S ( ' 1 STORY °E (N39 T HAL ASP ER PENC OF S Y T I C RKS R WO WATE SMH 2.50 PC Sta. 1+3 5 6 1 2 9 R/W EX. 2 W 8" WM H ' 0 4 7 ') °30'E 4 1 S1 ( TC E 7 60 ' L = 1,063.96' CURVE 33/2-1 E SMH ( S37°37'51 "E 297. 63') 71 0' PARKERSBURG, WV PC Sta. 2+86.96 GOFF RUN 0' 1 7 SMH D THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 3 0 SCALE : J04C23C03-PLAN e 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY STA. 52+50 TO END PROJECT P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t3_02.dgn EXPOSED SMH D GV 7 1 0' 71 0' D E S O P X E 7 2 0 ' ' 20 7 7 20' D CURVE 33/2-3 DATA Public State State Roads Dist. Project Federal Fiscal 720' 730' EK CRE NG I R SP (N36°09'5 1 "W 21 0.36') 73 0 ' 72 0 ' 75 0' NOTE TURN LANE ADDED USING EXISTING SHOULDER WIDTH. NO WIDENING. SEE TTC PLAN. . Sta PC 55 71. + 1 40 D SMH H { US ROUTE 119 ' 20 7 2 40 rD SMH AC R/W EX. ' 0 2 7 S . A R G K R M Y OR ST K 1 N BA AC GM AC T HAL ASP PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION ' 20 7 C = 471.12' DIVISION OF HIGHWAYS ALTERNATIVE 3 0 SCALE : J04C23C03-PLAN e " 8 PE R / W CURVE US 119-1 /W .R X E r rH 20' 7 . Sta T O P E X . 3 40 E 0 0.0 0 + 400 ' 20 7 J K EE CR 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY STA. 300+00 TO STA. 305+59.32 DD-MMM-YYYY HH: MM 0' 72 P DI 4 40 E = 30.86' 7 0 . 7 2 L = 476.15' ' 20 7 NG RI SP + 5 0 3 " 10 ET RE ST 0' 1 7 T = 243.26' H ' 0 1 7 0' 72 ET RK MA ' 0 2 7 0' 75 R = 943.44' W R/ . X E $USERNAME$ J 20' 7 ' 0 3 7 730' DELTA PE 7 50 ' T EC 7 J 5 O . PR 46 D 5+ EN 30 9 1 1 . . A R. RT D ST S 58 AM . I 4 LL +7 I 4 W 40 32 . . A 59 T S 5+ 30 . A ST P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t3_03.dgn H Q P ' 40 7 PJB P.I. Sta. 404+14.81 Lpole PE ' 40 7 CURVE US 119-1 DATA Phone ped Marker TCE 7 5 0 ' . 07 a E . G 7 t S ID +2 R B 05 T 3 O D P N E A. ST W R/ . X E 20' 7 ' 20 7 ' 50 7 Y T I S L A 0' I G 75 T U TCE . L S T A S G " S 6 R E M U S N R/W O EX. C E P ' 30 7 R / W ' 0 4 7 . R K R M E P PE . O C R/W EX. TRACT 1 + 5 0 3 EX. R/W H 5 7 5 0 ' 3 0 5 2 3 . 9 5 U9 -0 68 H W / R E C T 5 TRACT 2 30' 7 ' 0 5 7 R / W IN C. P DI T L A H P S A Marker ' 40 7 ' 50 7 3 .8 11 3+ 30 PJB " 10 W R/ . EX WE FR ST ON ASPHAL TI VI T ER RG IN CI IA TY , OF IN WA SP C. TE E NC R ER WO 8" R KS W 12" W D EX. R/W VI RG IN IA , P E a. St TMH WV WE ST F I B M E A R R K O E P R T I C ) D N U O R G R E D N U ( CH EN TR N AI DR 8" 8" EX. R/W 0' 75 PC 4" CONCRETE / ASPHALT 74 0' P 301 WV A S P H A L T 75 0' H 300 302 FR ON TI ER P DI . a t S H CURVE 33/2-2 S A G 4" S GA PE ( N50°49'41 "E 73. 38') BEGIN PROJECT STA. 300+40.46 " 10 NE TW OR (A K ER IA L) EX. R/W 7 1 0 1 4 1 0 9 SMH LU MO S TJB 72 0' 3 30 T2 C A TR PE 304 3 PE W " 7 4 ' 7 ) 5 ' ° 8 3 5 1 . 0 (S 4 R/W 720' A 5 4 A P P S 3 8 1 B P ') 23 . 72 E W ' 6 R/ . °3 X 8 E N2 ( PE GE 35 D I 8. BR +4 4 IN 30 G BE A. ST CURVE 33/2-3 PJB EX. R/W 0' 72 0' 73 S . A R G K R M 76 0' ' 750 8"W 740' 760' 43 6. 2 2+ 30 a. St R/W R/W ' 0 6 7 { WILLIAMS DRIVE PT BASIN PC Sta. 301+74.48 TC E BASIN B POT Sta. 300+00.00 CATCH T1 C A TR W / R R / W CATCH W R/ R/W B B TCE 6 J TCE CONCRETE PROPOSED CONCRETE PAVEMENT R/W H E C T TCE 740' 750' 6" S TL. GAS CONS UMER S GA S UT ILIT Y CO . S . A R G K R M WEST 760 ' 45.85') 1 "E (S39°57'41 CONCRETE Marker P BASIN Q GRAVEL H WV H T2 C A TR E CATCH R/W R/W H (N39°57'41 "W 1 45.85') 6 Q TC E TC E H ' 0 6 7 TC E BB E TC E TC ' 0 6 7 H E TC E TC T P T C E H E TC AJ E C = 204.79' 5 0 4 C = 51.80' E86 B E = 33.34' E64 243 (D) E E = 1.72' ROANE 2014 12.76 00 Marker J L = 215.24' GM U344-33- STP-0033- B B L = 51.95' NIA WEST VIRGI ARD U G L A N NATIO ING D L I U B Y 1 STOR 3 M T = 119.64' W.V. No. M T = 26.12' M R = 198.00' H R = 198.00' TIER FRON C. , IN INIA VIRG NEW LOADING DOCK CONSTRUCTED AT 90° TO EXISTING LOADING DOCK Sheets M DELTA No. Total No. ' 0 3 7 DELTA E P.I. Sta. 304+31.47 Year D 41 3. 0'27"E 71 N50°1 ( P.I. Sta. 302+00.60 Sheet County Project No. Div. B CURVE 33/2-2 DATA Public State State Roads Dist. Project Federal W.V. 3 Year Sheet Total No. Sheets E65 E86 No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 726.19 No. 726.69 727.21 727.91 728.86 730.05 731.48 733.15 735.06 737.21 739.60 742.23 745.07 747.77 749.96 751.63 752.77 753.40 753.53 753.56 753.59 753.61 Div. Fiscal County Project No. 775 775 770 770 765 765 V.P.I. Sta. 301+52.18 Elev. = 753.449 760 BEGIN PROJECT STA. 300+40.46 760 EXISTING GROUND 137' V.C. K = 12 SSD = 126' 755 755 -0.109 % -0.109 % -0.109 % -1 1. 50 0 % 750 750 V.P.I. Sta. 300+43.72 745 745 Elev. = 753.567 -1 1 . 50 0 PROFILE GRADE LINE WILLIAMS DRIVE EXTENSION 740 740 735 END BRIDGE 80.00' STA. 305+27.07 BEGIN BRIDGE STA. 304+48.35 -1 1. 50 0 730 730 END PROJECT % STA. 305+46.57 -2.000 % Q100 725 00 % +4.0 -2.000 % V.P.I. Sta. 303+60.63 720 735 725 720 1 2: 1 Elev. = 729.478 1 2: 1 247' V.C. K = 26 715 715 30' V.C. 710 710 K = 5 302+00 303+00 304+00 726.77 724.2 709.93 709.9 730.73 753.8 755.97 756.3 758.85 758.7 758.25 757.6 756.78 756.1 755.48 755.1 754.88 754.6 753.8 753.60 754.19 301+00 305+00 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 5 ft. DIVISION OF HIGHWAYS SCALES 0 ALTERNATIVE 3 - WILLIAMS DR. EXTENSION PARKERSBURG, WV J04C30C03-PROFILE c PROFILE SHEET 20 ft. 0 REVISION SHEET NUMBER NUMBER REVISION 700 DATE BY STA. 300+00 TO STA. 305+50 P: \PR5331 3\cadd\RDY_PRO_WI LLEXT_01 .dgn 300+00 753.5 700 705 753.61 705 $USERNAME$ Elev. = 726.050 DD-MMM-YYYY HH: MM V.P.I. Sta. 305+32.00 71 0' 12 " PE H 6" VCP p ipe Ve nt D H H H H H PC Sta. 52+76.76 73 0 ' I PE ' 0 3 7 PJB ' 0 3 7 A FRON TIER WEST VIRG INIA (3-F , IN .O. C. 3 0 & 7 ' 1COPP ER) J M. F. 5 6 1 2 9 G u y PE V. C. 3 6" F.M . TRACT 1 6" F.M . CONSUMERS GAS UTILITY CO. EXIST. R/W ') 1 1 82. CHORD S40°55'E 1 ( 29') 90. S39°48'E 1 ( 4 E TC Sept tnk E TC E TC 3890' R) ( E TC 4 735.63 736.56 737.50 738.43 739.36 .45') 71 740.30 (S47°06'W 741.23 742.17 743.10 TC E DRAULIC HY DATA AT NORTH MARKET ST. SPRING CREEK 252'-0" OUT TO OUT OF PAVING NOTCH 780 HWE 250'-0" C/C BEARINGS { ABUTMENT 2 { ABUTMENT 1 760 75'-0" 100'-0" { PIER 1 { PIER 2 75'-0" 740 721.61 723.11 2.63 3950 722.45 723.95 2.06 4500 Q50 723.90 725.40 2.64 5430 Q100 725.02 726.52 2.64 6200 DRAINAGE AREA = 39.6 SQ. MI. WATERWAY OPENING = 575 SF I NTEGRAL Q50 Q100 Q(CFS) BASED ON SLOPE OF *ESTIMATED STREAM FOR RUBY BRADLEY. EXISTING GROUND 2: 1 V(FPS) Q25 PROPOSED GRADE 3. 74 % * HWE Q10 EXISTING AND I NTEGRAL ) ' 3 ) 3 . ' 7 8 2 7 . E ) 2 ' 2 1' 8 8 2 . ° W ' 16 72 9 (S 0 W ° 1' 2 3 2 ° 8 (S 8 (N DD-MMM-YYYY HH: MM P DI 6 6 1 2 9 t Q10 Q25 1 2: $USERNAME$ 720 NORMAL POOL 700 ESTIMATED TOP SPRING CREEK OF ROCK. TYP. EW EW 20 ft. EXISTING STRUCTURE TO BE DEMOLISHED IN PHASE 2 0 t - 3'-0" FOUNDATION PROTECTION TYP. 20 ft. DESIGNED DATE MWL 7/14 51+00 52+00 733.7 734.9 735.7 733.2 713.6 713.8 713.7 708.0 705.0 718.6 717.1 719.7 736.0 745.5 746.7 747.7 748.2 660 50+00 NUMBER 53+00 DRAWN ASG DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 7/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT SITUATION PLAN ALTERNATIVE 3 SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV J04C22C03 - BRIDGE b REVISION DIVISION OF HIGHWAYS 0 49+00 SHEET NUMBER SCALES 680 640 REVISION P: \PR5331 3\cadd\str_l ay_si tpl an Al t. 3.dgn PE PE Sept tnk 10" VCP u 71 0' 6" B 6" STL. GAS M. F. u 12 " F. M. BI G uy 73 0 ' END PROJECT STA. 54+35.47 CON C. WAL K H D P DI 730' { US ROUTE 33 SMH 6" 720' 744.04 730' 744.97 54 { PIER 2 8" 8" 740' CONC. WALK 6" VCP PE 71 0' 72 0' 73 0' EXIST. R/W R/W ST. EXI 746.78 HH H PE PE PE OUT TO OUT 63'-0" J D TMH 800 ST.R/W EXI Lpole 720' R/W ST. EXI WEST VIRGINIA, INC. IN C. 745.88 HJ VI RG IN IA , 7 3 0 ' 9 1 1 7 T END APPROACH SLAB STA. 52+59.00 53 52 71 0' H Sig pole PJB WE ST END BRIDGE STA. 52+39.00 51 2 TRACT 1 ASPHALT 6" FR ON TI ER TC E R / W { BEARINGS ABUTMENT 2 TRACT 1 { BRIDGE FRONTIER 740' WM E86 TC E 2 H H H H H GV GV 4 6 1 2 9 PJB ROANE R / W { PIER 1 PJB BJ H 1 H HH A BEGIN BRIDGE STA 49+87.00 WM 720' 730 ' ' 740 J H 1 11 Sig pole 2014 2 TRACT 2 71 0' BEGIN APPROACH SLAB STA. 49+67.00 U344-33- STP-03312.76 00 243 (D) R / W 71 0' H P L A S T I C BEGIN PROJECT STA. 49+58.48 WM 0' 71 PE 50 E66 No. R / W N39°W 70') ( { BEARINGS ABUTMENT 1 Sheets TC E TRACT 2 R / W Total No. 13 .9 'D EE P 12" CI (AB AND ONE D) STA. 49+27.83 RT.33 STA. 0+00.00 RT.119 1 ASPHALT CONSUMERS GAS UTILITY CO. V. C. SP RI NG 71 0' CR EE K 6" STL. GAS 16 5' ) (S 72 °W 720' ' 730 TS RE TRACT 1 H H E TC PE R / W M SALES R/ W 3 Sheet County Year Lpole E TC PE TRACTOR F. M. H E X I S T . RICHARD'S 1 2 PJB 100 4 " W 1 1 1 1 1 H B L ERA LAT SAN N O ATI Y LOC CIT BY N W O N UNK 6" BB . ST PL R/ W 72 0' (N6 9° E 5 1 720 ') ' 69 '(S ) H 1 / 9 W.V. ' 720 49 { US ROUTE 119 P C I T Y W O A F T E S R P E W N O C R E K R 74 S 0' W A L K MA I N R / W 9 0 1 7 2 6 " H ST . C O N C . J NO RT H E X I S T . H PI HH M .2 TR 71 0 ' 3 B 3 6 1 2 9 72 0' C O N S U M E R S G A S A S P H A L T E H H v R / W H M H H M 2 6.6 1 + 9 . 4 Sta H M M H 2 1TSRE No. Fiscal 32.50 PC Sta. 1+ Sig pole R/ W GM Project Federal TS RE WM State Dist. Div. 720' Lpole State Roads Project No. ( N2 0° W 47 ') PJB Public Public State State Roads Dist. Project Federal 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 Div. No. W.V. 3 130 Fiscal Year U344-33- STP-003312.76 00 140 2014 ROANE 150 160 740 300+50 730 730 780 780 770 770 NO. AREAS CHECKED 750 E. P. 753.60 E. P. BY AREAS EX.R/W 4:1 DD-MMM-YYYY HH: MM E. P. 740 300+00 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 3 - WILLIAMS DR. EXTENSION SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 300+00 TO STA. 300+50 P: \PR5331 3\cadd\RDY_XSC_WI LLEXT_ALT3_01 .dgn 740 J05C07C03-XSECT2 b $USERNAME$ EX.R/W 760 750 E. P. E. P. 750 753.62 760 EX.R/W EX.R/W AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY / / / / / / / / / / NOTE BOOK E86 760 4:1 740 SURVEY E67 243 (D) EX.R/W 753.56 EX.R/W / / / / / / / / / / DATE 1 . 5 : 1 750 SURVEYED PLOTTED TEMPLATE Sheets 770 760 FI NAL Total No. No. 770 DATE Sheet County Project No. Public State State Roads Dist. Project Federal 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 Div. No. W.V. 3 130 Fiscal Year U344-33- STP-003312.76 00 140 2014 ROANE 150 EX.R/W EX.R/W E. P. 754.89 TURNOUT EP 730 780 780 AREAS CHECKED 730 NO. AREAS 740 AREAS CHECKED AREAS 4:1 753.60 E. P. GRADE EXISTING 740 750 E. P. 6.56% 750 1 : 5 . 1 740 301+00 730 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 3 - WILLIAMS DR. EXTENSION SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 301+00 TO STA. 301+50 P: \PR5331 3\cadd\RDY_XSC_WI LLEXT_ALT3_01 .dgn 730 J05C07C03-XSECT2 b DD-MMM-YYYY HH: MM 2.00% 760 $USERNAME$ 10.00' EX.R/W 753.56 760 EX.R/W 770 EX.R/W 770 MATCH NO. PLOTTED TEMPLATE PRIVATE APPROACH NOTE BOOK SURVEY ORI GI NAL SURVEYED BY / / / / / / / / / / NOTE BOOK 750 301+50 BY SURVEY E86 160 1 : 5 . 1 4:1 4:1 740 SURVEYED PLOTTED TEMPLATE E68 243 (D) 760 2.00% E. P. 1 . 5 : 1 LOT / / CONCRETE 5.53% EP / / / / / / / / DATE 751.63 EX.R/W 2.00% 750 FI NAL Sheets 770 PAVEMENT DATE Total No. No. 770 760 Sheet County Project No. Public State State Roads Dist. Project Federal 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 Div. No. W.V. 3 130 Fiscal Year U344-33- STP-003312.76 00 140 2014 ROANE / / E69 E86 243 (D) 150 160 GRADE EX.R/W 760 E. P. E. P. EXISTING MATCH 1 . 5 : 1 770 750 1 : 5 . 1 4:1 4:1 740 756.77 / / / / / / / 740 742.23 EX.R/W 50' PAVEMENT 750 / Sheets 780 760 DATE Total No. No. 780 770 Sheet County Project No. 730 730 780 770 770 AREAS CHECKED 780 NO. AREAS 720 / / / / / / / / / / NOTE BOOK SURVEY 720 EX.R/W 740 302+00 730 730 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 3 - WILLIAMS DR. EXTENSION SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b DD-MMM-YYYY HH: MM 4:1 750 REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 302+00 TO STA. 302+50 P: \PR5331 3\cadd\RDY_XSC_WI LLEXT_ALT3_01 .dgn 4:1 1 : 5 . 1 $USERNAME$ E. P. E. P. 760 755.51 740 GRADE 750 EXISTING 760 1 . 5 : 1 EX.R/W 747.77 EX.R/W 50' PAVEMENT MATCH AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY DATE FI NAL SURVEYED PLOTTED TEMPLATE BY 302+50 Public State State Roads Dist. Project Federal 110 100 90 80 70 60 50 40 30 20 10 0 733.15 770 760 10 20 30 40 50 60 70 80 90 100 110 120 No. W.V. 3 130 Year Sheet Total No. Sheets E70 E86 No. U344-33- STP-003312.76 00 140 2014 ROANE 243 (D) 150 160 EX.R/W 120 Div. Fiscal County Project No. 770 760 750 750 1 . 5 : 1 / 4:1 BY AREAS CHECKED 720 NO. AREAS 303+50 / / / / / NOTE BOOK SURVEY 730 760 E. P. 1 : 5 . 1 740 4:1 758.29 4:1 730 303+00 720 720 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 3 - WILLIAMS DR. EXTENSION SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 303+00 TO STA. 303+50 P: \PR5331 3\cadd\RDY_XSC_WI LLEXT_ALT3_01 .dgn 730 DD-MMM-YYYY HH: MM 750 $USERNAME$ E. P. EXISTING 740 770 1 . 5 : 1 GRADE MATCH GRADE 750 EXISTING 760 EX.R/W 737.21 24' PAVEMENT EX.R/W 770 MATCH AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY / / / / / FI NAL SURVEYED PLOTTED TEMPLATE 720 758.85 4:1 730 DATE 740 1 : 5 . 1 / / / / / / / / / DATE 740 Public State State Roads Dist. Project Federal Fiscal 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 W.V. 3 130 Total No. Sheets E71 E86 No. U344-33- STP-003312.76 00 140 2014 ROANE 243 (D) 150 160 / AREAS CHECKED / / / / / AREAS / / / / 110 No. Year NO. NOTE BOOK SURVEY / / / / / / / / / / 760 760 750 750 1 . 5 : 1 730 730 4:1 4:1 720 SEE ALTERNATIVE 2A 720 FOR US 33 304+00 CROSS SECTION SHEETS 710 50 60 70 80 90 100 110 120 130 140 150 710 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 3 - WILLIAMS DR. EXTENSION SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b $USERNAME$ 1 : 5 . 1 DD-MMM-YYYY HH: MM 740 REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 304+00 P: \PR5331 3\cadd\RDY_XSC_WI LLEXT_ALT3_01 .dgn 740 755.97 AREAS CHECKED NO. AREAS TEMPLATE NOTE BOOK SURVEY PLOTTED BY SURVEYED ORI GI NAL 770 EX.R/W 770 730.05 DATE FI NAL BY SURVEYED PLOTTED TEMPLATE DATE 120 Div. Sheet County Project No. Public State State Roads Dist. Project Federal 2'-0" 2'-0" DRUMS DRUMS 5'-0" 10'-0" MIN. 10'-0" MIN. 10'-0" MIN. SIDEWALK LANE LANE LANE 1 . 5 : 1 No. W.V. 3 Fiscal Sheet Total No. Sheets County Project No. Div. Year No. U344-33- STP-003312.76 00 2014 243 (D) ROANE E72 E86 2: 1 EXISTING US ROUTE 33 PROPOSED TYPICAL SECTION US ROUTE 33 TEMPORARY DETOUR, ALTERNATIVE 4 END BRIDGE TO END PROJECT { US ROUTE 33 2'-0" SHLDR 5'-6" 12'-0" 11'-0" 11'-0" 12'-0" SIDEWALK LANE TURN LANE TURN LANE LANE VARIES 5'-6" SHLDR SIDEWALK 1 2: 2: 1 PROPOSED TYPICAL SECTION $USERNAME$ DD-MMM-YYYY HH: MM US ROUTE 33, ALTERNATIVE 4 END BRIDGE TO END PROJECT NOTES: PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 4 J04C23C03-PLAN e REVISION SHEET NUMBER NUMBER REVISION DATE BY PLAN SHEET TYPICAL SECTIONS P: \PR5331 3\cadd\RDY_TYP_CRBB.dgn SEE TYPICAL SHEET E2 FOR EXISTINGTYPICAL SECTION DIMENSIONS Public State State Roads Dist. Project Federal S . A R G K R M HARDMAN'S DETOUR BUSINESS TRAFFIC TO COURT No. W.V. 3 Fiscal Sheet Total No. Sheets E73 E86 County Project No. Div. Year No. U344-33- STP-003312.76 00 ROANE 2014 243 (D) S . A R G K R M E X.R/ W DO IT BEST STREET THEN TO MARKET STREET EX.R /W . ST RT U CO CITY R/W EX. R/W EX. BUILDING 1 STORY GROCERY C O N C . INTERSECTION R /W WENDY'S E X . SALES COUNTY EX.R/W 12-FOOT LANES GRAVEL PARKING DURING PHASE 1 CONSTRUCTION, USE EXISTING TRAFFIC PATTERNS, USING CASE A4 AS NEEDED. /W .R X E ASPHALT EMERGENCY PARKING SEVICES GV MAINTAIN TWO EX. R/W EX. R/W /W EX. R W / .R EX EX.R/W GE NE RA TO EX. CONR/W R C. WAL K THREE LEGS W R/ . X PUMP E STATION SAN. LT ASPHA EACH REMAINING R/W EX. W / .R EX R / W RE-PHASE SIGNAL TO DEDICATED GREEN FOR CONC. WALK CON C. WAL K EX.R/W R/W EX. US ROUTE 33 ASPHALT INSURANCE TO PHARMACY EX.R/W ASPHALT /W EX. R ERIE /W EX.R 1 STORY URG DSB L O ARN /W EX.R T HAL ASP Y PLE RI O T R/W EX. ROAD CLOSED COURTHOUSE R/W EX EX. . R/W EX. R/W EX. CONVERT TO ONE WAY EX.R/W R/W EX. T HAL ASP WORK ZONE RICHARD'S TRACTOR /W .R X E PARKING R/W EX. APPROACH TO A E S X P . H R A / L W T E X . R NO / W R W A L K CLOSE NORTH TH OFFICE R/W EX. ROAD CLOSED R/W EX. POST R/W EX. MA I N ST . STORES SUBSTRUCTURES USING NIGHT TIME CLOSURE. EX. R/W BUILDING S . A R G K R M TRAFFIC FLOW $USERNAME$ 1 STORY WORK ZONE W S . A R G K R M DD-MMM-YYYY HH: MM LEGEND BALL FIELD EEK SPRING CR 3. PHASE 2B: SLIDE NEW BRIDGE ONTO PERMANENT 2 OFFICE /W EX. R PROPOSED SUBSTRUCTURES. /W EX. R 1. PHASE 1: CONSTRUCT NEW BRIDGE ON TEMPORARY SUPPORTS UPSTREAM OF EXISTING BRIDGE. USE EXISTING TRAFFIC PATTERNS AND CASE A4 AS NEEDED. 33 LT HA P AS WI LLI AMS DRI VE EX. R/ 9 1 E 1 OUT US R NOTES 2. PHASE 2A: DEMOLISH EXISTING BRIDGE AND CONSTRUCT S Y T R N O A T R S U A 1 T S E R EX. R/W EX. R/W GOFF RUN A S P H A L T AND REOVE TEMPORARY DETOUR USING CASE A4. PEKING ADVANCED BUFFET AUTO MOVIE PARKERSBURG, WV GALLERY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 0 SCALE : J04C23C03-PLAN e 50 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY TEMPORARY TRAFFIC CONTROL PLAN SHEET ALTERNATIVE 4, PHASE 2 P: \PR5331 3\cadd\TRF_PLN_Al t4.dgn 3. PHASE 3: CONSTRUCT REMAINING PORTION OF SIDEWALK Public State State Roads Dist. Project Federal Fiscal (N 71 °3 44 0'E ') 72 0' 6" VCP p ipe Ve nt D H 73 0 ' H PE 71 0' PE 6" VCP PE H D G u y BI Gu y I PE V. C. 12 " F. M. 6" M. F. 71 0' 6" M. F. 551 PE PE P DI 552 EX.R/W 5 6 1 2 9 29') 90. S39°48'E 1 ( 720' 4 D DD-MMM-YYYY HH: MM .45') 71 TCE ' 0 1 7 $USERNAME$ (S47°06'W 0' 71 720' 730' 7 1 0 ' PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 4 PHASE 1 - US 33 0 SCALE : J04C23C03-PLAN e 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY BEGIN PROJECT TO STA. 52+50 P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t4_01 .dgn 0' 71 7 20 ' 71 0' 12" V.C. 720' 730' T 740' WES P I 7 20 ' E TC TIER C. FRON , IN INIA G R I V 740' EX. R/W SMH Gu y LT ASPHA 73 0 ' MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E75 PE PE PE 73 0' 730' 740' /W EX. R 101 H B 71 0' V. C. 12 " F. M. 6" PE 71 0' 72 0' H /W EX. R HHHH GM P DI { BRIDGE PHASE 1 M GM CONSUMERS GAS UTILITY CO. (S 72 °W 720' TS RE H 6" 0' 71 TIC LAS P " 8 GM SMH 8" 8" GM TRACT 1 ' 0 1 7 ERIE 6" STL. GAS 16 5' ) ' 730 P 720' 73 0' ' 740 D EX.R/W INSURANCE 2 52 3 550 TMH 7 88 33 10 E86 71 0' 72 0' E X . M J H H H J WEST VIRGINIA, INC. H H D D TMH SMH IN C. ROANE 720' 00 -1 T7 1 / 6 92 H H BJ M Sig pole PJB VI RG IN IA , R/W 51 1 11 HJ WE ST FRONTIER 740' M M M P H B H H R / W 2014 243 (D) TRACT 2 R/ W EX.R/W 71 0' H H 1 H H H H H SMH P VC 8" FR ON TI ER M D D SMH WV E X . A P 8"VCP 4"W TIC LAS P 6" PJB 4 6 1 2 9 WM WM 0' 71 Sig pole PJB WM N39°W 70') ( STA. 49+27.83 RT.33 STA. 0+00.00 RT.119 50 GV GV 12.76 00 2 H P L A S T I C A H WM TRACT 1 PE H H H P R/W EX. U344-33- STP-0033- ' 0 1 7 B T HAL ASP E74 No. TCE PE 71 0' D WV 48 R/ W 12" CI (AB AND ONE D) 6 " 1 100 4 " W BEGIN PROJECT STA. 49+58.48 GV 03 -1 T7 H H PI 1 1 1 1 1 H ASPHALT GV SMH H R /W E X . M H H . Sta HH H H B 1 H H H 49 WM 1 PJB POT Sta. 549+50.00 WM M 2 6.6 1 + 49 M M H H . Sta T PO R/W EX. M B H H H HH HH M WM TRACTOR M H 0 0.0 0 + 48 HHH 06 -1 T7 RICHARD'S EX.R/W 3 B 3 6 1 2 9 GM L ERA LAT N A S ON ATI Y LOC CIT Y B WN O N UNK SALES Sig pole GV WM . ST PL R/ W 7 (N6 20' 9° E 5 1 720 ') ' 69 '(S ) BB J H C I T Y W O A F T E S R P E W N O C R E K R 74 S 0' 1 / 9 H H 9 0 1 7 2 ' 720 WM 2 .2 TR 71 0 ' WM WM 1 TSR E 720' v PJB R/ W Lpole WM G A S W A L K C O N C . M WENDY'S Sheets 71 0' E C O N S U M E R S E A S P H A L T E X . E H HH TS RE ( N2 0° W 47 ') Lpole 73 0' (N R / 7 8 E W ° 3 0 ' E R /J W E H 4 " E PJB GM 3 Total No. 6 " C . I . WV (S 5 ° 5 30 3 ' 'E ) W.V. Year 71 0' H E 7 4 0 ' 2 / 9 W P L A S T I 9 C 4 H ' ) E H E AE M 0 1 1 7 T No. Sheet County Project No. Div. Public State State Roads Dist. Project Federal Fiscal No. W.V. 3 Sheet Total No. Sheets E75 E86 County Project No. Div. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 0' 75 CURVE 33-1 DATA PARKING P.I. Sta. 58+11.90 DELTA R = 3,997.39' °40'W N51 ( W ' 0 3 ° 11 (S °E) (N39 (S) 37' W 08') 0'W 1 N45°1 ( R/W EX. R/W EX. SMH D SMH SMH D 8"W R/W EX. ) 64' °E (N39 D PHARMACY ' 0 4 7 TR A C T2 ' 30 7 H 1 1 H 1 { US ROUTE 33 4 55 P R C 730' END PROJECT STA. 54+35.47 CON C. WAL K ' 3 . 5 1 1 H ' 0 2 7 SMH D A T WES Sig pole PJB J H ER . NTI INC FRO A, INI G R VI PJB J W R/ X. E WV HSAN. PUMP STATION Sept tnk u ') 1 1 82. CHORD S40°55'E 1 ( { TEMPORARY DETOUR T = 46.04' P.I. Sta. 1+80.94 L = 86.96' PJB J DELTA ASPHALT R = 2,000.00' GRAVEL (S50°1 3'W 90.55') PARKING PT Sta. 2+29.37 7 20 ' P C V " 8 E TC SMH D EX. R/W TCE E E = 9.49' ' 0 72 C = 84.58' PARKING T = 48.44' L = 96.87' CURVE DET-8 DATA E = 0.59' C = 96.86' P.I. Sta. 554+09.42 DELTA E TC TCE CURVE 33/2-1 DATA J E DRIVE (CR 33/2) 4 R = 107.00' PJB ) E ' 3 ) 3 ' E 7. 8 2 7 . E ) 2 ' 2 1' 8 2 ° .8 W 2 6 ' 1 7 9 (S 0 W ° ' 1 2 3 2 ° (S 8 8 { WILLIAMS (N CURVE DET-7 DELTA PJB E 3890' R) ( P.I. Sta. 553+24.88 J EX. R/W u 10" VCP CURVE DET-7 DATA W / .R EX STMH GV H B "W 12 72 0' B 1D 2 W / .R EX 6 6 1 2 9 Sept tnk D CON C. WAL K CONSUMERS GAS UTILITY CO. 6" F.M . GE NE RA TO R 6" STL. GAS STMH 6 1 2 9 72 0' ' 0 3 7 Phone ped Phone ped H H J B J -7 H Sig pole BLOCK WALL B SMH D 2.50 PC Sta. 1+3 J 12"W CER F SPEN CITY O S K R WO WATER P 8"VC 730' PJB 6" F.M . 553 1 1 P E E D SMH D R = 107.00' T = 43.63' L = 82.85' CURVE 33/2-1 DD-MMM-YYYY HH: MM S t a . ASPHALT CURVE 33-1 $USERNAME$ 54 FRON TIER WEST VIRG (3-F INIA , IN .O. 7 C. 3 & 1 0 ' -COP PER) FRONT IER WEST VIRGI NIA, ING L. CAS 20" ST 55 8"VCP 5 5 3 + 53 1 57 STA. 55+20.82 RT. 33 STA. 1+03.31 WILLIAMS DR.56 12"W 6 5 . 7 9 CONC. WALK 24" RC P HH H Sig pole H INC. EX.R/W Sig pole 18" RCP PC Sta. 52+76.76 PC Sta. 552+78.83 H PJB J A C T1 2 TR Lpole /W EX.R A B 4') 64. N45°W 2 ( R / W 7 3 0 ' 30') 30'W S28° ( ' 30 7 CURVE DET-8 9 1 1 7 T ' 0 5 7 ' 0 4 7 TCE R / W 7') . E 76 S50° ( 7 5 0 ' C 6"PV MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E74 R/W EX. 73 06°E 52') S ( ' 1 STORY TCE 2 ER PENC OF S Y T I C RKS R WO WATE SMH TCE R / W W 8" WM H ' 0 4 7 ') °30'E 4 1 S1 ( 5 6 1 2 9 C = 1,060.82' . I . C WV 13 .9 'D EE P T HAL ASP E = 35.66' H P C V " 8 Lpole H L = 1,063.96' " 8 0' 74 0' 73 Lpole ) ' 0 6 D H T = 535.14' D 9') 85. 7 60 ' E = 8.55' C = 80.80' E SMH ( S37°37'51 "E 297. 63') 71 0' PARKERSBURG, WV PC Sta. 2+86.96 GOFF RUN 0' 1 7 SMH D THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 4 PHASE 1 - US 33 0 SCALE : J04C23C03-PLAN e 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY STA. 52+50 TO END PROJECT P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t4_02.dgn EXPOSED SMH D GV 7 1 0' 71 0' D E S O P X E 7 2 0 ' ' 20 7 7 20' D Public State State Roads Dist. Project Federal Fiscal (N 71 °3 44 0'E ') 72 0' PE 71 0' 71 0' PE PE H 29') 90. S39°48'E 1 ( 4 D DD-MMM-YYYY HH: MM .45') 71 TCE ' 0 1 7 $USERNAME$ 0' 71 720' 730' 7 1 0 ' PARKERSBURG, WV THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 4 PHASE 2 - US 33 0 SCALE : J04C23C03-PLAN e 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY BEGIN PROJECT TO STA. 52+50 P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t4_03.dgn 0' 71 7 20 ' 71 0' 12" V.C. 720' 730' T 740' WES P I 7 20 ' E TC TIER C. FRON , IN INIA G R I V 740' (S47°06'W SMH Gu y LT ASPHA 5 6 1 2 9 720' 730' 740' /W EX. R 101 H B P DI EX.R/W EX. R/W /W EX. R HHHH GM BI Gu y I M. F. M GM M. F. PE V. C. 12 " 6" 0' 71 TIC LAS P " 8 GM 6" VCP G u y 6" 8" GM 73 0 ' ' 0 1 7 ERIE H 8" PE 73 0' EX.R/W INSURANCE p ipe 6" VCP PE 71 0' 72 0' H H D H D IN C. TMH 7 88 33 10 SMH P DI 720' D TMH SMH D PE 51 71 0' 00 -1 T7 1 / 6 92 Ve nt END BRIDGE STA. 52+39.00 52 3 H SMH F. M. M M Sig pole PJB VI RG IN IA , WEST VIRGINIA, INC. 740' WE ST HJ R / W FRONTIER 6" H 1 H H H H H M M P H B E X . H H FR ON TI ER WM WM M D D SMH P VC 8" WM A P 8"VCP 4"W TIC LAS P 6" J BJ A 4 6 1 2 9 73 0 ' EX.R/W H PE TRACT 1 MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E77 PE PE 2 { BRIDGE PJB PJB GV GV E86 D 71 0' V. C. 12 " R/W H 1 11 Sig pole H WM CONSUMERS GAS UTILITY CO. (S 72 °W 720' TS RE 6" STL. GAS 16 5' ) ' 730 P 720' 73 0' ' 740 J H 0' 71 PE H H P R/W EX. ROANE ' 0 1 7 B BEGIN BRIDGE STA 49+87.00 2014 243 (D) 71 0' 72 0' E X . M H H 6 " 1 100 4 " W N39°W 70') ( 50 H D 48 12.76 00 TRACT 2 R/ W 71 0' 03 -1 T7 T HAL ASP U344-33- STP-0033- 2 H P L A S T I C PI 1 1 H H TRACT 1 WV SMH E76 No. TCE PE 12" CI (AB AND ONE D) STA. 49+27.83 RT.33 STA. 0+00.00 RT.119 BEGIN PROJECT STA. 49+58.48 GV R/ W PJB ASPHALT GV F. M. H H . Sta 1 1 1 49 WM 6" H R /W E X . H M H M 2 6.6 1 + 49 H B 1 H H H M B H H H HH HH M WM HH H H . Sta T PO HHH M H M M H 0 0.0 0 + 48 R/W EX. 1 63'-0" WM TRACTOR OUT TO OUT 06 -1 T7 RICHARD'S EX.R/W 3 B 3 6 1 2 9 GM L ERA LAT N A S ON ATI Y LOC CIT Y B WN O N UNK SALES Sig pole GV WM . ST PL R/ W 7 (N6 20' 9° E 5 1 720 ') ' 69 '(S ) BB J H C I T Y W O A F T E S R P E W N O C R E K R 74 S 0' 1 / 9 H H 9 0 1 7 2 ' 720 WM 2 .2 TR 71 0 ' WM WM 1 TSR E 720' v PJB R/ W Lpole WM G A S W A L K C O N C . M WENDY'S Sheets 71 0' E C O N S U M E R S E A S P H A L T E X . E H HH TS RE ( N2 0° W 47 ') Lpole 73 0' (N R / 7 8 E W ° 3 0 ' E R /J W E H 4 " E PJB GM 3 Total No. 6 " C . I . WV (S 5 ° 5 30 3 ' 'E ) W.V. Year 71 0' H E 7 4 0 ' 2 / 9 W P L A S T I 9 C 4 H ' ) E H E AE M 0 1 1 7 T No. Sheet County Project No. Div. Public State State Roads Dist. Project Federal No. W.V. 3 Fiscal Sheet Total No. Sheets E77 E86 County Project No. Div. Year No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 0' 75 CURVE 33-1 DATA PARKING P.I. Sta. 58+11.90 DELTA R = 3,997.39' °40'W N51 ( W ' 0 3 ° 11 (S °E) (N39 (S) 37' W 08') 0'W 1 N45°1 ( R/W EX. R/W EX. SMH D SMH SMH D 8"W R/W EX. ) 64' °E (N39 D PHARMACY ' 0 4 7 TR A C T2 ' 30 7 H 1 1 H END PROJECT STA. 54+35.47 1 1 P E E D ' 3 . 5 1 1 H ' 0 2 7 SMH D ER . NTI INC FRO A, INI G R VI PJB J W R/ X. E WV HSAN. PUMP STATION Sept tnk u ') 1 1 82. CHORD S40°55'E 1 ( PJB J E E 3890' R) ( P.I. Sta. 1+80.94 PJB J DELTA ) E ' 3 ) 3 ' E 7. 8 2 7 . E ) 2 ' 2 1' 8 2 ° .8 W 2 6 ' 1 7 9 (S 0 W ° ' 1 2 3 2 ° (S 8 8 { WILLIAMS (N ASPHALT 2 R = 2,000.00' DRIVE (CR 33/2) 4 GRAVEL (S50°1 3'W 90.55') PARKING PT Sta. 2+29.37 7 20 ' E TC P C V " 8 E TC SMH D EX. R/W TCE TCE CURVE 33/2-1 DATA PJB J E ' 0 72 PARKING T = 48.44' L = 96.87' E = 0.59' C = 96.86' $USERNAME$ u 10" VCP GV H B EX. R/W B Sept tnk 12"W W / .R EX 6 6 1 2 9 6" F.M . W / .R EX 72 0' CONSUMERS GAS UTILITY CO. 1D "W 12 STMH CON C. WAL K 6" STL. GAS STMH D 6 1 2 9 72 0' T WES Sig pole PJB J H Phone ped Phone ped H BLOCK WALL J B J -7 H Sig pole ' 0 3 7 A B SMH H 6" F.M . 12"W D CER F SPEN CITY O S K R WO WATER D 2.50 PC Sta. 1+3 J SMH P 8"VC 730' PJB CURVE 33-1 DD-MMM-YYYY HH: MM 730' { US ROUTE 33 CON C. WAL K FRON TIER WEST VIRG (3-F INIA , IN .O. 7 C. 3 & 1 0 ' -COP PER) FRONT IER WEST VIRGI NIA, 1 ASPHALT 8"VCP 55 54 53 ING L. CAS 20" ST 1 57 STA. 55+20.82 RT. 33 STA. 1+03.31 WILLIAMS DR. 6 5 CONC. WALK 24" RC P HH 18" RCP H Sig pole H INC. EX.R/W GE NE RA TO R PC Sta. 52+76.76 H PJB J Sig pole Lpole /W EX.R A B 4') 64. N45°W 2 ( R / W 7 3 0 ' 30') 30'W S28° ( ' 30 7 A C T1 2 TR 9 1 1 7 T ' 0 5 7 ' 0 4 7 TCE R / W 7') . E 76 S50° ( 7 5 0 ' C 6"PV MATCH LINE STA. 52+50 US ROUTE 33 SEE SHEET E76 R/W EX. 73 06°E 52') S ( ' 1 STORY TCE 2 ER PENC OF S Y T I C RKS R WO WATE SMH TCE R / W W 8" WM H ' 0 4 7 ') °30'E 4 1 S1 ( 5 6 1 2 9 C = 1,060.82' . I . C WV 13 .9 'D EE P T HAL ASP E = 35.66' H P C V " 8 Lpole H L = 1,063.96' " 8 0' 74 0' 73 Lpole ) ' 0 6 D H T = 535.14' D 9') 85. 7 60 ' CURVE 33/2-1 E SMH ( S37°37'51 "E 297. 63') 71 0' PARKERSBURG, WV PC Sta. 2+86.96 GOFF RUN 0' 1 7 SMH D THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALTERNATIVE 4 PHASE 2 - US 33 0 SCALE : J04C23C03-PLAN e 20 ft. PLAN SHEET REVISION SHEET NUMBER NUMBER REVISION DATE BY STA. 52+50 TO END PROJECT P: \PR5331 3\cadd\RDY_PLN_CRBB_Al t4_04.dgn EXPOSED SMH D GV 7 1 0' 71 0' D E S O P X E 7 2 0 ' ' 20 7 7 20' D Public State State Roads Dist. Project Federal No. W.V. 3 Year Sheet Total No. Sheets E78 E86 No. U344-33- STP-003312.76 00 2014 ROANE 243 (D) 732.15 733.16 734.17 735.18 736.19 737.20 738.08 738.95 739.83 740.70 741.58 742.45 743.33 744.20 745.08 745.95 747.07 Div. Fiscal County Project No. 770 770 765 765 760 760 755 755 750 V.P.I. Sta. 549+64.71 750 Elev. = 746.311 745 PROFILE GRADE LINE US 33 745 -3.5 00 % -3.5 00 % V.P.I. Sta. 552+25.79 Elev. = 737.173 740 740 V.P.I. Sta. 549+98.40 -3.5 00 % Elev. = 745.131 735 -4.0 45 % 735 SEE ALTERNATIVE 4 SITUATION PLAN FOR STRUCTURE DETAILS 730 730 725 725 551+00 553+00 730.77 731.5 731.89 728.0 728.20 728.4 728.23 724.6 552+00 554+00 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 5 ft. DIVISION OF HIGHWAYS SCALES 0 ALTERNATIVE 4 PHASE 1 - US 33 0 PARKERSBURG, WV J04C30C03-PROFILE c PROFILE SHEET 20 ft. REVISION SHEET NUMBER NUMBER REVISION DATE BY $USERNAME$ 695 STA. 549+50 TO STA. 554+40 P: \PR5331 3\cadd\RDY_PRO_ALT4_PHI _01 .dgn 550+00 716.98 695 716.0 700 717.13 700 715.4 705 709.85 705 708.7 710 717.33 710 719.1 715 733.57 715 744.7 720 747.07 720 DD-MMM-YYYY HH: MM EXISTING GROUND 71 0' H H 6" VCP pi p e Ve n t D PC Sta. 52+76.76 H H PE 71 0' H H Sig pole CONC. WALK 1 H H ST.R/W EXI Lpole H 73 0 ' 7 3 0 ' R / W 2 TRACT 1 9 1 1 7 T END APPROACH SLAB 52+59.00 53 END BRIDGE STA. 52+39.00 52 51 R / W 54 1 PE OUT TO OUT H ' 0 3 7 6" F.M . J PE PE 6 6 1 2 9 E Sept tnk ') 1 1 82. CHORD S40°55'E 1 ( 29') 90. S39°48'E 1 ( ) ' 3 ) 3 . ' 7 8 2 7 . E ) 2 ' 2 1' 8 8 2 . ° W ' 16 72 9 (S 0 W ° 1' 2 3 2 ° 8 (S 8 (N 3890' R) ( 4 D 730' 735.63 736.56 737.50 738.43 739.36 740.30 .45') 71 (S47°06'W 741.23 742.17 743.10 744.04 744.97 SAN. PUMP STATION 720' P DI Sept tnk 10" VCP u CONSUMERS GAS UTILITY CO. EXIST. R/W 8" 740' 6" F.M . B M. F. E 71 0' D WV 6" STL. GAS 6" H 3 u 12 " 6" PJB EXIST. R/W 745.88 746.78 Sig pole PJB BLOCK WALL SMH 800 HJ I ' 0 3 7 PJB A BI FRON TIER WEST VIRG INIA (3-F , IN .O. C. 3 0 & 7 ' 1COPP ER) PE V. C. F. M. WEST VIRGINIA, INC. M. F. Guy PE 6" 5 6 1 2 9 J 73 0 ' Gu y 8" END PROJECT STA. 54+35.47 CON C. WAL K H D 71 0' 72 0' { US ROUTE 33 SMH P DI 730' 6" VCP PE 63'-0" J 73 0' TRACT 2 H PE PE TRACT 1 H H H H BJ FRONTIER IN C. R/W ST. EXI HHHH { BEARINGS ABUTMENT 2 2 720' GM 2 R/W 71 0' GM E86 TCE { PIER 2 TMH ERIE ROANE ASPHALT 740' VI RG IN IA , R/W ST. EXI Sig pole PJB WE ST CONSUMERS GAS UTILITY CO. 6" STL. GAS 71 0' SP RI NG V. C. 12 " F. M. CR EE K (S 72 °W TS RE 720' PE 720' 730 ' ' 740 J H 1 11 H A H FR ON TI ER 2014 R / W { BRIDGE PJB 4 6 1 2 9 U344-33- STP-03312.76 00 243 (D) TCE TRACT 2 { PIER 1 PJB WM HJ 16 5' ) ' 730 M H H H P L A S T I C 1 100 4 " W PE E79 No. 13 .9 'D EE P TCE R/ W 71 0' GV GV H 12" CI (AB AND ONE D) Sheets T HAL ASP TCE PE Total No. Lpole 0' 71 Sig pole BEGIN BRIDGE STA 49+87.00 H 1 H HH R/ W 3 Sheet County Year Lpole 2 N39°W 70') ( 50 BEGIN APPROACH SLAB STA. 49+67.00 WM TRACT 1 { BEARINGS ABUTMENT 1 STA. 49+27.83 RT.33 STA. 0+00.00 RT.119 BEGIN PROJECT STA. 49+58.48 WM 6" BB H 72 0' (N6 9° E 5 1 720 ') ' 69 '(S ) H SALES 1 PJB ASPHALT INSURANCE P C I T Y MA W O A I F N T E S R P E W N O C R E K R 74 S 0' NO RT H R / W L ERA LAT SAN N O ATI Y LOC CIT BY N W O N UNK TRACTOR EXIST. R/W 6 " 1 1 1 1 1 R/ W RICHARD'S E X I S T . H PI HH H H 72 0' C O N S U M E R S ST . W A L K C O N C . J E X I S T . M H H M 2 6.6 1 + 9 . 4 Sta H M H M M H B DRAULIC HY DATA AT NORTH MARKET ST. SPRING CREEK 780 HWE 252'-0" OUT TO OUT OF PAVING NOTCH 250'-0" C/C BEARINGS { ABUTMENT 2 { PIER 2 75'-0" 100'-0" 75'-0" 721.61 723.11 2.63 3950 Q25 722.45 723.95 2.06 4500 Q50 723.90 725.40 2.64 5430 Q100 725.02 726.52 2.64 6200 DRAINAGE AREA = 39.6 SQ. MI. 740 WATERWAY OPENING = 575 SF PROPOSED GRADE 3. 74 % BASED ON SLOPE OF *ESTIMATED STREAM FOR RUBY BRADLEY. EXISTING GROUND I NTEGRAL Q50 Q100 Q(CFS) Q10 EXISTING AND I NTEGRAL V(FPS) DD-MMM-YYYY HH: MM 760 { PIER 1 * HWE 2: 1 t Q10 Q25 1 2: $USERNAME$ 720 NORMAL POOL ESTIMATED TOP 700 OF ROCK. TYP. SPRING CREEK EW EW 20 ft. EXISTING STRUCTURE TO BE DEMOLISHED IN PHASE 2. 0 20 ft. DESIGNED 51+00 52+00 DATE MWL 7/14 733.7 734.9 735.7 733.2 713.6 71.8 713.7 708.0 705.0 708.6 745.5 746.7 747.7 748.2 736.0 50+00 714.65 t - 3'-0" FOUNDATION PROTECTION TYP. 49+00 NUMBER 53+00 DRAWN ASG DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 7/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT SITUATION PLAN ALTERNATIVE 4 SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV J04C22C03 - BRIDGE b REVISION DIVISION OF HIGHWAYS 0 640 SHEET NUMBER SCALES 680 660 REVISION P: \PR5331 3\cadd\str_l ay_si tpl an Al t. 4.dgn { ABUTMENT 1 719.7 1 G A S A S P H A L T E E H H v R / W H 1 / 9 No. W.V. ' 720 49 { US ROUTE 119 .2 TR 71 0 ' 3 B 3 6 1 2 9 2 1 TSR E 9 0 1 7 2 GM Fiscal 32.50 PC Sta. 1+ R/ W . ST PL Project Federal 720' Sig pole WM State Dist. Div. TS RE Lpole State Roads Project No. ( N2 0° W 47 ') PJB Public Public State State Roads Dist. Project Federal Div. No. W.V. 3 Fiscal Sheet Total No. Sheets E80 E86 County Project No. Year No. U344-33 STP-0033 12.76 00 (243)D 2014 ROANE 63'-0" { EXISTING US ROUTE 33 2'-0" 2'-0" 11'-0" 11'-0" 12'-0" LANE LANE LANE LANE SHOULDER 5'-6" 8" REINFORCED CONCRETE DECK 16'-9" 2 % 1'-0" 1 '-6" 12'-0" 9•" 6" SHOULDER 5'-6" 6" 2 % 2'-0" 6 SPA. @ 9'-0" = 54'-0" 4'-6" 5/4/201 5 1 0: 1 0: 02 AM COMPLETED TYPICAL SECTION $USERNAME$ 4'-6" REVISION SHEET NUMBER NUMBER REVISION DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DESIGNED DATE MWL 6/14 DRAWN ASG 7/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT COMP.TYPICAL SECTION ALTERNATIVE NO. 4 SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV P: \PR5331 3\cadd\str_typ_phased const.dgn 1'-0" Public State State Roads Dist. Project Federal Div. No. W.V. 3 Fiscal Sheet Total No. Sheets E81 E86 County Project No. Year No. U344-33 STP-0033 12.76 00 (243)D 2014 ROANE 100'-2" { EXISTING US ROUTE 33 2:1 TEMPORARY 25'-3" PERMANENT 28'-0" 63'-0" 1 0: 1 0: 03 AM 8'-0" 5/4/201 5 ABUTMENT 1 $USERNAME$ 4'-2" REVISION SHEET NUMBER NUMBER REVISION DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DESIGNED DATE MWL 6/14 DRAWN ASG 6/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT ABUTMENT 1 ALTERNATIVE NO. 4 SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV P: \PR5331 3\cadd\str_typ_phased const.dgn 8'-0" Public State State Roads Dist. Project Federal Div. No. W.V. 3 { EXISTING Fiscal Sheet Total No. Sheets E82 E86 County Project No. Year No. U344-33 STP-0033 12.76 00 (243)D 2014 ROANE US ROUTE 33 63'-0" 12'-0" LANE LANE LANE 5'-6" 2'-0" 56'-0" A 54'-0" 8'-0" 10'-0" PERMANENT PIER 1 0: 1 0: 03 AM 16'-9" 11'-0" A SECTION A-A TEMPORARY BENT 5/4/201 5 LANE 11'-0" $USERNAME$ 2'-0" 12'-0" REVISION SHEET NUMBER NUMBER REVISION DATE BY THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DESIGNED DATE MWL 6/14 DRAWN ASG 6/14 COL. RUBY BRADLEY BRIDGE REPLACEMENT TEMPORARY BENT ALTERNATIVE NO. 4 SHEET CHECKED OF BRIDGE NO. CHECKED PARKERSBURG, WV P: \PR5331 3\cadd\str_typ_phased const.dgn 5'-6" Public State State Roads Dist. Project Federal 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 Div. No. W.V. 3 130 Fiscal Sheet Total No. Sheets E83 E86 County Project No. Year No. U344-33- STP-003312.76 00 140 2014 ROANE 243 (D) 150 160 750 750 733.97 740 EX.R/W 760 EX.R/W 760 1 . 5 : 1 740 / / E. P. 730 728.18 / / / / / / / / 730 DATE E. P. 2: 1 BY 720 750 AREAS CHECKED 750 NO. AREAS 710 / / / / / NOTE BOOK SURVEY 710 / / / / / FI NAL SURVEYED PLOTTED TEMPLATE 553+00 1 2: 740 2: 1 E. P. 552+50 710 710 700 700 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 4 PHASE 1 - US 33 SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 552+50 TO STA. 553+00 $USERNAME$ 720 P: \PR5331 3\cadd\RDY_XSC_US33_ALT4_PHI _01 .dgn 720 DD-MMM-YYYY HH: MM 730 728.22 E. P. 730 EX.R/W 740 735.99 EX.R/W AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY DATE 720 Public State State Roads Dist. Project Federal Fiscal 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 3 130 Sheets E84 E86 No. U344-33- STP-00332014 12.76 00 140 ROANE 243 (D) 150 160 / 100 W.V. Total No. / / / / / AREAS / / / / 110 No. Year AREAS CHECKED NO. NOTE BOOK SURVEY / / / / / / / / / / 760 750 750 2: 1 730 731.05 E. P. E. P. 730 720 SEE ALTERNATIVE 1A 720 DD-MMM-YYYY HH: MM 740 $USERNAME$ 732.75 740 EX.R/W 760 EX.R/W FOR US 33 553+50 PROFILE SHEET 710 710 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 4 PHASE 1 - US 33 SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 553+50 P: \PR5331 3\cadd\RDY_XSC_US33_ALT4_PHI _01 .dgn AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY DATE FI NAL BY SURVEYED PLOTTED TEMPLATE DATE 120 Div. Sheet County Project No. Public State State Roads Dist. Project Federal 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 50 60 70 80 90 100 110 120 Div. No. W.V. 3 130 Fiscal Sheet Total No. Sheets E85 E86 County Project No. Year No. U344-33- STP-003312.76 00 140 2014 ROANE 243 (D) 150 160 760 750 750 E. P. 1 2: EX.R/W 730 E. P. 730 740 2: 1 733.99 740 733.76 EX.R/W 760 720 720 / / / / / / / / / / 710 710 700 700 760 760 750 750 AREAS CHECKED NO. AREAS NOTE BOOK SURVEY / / / / / / / / / / EX.R/W 710 710 700 700 50 60 70 80 90 100 110 120 130 140 150 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 4 PHASE 2 - US 33 SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 52+50 TO STA. 53+00 $USERNAME$ 720 52+50 DD-MMM-YYYY HH: MM 730 P: \PR5331 3\cadd\RDY_XSC_US33_ALT4_PHI I _01 .dgn 720 E. P. E. P. 1 2: 730 740 2: 1 735.66 740 735.63 EX.R/W AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY DATE FI NAL SURVEYED PLOTTED TEMPLATE BY DATE 53+00 Public State State Roads Dist. Project Federal Fiscal 120 110 100 90 80 70 60 50 40 30 40 50 60 70 80 90 100 110 120 130 2014 12.76 00 140 ROANE E86 243 (D) 150 160 EX.R/W 730.03 EX.R/W 740 730 1 2: E. P. 730.08 / / 30 U344-33- STP-0033- 750 E. P. / / / / / / / 20 E86 No. 720 760 760 750 750 AREAS CHECKED 710 NO. AREAS 710 / / / / / NOTE BOOK SURVEY SURVEYED PLOTTED TEMPLATE BY 54+00 EX.R/W 720 730 SEE ALTERNATIVE 1A 720 FOR US 33 53+50 PROFILE SHEET 710 50 60 70 80 90 100 110 120 130 140 150 710 160 THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION 10 ft. DIVISION OF HIGHWAYS ALTERNATIVE 4 PHASE 2 - US 33 SCALES 120 110 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 0 CROSS-SECTION SHEET 10 ft. 0 J05C07C03-XSECT2 b REVISION NUMBER SHEET NUMBER REVISION DATE BY STA. 53+50 TO STA. 54+00 P: \PR5331 3\cadd\RDY_XSC_US33_ALT4_PHI I _01 .dgn E. P. 1 2: $USERNAME$ 2: 1 DD-MMM-YYYY HH: MM 740 E. P. 730 732.08 740 731.89 EX.R/W AREAS CHECKED NO. AREAS PLOTTED TEMPLATE NOTE BOOK SURVEY ORI GI NAL SURVEYED BY / / / / / FI NAL 10 3 Sheets 750 720 DATE 0 W.V. Total No. 760 730 / 10 No. Year 760 740 DATE 20 Div. Sheet County Project No. Design Study Report Final Submission Colonel Ruby Bradley Bridge, Spencer, WV May 6, 2015 APPENDIX F COMMENTS AND RESPONSES FROM FIELD AND OFFICE REVIEWS Project No. 53313 WEST VIRGINIA DEPARTMENT OF TRANSPORTATION Consultant: Burgess & Niple Rodney Holbert Matt Lewellyn Steph Chevalier DIVISION OF HIGHWAYS RUBY BRADLEY FIELD REVIEW DESIGN STUDY FIELD REVIEW MEETING COMMENTS AND RESPONSES 1. Utilities and Right-of-way a. Comment: Review Date: September 4, 2014 Response: Project Number: Federal Project No.: U334-33-12.76 00 STP-0033(243) D b. Comment: Description of Project: Colonel Ruby Bradley Bridge Design Study Spencer, West Virginia Response: Consumers Gas indicated that 6” gas line that is located below the bridge is a one-way feed and needs to be maintained throughout the project. No action needed by B&N. The overhead lines paralleling the upstream edge of the bridge consist of power (First Energy) on the top, with three fiber optics lines (Frontier), three coper telephone lines (Frontier), Cable TV, and a city owned 110V Christmas light feed. No action needed by B&N. Participants: c. Comment: WVDOT: Chuck Bartley, R/W Dir Ahmed Mongi, DDI (Bridges) Feras Tolaymat, DDR Cliff Essig, D3 (Bridge) Mike Foley, D3 (Construction) Brian Kucish, D3 (Construction) Harry Hutchinson, D3 (Construction) Jared Evans, D3 (Construction) George Chappell, DDI (Geotech) Sondra Mullins, DDI (Environmental) Randy Epperly, DDE (Environmental) Don Meadows, DT Deanna Dehere, DT Brad Fallecker, DDR City of Spencer Rob Miller, Public Works Consumers Gas Jerry Watson Benny Caper Response: d. Comment: Response: Frontier commented that the high tension power line near Williams Drive Extension would likely be costly to relocate. No action needed by B&N. B&N to provide updated utility mapping once verifications are received. WVDOT to provide utility and right-of-way cost estimates. The utility mapping is updated. Utility and R.O.W. costs have been provided byWVDOT are included. 2. Geotechnical Overview a. Comment: Response: In the last sentence, George Chappell commented to not state that all alternatives will use spread footings on rock for the piers and abutments on H-Piles. George commented that this was a premature statement (prior to soil borings). He stated not to state at this point. The sentence was revised to not mention spread footings or H-piles. 3. Design Criteria Frontier Communications B.J. Miller a. Comment: Lumos Networks Brad Payne Bob Durham Page 1 of 7 Response: Add PROWAG 2014 to the specifications. PROWAG 2014 was added to the specifications. Page 2 of 7 4. Environmental Overview h. Comment: a. Comment: Under the first bullet change the “The existing bridge is listed” to “The existing bridge is eligible for registration for”. Response: The sentence was revised to say “The existing bridge is eligible for registration for”. Page E19: Please assume a vertical wall to minimize cut on the loading dock and add a frontage road to connect to the loading dock for the National Guard. Please check that large trucks can make the turns at the loading dock. Cliff Essig indicated the loading dock at the National Guard Building could be reconstructed on a skew to accommodate Alternative 3. Response: A retaining wall was evaluated but was found to not supply adequate room for large trucks. The loading dock will need to be reconstructed at 90°. Comment: Cliff Essig indicated that it may be possible to add a pedestrian walkway between Tractor Supply and the Tutors Biscuit to connect the pedestrian bridges. This could be used an alternate route during construction of the bridge. Response: This possible pedestrian walkway was mentioned in the narrative. Comment: Should the existing 12” aerial sewer line be considered in the hydraulics? Is this line in service? Could it be removed to improve the hydraulics? The mapping indicates it is abandoned. Response: The 12” aerial sewer line is not in service and should be removed as part of the project. 5. Alternatives i. a. Comment: Response: Alternate 1A – Please change Alternate 1A to the actual rehabilitation option instead of the widening option. Provide narrative discussion of the constructability issues and lack of meeting the purpose and need (traffic flow and durability). No cost estimate is needed. Alternative 1A was replaced with the rehab (no widening) option. Durability and traffic issues were mentioned in the discussion. j. b. Comment: Response: d. Comment: Cliff Essig prefers that the abutments would not be re-used in Alternative 4. Matt Lewellyn explained that re-using the abutments would reduce the amount of time the traffic would need to be maintained in the temporary condition. The existing abutments will not be used for Alternative 4. k. Comment: Cliff Essig prefers clear coating on substructures. Ahmed Mongi indicated that the epoxy concrete protective coating has been used successfully on many bridges around the state and has become the standard. l. Response: e. Comment: Response: Bridge details such as spans, length, and out-to-out width were provided in the narrative. Comment: Alternative 1A – In the description of Alternate 1A it mentions that four new spread box beams will be constructed, but pages E45 and E46 show the construction of 3 new box beams. Response: No action needed (Alternate 1A has been changed to rehab only). No action needed by B&N. Chloride ion sampling and testing was performed by state forces. The results indicate the bridge substructures are highly contaminated and extraction of the chlorides is not possible. Consider cost increases to Alternative 1A. WVDOT Materials Division will provide a report to summarize the results. Response: The construction cost of the rehabilitation was not increased due to the contamination, but on-going maintenance cost would increase over time. Comment: On sheet 4, first paragraph, change analysis of the existing beams with the deck removed is “recommend” to “required and likelihood of passing is unknown at this time”. Response: The sentence was revised m. Comment: Response: n. Comment: f. Response: g. Comment: Response: Use 3’ thick foundation protection. In the narrative for the existing conditions and all the proposed alternates please provide more details about the bridge like the length, spans, etc. o. Comment: Alternative 2 – Does the 175 foot long temporary bridge have any piers, if so please state in the narrative. The temporary bridge does not have any piers. Noted as single span. Alternative 3 – Should there be any mention of the other bridge on Williams Drive crossing Goff Run. Will that bridge be able to take the detour traffic. Discussion added to report. This bridge should be adequate as it is a modern pre-cast slab bridge. Alternative 4 – the 4th line of the description has the word “new” repeated twice. WVDOH does not agree with the option of reusing the existing abutments for Alternate 4. Drawings and calcs were revised to show 3’ thick foundation protection. Response: Page 3 of 7 The sentence was revised. The existing abutments will not be re-used. Page 4 of 7 b. Comment: p. Comment: Response: Table 2 – Add the bridge detail, width, length, span etc. The width, length and span length of each alternative was added to Table 2. Response: Please verify the cost of roadway paving and subgrade, concrete sidewalk and curb and gutter for Alternate 4. The quantities are revised based on the revised layout. 6. Traffic 9. Drawings a. Comment: Revise drawings to provide a minimum of 10’ lanes for the temporary condition. a. Comment: Response: Drawings were revised to provide 10’ min. temporary lanes. Response: b. Comment: Cliff Essig and Mike Foley prefer 12’ lanes for the permanent condition. The Typical Section has been revised to two 12’ outside lanes and two 11’ inside lanes (46’) on the bridge with two 2’ shoulders for a total curb to curb width of 50’. b. Comment: Response: Response: An analysis of the temporary signal phasing will need to be performed. It is assumed WVDOT Traffic Engineering will be performing this analysis. Response: Response: Response: e. Comment: Response: On sheet E19, show the upstream bridge barrier as a straight line without a kink. The upstream bridge barrier was changed to a straight line. On sheet E31, add a short vertical sag curve going from the 2% to the 4% near the intersection with US 119. A vertical sag curve was added at this location near US 119. Results of the analysis have not been provided to B&N to date. d. Comment: d. Comment: The drawings were re-organized by alternative and number. The drawings were revised to show two 11-foot lanes and two 12-foot lanes. c. Comment: c. Comment: The drawings are hard to follow. Group the drawings by alternative and renumber. The turning radius onto the bridge from US 119 will be tight in the temporary condition. Verify that it can be accomplished. The turning radius from US 119 on to the bridge was evaluated and a larger radius was used to accommodate. Response: e. Comment: Please Label the Station for Begin and End project and Begin and End Bridge on all plan sheets. Stations for Begin & End Project and Begin & End Bridge were added to all plan sheets Please show all Station Equations at the intersection of two centerlines. Response: Station equations were show at intersections of two centerlines Comment: Please label all curves and show curve data. Response: Curve data was added to all plan sheets. g. Comment: Please label the temporary detour bridges. Add discussion that an incentive/disincentive clause will be used for Alternative 4. An incentive/disincentive clause was mentioned in the write-up. f. 7. Bridge Aesthetics and Lighting a. Comment: Response: Cliff Essig likes the idea of staining the concrete in the form lined areas. The form lined concrete will be stained. h. Comment: 8. Cost (Appendix C) a. Comment: Response: Response: For Alternative 1A, has the cost of the rehabilitation of the existing structure been added. Response: The temporary detour bridges were labeled. Sheet E24, At Begin project location, the existing and proposed profile should match. The existing and proposed profiles were changed to match. Yes, the cost was included. Page 5 of 7 Page 6 of 7 10. Alternates a. Comment: Response: b. Comment: Response: c. Comment: Response: d. Comment: Response: Alternate 2 – Please make the detour upstream on Alternate 2. Revised: Alt. 2A has downstream detour and Alt. 2B has upstream detour. Alternate 3 – Please add a left turn lane from US 119 onto the new Williams Drive Extension Bridge. Please show the storage lane and taper stripe for the left turn. Striping was added to the traffic control sheet to show the left turn lane. Under Section 3.12 “Other Considerations” add a paragraph regarding looking at the one lane temporary detour behind the save-a-lot (location of old truss bridge), and dismiss this option for temporary traffic control because of narrow lanes and impacts to save a lot and the lumber facility. A discussion was added regarding the 1-lane detour behind Save-A-Lot Alternate 4 – Under the temporary conditions Phase I, an additional lane will be required where the detour meets with US Route 33. An additional lane was added to all alternatives that use an upstream temporary detour. Page 7 of 7 Response: WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RUBY BRADLEY FIELD REVIEW DESIGN STUDY OFFICE REVIEW MEETING The geotechnical overview has been reworked. 3. Comments from Dave Cramer, CD (Director of Economic Development) provided via red marks. a. Comment: Response: Various red marks were provided on the word usage, punctuation, etc. Return set with final submission. The markup set will be returned with the final submission. Various marks were corrected. COMMENTS AND RESPONSES b. Comment: On page 1, is the bridge on the national register for historic structures? The bridge is eligible for registration. Discussion was added to page 1. Review Date: February 12, 2015 Response: Project Number: Federal Project No.: U334-33-12.76 00 STP-0033(243) D c. Comment: Response: Description of Project: Colonel Ruby Bradley Bridge Design Study Spencer, West Virginia d. Comment: Participants: Response: Rubina Tabassum, DDR Cliff Essig, D3 (Bridge) Joe Carte, DDI (Geotech) Brad Fallecker, DDR WVDOT: Consultant: Burgess & Niple Matt Lewellyn Steph Chevalier 1. Utilities and Right-of-way a. Comment: Response: e. Comment: f. All verifications have been received. Joe Carte provided an example geotechnical overview from another project. B&N to rework the overview to include available information from WVGS and WVDEP (TAGIS) webpages concerning coal bed mapping, mining permits, oil and gas wells. Reference a geological map of the state. The goal should be to avert any potential issues prior to the span arrangement with slips, mining, and oil/gas wells. Page 1 of 5 The green line shows a potential detour option. A note was added to the location map. On page 3, add last bullet under environmental overview, “Environmental Justice/Title VI Community Review. Roane County is considered a distressed county by the Appalachian Regional Commission (ARC). “ Comment: On page 3, under No Build Option, address what the eventual failure would be in respect to – operations, congestion, etc? Response: Discussion was added regarding failure. Response: h. Comment: i. On page 1, what is the green, dashed line on the map? Can we use a map that identifies Spring Creek? The above bullet point was added to page 3. 2. Geotechnical Overview a. Comment: The current ADT of 10,300 was added in the discussion on page 1. Response: g. Comment: Brad Fallecker commented that if we are waiting on any utilities to provide verification to let him know and he would follow up. B&N thought all verifications were received, but will verify and revise comment on sheet 5 as needed. On page 1, what is the current ADT? On page 3, under Alternative 1A, address why particular care would be needed during demolition of the deck. Is it for contaminated debris falling into the stream, protecting the beams, etc.? Discussion was added describing why care would need to be taken when removing the deck. On page 4, under Alternative 1A, any estimate of the significant ongoing maintenance costs? This was discussed at the meeting and how an estimate of maintenance costs is beyond the scope of this study. Ruby Tabassum will check to see if any maintenance/life cycle costs should be included. Response: Maintenance and life cycle costs will not be included. Comment: On page 6, under Bicycle Facilities, are bicycle facilities needed? If not, why? This was discussed at the meeting. B&N will revise this section to state that although dedicated bicycle lanes have not been included, the bicycles are accommodated within the proposed typical Page 2 of 5 section by using wider 12 foot lanes and two foot shoulders. B&N to verify statement complies with AASHTO Guide Specs and DDs. Response: Section revised to discuss how bicycles will be accommodated. Response: 7. Temporary Traffic Control a. Comment: 4. Project Description and Purpose a. Comment: In the 3rd paragraph, add “The bridge was originally designed for two-lanes of traffic and was converted to three-lanes in the 2000’s.” In the 4th paragraph, replace “truck” with “vehicular” as the detour really is not practical for either. Response: b. Comment: Response: The above revisions were made. The above revisions were made. B&N will perform a Synchro model of the temporary condition to confirm the LOS is acceptable to WVDOT. Include results in final study report. The results of the analysis are included in the report. Add, “The turning radius during the construction of Alternative 1B will be an issue for trucks coming from US 119. The proposed structure would need to be flared to accommodate this increasing the cost of the alternative.” 5. Design Criteria Response: a. Comment: The above sentence was added. nd In the 2 paragraph, replace two 11’ “turning” lanes with “inside” lane. They may be through lanes in some cases. 8. Bridge Aesthetics and Lighting Response: “Turning lanes” was changed to “inside lanes”. a. Comment: Cliff Essig commented that aluminum light posts and railing should be considered. 6. Alternatives Response: a. Comment: Response: Alternate 1A – Add discussion that 1A using the three 10’ lane configurations. Add discussion that it does not meet the “purpose and need” of the project. Discussion was added about lane configuration and about not meeting the purpose and need. 9. Conclusions a. Comment: Response: b. Comment: c. Comment: So noted Alternative 4 – Should we be included the cost of the incentive in the cost estimate? Ruby Tabassum will check with Steve Jarrell about the cost used on the Bassinette Bridge. Response: Response: 4th bullet point, appears use of 2A and 2B are reversed. Yes, it was reversed. The order was revised. Alternative 1B – Cliff Essig mentioned that if a closure pour is used, he would prefer for the longitudinal construction joints to located overtop of the girders – a beam-to-beam closure pour. b. Comment: Response: Discussion of aluminum lights and rails was added. WVDOT will hold another meeting to discuss the preferred alternative and provide further direction to B&N. Cliff Essig indicated there is a local preference for Alternative 3. He feels the hydraulic issues of the Williams Drive Extension Bridge should be confirmed prior to making a selection. Cliff also presented schematics of a few other possible alternatives to accommodate a new bridge (fly-over bridge and bridge connecting to a roundabout). A preferred alternative will not be selected at this time. An incentive cost will not be included. 10. Cost (Appendix C) d. Comment: Response: e. Comment: Chloride ion sampling and testing was performed by state forces. WVDOT Materials Division will provide a report to summarize the results. Ruby Tabassum will send the report to B&N. Reference report in narrative. The memorandum was referenced in the report. On sheet 8, under Impact During Construction, Alternative 4, change to “Low, due to shorter duration”. Under Hydraulic Performance, Alternatives 1B and 4, revise to “Best, Less Impact from Temporary Structure.” Page 3 of 5 a. Comment: Response: b. Comment: Response: For Alternative 4, why is the cost of the sidewalk and curb and gutter so much lower than the other alternatives? The cost should be the same as for Alternatives 2A & 2B. Quantities were revised. Add cost of overlaying the entire length (full-width) of Williams Drive to Alternative 3. The cost of full-length full-width overlay on Williams Drive was added to the cost estimate. Page 4 of 5 11. Drawings a. Comment: Response: b. Comment: Response: c. Comment: Response: d. Comment: Response: e. Comment: Response: On sheet E12 and E13, the station equation does not match the stationing shown. Check this on all plan sheets, all alternatives. The stations were checked and revised if needed. All profile sheets: provide the existing elevations on the same interval as the proposed elevations. Updated to show existing elevations on the same interval as the proposed elevations. On sheet E15, end project label does not match the station location it points to. Check all. Sheet E15 was updated. Other sheets checked for same error. On sheet E16, the grid station labels do not match plan sheet labels on sheet E12. Check all. All sheets checked and revised if needed. Check all plan sheets for spelling of “Goff Run”, not “Golf”. All sheets were checked for spelling and revised if needed. Page 5 of 5