AESO Transmission System Projects - Quarterly Report - Q4 2014
- see notes at the end of this document for report terminology and definitions
Project Name and Number
Need
Application
Filing
Need Application
Approval
Need
Application
Estimated Cost
TFO
ATCO
737 - North South Transmission Reinforcement
CTI
Dec 09, 2009
CTI
AltaLink
AltaLink &
EPCOR
Facility
Application
Number
1
3
2
1
AltaLink
786 - Edmonton Region 240kV Line Upgrades
Aug 26, 2008
Feb 24, 2009
$125.41M
EPCOR
787 - Southern Alberta Transmission Reinforcement
AESO Transmission System Projects - Quartery Report - Q4 2014
Dec 30, 2008
Sep 17, 2009
$3442.90M
Facility Application Name
ATCO East DC Facilities (Currently known to TFO as P961)
AltaLink East DC Facilities (Currently known to TFO as P961)
AltaLink West DC Facilities (Currently known to TFO as P962)
AML Keephills Substation Addition (Formerly P953)
Facility
Application Filing
Mar 29, 2011
May 01, 2011
Mar 01, 2011
Nov 06, 2009
Facility
Application
Approval
Nov 15, 2012
Nov 15, 2012
Dec 06, 2012
Proposal To
Provide Service
Estimated Cost
$1598.76M
$39.35M
$1420.19M
Authorized
Budget
$1802.99M
$92.04M
$1668.84M
Mar 19, 2010
2
AML Rebuild 240kV 904L (1043L)
Jul 28, 2010
Aug 12, 2011
4
AML 902L Restring & 909L Retermination (Formerly P1057)
Aug 05, 2011
Oct 31, 2012
5
AML 908L, 909L Restring (Formerly P1058)
Sep 13, 2009
Feb 10, 2010
6
Epcor Jasper, Petrolia (Formerly P955)
Apr 15, 2010
Jun 16, 2010
$101.35M
$4.55M
$114.01M
$7.20M
Energization
Number
Energization Name
Forecast InService Date
1
ATCO Re-energization 9L950
12
ATCO SPS
May 20, 2013
TBD
13
ATCO Tie-in 1035L/1088L
TBD
14
ATCO Tie-in 923L/1087L
TBD
15
ATCO Tie-in 12L85/12L70
TBD
16
ATCO DC
TBD
17
ATCO AIES Integration Readiness (No PDUP)
3
AML Re-energization 950L
32
AML SPS
TBD
33
AML Tie-in 1035L/1088L
TBD
34
AML Tie-in 923L/1087L
TBD
35
AML Tie-in 12L85/12L70
TBD
36
AML AIES Integration Readiness (No PDUP)
2
WATL Stage 1 (EN2)
Jun 18, 2013
5
WATL Stage 2-12 (EN5)
May 27, 2014
6
WATL Stage 13-16 (EN6)
Apr 27, 2015
7
WATL 500 kV Line (EN7)
Jun 26, 2015
8
WATL 809L, 1209L Relocation (EN8)
Jul 10, 2014
9
WATL 1203L Relocation (EN9)
Nov 05, 2014
TBD
May 20, 2013
TBD
1
AML Keephills Substation Addition
Jul 31, 2010
2
New 904L (renumbered as 1043L) AltaLink
Jan 04, 2016
11
50km of rebuild 904L (1043L) TransAlta
Jan 01, 2016
4
902L restring
Apr 15, 2013
5
909L re-terminate back to Sundance
Jan 01, 2016
6
AML 908L restring, renumber line 1044L, 1044EL, 1045EL
Mar 20, 2011
7
909L Restring
Mar 20, 2011
8
Jasper, Petrolia substation switchgear
Jun 14, 2011
Feb 29, 2012
Aug 20, 2013
3
EPCOR 1044EL, 1045EL (Formerly P955)
Oct 15, 2010
Aug 12, 2011
$7.97M
$7.97M
3
Jasper Tap change, 1044EL, 1045EL restring. Line number change to
1055L, 1055EL, 1056L, 1056EL
ATCO
7
ATCO Phase Shifter (Formerly P957)
Sep 14, 2009
Mar 25, 2010
$31.52M
$39.51M
9
Livock Phase Shifting Transformer
TransAlta
8
TransAlta 902L
Aug 05, 2011
Oct 31, 2012
$9.65M
$9.65M
10
902L
Nov 12, 2014
1
911L Line Replacment (Formerly P882)
Sep 25, 2012
Nov 11, 2013
$440.17M
$499.72M
1
911L Replacement
Sep 22, 2015
2
Milo Junction Switching Station (Formerly P883)
Dec 21, 2009
Aug 05, 2010
$29.70M
$30.17M
2
New Milo Junction
Nov 01, 2011
3
PST Addition at Russell 632S (Formerly P884)
Aug 27, 2010
Jan 12, 2011
$17.21M
$17.13M
3
Russell PST
Apr 25, 2012
4
Cassils to Bowmanton (Sub)
Sep 04, 2012
AltaLink
4
Cassils to Bowmanton (Formerly P886)
Jul 27, 2010
Jun 08, 2011
$407.91M
$379.81M
41
Cassils to Bowmanton (Line)
Nov 27, 2013
5
Bowmanton to Whitla 240kV Transmission Line (Formerly P887)
Jul 27, 2010
Jun 08, 2011
$352.75M
$310.98M
5
Bowmanton to Whitla 240kV Transmission Line
Mar 25, 2014
6
Med Hat Area 138kV Line Development (Formerly P888)
Dec 03, 2012
Oct 18, 2013
$120.29M
$121.17M
6
Med Hat Area 138kV Line Development
Apr 30, 2016
7
Castle Rock Ridge to Chapel Rock 240 kV Line (Formerly P1034)
Sep 08, 2015
Oct 06, 2016
Future
Future
7
Goose Lake to Chapel Rock 240kV Line
Oct 31, 2018
8
Etzikom Coulee S/S and 240kV line to Picture Butte S/S (Formerly P1035)
Jun 16, 2016
Jun 16, 2017
Future
Future
8
Journault S/S and 240kV line to Picture Butte (MATL) S/S
May 01, 2017
9
Goose Lake S/S to Etzikom Culee S/S 240kV Line (Formerly P1036)
Nov 19, 2016
Feb 08, 2017
Future
Future
9
Goose Lake S/S to Etzikom Coulee 240kV Line
Mar 31, 2018
10
Etzikom Coulee S/S to Whitla 240kV Line (Formerly P1037)
Jul 14, 2017
Jul 16, 2018
Future
Future
10
Etzikom Coulee to Whitla 240kV Line
Jan 01, 2020
11
Blackie Area 138kV Upgrade (Formerly P1038)
Sep 11, 2014
Jan 16, 2015
$41.45M
$41.45M
11
Blackie Area 138kV Upgrade
Apr 30, 2016
12
Reactive Power Addition to Cypress 562S (Formerly P1039)
Aug 17, 2015
Dec 07, 2015
Future
Future
12
Reactive Power Addition to Cypress Substation
May 30, 2016
13
Ware Junction Substation Upgrade (Formerly P1040)
Apr 05, 2011
Feb 06, 2012
$6.13M
$6.61M
13
Ware Junction Substation Upgrade
Oct 04, 2013
14
911L Salvage (Formerly P886)
Feb 03, 2016
May 25, 2016
Future
Future
14
911L Salvage Subproject
Nov 23, 2016
Page 1 of 4
AESO Transmission System Projects - Quarterly Report - Q4 2014
- see notes at the end of this document for report terminology and definitions
Project Name and Number
Need
Application
Filing
Need Application
Approval
Need
Application
Estimated Cost
TFO
Facility
Application
Number
1
Facility Application Name
Cold Lake Area 144 kV Reinforcements
Facility
Application Filing
Mar 07, 2012
Facility
Application
Approval
Proposal To
Provide Service
Estimated Cost
Dec 11, 2012
$141.08M
2
811 - Central East Area Transmission Development
May 17, 2010
Feb 10, 2011
$431.00M
ATCO
ATCO
812 - Hanna Region Transmission Development
Aug 14, 2009
Apr 29, 2010
$983.00M
AltaLink
AESO Transmission System Projects - Quartery Report - Q4 2014
Bonnyville 700S and 7L146
Apr 27, 2012
Authorized
Budget
$195.92M
Jul 02, 2013
Energization
Number
Energization Name
Forecast InService Date
1
EN-1 Bourque 970S
10
EN-10 7L157 Bourque 970S to Mahihkan 837S
Oct 01, 2013
Jul 31, 2013
11
EN-11 7L574 Bourque 970S to Wolf Lake 822S
Oct 01, 2013
12
EN-12 7L583 Bourque 970S to Leming Lake 715S
Jul 31, 2013
13
EN-13 7L160 Bourque 970S to Mahihkan 837S
Oct 01, 2013
20
EN-20 7L587 Marguerite Lake 826S to Wolf Lake 822S
Jan 30, 2014
2
EN-2 - 7L/9L146 Bonnyville 700S to Bourque 970S
Aug 29, 2014
16
EN-16 7L24 Termination at Bonnyville 700S
Aug 06, 2014
25
EN-25 - Bonnyville 700S Transformer addition
Dec 01, 2015
3
EN-3 - St. Paul Area Upgrades - Watt Lake 956S
Dec 12, 2013
4
EN-4 - St. Paul Area Upgrades - St. Paul 707S, 7L139/7L70 in/out
Apr 01, 2016
14
EN-14 - St. Paul Area Upgrades - 7LA92 tap off to Watt Lake 956S
Dec 12, 2013
24
EN-24 - St. Paul Area Upgrades - Watt Lake 956S - Whitby Lake 819S
144kV CB Addition
Jun 25, 2014
EN-5 - Vermillion 710S Substation Upgrade
Sep 15, 2013
3
St. Paul Area Upgrades - Watt Lake 956S
Dec 23, 2011
Mar 27, 2013
4
St. Paul Area Upgrades - St. Paul 707S, 7L139/7L70 in/out
Jul 12, 2012
Dec 20, 2013
5
St. Paul Area Upgrades - Whitby Lake 819S 144kV CB Addition
Dec 23, 2011
Apr 20, 2012
6
Vermillion 710S Substation Upgrade
Oct 24, 2011
May 16, 2012
7
Heisler Area Upgrades
Dec 23, 2011
Feb 27, 2012
8
Kitscoty Area Upgrades
Jun 13, 2012
Jan 02, 2013
10
7L701 Line Clearance Mitigation
Oct 24, 2011
1
Youngstown 772S Capacitor bank addition (Formerly P977)
Aug 09, 2010
2
Battle River 757S Capacitor Bank addition (Formerly P978)
Aug 09, 2010
Aug 27, 2010
$3.00M
$2.83M
2
Battle River 757S Capacitor Bank addition
Oct 03, 2011
3
New Lanfine 240/144kV substation (Formerly P979)
Dec 21, 2010
May 08, 2012
$38.75M
$36.54M
3
New Lanfine 240/144kV substation
May 20, 2013
4
Lanfine 959S 200MVAr SVC (Formerly P980)
Mar 04, 2011
May 08, 2012
$39.36M
$37.12M
4
Lanfine 959S 200MVAr SVC
Mar 31, 2015
5
Lanfine-Oyen 144kV S/C Line 7L132 (Formerly P982)
Mar 21, 2011
May 08, 2012
$15.62M
$14.73M
5
Lanfine-Oyen 144kV S/C Line 7L132
Jul 15, 2013
6
Relocate 7L98 Oyen 767S - Lanfine 959S (Formerly P995)
Mar 21, 2011
Dec 22, 2011
$12.77M
$12.04M
6
Relocate 7L98 Oyen 767S - Lanfine 959S - Lanfine to Excel new line
Jun 01, 2013
7
Oakland 946S 240kV S/S combined with Anderson-Oakland line (Formerly P996)
Nov 25, 2010
May 08, 2012
$45.47M
$43.75M
7
Oakland 946S 240kV S/S combined with Anderson-Oakland line
Mar 25, 2013
8
Oakland-Lanfine 240kV S/C Line 9L924 (Formerly P998)
Dec 21, 2010
May 08, 2012
$119.93M
$116.88M
8
Oakland-Lanfine 240kV S/C Line 9L924
May 21, 2013
May 17, 2013
$50.85M
$78.65M
$6.70M
$9.62M
5
6
EN-6 - Heisler Area Upgrades - Heisler 764S and 7LA701 Tap Off
Jul 27, 2013
$31.48M
$46.17M
7
EN-7 - Kitscoty 705S and lines 7L14/7L130 line in/out
Nov 30, 2014
26
EN-26 - Kitscoty 6L06 Decommission
Dec 04, 2014
Feb 27, 2012
$13.28M
$13.28M
9
EN-9 - 7L701 Line Clearance Mitigation (Letter Of Enquiry)
Jul 18, 2012
Nov 15, 2010
$6.29M
$5.93M
1
Youngstone 772S Capacitor bank addition
Oct 06, 2011
9
Coyote Lake 963S 240kV S/S combined with Oakland-Coyote line (Formerly P999)
Feb 07, 2011
May 08, 2012
$77.80M
$73.38M
9
Coyote Lake 963S 240kV S/S combined with Oakland-Coyote line
10
Coyote Lake 963S - Michichi Creek 802S 144kV SC Line 7L128 (Formerly P1000)
Apr 08, 2011
May 08, 2012
$39.25M
$37.02M
10
Coyote Lake 963S - Michichi Creek 802S 144kV SC Line 7L128
Jul 12, 2013
11
Pemukan 932S 240 kV Substation (Formerly P1001)
Jan 24, 2010
May 08, 2012
$32.49M
$30.64M
11
Pemukan 932S 240 kV Substation
Jun 01, 2013
12
New Lanfine-Pemukan 240kV S/C Line 9L46 (Formerly P1003)
Mar 03, 2011
May 08, 2012
$97.24M
$92.09M
12
New Lanfine-Pemukan 240kV S/C Line 9L46
Jun 01, 2013
13
144 kV Capacitor Bank and Circuit Breaker Additions at Three Hills Substation 770S
(Formerly P1022)
Oct 08, 2010
Dec 23, 2010
$27.04M
$25.50M
13
Three Hills 770S Capacitor Bank
Dec 13, 2011
14
Hansman Lake - Pemukan 240kV S/C Line 9L966 (Formerly P1011)
Jan 24, 2011
May 08, 2012
$67.69M
$67.35M
14
Hansman Lake - Pemukan 240kV S/C Line 9L966
Aug 21, 2013
15
Pemukan 932S - Monitor 774S 144kV S/C Line 7L127 (Formerly P1013)
Jan 24, 2011
May 08, 2012
$14.31M
$13.50M
15
Pemukan 932S - Monitor 774S 144kV S/C Line 7L127
Jun 15, 2013
16
Relocate 7L79 line from Monitor 774S - Pemukan 932S (Formerly P1015)
Jan 24, 2011
May 08, 2012
$10.26M
$9.68M
16
Relocate 7L79 line from Monitor 774S - Pemukan 932S
Jun 12, 2013
17
Heatburg 948S - Three Hills-Nevis 144kV D/C Line 7L16/7L159 (Formerly P1021)
Feb 13, 2012
Jun 13, 2012
$14.84M
$14.00M
17
Heatburg 948S - Three Hills-Nevis 144kV D/C Line 7L16/7L159
Jan 25, 2013
Jun 01, 2012
18
Rowley 768S - Michichi-Three Hills 144kV DC Line 7L25 (Formerly P1022)
Nov 15, 2010
May 17, 2011
Included in FA 13
Included in FA 13
18
Rowley 768S - Michichi-Three Hills 144kV DC Line 7L25 and salvage of
6L22 and 6L44
19
Stettler 769S - Nevis 768S 144kV S/C Line 7L143 (Formerly P1023)
Jun 03, 2011
Dec 20, 2011
$41.29M
$38.94M
19
Stettler 769S - Nevis 768S 144kV S/C Line 7L143
Apr 21, 2013
20
Nilrem 574S combined with D/C 240kV 953L -1047L and Tucuman 478S combined with D/C
138kV 679L-680L (Formerly P1024,P1025)
Nov 12, 2010
Nov 10, 2011
$76.50M
$89.34M
20
Nilrem 574S combined with D/C 240kV 953L -1047L and Tucuman 478S
combined with D/C 138kV 679L-680L
Aug 30, 2013
21
Hardisty 377S Substation Capacitor Bank (Formerly P1024,P1025)
Nov 29, 2010
May 03, 2011
Included in FA 20
Included in FA 20
21
Hardisty Capacitor Bank
Jun 28, 2012
22
Hansman Lake 650S Substation Static VAR Compensator Addition (Formerly P1026,P1027)
Nov 29, 2010
Apr 27, 2011
$82.36M
$98.89M
22
Hansman Lake 650S SVC Addition
Oct 05, 2012
23
New 240 kV line 966L from Pemukan 932S -Hansman Lake 650S (Formerly P1026,P1027)
Dec 06, 2010
May 08, 2012
Included in FA 22
Included in FA 22
23
New 240 kV line 966L from Pemukan 932S -Hansman Lake 650S
Aug 21, 2013
24
New 240kV line 1060L from Ware Junction 132S-Cassils 324S (Formerly P1028)
Apr 05, 2011
Feb 06, 2012
$78.66M
$109.17M
24
New 240kV line 1060L from Ware Junction 132S-Cassils 324S
Nov 29, 2013
Page 2 of 4
AESO Transmission System Projects - Quarterly Report - Q4 2014
- see notes at the end of this document for report terminology and definitions
Project Name and Number
Need
Application
Filing
Need Application
Approval
Need
Application
Estimated Cost
TFO
Facility
Application
Number
1
2
813 - Red Deer Transmission Development
Jul 20, 2011
Apr 10, 2012
$222.80M
4
5
Dec 14, 2012
May 05, 2014
$172.17M
AltaLink
Epcor
1101 - Christina Lake Area Development
Oct 20, 2011
Apr 24, 2012
$406.61M
Jul 05, 2012
Oct 07, 2013
PPS
1186 - Thickwood Hills 240 kV Transmission Development
and Reactive Power Reinforcement
1267 - Algar Area System Reinforcement
Nov 10, 2011
Dec 16, 2014
Nov 30, 2012
Jun 19, 2012
Sep 01, 2015
Apr 18, 2013
$366.29M
$190.80M
$39.13M
AltaLink
ATCO
ATCO
ATCO
1343 - Fidler Substation Connection
Nov 01, 2012
May 10, 2013
PPS
AltaLink
1354 - Foothills Area Transmission Development - Third
Circuit
Aug 22, 2014
Aug 18, 2015
$19.36M
ENMAX
AESO Transmission System Projects - Quartery Report - Q4 2014
Greenfields
166L Rebuild
Salvage
6
423L
Jun 18, 2013
Sep 27, 2012
Aug 05, 2014
Proposal To
Provide Service
Estimated Cost
$20.72M
$179.48M
Authorized
Budget
$31.70M
$184.22M
7
1
Jun 18, 2013
Oct 01, 2015
Feb 24, 2015
Jul 28, 2014
Jan 01, 2016
Oct 06, 2015
$137.30M
Future
Future
$175.68M
Future
Future
Energization
Number
Energization Name
Forecast InService Date
1
Split 768L and 778L and Re-terminate at Red Deer North 217S
Mar 28, 2013
4
Add Second Transformer at Benalto 17S
Mar 28, 2013
5
Add 50 MVAR Cap Bank at Joffre 535S
Oct 11, 2013
6
Add 50 MVAR Cap Bank at Prentiss 276S
Oct 31, 2013
7
Add 27.6 MVAR Cap Bank at Ellis 332S
Nov 28, 2013
10
Rebuild 80L from South Red Deer 194S to North Red Deer 217S
Apr 21, 2015
11
Rebuild 80L from South Red Deer 194S to Red Deer 63S
Sep 05, 2015
121
Rebuild Red Deer 63S to Piper Creek 247S (427L)
Sep 21, 2015
122
Rebuild Piper Creek 247S to Joffre 535S (755L)
Sep 21, 2015
211
Rebuild 717L from Red Deer 63S to Sylvan Lake 580S (648L)
Aug 25, 2015
212
Rebuild 717L from Sylvan Lake 580S to Benalto 17S (637L)
Aug 25, 2015
2
New Johnson 240/138 kV Substation 281S
Apr 23, 2015
3
New 138kV Line from Lacombe 212S to Ellis 332S
Apr 04, 2016
32
New Wolf Creek 240/138kV Substation 247S
Jul 25, 2015
34
New Hazelwood 240/138kV Substation 287S
May 03, 2015
24
Rebuild 166L
Jul 01, 2016
13
Salvage 80L from Ponoka 331S to West Lacombe 958S
Apr 15, 2016
14
Salvage 80L from Red Deer 63S to Innisfail 214S
Apr 15, 2016
16
Salvage 716L from Wetaskiwin 40S to Ponoka 331S
Apr 15, 2016
Oct 06, 2014
Mar 23, 2015
Included in FA3
Included in FA3
423
423L
Sep 21, 2015
Stage II 2017 Facilites
Oct 27, 2016
May 11, 2017
Future
Future
2017
Stage II 2017
Nov 09, 2017
Harry Smith Sub
Mar 17, 2015
Mar 18, 2016
Future
Future
1
Harry Smith Sub
Dec 30, 2016
2
New Saunders Lake 240/138kV Substation Development
Mar 17, 2015
Mar 18, 2016
Future
Future
2
New Saunders Lake 240/135kV Substation Development
Jul 05, 2017
3
New 138kV Line from 780L to Cooking Lake & 174L and reconfigurations
Mar 17, 2015
Mar 18, 2016
Future
Future
3
New 138kV Line from 780L to Cooking Lake & 174L and Reconfiguration
Dec 30, 2016
4
Open 133L from Wabamun to 234L tap
Mar 17, 2015
Mar 18, 2016
Future
Future
4
Open 133L from Wabamun to 234L tap
Dec 30, 2016
5
New Capacitor Bank at Leduc 325S
Mar 17, 2015
Mar 18, 2016
Future
Future
5
New Capacitor Bank at Leduc 325S
Dec 30, 2016
6
EPCOR Scope of Work
Mar 17, 2015
Mar 18, 2016
Future
Future
6
EPCOR
Dec 30, 2016
1
CHL1 Black Spruce 154S
Jul 23, 2012
Dec 24, 2012
$19.96M
$31.73M
1
CHL1 Black Spruce 154S
Jul 10, 2013
2
Black Spruce 154S to Pike 170S
Jan 18, 2013
Jun 28, 2013
$116.15M
$134.39M
2
Black Spruce 154S to Pike 170S/1115L
Jun 30, 2014
3
Pike to Ipiatik Lake 167S/1116L
Jun 30, 2015
5
1117L - Ipiatik to Heart Lake
Apr 15, 2016
6
Christina Lake 723S - 2-240 kV Breaker addition
Jul 22, 2016
7
Winefred 818S, Kirby 651S, 428L, 457L
Aug 11, 2015
4
ATCO Heart Lake 898S/9L930/9L81
Jun 30, 2015
1
NFTP-Foothills-Enmax SS-65
May 25, 2015
3
Enmax
1180 - NW Ft McMurray Transmission Development
Rebuilds
Sep 26, 2011
Facility
Application
Approval
AltaLink
ATCO
1117 - Foothills Area Transmission Development - East
Brownfields
Facility
Application Filing
AltaLink
3
850 - South and West of Edmonton Transmission
Development
Facility Application Name
Pike 170S to Ipiatik Lake 167S/1116L/1117L
Mar 28, 2013
Nov 01, 2013
$256.74M
$339.05M
4
ATCO Heart Lake 898S/9L930/9L81
Oct 10, 2013
Jan 06, 2014
$26.05M
$21.25M
1
North Foothills Transmission Project - AltaLink Facilities
Jul 13, 2012
Oct 07, 2013
$247.94M
$228.49M
6
Temporary Switching Station
Sep 22, 2014
3
Langdon to Janet - AltaLink Facilities
Jul 16, 2012
Oct 07, 2013
$81.98M
$135.97M
3
L to J - East Calgary-Janet-Langdon
Nov 14, 2014
4
Janet to Langdon - Enmax Facilities (By AltaLink)
Jul 13, 2012
Oct 07, 2013
$22.66M
$22.66M
4
East Calgary-Janet-Langdon
Jul 31, 2015
5
Foothills 138kV - AltaLink Facilities
Jul 16, 2012
Oct 07, 2013
$86.59M
$130.69M
5
Foothils 138kV
Nov 01, 2015
2
Enmax SS-65 and SS-25 Additions - Enmax Facilities
Jul 13, 2012
Oct 07, 2013
$4.29M
$4.29M
2
ENMAX SS-25 - ENMAX SS-65
Nov 01, 2015
1
Birchwood Creek
Oct 31, 2013
Jan 08, 2014
$35.60M
$35.60M
1
Birchwood Creek/9L57/9L74
Mar 15, 2015
2
Ells River/9L08/9L76
Sep 10, 2014
Feb 24, 2015
$199.49M
$199.49M
2
Ells River/9L08/9L76
Mar 01, 2016
3
9L95
Mar 10, 2015
Aug 25, 2015
Future
Future
3
9L95
Dec 01, 2016
1
Thickwood
Sep 15, 2015
Mar 29, 2016
Future
Future
1
Thickwood and 240 kV Lines
Oct 01, 2018
1
Dawes sub and 240 kV Lines
Aug 01, 2015
2
144 kV line swap
Aug 01, 2015
3
144 kV Breaker at Algar
Jan 29, 2015
1
Transformer #1
Jul 27, 2014
2
Transformer #2
Oct 03, 2017
1
All Equipment
Sep 29, 2017
1
All P1267 Facilities
Nov 27, 2013
Feb 20, 2014
1
Transformer #1
Oct 31, 2012
Jul 26, 2013
2
Transformer #2
Jun 09, 2016
Nov 07, 2016
1
All Enmax Facilities
Aug 26, 2014
Aug 25, 2015
$48.62M
$48.62M
$88.80M
$86.91M
$24.39M
$25.53M
Page 3 of 4
AESO Transmission System Projects - Quarterly Report - Q4 2014
- see notes at the end of this document for report terminology and definitions
Project Name and Number
Need
Application
Filing
Need Application
Approval
Need
Application
Estimated Cost
TFO
Facility
Application
Number
Facility Application Name
Facility
Application Filing
Facility
Application
Approval
Proposal To
Provide Service
Estimated Cost
Authorized
Budget
Energization
Number
Energization Name
Forecast InService Date
Report Notes:
1. This report includes any System projects that have had a Need Application filed with the AUC. Projects will no longer appear on this report once all Energizations for the Project are in service.
2. Dates in this report show both forecast and actual. Dates that are prior to the report date are actuals. Dates that are post the report date are forecast.
Column Explanations:
1. Project Name and Number: This is the AESO designation for all of the project work that falls under a system study. This will include the Need Application, Facility Application, and Energizations.
2. Need Application Filing: This is the date a Need Identification Document (NID) has been submitted to the AUC for approval as per the requirement of Section 34(1) of the Act.
3. Need Application Approval: This is the date the NID is approved by the AUC.
4. Need Application Estimated Cost: All values include AFUDC and are based on NID ISD$. Numbers presented with an * have calculated escalation values as escalation $'s were not included in the NID.
5. TFO: This is the Transmission Facility Owner(s) (TFO) who file the Facility Applications, and are responsible for the estimates, schedule, construction and costs for the project.
6 Facility Application Number: This is used to identify individual Facility Application Filings within the project.
7. Facility Application Name: This is the name of the TFO's Facility Application Filing (sometimes called Permit and License application) that has been registered with the AUC. There may be multiple Facility Applications associated with a Project.
8. Facility Application Filing: This is the date the Facility Application was registered with the AUC.
9. Facility Application Approval: This is the date the Facility Application is approved by the AUC.
10. Proposal To Provide Service Estimated Cost: This is the +20 / -10% estimate that is provided to the AESO by the TFO in the Proposal To Provide Service, in support of the Facility Application.
11. Authorized Budget: This is the amount of the Proposal To Provide Service Estimated Cost, plus or minus any Authorized Changes from TFO that have been approved by the AESO.
12. Energization Number: This is used to identify individual energizations within the project.
13. Energization Name: This is the identifier within the Facility Application of the energization dates of various pieces of equipment. There may be multiple Energizations associated with a Facility Application.
14. Forecast In-Service Date: This is the most recent information the TFO has provided on the expected In Service Date of the equipment within the Energization.
AESO Transmission System Projects - Quartery Report - Q4 2014