Stakeholder Comment and AESO Replies Matrix – Energy Storage Integration Recommendation Paper
by user
Comments
Transcript
Stakeholder Comment and AESO Replies Matrix – Energy Storage Integration Recommendation Paper
Stakeholder Comment and AESO Replies Matrix Recommendation Paper – Energy Storage Integration June 18, 2015 The AESO is asking market participants and interested parties to participate in the AESO’s consultation regarding the development of Energy Storage Integration. The AESO is seeking comments from stakeholders on the recommendations. Date of Request for Comment: Period of Consultation: June 18, 2015 June 18, 2015 through July 15, 2015 Comments From: Contact: Jacques Duchesne Phone: 403 539-2518 E-mail: [email protected] Date [yyyy/mm/dd]: Complete the drafting of and file ISO Rules to address technical and operating requirements for battery storage facilities (“Proposed Battery Facility Rules”) with the Alberta Utilities Commission (”AUC”). The AESO is interested in stakeholder feedback on this recommendation. Stakeholder Stakeholder Comment AESO Replies Storage facilities operate as generating units when injecting power into the grid and operate as load when purchasing or withdrawing electricity from the transmission system. The storage facility is using the transmission system and is required to pay the just and reasonable costs of the transmission system. An economic dispatch study will be performed to develop ISO tariff treatment options for storage. The study will examine in detail the differences between storage and conventional load and generators. The AESO is interested in stakeholder feedback on this recommendation. Stakeholder Stakeholder Comment AESO Stakeholder Comment and AESO Replies Matrix 1 AESO Replies Maintain the minimum requirement of 15 MW range for regulating reserve (“RR”) and of 10 MW for spinning reserve (“SR”) The AESO is interested in stakeholder feedback on this recommendation. Stakeholder Stakeholder Comment Replies The AESO will revise, where appropriate, ISO Rule 205.4 Regulating Reserve Technical Requirements and Performance Standards, ISO Rule 205.5 Spinning Reserve Technical Requirements and Performance Standards and ISO Rule 205.6 Supplemental Reserve Technical Requirements and Performance Standards and other rules as may be incidentally impacted to reflect how energy storage technology will participate in operating reserve products (RR, SR) and Supplemental Reserve (“SP”) The AESO is interested in stakeholder feedback on this recommendation. Stakeholder Stakeholder Comment Replies Examine the performance of current RR providers and assess if changing the current technical requirements and/or introducing new technologies (such as energy storage) could reduce the required amount of RR. The AESO is interested in stakeholder feedback on this recommendation. Stakeholder Stakeholder Comment Replies Stakeholder Comment Replies Other Stakeholder AESO Stakeholder Comment and AESO Replies Matrix 2