Information Document Automatic Generation Control ID# 2012-005RS
by user
Comments
Transcript
Information Document Automatic Generation Control ID# 2012-005RS
Information Document Automatic Generation Control ID# 2012-005RS Information documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between the information document and the related authoritative document(s) in effect, the authoritative document(s) governs. Please submit any questions or comments regarding this information document to [email protected]. 1 Purpose This information document supports the Alberta Reliability Standard BAL-005-AB-0.2b Automatic Generation Control (“BAL-005”). The purpose of this information document is to provide a list of metering points and their associated data used for automatic generation control by the AESO. 2 Background BAL-005 establishes the requirements for the automatic generation control application within the AESO’s energy management system. Included in BAL-005 are requirements detailing quality and calibration of those metering points owned by the legal owner of a transmission facility that the AESO uses for automatic generation control. The ICCP name of the metering points the AESO uses for automatic generation control are provided to enable the legal owner of a transmission facility to map to the physical meter providing the data. Tables listed in Section 3.1 below are the frequency data the AESO has identified per the Applicability section of BAL-005 and relate specifically to requirements R20 and R21. Tables listed in Section 3.2 below relate to requirements R1 through R18. 3 Tables Automatic Generation Control Metering 3.1 Time Error and Frequency Metering Tables Table 1: Time Error and Frequency Sources Data Source Measurement Location AESO GPS1 SCC - AESO System Control Centre N/A - directly sourced through EMS AESO GPS2 SCC - AESO System Control Centre N/A - directly sourced through EMS AESO BUCC GPS1 BUCC - AESO Backup Control Centre N/A - directly sourced through EMS Altalink ACC – Altalink Control Centre Information Document Effective: xxxx-xx-xx ICCP Name Page 1 W106ALAIES_ND_ALTALINK_FREQ_HZ Public Information Information Document Automatic Generation Control ID# 2012-xxx(R/ARS/T) 3.2 Tie Line Metering Tables Table 2: Tie Line Metering - Langdon (102S) Measurement Datasource MW MWh ICCP Name Altalink W106AL102S_LN_1201L_CRN_102S_P BCTC W030_TAU_LGN_MW Altalink W106AL102S_LN_1201L_10_BCKUP_P BCTC W030_CBK_5L94_MW BCTC W030_LGN_5L94_MW Altalink W106AL102S_TYLN_1201L_10AC_PHI Altalink W106AL102S_TYLN_1201L_10AC_PHO BCTC W030_LGN_MWHR_IN BCTC W030_LGN_MWHR_OUT Table 3: Tie Line 887L Metering - Pocatererra (48S) Measurement Datasource MW MWh ICCP Name Altalink W106AL48S_LN_887L_01_P BCTC W030_POC_1L274_MW Altalink W106AL48S_LN_BACKUP_P Altalink W106AL48S_TYLN_887L_10_PHI Altalink W106AL48S_TYLN_887L_10_PHO BCTC W030_POC_MWHR_IN BCTC W030_POC_MWHR_OUT BCTC W030_POC_TAU_MWHR Table 4: Tie Line 786L Metering - Natal / Coleman (799S) Measurement Datasource MW MWh Information Document Effective: xxxx-xx-xx ICCP Name Altalink W106ALBC_NT_LN_786L_1_P BCTC W030_TAU_NTL_MW Altalink W106ALBC_NT_LN_BACKUP_P Altalink W106AL799S_LN_786L_1_P BCTC W030_NTL_TAU_MWHR Altalink W106ALBC_NT_TYLN_786L_PHI Altalink W106ALBC_NT_TYLN_786L_PHO BCTC W030_NTL_1L275_MWHR_IN BCTC W030_NTL_1L275_MWHR_OUT Page 2 Public Information Information Document Automatic Generation Control ID# 2012-xxx(R/ARS/T) Table 5: Tie Line Metering - McNeill (840S) Measurement Datasource MW ATCO W106AT840S_LN_MCNEILL_SPCMCN_P ATCO W106AT840S_TYLN_MCNEILL_CONV_PHI ATCO W106AT840S_TYLN_MCNEILL_CONV_PHO MWh ICCP Name Revision History Effective Date Description of Changes Yyyy-mm-dd Initial release Information Document Effective: xxxx-xx-xx Page 3 Public Information