RendezView™ Collaborative Planning and Monitoring How complex plans come together ®
by user
Comments
Transcript
RendezView™ Collaborative Planning and Monitoring How complex plans come together ®
We never forget who we’re working for® RendezView™ Collaborative Planning and Monitoring How complex plans come together Aegis Ashore: Same as Aegis Afloat Aegis Ashore with the Standard Missile 3 (SM-3) Combat System is identical to the fielded maritime system. Aegis is already ashore and has been for more than 30 years. Existing Capabilities, New Missions All elements of Aegis are already in use in land-based applications that range from development and integration test facilities to launch and production test facilities. Every Aegis system at sea today was fully tested ashore before it was transitioned to ship use. Aegis Ashore fully supports the ability to do new missions with capabilities that already exist. RendezView™ Collaborative Planning and Monitoring SPY-1 radars are active at the U.S. Navy’s Combat System Both planned, large-scale Engineering Development Siteoperations (CSEDS) in Moorestown, N.J.; andSurface suddenWarfare disasterCenter recoveries require Naval Dahlgren Division (NSWCDD) decisive action, often by a diverse set in Dahlgren, Va.; National Severe Storms Laboratory in of organizations. In theseCombat situations, Norman, Okla.; and Surface Systems Center (SCSC) the complexity of the task is matched in Wallops Island, Va. only by the speed of the changing Multiple baselines ofcoordinators, the Aegis Weapon conditions. Fleet first System and Aegis Ballistic Missileevent Defense (BMD) centers, are active in Moorestown, responders, command Reduces Dahlgren and Wallops Island. relief staging areas, and integrated In March 2011, the USS Monterey, equipped with the Aegis Weapon System, was deployed to Europe as part of Phase 1 of the Administration’s Four-Phased European Phased Adaptive Approach (EPPA) approved by NATO. In April 2011, Flight Test Mission (FTM) -15 demonstrated “launch on remote” with BMD 3.6.1 engage supported by the THAAD radar, proving EPAA Phase 1 architecture and system capability against intermediate range ballistic missiles for the first time. This consummated the longest range engagement of any U.S. ballistic missile defense system element to date. planning workload By validating complex plans against project benefitSystem from tools The Aegis managers Weapons Control and the MK a41variety Verticalof conditions, such as that allow them to see the picture Launching System are active atbig White Sands Missile Range relative asset positions, environmental and to make effective use of resources. in New Mexico. conditions, and communications The RendezView™ tool integrates team planning, schedule monitoring, collaboration, resource optimization, task prioritization, and scenario predictions into a single, affordable, Java™ application. capabilities, the RendezView™ scheduling tool reduces a planner’s cognitive load by locating task errors within integrated plans, predicting sub-optimal plans, and suggesting improvements. Built on Proven Technology Aegis Ashore is built on operationally validated sea-based Aegis BMD technology and leverages the existing capability Increases situational Optimizes andawareness proven track record of the Aegis system, currently operating project execution RendezView™ features provide the on more than 100 ships at sea worldwide. positioning, and logistics in a way that provides powerful workload sharing and strategic decision-making capability. Shared voice, chat, and white-boarding features immerse even a widely distributed team in a common environment based on updated information, where risks and opportunities are exposed, enabling timely decisions for efficient use of common resources. …and fits into your budget At Lockheed Martin, we don’t lose sight of the bottom line. That’s why RendezView™ master plans are ability to create, edit, and monitor RendezView™ licensing arrangements displayed Aegis in a familiar Gantt-style •Twenty-six BMD-equipped warships – 22 in the U.S. plans in realtime, by incorporating are as flexible as the application itself, format, with time-oriented views of Navy and four in the Japanese Maritime Self-Defense Force mission priorities and other operatorBest Option for Cost, Risk and Schedule Requirements including allowing for unlimited users operating –tasks have organized the certifiedby capability to unit, engage ballistictunable missilesparameters and to optimize Aegis was selected as the lowest cost and earliestwhen per siterisk, andlowest discounted licenses for fulllong-range user situational awareness of perform surveillance and tracking missions. events for multiple objectives and deployable option for European BMD. Missile Defense Martin bundled withAother Lockheed plans, goals, capabilities, and overall variety of human and material •Twelve additional ships have been identified foramodification products. Agency (MDA) analysis of alternatives identified the effectiveness. The RendezView™ assets. RendezView™ monitors track to perform BMD missions in 2014. operationally proven Aegis BMD System as the best option tool registers assets such as vehicles, real-time team performance against •Standard Missile 3 (SM-3) is for already fully integrated with personnel, and equipment use in for jeopardize land basing the SM-3 interceptor as it met the desired conditions that would Aegis/SPY-1/VLS. accomplishing objectives, along with fielding schedule and reduced development risk. completion of a project. The user can asset capabilities and constraints. •Aegis/SPY-1 has link capability to connect withconfigure other sensors. rules for what should be This information is readily available Lockheed Martin Corporation Lockheed Martin monitored, •Aegis offersusers, a robust lifecycle and well-established logisticswhen a system-generated to system both for planning Mission Systems & Training Sensors (MS2) Mission Systems and alert should be sent, or whether to and andtraining in situ programs. mission execution. The M Street, 300300 M Street, SE SE automatically adjust tasks to mitigate Washington, D.C.D.C. 20003, USAUSA Washington, 20003, RendezView™ asset monitor panel plan deficiencies. www.lockheedmartin.com/mst/product_contacts http://www.lockheedmartin.com/ms2/ presents command group hierarchy Key Milestones product_contacts Copyright ©2013 Lockheed Martin Corporation and available assets under each group. All rights reserved Strengthens team cohesion Each- Pacific asset’s Missile green-yellow-red status •2013 Range Facility (PMRF) Testbed Copyright ©2010 Lockheed Martin Corporation PIRA# MOR201009006_RevA indicator collectively illustrates team RendezView™ plan execution All rights reserved •2015 - System install in Romania readiness. PIRA# MOR201009006 aggregates task status, resource