2015 Overholt Drainage School
2015 Overholt Drainage School
March 16-20, Defiance County, Proposed 5-day Program
Subsurface Drainage: Design, Layout and
Installation; Benefits and Impacts
Drainage Water Management (Controlled Drainage)
Design, Layout, Installation, and Management
Water Table Management w/Subirrigation: Design
Concepts, Operation, Management, Benefits
Drainage Water Harvesting, Water for Agriculture
Larry C. Brown, 614-292-3826
[email protected]
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
SUBSURFACE DRAIN
DESIGN PROCEDURE
Paul Chester, Mark Seger
USDA-NRCS, ODNR-DSWR
1 of 18
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
2 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 1. Topo Survey
CONTOUR MAP
Problem #4
1200'
x
x
Farmstead
1 Acre
x
Trees
Ditch Bottom
1000'
SSD Design Procedure
200 100
200
400
2
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
3 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 2. Contour Map
SSD Design Procedure
3
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
4 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 3. Soil Type
SSD Design Procedure
4
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
5 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 4. Drain Spacing
SSD Design Procedure
5
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
6 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 5. Layout Alternatives
SSD Design Procedure
6
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
7 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
950'
Main 1
• 6. Layout & Station
1200'
x
x
600'
1 Acre
0+
00
Farmstead
x
Ditch Bottom
Trees
1000'
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
8 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 7. Plot Profile
SSD Design Procedure
8
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
9 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 7. Plot Profile
SSD Design Procedure
9
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
10 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 8. Control Points
•
a) Low points
•
b) High Points
•
c) Outlet
•
d) Laterals
•
e) Obstructions
•
f) Wetlands
SSD Design Procedure
10
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
11 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 9. Set Main Gradelines
– Start with outlet
elevation
– Based upon previous
designs – choose main
size
– Keep cover
– Keep lateral cover
SSD Design Procedure
11
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
12 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 9. Gradelines
• a) Round off
• b) Station/Elev.
SSD Design Procedure
12
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
13 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 10. Drainage Area
SSD Design Procedure
13
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
14 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 11. Drainage Coefficient
F IE L D
CROPS
TRUCK
CROPS
M in e r a l
3 /8 to ½
½ to ¾
O r g a n ic
½ to ¾
S O IL
SSD Design Procedure
¾ to 1 ½
14
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
15 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 12. Capacity At Outlet
SSD Design Procedure
15
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
16 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 13. Outlet
•
Pipe
•
Material
SSD Design Procedure
16
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
17 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 14. Outlet Pipe Size
SSD Design Procedure
17
Vermont Drainage Workshop 1/19/15
Larry C. Brown [email protected]
1-614-292-3826
18 of 18
SUBSURFACE DRAIN
DESIGN PROCEDURE
• 15. Main Design
• a) Upper Main Size
• b) Main Capacity
• c) Lat. Flow Area
• d) Lat. Contribution
• e) Sum Lat. Flow
• f) Note Flow & D.A.
•
•
•
•
g) Note Stations
h) Est. Main Size
i) Main Capacity
j) Cap. Available
• 16. Repeat 15c - 15j
SSD Design Procedure