INFO SHEET WEST COAST BASIN SEAWATER BARRIER TELEMETRY PROJECT
INFO SHEET
WEST COAST BASIN SEAWATER BARRIER
TELEMETRY PROJECT
Project Summary
The County of Los Angeles Department of Public Works (LACDPW) proposes to install
a telemetry system along the existing West Coast Basin Barrier Project (WCBBP).
Once installed, the telemetry system will collect more accurate injection rate and
groundwater level information, and transmit the data directly to our headquarters
building. The telemetry system will allow barrier engineers to see in real time how
changes in injection rates impact groundwater levels and will result in a more efficient
operation of the WCBBP.
Within the City of Manhattan Beach, the plans call for a majority of the telemetry system
to be installed along the existing WCBBP water supply line, which is located within the
greenway between Elm Avenue and Boundary Place. In addition, a small portion of the
system will be installed along Valley Boulevard and Oak Street.
Background
Since 1951, the Los Angeles County Flood Control District, now part of LACDPW, has
operated the WCBBP by injecting fresh water into the underlying aquifers to prevent
seawater from contaminating this valuable drinking water source. Data needed for the
operation of the WCBBP has traditionally been collected manually by visiting each
injection and observation well location.
However, technological advances in
instrumentation used to measure flow and pressure have provided improved methods to
operate the WCBBP. By installing these electronic devices in existing injection and
observation wells, the overall operation of the WCBBP will become more efficient and
effective.
Project Design
The telemetry system will stretch 9 miles, from Pacific Coast Highway
in the City of Torrance, to El Segundo Boulevard in the City of El Segundo
(see Attachment A). It will collect information from 98 injection wells and 65 observation
wells located in the Cities of Torrance, Redondo Beach, Hermosa Beach, Manhattan
Beach, and El Segundo. The telemetry system will be continuous from one end of the
project to the other and will provide A/C power to each injection well location for future
remote control capability of seawater barrier operations.
Within the City of Manhattan Beach, the system will stretch 2.2 miles and collect
information from 10 injection wells and 7 observation wells (see Attachment B).
LACDPW design engineers met multiple times with representatives from the City of
Manhattan Beach to come up with a design to minimize impacts to the greenway and
still allow the installation of the infrastructure necessary for the telemetry system. For
example, the original design called for 9 above ground monitoring control units (MCUs)
INFO SHEET
to be installed at various injection wells located in the greenway. However, at the
request of Manhattan Beach representatives, this number was reduced to a minimum
number of 3 MCUs. In addition, the project specifications were modified to include a
requirement to maintain pedestrian access to the greenway walking path at all times
during construction, and require the MCUs to blend in with the existing environment.
Estimated Project Duration
It is estimated that construction activities will last approximately two months.
Construction will start after a project update is presented to the Manhattan Beach City
Council and once the construction contract is awarded (anticipated start in April 2009).
Construction Activities
Construction activities will include the following:
1. Excavate a trench 6 inches wide by 36 inches deep to install two 2-inch PVC
conduits along the alignment. One conduit will be used for installing electrical
equipment to transmit the telemetry signal, while the other conduit will be used to
install wiring to provide A/C power to the injection wells.
Installation of conduits within the greenway will be accomplished by temporally
removing the existing wood chips over the trench area, trenching, and installing
the conduits. The wood chips will then be placed over the trench area to restore
the site to its original condition.
For street crossings, PVC conduits will be directionally drilled below the existing
pavement rather than trenching across the street. This will minimize the impact
of construction activities on local traffic.
2. Install pull boxes along the alignment at approximately 300-foot intervals. The
pull boxes will allow the electrical wiring and equipment to be installed and
connected from one well to the next within the PVC conduits.
3. Retrofit observation wells with new vaults to accommodate the electronic wiring
and equipment. When the observation wells were originally installed in the
1960s and 1970s, they were done so without the benefit of knowing the future
advances in electronic monitoring equipment.
4. Install small MCU cabinets at three injection well locations. Originally, 9 MCU
cabinets were proposed for the telemetry system. However, as noted above,
after meeting with representatives from Manhattan Beach, the number of MCU
cabinets was reduced to three.
INFO SHEET
The locations of the three MCU cabinets were carefully selected to minimize any
visual impact on the greenway and will be installed in the following locations: on
the sidewalk along Oak Street located 600 feet away from the greenway near
injection well 5R; inside the existing chain-link fenced area that is used for well
maintenance near the intersection of 12th Street and Ardmore Avenue near
injection well 6B; and on the existing paved area used for well maintenance
along the Valley Drive between 1st and Francisco Streets near injection well 6I2
(see Attachment C).
Please note, this is the absolute minimum number of MCU cabinets that can be
used and still maintain a functional telemetry system.
Benefits to City of Manhattan Beach
The City of Manhattan Beach and its residents will receive the following benefits as a
result of the installation of the telemetry system:
1. Increased protection of the City’s groundwater resources. The telemetry system
will allow barrier engineers to monitor seawater intrusion more closely.
2. Reduced traffic and automobile emissions from LACDPW vehicles. The need to
collect manual measurements will be significantly reduced as sensors will relay
information directly to the LACDPW headquarters building.
3. Reduced visual impact to greenway by LACDPW activities. The telemetry
system will result in a significant reduction in the number of trips LACDPW
personnel will need to make to the injection and observation wells.
4. Possible reduction in amount of water injected. The telemetry system will allow
barrier engineers to operate in a more efficient manner.
5. Installation of a conduit for a fiber optic cable. During its regular meeting on
November 19, 2002, the Manhattan Beach City Council approved the installation
of the WCBBP telemetry system with the condition that LACDPW would
reimburse the City for the cost of materials associated with installing a four-inch
conduit for the City’s future use. The conduit has already been installed and
LACDPW has reimbursed Manhattan Beach as agreed.
P:\wrd\Ops\Seawater Barriers\WCBBP\Telemetry Phase 1\2008_08_04_infosheet.doc
N
EL SEGUNDO
HAWTHORNE
MEMORIAL
PARK
GREENBELT
PARK
MARINE
AVENUE
PARK
POLLIWOG PARK
AVIA TIO N
PARK
BODGER
PARK
LAWNDALE
JANE
ADDAMS
PARK
MANHATTAN BEACH
GLEN
ANDERSON
PARK
PAGE
PARK
MANHATTAN
STATE
BEACH
ROG ERS-A NDERSO N PARK
*****
*
****
MANHATTAN
HEIG HTS
PARK
ALONDRA PARK
EL CAM
ALONDRA PARK GOLF COURSE
ALONDRA PARK
WILLIAM
GREEN
PARK
AVIA
PIER
PACIFIC
CREST
CEMETERY
HERMOSA
EL
NIDO
PARK
GREENWOOD
PARK
CLARK PARK
HERMOSA BEACH
190TH
FORT
LO TS
OF
FUN
PARK RODAWAY
PARK
ANITA
PARK
NDO
HERO
HERMOSA
BEACH
*
ATTAN
TION
GALLERIA
AT
SOUTH
BAY
PERRY PARK
MCMASTER
PARK
****
MANH
ARTESIA
VALLEY PARK
BICENTENNIAL
PARK
GREENBELT
PARK
LA
ROMERIA
PARK
ENTRADERO
PARK
SU NNYGLEN
PAR K
ANZA
VINCENT
PARK
SEASID E
LAGOON
190TH
COLUMBIA REGIONAL PARK
DOMINGUEZ
PARK
REDONDO BEACH
VICTOR
PARK
DELTHORNE
PARK
TORRANCE
PACIFIC COAST
CATALINA
VETERANS
PARK
TORRAN
PARADISE
PARK
TORRANCE
REDONDO
STATE
BEACH
WILDERNESS
PARK
SEPULVEDA
CARSON
GREENWOOD
PARK
MADRONA
MARSH
NATURE
PRESERVE
ANZA
ALTA VIS TA PARK
DEL AMO FASHION CENTER
SEA-AIRE
GOLF
COURSE
PARK
EL
RETIRO
PARK
RDES
MIRPARK
AMAR
0
0.5
1 Miles
Data contained in this map is produced in whole or
part from the Thomas Bro. Maps digital database.
Thismap is copyrighted, and reproduced with
permission granted by Thomas Bros. Maps. All
rights reserved.
AUG 11 2008 , 04:24:25 EBATMAN
S VE
0.5
HICKORY
PARK
PAC
IFIC
TORRANCE
BEACH
PARK
PALO
c:\ejb\arcview\sea water barrier\wcbbp_tel_location map.apr (8.5 X 11 Layout)
JIM
THORPE
PARK
ROSECRANS
*
MANHATTAN BEACH
PARK
ZELLA
DAVIS
PARK
****
LIVE
OAK
PARK
BICENTENNIAL
PARK
MADRONA
AND
PARK
RADI
PLAZAS SON
GOLF
COURSE
RAMONA
PARK
AVIATION
HIGHL
SEPULVEDA
ROSECRANS
MANHATTAN
VILLAGE
PARK
SAN DIEGO
(%&l
HOLLY
GLEN
PARK
MANHATTAN
VILLAGE
PRAIRIE
HAWTHORNE
DEL AIR E PARK
EL
SEGUNDO
GOLF
COURSE
SAND
DUNE
PARK
HAWTHORNE
PLAZA
HAWTHORNE
MAR
EL SEGUNDO
CANDY
CANE
PARK
HAWTHORNE MUNICIPAL AIRPORT
PARK
HAWTHORNE
KANSAS
PARK
HILLTOP
PARK
INGLEWOOD
RECREATION PARK
AVIATION
WASHINGTON
PARK
LIBRARY
PARK
INGLEWOOD
SEPULVEDA
West Coast Basin Barrier Project
Telemetry System Conduit Alignment
COA
ST
LAGO
SECO
PARK
LO S LES
ARBO
PARK
PALOS VERDES ESTATES
WALTERI
PARK A
LEGEND
Proposed WCBBP Telemetry
Conduit Alignment
ATTACHMENT A
S
BLVD
AV
AV
N
FAYMONT
1200
HARKNESS
1200
WENDY
M AN ZAN ITA
R ED ONDO
LYNNGROVE
WY
LN
1900
ST
DR
HERRIN
N
ST
N
ST
800
REDONDO
AV
1 00
100
BL
2600
AV IATION
1800
BLV D
VANDERBILT
CARNEGIE
ROCK EFE LL ER
GRANT
LN
LN
LN
LN
LN
WY
1 701
WY
ST
AXENTY
WOLLACOTT
BLVD
AV
ORMOND LN
AVIATION WY
AV
600
AV
AVIATION
S
AV
AV
S
AV
REDONDO
AV
1800
GRAHAM
2800
300
HARKNESS
HALEY
N
WY A V
IAT
IO N
BL V
D
HERRIN
N
100
100
ST
AV
1700
S
ST
PECK
AV
ST
R EE D ST
DIXON
H ER RIN
CARVER
D
N
LDE
GO
ST
ST
ND
MO
OR
LN
ST
AV
1600
CARNEGIE
D
FOR
AR T
MA
OD
I NH
GO
STE 00
16
FO R
19TH
ST
IE
EG
RN
LN
CA
1700
HERRIN
AV
PECK
S
MEA-
S
ST
LIE
WY
LN
N
STA
PL
H
20 T
L IE
WY N
L
DR
ST
ST
ST
AV
ROWELL
500
ARTESIA
H
20 T
AVIATION
CIR
CT
AV
AV
PECK
N
N
S
CUR TIS
VOORHEES
S
18TH
GATES
NELSON
ST
PECT
PROS
#
Y
#Y
RHODE
PACIFIC
MO
P
VALLEY
DR
ST
24TH
20TH
ST
19TH
ST
1500
MATHEWS
ST
ERN
ST
1ST
DOWS
AV
ST
ST
ST
1700
ST
RUHLAND
S
SHELLEY
TENNYSON
E
MOR
ARD
ST
VOORHEES
AV
1800
ST
1600
PL
CARRIAGE
MEADOWS AV
DR
AV
DR
ALTURA
WY
PROSPECT
CHABELA
KUHN
PAC
ST
ST
CONTINENTAL
WY
APOLLO ST
S AUSALIT O
WY
AV
ROWELL
MEADOWS
N
JOHNSON
SEPULVEDA
100
100
DR
BL
S
SEPULVEDA
HWY
PL
COAST
ST
200
N
LARSSON
N
PL
LA
CARLITA
KEATS
21S T
CURTIS AV
AV A
PAR
12TH ST
MANHATTAN
1700
HEIGHTS
PARK
1600
ST
CT
ST
ST
1400
PL
R EST
HILLC
24TH
ST
BLV D
BRYANT
1100
PL
24TH
GATES AV
ST
15TH
POLLIWOG PARK
600
ST
1000
ST
DIANTHUS
ST
CHESTNUT AV
BLV D
M AGNOLIA
OAK
1100
E LM
ST
801
PL
500
ANDERSON
200
100
S
DIANTHUS
TENNYSON
0
N REDONDO AV
YET
TE
MA R
K ET
PL
DR
PL
W
M AL A G A
MALAGA
PL
LA FA
ER
GR
EE
N
LN
C AM BR IDGE
PORTSMOUTH
WY
BR ID GE PORT
P A RK
AV
AV
1900
AV
AV
AV
1700
PINE
WALNUT
POINSETTIA
901
PACIFIC
JOHN
JOHN
N
S P OIN SE TTIA A V
CT
S DOUGLAS
F
NS
S N AS H S T
WY
PARK
V ILLAGE
V ILL AGE
AV
2500
CEDAR
PALM
W E STP ORT
AV
AV
AV
AV
2300
DR
900
3 300
AV
O AK AV
0
3 30
E LM
PINE
DR
2500
AV
AV
ST
1900
JOHN
1400
PL
ST
100
AMBY PL
L AU REL
AV
AV
28
N
OR
E
2500
AV
1800
PACIFIC
WALNUT
POINSETTIA
3100
PALM
MAPLE
LAUREL
AGNES
FLOURNOY
2700
RD
AGNES
PL
RAILROAD
AV
PACIFIC
3000
AV
AV
AV
3500
AV
RD
RD
AV
RD
3500
AV
BLANCHE
00
0
12
N
BORDE
AV
AV
R
DUN
AV
FI ELD
SPR ING
T
20TH
AV
AVA AV
PARK
LN
ST
ST
1400
1ST ST
PENNEKAMP
19TH
18TH ST
2ND
1ST PL
RONDA D
21ST ST
1500
R
PE
HAR
25TH
T
21ST S
1200
ST
ST
AV
1700
LEGEND
Proposed WCBBP Telemetry Conduit Alignment
WCBBP Injection Well Location
WCBBP Observation Well Location
ATTACHMENT B
PER
AVIATION PL
MARLITA PL
ST
1400
CM
I NE
LL
ST
AV
1500
6TH
2600
ICH
V ILL
AGE
1500
BEACH
5TH
3RD
LONGFELLOW
EL
G RE
E NW
DR
1 800
AY
EW
ST
LEY
A
AN
R
HE
T
AT
NH
MA
ST
AV
PORTER
ST
C LE
CIR
CT
PL
700
TER
ST
PO WE R S
CIRC LE
DR
AV
GO
ULD
PL
LOM
PL
1000
V AL
AV
24 TH
ND
TR A AV
T
25TH
ST
OE S TE
DR
ERS
c:\ejb\arcview\sea water barrier\wcbbp_tel_mb.apr (8.5 X 11 Layout)
ON
UR CT
PL
IE W V
HER MOS A V
A
DR
E
SIL V
CT
CT
600
RN
MO
SID
E
DR
MONT EREY
S
21
ST
R
ARD MO
DR
24TH
ST
30TH
GOU
LD
AV
ING
DR
22ND
BRA E HOLM
DR
V AL LEY
IDE
L ES
ST
ND
STRA
D
23R
BOUNDARY
LONGFELLOW
600
ST
1000
DUNCAN
900
ST
1600
ST
8TH
1200
N
CA
DR
DR
CT
M
PAL
THE
24TH
ST
MARINE
AVENUE
15TH
10TH
TE RRA ZA
PL
S
VALLEY
OZ
T LE
MYR ONE
0
25 0
ST
ST
ST
1200
33RD
22ND ST
ST
11TH
9TH
DUNCAN
VALLEY PARK
CT
ST
ST
12TH
CA R D
100
S
R E AV
A RDM O
AV
AUG 11 2008 , 04:21:43 EBATMAN
100
E
GSID
NIN R
MOR
D
AV
AV
100
25TH
21ST
Data contained in this map is produced in whole or
part from the Thomas Bro. Maps digital database.
Thismap is copyrighted, and reproduced with
permission granted by Thomas Bros. Maps. All
rights reserved.
1ST
CT
LD
GOU
DR
1700 Feet
ST
ST
1300
1000
900
2ND
IN G
D
L AN
PALM
850
H
26 T ST
ST
1100
ST
ST
200
100
H
HIG
AN
ATT
ND
STRA
ST
H
27T
18TH
17TH
10TH
3RD
#Y
#Y
CT
H
27 T
H
26 T
19TH
14TH
ST
ST
300
1
H
MAN
CT
ST
H
28T 28T H
0
AV
S
GN IN
MO R SIDE
DR
100
AV
DR
ST
PL
T
ER S
HO M
ER
HO M
O
C ISC
N
PL
A
FR
ST
ST
ST
AV
PL
PL
400
D
300
ST
33R
PL
PL
200 D
ST
32N
PL
T
ST
31 S
H
30T 0TH
CT
3
H
T
9
ST
2
0
H
0
2
H
28 T
H
28T
29T
100
H
29T
850
PL
18TH ST
ST
6TH
5TH
DR
ND
R
TA D
E
N V IS
GSID
N IN
DR
MO R
SIDE
N
PL
ST
100
T
31S
400
ST
ST
8TH
DR
E
INGL
LA
HIGH
A
MOS
HER
THE
PL
1S T
1ST
ST
TH
1 35
H
35 T
H
34T H
34T D
33R
W
LLO
G FE
LON
600
PL
20TH
AV
BERMUDAPARK
23RD
1400
21ST
21ST
DOVER
PL
E
N
ST
MONT
EREY
COR ON A
D O CT
IN A
CT
CATAL
CT
MARIN
CEN
L AGE
TER
V IL
CT
DR
CAYM AN
LAGU NA
CT
CT
CORDOBA
NANTUCKET
CT
PL
PL
AV
E
OR
DM
AR
EY
PL
DR
AV
2ND
2ND
NEPTUNE AV
ST
DR
3RD
1
LL
VA
N
4TH
3RD
9TH
#Y
#
Y
PL
500
5T H
4T H
ST
ST
CRE N
700
6TH
H
11T
701
CIR
RR
SANTA
ROSA
CT
GR
EN
AD
EV CT
A
CT
1300
ST
22ND ST
MANHATTAN
800
#Y
PL
TA
VIE W
HAT
BAY
MAN
N
7TH TH
6
MANHATTAN
STATE 5TH
BEACH
ST
N
7TH
ST
PL
8T H
AN
OCE
8TH
N
0
10 0
ST
VIEW
H
11T
23RD
1100
ST
12TH CT
LADO
CT
PL
R
MARINE
ST
14TH
ESCUELA
ARBO-
700
PL
#Y
PL
PL
900
9TH
9TH
ST
400
N
10TH
H
10T
N
11TH
PL
1100
11TH
PL
TE
CEN
ST
N L
SA UE
MIG T
C
CT
GA
LA
MA
ST
R
DR
TE
CEN
#Y
H
12T
MANHATTAN
VILLAGE
SANTA
CRUZ
AV
RADISSON
PLAZA
GOLF
COURSE
ST
F
1700
MANHATTAN BEACH
ST
ST
2100
T
GA
H
12T
AV
12TH
PL
DR
13TH
PL
13TH
ST
17TH
VILLA
HIGH
13TH
ST
ST
MANHATTAN
VILLAGE
PARK
STR ATF OR D
ST
1100
DE
N
GS I
N IN
MO R
PL
H
14T
M
ARD
V IE W
PARK
FAIRWAY
ST
30TH
28TH
ST
801
RC H
CH U
ST
#Y
ST
H
14T
14TH
500
PL
H
15T
15TH
15TH
ST
33RD
ST
1000
23RD
ST
AN
PL
PL
ER
FISH AV
16TH
ST
ST
700
#Y
N
ER
DL L
A
SA
H
17T
EY
VALL
#Y
#Y
#Y
27TH
GREENBELT
PARK
#Y
0
G
DEE
PL
DR
N
ST
CR E
17TH
18TH
#Y
#Y
ST
FLOURNOY RD
ST
H
17T
300
H
16T
18TH
E
PL
H
18T
#Y
H
19T
N
19TH
DR
AV
ST
19
20TH
PL
N
0
ST
700
0
23
ST
LIVE
OAK
PARK
ST
D
LAN 00
AN
OCE
19T H
60
RD
500
PL
IGH
ND
T
21S 00
3
H
20T
CH
LA N
NB
0
240
2400
NH
N
A
ST R
IN E
MAR
AV
PL
500
INE
MAR PL
ST
ST
ST
ST
500
D
23R
D
23R
T
21S
PL
AV
H
24T
H
24T
ST
PL
25TH
R
ANO
N M IEW
V
AND
ST
DR
25TH
PL
27TH
26TH
PL
24TH
N GR
THE
H
26T TH
25
DR
ST
400
700
#Y
AM
C HAT H
ST
500
PL
ST
29TH
AV
PL
H
26T
PARK
BELL
500
DR
AV
27TH
PL
ST 400PL
2800
N
27TH
30TH
AV
3000
ST
28TH
PL
ST
31ST
N
PL
00
ST 4 PL
28TH
33RD
ST
ROSECRANS
2000
1100
TIB
ALMA
3100
ST
29TH
29TH
PL
31ST
SAND
DUNE
PARK
PL
300
ST
700
35TH
33RD
PL
ST
30TH
30TH
400
35TH
N BELL
PL
600
36TH
W
DVIE
ST
ST
T
31S
31ST
PL
900
800
PL
36TH
N
GRA
A
VIST
3500
32ND
IEW
BAYV
32ND
PL
ST
N
TTAN
ANHA
N M
D
33R
33RD
N
N
REST
N C
DR
3600
ST
500
400
AVIATION
S
DR
3900
ND
36TH 5T H
3
35TH 34TH
AV
ECRANS
ROS PL
210
0
E
2000
NS
PL
II
B
ST
ST
ST
VIEW
ST
ND
ST
ON E
NS T
ST
T
1S
4
ST
KELP
ST
H
40T
O
T
ST
OR
EL P
PL
39T H
ST
38T H
H
PL
38T
S
N
A
EC R
S
O
00
2
R
36TH
34TH
PARK
B
ST
CRE
ST
ST
ST
AV
2300
HA W A
ST
ALA
SKA
CHA
PMA
NW
Y
UP
600
RR
D WY
ALLIE
HUG HES
N
500
SEP
West Coast Basin Barrier Project
Telemetry System Conduit Alignment
MCU CABINET LOCATION
INJECTION WELL 5R
(Along Oak Street 600 ft from Greenway)
BEFORE
AFTER
ATTACHMENT C
1 OF 3
MCU CABINET LOCATION
INJECTION WELL 6B
(Inside existing chain-link fence near intersection of 12th Street and Ardmore Avenue)
BEFORE
AFTER
ATTACHMENT C
2 OF 3
MCU CABINET LOCATION
INJECTION WELL 6I2
(On existing paved area adjacent to Valley Boulevard between 1st Street and Francisco Street)