REGIONAL POLICY DIALOGUE ON STRENGTHENING TRANSPORT
REGIONAL POLICY DIALOGUE
ON
STRENGTHENING TRANSPORT
CONNECTIVITY IN SOUTHERN ASIA
Session 6: SOUTH ASIA –ASEAN CONNECTIVITY
TRANSIT AND TRADE FACILITATION
AND
DEVELOPMENT OF BORDER REGIONS
20TH NOVEMBER, 2014
Dr. Manoj Singh, Adviser (Transport)
PLANNING COMMISSION, GOVERNMENT OF INDIA
NEW DELHI
EXISTING RAIL NETWORK IN THE
NORTH EAST
State
Broad Gauge
Meter Gauge
Total (Km)
-
1.26
1.26
Assam
1,443.03
990.96
2,433.99
Tripura
-
151.40
151.40
Nagaland
11.13
1.72
12.85
Manipur
-
1.35
1.35
Mizoram
-
1.50
1.50
Meghalaya
-
-
-
Sikkim
-
-
-
1,454.16
1,148.19
2,602.35
Arunachal Pradesh
Total
MASTER PLAN FOR THE DEVELOPMENT OF RAIL INFRASTRUCTURE IN
THE NORTHEAST REGION
RAILWAYS : ON-GOING PROJECTS
IN NORTH EAST (2013-14)
New
Line
Gauge
Doubling
Conversion
Total
Projects in progress (Nos.)
14
4
2
20
Of which, National Projects
(Nos.)
8
2
-
10
Throw forward (Rs. Crore)
as on 1.4.2013
21,689
2,071
2,044
25,806
($4.3 b)
Of which, National Projects
(Rs. Crore)
16,354
1,586
-
17,940
($3 b)
965
1,510
44.92
2,520
Length of ongoing works
(Km)
5
EXPENDITURE ON N.F.RAILWAY (Construction)
(NEW LINES, GAUGE CONVERSION & DOUBLING)
Total –Rs 12810 Crs (Last 5yrs)
7000
*Projected
6000
2009-10
2010-11
5743
4000
2009-10
2010-11
2011-12
3575
2226
1000
2204
2000
2838
3000
1967
Rs in Crore
5000
2012-13
2013-14
2014-15
0
2012-13
2011-12
2013-14
2014-15
COMMISSIONING OF B.G RAILWAY LINE
Commissioning (Based on CRS Inspection)
450
400
* Targeted
350
2009-10
2010-11
250
2011-12
457.76
300
309.24
200
2009-10
2010-11
0
2011-12
2012-13
2013-14
2012-13
2013-14
2014-15
10.18
50
89.05
100
169.26
150
88.53
Commissioned Length (Km)
500
2014-15
ACHIEVEMENTS
Year
New Line
Gauge
Conversion
Doubling
2007-08
20
107
-
2008-09
113
170
-
2009-10
-
110
-
2010-11
58
110
31
2011-12
148
409
-
2012-13
61.50
206.18
-
2013-14
2.0
154
-
Progress of Railway Projects - I
•
Additional financial resources (Rs.314 crore in in 2013-14) in Rangiya –
Murkongselek Gauge Conversion have helped early completion of the following
sub-parts:
 Rangiya-Rangapara – North Dekargaon
operationalized on 4th January 2014
(Tezpur)
(186
km)
completed
&
 Rangapara (N)–Harmuti (143 km) – Target Completion: Mar. 2014. completed on 28th
March, 2014.
 Harmuti-Murkongselek (184 km) – TDC: March, 2015. Will be completed on schedule.
 Balipara-Bhulkpong (New Line 35 km) – TDC: March, 2015. Will be completed on
schedule.
• New line Harmuti-Naharlagun (21.75 km): first connectivity to Arunachal
Pradesh. TDC: March. 2014. Completed on 29th March, 2014. First Train service
ran on 7th April, 2014.
• Lumding-Silchar (421 km) and branch lines - Gauge Conversion expected Mar.st
2015 for Main Line/June 16 for branch lines. On Schedule – Mega Block since 1
Oct. 2014.
• Dudhnoi-Mendipathar (19.75 km): first connectivity to Meghalaya (10 km) –
TDC: March. 2014 and revised TDC: Sep., 2014. Completed in Aug. 2014.
• Bogibeel Rail-cum-Road Bridge (across Brahmaputra) with 73 km link lines to
be completed by Dec. 2016.
9
NAHARLAGUN STATION
(Arunachal Pradesh)
MENDIPATHAR STATION
(Meghalaya)
Pictures of Completed Projects
Progress of National Railway Projects - 2
Name of Project
Rangiya-Murkongselek with linked fingers
(520 km) (Assam)
Lumding-Silchar, incl. Branch (GC) lines &
MMs (421 km)
(Assam, Manipur, Mizoram, Tripura)
Tetelia-Byrnihat (21.50 km) (Meghalaya)
Cost
(Rs. Crore)
Progress
(%)
TDC
3,019
94%
Marc, 14
5,185
93%
Mar. 15/
June. 16
385
17%
Jiribam- Tupul -Imphal (111km) (Manipur)
5,996
31%
Mar.17
Mar. 16/
Mar.18
Kumarghat – Agartala (109 km) (Tripura)
1,151
82%
March, 16
Agartala - Sabroom (112 km) (Tripura)
1,741
33%
June.16
Bogibeel Bridge with linking lines (73 km)
(Assam)
5,000
65%
Dec.16
Bhairabi-Sairang (51.38 km) (Mizoram)
2,393
12%
March,2020
Sivok-Rangpo (44.39 km) (Sikkim)
Dimapur-Zubza (Kohima) (88 km)
(Nagaland)
Byrnihat-Shillong (108.40 km)
(Meghalaya)
3,380
0%
March,2020
2,447
1%
March,2020
4,083
1%
Not fixed
11
Railway Projects: Major Thrust in the 12th Plan
•
•
•
7 National Projects will be completed during the 12th 5 Year Plan
This will Enable Up-gradation of Rail Network in Major parts of North East
 North Bank of Brahmaputra Upgraded to BG
 Main Arterial Route in form of Lumding – Silchar upgraded to BG which will
provide Trunk Route for Capital Connectivity
To Achieve the Above, apart from Funds, Land and Other Issues Require Resolution
with help of State Governments
 Progress in Tetelia – Byrnihat and Byrnihat–Shillong affected due to nonavailability of land and Khasi students’ agitation (Meghalaya)
 Land Issue between Revenue and Forest in Jiribam – Imphal Project (Manipur)
 Land acquisition in Sivok – Rangpo (Assam & Sikkim) and Land acquisition in
Agartala – Sabroom (Tripura)
• Road Stretches that Need Urgent Attention in View of Mega Block: NH-54 is a bad
shape and will take atleast March 2016 to complete. Beyond Halflong, NH-54 is in
bad shape up to next 40 Km up to Harangajao (NHAI). NH-44 between KarimganjChuraibari,
(40
Km
)
and
between
Sonapur-Badarpur
(BRO).
12
INDO-MYANMAR RAIL
CONNECTIVITY
RAIL PROJECTS IN MANIPUR
RAIL MAP OF MYANMAR
Myanmar: India’s Land Bridge to ASEAN
Asian Railway Network
17
BROAD PROJECT PARAMETERS OF
INDO-MYANMAR RAIL
CONNECTIVITY
• Imphal – Moreh – 111 Kms – Rs. 5500 Crores ($ 1
b)
• Moreh – Kalay – 130 Kms – Rs. 3000 Crores ($ 0.5
b)
• Possibility of funding by JICA, ADB, and other
Multi-lateral Agencies;
Road Development in the North East

Two Major Projects Going On Presently
 East West Corridor (Silchar in Assam to Porbandar in
Gujarat)
Completed length is 500 km (81%)
Likely completion date : Dec. 2014
 Special Accelerated Road Development Project in the North
East (SARDP-NE)
 Phase ‘A’ – 4,099 km (Project cost Rs.21,000 crore)
 Phase ‘B’ – 3,723 km (Only DPR approved)
 Arunachal Package (MoRTH, Arunachal PWD and
BRO)
 2,319 km (Rs.11,919 crore)
 Total Investment : Rs 40,000 crores ($ 7 b)
19
Progress of Phase ‘A’ and Arunachal Package
(In Kms)
•
•
•
Item
Total
Length
Target
Work
Sanctioned/
Awarded
Roads
Completed
Phase ‘A’
4,099
2,505
1,214
Arunachal
Package
2,319
1,341 (58%)
113 (5%)
Total
6,418
3,846 (60%)
1,327
(21%)
Targeted/Expected
Date for
Completion
June,
2015/March2017
June,
2016/March2018
Upgrade National Highways connecting state capitals to
2/4 lane
Connect 88 District Headquarters of NER by at least 2
lane roads
Improve connectivity to neighbouring countries/border
areas
20
International Road Gateway
• Moreh to Guwahati
– Moreh – Imphal : NH 39 - 120 km – 2 lane road –
3 hrs
– Imphal – Jiribam – Silchar : NH 53 - 240 km – 2
lane : 8 hrs
– Silchar – Guwahati : East West Corridor – 325 km –
6 hrs
– Total : 700 kms : 17 hrs
Thank You for Your Attention
[email protected]
MAP OF MANIPUR
155
150
MELURI
MAO
MARAM
150
SENAPATI
KANGPOKPI
UKHRUL
39
TAMENGLONG
150
53
YAINGANGPOPKI
KHONSANG
IMPHAL
JIRIBAM
53
NUNGBA
THOUBAL
BISHNUPUR
39
PALEL
150
CHURACHANDPUR
LEGEND :MOREH
TIPAIMUKH
CHANDEL
1. NH with PWD
2. NH with BRO
3. Roads transferred from
Phase ‘B’ to Phase ‘A’
4. State Boundary
ROING
37
52
MAP OF ASSAM
DHOLA
JONAI
ARUNACHAL
37
MAKUM
TINSUKHIA
PRADESH
52
RUPAI
38
BORDUMSA
LEKHAPANI
DIBRUGARH
DIGBOI
NORTH
LAKHIMPUR
37
52B
ITANAGAR
BANDER
DEWA
52A
52
UDALGURI
ROWTA
BASKA
152
31
31C
52
KOKRAJHAR
31
BAKSHIRHAT
31B
GUWAHATI
PAIKAN
SILGHAT
KAZIRANGA
37
GOLAGHAT
39
NAGAON
MANJA
37
DABOKA
54
GOALPARA
DHUBRI
37
TEZPUR
MORIGAON
SRIRAMPUR
BAIHATA
BARPETA CHARALI
61
GOHPUR
37
NAGALAND
36
DIPHU
DIMAPUR
LUMDING
51
62
MANIPUR
MEGHALAYA
HAFLONG
LEGEND :-
BADARPUR
44
JATINGA
SILCHAR
151
54
44
154
CHURAIBARI
1. NH with PWD
2. NH with BRO
3. NH with NHAI
4. State Boundary
5. SARDP-NE Phase ‘A’
6. Roads Transferred from
Phase ‘B’ to Phase ‘A’
153
54
MAP OF MIZORAM
BILKHAWTLIR
154
44A
KOLASIB
MAMIT
150
AGARTALA
`
44A
SELLING
SAIRANG
AIZWAL
CHAMPAI
54
SERCHHIP
54A
LUNGLEI
THERIAT
54 B
SAIHA
LAWNGTLAI
LEGEND :54
S. BUNGTLANG
TUIPANG
HMAWNGBU
TO KALETWA
( MYANMAR)
502A
1. NH
2. Roads transferred from
Phase ‘B’ to Phase ‘A’
3. Kaladan Multi Model
Transit Transport
Project
MAP OF TRIPURA
KUKITAL
CHURAIBARI
KAILASAHAR
44
MIZORAM
KUMARGHAT
MANU
Khowai
SIMLUNG
AMBASSA
44
AGARTALA
44A
Teliamura
UDAIPUR
Amarpur
44
LEGEND :-
1.
2.
3.
4.
5.
SABROOM
NH with BRO
SARDP-NE Phase ‘A’
Road under Phase ‘B’
State Boundary
District Headquarters
MAP OF MEGHALAYA
31C
EAST WEST CORRIDOR
TO NAGAON/ SILCHAR
TO PORBANDER
BAIHATA
CHARALI
ASSAM
31B
GUWAHATI
JORABAT
37
31
NONGPOH
CHAIGAON
Phulbari
TO TEZPUR
52
31
DAMRA
BADAPANI
KYRSHAI
51
ASSAM
40
62
SHILLONG BYPASS
RAMBRAI
RONGJENG
SHILLONG
NOINGSTOIN
TURA
JOWAI
44
E
44
PAMBRIEW
WILLIAMNAGAR
40
LAITLAWSNAI
MAWTHABAH
DOMIASIAT
62 BAGHMARA
DALU
NONGHYLLAM
WAHKAJI
PHLANGDILION
RANIKOR
MAHESKHOLA
BORSORA
BANGLADESH
44
40
DAWKI
LEGEND :-
TO
AGARTALA
1. NH with PWD
2. NH with NHAI
3. New NH (Yet to be entrusted)
4. Roads transfer from
Phase ‘B’ to Phase ‘A’
5. State Boundary
Roads covered for
improvement in
Arunachal Pradesh
under SARDP-NE
Yingkiong
Aalong
Daporijo
Anini
GORGING
BISHING
Roing
JIDO
PONGO
Koloriang
Tezu
SINGA
MIGGING
SAKRAM POINT
LUNGTE
TATO
BILE
Seppa
MARIYUNG
PANGIN
Ziro
Tawang
BAME
JONAI
229
LUMLA
Yupia
ZORAM
TASHIGAONG
Potin
CHOWKHAM
SADIA
DHOLA
Hawai
52
MAHADEVPUR
RUPAI
52B
TINSUKIA
NAMCHIK
JAIRAMPUR
Lalpul
DIBRUGARH
PANGSU PASS
153
BIMLAPUR
SIBSAGAR
BANDER DEWA
ITANAGAR
HOLONGI
BALIPARA
AKAJAN
NORTH
LAKHIMPUR
Hoj
NECHIPU
37
Ext
229
PAKA
Being improved to 2 lane by BRO
under China Study Group(CSG)
Koronu
Paya
TAHILA
Bomdila
229
BOMJIR
52
GOHPUR
52B
52B
KANUBARI
Changlang
LEGEND :-
Pasighat
A. Roads under Arunachal Package
To Srirampur
NUMALIGARH
SILGHAT
Baihata
Charali
GUWAHATI
Khonsa
1. Trans Arunachal Highway(NH-229, 52 & 52B)
2. Roads connecting remaining 5 DHQs
3. Road stretches proposed on Annuity basis
B. Roads under Phase ‘A’
NAGAON
TO
SILCHAR
ROUTE OF 4 LANE CONNECTIVITY
OF ITANAGAR WITH EAST WEST
CORRIDOR AT NAGAON
Other National Highways
East West Corridor
DISTRICT HEADQUARTER TOWN
MAP OF SIKKIM
MANGAN
SIKKIM
NATHULA
SHERATHONG
RANGRANG
Tashiview Point
MENLA
DIKCHU
ZULUK
Gangtok Bypass
(under Ph A)
LEGSHIP
GYALSHING
SINGTAM
TARKU
`
NAYABAZAR
MANPUR
NAMCHI
PADAMCHEN
ARITAR
PAKYONG
RONGLI
RANGPO
ALGARAH
BHUTAN
TANGTA
THODE
RIVER TEESTA
LAVA
JALDHAKA
MELLI
LOLEGAON
31A
LEGEND
1. Existing National Highways
2. G- N Road under Phase- A
3. Other Roads
4. Alternate route (NH 31A)
5. New Roads to be
constructed
6. East-West Corridor
7. Roads transferred from
Phase ‘B’/added to Phase ‘A’
BENGAL
SIVOKE
31
RACHELA
RORATHANG RHENOK
KALIMPONG
WEST
GANGTOK
ROLEP
RANIPUL
31A
NEPAL
TIBET
KUPUP
ORIGINAL ROUTE
APPROVED
ALIGNMENT
NIMBONG
ROUTE Proposed
by BRO as
recommended by
DG (Forest)
31
CHALSA
KHUNIAMORE
BAGRAKOT
DAMDIM
31
BAGDOGRA
SILIGURI
JALPAIGURI
BANGLADESH
ASSAM
SIMULGURI
(NH-37 ASSAM)
MAP OF NAGALAND
TIZIT
NAGINIMARA
Amguri
TAMLU
Tuli
MON
MERANGKONG
LONGLENG
CHANGTONGYA
TOBU
61
ASSAM
Bhandari
155
TUENSANG
MYANMAR
MOKOKCHUNG
Sanis
WOKHA
NIULAND
BOKAJAN
DIMAPUR
61
ZUNHEBOTO
KIPHIRE
39
TSEMINYU
36
PHEK
Shedhunmi
Proposed
CHUMUKEDIMA
Ghaspani
KOHIMA
150
Dimapur Bypass
39
PEREN
39
Proposed
Kohima Bypass
KHELMA
ATHIBUNG
Leikie
155
SATAKHA
CHAKABAMA
Laruri
JESSAMI
PFUTZERO
LEGEND :ZHAMAI
TO
IMPHAL
MANIPUR
1. National Highways
2. SARDP-NE, Ph-A
3. Transferred
from Ph-B to Ph-A
4. Proposed NH
5. State Boundary
Drawn By :- Neeraj Pant, D/Man Gr-II (P-8), M/O RT&H
Airports in NE
Arunachal Pradesh
Daparizo Along Pasighat
Itanagar
Pakyong
Ziro
Dibrugargh
Sikkim
North Lakhimpur
(Lilabari)
Bagdogra
Guwahati
Rupsi
West Bengal
Shillong
Meghalaya
Assam
Operational
6
3 IAF, 3 AAI
2
Nagaland
5
Manipur
1
-
Meghalaya
1
1
Mizoram
1
1
Nagaland
1
-
Tripura
1
3
Sikkim
-
-
1*
-
11+1
12
Agartala
Tripura
Chiethu/
Kohima
Dimapur
Silchar
Kailashahar
Kamalpur
Khowai
-
Total
Shella
NonOperational
Arunachal
Pradesh
West Bengal
Jorhat
Tezpur
Assam
Tura
State
Tezu
Imphal
Manipur
Lengpui
Mizoram
LEGEND
Turial
Operational
(11+1)
Non-Operational (12)
* Bagdogra Airport, although in
Eastern Region, is included as it is
the
gateway
to
North-East
including Sikkim State
Greenfield (3)
32
mmm
33
NAGALAND
TEJPUR
SILGHAT
INDO – BANGLADESH
PROTOCOL ROUTES
P
31C
I
N
D
JOGIGHOPA
DHUBRI
I
A
ASSAM
PANDU
31
DISPUR
37
P
37
36
KOHIMA
DAIKHAWA
31
40
SHISHUMARA
SHILLONG
51
CHILMARI
MEGHALAYA
53
BAHADURABAD
34
MANIPUR
ZAKIGANJ
SYLHET
LAKHIPUR
53
BHANGA
KARIMGANJ
MARKULI
B A N G L A D E S H
GODAGARI
SIRAJGANJ
RAJSHAHI
P
DHULIAN
BAGHABARI
IMPHAL
P
FENCHUGANJ
SHERPUR
AJMIRIGANJ
54
BHAIRAB
BAZAR
ARICHA
DHAKA
ASHUGANJ
AKHAURA
44
TRIPURA
AGARTALA
AGARTALA
NARAYANGANJ
N
AIZWAL
MIZORAM
P
Legend
CHANDPUR
2
35
KOLKATA
P
6
KHULNA
BARISAL
P
CHALNA
KAUKHALI
P
MONGLA
41
HALDIA
ANGTIHARA
P
NAMKHANA
Bay of Bengal
Declared National waterway
Proposed National waterway
Protocol route
Road
Rail
NH
51
Protocol route distances
Kolkata – Silghat………….. ...... 1720 Km
Kolkata - Karimganj...................1318 Km
Silghat- Karimganj………………1410 Km
Dhulian-Rajshahi...........................78
Km
34 34
Myanmar (Burma)
Proposed National Waterway (No 6)
River Barak
Bhanga
Badarpur
Silchar

Stretch
Km
Bhanga - Lakhipur
121
Length –121 km

Development cost -Rs 123.3 Cr (at 2012 prices)

Status: Declaration in process – Bill likely to be introduced in Budget
session 2013
3
5
•
•
Airports Development (2012-17) - I
Development of Airports at
 Pakyong – New TDC: Dec. 2014. Need resolution of land acquisition for AAI
Colony, shifting of 16 local residences and approach road from Pakyong to
Gangtok
 Itanagar – State Govt. to provide land acquisition (1,037 acres), Rehabilitation,
Compound Wall, Approach Road, Electricity/Water supply. PIL challenging site
before Guwahati High Court
 Cheithu – Alternative site needs to be selected by State Government
Modernize selected Airports by AAI
 Guwahati– Construction of 3 hangars for A-321. TDC – Sep. 2014
 Dibrugarh – Runway extension (32 acres land acquisition)
 Jorhat - Apron extension completed (30 Nov. 2013). New Terminal Building
planned
 Shillong – Upgradation at Barapani taken up. 32 acres defence land required.
Work stopped (August 2012) due to local agitation
 Imphal : Notified international airport (14 Nov. 2013) with connectivity to
South/East Asian countries. Extension of Apron & Boundary Wall Work going
on
 Agartala – New Terminal building in planning stage
36
Airports Development - II
•
Airports in Arunachal Pradesh & Meghalaya (Non-operational)
•
 Operationalize Along, Daparizo, Passighat, Tezu, Ziro (Arunachal Pradesh)
 Daparijo (Arunachal Pradesh to sort out Land Acquisition Issues)
 Greenfield Airport in Tawang (Arunachal Pradesh) – to be finalized after NOC
from MoD
 Tura (Meghalaya) land acquisition issues.
Average no. of departures per week from NE Airports increased sharply.
2001
•
2011
2012
226
581
497
Larger and more regular air connectivity to NER, specifically within the region
necessary.
 Guwahati being developed as a regional hub (Sept. 2014). Will help improve
connectivity
 Intra-regional network in NE is weak and needs to be developed. NEC has
invited bids (with VGF support) with little success so far
 Need to approve recommendations of Committee under Member (NE), PC on
issues relating to air connectivity by Alliance Air. Shillong-Kolkata services
37
resumed since 10 Jul. 2013, may be discontinued again by Alliance Air
Roads

East West Corridor (NHAI)
Completed length is 500 km (81%)
Likely completion date : Dec. 2014
Critical issues:
 Land availability. Likely to be resolved by State Govt.
•
Guwahati–Nalbari (14 km) (Assam)
•
Maibong–Harangajao (16 km) (Assam)
 Clearance for extraction of Mines & Minerals (State Govts.)


SARDP-NE (MoRTH, State PWDs, BRO)

Phase ‘A’ – 4,099 km (Project cost Rs.21,000 crore)

Phase ‘B’ – 3,723 km (Only DPR approved)
Arunachal Package (MoRTH, Arunachal PWD and BRO)

2,319 km (Rs.11,919 crore)
38
Progress of Phase ‘A’ and Arunachal Package
(In Kms)
•
•
Item
Total
Length
Target
Work
Sanctioned/
Awarded
Roads
Completed
Phase ‘A’
4,099
2,505
1,214
Arunachal
Package
2,319
1,341 (58%)
113 (5%)
Total
6,418
3,846 (60%)
1,327
(21%)
Targeted/Expected
Date for
Completion
June,
2015/March2017
June,
2016/March2018
Work Sanctioned and Awarded Likely to be 5800 Km (84%) by March 2015.
Steps taken to strengthen project execution:
 ADG (1), CE (3) at Guwahati, Agartala & Itanagar posted.
 Tripura PWD Engineers (7) seconded to Ministry for NH-44 work at Agartala
 PIU (2) at Guwahati, PIU (2) at Itanagar and PIU (1) at Agartala
 PIU (1) at Imphal to look after work of NH-53 & construction of 2 bridges –
Barak and Makru
 Non-strategic roads off-loaded from BRO
39
Agency-wise Re-Distribution of Road Lengths
under SARDP-NE & Arunachal Package
Agency
BRO
PWD
Ar. Pradesh
Assam
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
NHAI
MoRTH
Total
Original
Ar.
Phase 'A'
Package
Total
Modified
Ar.
Phase 'A'
Package
Total
1247
812
2059
578
558
1136
52
633
685
52
887
939
745
609
299
342
207
0
394
204
4099
98
776
2319
843
609
299
342
207
394
980
6418
984
58
609
299
342
304
130
539
204
4099
98
776
2319
1082
58
609
299
342
304
130
539
980
6418
40
Map of Sikkim
MANGAN
NATHULA
TIBET
MENLA
GYALSHING
Tashiview
Point
Gangtok
Bypass
GANGTOK
ROLEP
RANIPUL
TARKU
NEPAL
31A
PAKYONG
RONGLI
SINGTAM
LEGSHIP
ARITAR
RACHLA
RHENOK
NAMCHI
NAYABAZAR
MANPUR
BHUTAN
RISHI
PAYONG
TANGTA
ALAGARH
RANGPO
THODE
KALIMPONG
LEGEND
1. Existing National Highways
2. East West Corridor
3. Gangtok- Nathula Road
under Phase- A of SARDP-NE
4. Alternate route to Gangtok
(i) Original Alignment
(ii) Proposed New Alignment
5. District Connectivity roads in
Phase ‘A’ of SARDP-NE
6. Roads under Phase – B
of SARDP-NE
MELLI
LAVA
RIVER
TEESTA
JALDHAKA
SHYLAPOKHARI
Km 49.00
WEST
BENGAL
31A
New alignment
suggested
by DG (Forest),
MoEF
SIVOKE
DAMDIM
CHALSA
SILIGURI
31
ORIGINAL
ALIGNMENT
APPROVED
by CCEA
BAGRAKOT
31
To ASSAM
Map of Sikkim
MANGAN
NATHULA
Tashiview
Point
Gangtok
Bypass
GANGTOK
ROLEP
RANIPUL
TARKU
NEPAL
31A
PAKYONG
RONGLI
SINGTAM
LEGSHIP
NAMCHI
ARITAR
RORATHANG
RHENOK
NAYABAZAR
MELLI
LEGEND
BAGDOGRA (km566)
RACHLA
BHUTAN
TANGTA
MANPUR
1. Existing National Highways
2. East West Corridor
3. G- N Road under Phase- A
4. Alternate route to Gangtok
(i) Existing road
(ii) New roads to be constructed
5. New roads added to Phase ‘A’
6. Roads transfer from Phase ‘A’
to Phase ‘B’.
7. SARDP- NE Phase – B
TIBET
MENLA
GYALSHING
WEST
RANGPO
RIVER
TEESTA
THODE
JALDHAKA
BENGAL
31A
SIVOKE (km 595)
SILIGURI
31
31
To ASSAM
CHALSA
MAP OF SIKKIM
MANGAN
SIKKIM
NATHULA
SHERATHONG
RANGRANG
Tashiview Point
MENLA
DIKCHU
ZULUK
Gangtok Bypass
(under Ph A)
LEGSHIP
GYALSHING
SINGTAM
TARKU
`
NAYABAZAR
MANPUR
NAMCHI
PADAMCHEN
ARITAR
PAKYONG
RONGLI
RACHELA
RORATHANG RHENOK
RANGPO
ALGARAH
BHUTAN
TANGTA
THODE
RIVER TEESTA
LAVA
KALIMPONG
JALDHAKA
MELLI
LOLEGAON
WEST
31A
LEGEND
1. Existing National Highways
2. G- N Road under Phase- A
3. Other Roads
4. Alternate route (NH 31A)
5. New Roads to be
constructed
6. East-West Corridor
7. Roads transferred from
Phase ‘B’/added to Phase ‘A’
BENGAL
SIVOKE
31
GANGTOK
ROLEP
RANIPUL
31A
NEPAL
TIBET
KUPUP
ORIGINAL ROUTE
APPROVED
ALIGNMENT
NIMBONG
ROUTE No.2
Proposed by Forest
Deptt. WB. Existing
Jeepable track.
31
ROUTE No.1
Proposed by Forest
Deptt. WB. Existing
BRO road.
CHALSA
KHUNIAMORE
BAGRAKOT
DAMDIM
31
BAGDOGRA
SILIGURI
JALPAIGURI
BANGLADESH
ASSAM
Map of Sikkim
MANGAN
NATHULA
TIBET
MENLA
GYALSHING
Tashiview
Point
Gangtok
Bypass
GANGTOK
ROLEP
RANIPUL
TARKU
NEPAL
31A
PAKYONG
RONGLI
SINGTAM RHENOK
LEGSHIP
NAMCHI
BHUTAN
RISHI
PAYONG
NAYABAZAR
MANPUR
ARITAR
RACHLA
TANGTA
ALAGARH
RANGPO
THODE
KALIMPONG
LEGEND
1. Existing National Highways
2. East West Corridor
3. G- N Road under Phase- A
4. Alternate route to Gangtok
(i) Existing road
(ii) New roads to be constructed
5. New roads added to Phase ‘A’
6. Roads transfer from Phase ‘A’
to Phase ‘B’.
7. SARDP- NE Phase – B
MELLI
LAVA
RIVER
TEESTA
JALDHAKA
SHYLAPOKHARI
Km 49.00
WEST
BENGAL
31A
ROUTE No.2
Proposed by Forest
Deptt. WB. Existing
Jeepable track.
SIVOKE
ROUTE No.1
Proposed by Forest
Deptt. WB. Existing
BRO road.
DAMDIM
CHALSA
SILIGURI
31
ORIGINAL ROUTE
APPROVED
ALIGNMENT
BAGRAKOT
31
To ASSAM
•
Road Sector Issues
Need for special focus on:
 Work on connecting Sikkim (NH-31A, Sivok-Gangtok-Nathula by BRO)
has progressed at a slow pace. New TDC March 2016
 Work on NH-44 has been stalled for quite some time. Need for fast pace
after the re-distribution & being taken up by State PWD
 Work on NH-53 (Jiribam-Imphal) critical. Needs early completion
 Silchar Bridge being replaced with support from M/o DONER. Need for
early completion of project
 Dhola Sadiya Bridge (river Brahmaputra) targeted for completion in 2015.
Work going on well
 Road to Vijaynagar from Miao needs early sanction
 Construction of Bridge over Feni river (Tripura) connecting Bangladesh
taken up with MEA support. Work should start early
 Replacement of all semi-permanent timber bridges in the region. Special
focus and be funded by State Govts., along with Central assistance under
SPA over next 3 years. A special scheme needs to be launched to complete
this
47
Airports in NE
Arunachal Pradesh
Daparizo Along Pasighat
Itanagar
Pakyong
Ziro
Dibrugargh
Sikkim
North Lakhimpur
(Lilabari)
Bagdogra
Guwahati
Rupsi
West Bengal
Shillong
Meghalaya
Assam
Operational
6
3 IAF, 3 AAI
2
Nagaland
5
Manipur
1
-
Meghalaya
1
1
Mizoram
1
1
Nagaland
1
-
Tripura
1
3
Sikkim
-
-
1*
-
11+1
12
Agartala
Tripura
Chiethu/
Kohima
Dimapur
Silchar
Kailashahar
Kamalpur
Khowai
-
Total
Shella
NonOperational
Arunachal
Pradesh
West Bengal
Jorhat
Tezpur
Assam
Tura
State
Tezu
Imphal
Manipur
Lengpui
Mizoram
LEGEND
Turial
Operational
(11+1)
Non-Operational (12)
* Bagdogra Airport, although in
Eastern Region, is included as it is
the
gateway
to
North-East
including Sikkim State
Greenfield (3)
48
•
•
Airports Development (2012-17) - I
Development of Airports at
 Pakyong – New TDC: Dec. 2014. Need resolution of land acquisition for AAI
Colony, shifting of 16 local residences and approach road from Pakyong to
Gangtok
 Itanagar – State Govt. to provide land acquisition (1,037 acres), Rehabilitation,
Compound Wall, Approach Road, Electricity/Water supply. PIL challenging site
before Guwahati High Court
 Cheithu – Alternative site needs to be selected by State Government
Modernize selected Airports by AAI
 Guwahati– Construction of 3 hangars for A-321. TDC – Sep. 2014
 Dibrugarh – Runway extension (32 acres land acquisition)
 Jorhat - Apron extension completed (30 Nov. 2013). New Terminal Building
planned
 Shillong – Upgradation at Barapani taken up. 32 acres defence land required.
Work stopped (August 2012) due to local agitation
 Imphal : Notified international airport (14 Nov. 2013) with connectivity to
South/East Asian countries. Extension of Apron & Boundary Wall Work going
on
 Agartala – New Terminal building in planning stage
49
Airports Development - II
•
Airports in Arunachal Pradesh & Meghalaya (Non-operational)
•
 Operationalize Along, Daparizo, Passighat, Tezu, Ziro (Arunachal Pradesh)
 Daparijo (Arunachal Pradesh to sort out Land Acquisition Issues)
 Greenfield Airport in Tawang (Arunachal Pradesh) – to be finalized after NOC
from MoD
 Tura (Meghalaya) land acquisition issues.
Average no. of departures per week from NE Airports increased sharply.
2001
•
2011
2012
226
581
497
Larger and more regular air connectivity to NER, specifically within the region
necessary.
 Guwahati being developed as a regional hub (Sept. 2014). Will help improve
connectivity
 Intra-regional network in NE is weak and needs to be developed. NEC has
invited bids (with VGF support) with little success so far
 Need to approve recommendations of Committee under Member (NE), PC on
issues relating to air connectivity by Alliance Air. Shillong-Kolkata services
50
resumed since 10 Jul. 2013, may be discontinued again by Alliance Air
Inland Water Transport in the NE Region
• 891 Km National Waterway-2 on River Brahmaputra along with
Indo-Bangladesh Protocol Route provides safe, cheap and eco–
friendly route for carriage of commodities
 Navigability of 2.0-2.5 meter depth along with navigation aids and ten
floating terminals maintained by IWAI
 16 Floating terminals for passengers funded by MoS will be commissioned
by March 2014. 4 already operational
•
•
Inland Water Port at Pandu developed with high level and low
level jetties, two warehouses, Railway siding and open storage:
Land for Connecting Road needs resolution with NFR/Govt. of
Assam
IWAI is developing:
 Ro-Ro facility at Dhubri and Hatsingimari (opposite bank of Brahmaputra)
to reduce travel time of vehicles between Meghalaya and Dhubri in Assam
which now have to go over Jogighopa bridge covering a distance of 220 km
 Vessel repair facility at Pandu (Guwahati). Assam Govt. to expedite transfer
of land
51
I
Aizwal
N D I A
I
BANGLADESH
N D I A
Lawngtlai
Myeikwa (IM Border)
Kaletwa
Myanmar
Bay of Bengal
Kolkata
Sittwe
539 km
Sea
Sittwe
Paletwa
158 km
IWT
Paletwa
Kaletwa
67 km
Road
Kaletwa
Myeikw
a (IM
Border)
62 km
Road
Myeikwa (IM
Border)
Lawngtl
ai
100 km
Road
Lawngtlai
Aizwal
334 km
Road
Kolkata
Aizwal
1260 km
Paletwa
Kyauktaw
Sittwe 52
• North East has special requirements of transport because of
topographical challenges (hilly, landslides )
– Transport Infrastructure benefits in NE States.
– It is provides neighbouring countries.
– Area: 0.26 million sq land and 46 million population.
– Partition: Distanced the NE Region to the rest of India by connecting
countries to the narrow 27 km wide.
– 96 % of the boundary of region frame international burdens.
• Challenges for NE Region:
– Complete the progress of infrastructure in NE Region;
– Create institutional & functional mechanisms to sustain and maintain the
infrastructure.
– Well Policy region for free movements of govt./service and from NE region
to the international neighbour.
60
Agency-wise Re-Distribution of Road Lengths
under SARDP-NE & Arunachal Package
Agency
BRO
PWD
Ar. Pradesh
Assam
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
NHAI
MoRTH
Total
Original
Ar.
Phase 'A'
Package
Total
Modified
Ar.
Phase 'A'
Package
Total
1247
812
2059
578
558
1136
52
633
685
52
887
939
745
609
299
342
207
0
394
204
4099
98
776
2319
843
609
299
342
207
394
980
6418
984
58
609
299
342
304
130
539
204
4099
98
776
2319
1082
58
609
299
342
304
130
539
980
6418
61
•
Road Sector Issues
Need for special focus on:
 Work on connecting Sikkim (NH-31A, Sivok-Gangtok-Nathula by BRO)
has progressed at a slow pace. New TDC March 2016
 Work on NH-44 has been stalled for quite some time. Need for fast pace
after the re-distribution & being taken up by State PWD
 Work on NH-53 (Jiribam-Imphal) critical. Needs early completion
 Silchar Bridge being replaced with support from M/o DONER. Need for
early completion of project
 Dhola Sadiya Bridge (river Brahmaputra) targeted for completion in 2015.
Work going on well
 Road to Vijaynagar from Miao needs early sanction
 Construction of Bridge over Feni river (Tripura) connecting Bangladesh
taken up with MEA support. Work should start early
 Replacement of all semi-permanent timber bridges in the region. Special
focus and be funded by State Govts., along with Central assistance under
SPA over next 3 years. A special scheme needs to be launched to complete
this
62
Roads

East West Corridor (NHAI)
Completed length is 500 km (81%)
Likely completion date : Dec. 2014
Critical issues:
 Land availability. Likely to be resolved by State Govt.
•
Guwahati–Nalbari (14 km) (Assam)
•
Maibong–Harangajao (16 km) (Assam)
 Clearance for extraction of Mines & Minerals (State Govts.)


SARDP-NE (MoRTH, State PWDs, BRO)

Phase ‘A’ – 4,099 km (Project cost Rs.21,000 crore)

Phase ‘B’ – 3,723 km (Only DPR approved)
Arunachal Package (MoRTH, Arunachal PWD and BRO)

2,319 km (Rs.11,919 crore)
63
Progress of Phase ‘A’ and Arunachal Package
(In Kms)
•
•
Item
Total
Length
Target
Work
Sanctioned/
Awarded
Roads
Completed
Phase ‘A’
4,099
2,505
1,214
Arunachal
Package
2,319
1,341 (58%)
113 (5%)
Total
6,418
3,846 (60%)
1,327
(21%)
Targeted/Expected
Date for
Completion
June,
2015/March2017
June,
2016/March2018
Work Sanctioned and Awarded Likely to be 5800 Km (84%) by March 2015.
Steps taken to strengthen project execution:
 ADG (1), CE (3) at Guwahati, Agartala & Itanagar posted.
 Tripura PWD Engineers (7) seconded to Ministry for NH-44 work at Agartala
 PIU (2) at Guwahati, PIU (2) at Itanagar and PIU (1) at Agartala
 PIU (1) at Imphal to look after work of NH-53 & construction of 2 bridges –
Barak and Makru
 Non-strategic roads off-loaded from BRO
64
Agency-wise Re-Distribution of Road Lengths
under SARDP-NE & Arunachal Package
Agency
BRO
PWD
Ar. Pradesh
Assam
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
NHAI
MoRTH
Total
Original
Ar.
Phase 'A'
Package
Total
Modified
Ar.
Phase 'A'
Package
Total
1247
812
2059
578
558
1136
52
633
685
52
887
939
745
609
299
342
207
0
394
204
4099
98
776
2319
843
609
299
342
207
394
980
6418
984
58
609
299
342
304
130
539
204
4099
98
776
2319
1082
58
609
299
342
304
130
539
980
6418
65
•
Road Sector Issues
Need for special focus on:
 Work on connecting Sikkim (NH-31A, Sivok-Gangtok-Nathula by BRO)
has progressed at a slow pace. New TDC March 2016
 Work on NH-44 has been stalled for quite some time. Need for fast pace
after the re-distribution & being taken up by State PWD
 Work on NH-53 (Jiribam-Imphal) critical. Needs early completion
 Silchar Bridge being replaced with support from M/o DONER. Need for
early completion of project
 Dhola Sadiya Bridge (river Brahmaputra) targeted for completion in 2015.
Work going on well
 Road to Vijaynagar from Miao needs early sanction
 Construction of Bridge over Feni river (Tripura) connecting Bangladesh
taken up with MEA support. Work should start early
 Replacement of all semi-permanent timber bridges in the region. Special
focus and be funded by State Govts., along with Central assistance under
SPA over next 3 years. A special scheme needs to be launched to complete
this
66
INVESTMENT IN N.E REGION OVER LAST 10 YEARS
(NEW LINES, GAUGE CONVERSION & DOUBLING)
3392
Total –Rs 15,629 Crs(Last 10yrs)
(Including works in progress)
4000
1403
500
295
845
1000
542
1500
2365
2130
979
2000
1913
2500
1765
3000
2013-14
2012-13
2011-12
2010-11
2009-10
2008-09
2007-08
2006-07
2005-06
0
2004-05
Rs in Crore
3500