Progress of T.A.R. in Thailand 4 WORKING GROUP T.A.R. MEETING 23-24 November 2015,
by user
Comments
Transcript
Progress of T.A.R. in Thailand 4 WORKING GROUP T.A.R. MEETING 23-24 November 2015,
Progress of T.A.R. in Thailand 4th WORKING GROUP T.A.R. MEETING 23-24 November 2015, Bangkok, Thailand CONTENTS • Existing Railway Network • Current and future projects • Proposed Amendments to Annex I Existing Railway Network Railway Network (Meter Gauge) Single Track 3,685 Km. (91.10%) Double Track 251 Km. (6.25%) Triple Track 107 Km. (2.65%) Total Length 4,043 km. Existing Railways link to the Neighbor Nong Khai: Connecting Lao PDR (Thanaleng) Railways to Laem Chabang, Sattahip, Map Ta Phut Padang Besar: Connecting Malaysia. Currently under study for double track and electrified Su-ngai Kolok: Connecting Malaysia 3 Projects Relating Trans-Asian Railway 4 Projects Relating Trans-Asian Railway Den Chai – Chiang Rai - Chiang Khong Phitsanulok – Sukhothai – Tak Bua Yai Junction – Roi Et – Mukdahan - Nakhon Phanom Ubon Ratchathani – Chong Mek Nam Tok – Dan Chedi Sam Ong Aranyaprathet – Klong Luk: Underconstruction: Single Track which is to be completed early 2016 Kaeng Khoi Junction – Chachoengsao Junction – Map Ta Phut: Currently under Study for Thailand-China Cooperation: Standard Gauge, Double Track Double Track Projects 6 Double Track Projects 6 routes: Urgent Construction Year 2015-2018 Projects 2015 2016 2017 2018 2019 Cost (million baht) Project in Progress 1.Chachoengsao Junction Kaeng Khoi Junction (106 km) 11,272 Land Acquisition Construction Tender Waiting for budget approval 2. Thanon Chira Junction-Khon Kaen (185 km.) CabinetLand Acquistion Tender 3. Prachuap Kiri KhanChumphon (167 km.) Construction Cabinet Land Acquistion . Tender 26,007 17,292 Construction Waiting for EIA approval Double Track Project (MG) 4. Lopburi-Pak Nam Pho 148 km.) EIA 5. Map Kabao-Thanon Chira Junction (132 km.) 6. Nakhon Pathom-Hua Hin (165 km.) CabinetLand Acquistion 24,842 EIA CabinetLand Acquistion Construction 29,855 EIA CabinetLand Acquistion Construction Tender Construction Tender 20,038 Tender Total (903 km) 129,308 Double Track Project 8 routes : next phase Construction Year 2015-2020: 90 Design Cabi Constructi net on EI Tender A Double Track Project (MG) 8 2. Pak Nam Pho - Den Chai 285 3. Thanon Chira Junction Ubon Ratchathani 309 4. Khon Kaen - Nong Khai 174 5. Chumphon - Surat Thani 167 6. Surat Thani – Songkhla 339 7. Hat Yai Junction - Padang Besar 48 8. Den Chai - Chiang Mai 217 Total 1,629 Land Design Cabi Acquisition net EIA Tender Construction 2020 2019 2018 2017 2016 1. Hua Hin - Prachuap Kiri Khan Length (km.) 2015 Project Thailand-China Cooperation Double Track Railway Gauge width 1.435 m. Max Speed 180 Km./ Hr. Route Distance (Km.) 1 Bangkok-Kaeng Khoi Junction 133.0 246.5 2 Kaeng Khoi Junction-Map Ta Phut 138.5 3 Kaeng Khoi Junction-Nakhon Ratchasima Nakhon Ratchasima-Nong Khai 355.0 4 3 1 2 4 Total 873.0 Feas. Study and Design Section 1 Bangkok-Kaeng Khoi Junction Section 2 Kaeng Khoi JunctionMap Ta Phut Aug 2015 Section 3 Kaeng Khoi Junction-Nakhon Ratchasima Sectio 4 Nakhon RatchasimaNong Khai Dec 2015 – Early 2016 Cost Estimation Sep 2015 Jan 2016 Construction Dec 2015 Feb 2016 Construction Duration 30 months 36 months Process Thailand-Japan Cooperation 4 4 3 1 2 3 2 Route Distance (Km.) 1. Bangkok – Kanchanaburi 180 2. Bangkok – Aranyaprathet 255 3. Bangkok – Laem 139 Chabang 1,2,3 : are to be decide the gauge width speed 100-120 km./Hr 4. Bangkok-Chiang Mai - Double Track 672 - Standard Gauge - Speed >200 Km./Hr Process Bangkok – Chiang Mai Kanchanaburi-BKK-Aranyaprathet BKK-Laem Chabang Framework Planning Jun 2015 Jun 2015 Feas. Study and Design Jul 2015 Jul 2015 Construction Early 2017 After Feas. Study Progress Report by State Railway of Thailand (SRT) Route 1 (Eastern Line) Track Rehabilitation between Khlong Sip Kao Junction – Khlong Luk (Border of Thailand and Cambodia) c) Re-construction of the Khlong Luk Border Steel Bridge Work completed in July 2015 b) Re-construction of the missing from Aranyaprathet Station to Khlong Luk Border Bridge (6 km) Work completed in Aug 2015 NAKHONNAYOK PRACHIN BURI A Khlong Sip Kao Junction SA KAEO CHACHOENSAO a) Rehabilitation of the existing single track from Khlong Sip Kao Junction to Aranyaprathet Station (169 km) Work will be completed in Feb 2016 Khlong Luk B C Aranyaprathet Thailand Cambodia Route 2 (Western Line) 2.1 Construction of Nam Tok Three Pagoda Pass Section Historical Line At the 24th LTWG meeting, Thailand and Myanmar agreed to cancel this project. The DaweiKanchanaburi project will be carried out. 2.2 Construction of Dawai Port – Ban Phu Nam Ron – Kanchanaburi – Laem Chabang Port Section F.S. was completed in April 2015. D.D. and EIA for Thailand section will be carried out in 2016-2017. Route 3 (Northeastern Main Line) 3.1 T.D. Map Kabao – Thanon Chira Jct. Thanon Chira Junction Pa sak Jolasid Dam Dong Phayayen Mountains End Point km.270+000 Map Kabao Starting Point km.134+250 SARABURI 3.1 T.D. Map Kabao – Thanon Chira Jct. (132 km) F.S. and D.D. completed Under process of EIA report consideration by concerned agencies 3.2 T.D. Thanon Chira Jct. – Khon Kaen End Point 3.2 T.D. Thanon Chira Junction – Khon Kaen (187 km) KHON KAEN F.S. and D.D. completed EIA report approved by the National Environment Board (NEB) Project approved by the cabinet on 6 May 2015 Track Doubling Project : Section Thanon Chira Junction – Khon Kaen A total distance of 187 km. Under process of tendering and land expropriation NAKHON RATCHASIMA Starting Point 3.3 T.D. Khon Kaen – Nong Khai End Point km.621+345 Nong Khai New Station 3.3 T.D. Khon Kaen – Nong Khai (174 km) Udon Thani Station Starting Point km.453+955 Khon Kean Station Under process of F.S. / D.D. / EIA, which are expected to be completed in March 2016. 3.4 Track Rehabilitation between Bua Yai Junction – Nong Khai Station (3A) End Point km.623+756.756 Nong Khai Station NONG KHAI 3.4 Track Rehabilitation between Bua Yai Junction – Nong Khai Station (3A) Rehabilitation of track and bridges were completed in June 2014. UDON THANI Project Control Office KHON KAEN NAKHON RATCHASIMA Starting Point km.346+976.00 Bua Yai Junction 3.5 T.D. Thanon Chira Junction – Ubon Ratchathani Station (3C) AMNAI CHAROEN Double Track Construction of Thanon Chira Junction – Ubon Ratchathani Station Section (3C) YASOTHON Ubon Ratchathani Station End Point km.575+100 SURIN Thanon Chira Junction Starting Point km.266+304 UBON RATCHATHANI SI SA KET NAKHON RATCHASIMA BURI RAM 3.5 T.D. Thanon Chira Junction – Ubon Ratchathani Station (3C) (309 km) SRT received F.Y. 2015 budget for F.S. and D.D. Contract for consultant service for the F.S. and D.D. was signed on 26 March 2015. The works are expected to be completed in March 2016. 3.6 Construction of Ban Phai – Nakhon Phanom Section (3D) 3.6 Construction of Ban Phai – Nakhon Phanom Section (3D) F.S. and D.D. work completed in August 2014 Under process of EIA consideration by concerned agencies Route 4 (Southern Main Line) 4.1 T.D. Bang Sue Junction – Nakhon Pathom Nakhon Pathom Station End Point Bang Sue Junction Starting Point 4.1 T.D. Bang Sue Junction – Nakhon Pathom Completed in 2003 4.2 T.D. Nakhon Pathom – Hua Hin Nakhon Pathom Station Starting Point NAKHON PATHOM RATCHABURI SAMUT SAKHON SAMUT SONGKHRAM 4.2 T.D. Nakhon Pathom – Hua Hin (165 km) PHETCHABURI F.S. and D.D. completed Under of EIA consideration by concerned agencies PRACHUAP KHIRI KHAN Hua Hin Station End Point 4.3 T.D. Hua Hin – Prachuap Khiri Khan PHETCHABURI Hua Hin Station Starting Point PRACHUAP KHIRI KHAN Prachuap Khiri Khan Station End Point 4.3 T.D. Hua Hin – Prachuap Khiri Khan (90 km) Under process of F.S., D.D. and EIA, which expected to be completed in March 2016. 4.4 T.D. Prachuap Khiri Khan – Chumphon PRACHUAP KHIRI KHAN Prachuap Khiri Khan Station Starting Point 4.4 T.D. Prachuap Khiri Khan – Chumphon (167 km) Myanmar F.S. and D.D. completed EIA approved by the Nation Environment Board (NEB) on 10 June 2015. Under process of submission for cabinet’s approval Thailand CHUMPHON Chumphon Station End Point 4.5 T.D. Chumphon – Surat Thani Double Track Construction of Chumphon – Surat Thani Section Chumphon Station Starting Point km.468+534.00 RANONG 4.5 T.D. Chumphon – Surat Thani (167 km) CHUMPHO N Under process of F.S., D.D. and EIA, which are expected to be completed in March 2016. RANONG SURAT THANI Surat Thani Station End Point km.635+106.46 NA KHON SI THAMMARAT 4.6 T.D. Surat Thani – Hat Yai Junction SURAT THANI Surat Thani Station Starting Point 4.6 T.D. Surat Thani – Hat Yai Junction (339 km) NA KHON SI THAMMARAT Under process of F.S., D.D. and EIA, which are expected to be completed in March 2016. PHATTHALUNG SONGKHLA Hat Yai Junction End Point 4.7 T.D. Hat Yai Junction – Padang Besar Hat Yai Junction Hat Yai Khlong Hoi Khong Khlong Ngae Station Sadao Padang Besar Station 4.7 T.D. Hat Yai Junction – Padang Besar (48 km) Under process of F.S., D.D. and EIA by Office of Transport and Traffic Policy and Planning (OTP), which are expected to be completed in December 2015 This section will be the electrified doubled track to connect to the completed electrified doubled track of KTMB (Malaysia) at Padang Besar. Route 5 (Northern Main Line) 5.1 T.D. Lop Buri – Pak Nam Pho NAKHON SAWAN 5.1 T.D. Lop Buri – Pak Nam Pho (148 km) End Point Km.252+109.973 F.S. and D.D. completed Under process of EIA consideration by concerned agencies Starting Point Km.131+275.857 LOPBURI 5.2 T.D. Pak Nam Pho – Den Chai End Point 5.2 T.D. Pak Nam Pho – Den Chai (285 km) Starting Point Under process of F.S., D.D. and EIA report preparation 5.3 T.D. Den Chai – Chiang Mai Overall view of the project End Point CHIANG MAI LAMPANG LAMPHUN PHRAE Starting Point 5.3 T.D. Den Chai – Chiang Mai (217 km) Under process of F.S., D.D. and EIA report preparation. (FS & design will be completed in April 2016.) 5.4 New Line Construction between Den Chai – Chiang Rai – Chiang Khong 5.4 New Line Construction of Den Chai Station – Chiang Rai Station – Chiang Khong Station F.S. and D.D. completed in June 2012. Under process of EIA consideration by concerned agencies End Point, Chiang Saen Station End Point, Chiang Khong Station CHiANG RAI PHAYAO NAN LAMPANG PHRAE Starting Point, Den Chai Ststion Proposed Amendments to Annex I of the Intergovernmental Agreement on the Trans-Asian Railway Network made by Thailand 1. On the Nongkhai – Padang Besar line, opposite Banpachi Replace [Denchai – Chiangrai – Mae Sai (border station) – (Tachilek, Myanmar)] With [Denchai – Chiangrai – Chiang Khong (border station) – (Lao PDR)] End of the Project at Chiang Saen End of the Project at Chiang Khong Chiang Saen Station Chiang Khong Station CHIANG RAI PHAYAO NAN New Line Construction between Den Chai – Chiang Rai LAMPANG PHRAE Beginning of the Project at Denchai Den Chai Station Proposed Amendments to Annex I of the Intergovernmental Agreement on the Trans-Asian Railway Network made by Thailand 2. On the Nongkhai – Padang Besar line Replace Bangkok – Bang Sue station (junction) With Bangkok – Bang Sue station (junction) Proposed Amendments to Annex I of the Intergovernmental Agreement on the Trans-Asian Railway Network made by Thailand Bangkok station (aka Hua Lam Pong) is dead-end terminus, which is mainly used for passenger service. It does not have tracks to accommodate freight trains. Upon completion of the Red Line commuter rail development project (Bang Sue – Rangsit), the new grand central station will be located at Bang Sue, which will serve both passenger and freight transport, including 20-ft containers. Proposed Amendments to Annex I of the Intergovernmental Agreement on the Trans-Asian Railway Network made by Thailand To northern and northeastern lines Bang Sue Station To eastern line Bangkok Station To southern line To seaports Office of Transport and Traffic Policy and Planning, Ministry of Transport www.otp.go.th State Railway of Thailand, Ministry of Transport www.railway.co.th THANK YOU