The UniversiTy of vermonT Campus Life Task Force II May 2009
by user
Comments
Transcript
The UniversiTy of vermonT Campus Life Task Force II May 2009
The University of Vermont Campus Life Task Force II Phase II Report - Analysis, Recommendations, and Implementation Strategies May 2009 PREFACE The Project Team of Cannon Design (“Cannon Design”) and Brailsford & Dunlavey (“B&D”) was retained in spring of 2008 to continue to evaluate the extent to which the University of Vermont should improve its current athletic, health and wellness, recreational, and event facilities to meet growing demand. B&D, in partnership with Cannon Design, developed market projections, prepared conceptual diagrams, and created a baseline financial model. The Project Team would like to thank the following members who served on the Campus Life Task Force II and the Campus Master Planning Committees and provided insight and comments throughout the process: Dr. Daniel Fogel, President Ian Boyce, Trustee and Chair of the University of Vermont Thomas Gustafson, Vice President, Student & Campus Life Gregg Bates, Student/Academic Services Manager Margaret “Candy” Battey, Assistant for Student & Campus Life Ken Bean, University Architect Joanna Birbeck, Campus Planning Space Program Manager Paula Carlaccini, Director of Architectural & Engineering Services Richard Cate, Interim Vice President for Finance & Administration Sal Chiarelli, Director, Physical Plant Robert Cioffi, Trustee Robert Corran, Associate VP and Director of Athletics Shirley Fortier, Assistant Planner, Campus Planning Services Luce Hillman, Physical Plant Engineer Jane Knodell, Associate Provost, Budget & Capital Planning Rose Leland, Physical Plant Grounds Manager Sarah Lovell, Assistant Professor Darina Mernicky, Architecture & Engineering Services Architect Bud Meyer, Associate Professor Robert Penniman, Executive Director of Campus Area Transportation Management Jon Porter, M.D., Clinical Assistant Professor and Interim Director CHWB Lani Ravin, Associate Planner, Campus Planning Services Judy Riani, Office Manager, Campus Planning Services Paul Robertson, Student Jeff Schulman, Senior Associate Athletic Director Linda Seavey, Director of Campus Planning University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies i PREFACE Annie Stevens, Assistant Vice President for Student & Campus Life Gioia Thompson, Environmental Council Representative Robert Vaughan, Director, Capital Planning and Management Ted Winfield, Associate Vice President for Business and Resource Management This study was produced by a Project Team composed of the following individuals: Cannon Design Colleen McKenna, Associate Principal Robert Peterson, Principal John Swift, Principal John Boekelman, Principal Brian Pineau, Senior Associate Xun Chen, Architect Brailsford & Dunlavey Jeff Turner, Senior Vice President Craig Levin, Project Manager Rolf Jensen & Associates, Inc. James DiPaoli, P.E. Michael Sheehan, P.E. The findings contained herein represent the professional opinions of the Project Team personnel based on the assumptions and conditions detailed. This report is structured and developed within a framework emphasizing pragmatism and ease of implementation, and the intent is for this document to serve as an integral tool in guiding the University’s implementation of the proposed plan. ii University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies TABLE OF CONTENTS SECTION A ......... Executive Summary B ......... Outline Building Program C ......... Master Planning Concept D ......... Financial Model Summary 1 .......... Detailed Building Program 2 .......... Site Analysis 3 .......... Detailed Financial Analysis 4 .......... Existing Building Code Review Aerial cover photo provided by Shirley Chevalier, FliRite Aviation UVM cover photos provided by Sally McCay University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies i EXECUTIVE SUMMARY Introduction In February 2008, the University of Vermont’s Board of Trustees approved the report and findings of the Campus Life Task Force II (“Task Force”), which assessed and identified programmatic and student needs related to major events, health, fitness and recreation, and intercollegiate athletics. In March 2008, the Project Team of Cannon Design (“Cannon”) and Brailsford & Dunlavey (“B&D”) was retained by the University of Vermont (“the University” or “UVM”) to develop concepts, phasing strategies, and a list of projects to be put into the Annual Capital Project Request and Prioritization Process. Current Situation UVM boasts a unique environment both academically and aesthetically by virtue of its location overlooking the shores of Lake Champlain and its aspiration to be among the nation’s premier small research universities. UVM’s learning environment emphasizes developing well-rounded students by providing resources that seek to promote academic excellence, fitness, health and well-being, and a strong and vibrant university community. As outlined in the initial report dated February 2008, when originally constructed in the 1960s, the Patrick-Forbush-Gutterson Athletic Complex (“PFG”) addressed the needs of UVM’s 3,500 undergraduate students. As the institution grew, the complex was partially renovated and expanded several times, including, most recently, the Indoor Tennis Center in 1982 and the Gucciardi Fitness Center in 1999. The Center for Health and Wellbeing currently occupies seven distinct locations around the periphery of the campus. These facilities include the following services; DeGoesbriand Building (medical clinic and women’s health), Wright Hall on Redstone Campus (health promotion and alcohol/drug services), 146 South Williams Street (counseling), and Patrick Gymnasium (athletic medicine and sports therapy). The Center for Health and Wellbeing (“CHWB”) is not centrally located for most UVM students. Despite antiquated and undersized facilities, UVM’s student population is among the most active in the country, with over 8,300 students participating in campus recreation, 1,300 students participating in at least one of the almost 50 club sports, over 2,000 students participating in some type of campus-led outdoor programming, and over 400 Division I student-athletes. Guiding Principles During the updated study, the Project Team maintained the 12 guiding principles that were identified in the previous report. The principles stated that new facilities must: • Match the level of excellence required by UVM’s Vision: To be among the nation’s premier small research universities, preeminent in our comprehensive commitment to liberal education, environment, health, and public service. • Reflect and support the mission and values of the University. University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 1 EXECUTIVE SUMMARY • In a highly student-centered way, meet the breadth and depth of health, wellness, recreation, fitness, athletic, and event/activities needs of UVM’s active and diverse community. • Maximize cost savings through utilization of existing facilities and co-location of new ones. • Build community in a creative and integrated way. • Compare well with our peer institutions. • Model exemplary environmental stewardship. • Assist in the recruitment, retention, and success of students, faculty, and staff. • Integrate academic components into the program. • Embody the outdoor, natural spirit of Vermont. • Allow the intercollegiate athletic program to compete, thrive, and enhance the experience and success of the student-athlete. • Be planned and constructed within available resources (from sources internal and external), and in light of other institutional needs and priorities. The Work Plan To develop a group of projects to be put in the Prioritization process, the project team completed the following tasks: • An updated program based on additional interviews with UVM faculty, staff, and students. • Master planning concepts to illustrate approaches to meeting program needs, incorporating existing facilities, phasing, and order-of-magnitude cost estimates. • Collaboration with members from the Campus Master Plan Committee to review campus wide planning issues such as transportation, land use, parking, and storm water management. • A Code Analysis summary report was prepared based upon the preferred concept for compliance with applicable codes. • A detailed financial model outlining a potential financing strategy for the proposed projects. • A reconciliation of six groups of projects to move forward into the prioritization process for the campus. 2 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies EXECUTIVE SUMMARY Master Planning Concept The governing master planning concept is focused around the continued development of a centralized facility in the heart of the existing athletics and recreation complex. Through a combination of new construction, adaptive re-use, and renovation, the athletics and recreation facilities will be transformed into a hub of activity for the entire campus wide community. The proposed site for the new University Multipurpose Events Center—bounded by Patrick Gym to the west, the new parking structure to the east, and Gutterson Field House to the south—was chosen to take advantage of its proximity to the existing athletic facilities and its potential to benefit from the existing infrastructure. The University Multipurpose Events Center is intended to add to and adaptively reuse the current athletic facilities to provide a new venue for campus and community-wide events, hockey, and basketball. The new recreation center will replace the existing Indoor Tennis Center to the west of Patrick Gymnasium. The recreation center will connect to the new Events Center by a central public lobby space spanning across the length of the building on the north side. The proposed location for CHWB is along Main Street behind the Johnson House. It will unite all the student health services into one centralized facility. Summary of Findings & Recommendations Significant changes are necessary to deliver on the guiding principles established by the Task Force and to provide students with an environment that fosters academic excellence and opportunities to develop healthy and well-balanced lives. These changes include maximizing the opportunities present within existing facilities and developing new facilities that meet the demands of an active campus community and elevate the quality of existing facilities from their substandard state. The Project Team, in coordination with the campus, developed six groups of projects to be put into the prioritization process. The team did not assign a specific priority to each group since economic factors such as fundraising and donor support may influence specific projects to occur at different intervals. Therefore, the following project recommendations are suggested, in no specific order. Indoor Facilities • Group A - Create a true “center” for health and well-being. Current facilities are spread throughout campus. Space limitations, dispersion of services, and a growing student population limit the effectiveness of this important University-provided service. A visible, centrally located facility dedicated to meeting students’ healthcare, counseling, and physical therapy needs in an integrated and holistic manner will convey a powerful message to the UVM community of the University’s commitment to personal health, wellbeing, and nutrition. University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 3 EXECUTIVE SUMMARY • Group B - Develop a dedicated recreation facility for intramural sports, fitness programs, instructional classes, club sports, academics, and outdoor programming/outing club on the indoor tennis court site. A number of schools have created, or are in the process of creating, such dedicated facilities to enable students to access fitness opportunities without competing with the interests of other athletic programs. To maintain indoor tennis courts for the UVM community, this series of projects includes resurfacing the field house (cage) to accommodate indoor tennis and expanding the track to include a regulation 3lane, 200-meter training track. • Group C - Develop a multipurpose event center adjacent to PFG to support a growing number of athletic and non-athletic campus activities. A multipurpose facility would enable the University to host graduations, convocations, career fairs, student events, athletic and academic competitions, performances, and community events. Since a new fitness center would be built in the new recreation center, Gucciardi could be renovated to become the location for varsity strength training. In addition, a new shared lobby between the new multipurpose event center and the recreation center is envisioned. • Group D – Group D includes continuing to renovate the existing support spaces, locker rooms, meeting rooms, and administrative offices in PFG, and building a new aquatic center adjacent to the recreation center, Outdoor Facilities • Group E – Group E includes building a new outdoor 400-meter completive track and throws area in the field complex behind the PFG complex. Currently, no outdoor track is available to the UVM community. • Group F – Group F includes building a new soccer/lacrosse facility with spectator seating in the current location of the soccer field behind the PFG complex. The shared facility would be the home for UVM soccer and lacrosse and serve as a valuable multipurpose field for the entire community. In addition, the two recreation fields would be reconstructed with an artificial turf surface to maximize student use. 4 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies EXECUTIVE SUMMARY Project Cost The project costs for each of the series of projects in today’s dollars are shown below: Project Description Quantity (GSF) Project Cost 2008 Dollars INDOOR FACILITIES A Center for Health & Wellbeing Total 35,329 $13,779,000 $13,779,000 B B B Demolish Tennis Facility New Recreation Center Resurface/Expand Field House (cage) Total 37,000 97,000 40,500 $694,000 $39,406,000 $2,656,000 $42,756,000 C C C C Renovate Gucciardi New Multipurpose Event Center New Entry/Shared Lobby Parking Garage Expansion Total 10,000 197,738 12,000 1 $1,875,000 $84,039,000 $4,875,000 $3,125,000 $93,914,000 D D Renovation of Support Spaces New Aquatics Center Total 40,000 46,500 $10,500,000 $18,891,000 $29,391,000 OUTDOOR FIELDS E E New Outdoor Track Throwing Events Area Total 1 1 $3,875,000 $350,000 $4,225,000 F F F Recreation Field Soccer/Lacrosse Field Spectator Seating Total 1 1 1 $750,000 $1,875,000 $2,500,000 $5,125,000 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 5 EXECUTIVE SUMMARY Financial Analysis A detailed financial analysis was performed to examine the costs associated with the recommended improvements, the associated revenue opportunities, operating expenses, and potential funding sources. The use of conservative assumptions throughout the analysis is intended to allow the University to proceed with the knowledge that detailed implementation and operating decisions can be made within the established financial parameters without compromising the project scope or quality. The financial model utilizes the existing operating budget for the University and income and expense projections as the primary inputs. Variables such as inflation rates, fundraising, student fees, renovation costs, and project schedules were analyzed and incorporated into the financial model Since the exact order of the projects is not known, the detailed financial models included in this report assume 2012 as the midpoint of construction for all projects with the exception of the Center for Health and Wellbeing, which is estimated to open in fall of 2012. The sources of funds for all of the projects include $25 million in fundraising, $30 million in early student fee collection, a $2 per ticket facility fee, and the rest funded through general bonds issued by the University and backed by building revenues and student fees. To complete all projects, it is assumed that the comprehensive fee would be increased to $1,200 per year over a four-year period. Of course, if additional donor or other fund sources become available, the comprehensive fee can be reduced. 6 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies OUTLINE PROGRAMMING OUTLINE PROGRAM Athletics/Shared Use Facility Public Areas Proposed public areas are noticeably larger than the existing to accommodate the increased number of anticipated users. The recommended program provides adequate space for circulation, public restrooms, concessions, ticketing, and novelties for special events. A Hall of Fame and awards area is proposed in the main lobby area for high visibility. The recommended outline program area is 1,700 sf for all public spaces. Administration Zone Recommended square footages for athletic department and coaches’ offices, conference rooms, storage, and copying are significantly larger than existing square footages. The ideal program provides separate offices for head coaches and assistant coaches, who currently share a work space. The program also includes conference rooms that can also be used for student athlete and/or team meetings. Administrative offices were configured according to the University’s office standards. The recommended area is 21,100 sf, including the Academic Resource Center. Activity Zone Patrick Gymnasium will remain as practice space for the men’s and women’s basketball teams and additional space for recreational programs or non-activity based programs. The recommended competitive swimming program is significantly larger than the Forbush Natatorium. An eight-lane 25-yard stretch pool with a diving well is proposed within the new recreation center as a shared use facility. The difference in square footage between existing and recommended space stems primarily from the difference in the size of the pool, deck space, and ancillary support spaces. The outline program recommends a total area of 23,200 sf for this component. The men’s and women’s hockey program and associated support spaces will relocate to the new Multipurpose Events Center, freeing up the current ice rink in Gutterson for recreation, intramural and club sports, and other activities. The seating count in Gutterson will be reduced to approximately 2,500 spectators with new comfortable seating. Gutterson Field House will be expanded to allow a NCAA regulation 3-lane 200m training track on the ground level. Four tennis courts will be constructed on the infield of the track to replace the courts lost in the demolition of the Tennis Center. Support Zone Team locker rooms experienced the largest square footage growth among major program elements. Each sport is allocated a year-round locker room. Each locker room space also includes an appropriate number of showers, toilets/urinals, and grooming stations. Coaches’, visitors’, and officials’ locker rooms are University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 1 OUTLINE PROGRAMMING included in the proposed total of 19,600 sf. It is anticipated that some of the program need will be resolved through adaptive reuse and renovation of the existing locker room areas. The recommended athletic training room was designed to provide adequate space for the athletic trainers, taping, treatment, and hydrotherapy. The outline program recommends a minimum total area of 7,000 sf. The strength training room is programmed to be 10,700 sf, approximately the same as current configuration. An office and storage area has also been included. Additional key support spaces include equipment storage, laundry, and general building storage for a recommended outline program of 7,200 sf. The recommended space is a significant increase over the existing space. Center for Health and Wellbeing Public Areas The public areas in the new center will include circulation and centralized information area, a visitor coat room, a large conference room, a quiet room/meditation area, and student computer terminal area. A staff kitchen area and break room is also included. The outline program recommends a total area of nearly 3,000 sf for public spaces. Administration Zone The recommended square footages for 9 staff offices with expansion for an additional 2 staff offices, waiting and coat rooms, a conference room for 8-12 people, storage, and copying is 1,900 sf. Women’s Health The Women’s Health zone is programmed at almost 1,800 sf to serve 4-6 providers with a waiting area, one office, storage, six exam rooms, one procedure room, utility rooms, and storage. The Women’s Health area will be integrated with the Primary Care area. Medical Clinic The medical clinic area, the largest zone in the new center, will serve 6 full-time providers plus administrative assistants and clinical staff. The program recommends a total of nearly 5,000 sf, including a larger reception area for check-in/check-out with administrative offices, medical records storage, copying/fax/shredder, and storage. Fifteen (15) exam rooms with sinks, a procedure room, a pre-exam room, a lab, and a waiting area are also included. The Medical Clinic will be integrated with Women’s Health and the Counseling Center. Nutrition The outline program recommends 280 sf for 2 private offices and a weigh-in area. 2 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies OUTLINE PROGRAMMING Psychiatric Services The psychiatric services will serve 3-4 staff and a resident. The outline program recommends 560 sf for a receptionist, 4 private offices, and a separate reception/seating area. Travel Clinic The outline program recommends 330 sf for one private office plus space for supplies. Counseling Center The outline program recommends a total of 3,600 sf to serve 10-12 staff plus a waiting area, reception, copy/fax, conference room, group room, counselor offices, intern offices, and a relaxation room. The core counselor offices will be integrated with the Primary Care area. Alcohol and Drug Counseling The outline program recommends 620 sf for 4 counselor offices, a supervisor’s office, and a records room. Health Promotion Services The Health Promotion Service zone is programmed at 1,400 sf with the alcohol and drug services. A waiting area, reception, director’s office, 4 staff offices, group meeting room, video room, and small group study room are included in the program. Physical Therapy Physical therapy is one of the larger service areas within the new center. Programmed at 2,660 sf, it will include a reception area, offices, 3 private evaluation rooms, an equipment area, massage room, and 1,500 sf of rehabilitation space. Occupational Health The outline program identifies 500 sf for 2 staff offices, 2 exam rooms, and a hearing test booth. Pharmacy The outline program identifies 300 sf for the pharmacy. X-ray The outline program identifies 600 sf for radiology. Growth/Rental Space The outline program identifies 500 sf for future growth. University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 3 OUTLINE PROGRAMMING University Multipurpose Events Center Public Areas The new university multipurpose events center is intended to be capable of hosting graduations, convocations, athletic and academic competitions, and performances as well as provide a resource for other institutions and local entities. The public areas are significantly larger than the existing public spaces in Gutterson to serve the increased number (6,500+) of anticipated spectators. The main circulation areas are complemented with a ticket window, club room with food prep area for 250 people, public restrooms, a Hall of Fame, and UVM team store. The recommended outline program for public spaces is 12,370 sf. Hockey/Basketball Offices Administrative offices were configured according to the University’s office standards. The recommended area is equal to 2,660 sf to fully provide for both hockey and basketball programs. Areas that were added to the existing configuration include more office space for coaches, storage, and a conference room. The hockey/basketball offices will be integrated with other coaches’ offices. Concourse Level The concourse level will serve as the primary circulation space for all spectators. Composed of a mixture of seating options within a bowl configuration, the events center will have a 90 ft x 200 ft ice rink for hockey that could be converted to a basketball court with the introduction of a portable wood floor. The space will be used for other university events such as concerts, convocations, and popular lectures. A President’s suite box for 16 people and 8 general suite boxes for 8-10 people each will be provided along the concourse level. The recommended outline program is 70,660 sf including the seating area. Lockers Locker rooms will increase significantly to fully satisfy the program demand. Both the men’s and women’s hockey teams are allocated a year-round locker room area that includes a team lounge/meeting room. Each locker room space also includes an appropriate number of showers, toilets/urinals, and grooming stations for the number of players. The basketball teams will use a game day team meeting room. Coaches’, visitors’, and officials’ locker rooms are included in the total of 9,760 sf. Support Facilities In addition to the activity areas, the outline program identifies 1,900 sf for athletic training, laundry, and equipment space to support varsity athletes. Event staff lockers, performer dressing rooms, portable floor storage, general building storage, refrigeration, and zamboni space are included in a total recommended outline program of 18,240 sf for support space. 4 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies OUTLINE PROGRAMMING Recreation Center Free Zone The proposed public areas identified in the free zone are recreation, club sports, and outdoor recreation administrative areas. All of these program areas are significantly larger than their current respective areas. The outline program includes 2,630 sf for recreation offices, marketing production area, pantry/lounge, employee work area, and storage. The club sport area includes a meeting room and equipment storage for a total of 1,800 sf. The recommended outline program for the outing club includes 6 offices, kitchen, 2,500 sf equipment storage area, resource room, and training room for a total of 4,110 sf. Activity Spaces One of the largest activity areas is the gymnasium space. The recommended outline program calls for (1) two-court gymnasium with an elevated jogging track and (2) single-court multipurpose gymnasia, each with ample storage, totaling nearly 40,000 sf. The suggested net square footage for the weight/fitness space is 18,000 sf, significantly larger than the existing fitness area. Other specialized activity spaces include a lap pool to be shared with the varsity teams, squash courts, a rock climbing wall, and 4 multipurpose rooms of varying sizes, for a total recommended program area of 43,600 sf. Support Zone The support zone includes a variety of social and support areas for the activity zone such as a lounge area, juice bar/vending and a large classroom. Men’s and women’s locker rooms account for nearly 5,800 sf. Other support spaces include recreation equipment check-out and storage at 500 sf, plus another 800 sf for general building storage. The total recommended outline program for the support zone is 10,633 sf. Outdoor Fields Athletics The varsity athletic program sponsors 8 Division I intercollegiate outdoor programs for men and women, including skiing. To serve the number of student athletes who participate in cross-country, track and field, field hockey, soccer and lacrosse, the outline program recommends a minimum 8-lane 400m track and throws area, and a 2,500-seat lacrosse/soccer stadium with a total general capacity of 4,000 spectators to be located to the south of the existing facilities. Adequate public restrooms, visitor locker rooms, storage and media/game management space are also needed to support the outdoor facilities. To the greatest extent possible, new fields should be constructed with an artificial turf infill system and lighting to maximize field use for everyone. University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 5 OUTLINE PROGRAMMING Recreation/Intramurals To serve intramural programs such as flag football, outdoor soccer, Ultimate, softball, and many other informal recreational activities, the outline program recommends a total of 4-5 dedicated fields. To maximize program use the fields should be constructed with artificial turf infill system and lighting wherever possible. Club Sports To serve club sport programs such as Ultimate, soccer, rugby, lacrosse, football, field hockey, and many other activities, the outline program recommends a total of 4-5 fields. These programs could be served through shared-use scheduling with athletics and recreation for the proposed fields described above. The entire outline program and a summary of square footages are located in Section 1 of the Appendix. 6 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies PLANNING CONCEPT MASTER PLANNING CONCEPT The governing master planning concept is focused around the continued development of a centralized facility in the heart of the existing athletics and recreation complex. Through a combination of new construction, adaptive re-use and renovation, the athletics and recreation facilities will be transformed into a hub of activity for the entire campus wide community. The proposed site for the new University Multipurpose Events Center, bounded by Patrick Gym to the west, the new parking structure to the east, and Gutterson Field House to the south, was chosen to take advantage of its proximity to the existing athletic facilities and its potential to benefit from the existing infrastructure. The site area is about 100,000 sf, with dimensions of approximately 250 feet in the eastwest axis and 400 feet in the north-south axis. To accommodate the extent of new improvements, demolition is required of the existing varsity weight room. The University Multipurpose Events Center is intended to add to and adaptively reuse the current athletic facilities to provide a new venue for hockey, basketball, and other community wide non-sporting events and to provide high-quality support facilities for all spectator events. The new recreation center will replace the existing Indoor Tennis Center to the west of Patrick Gymnasium. It is bounded to the north by the existing drop-off area and to the west by an existing recreation field. The recreation center will connect to the new events center by a central public lobby space spanning across the length of the building on the north side. The proposed location for the Center for Health and Wellbeing is along Main Street behind the Johnson House. This location was selected to best serve the students and campus community with close proximity to the Davis Center, Main Street and student residences. The Center has outgrown its current multiple facilities and will benefit greatly by uniting all the student health services into one centralized facility. Existing Conditions UVM athletic and recreation facilities are not in disrepair, but they are outdated and no longer meet current athletic and recreation planning standards, rendering them functionally obsolete. Wayfinding throughout the complex is difficult, views into activity spaces are limited, and access is difficult to control and secure. Universal accessibility is reasonably accommodated but does not fully comply with current requirements. While ongoing maintenance improvements have extended the facilities’ lifespan, the majority of interior finish materials are showing wear. Aesthetically, the buildings’ interiors are outdated, and exterior forms and materials are not consistent with the University’s architectural character. Facilities are functioning at or beyond their full capacity. The growth and success of the athletic and recreation programs, combined with changes in training methods, have led to increased demand on every activity and support space. Limitations are evident, and the facility operators are maximizing the utilization of each space. The Center for Health and Wellbeing occupies seven distinct sites at the periphery of the campus. While the Center has worked to maintain a welcoming and pleasant environment at each site, the lack of adequate space has become a critical issue for the counseling, primary care, women' s health, and psychiatry areas. Inadequate space adversely affects the Center' s ability to both deliver care and support University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 1 PLANNING CONCEPT important programming initiatives for the campus community. Moreover, the lack of proximity between medical and counseling professionals is a significant obstacle to providing seamless and holistic care for students. Outdoor fields are equally strained by high demand from athletics, recreation, intramurals, and club sports. The majority of the existing fields are in poor condition, with natural grass and no lighting or drainage. Several club sport teams rent space off campus due to the lack of field space. University Multipurpose Events Center The new multipurpose facility would be located between and adjacent to Patrick Gym and the parking structure, north of Gutterson Field House. It would encompass approximately 197,000 sf distributed on three levels and provide approximately 6,500 seats for a hockey game and as many as 7,500 seats for basketball. Many other seating configurations would be possible with the maximum capacity of 8,400 seats for concerts and other university events. Adjoining Patrick Gym on the north and east, the multipurpose facility addition would provide a new face and primary entrance to the athletics and recreation complex. The current drop-off area would be slightly reconfigured to create a new entry plaza oriented on axis with the new University Heights District quad to the north. The north façade would be reimaged with a new entrance lobby, hall of fame, athletic department, coaches’ offices, and academic support center. From the parking garage, access to the complex would be provided at the event level and entry level. Service access and television truck parking is provided at the southeast corner. From the main lobby, athletes and visitors may access all components of the existing athletic complex and the new events center. In the main lobby, the team store will offer UVM clothing and memorabilia, and patrons will be able to purchase tickets in advance or for game-day events. The entrance to Patrick Gym will remain the same, directly from the lobby. A 20-foot-wide grand staircase and large elevator will give spectators access to the concourse level. A new 2,000 sf Hall of Fame would extend along the length of the lobby, visible from the entry plaza. Restrooms will be located in the lobby, available to events at Patrick Gym as well as to departmental offices and academic support space. Most spectators will access the concourse level from the main lobby by the grand stair or the elevator. The club room is located at the northeast corner of the concourse level. The club room will accommodate as many as 250 persons in a lounge setting, with a bar, kitchen, and toilets. Elevated above the parking deck, the club room will afford unobstructed distant views of the campus to the north and mountains to the east. From nearly every vantage point on the concourse, patrons will have a complete view of the entire seating bowl. Handicapped-accessible seating and companion seats are dispersed equally around the concourse and at the event level at the northeast corner. Concession areas and restrooms are evenly distributed on both sides of the seating bowl. Access to the event level is accomplished in a number of ways. From the main lobby, athletes can take the elevator or stair down to the event level. Direct access is possible from the lower level of the existing athletic complex and from the service dock. Included on this level are the men’s and women’s hockey 2 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies PLANNING CONCEPT team rooms and a half-time locker room for basketball. Team rooms will be supported by an athletic training room, an equipment room, and an additional laundry room. There will also be coaches’ game day locker rooms, officials’ locker rooms, four visiting team rooms, performers’ locker rooms, and staff locker rooms. The projected events for the new facility range from 54 per year to 111 per year. The projected seating capacities for the expanded facility are 6,500 fixed seats in the new Multipurpose Event Center and a reduction from 4,500 seats in Gutterson to approximately 2,500 seats. The total seating capacity could range between 9,000 and 10,500 seats. It is not anticipated that two major events would take place simultaneously in both the new Multipurpose Event Center and Gutterson. A more likely scenario would include a hockey game in the Multipurpose Event Center and recreation or varsity practice in Gutterson. Based on the projected event scenarios and seating capacities it is projected that there will be no significant impact to parking or traffic patterns in the vicinity of the complex. Athletics/Shared Use Space at Patrick Gymnasium and Gutterson Field House To meet the needs of all varsity teams, several areas within Patrick Gymnasium and Gutterson Field House would be renovated. One of the driving forces behind these renovations is the relocation of program components into the new events center that currently reside in the existing facility, which effectively allows the University to adaptively reuse and expand existing areas to meet the program needs of all varsity teams and the recreational programs. The majority of the proposed renovation work will be on the ground level and include new men’s and women’s team and general lockers, a new equipment storage area and workshop. Circulation to and from locker rooms will be significantly improved by eliminating dead-end corridors and circuitous hallways. A large meeting room and climbing wall will eventually replace the old pool once a new competitive lap pool is constructed as part of the recreation center. The existing seating in Gutterson could be reduced to 2,500 spectators with a higher quality and more comfortable seating arrangement for smaller events. A connector running north south along the west end of the arena could provide a future connection to the proposed future strength training location. The Gardner-Collins Cage will be renovated with a new synthetic surface and reconfigured to allow a 3lane 200m training track. Four tennis courts will be provided in the infield area. The Gucciardi Fitness Center adjacent to the cage will be renovated for varsity strength training with views overlooking the fields. On the plaza level, the existing lobby to Patrick Gymnasium will be reconstructed to unite the new recreation center and events center. The men’s and women’s basketball team lockers will be enlarged. The squash courts will be replaced in the new recreation center to create meeting rooms, coaches’ offices and lounge space. The athletic medicine suite will be redesigned and enlarged to better serve varsity teams. University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 3 PLANNING CONCEPT Recreation Center A new recreation center would be located in the current location of the Indoor Tennis Center. The site will offer a cornerstone location of high visibility from University Heights. The north façade will be very transparent, giving visual access into the shared lobby, fitness space on two levels, and the administrative offices. With a slight modification to the roadway and the enhancement of the drop-off area, the new shared entry plaza creates a special outdoor gathering place that becomes a visual terminus to the north-south axis of the University Heights District quad. From the main lobby, visitors will be able to quickly access the fitness center, outing club and gymnasium spaces. General locker rooms will be provided along the primary circulation corridor terminating on axis with a new climbing wall. A grand stair and elevator will lead users to the second level to access multipurpose rooms, a 3-lane jogging track and 11,000sf of fitness space. As the recreation program expands, a single-court multipurpose gymnasium, multipurpose rooms, squash/racquetball courts, and a 25-yard stretch lap pool will be added. The pool will be a shared use venue with the varsity athletics program replacing Forbush Natatorium which will be converted into team meeting space and a large climbing wall. Center for Health and Wellbeing The Center for Health and Wellbeing currently occupies seven distinct locations around the periphery of the campus. These facilities include the following services; Degoesbriand Building (medical clinic and women’s health), Wright Hall on Redstone Campus (health promotion and alcohol/drug services), 146 South Williams Street (counseling), and Patrick Gymnasium (athletic medicine and sports therapy). The proposed location will unite the individual sites into one central location adjacent to Main Street behind the Johnson House. The entry lobby will have a warm and welcoming environment with natural light. Visitors will be greeted by a central reception area and large waiting area. A quiet room with natural daylight is proposed adjacent to the waiting area. A dispensary will be located within the lobby. The exam rooms, procedure rooms, physician and counseling offices will be organized into several pods of cohesive services on both the first and second floors. A conference room and future growth/rental space is adjacent to the main lobby opposite a single radiology room. A prominent stair and public elevator will transport visitors to the second level waiting area and reception. The physical therapy suite and occupational health would be adjacent to the waiting area. Group and conference rooms are placed around the perimeter of the building to capture natural daylight. Executive administrative offices and health promotions occupy the majority of the space on the third level. A large conference room for 75 to 100 people and a smaller conference/meeting room for 30 people are located in close proximity to the stair and public elevator. Future growth space is available should the number of visits and demand for services continue to increase. 4 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies PLANNING CONCEPT BUILDING SYSTEMS CONCEPT Main Structural Systems The new Multipurpose Events Center seating bowl is supported on precast concrete risers supported by sloping structural steel rakers and bents. These bents will be placed on a regular column grid along the long sides of the facility and in a radial pattern at the end zones. The event floor consists of a concrete slab on grade. The main concourse and suite level will be concrete on steel deck supported by steel beams and columns. The main roof will be framed with primary long span steel trusses with a design length between supports of approximately 210 feet. Secondary steel trusses span perpendicular to these main trusses and provide stability for the roof system. The proposed profile of the primary trusses is an arched top chord with a flat bottom chord. The main roof covers the seating bowl and cantilevers over the lower flat roof. The building will be conventional framing with composite decking and composite steel beams at the floor levels, sloped steel beams supporting precast concrete seating sections within the seating bowl, and steel deck on steel beams supported on long span steel trusses at the roof. All structural steel will require a fire rating, with the exception of the main roof framing in locations that exceed the minimum clearance for fire protection. A site-specific geotechnical investigation will be required for the foundation design of the multipurpose events center. The facility covers a large footprint, and soil conditions may vary across the site. The original gymnasium is founded on concrete piers that extend into the shallow bedrock. However, the subsequent additions to the original building all have spread footing foundations with an allowable bearing pressure of 5,000 to 6,000 pounds per square foot. At this stage of design, it is reasonable to assume that the new building foundations will also have spread footings. It is not clear whether rock removal will be required to reach suitable grade, especially near the varsity strength training that is slated for demolition. Perimeter foundations will extend below the design frost penetration level. Interior footings may be shallower, as long as the bearing grades will be protected against freezing during the construction process and suitable bearing material is present near the design sub-grade. The foundations adjacent to the existing parking garage will need to extend down to match the level of the parking garage footings, which is one level below current grade. The new team rooms, stair, and elevator at the event level will be built one level below the existing gymnasium floor level. A portion of the gymnasium floor will need to be removed and replaced to create a new foundation wall along the east side of the existing gymnasium. Along the north side of the gymnasium, the existing foundations for the long-span roof will need to be underpinned to allow for construction of a new stair and elevator. A pair of rated walls will need to be built above these foundation walls to create a fire separation between the existing and new construction. Heating, Ventilating, and Cooling Systems The new multipurpose events center will be served by the central steam heating plant with a new 12,000 lbs/hr new back-up steam boiler plant to supplement campus redundancy issues. The steam will further serve steam-to-hot-water heat exchangers for heating and domestic hot water systems. A primary o pumping system will distribute 200 F hot water to air-handling unit (AHU) coils and terminal units throughout the facility. University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 5 PLANNING CONCEPT The new facilities will also be served by a 1200-ton, high efficiency, variable primary flow, water-cooled, electric, centrifugal chilled-water plant. The plant will be modular. An 800 ton system will serve the initial construction, and an additional 400 ton chiller will be added as other components are constructed. The chillers will operate utilizing a primary/secondary pumping system. The secondary pumping system will distribute chilled water to AHU chilled water coils. Central station air handling units will serve the overall complex. Constant-volume units will serve the events center and large gymnasium spaces. Variable-air-volume (VAV) units will serve support and common spaces. A dedicated unit with heat recovery and dehumidification capability will serve the new aquatics area. The air handling systems will provide adequate outside air for ventilation, cooling, and heating for the main areas of the building. Systems will be equipped with control sequences and devices to optimize indoor air quality and minimize energy costs. All restroom, locker rooms, and utility areas will be exhausted. Heat-recovery units will be used for the toilet and locker room areas. Exhaust fans will be used for utility ventilation areas. A smoke management system will be provided for the events center, including dedicated smoke exhaust fans and sequences for makeup air from the AHUs. A building automation system as manufactured by Johnson Controls Metasys or Honeywell Controls EBI will be fully integrated into the central university system, and all components will be compatible with all existing system requirements. A 2,500-gallon diesel fuel oil tank will be installed at the highest parking level to serve the emergency generators and the new boilers. A complete fuel oil pumping system including duplex fuel pumps, strainers, fuel oil supply, and return piping will be provided. A new ice making system will be provided to serve the new ice sheet. The existing ice refrigeration systems at Gutterson will remain as an independent system. Energy conservation and high-performance system measures will be incorporated throughout to ensure occupant comfort and minimize energy usage. Electrical Systems The new complex will be served from a new 13.8 kV service from the Utility Company network. A new duct bank will extend from the street into the building. New primary metering will be required. Two (2) single-ended unit substations will be provided, each with 600A load break switches and 2,000 kVA drytype transformers. 480V distribution sections will also be included. Substations will feed each end of the events center. Secondary distribution will be designed to respond to the power needs of the building program, with the flexibility to accommodate future space or renovations. Secondary distribution will be 480/277 volts, 3 phase, 4 wire plus ground. This will provide service to equipment and lighting loads. This will be further transformed down to 208/120 volts, 4 wire plus ground as required by building loads – typically for receptacles and miscellaneous small loads. 6 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies PLANNING CONCEPT Provisions will be included for four (4) 400A switches for concert connections for lighting and power systems. Two (2) additional 200A switches/plug-in jacks will provided for curbside broadcast trucks. Separate audiovisual (AV) and tel/data branches will be provided to separate delicate/sensitive loads. An electric power monitoring system will be provided, complete with digital metering systems, to monitor service entrance mains, feeders, generator systems, and energy usage. A standby rated 1,000 kW diesel-engine, radiator-cooled generator set will be located in the multipurpose events center loading dock area. Emergency power will be provided to: life-Life Safety (serves emergency lighting, fire alarm, and paging systems); Essential Building Equipment (serves smoke exhaust systems, etc.); Elevators and Optional Standby (serves elevators, limited ice making equipment, and other optional loads such as concession refrigeration); and Fire Pump. In general, high-color-rendering, energy-efficient fluorescent lighting will be used for ambient and accent illumination. In selected spaces, high-color-rendering, energy-efficient metal halide lighting will be used. Special event and effects lighting will be provided within the seating bowl. Lighting control systems will include occupancy sensors, timers, daylighting and dimming controls. A new UL-listed fire alarm system will include full voice communication/evacuation capability and be able to override the center’s paging and audio systems. The system’s solid-state modular design will allow for future expansion and interfacing with the existing campus system. The complete system will incorporate a firefighters’ command center (FCC), graphic firefighters’ annunciator panels, peripheral detection and alarm devices such as smoke/heat detectors, speakers, and manual pull stations. A firefighters’ phone system will be included. Special automatic beam-detection devices will be utilized to monitor arena atrium smoke conditions. Consideration will be given to consolidating telephone, data processing, and educational-television components into a central communications backbone. Fiber and copper backbones will extend throughout the facility and interconnect to the existing campus systems. Security systems will include perimeter door monitoring, CCTV camera coverage in selected areas, card access systems at main entrances, and emergency blue phones Plumbing Systems The new facilities will be supplied with a new domestic 4” cold-water service, taken from an existing campus water main. A complete domestic cold-water distribution system will be provided throughout the facility. The proposed facilities will be provided with steam-fired domestic water heaters. Adequate domestic hot water storage will be provided centrally. The proposed facility will be provided with two (2) 6” sanitary connections. The sanitary will connect to the new existing municipal sanitary main. Grease traps will be provided from kitchen areas as required by code. Storm water from the roof will be discharged into a new storm drainage system. Rainwater leaders will collect from new gutters and roof drains, drain by gravity through the buildings, and connect to the new future campus storm drainage system from three (3) new 15” connections. University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 7 PLANNING CONCEPT Water-conserving fixtures and trim will be provided to minimize water usage in the facility. Fire Protection Systems Fire protection service will consist of a dedicated fire service brought from the city water main in the street. A water meter and a backflow protection device will be provided in the building near the point of entry. The incoming main will supply a combined sprinkler/standpipe system. The fire protection system will include an automatic electric fire pump and jockey pump. The fire pump will be fed from the city water supply. Emergency power transfer switches will be included with the fire pump controller. The Patrick Gymnasium building sprinkler system will be brought up to current code; the entire building will be sprinklered. The fire standpipe system will provide the required water flow rate of 500 GPM at the most hydraulically remote outlet. Sprinklers will be provided throughout the building to protect all areas. A complete combined "wet" standpipe/sprinkler riser system with appurtenances located on each floor level will be provided, including zoned control valves and tamper and flow switches. 8 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies T H E U N I V E R S I T Y P H A S E I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Master Planning Concept Bu Sou rlingt th on Bu rlin gt on INFORMAL RECREATION FIELDS East Av PRIMARY CENTER FOR HEALTH & WELLBEING e8 Int t 9 INFORMAL RECREATION ee e tat Str on tam Ca ers in riv tD enue Ma Wil listo nR oa d SECONDARY CENTER FOR HEALTH & WELLBEING UNIVERSITY MULTI-PURPOSE EVENTS CENTER eet Spear Str STUDENT RECREATION/ OUTING CLUB Athletics 180’ x 300’ Recreation Field New Rec Field Throwing Events New Soccer/ Lacrosse Field Moulten Winder Artificial Turf Field New Track ATHLETIC FIELDS N 0 2 00 4 00 800 1 T H E U N I V E R S I T Y P H A S E I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Design Opportunities 4 Renovation 1 A D New Construction - Recreation Center H EI G H TS RO New Construction - University Multipurpose Facility UN IV ER SI TY New Field 3 Pedestrian / Bicycle Circulation Vista View 2 1 Main Entry Plaza / New Building Front 2 Service Entry 3 New Connection from Main Campus to Athletic Fields 4 New Corner Beacon along Main Pedestrian Circulation 2 RECREATION FIELD NEW RECREATION FIELD MOULTON WINDER FIELD MIDDLE STORMWATER POND LOWER STORMWATER POND City of Burlington NEW 400M TRACK City of South Burlington PROPOSED STORMWATER SPEAR STREET NEW LACROSSE/ SOCCER STADIUM (2500 SEATS) N 0 100 200 2 Fitness 7200sf T H E Club Sport Storage P H A S E Rec. Staff Admin. Outing Club Hall of Fame Athletic Admin. Offices Ticket/ Store Lobby / Control Coaches/Staff Offices I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Building Zoning Diagram Plaza Level . . . . . . . . . . Equip./ Laundry U N I V E R S I T Y Demolition Renovation New Construction 2-Court Gym 14500sf Lockers (Men) Unisex Student Change Athlete Services MAC 10000sf Phase I Phase II Storage Storage Admin. Offices Strength Training / Athletic Medicine Activity Locker Room Health & Wellbeing Coaches/ Staff Offices Lockers (Women) Climbing Wall Aquatics Multipurpose / Classroom / Meeting Circulation Building Support (Storage, Laundry, Mechanical) M. BBall Lounge Classroom W. BBall Multipurpose Squash / Racquetball 4000sf Athletic Medicine 8650sf Coaches/ Staff Offices MAC 10000sf . . . . . . . . . . . . . . . . . . . . Future Connector Strength Training N 0 40 80 3 Fitness 11000sf T H E U N I V E R S I T Y P H A S E Multipurpose 1500sf Jogging Track 6000sf I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Building Zoning Diagram Concourse Level VIP Club / Kitchen Multipurpose 2500sf . . . . . . . . . . Demolition Renovation New Construction Concess. Toilet Classroom 1200sf Student Athlete Services Admin. Offices Strength Training / Athletic Medicine Activity Locker Room Health & Wellbeing New Seating Multipurpose 3500sf Phase I Aquatics Multipurpose / Classroom / Meeting Circulation Building Support (Storage, Laundry, Mechanical) Stretching Phase II Roof below Concess. Concess. . . . . . . . . . . . . . . . . . . . . N 0 40 80 4 T H E U N I V E R S I T Y P H A S E I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Building Zoning Diagram Event Level . . . . . . . . . . Demolition Renovation New Construction Storage Storage Men Team Rooms BBall Game Day Athletic Training Coaches Game Day General Storage Admin. Offices Strength Training / Athletic Medicine Activity Locker Room Health & Wellbeing Equipment M.Coaches Workshop Hockey Team Lockers Elec. General Lockers Phase I Aquatics Multipurpose / Classroom / Meeting Circulation Building Support (Storage, Laundry, Mechanical) (4) Visiting Lockers Lounge W.Coaches Phase II Pool Mech. Men Lockers Equip./ Laundry Women Lockers Women Team Rooms Pool Pool Support Climbing Wall 100-seat Classroom Mechanical Zamboni Mechanical Kitchen Storage Officials . . . . . . . . . . Track/Field Lockers . . . . . . . . . . Track Expansion Strength Training N 0 40 80 5 T H E U N I V E R S I T Y P H A S E (1) 200’ x300’ Recreation Field Recreation Baseball I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Master Planning Concept Outdoor Fields Program Need Bu Sou rlingt th on Bu rlin gt on Existing Baseball Field to Remain enue East Av Ma Str e riv tD on tam Ca ee t Outline Program Needs: Int ers tat e8 9 in Wil listo Add Artificial Turf Athletics Complex Spear Str Existing Recreation Field Add Artificial Turf 300-Seat Stadium eet Natural Grass to remain at Redstone Historic Green New Lax / Field Soccer Field Throwing Events Existing Artificial Turf Field New Track New 225’ x 360’ Artificial Turf Field nR oa d 1. Recreation: 4-5 lighted/ artificial turf fields (40 yds x 100 yds) min. size 2. Athletics: Development of soccer / lacrosse stadium; outdoor track, lighting, artificial turf fields, and throws area. 3. Tennis: Minimum (4) tennis courts; prefer (6) courts. New 2500-Seat Stadium N 0 2 00 4 00 800 6 T H E U N I V E R S I T Y P H A S E I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y (11) Offices Adm (4) Exam Rms & Toilet Travl Proced Utilities Rec. Roof Below (Potential Future Expansion) Group Room (4) Exam Rms & Toilet Occupational Health Stor. Conf. Conf. Center for Helth and Wellbeing Building Zoning Diagram Administration Executive Admin/ IT/ Business Physical Therapy Waiting Lobby/ Waiting Elev. Off. Off. W Elev. Primary Care Future Off. Off. Radiology Large Conf. Off. Physical Therapy M Conf. Health Promotions Dispensary Off. Growth / Rental Level 3 Level 2 Conference / Meeting Room Building Storage / Services Circulation (8) Offices Lab Conf. Rm. Proced. (4) Exam Rooms & Toilet Exam (4) Exam Rooms & Toilet Nurse/ Exam Exam Radiology Procedure Reception Storage (5) Off. Elev. Lobby/ Waiting Phm Conf. Rm. Growth/ Rental (3) Off. N Level 1 0 10 20 40 7 T H E U N I V E R S I T Y P H A S E I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Building Planning Concept Project Components Indoor Facilities: C B C D D C F B B A Center for Health and Wellbeing (Off Site) B Demolish Tennis Facility B New Recreation Center & Expand Cage C Renovate Gucciardi C New Multipurpose Events Center C New Entry / Shared Lobby C Parking Garage Expansion D Renovation of Support Spaces D New Aquatics Center Outdoor Facilities: C New 400m Outdoor Track E New Throwing Events Area F New Soccer / Lacrosse Field / Stadium F Recreation Field w / Artificial Turf F F THROWS AREA E E E N 0 1 00 200 8 FINANCIAL ANALYSIS INTRODUCTION In February 2008, an assessment was completed that identified a series of projects related to improving health and well-being, campus recreation, and athletics facilities at the University of Vermont. Due to the overall scale of these projects, it was determined that further analysis was needed to refine these project concepts and to develop a detailed financial feasibility analysis to understand the cost implications of the recommendations. The purpose of this assessment is to examine the costs associated with the recommended improvements and the associated revenue opportunities, operating expenses, and potential funding sources. Key to this analysis is the comprehensive financial model. The tool allows for a thorough understanding of all of the financial implications associated with facility investments by integrating the various building programs, the event schedule, revenue calculations, and operating expense calculations into an allinclusive model. All of these assumptions are linked such that any change in assumptions automatically triggers an adjustment to all of the affected financial elements. The model enables any and all changes to the project to be quickly analyzed on a specific and project-wide basis while maintaining the internal balance of the model. Due to the volatility of the construction market, projected results and costs may vary significantly from the project’s actual performance. Therefore, B&D and Cannon Design cannot ensure that the results highlighted in this report will portray the actual performance of the proposed development project; however, to identify the range of risks inherent in the proposed project, the model allows for testing of multiple scenarios to evaluate the project concept under a variety of economic conditions. METHODOLOGY Due to the overall scale of these projects and for the purposes of entering projects into the University’s process for setting capital priorities, the Project Team put the recommended projects into six distinct project groups. Each group has a series of projects that are interdependent and therefore can be isolated and developed independently to give the University maximum flexibility moving forward. The Project Team did not assign a specific priority to each group since economic factors such as fundraising and donor support may influence specific projects to occur at different intervals. This exercise was intended to examine each grouping of projects independently as well as collectively. The financial model includes the testing of multiple scenarios with respect to event schedules, fundraising, operating revenue, and operating cost assumptions. The ultimate goal of this exercise is to estimate the overall project costs and how those costs will be covered by various revenue streams and financing mechanisms. Based on the relationship of the various projects, B&D developed two financial models: one that examines the Center of Health and Wellbeing as a separate project, and the other that combines campus recreation, events, and athletics. The building program and operating assumptions utilized in the models are based, where appropriate, on the market analysis, comparisons to similar projects, the use of industry standards, University projections and operating data, and B&D’s industry expertise. With respect to the Multipurpose Event Center, B&D University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 1 FINANCIAL ANALYSIS also reviewed the report developed by CSL to understand previous assumptions regarding the potential market for events. A more detailed description of the specific assumptions is included in the following text. Versions of the respective model are included in Appendix 3. Following is a chart identifying and grouping the specific recommended projects that are detailed in Section B of this report. Group Description A Center for Health & Wellbeing INDOOR FACILITIES B B B Demolish Tennis Facility New Recreation Center Resurface/Expand Field House (cage) C C C C Renovate Gucciardi New Multipurpose Event Center New Entry/Shared Lobby Parking Garage Expansion D D Renovation of Support Spaces New Aquatics Center CHWB Financial Model Athletics/Recreation Financial Model OUTDOOR FIELDS E E New Outdoor Track Throwing Events Area F F F Recreation Field Soccer/Lacrosse Field Spectator Seating CENTER FOR HEALTH AND WELLBEING (CHWB) The Center for Health and Wellbeing (“CHWB”) currently operates out of several locations dispersed around campus. The new CHWB will consolidate all operations into one centralized facility, thus creating operational efficiencies that are incorporated in the financial model. For the purposes of this exercise, B&D developed a separate financial model specifically for this operation, since this project can be developed separate and distinct from athletics and recreation. The model is based on several assumptions from data provided by Cannon Design and the Center for Health and Wellbeing staff regarding the construction costs and operating expenses. Revenue Assumptions Revenues generated by a facility of this type come primarily from student fees. To support current operations, students are assessed $488 annually, which generates approximately $4.8 million annually. This calculation is based on a baseline number of students which is projected to increase from 9,900 to 2 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies FINANCIAL ANALYSIS 10,000. B&D estimates that the existing fee would need to increase $110 annually to support the consolidation and expansion of the CHWB. It is further assumed that the fee will increase by 3% annually to keep up with inflation and increased operating expenses. To help minimize the impact of student fees, the CHWB also generates revenues from various operations with respect to additional services and product sales. Revenue for these services is budgeted to be approximately $950,000. With a consolidated facility and projected additional patrons served, B&D estimates that revenues would grow by 5%, a conservative estimate which would generate an additional $50,000 annually. ! ! " # % $ & " # $ ' &) *& '() ( !% !& & ( % ( % & & & +&! +++ ! & +) ( *) * ' Operating Assumptions As a consolidated facility with administrative, clinical, classroom, and conferencing spaces, the operating costs were calculated according to several expense categories that together represent the total operating costs for the facility. For this exercise the costs were divided into personnel costs, existing operating costs, and new operating expenses. Personnel Costs The personnel costs include the salaries and benefits for permanent administrative staff, clinicians, nurses, graduate teaching assistants, temporary staff, and part-time labor. The staffing model is based on current operations and is expected to remain steady with the consolidation into a new facility. The model details personnel expenses based on several operational categories that include: University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 3 FINANCIAL ANALYSIS . 7 '8 ' * 3 . * ', 8 , : 8 4 '8 0 .2 47' . '8 ' ! , '8 : %4. .*% ' 48 # %4. *% 3.8 4 * % 3 , , * ', 8 4 * ' 4 7 ' '8 4 , -* 48 *43 ., 7 % ; ' . *% 43 . ; '8 7 $ : 8 4 '8 8 , 9 . * ', 8 0 3 . 8 * , : . * ', 8 . % 4 . * % %, 4 Within each of the operational categories, personnel expenses are further segmented into administration, full-time staff, part-time staff, and associated benefits. Personnel expenses represent approximately $4.8 million of total operation expenses. B&D assumes that personnel expenses will increase 3% annually. + ' , --0 * " + $ 2 * , -* . -. " ) * & 1 . ) ! 1 - 3 " 2 - 3 / ( ( (( ( ( / ( ( ((( / ! & ( ( / / & / & % & & & / & ! ! Non-Personnel Costs Costs associated with the day-to-day operations of the permanent staff are included in the non-personnel costs. These expenses include general operation expenses, telephone and related charges, rentals, software maintenance, and overhead allocated from the University. With current operations dispersed across several locations, certain operational expenses not previously associated with a stand-alone facility need to be included in the model. These expenses include utilities, repair and maintenance, contract services, insurance, and custodial support. Operating Expenses Existing operating expenses were calculated based on data provided by the University. Operating expenses associated with having a consolidated facility were calculated on a square foot basis and applied to all portions of the facility. The applied square foot costs were based on most recent costs provided by the University and were inflated to current dollars. + 0 * 0 * 3 1 , -* , + +& -6 ' , 4 5+ 3 / & 1 (/ ( 4 5+ / & / / 4 . / / / / (( / / / / (/ // ( University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies FINANCIAL ANALYSIS Project Costs In conjunction with Cannon Design, B&D developed a preliminary project budget for this facility based on a building program. The building was programmed with several building components; within each of those components is a list of specific spaces. A detailed list of spaces can be found in Appendix 1. HEALTH AND WELLBEING PROGRAM SUMMARY Public Areas Administration Zone Women' s Health Medical Clinic Nutrition Psychiatric Services Travel Clinic Counseling Center Alcohol and Drug Counseling Health Promotion Service (drug and alcohol) Physical Therapy Occupational Health Pharmacy X-Ray Communicable Disease Unit Outdoor Enclosed Patio Atrium Growth/Rental Space Assuming the facility would have to be approximately 35,000 gross square feet, the total project cost is estimated to be approximately $15 million assuming the building is constructed and opened within a fouryear window. The financial model assumes the building will be open in the fall of 2012. ' 2 4" 5 ' 6 ( % 6 3 ! & ! ! These projections are based on certain assumptions that, if changed, could have a significant impact on the overall costs. The location of the facility also will have an impact on parking and how many spaces will be needed to support a facility of this size. With rising construction costs, B&D assumes that the building will take two years to midpoint of construction at an annual inflation rate of 6%. This assumes the University gets approval for the project and is able to begin construction within a relatively short period of time. University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 5 FINANCIAL ANALYSIS Project Economics B&D considered different scenarios, each of which plays an important role in determining project viability. In the scenario represented in this report, the University would be responsible for covering $11 million in project costs, which equates to an annual debt service of $814,000 assuming an interest rate of 5.5% and debt term of 30 years. B&D assumed that 25% of funding would come from other sources, of which fundraising would account for $2 million. The remaining amount would be generated through early fee collection that would begin immediately and increase until the building opens. This would generate an additional $1.6 million based on a phased-in fee of $110 annually as shown below: / 73 3 4=0 $ $ 1 : +$ 4> 3 < < ' < $ $ 6 ,9 & ) 2 ( ) + $ ." 3 ? ? ? & ! 8 % 73 8 6 % - 6 & ! 1 / / ( ( & ! University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies FINANCIAL ANALYSIS ATHLETICS AND RECREATION A series of projects were recommended that would significantly improve the University of Vermont’s recreation and athletics facilities. In total there are fourteen projects that include upgrades and expansion of indoor and outdoor facilities. These fourteen projects were then grouped together based on certain development characteristics in order for certain projects to happen in a logical sequence. This process allowed for the University to examine each group of projects independently to understand the impact and opportunities related to financial realities. B&D developed a comprehensive financial model that explored the revenue opportunities and operating expenses associated with the main components of each project. Specifically, B&D focused on modeling the operations of a new Multipurpose Event Center (“Center”) and expanded recreation facility. For the purposes of this exercise, the Center is being treated as a cost center, in that all revenues generated will go to support building operations and will be self-operated. The model is based on several assumptions using cost data provided by Cannon Design and operating information provided by athletics and recreation. The ultimate goal of this exercise is to understand all of the funding sources and determine what fee would need to be assessed to fully fund the entire development. Revenue Assumptions Multipurpose Events Center Revenues generated by a facility of this type will come from a number of sources including University and non-University events, conference customers, and ancillary income streams from these operations and events. Revenue streams from events include advertising/sponsorship, luxury seating, event rental, concessions, merchandise, conferencing food and beverage sales, facility fee, and equipment rentals. Beyond direct operating revenues, the building should be able to generate supplementary revenue through the sale of naming rights. The majority of revenues streams correlate directly with the number of events and the total spectators/users that enter the facility. Although these numbers can fluctuate heavily based on entertainment, sports, and conference market conditions, the model assumes a moderate number of events in estimating the total revenues that the building will achieve. In the end, the building management team will be the greatest determinant of the level of revenues achieved by the facility, based on its success in attracting outside events and maximizing the number of participants. University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 7 FINANCIAL ANALYSIS , : : : :, 9 9 ! 9 " " ;', # 2 " # # % " A 1 A " $ " ) 4 + @ 1 4 ." 4 % 1& & % 1& & " 1 < 11 @ % @ ) @ ) < :9 :9 :9 ( B B $ 5& 3 1 0 2 @ * & 6 + * " * & 6 . ( % % " 2 > , & ! % & & & & ! % & % " " & B&D estimates that attendance from these events will be approximately 248,000 annually. ( , 1 < # 2 @ ! " # % @ ) # % @ ) " " " A 1 B A " B " ) 4 + @ 1 4 " 4 5& + 3 1 * 1& & 0 1& & 2 @ * &! Rental Income Rental income is collected from all events including athletics, concerts, family events, and conference event sponsors on a per-event basis. B&D assumed a moderate number of events per year (84) based on existing market conditions and University obligations. Rental rates range from $1,250 to $2,500 for high school events and UVM athletics events, to $7,000 for concerts and family events. Smaller events such as banquets and meetings range between $1,500 and $3,500. Furthermore, the event schedule is limited to major University events and rent-generating events and is not intended to include any community-based or other University events that would not generate any revenue. , : : : :, 9 9 ! 9 " " ;', # 2 " # # % " A 1 A " $ " ) 4 + @ 1 4 ." 4 % 1& & % 1& & @ % @ ) @ ) & & & B B % & & 5& 3 1 0 2 @ + * & " * " & & & A detailed business plan for the facility will need to be done to analyze the operating philosophy for the building. 7 , * " 1 & 6 )* & 6 < 1 3 ( ( 2 > , & 8 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies FINANCIAL ANALYSIS Concessions, Catering, Food and Beverage, Merchandise Concession and merchandise income is calculated based on the number of events and anticipated attendees per event. Based on the event type, it is assumed that each attendee will spend a certain amount on concessions and merchandise. For sporting events, concerts, and family events it is assumed attendees will spend between $1.00 and $4.00 for concession items; this assumes that no alcohol will be sold to the general public. For the conference center events, a food and beverage per-attendee cap was applied to each event type, ranging from $1.25 for consumer shows to $25.00 for banquets. For UVM sporting events, it is assumed attendees will spend $1.00 for merchandise. For concerts the per-attendee cap is estimated to be $8.00. The model projects that 25% of gross concession revenues and 15% of gross merchandise revenues will go to the Center ' , : : : :, 9 9 ! 9 " " ;', # 2 " # # % " A 1 A " $ " ) 4 + @ 1 4 ." 4 % 1& & % 1& & *= @ % @ ) @ ) B B 5& 3 1 0 2 @ + * " * " ? ? ? ? ? ? (? ? (? ? ? ? ( ' * ? ? ? ? ? ? ? ? ? ? ? ? Naming Rights/Fundraising Naming rights are becoming increasingly prevalent revenue opportunities for universities. The pricing of these rights varies and can have a significant impact on financing this type of facility. Naming rights, sponsorships, and suites sales are types of contractually obligated income (COI) used in financing these types of facilities. These income sources are usually long-term contracts and are considered relatively stable and credit worthy. B&D worked with the University in developing a goal of $25 million dollars in naming rights from donor support and other sponsorship opportunities. Many similar facilities have been successful in selling to UVM supporters the name of the ice sheet itself, the locker rooms, the media rooms, the banquet facilities, and other opportunities. Of this $25 million, $20 million would be spread over a 10-year term with the proceeds applied as annual revenue, and the remaining amount used as project equity reducing the amount of debt issued. Advertising/Sponsorship Income The amount of attendees at a facility typically dictates the amount of advertising income that can be generated. The greater the number of attendees, the more likely advertisers will support the facility. B&D assumed that this facility will generate $250,000 per year in advertising revenues above and beyond what University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 9 FINANCIAL ANALYSIS is currently generated from Athletics. Currently, Athletics generates about $450,000 in sponsorships per year. So the total sponsorship revenue for the facility and the Athletics Department is assumed to be $700,000. Premium Seating Premium seating has been a key component in the recent surge in the development of university arenas. For this facility, B&D included two types of premium seating: luxury suites and preferred seating. Luxury suites are generally purchased by companies and are the most - ) / expensive seats in the facility. They typically include 8-12 tickets to + the game, free parking, an enclosed suite, and waiter/waitress services. They also typically include the first right of refusal for nonUVM events at the building. For this analysis, the building program assumes eight luxury suites leasing for $20,000 each per year. ) . ' 3 7 ' . / ) 3 1 & & Preferred seats are generally the seats closest to the event floor. These seats can be marketed to alumni and local businesses. This analysis assumes that 500 preferred seats will be sold at $750 each. Parking B&D assumed that the facility would generate revenue through a dedicated parking fee that be can be assessed through various mechanisms. For this exercise, projections are based on the estimated annual attendance divided by the ratio of patrons per car (4). The parking fee is estimated to generate $163,000 annually. A detailed parking assessment would need to be done to look at the ability of UVM to manage the existing parking lots. Other similar facilities have simply included a parking fee for every ticket sold. Facility Fee A facility fee is an amount allocated to all tickets sold that helps to provide an additional revenue stream to the building. Based on the average number of tickets sold, B&D projects that assessing a $2 facility fee to all tickets would generate $192,000 annually. This fee would be imposed prior to facilities coming on line, and also would become a permanent fee to support overall operations. As attendance increases, so will the ability to generate additional revenue. ! /* # " < 1 > / # # % ! ! ! $ ( @ ) # % @ ) # 2 @ " # 2 @ # " # % @ ) " / ( / + % 10 / 3 ) 3 ? ? ? ? ? ? ? ? ? / ( ( ( / (/ + &! University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies FINANCIAL ANALYSIS Recreation Center Revenue B&D projected revenues that would be generated from an expanded recreation facility. Currently Recreation is generating over $200,000 annually from various services and programs. B&D estimates that these revenues will rise with increased patron capacity and expanded services and programs. In addition, B&D assumes additional revenue can be generated through offering memberships to faculty and staff as well as community members. ? $ )3 ' " ' $ - 3 1 $ $ 3 / 4 > +" ( 0 : '7 - 1 0 ( $ + 45 * 8 1 ' 2 & " + ) 2 ( & 6 " & + & + / ( + ( % + %! Student Fees It is anticipated that the revenue generated from the various operations will cover a majority of the operating expenses but will not be sufficient to cover the debt associated with constructing each project. This exercise was intended to determine the necessary student fee that would be needed to fully fund the development of proposed projects. B&D estimates that students would need to be assessed a fee totaling $1,200 annually in addition to the current $243 fee to fully fund the entire project. These fees would be phased in over a period of time to generate project equity, thus reducing the amount assessed to students when all projects come on line. Collecting fees early can also help efforts relating to fundraising by demonstrating the University’s commitment to improving facilities. During this period the University can allocate a percentage of these fees to develop projects immediately and add value to University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 11 FINANCIAL ANALYSIS existing facilities that would benefit students, e.g. new outdoor fields, reduction in club sports/intramural dues, etc. Operating Assumptions As a facility with administrative, public assembly, recreation, and conferencing spaces, the operating costs were calculated according to several expense categories that together represent the total operating costs for the facility. For this exercise the costs were divided into personnel costs and operating expenses. It is assumed that the building will be managed by the University. Personnel Costs The personnel costs include the salaries and benefits for permanent facility staff and part-time labor above what currently exists for athletics and recreation. The bulk of this is associated with the operations of a new Multipurpose Event Center. The cost assumptions provide for a permanent marketing and management staff to maximize the event schedule and ensure the highest level of service to building users. ', /0 , 0 2 5 , -- 7 7 , + . , + 2 1 4 1 @ 1 3 . " ' 3 @ / 77 / / 8 1 7 . 1 ( 77 / <4 ' * " , -* A' * 3 --B & & Operating Expenses Operating costs to the University associated with utilities, operations, and maintenance were calculated on a square foot basis and applied to all portions of the facility. The applied square foot costs were based on the most recent costs provided by the University and were inflated to current dollars. 0 * : 1 , -* ++ 3 + ' @ 1 , & 4 5+ 0* 12 1 , -* 3 + " ' /3 (? ? ? ? ?(( ? ? @& 7 ' (? ?( ?(/ ?( ?(/ ? / ? +@ & /3 ( / / / ( + ! University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies FINANCIAL ANALYSIS Project Costs Cannon Design developed preliminary cost estimates for the development of various projects. The total project cost is estimated to be approximately $175 million in today’s dollars, not factoring in project equity. These projections are based on certain assumptions that, if changed, could have a significant impact on the overall costs. For instance, B&D assumed for this exercise that the projects would be staggered over a period of six years with construction starting in 2012. Based on this assumption, future project costs were developed based on a midpoint of construction, assuming a 2012 start date and a 6% escalation rate. ' ' 6 200 2 3< * 2 6 3 ,/ B B B Demolish Tennis Facility New Recreation Center Resurface/Expand Field House (cage) $694,000 $39,406,000 $2,656,000 ! & $826,000 $46,934,000 $3,163,000 & + % C C C C Renovate Gucciardi New Multipurpose Event Center New Entry/Shared Lobby Parking Garage Expansion $1,875,000 $84,039,000 $4,875,000 $3,125,000 +% + ! $2,234,000 $100,091,000 $5,806,000 $3,723,000 &! D D Renovation of Support Spaces New Aquatics Center $10,500,000 $18,891,000 + %+ $12,506,000 $22,499,000 %& & 0 8 20 0 3 , 2/ E E New Outdoor Track Throwing Events Area $3,875,000 $350,000 ! & $4,615,000 $416,000 & % F F F Recreation Field Soccer/Lacrosse Field Spectator Seating $750,000 $1,875,000 $2,500,000 & & $894,000 $2,234,000 $2,978,000 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies 13 FINANCIAL ANALYSIS Project Economics B&D considered different scenarios, including building size, event schedules, and policy decisions, that each plays an important role in determining project viability. It is essential to note that only the most successful venues of this type are able to achieve break-even financial performance. For this project to be successful and to offset some of the costs, the University should continue to explore partnership opportunities with the surrounding cities and counties. operational costs and minimize the impact on / 73 3 4=0 $ $ 1 : +$ 4> ) * @ & 1 < < + + 73 7 8 3 3 8 8 the University can garner through the community and its ability to generate upfront equity. Based on would be no financial support from local, state, or ( / 2 8 % student fees depend on the level and type of support discussions with the University, B&D assumed there ( < 3 The ability to build this facility and cover federal sources. Therefore, in the scenario represented in this report, the University would be responsible for covering $152 million in project costs, which equates to an annual debt service of $11.8 " & * $ 6 3 $ % 0 6 + + 4 6 4 ) & @ 1 0 1 4 5+ 3 - ++ 8 6 .> , $ 8 6 , * @ *& 6 1 4 . 3 $ $ + 1 - million (5.5% interest rate, 30-year term). ) ( A 1 B ( ( ) / + /// '( Project B Project C Project D Project E Project F ' 6 ' 6 $50,923,000 $111,854,000 $35,005,000 $5,031,000 $6,106,000 + + ,9 2 ) / ( (( (( ( % ( / ((( ( + + The model assumes that the University would be able to generate approximately $56 million in upfront equity from early fee collection, naming rights and fundraising, and a facility fee. B&D assumed that an annual fee of $1,200 would be needed to fully fund the entire list of proposed projects and would be phased in over a four-year period beginning immediately. Based on this scenario, early student fee collection could generate $30 million in upfront equity. In working with the University, B&D assumed that $25 million could be generated through various fundraising efforts. Part of this amount would go towards project equity, and the remaining funds would be considered revenue for the Multipurpose Event Center and would be allocated over a 10-year period. The final source of upfront equity would be generated from assessing a ticket surcharge to all events that would begin immediately. Based on the average number of tickets currently sold, B&D estimated that the University could generate $192,000 annually. 14 University of Vermont Campus Life Task Force II: Analysis, Recommendations, and Implementation Strategies APPENDIX 1 0 3 4 5 Campus Life Task Force II: Implementation Outline Program - Summary FACILITY PROGRAM Quantity TOTAL PROGRAM SUMMARY Quantity TOTAL NSF Total GSF 1 1 1 1 177,841 22,964 128,530 103,385 261,531 35,329 197,738 143,591 638,189 Existing Total Area (PFG Complex) 1 n/a 370,000 Total Net New Program Renovation 1 0 268,189 370,000 Athletics/Shared Use Center for Health and Wellbeing University Multipurpose Events Center Recreation Sub-Total 1 0 3 4 5 Campus Life Task Force II: Implementation Outline Program - Athletics/Shared Use FACILITY PROGRAM Quantity Project GENERAL ATHLETICS PROGRAM PUBLIC AREAS Concessions Concessions Storage Control Hall of Fame Lobby Toilets- Men Lobby Toilets- Women Lobby/Lounge Merchandise / Book Store Ticketing/Novelties Vending Area Quantity UNIT AREA Total NASF 1 1 0 0 0 0 0 1 1 1 750 250 200 1,500 1,400 2,400 5,000 250 200 250 750 250 0 0 0 0 0 250 200 250 1,700 Sub-Total Public Areas FACILITY PROGRAM Quantity Project GENERAL ATHLETICS PROGRAM ADMINISTRATION ZONE Reception/Lounge Administrative Assistant Director of Athletics/Assoc VP Senior Associate Athletic Director Assistant Athletic Director Assistant VP of Marketing Athletics Marketing Director Director of Ticket Operations Director of Ticketing/Victory Club Assistant Ticket Manager Director of Athletic Development Communications Director Sports Information Events Manager Financial Manager Assistant Financial Manager Archives Room Conference/Meeting Conference/Meeting Conference Storage Large Team Meeting Room Storage Large Team Meeting Room/Classroom (100 persons) Small Team Meeting Room Storage Small Team Meeting Room/Classroom Video Room Work Room Kitchen Storage/Copying Quantity UNIT AREA Total NASF 1 2 1 1 2 1 1 1 1 2 1 1 3 1 1 1 1 2 2 4 1 1 2 2 4 1 1 2 400 80 300 250 180 180 140 140 140 90 140 140 110 120 140 110 300 400 200 80 200 1,800 100 800 225 150 200 200 400 160 300 250 360 180 140 140 140 180 140 140 330 120 140 110 300 800 400 320 200 1,800 200 1,600 900 150 200 400 2 FACILITY PROGRAM Quantity Project GENERAL ATHLETICS PROGRAM ADMINISTRATION ZONE Coaches Offices Director of Basketball Operations Basketball Head Coaches' Offices Basketball Assist. Coaches' Offices Director of Skiing Skiing Head/Assoc Head Coaches' Offices Hockey Head/Assoc Head Coaches' Offices Hockey Asst. Coaches' Offices Head Coaches' Offices Asst. Coaches Offices (could be open space) Volunteer Asst. Coaches' Offices Academic Resource Center Academic Coordinator Administration/Lounge Asst. Academic Coordinator Asst. AD Student-Athlete Services Medium Conference Small Conference Storage Study Area (30 workstations) Toilet (HC Unisex) Sub-Total Athletics Administration Zone Quantity UNIT AREA Total NASF 1 2 8 1 3 2 6 14 27 3 140 140 140 140 140 140 140 140 110 80 140 280 1,120 140 420 280 840 1,960 2,970 240 1 1 1 1 1 3 1 1 1 120 100 120 140 350 140 100 800 80 120 100 120 140 350 420 100 800 80 21,120 FACILITY PROGRAM Quantity Project GENERAL ATHLETICS PROGRAM ACTIVITY ZONE Field House w/ 200M Track/Tennis Ice Hockey Rink, single sheet Ice Hockey Rink, spectator seating area Aquatic Meet Management / Classroom Pool Offices Pool Storage/Filtration Swimming Pool (25 yd stretch, w/ diving well) Swimming Poof. Spectator seating Three Court Competition Gymnasium Three Court Competition Gymnasium Storage Sub-Total Athletics Activity Zone Quantity UNIT AREA Total NASF 1 1 1 1 2 1 1 1 1 1 39,300 17,141 4,757 400 120 1,200 19,000 2,500 22,393 400 39,300 17,141 4,757 400 240 1,200 19,000 2,500 22,393 400 107,331 3 FACILITY PROGRAM Quantity Project GENERAL ATHLETICS PROGRAM SUPPORT ZONE Team Locker Rooms Men's Team Room 1 - Basketball Toilets/Showers Men's Team Room 2 - CC / Track & Field Toilets/Showers Men's Team Room 3 - Ice Hockey Toilets/Showers Men's Team Room 4 - Lacrosse Toilets/Showers Men's Team Room 5 - Skiing Toilets/Showers Equipment Storage Men's Team Room 6 - Soccer Toilets/Showers Men's General Lockers Toilets/Showers Shared Lounge Area Women's Team Room 1 - Basketball Toilets/Showers Women's Team Room 2 - Swimming Toilets/Showers Women's Team Room 3 - CC / Track & Field Toilets/Showers Women's Team Room 4 - Field Hockey Toilets/Showers Women's Team Room 5 - Ice Hockey Toilets/Showers Women's Team Room 6 - Lacrosse Toilets/Showers Women's Team Room 7 - Skiing Toilets/Showers Equipment Storage Women's Team Room 8 - Soccer Toilets/Showers Women's Team Room 9 - Volleyball Toilets/Showers Women's General Lockers Toilets/Showers Shared Lounge Area Coaches Locker Rooms Men's Coaches Locker Rooms Toilets/Showers Women's Coaches Locker Rooms Toilets/Showers Quantity UNIT AREA Total NASF 1 800 800 1 1,200 1,200 0 3,500 0 1 1,200 1,200 1 500 500 1 1,000 1,000 1 800 800 1 1 1,000 800 1,000 800 1 800 800 1 1,200 1,200 1 1,000 1,000 0 3,500 0 1 1,000 1,000 1 500 500 1 1,000 1,000 1 1,000 1,000 1 800 800 1 1,000 1,000 1 800 800 1 800 800 4 FACILITY PROGRAM Quantity Project Quantity UNIT AREA Total NASF 2 800 1,600 1 400 400 1 400 400 Athletic Medicine (7,000sf) Athletic Medicine Services Director's Office Athletic Medicine Office Coordinator Senior Assoc. Athletics Trainer Office Assoc. Athletic Trainer Asst. Athletic Trainer Sports Therapy Exam Room Rehab Area Taping Area Hydrotherapy Treatment Unisex Toilet Storage 1 1 2 4 4 2 1 1 1 1 1 2 1 140 140 100 80 80 80 160 1,800 800 400 2,000 80 400 140 140 200 320 320 160 160 1,800 800 400 2,000 160 400 Strength & Conditioning Center (10,780sf) Head Strength & Conditioning Coach Asst. Strength & Conditioning Coach Strength Training Room Strength Training Room Storage Unisex Toilet 1 2 1 1 2 120 100 10,000 300 80 120 200 10,000 300 160 Equipment Operations Equipment Manager/Operations Equipment Room General Storage (off-season) Laundry 1 1 1 1 140 3,500 800 800 140 3,500 800 800 1 1 9 1 1 2 2 120 100 50 2,000 800 400 400 120 100 450 2,000 800 800 800 47,690 Qty. UNIT AREA GENERAL ATHLETICS PROGRAM Visitors and Officials Lockers Visitors Lockers Toilets/Showers Men's Officials Lockers Toilets/Showers Women's Officials Lockers Toilets/Showers Facilities Operations Building Manager Groundskeeper Janitorial (all levels) General Building Storage Loading Area Recycling Trash Sub-Total Athletics Support Zone ATHLETIC PROGRAM SUMMARY PROGRAM SPACES Public Areas Administration Zone Activity Zone Support Zone Quantity Efficiency Factor TOTAL Total NASF 1,700 21,120 107,331 47,690 177,841 68% 261,531 5 Campus Life Task Force II: Implementation Outline Program - Health and Wellbeing Existing FACILITY PROGRAM Expansion Quantity Project HEALTH AND WELLBEING PROGRAM Qty. UNIT AREA Total NASF Public Areas Public Lobby Centralized information area Large conference room (75-100 people) sub-dividable Classroom (space for 30 individuals) Quiet room/meditation area Staff kitchen and break room Student computer terminals Sub-Total Public Areas 1 1 1 1 1 1 1 1 1 1 1 1 1 4 600 100 1,250 600 120 250 15 600 100 1,250 600 120 250 60 2,980 Administration Zone Waiting room Conference room (8-12p) Director office CQI office Finance and operations office Finance assistant office Administrative assistant Human Resources Director Office Manager IT office Additional office spaces (2) for expansion Storage and spacing for office equipment Sub-Total Administration Zone 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 100 350 140 120 140 120 100 140 120 120 120 120 100 350 140 120 140 120 100 140 120 240 240 120 1,930 1 1 1 1 1 1 1 1 1 1 1 1 1 6 1 1 1 1 150 200 200 120 120 150 60 60 80 150 200 200 120 720 150 60 60 80 1,740 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 3 1 1 1 1 1 1 1 1 300 200 150 100 192 120 100 120 150 60 60 144 300 200 450 300 192 120 100 120 150 60 60 144 Women's Health Check-in/ Reception area Waiting area Four provider offices I Co-or office Exam Rooms Procedure Room Clean utility room Dirty utility room Storage Sub-Total Women's Health Medical Clinic Larger waiting room (seating for 20-30 people) Reception area 4 Multi Clinician offices (6 providers) Clinic assistant space Assistant Directors Office Med Dir. Admin Assist Billing office coordinator Insurance billing office Medical Records Coordinator Office w/scanner Clean utility room Dirty utility room Conference room 6 FACILITY PROGRAM Quantity Medical Clinic cont. Exam rooms with sink Two-bed lying down treatment and bath Lab-with emergency shower/eye station Nurse manager office Procedure room Referral / Information specialist Storage (supplies) Supply room Sub-Total Medical Clinic Nutrition Office Qty. UNIT AREA Total NASF 1 1 1 1 1 1 1 1 15 1 1 1 1 1 1 1 108 144 200 120 150 120 280 120 1,620 144 200 120 150 120 280 120 4,950 1 2 140 280 280 1 1 1 1 3 1 100 120 100 100 360 100 560 1 1 1 1 150 180 150 180 330 1 1 1 1 1 1 1 1 1 1 1 1 1 1 10 6 1 1 1 1 1 1 300 192 120 120 120 120 350 200 150 150 100 300 192 120 1,200 720 120 350 200 150 150 100 3,602 Sub-Total Nutrition Psychiatric Services Secretary/receptionist office (seating for 4-6 people) 3 Provider offices 1 Resident office Sub-Total Psychiatric Services Travel Clinic Travel and immunization clinic Office with room for supplies Sub-Total Travel Clinic Counseling Center Waiting room (area for 12-15 individuals) Director's office Admin Secretary "Core" Counselors offices Intern offices Central office Conference (8-12p) Group room Observation room Relaxation/meditation room Storage Sub-Total Counseling Center 7 FACILITY PROGRAM Quantity Alcohol and Drug Counseling Counselors Supervisors office Sub-Total Alcohol and Drug Counseling Health Promotion Service (drug and alcohol) Recep/secretary office Director's Office Group meeting room Staff offices Peed Ed Space Storage, copier/fax Work-study Sub-Total Health Promotion Service Incl. Alcohol and Drug Physical Therapy Reception area Waiting area Office space Massage room Private eval/rx rooms Work hardening/rehab space Storage Qty. UNIT AREA Total NASF 1 1 4 1 120 140 480 140 620 1 1 1 1 1 1 1 1 1 1 4 1 1 1 120 192 280 120 120 100 120 120 192 280 480 120 100 120 1,412 1 1 1 1 1 1 1 1 1 3 1 3 1 1 120 100 120 120 120 1,500 100 120 100 360 120 360 1,500 100 2,660 1 1 1 2 1 2 120 60 100 240 60 200 500 1 1 300 300 300 1 1 600 600 600 1 0 1,000 0 0 Sub-Total Physical Therapy Occupational Health Staff offices Hearing/vision testing booth Exam room Sub-Total Occupational Health Pharmacy Pharmacy Sub-Total Pharmacy X-Ray Single room w/ one machine Sub-Total X-Ray Communicable Disease Unit Sub-Total Communicable Disease Unit 8 FACILITY PROGRAM Quantity Outdoor Enclosed Patio Qty. UNIT AREA Total NASF 1 0 1,520 0 0 1 0 4,000 0 0 1 1 500 500 500 Qty. UNIT AREA Sub-Total Outdoor Enclosed Patio Atrium Sub-Total Atrium Growth/Rental Space Sub-Total Growth/Rental Space Quantity HEALTH AND WELLBEING PROGRAM SUMMARY Public Areas Administration Zone Women's Health Medical Clinic Nutrition Psychiatric Services Travel Clinic Counseling Center Alcohol and Drug Counseling Health Promotion Service (drug and alcohol) Physical Therapy Occupational Health Pharmacy X-Ray Communicable Disease Unit Outdoor Enclosed Patio Atrium Growth/Rental Space Efficiency Factor TOTAL Total NASF 2,980 1,930 1,740 4,950 280 560 330 3,602 620 1,412 2,660 500 300 600 0 0 0 500 22,964 65% 35,329 9 Campus Life Task Force II: Implementation Program - University Multipurpose Events Center Existing FACILITY PROGRAM Expansion Project MULTIPURPOSE FACILITY Quantity Quantity UNIT AREA Total NASF PUBLIC AREAS Arena Tickets (6 windows) Lobby Hall of Fame Club Room (250 capacity) Club Room Food Prep/Storage Club Room Men's Toilets (3T., 2L.) Club Room Women's Toilets (5T., 3L.) UVM Team Store UVM Team Store Storage Ticket Manager's Office Lobby Toilets- Men Lobby Toilets- Women Sub-Total-Public Areas 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 180 5,000 500 3,750 800 210 290 600 120 120 300 500 180 5,000 500 3,750 800 210 290 600 120 120 300 500 12,370 HOCKEY OFFICES - keep with other coaches office Administrative Assistants Assistant Coaches Conference Copy/Storage Head Coaches Shared Reception Storage Sub-Total Hockey Offices 1 1 1 1 1 1 1 0 0 0 0 0 0 0 100 120 350 100 200 250 120 0 0 0 0 0 0 0 0 CONCOURSE LEVEL Accessible Seating: 130 (1% w/companion @ 20 sf/pair) Arena Seating (6,500 seats @ 6 sf/seat) Pep Band Seating Platform (within general seating) Concessions and Storage (1 point of sale for every 300 spectators)) Concourse (16 ft wide x 1000 ft long) Open Lounges Suitebox (8 seats; 8-12 p.) President's Suitebox (16 p.) Announcer's Booth Broadcast Television Booth General Press/Statistics/Sports Information Radio Booths Television Camera Position Acoustics, Lighting, A/V Control Booth First-Aid Toilets-Men (19 urinals; 20 toilets, 16 lavs @ 35 sf/fixture) Toilets-Women (76 toilets, 25 lavs @ 35 sf/fixture) Sub-Total Concourse Level 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 30 1 1 8 1 1 1 30 2 3 3 1 1 1 2,600 39,000 0 100 16,000 750 180 400 130 150 20 150 100 150 80 1,925 3,535 2,600 39,000 0 3,000 16,000 750 1,440 400 130 150 600 300 300 450 80 1,925 3,535 70,660 10 FACILITY PROGRAM Quantity Quantity UNIT AREA Total NASF 1 1 17,500 17,500 17,500 LOCKERS Vermont Teams Lockers Coaches Lockers (4 lockers, 3' wide; 2 Showers, 1 Toilet) Hockey Changing Areas Hockey Locker Rooms (28 Lockers, 3 ft wide) Hockey Toilets/Showers (4 Toilets,3 Lavs,10 Showers) Lounge/Meeting Room Stick Storage Basketball Locker Rooms (game day space) 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 400 280 840 480 300 80 500 800 560 1,680 960 600 160 1,000 Visitors and Officials Lockers Officials Lockers (6 lockers each) Visitors Lockers Visitors Showers/Toilets for Lockers 1 1 1 1 2 4 4 400 500 300 800 2,000 1,200 9,760 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 120 200 120 400 80 400 80 300 350 600 120 200 120 400 80 400 80 300 350 600 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 180 80 800 200 110 600 500 2,700 1,200 120 2,500 600 2,000 2,400 1,000 180 80 800 200 110 1,200 500 2,700 1,200 120 2,500 600 2,000 2,400 1,000 18,240 Qty. UNIT AREA MULTIPURPOSE FACILITY RINK LEVEL Rink (90 x 200) Sub-total Rink Sub-total Lockers SUPPORT FACILITIES Team Support Facilities Athletic Training Center - (1900 sf) Exam Room Hydrotherapy Offices Rehab Area Storage Treatment (8 tables) (600 sf) Unisex Toilet Visiting Team Training Center Laundry Equipment Room Events Support Operations Office Operations Office Storage Commissary (Storage for Concessions and Club Room) Production Support/Equipment Room (editing) Events Power Event Staff Lockers (40 l ea.) Media Interview Room Portable Floor Storage Refrigeration Sound System General Building Storage Janitorial (all levels) Loading Area Truck Dock (3-bay)/ Trash Compactor Zamboni (3, Storage and Ice Melt) Sub-Total Support Facilities MULTIPURPOSE FACILITY PROGRAM SUMMARY PROGRAM SPACES Public Areas Hockey Offices Concourse Level Rink Level Lockers Support Facilities Quantity Efficiency Factor TOTAL Total NASF 12,370 0 70,660 17,500 9,760 18,240 128,530 65% 197,738 11 Campus Life Task Force II: Implementation Outline Program - Recreation Existing FACILITY PROGRAM Expansion Quantity Project RECREATION PROGRAM Qty. NASF Total NASF FREE ZONE Recreation Staff Administration Admissions Control Lobby / Guest Seating Area Director's Office Assistant Director's Offices Associate Director's Offices Building Operations Manager's Office Future Staff Office Secretarial Work Station Student Employee Work Area Conference Room Duplication/Mail Room/Administrative Area Marketing Production Area Pantry/Lounge Storage 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 2 1 1 1 1 2 150 300 150 110 110 110 150 60 110 400 150 200 100 100 150 300 150 220 220 110 150 60 220 400 150 200 100 200 Club Sports Club Sports Coordinator Club Sports Cubicles Club Sports Leagues & Storage Meeting Room 0 0 1 2 0 0 1 1 110 80 1,500 300 0 0 1,500 300 Outing Club Offices Resource Room Training Room Kitchen Outdoor Equipment Storage 1 1 1 1 1 6 1 1 1 1 110 400 800 300 2,500 660 400 800 300 2,500 Sub-Total Free Zone 9,090 ACTIVITY SPACES Gymnasiums Two Court Gymnasium - 84 ft courts Two Court Gymnasium Storage MAC Gymnasium (1 court) (96x104) MAC Gymnasium Storage Elevated Jogging Track 1 1 2 1 1 1 2 2 2 1 12,800 200 9,984 250 6,500 12,800 400 19,968 500 6,500 Specialized Activity Spaces Weight/Fitness Room - Main Weight/Fitness Room Storage Multipurpose Type - 1 Multipurpose Type - 1 Storage Multipurpose Type - 2 Multipurpose Type - 2 Storage Multipurpose Type - 3 Multipurpose Type - 3 Storage 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 18,000 300 3,500 200 2,500 200 1,500 200 18,000 300 3,500 200 2,500 200 1,500 200 12 Multipurpose Type - 4 Multipurpose Type - 4 Storage 2 2 1 1 800 100 800 100 Racquetball Courts 2 4 800 3,200 Squash Courts (International) 2 2 672 1,344 Small Competition/Leisure Pool (25yds - six lanes) 2 1 8,000 8,000 Whirlpool Wet Classroom Natatorium Storage Aquatic Director's Offices Indoor Golf Simulators Rock Climbing Wall Rock Climbing Wall Storage Sub-Total Activity Zone 2 2 2 2 2 1 2 1 1 1 1 2 1 1 400 500 400 100 300 1,500 150 400 500 400 100 600 1,500 150 83,662 1 1 1 1 1 1 400 500 750 400 500 750 1 1 1 1 1 1 1 1 200 200 10 6 6 4 0 0 6 4 27 23 12 15 300 250 1,200 800 270 140 72 60 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 200 200 10 12 6 0 0 2 1 1 1 1 1 6 4 27 23 15 300 250 200 300 500 300 800 1,500 1,200 800 270 281 90 0 0 400 300 500 300 800 1,500 10,633 Qty. UNIT AREA SUPPORT ZONE Social Lounge Juice Bar/ Vending Area Entry Lobby Men's Locker Rooms -- Single Tier 12" Lockers -- Double Tier 12" Lockers -- Showers -- Toilets -- Urinals -- Grooming Stations -- Sauna -- Whirlpool Women's Locker Rooms -- Single Tier 12" Lockers -- Double Tier 12" Lockers -- Showers -- Toilets -- Grooming Stations -- Sauna -- Whirlpool Assisted Change Rooms Sauna Rec Equipment Checkout Laundry Room General Building Storage Large Classroom Sub-Total Support Zone Quantity RECREATION PROGRAM SUMMARY Free Zone Activity Zone Support Zone Efficiency Factor TOTAL Total NASF 9,090 83,662 10,633 103,385 72% 143,591 13 Campus Life Task Force II: Implementation Program - Outdoor Fields Existing Existing Program Additional Program Requirement Field Type Men's Lacrosse Practice 1 shared 1 new field (shared) Artificial New artificial turf shared w/ Soccer Men's Soccer Practice 1 shared 1 new field (shared) Artificial New artificial turf shared w/ Lacrosse 0 new 400M Track N/A Women's Field Hockey Practice 1 shared 0 Artificial Moulton Winder Field- shared use w/ Lacrosse Women's Lacrosse Practice 1 shared 1 new field (shared) Artificial New artificial turf shared w/ Soccer Women's Soccer Practice 1 shared 1 new field (shared) Artificial New artificial turf shared w/ Lacrosse Women's Track Practice 0 new 400M Track N/A Outdoor Tennis Courts 0 4-6 courts 3 dedicated 4-5 dedicated Comments OUTDOOR PROGRAM Outdoor Fields Men's Track Practice Recreation Fields New track/throwing events, shared w/women's program New track/throwing events, shared w/men's program Location TBD Artificial Location TBD 14 APPENDIX 2 T H E U N I V E R S I T Y P H A S E I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Site Analysis Architectural Districts Redstone District TS RO A D University Heights District TY H EI G H Athletic District Land Banks for Residential Uses UN IV ER SI PATRICK GYM RECREATION FIELD GUTTERSON FIELD HOUSE GARDNER-COLLINS CAGE GUCCIARDI FITNESS CENTER MOULTON WINDER FIELD SOCCER FIELD SPEAR STREET MIDDLE STORMWATER POND LOWER STORMWATER POND City of Burlington SOFTBALL FIELD City of South Burlington RECREATION FIELD N 0 100 200 1 T H E U N I V E R S I T Y P H A S E I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Site Analysis Views and Vistas View TS RO A D Vista TY H EI G H Site UN IV ER SI PATRICK GYM GUTTERSON FIELD HOUSE GARDNER-COLLINS CAGE RECREATION FIELD GUCCIARDI FITNESS CENTER MOULTON WINDER FIELD SOCCER FIELD SPEAR STREET MIDDLE STORMWATER POND LOWER STORMWATER POND City of Burlington SOFTBALL FIELD City of South Burlington RECREATION FIELD N 0 100 200 2 Winter Prevailing Winds T H E U N I V E R S I T Y P H A S E I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Site Analysis Environmental Characteristics Site Slopes JUN TY H EI G H TS RO A D JUN UN IV ER SI PATRICK GYM MAR/ SEPT MAR/ SEPT RECREATION FIELD GUTTERSON FIELD HOUSE GARDNER-COLLINS CAGE GUCCIARDI FITNESS CENTER DEC DEC MOULTON WINDER FIELD SOCCER FIELD SPEAR STREET MIDDLE STORMWATER POND Summer Prevailing Winds SOFTBALL FIELD City of Burlington LOWER STORMWATER POND City of South Burlington RECREATION FIELD N 0 100 200 3 T H E U N I V E R S I T Y P H A S E I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Site Analysis Existing Circulation and Parking Pedestrian / Bicycle Circulation TY H EI G H TS RO A D Vehicular Circulation p UN IV ER SI PATRICK GYM Existing Parking Garage Spaces: 903 Existing Sur face Parking Spaces: 414 Total Existing Parking Spaces: 1317 p p p RECREATION FIELD GUTTERSON FIELD HOUSE GARDNER-COLLINS CAGE GUCCIARDI FITNESS CENTER GATE ED T R O LL C O N U LA R V E H IC S S E ACC GATE p MOULTON WINDER FIELD SOCCER FIELD SPEAR STREET MIDDLE STORMWATER POND p SOFTBALL FIELD City of Burlington LOWER STORMWATER POND City of South Burlington RECREATION FIELD N 0 100 200 4 T H E U N I V E R S I T Y P H A S E I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Site Analysis Proposed Circulation and Parking D Pedestrian Circulation TY H EI G H TS RO A Vehicular Circulation p UN IV ER SI PATRICK GYM Proposed Parking Garage Spaces: 1146 Proposed Sur face Parking Spaces: 136 Total Proposed Parking Spaces: 1282 Net loss: p p Ser vice Deliver y GUTTERSON FIELD HOUSE GARDNER-COLLINS CAGE (35) Spaces RECREATION FIELD GUCCIARDI FITNESS CENTER GATE GATE p NEW LACROSSE/ SOCCER STADIUM (2500 SEATS) SNOW REMOVAL ZONE SNOW REMOVAL ZONE MOULTON WINDER FIELD MIDDLE STORMWATER POND PROPOSED STORMWATER SPEAR STREET NEW RECREATION FIELD SNOW REMOVAL ZONE City of Burlington LOWER STORMWATER POND City of South Burlington p N 0 100 200 5 T H E U N I V E R S I T Y P H A S E Varsity Soccer Competition I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Master Planning Concept Existing Field Use Bu Sou rlingt th on Bu rlin gt on Centennial Field Varsity Baseball enue East Av Ma Str e riv tD on tam Ca ee t e8 9 in Int ers tat Rugby Pitch Recreation/ Club Sports Wil listo Redstone Green Recreation/ Club Sports nR oa d Flag Football/ Recreation eet Spear Str PFG Field #6 Field #5 Recreation/ Intramurals/ Soccer Moulten Winder Artificial Turf Field, Field Hockey/Lax Soccer Practice Field Softball Field #1 Recreation/ Club Sports Varsity/Recreation N 0 2 00 4 00 800 6 T H E U N I V E R S I T Y P H A S E I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y S i t e A n a l y s i s - C e n t e r f o r H e a l t h & We l l b e i n g Circulation and Parking Pedestrian Circulation Vehicular Circulation N 0 200 400 7 T H E U N I V E R S I T Y P H A S E I I O F V E R M O N T I M P L E M E N T A T I O N S T U D Y Master Planning Concept Center for Health and Wellbeing Adams House Parking for 20 Cars Johnson House New Center for Health and Wellbeing: 7375 gsf x 2 levels = 14,750 gsf 7475 gsf x 3 levels = 22,425 gsf Total Area = 37,175 gsf To Redstone Green Area Parking for 29 Cars Access from Residence Halls N 0 20 40 80 8 APPENDIX 3 This page left blank intentionally Detailed Financial Analysis – Center for Health & Wellbeing This page left blank intentionally University of Vermont Phase II Implementation Strategies Project Phasing Project Description Current Year Escalation 2008 106.00% Page 1 Construction Start Building Opens Quantity (GSF) 2010 2012 35,329 Cost/SF 2008 Future Construction Cost 2008 Dollars Future Cost $300 $10,599,000 Site/Soft Costs Project Cost 2008 Dollars Future Cost Center For Health and Wellbeing A New Health and Wellbeing $337 $11,909,000 $3,573,000 30% $13,779,000 $15,482,000 University of Vermont Phase II Implementation Strategies Center for Health & Wellbeing Sources of Funds Reserves E&G Funds Fundraising Upfront Fee Equity State Contribution Revenue Bond Total Uses of Funds Hard Costs New Health and Wellbeing Soft Costs Total Page 2 $ $ $ $ $ $ $ 2,000,000 1,650,000 11,832,000 15,482,000 $ $ $ 11,909,000 3,573,000 15,482,000 Percent 0% 0% 13% 11% 0% 76% 77% 23% University of Vermont Phase II Implementation Strategies Debt Schedule CHWB Page 3 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Debt Service CHWB SUBTOTAL $ $ - $ - $ - $ - $ - $ - $ - $ - $ 814,000 $ 407,000 $ 814,000 $ 814,000 $ Debt Assumptions Interest Rate 5.50% Term 30 1.1 DCR Phase CHWB Project Cost $15,482,000 * Assumes payment for first year Debt Service is only half Project Equity $3,650,000 Project Cost Debt Service $11,832,000 $814,105 Year 2012 814,000 $ 814,000 $ 814,000 $ 814,000 $ 814,000 $ 814,000 $ 814,000 $ 814,000 $ 814,000 814,000 University of Vermont Phase II Implementation Strategies CWHB Pro Forma Total Square Feet Annual Student Fee 35,329 $110 Operating Pro Forma 0 2008 Page 4 EXISTING OPERATIONS 1 2009 2010 2 3 2011 4 2012 5 2013 6 2014 NEW OPERATIONS 7 2015 8 2016 9 2017 10 2018 INCOME Product Sales - Service Income Existing Student Fee Revenue New Student Fee Revenue TOTAL INCOME $955,000 $4,831,000 $0 $5,786,000 $984,000 $5,026,000 $0 $6,010,000 $1,014,000 $5,177,000 $0 $6,191,000 $1,044,000 $5,333,000 $0 $6,377,000 $1,075,000 $5,492,000 $1,100,000 $7,667,000 $1,107,000 $5,657,000 $1,133,000 $7,897,000 $1,140,000 $5,827,000 $1,167,000 $8,134,000 $1,174,000 $6,002,000 $1,202,000 $8,378,000 $1,209,000 $6,182,000 $1,238,000 $8,629,000 $1,245,000 $6,367,000 $1,275,000 $8,887,000 $1,282,000 $6,558,000 $1,313,000 $9,153,000 EXPENSES Personnel Expense: Office of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rates Part Time Benefit Rates Subtotal $143,000 $3,256,000 $13,200 $102,000 $1,333,000 $9,000 $4,856,200 $147,000 $3,354,000 $14,000 $105,000 $1,373,000 $9,000 $5,002,000 $151,000 $3,455,000 $14,000 $108,000 $1,414,000 $9,000 $5,151,000 $156,000 $3,559,000 $14,000 $111,000 $1,456,000 $9,000 $5,305,000 $161,000 $3,666,000 $14,000 $114,000 $1,500,000 $9,000 $5,464,000 $166,000 $3,776,000 $14,000 $117,000 $1,545,000 $9,000 $5,627,000 $171,000 $3,889,000 $14,000 $121,000 $1,591,000 $9,000 $5,795,000 $176,000 $4,006,000 $14,000 $125,000 $1,639,000 $9,000 $5,969,000 $181,000 $4,126,000 $14,000 $129,000 $1,688,000 $9,000 $6,147,000 $186,000 $4,250,000 $14,000 $133,000 $1,739,000 $9,000 $6,331,000 $192,000 $4,378,000 $14,000 $137,000 $1,791,000 $9,000 $6,521,000 Operating Expenses: General Operation Expenses Telephone and Related Charges Rental Expenses Software Maintenance IC Overhead Utilities Repair & Maintenance Contract Services Insurance Custodial Support Subtotal TOTAL EXPENSES (w/out Debt Service) $657,000 $43,000 $122,000 $17,000 $86,000 $0 $0 $0 $0 $0 $925,000 $5,781,200 $676,000 $44,000 $126,000 $17,000 $89,000 $0 $0 $0 $0 $0 $952,000 $5,954,000 $697,000 $45,000 $129,000 $18,000 $91,000 $0 $0 $0 $0 $0 $980,000 $6,131,000 $718,000 $47,000 $133,000 $18,000 $94,000 $0 $0 $0 $0 $0 $1,010,000 $6,315,000 $739,000 $48,000 $69,000 $19,000 $97,000 $139,000 $99,000 $10,000 $14,000 $70,000 $1,304,000 $6,768,000 $761,000 $49,000 $71,000 $20,000 $100,000 $143,000 $102,000 $10,000 $14,000 $72,000 $1,342,000 $6,969,000 $784,000 $50,000 $73,000 $21,000 $103,000 $147,000 $105,000 $10,000 $14,000 $74,000 $1,381,000 $7,176,000 $808,000 $52,000 $75,000 $22,000 $106,000 $151,000 $108,000 $10,000 $14,000 $76,000 $1,422,000 $7,391,000 $832,000 $54,000 $77,000 $23,000 $109,000 $156,000 $111,000 $10,000 $14,000 $78,000 $1,464,000 $7,611,000 $857,000 $56,000 $79,000 $24,000 $112,000 $161,000 $114,000 $10,000 $14,000 $80,000 $1,507,000 $7,838,000 $883,000 $58,000 $81,000 $25,000 $115,000 $166,000 $117,000 $10,000 $14,000 $82,000 $1,551,000 $8,072,000 $4,800 $56,000 $60,000 $62,000 $899,000 $928,000 $958,000 $987,000 $1,018,000 $1,049,000 $1,081,000 $0 $0 $0 $0 $77,000 $407,000 $79,000 $814,000 $81,000 $814,000 $84,000 $814,000 $86,000 $814,000 $89,000 $814,000 $92,000 $814,000 $4,800 $56,000 $60,000 $62,000 $415,000 $35,000 $63,000 $89,000 $118,000 $146,000 $175,000 0.00 0.00 0.00 0.00 2.21 1.14 1.18 1.21 1.25 1.29 1.33 NET OPERATING INCOME RESERVE & REPLACEMENT (1% of Income) DEBT SERVICE (NEW) CASH FLOW AFTER DEBT SERVICE Debt Coverage Ratio University of Vermont Phase II Implementation Strategies CHWB Assumptions Revenue Lab Product/Service Sales Total Lab Medical Clinic Product/Service Sales Total Medical Clinic Women's Clinic Fees/Health Total Women's Clinic Insurance Product/Service Sales Total Insurance Center Product/Service Sales Total Center Physical Therapy Product/Service Sales Total Physical Therapy Total Total Square Feet Building Opens 35,329 2012 Current Net Increase % Net New Revenue $160,000 $160,000 105% $168,000 $168,000 $216,800 $216,800 105% $227,640 $227,640 $70,000 $70,000 100% $70,000 $70,000 $430,000 $430,000 105% $451,500 $451,500 $13,000 $13,000 105% $13,650 $13,650 $65,000 $65,000 105% $68,250 $68,250 $954,800 Percent Increase Square Footage Revenue Inflator 35,329 103% $999,040 5% Page 5 Total Square Feet Building Opens Expense Inflator University of Vermont Phase II Implementation Strategies CHWB Assumptions Personnel Expenses ADMINISTRATION Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal Administration COUNSELING Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal Counseling LAB Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal Lab MEDICAL CLINIC Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal Medical Clinic WOMEN'S HEALTH Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal Women's Health INSURANCE Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal INSURANCE Current Operational Savings New Expenses $128,943 $179,019 $0 $0 $120,105 $0 $428,067 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $128,943 $179,019 $0 $0 $120,105 $0 $428,067 $0 $618,666 $0 $0 $241,280 $0 $859,946 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $618,666 $0 $0 $241,280 $0 $859,946 $0 $47,922 $0 $0 $18,690 $0 $66,612 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $47,922 $0 $0 $18,690 $0 $66,612 $0 $1,323,819 $0 $45,000 $516,289 $4,275 $1,889,383 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $1,323,819 $0 $45,000 $516,289 $4,275 $1,889,383 $0 $181,987 $0 $57,200 $70,975 $5,434 $315,596 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $181,987 $0 $57,200 $70,975 $5,434 $315,596 $0 $41,310 $0 $0 $16,111 $0 $57,421 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $41,310 $0 $0 $16,111 $0 $57,421 35,329 2012 103% Page 6 HEALTH PROMOTION Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal Health Promotion ATHLETIC MEDICINE Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal Athletic Medicine CENTER Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal Center AOD Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal AOD PHYSICAL THERAPY Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal Physical Therapy MINDFULNESS Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal Mindfulness INNOVATION GRANT Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Page 7 $0 $208,733 $13,200 $0 $81,406 $0 $303,339 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $208,733 $13,200 $0 $81,406 $0 $303,339 $0 $352,196 $0 $0 $137,356 $0 $489,552 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $352,196 $0 $0 $137,356 $0 $489,552 $14,385 $0 $0 $0 $5,610 $0 $19,995 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $14,385 $0 $0 $0 $5,610 $0 $19,995 $0 $157,414 $0 $0 $61,391 $0 $218,805 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $157,414 $0 $0 $61,391 $0 $218,805 $0 $144,930 $0 $0 $56,523 $0 $201,453 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $144,930 $0 $0 $56,523 $0 $201,453 $0 $0 $0 $0 $3,000 $0 $3,000 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $0 $0 $0 $3,000 $0 $3,000 $0 $0 $0 $0 $3,000 $0 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $0 $0 $0 $3,000 $0 Subtotal Innovation OCCUPATIONAL HEALTH Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal Occupational Health HOPE Officer of Administration Staff Salary Graduate Teaching Assistant Temporary Wages Full Benefit Rate Part Time Benefit Rate Subtotal Hope TOTAL CHWB PERSONNEL EXPENSES $3,000 $3,000 $0 $0 $0 $0 $1,000 $0 $1,000 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $0 $0 $0 $1,000 $0 $1,000 $0 $0 $0 $0 $0 $0 $0 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% $0 $0 $0 $0 $0 $0 $0 $4,857,169 $4,857,169 Page 8 Total Square Feet Building Opens Expense Inflator University of Vermont Phase II Implementation Strategies CHWB Assumptions Personnel Expenses ADMINISTRATION Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Administration COUNSELING Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Counseling LAB Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Lab MEDICAL CLINIC Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Medical Clinic WOMEN'S HEALTH Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Women's Health INSURANCE Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal INSURANCE HEALTH PROMOTION Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Health Promotion ATHLETIC MEDICINE Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Athletic Medicine CENTER Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Center AOD Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal AOD 35,329 2012 103% Page 9 2008-2009 2009-2010 2010-2011 2011-2012 Operational Savings New Expenses $3,972 $0 $0 $90,302 $0 $94,274 $4,091 $0 $0 $93,011 $0 $97,102 $4,214 $0 $0 $95,801 $0 $100,015 $4,340 $0 $0 $98,675 $0 $103,016 100.0% 100.0% 100.0% 100.0% 100.0% $4,471 $0 $0 $101,636 $0 $106,106 $8,679 $0 $0 $26,980 $0 $35,659 $8,939 $0 $0 $27,789 $0 $36,729 $9,208 $0 $0 $28,623 $0 $37,831 $9,484 $0 $0 $29,482 $0 $38,966 100.0% 100.0% 100.0% 100.0% 100.0% $9,768 $0 $0 $30,366 $0 $40,135 $0 $0 $0 $141,690 $0 $141,690 $0 $0 $0 $145,941 $0 $145,941 $0 $0 $0 $150,319 $0 $150,319 $0 $0 $0 $154,828 $0 $154,828 100.0% 100.0% 100.0% 100.0% 100.0% $0 $0 $0 $159,473 $0 $159,473 $13,556 $0 $0 $165,300 $0 $178,856 $13,963 $0 $0 $170,259 $0 $184,222 $14,382 $0 $0 $175,367 $0 $189,748 $14,813 $0 $0 $180,628 $0 $195,441 100.0% 100.0% 100.0% 100.0% 100.0% $15,257 $0 $0 $186,047 $0 $201,304 $2,764 $0 $0 $34,329 $0 $37,093 $2,847 $0 $0 $35,359 $0 $38,206 $2,932 $0 $0 $36,420 $0 $39,352 $3,020 $0 $0 $37,512 $0 $40,533 100.0% 100.0% 100.0% 100.0% 100.0% $3,111 $0 $0 $38,638 $0 $41,748 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 100.0% 100.0% 100.0% 100.0% 100.0% $0 $0 $0 $0 $0 $0 $2,600 $0 $0 $65,288 $0 $67,888 $2,678 $0 $0 $67,247 $0 $69,925 $2,758 $0 $0 $69,264 $0 $72,022 $2,841 $0 $0 $71,342 $0 $74,183 100.0% 100.0% 100.0% 100.0% 100.0% $2,926 $0 $0 $73,482 $0 $76,409 $6,604 $0 $0 $51,837 $0 $58,441 $6,802 $0 $0 $53,392 $0 $60,194 $7,006 $0 $0 $54,994 $0 $62,000 $7,216 $0 $0 $56,644 $0 $63,860 100.0% 100.0% 100.0% 100.0% 100.0% $7,433 $0 $0 $58,343 $0 $65,776 $1,287 $121,860 $16,680 $63,908 $86,171 $289,906 $1,326 $125,516 $17,180 $65,825 $88,756 $298,603 $1,365 $129,281 $17,696 $67,800 $91,419 $307,561 $1,406 $133,160 $18,227 $69,834 $94,161 $316,788 100.0% 50.0% 100.0% 100.0% 100.0% $1,449 $68,577 $18,773 $71,929 $96,986 $257,715 $2,102 $0 $0 $7,800 $0 $9,902 $2,165 $0 $0 $8,034 $0 $10,199 $2,230 $0 $0 $8,275 $0 $10,505 $2,297 $0 $0 $8,523 $0 $10,820 100.0% 100.0% 100.0% 100.0% 100.0% $2,366 $0 $0 $8,779 $0 $11,145 Page 10 PHYSICAL THERAPY Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Physical Therapy MINDFULNESS Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Mindfulness INNOVATION GRANT Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Innovation OCCUPATIONAL HEALTH Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Occupational Health HOPE Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Subtotal Hope TOTAL CHWB PERSONNEL EXPENSES Operating Expenses Telephone and Related Charges Rental Expenses Software Maintenance General Operation Expenses IC Overhead Total Operating Expenses Utilities Repair & Maintenance Contract Services Insurance Custodial Support $992 $0 $0 $8,750 $0 $9,742 $1,022 $0 $0 $9,013 $0 $10,034 $1,052 $0 $0 $9,283 $0 $10,335 $1,084 $0 $0 $9,561 $0 $10,645 100.0% 100.0% 100.0% 100.0% 100.0% $1,117 $0 $0 $9,848 $0 $10,965 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 100.0% 100.0% 100.0% 100.0% 100.0% $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 100.0% 100.0% 100.0% 100.0% 100.0% $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 100.0% 100.0% 100.0% 100.0% 100.0% $0 $0 $0 $0 $0 $0 $0 $0 $0 $500 $0 $500 $0 $0 $0 $515 $0 $515 $0 $0 $0 $530 $0 $530 $0 $0 $0 $546 $0 $546 100.0% 100.0% 100.0% 100.0% 100.0% $0 $0 $0 $563 $0 $563 $923,951 $951,670 $980,220 $1,009,626 $42,556 $121,860 $16,680 $656,684 $86,171 $923,951 Per SF (2008) $3.50 $2.50 $0.25 $0.35 $1.75 $43,833 $125,516 $17,180 $676,385 $88,756 $951,670 Per SF (2012) $3.94 $2.81 $0.28 $0.39 $1.97 $45,148 $129,281 $17,696 $696,676 $91,419 $980,220 Total Cost $139,172 $99,408 $9,941 $13,917 $69,586 $46,502 $133,160 $18,227 $717,576 $94,161 $1,009,626 $971,338 $47,897 $68,577 $18,773 $739,104 $96,986 $971,338 Annual Student Fee Early Fee Collection Starts University of Vermont Phase II Implementation Strategies Student Fee Revenue 2008 2009 $110 2009 2010 Page 11 2011 2012 2013 2014 2015 2016 2017 2018 Enrollment Total Number of Students 9,900 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 Student Fees - Athletics/Recreation Existing Student Fee New Student Fee Total Student Fee $ $ $ 488 $ $ 488 $ 503 $ 28 $ 530 $ 518 $ 55 $ 573 $ 533 $ 83 $ 616 $ 549 $ 110 $ 659 $ 566 $ 113 $ 679 $ 583 $ 117 $ 699 $ 600 $ 120 $ 720 $ 618 $ 124 $ 742 $ 637 $ 128 $ 764 $ 656 131 787 $ $ $ 4,831,000 $ $ 4,831,000 $ 5,026,000 $ 275,000 $ 5,301,000 $ 5,177,000 $ 550,000 $ 5,727,000 $ 5,333,000 $ 825,000 $ 6,158,000 $ 5,492,000 $ 1,100,000 $ 6,592,000 $ 5,657,000 $ 1,133,000 $ 6,790,000 $ 5,827,000 $ 1,167,000 $ 6,994,000 $ 6,002,000 $ 1,202,000 $ 7,204,000 $ 6,182,000 $ 1,238,000 $ 7,420,000 $ 6,367,000 $ 1,275,000 $ 7,642,000 $ 6,558,000 1,313,000 7,871,000 Student Revenue Existing Student Revenue New Student Fee Revenue Total Student Fee Revenue Enrollment Growth Rate Annual Fee Increase 0.00% 103.00% (This page left blank intentionally) Detailed Financial Analysis – Athletics and Recreation This page left blank intentionally University of Vermont Phase II Implementation Strategies Project Grouping Current Year Escalation 2009 106.00% Page 1 Cost/SF 2008 Future Construction Cost 2008 Dollars Future Cost 2012 2012 2012 $15 $325 $52 $555,000 $31,525,000 $2,125,000 $34,205,000 $661,000 $37,547,000 $2,530,000 $40,738,000 25% 25% 25% $694,000 $39,406,000 $2,656,000 $42,756,000 $826,000 $46,934,000 $3,163,000 $50,923,000 Renovate Gucciardi New Multipurpose Event Center New Entry/Shared Lobby Parking Garage Expansion Total 2012 2012 2012 2012 $150 $340 $325 $2,500,000 $179 $1,500,000 $405 $67,231,000 $387 $3,900,000 $2,977,540 $2,500,000 $75,131,000 $1,787,000 $80,073,000 $4,645,000 $2,978,000 $89,483,000 25% 25% 25% 25% $1,875,000 $84,039,000 $4,875,000 $3,125,000 $93,914,000 $2,234,000 $100,091,000 $5,806,000 $3,723,000 $111,854,000 Renovation of Support Spaces New Aquatics Center Total 2012 2012 $210 $325 $250 $387 $8,400,000 $15,113,000 $23,513,000 $10,005,000 $17,999,000 $28,004,000 25% 25% $10,500,000 $18,891,000 $29,391,000 $12,506,000 $22,499,000 $35,005,000 Project Description Construction Start B B B Demolish Tennis Facility New Recreation Center Resurface/Expand Field House (cage) Total C C C C D D Site/Soft Costs Project Cost 2008 Dollars Future Cost INDOOR FACILITIES $18 $387 $62 OUTDOOR FIELDS E E New Outdoor Track Throwing Events Area Total 2012 2012 $3,100,000 $280,000 $3,692,150 $333,484 $3,100,000 $280,000 $3,380,000 $3,692,000 $333,000 $4,025,000 25% 25% $3,875,000 $350,000 $4,225,000 $4,615,000 $416,000 $5,031,000 F F F Recreation Field Soccer/Lacrosse Field Spectator Seating 2012 2012 2012 $600,000 $1,500,000 $2,000,000 $714,610 $1,786,524 $2,382,032 $600,000 $1,500,000 $2,000,000 $715,000 $1,787,000 $2,382,000 25% 25% 25% $750,000 $1,875,000 $2,500,000 $894,000 $2,234,000 $2,978,000 $4,100,000 $4,884,000 $5,125,000 $6,106,000 Total University of Vermont Phase II Implementation Strategies Athletics Recreation Sources of Funds Reserves E&G Funds Fundraising Upfront Fee Equity Ticket Surcharge State Contribution Revenue Bond Total Uses of Funds Hard Costs Demolish Tennis Facility New Recreation Center Resurface/Expand Field House (cage) Renovate Gucciardi New Multipurpose Event Center New Entry/Shared Lobby Parking Garage Expansion Renovation of Support Spaces New Aquatics Center Outdoor Fields New Outdoor Track Throwing Events Area Recreation Field Soccer/Lacrosse Field Spectator Seating Soft Costs Total Page 2 $ $ $ $ $ $ $ $ 25,000,000 30,000,000 1,349,000 152,570,000 208,919,000 Percent 0.0% 0.0% 12.0% 14.4% 0.6% 0.0% 73.0% 100.0% $ $ $ $ $ $ $ $ $ 661,000 37,547,000 2,530,000 1,787,000 80,073,000 4,645,000 2,978,000 10,005,000 17,999,000 0.3% 18.0% 1.2% 0.9% 38.3% 2.2% 1.4% 4.8% 8.6% $ $ $ $ $ $ $ 3,692,000 333,000 715,000 1,787,000 2,382,000 41,785,000 208,919,000 1.8% 0.2% 0.3% 0.9% 1.1% 20.0% 100.0% University of Vermont Phase II Implementation Strategies Debt Schedule Page 3 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 $ 2,368,000 $ 6,330,000 $ 2,409,000 $ 346,000 $ 420,000 $ 11,873,000 $ 2,368,000 $ 6,330,000 $ 2,409,000 $ 346,000 $ 420,000 $ 11,873,000 $ 2,368,000 $ 6,330,000 $ 2,409,000 $ 346,000 $ 420,000 $ 11,873,000 $ 2,368,000 $ 6,330,000 $ 2,409,000 $ 346,000 $ 420,000 $ 11,873,000 $ 2,368,000 $ 6,330,000 $ 2,409,000 $ 346,000 $ 420,000 $ 11,873,000 Debt Service Project B Project C Project D Project E Project F SUBTOTAL $ $ $ $ $ $ - $ $ $ $ $ $ - $ $ $ $ $ $ - $ $ $ $ $ $ - $ $ $ $ $ $ - $ $ $ $ $ $ - Debt Assumptions Interest Rate 5.50% Term 30 Phase Project B Project C Project D Project E Project F Total Project Cost $50,923,000 $111,854,000 $35,005,000 $5,031,000 $6,106,000 $208,919,000 Project Equity $16,500,000 $19,849,275 $0 $0 $0 $36,349,275 Total Project Cost $34,423,000 $92,004,725 $35,005,000 $5,031,000 $6,106,000 $172,569,725 Debt Service $2,368,488 $6,330,421 $2,408,533 $346,160 $420,126 $11,873,727 Year 2014 2014 2014 2014 2014 University of Vermont Phase II Implementation Strategies Combined Operating Pro Forma Annual Student Fee $1,200 1 Page 4 2 2008 3 2009 4 2010 5 2011 6 2012 7 2013 8 2014 9 2015 10 2016 11 2017 2018 REVENUES Multipurpose Facility Revenue Recreation Revenue New Student Fee Revenue SUBTOTAL TOTAL REVENUES $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ - $ $ $ $ 3,490,000 393,000 12,730,800 16,613,800 $ $ $ $ 3,539,000 405,000 13,112,724 17,056,724 $ $ $ $ 3,594,000 417,000 13,506,106 17,517,106 $ $ $ $ 3,652,000 430,000 13,911,289 17,993,289 $ $ $ $ 3,710,000 443,000 14,328,628 18,481,628 $ - $ - $ - $ - $ - $ - $ 16,613,800 $ 17,056,724 $ 17,517,106 $ 17,993,289 $ 33,253,255 Personnel Expenses Athletics/Multipurpose Facility Recreation SUBTOTAL $ $ $ - - $ $ $ - - $ $ $ - - $ $ $ - - $ $ $ - - $ $ $ - - $ $ $ 1,283,000 $ 24,000 $ 1,307,000 $ 1,322,000 $ 25,000 $ 1,347,000 $ 1,362,000 $ 26,000 $ 1,388,000 $ 1,403,000 $ 27,000 $ 1,430,000 $ 1,446,000 27,000 1,473,000 Operating Expenses Athletics/Multipurpose Facility Recreation SUBTOTAL $ $ $ - $ $ $ - $ $ $ - $ $ $ - $ $ $ - $ $ $ - $ $ $ 2,136,000 $ 903,000 $ 3,039,000 $ 2,202,000 $ 904,000 $ 3,106,000 $ 2,268,000 $ 904,000 $ 3,172,000 $ 2,335,000 $ 905,000 $ 3,240,000 $ 2,405,000 905,000 3,310,000 TOTAL EXPENSES $ - $ - $ - $ - $ - $ - $ 4,346,000 $ 4,453,000 $ 4,560,000 $ 4,670,000 $ 4,783,000 EXPENSES NET OPERATING INCOME $0 $0 $0 $0 $0 $0 $12,267,800 $12,603,724 $12,957,106 $13,323,289 $28,470,255 Debt Service Debt Service SUBTOTAL $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $11,873,000 $5,936,500 $11,873,000 $11,873,000 $11,873,000 $11,873,000 $11,873,000 $11,873,000 $11,873,000 $11,873,000 Reserve & Replacement $0 $0 $0 $0 $0 $0 $1,661,380 $1,705,672 $1,751,711 $1,799,329 $3,325,326 INCOME AFTER R&R & DEBT SERVICE $0 $0 $0 $0 $0 $0 $4,669,920 Debt Coverage Ratio 0.00 0.00 0.00 0.00 0.00 0.00 2.07 ($974,948) ($667,605) ($349,040) 1.06 1.09 1.12 $13,271,930 2.40 University of Vermont Phase II Implementation Strategies Multipurpose Event Center Pro Forma Operating Pro Forma Schedule Type: Student Fee Total SF Moderate Yes 197,738 Page 5 0 1 2008 2 2009 3 2010 4 2011 5 2012 6 2013 7 2014 8 2015 9 2016 2017 REVENUES Multipurpose Event Facility Advertising/Sponsorships Naming Rights/Fundraising Luxury Suites Preferred Seating Event Rental Gate Receipts Concessions Merchandise Facility Fee Parking Other Revenue SUBTOTAL $ $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ $ 299,000 1,333,000 191,000 450,000 223,000 224,750 49,050 218,908 185,000 175,000 3,349,000 $ $ $ $ $ $ $ $ $ $ $ $ 307,000 1,333,000 197,000 460,000 230,000 231,250 50,400 218,908 191,000 175,000 3,394,000 $ $ $ $ $ $ $ $ $ $ $ $ 317,000 1,333,000 202,000 475,000 237,000 238,250 51,900 218,908 197,000 175,000 3,445,000 $ $ $ $ $ $ $ $ $ $ $ $ 326,000 1,333,000 209,000 490,000 244,000 245,500 53,400 218,908 203,000 175,000 3,498,000 Conference Center Event Space Revenues Food and Beverage Equipment Rental Service Fees SUBTOTAL $ $ $ $ $ - - - $ $ $ $ $ - - $ $ $ $ $ - - $ $ $ $ $ - - $ $ $ $ $ - - $ $ $ $ $ - $ $ $ $ $ 43,583 73,315 13,075 10,896 141,000 $ $ $ $ $ 44,890 75,514 13,467 11,223 145,000 $ $ $ $ $ 46,237 77,780 13,871 11,559 149,000 $ $ $ $ $ 47,624 80,113 14,287 11,906 154,000 TOTAL REVENUES $ - $ - $ - $ - $ - $ - $ 3,490,000 $ 3,539,000 $ 3,594,000 $ 3,652,000 EXPENSES Personnel Expenses Staff Salaries Staff Benefits Part Time Labor SUBTOTAL $ $ $ $ - $ - $ - $ $ $0.00 - $ - $ - $ $ $0.00 - $ - $ - $ $ $0.00 - $ - $ - $ $ $0.00 - $ - $ - $ $ $0.00 - $ - $ - $ $ $0.00 537,000 209,000 537,000 1,283,000 $6.49 $ $ $ $ 553,000 216,000 553,000 1,322,000 $6.69 $ $ $ $ 570,000 222,000 570,000 1,362,000 $6.89 $ $ $ $ 587,000 229,000 587,000 1,403,000 $7.10 Operating Expenses Utilities Supplies Maintenance, Repair, and Replacement Contract Service Insurance Marketing Other Expenses SUBTOTAL $ $ $ $ $ $ $ $ - - - - - - $ $ $ $ $ $ $ $ 972,000 75,000 598,000 75,000 99,000 299,000 150,000 2,268,000 $11.47 3,630,000 $18.36 ($36,000) $ $ $ $ $ $ $ $ $ 944,000 73,000 581,000 73,000 96,000 290,000 145,000 2,202,000 $11.14 3,524,000 $17.82 $15,000 $ $ $ $ $ $ $ $ TOTAL EXPENSES 916,000 70,000 564,000 70,000 93,000 282,000 141,000 2,136,000 $10.80 3,419,000 $17.29 $71,000 1,001,000 77,000 616,000 77,000 102,000 308,000 154,000 2,335,000 $11.81 3,738,000 $18.90 ($86,000) NET OPERATING INCOME $ $ $ $ $ $ $ $ $0.00 $ $0.00 $0 $ $ $ $ $ $ $ $ $0.00 $ $0.00 $0 $ $ $ $ $ $ $ $ $0.00 $ $0.00 $0 $ $ $ $ $ $ $ $ $0.00 $ $0.00 $0 $ $ $ $ $ $ $ $ $0.00 $ $0.00 $0 $ $ $ $ $ $ $ $ $0.00 $ $0.00 $0 $ $ $ University of Vermont Phase II Implementation Strategies Revenue Assumptions Seating: Schedule Type: FACILITY PROGRAM ASSUMPTIONS SCENARIO Seating Capacity 6,500 Luxury Suites Preferred Seats Current Year 8 500 2008 FIXED REVENUES Advertising Naming Rights / Donor State Contribution Term Annual Naming Rights Proceeds Luxury Suites Capacity Annual Lease Rate Renewal Period (yrs) Renewal Rate Increase Preferred Seating Inventory Annual Rate Renewal Period (yrs) Renewal Rate Increase Parking Parking Charge Persons Per Car Conference Center Event Type Conventions / Tradeshows Consumer Shows Meetings Banquets Other REVENUE SHARING Building % of Gross Concession Revenues Tenant % of Gross Concessions Building % of Gross Merchandise Revenues Tenant % of Gross Merchandise Tenant % of Gross Gate Receipts Building % of Gross Gate Receipts Building % of Advertising Building % of Naming Rights Building % of Luxury Suite Revenues Building % of Preferred Seating Revenues Cost of Goods Sold Concessions Cost of Goods Sold Merchandise Building % of Ticket Surcharge Building % of Parking Revenue Inflator $250,000 $20,000,000 $0 15 $1,333,333 8 $20,000 1 5% 500 $750 1 5% Attendee Days 2.5 1 1.5 1 1 6,500 Moderate Page 6 Aggressive Moderate Conservative 25.0% 0.0% 15.0% 0% 0% 0% 100% 100% 100% 100% 0% 50% 100.0% 100.0% 3.0% Conference Center Revenues (as % of Event Space Revenues) Equipment Rental 30% Service Fees 25% Other Revenue Camps Facility Rentals Total Other Revenue $2.50 4 EVENT TYPE Rent UVM Men's Basketball $2,500 UVM Women's Hockey $2,500 UVM Men's Hockey $2,500 Commencement $2,000 Concerts (Large) $7,000 Concerts (Small) $3,500 Family Events $7,000 Speaking Events $1,750 Amateur / Exhibition Sports $7,500 Conference/Regional Tournaments $1,250 High School Graduations $1,250 High School Basketball Tournament $1,250 * Assumes no alcohol sales ($1 increase if added) SEATS: SCHEDULE TYPE: 6,500 Moderate Avg. Attendance 2,500 1,250 6,000 8,000 5,500 2,500 4,500 2,000 3,000 5,000 3,000 2,000 # of Events 4 6 18 2 4 4 4 8 2 3 4 4 63 Event Days Average Flat Ren 3.5 $3,500 3 $3,500 1.5 $1,500 1 $1,500 1.5 $1,000 $25,000 $150,000 $175,000 Avg. Ticket Price $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 F&B per cap $12.00 $1.25 $3.50 $25.00 $1.25 Gate Receipt Collection 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Number of Events 2 2 5 6 6 21 Concessions Per Merchandise Cap* Per Cap $4.00 $1.00 $4.00 $1.00 $4.00 $1.00 $0.00 $0.00 $4.00 $8.00 $4.00 $8.00 $3.00 $8.00 $0.50 $0.00 $3.00 $1.00 $1.50 $1.00 $1.00 $0.00 $1.00 $0.00 University of Vermont Phase II Implementation Strategies Multipurpose Event Center Pro Forma Fixed Revenues Seating: Schedule Type: 0 1 2 3 4 5 6 6,500 Moderate 7 Page 7 8 9 10 Advertising Total Building Revenues Less Tenant Capture NET BUILDING REVENUES 2017 326,193 $ - $ 326,000 $ 2018 335,979 336,000 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 $ 1,333,333 $ 1,333,333 $ 1,333,333 $ 1,333,333 $ 1,333,333 $ 1,333,333 $ 1,333,333 $ 1,333,333 $ 1,333,333 $ 1,333,333 $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ 1,333,000 $ 1,333,000 $ 1,333,000 $ 1,333,000 $ 1,333,000 $ 1,333,000 $ 1,333,000 $ 1,333,000 $ 1,333,000 $ 1,333,000 $ 2018 1,333,333 1,333,000 $ $ $ 2008 250,000 $ - $ 250,000 $ 2009 257,500 $ - $ 258,000 $ 2010 265,225 $ - $ 265,000 $ 2011 273,182 $ - $ 273,000 $ 2012 281,377 $ - $ 281,000 $ 2013 289,819 $ - $ 290,000 $ 2014 298,513 $ - $ 299,000 $ 2015 307,468 $ - $ 307,000 $ 2016 316,693 $ - $ 317,000 $ Naming Rights / Donor Total Building Revenues Less Tenant Capture NET BUILDING REVENUES LUXURY SUITES Lease Rate Total Suite Inventory Total Building Revenues Less Tenant Capture NET BUILDING REVENUES $ $ $ $ 2008 20,000 8 160,000 160,000 $ $ $ $ 2009 20,600 8 164,800 165,000 $ $ $ $ 2010 21,200 8 169,600 170,000 $ $ $ $ 2011 21,900 8 175,200 175,000 $ $ $ $ 2012 22,500 8 180,000 180,000 $ $ $ $ 2013 23,200 8 185,600 186,000 $ $ $ $ 2014 23,900 8 191,200 191,000 $ $ $ $ 2015 24,600 8 196,800 197,000 $ $ $ $ 2016 25,300 8 202,400 202,000 $ $ $ $ 2017 26,100 8 208,800 209,000 $ $ $ $ 2018 26,900 8 215,200 215,000 PREFERRED SEATING 2008 Lease Rate Total Preferred Seating Inventory Total Building Revenues Less Tenant Capture NET BUILDING REVENUES $ $ $ $ 750 500 375,000 375,000 2009 $ $ $ $ 770 500 385,000 385,000 2010 $ $ $ $ 800 500 400,000 400,000 2011 $ $ $ $ 820 500 410,000 410,000 2012 $ $ $ $ 840 500 420,000 420,000 2013 $ $ $ $ 870 500 435,000 435,000 2014 $ $ $ $ 900 500 450,000 450,000 2015 $ $ $ $ 920 500 460,000 460,000 2016 $ $ $ $ 950 500 475,000 475,000 2017 $ $ $ $ 980 500 490,000 490,000 $ $ $ $ 2018 1,010 500 505,000 505,000 University of Vermont Phase II Implementation Strategies Multipurpose Event Center Pro Forma Facility Fee Revenue Sport Women's Soccer Men's Soccer Men's Hockey Women's Hockey Men's Basketball Women's Basketball Men's Lacrosse Women's Lacrosse Field Hockey Total Page 8 Income $3,413 $6,057 $898,151 $4,949 $297,279 $61,519 $1,241 $691 $494 $1,273,794 Average Ticket $3.50 $3.50 $17.00 $3.50 $12.00 $10.00 $3.50 $3.50 $3.50 Average Ticket Sales 975 1,731 57,720 1,414 27,692 6,152 355 197 141 96,377 Average Ticket Sales 975 1,731 57,720 1,414 27,692 6,152 355 197 141 96,377 Facility Fee $2.00 $2.00 $2.00 $2.00 $2.00 $2.00 $2.00 $2.00 $2.00 Revenue $1,950 $3,461 $115,440 $2,828 $55,384 $12,304 $709 $395 $282 $192,754 Number of Events 6 7 20 16 14 15 4 7 2 Average Ticket Sales/Event 163 247 2,886 88 1,978 410 89 28 71 5,960 Facility Fee $1.00 $1.00 $2.00 $2.00 $2.00 $2.00 $1.00 $1.00 $1.00 Revenue $1,024 $1,817 $138,528 $2,969 $60,922 $12,919 $372 $207 $148 $218,908 Existing Sport Women's Soccer Men's Soccer Men's Hockey Women's Hockey Men's Basketball Women's Basketball Men's Lacrosse Women's Lacrosse Field Hockey Total Facility Fee Revenue 2009 2010 2011 2012 2013 2014 2015 Total Project Equity $192,754 $192,754 $192,754 $192,754 $192,754 $192,754 $192,754 $1,349,275 Future Sport Women's Soccer Men's Soccer Men's Hockey Women's Hockey Men's Basketball Women's Basketball Men's Lacrosse Women's Lacrosse Field Hockey Total Average Ticket Sales % Increase in Sales 975 105% 1,731 105% 57,720 120% 1,414 105% 27,692 110% 6,152 105% 355 105% 197 105% 141 105% 96,377 New Ticket Sales 1,024 1,817 69,264 1,485 30,461 6,459 372 207 148 University of Vermont Phase II Implementation Strategies Multipurpose Event Center Pro Forma Event and Attendance Schedule Seating: Schedule Type: 6,500 Moderate Page 9 3 2008 4 2009 5 2010 6 2011 7 2012 8 2013 9 2014 10 2015 11 2016 12 2017 13 2018 Number of Events Conventions / Tradeshows Consumer Shows Meetings Banquets Other 2 2 5 6 6 2 2 5 6 6 2 2 5 6 6 2 2 5 6 6 2 2 5 6 6 2 2 5 6 6 2 2 5 6 6 2 2 5 6 6 2 2 5 6 6 2 2 5 6 6 2 2 5 6 6 UVM Men's Basketball UVM Women's Hockey UVM Men's Hockey Commencement Concerts (Large) Concerts (Small) Family Events Speaking Events Amateur / Exhibition Sports Conference/Regional Tournaments High School Graduations High School Basketball Tournament 4 6 18 2 4 4 4 8 2 3 4 4 4 6 18 2 4 4 4 8 2 3 4 4 4 6 18 2 4 4 4 8 2 3 4 4 4 6 18 2 4 4 4 8 2 3 4 4 4 6 18 2 4 4 4 8 2 3 4 4 4 6 18 2 4 4 4 8 2 3 4 4 4 6 18 2 4 4 4 8 2 3 4 4 4 6 18 2 4 4 4 8 2 3 4 4 4 6 18 2 4 4 4 8 2 3 4 4 4 6 18 2 4 4 4 8 2 3 4 4 4 6 18 2 4 4 4 8 2 3 4 4 TOTAL: 84 84 84 84 84 84 84 84 84 84 84 Average Attendance Conventions / Tradeshows Consumer Shows Meetings Banquets Other 650 1,400 60 250 500 650 1,400 60 250 500 650 1,400 60 250 500 650 1,400 60 250 500 650 1,400 60 250 500 650 1,400 60 250 500 650 1,400 60 250 500 650 1,400 60 250 500 650 1,400 60 250 500 650 1,400 60 250 500 650 1,400 60 250 500 UVM Men's Basketball UVM Women's Hockey UVM Men's Hockey Commencement Concerts (Large) Concerts (Small) Family Events Speaking Events Amateur / Exhibition Sports Conference/Regional Tournaments High School Graduations High School Basketball Tournament 2,500 1,250 6,000 8,000 5,500 2,500 4,500 2,000 3,000 5,000 3,000 2,000 2,500 1,250 6,000 8,000 5,500 2,500 4,500 2,000 3,000 5,000 3,000 2,000 2,500 1,250 6,000 8,000 5,500 2,500 4,500 2,000 3,000 5,000 3,000 2,000 2,500 1,250 6,000 8,000 5,500 2,500 4,500 2,000 3,000 5,000 3,000 2,000 2,500 1,250 6,000 8,000 5,500 2,500 4,500 2,000 3,000 5,000 3,000 2,000 2,500 1,250 6,000 8,000 5,500 2,500 4,500 2,000 3,000 5,000 3,000 2,000 2,500 1,250 6,000 8,000 5,500 2,500 4,500 2,000 3,000 5,000 3,000 2,000 2,500 1,250 6,000 8,000 5,500 2,500 4,500 2,000 3,000 5,000 3,000 2,000 2,500 1,250 6,000 8,000 5,500 2,500 4,500 2,000 3,000 5,000 3,000 2,000 2,500 1,250 6,000 8,000 5,500 2,500 4,500 2,000 3,000 5,000 3,000 2,000 2,500 1,250 6,000 8,000 5,500 2,500 4,500 2,000 3,000 5,000 3,000 2,000 TOTAL: 48,110 48,110 48,110 48,110 48,110 48,110 48,110 48,110 48,110 48,110 48,110 Total Attendance Conventions / Tradeshows Consumer Shows Meetings Banquets Other 1,300 2,800 300 1,500 3,000 1,300 2,800 300 1,500 3,000 1,300 2,800 300 1,500 3,000 1,300 2,800 300 1,500 3,000 1,300 2,800 300 1,500 3,000 1,300 2,800 300 1,500 3,000 1,300 2,800 300 1,500 3,000 1,300 2,800 300 1,500 3,000 1,300 2,800 300 1,500 3,000 1,300 2,800 300 1,500 3,000 1,300 2,800 300 1,500 3,000 UVM Men's Basketball UVM Women's Hockey UVM Men's Hockey Commencement Concerts (Large) Concerts (Small) Family Events Speaking Events Amateur / Exhibition Sports Conference/Regional Tournaments High School Graduations High School Basketball Tournament 10,000 7,500 108,000 16,000 22,000 10,000 18,000 16,000 6,000 15,000 12,000 8,000 10,000 7,500 108,000 16,000 22,000 10,000 18,000 16,000 6,000 15,000 12,000 8,000 10,000 7,500 108,000 16,000 22,000 10,000 18,000 16,000 6,000 15,000 12,000 8,000 10,000 7,500 108,000 16,000 22,000 10,000 18,000 16,000 6,000 15,000 12,000 8,000 10,000 7,500 108,000 16,000 22,000 10,000 18,000 16,000 6,000 15,000 12,000 8,000 10,000 7,500 108,000 16,000 22,000 10,000 18,000 16,000 6,000 15,000 12,000 8,000 10,000 7,500 108,000 16,000 22,000 10,000 18,000 16,000 6,000 15,000 12,000 8,000 10,000 7,500 108,000 16,000 22,000 10,000 18,000 16,000 6,000 15,000 12,000 8,000 10,000 7,500 108,000 16,000 22,000 10,000 18,000 16,000 6,000 15,000 12,000 8,000 10,000 7,500 108,000 16,000 22,000 10,000 18,000 16,000 6,000 15,000 12,000 8,000 10,000 7,500 108,000 16,000 22,000 10,000 18,000 16,000 6,000 15,000 12,000 8,000 TOTAL: 257,400 257,400 257,400 257,400 257,400 257,400 257,400 257,400 257,400 257,400 257,400 University of Vermont Phase II Implementation Strategies Multipurpose Event Center Pro Forma Variable Revenues Seating: Schedule Type: 0 1 2008 2 2009 3 2010 4 2011 5 2012 6 2013 6,500 Moderate 7 2014 Page 10 8 2015 9 2016 10 2017 2018 Event Rental Income UVM Men's Basketball UVM Women's Hockey UVM Men's Hockey Commencement Concerts (Large) Concerts (Small) Family Events Speaking Events Amateur / Exhibition Sports Conference/Regional Tournaments High School Graduations High School Basketball Tournament $ $ $ $ $ $ $ $ $ $ $ $ 10,000 15,000 45,000 4,000 28,000 14,000 28,000 14,000 15,000 3,750 5,000 5,000 $ $ $ $ $ $ $ $ $ $ $ $ TOTAL REVENUES Less Tenant Capture NET BUILDING REVENUES $ $ $ 186,750 $ - $ 187,000 $ 0 2008 10,300 15,450 46,350 4,120 28,840 14,420 28,840 14,420 15,450 3,863 5,150 5,150 $ $ $ $ $ $ $ $ $ $ $ $ 192,353 $ - $ 192,000 $ 1 2009 10,609 15,914 47,741 4,244 29,705 14,853 29,705 14,853 15,914 3,978 5,305 5,305 $ $ $ $ $ $ $ $ $ $ $ $ 198,123 $ - $ 198,000 $ 2 2010 10,927 16,391 49,173 4,371 30,596 15,298 30,596 15,298 16,391 4,098 5,464 5,464 $ $ $ $ $ $ $ $ $ $ $ $ 204,067 $ - $ 204,000 $ 3 2011 11,255 16,883 50,648 4,502 31,514 15,757 31,514 15,757 16,883 4,221 5,628 5,628 $ $ $ $ $ $ $ $ $ $ $ $ 210,189 $ - $ 210,000 $ 4 2012 11,593 17,389 52,167 4,637 32,460 16,230 32,460 16,230 17,389 4,347 5,796 5,796 $ $ $ $ $ $ $ $ $ $ $ $ 216,494 $ - $ 216,000 $ 5 2013 11,941 17,911 53,732 4,776 33,433 16,717 33,433 16,717 17,911 4,478 5,970 5,970 $ $ $ $ $ $ $ $ $ $ $ $ 222,989 $ - $ 223,000 $ 6 2014 12,299 18,448 55,344 4,919 34,436 17,218 34,436 17,218 18,448 4,612 6,149 6,149 $ $ $ $ $ $ $ $ $ $ $ $ 229,679 $ - $ 230,000 $ 7 2015 12,668 19,002 57,005 5,067 35,470 17,735 35,470 17,735 19,002 4,750 6,334 6,334 $ $ $ $ $ $ $ $ $ $ $ $ 236,569 $ - $ 237,000 $ 8 2016 13,048 19,572 58,715 5,219 36,534 18,267 36,534 18,267 19,572 4,893 6,524 6,524 $ $ $ $ $ $ $ $ $ $ $ $ 13,439 20,159 60,476 5,376 37,630 18,815 37,630 18,815 20,159 5,040 6,720 6,720 243,666 $ - $ 244,000 $ 9 2017 250,976 251,000 10 2018 Gate Receipts UVM Men's Basketball UVM Women's Hockey UVM Men's Hockey Commencement Concerts (Large) Concerts (Small) Family Events Speaking Events Amateur / Exhibition Sports Conference/Regional Tournaments High School Graduations High School Basketball Tournament $ $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ $ TOTAL REVENUES Less Tenant Capture NET BUILDING REVENUES $ $ $ - $ - $ - $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ - $ - $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ - $ - $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ - $ - $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ - $ - $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ - $ - $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ - $ - $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ - $ - $ - $ $ $ $ $ $ $ $ $ $ $ $ - $ - $ - $ - $ $ $ $ $ $ $ $ $ $ $ $ - - $ - $ - $ - University of Vermont Phase II Implementation Strategies Multipurpose Event Center Pro Forma Variable Revenues Seating Capacity: 0 1 2008 2 2009 3 2010 4 2011 5 2012 6 2013 6,500 7 2014 Page 11 8 2015 9 2016 10 2017 2018 Concessions UVM Men's Basketball UVM Women's Hockey UVM Men's Hockey Commencement Concerts (Large) Concerts (Small) Family Events Speaking Events Amateur / Exhibition Sports Conference/Regional Tournaments High School Graduations High School Basketball Tournament Less Cost of Goods Sold $ $ $ $ $ $ $ $ $ $ $ $ $ 40,000 30,000 432,000 88,000 40,000 54,000 8,000 18,000 22,500 12,000 8,000 - $ $ $ $ $ $ $ $ $ $ $ $ $ 41,200 30,900 444,960 90,640 41,200 55,620 8,240 18,540 23,175 12,360 8,240 - $ $ $ $ $ $ $ $ $ $ $ $ $ 42,436 31,827 458,309 93,359 42,436 57,289 8,487 19,096 23,870 12,731 8,487 - $ $ $ $ $ $ $ $ $ $ $ $ $ 43,709 32,782 472,058 96,160 43,709 59,007 8,742 19,669 24,586 13,113 8,742 - $ $ $ $ $ $ $ $ $ $ $ $ $ 45,020 33,765 486,220 99,045 45,020 60,777 9,004 20,259 25,324 13,506 9,004 - $ $ $ $ $ $ $ $ $ $ $ $ $ 46,371 34,778 500,806 102,016 46,371 62,601 9,274 20,867 26,084 13,911 9,274 - $ $ $ $ $ $ $ $ $ $ $ $ $ 47,762 35,822 515,831 105,077 47,762 64,479 9,552 21,493 26,866 14,329 9,552 - $ $ $ $ $ $ $ $ $ $ $ $ $ 49,195 36,896 531,306 108,229 49,195 66,413 9,839 22,138 27,672 14,758 9,839 - $ $ $ $ $ $ $ $ $ $ $ $ $ 50,671 38,003 547,245 111,476 50,671 68,406 10,134 22,802 28,502 15,201 10,134 - $ $ $ $ $ $ $ $ $ $ $ $ $ 52,191 39,143 563,662 114,820 52,191 70,458 10,438 23,486 29,357 15,657 10,438 - $ $ $ $ $ $ $ $ $ $ $ $ $ 53,757 40,317 580,572 118,265 53,757 72,571 10,751 24,190 30,238 16,127 10,751 - TOTAL REVENUES Less Tenant Capture NET REVENUES Building % of Concession Revenues $ $ $ $ 752,500 753,000 188,250 $ $ $ $ 775,075 775,000 193,750 $ $ $ $ 798,327 798,000 199,500 $ $ $ $ 822,277 822,000 205,500 $ $ $ $ 846,945 847,000 211,750 $ $ $ $ 872,354 872,000 218,000 $ $ $ $ 898,524 899,000 224,750 $ $ $ $ 925,480 925,000 231,250 $ $ $ $ 953,244 953,000 238,250 $ $ $ $ 981,842 982,000 245,500 $ $ $ $ 1,011,297 1,011,000 252,750 0 1 2008 2 2009 3 2010 4 2011 5 2012 6 2013 7 2014 8 2015 9 2016 10 2017 2018 Novelties UVM Men's Basketball UVM Women's Hockey UVM Men's Hockey Commencement Concerts (Large) Concerts (Small) Family Events Speaking Events Amateur / Exhibition Sports Conference/Regional Tournaments High School Graduations High School Basketball Tournament Less Cost of Goods Sold $ $ $ $ $ $ $ $ $ $ $ $ $ 10,000 7,500 108,000 176,000 80,000 144,000 6,000 15,000 273,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 10,300 7,725 111,240 181,280 82,400 148,320 6,180 15,450 281,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 10,609 7,957 114,577 186,718 84,872 152,770 6,365 15,914 290,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 10,927 8,195 118,015 192,320 87,418 157,353 6,556 16,391 299,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 11,255 8,441 121,555 198,090 90,041 162,073 6,753 16,883 308,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 11,593 8,695 125,202 204,032 92,742 166,935 6,956 17,389 317,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 11,941 8,955 128,958 210,153 95,524 171,944 7,164 17,911 326,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 12,299 9,224 132,826 216,458 98,390 177,102 7,379 18,448 336,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 12,668 9,501 136,811 222,952 101,342 182,415 7,601 19,002 346,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 13,048 9,786 140,916 229,640 104,382 187,887 7,829 19,572 357,000 $ $ $ $ $ $ $ $ $ $ $ $ $ 13,439 10,079 145,143 236,529 107,513 193,524 8,063 20,159 367,000 TOTAL REVENUES Less Tenant Capture NET BUILDING REVENUES Building % of Merchandise Revenues $ $ $ $ 273,500 274,000 41,100 $ $ $ $ 281,895 282,000 42,300 $ $ $ $ 289,782 290,000 43,500 $ $ $ $ 298,175 298,000 44,700 $ $ $ $ 307,091 307,000 46,050 $ $ $ $ 316,543 317,000 47,550 $ $ $ $ 326,550 327,000 49,050 $ $ $ $ 336,126 336,000 50,400 $ $ $ $ 346,290 346,000 51,900 $ $ $ $ 356,059 356,000 53,400 $ $ $ $ 367,450 367,000 55,050 University of Vermont Phase II Implementation Strategies Multipurpose Event Center Pro Forma Seating: Schedule Type: 6,500 Moderate Page 12 Conference Center Revenues 0 2008 1 2009 2 2010 3 2011 4 2012 5 2013 6 2014 7 2015 8 2016 9 2017 10 2018 Attendee Days Conventions / Tradeshows Consumer Shows Meetings Banquets Other 3,250 2,800 450 1,500 3,000 3,250 2,800 450 1,500 3,000 3,250 2,800 450 1,500 3,000 3,250 2,800 450 1,500 3,000 3,250 2,800 450 1,500 3,000 3,250 2,800 450 1,500 3,000 3,250 2,800 450 1,500 3,000 3,250 2,800 450 1,500 3,000 3,250 2,800 450 1,500 3,000 3,250 2,800 450 1,500 3,000 3,250 2,800 450 1,500 3,000 TOTAL: 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 Function Days Conventions / Tradeshows Consumer Shows Meetings Banquets Other 7.0 6.0 7.5 6.0 9.0 7.0 6.0 7.5 6.0 9.0 7.0 6.0 7.5 6.0 9.0 7.0 6.0 7.5 6.0 9.0 7.0 6.0 7.5 6.0 9.0 7.0 6.0 7.5 6.0 9.0 7.0 6.0 7.5 6.0 9.0 7.0 6.0 7.5 6.0 9.0 7.0 6.0 7.5 6.0 9.0 7.0 6.0 7.5 6.0 9.0 7.0 6.0 7.5 6.0 9.0 TOTAL: 36 36 36 36 36 36 36 36 36 36 36 Average Flat Rental Rate Conventions / Tradeshows Consumer Shows Meetings Banquets Other $3,500 $3,500 $1,500 $1,500 $1,000 $3,605 $3,605 $1,545 $1,545 $1,030 $3,713 $3,713 $1,591 $1,591 $1,061 $3,825 $3,825 $1,639 $1,639 $1,093 $3,939 $3,939 $1,688 $1,688 $1,126 $4,057 $4,057 $1,739 $1,739 $1,159 $4,179 $4,179 $1,791 $1,791 $1,194 $4,305 $4,305 $1,845 $1,845 $1,230 $4,434 $4,434 $1,900 $1,900 $1,267 $4,567 $4,567 $1,957 $1,957 $1,305 $4,704 $4,704 $2,016 $2,016 $1,344 Event Space Revenue Conventions / Tradeshows Consumer Shows Meetings Banquets Other $7,000 $7,000 $7,500 $9,000 $6,000 $7,210 $7,210 $7,725 $9,270 $6,180 $7,426 $7,426 $7,957 $9,548 $6,365 $7,649 $7,649 $8,195 $9,835 $6,556 $7,879 $7,879 $8,441 $10,130 $6,753 $8,115 $8,115 $8,695 $10,433 $6,956 $8,358 $8,358 $8,955 $10,746 $7,164 $8,609 $8,609 $9,224 $11,069 $7,379 $8,867 $8,867 $9,501 $11,401 $7,601 $9,133 $9,133 $9,786 $11,743 $7,829 $9,407 $9,407 $10,079 $12,095 $8,063 TOTAL: $36,500 $37,595 $38,723 $39,885 $41,081 $42,314 $43,583 $44,890 $46,237 $47,624 $49,053 Equipment Rental Revenue 30% $10,950 30% $11,279 30% $11,617 30% $11,965 30% $12,324 30% $12,694 30% $13,075 30% $13,467 30% $13,871 30% $14,287 30% $14,716 Service Fees 25% $9,125 25% $9,399 25% $9,681 25% $9,971 25% $10,270 25% $10,578 25% $10,896 25% $11,223 25% $11,559 25% $11,906 25% $12,263 Food and Beverage Per Cap Conventions / Tradeshows Consumer Shows Meetings Banquets Other $12.00 $1.25 $3.50 $25.00 $1.25 $12.36 $1.29 $3.61 $25.75 $1.29 $12.73 $1.33 $3.71 $26.52 $1.33 $13.11 $1.37 $3.82 $27.32 $1.37 $13.51 $1.41 $3.94 $28.14 $1.41 $13.91 $1.45 $4.06 $28.98 $1.45 $14.33 $1.49 $4.18 $29.85 $1.49 $14.76 $1.54 $4.30 $30.75 $1.54 $15.20 $1.58 $4.43 $31.67 $1.58 $15.66 $1.63 $4.57 $32.62 $1.63 $16.13 $1.68 $4.70 $33.60 $1.68 Food and Beverage Revenue Conventions / Tradeshows Consumer Shows Meetings Banquets Other $15,600 $3,500 $1,050 $37,500 $3,750 $16,068 $3,605 $1,082 $38,625 $3,863 $16,550 $3,713 $1,114 $39,784 $3,978 $17,047 $3,825 $1,147 $40,977 $4,098 $17,558 $3,939 $1,182 $42,207 $4,221 $18,085 $4,057 $1,217 $43,473 $4,347 $18,627 $4,179 $1,254 $44,777 $4,478 $19,186 $4,305 $1,291 $46,120 $4,612 $19,762 $4,434 $1,330 $47,504 $4,750 $20,354 $4,567 $1,370 $48,929 $4,893 $20,965 $4,704 $1,411 $50,397 $5,040 TOTAL: $61,400 $63,242 $65,139 $67,093 $69,106 $71,179 $73,315 $75,514 $77,780 $80,113 $82,516 University of Vermont Phase II Implementation Strategies Multipurpose Event Center Expense Assumptions PERSONNEL General Manager Box Office Director Director Operations Assistant Operations Building Engineer Marketing/PR Director Administrative Assistant Ice Rink Manager Total Staff Salaries Employee Benefit Rate Total Staff Salaries Non-Event Part Time (Includes P/T Rec Staff) Total Personnel Expenses Seating: Schedule Type: Page 13 $100,000 $50,000 $65,000 $40,000 $60,000 $50,000 $35,000 $50,000 $450,000 39% $625,500 $450,000 $1,075,500 Expense Inflator 3.00% 103.00% Total Square Footage 197,738 Operating Expenses Utilities Supplies Maintenance, Repair, and Replacement Contract Service Insurance Marketing Other Expenses Total Operating Expnes 6,500 Moderate Current Per SF $3.25 $0.25 $2.00 $0.25 $0.33 $1.00 $0.50 $7.58 Inflated Per SF $3.88 $0.30 $2.39 $0.30 $0.39 $1.19 $0.60 $9.05 Total Cost $767,358 $59,028 $472,220 $59,028 $77,916 $236,110 $118,055 $1,789,714 University of Vermont Phase II Implementation Strategies Recreation Pro Forma Facility Opens 2014 2014 Page 14 Recreation 1 Recreation 2 Total Square Feet 1 0 2008 97,000 46,500 143,500 2 1 2009 INCOME Income - Recreation Income - Recreation Aquatics TOTAL INCOME $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $393,258 $68,917 $393,000 $405,055 $70,985 $405,000 $417,207 $73,114 $417,000 $429,723 $75,308 $430,000 $442,615 $77,567 $443,000 EXPENSES Personnel Expense: Personnel Expense Recreation Personnel Expense Aquatics Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $24,268 $3,162 $24,000 $24,996 $3,257 $25,000 $25,746 $3,355 $26,000 $26,518 $3,456 $27,000 $27,314 $3,559 $27,000 Operating Expenses: Operating Expenses Recreation Operating Expenses Aquatics Subtotal $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $903,422 $5,765 $903,000 $903,824 $5,938 $904,000 $904,239 $6,116 $904,000 $904,666 $6,299 $905,000 $905,106 $6,488 $905,000 TOTAL EXPENSES $0 $0 $0 $0 $0 $0 $927,000 $929,000 $930,000 $932,000 $932,000 NET OPERATING INCOME $0 $0 $0 $0 $0 $0 -$534,000 -$524,000 -$513,000 -$502,000 -$489,000 Operating Pro Forma 3 2 2010 4 3 2011 5 4 2012 6 5 2013 7 6 2014 8 7 2015 9 8 2016 10 9 2017 11 10 2018 University of Vermont Phase II Implementation Strategies Recreation Revenue Assumptions Revenue Administrative Facility Rentals Intramurals Intramural Reg Fees IM Forfeit Fees Informal Retail Sales Lost Equipment Guest Passes Unreturned ID Cards Lifeguard Fees Fitness Group Exercise Personal Training Non Credit Instruction Classes Aquatics Birthday Bash Learn to Swim Marketing Memberships Sponsorships Total Revenue Inflator Total Square Feet - Recreation Total Square Feet - Aquatics Total Square Feet 97,000 46,500 143,500 Page 15 2007-2008 Recreation Net Increase % Net New Revenue 2007-2008 Aquatics Net Increase % Net New Revenue $50,000 15% $7,500 $50,000 25% $12,500 $15,000 $1,500 15% 5% $2,250 $75 $15,000 $1,500 5% 5% $750 $75 $6,500 $750 $6,500 $1,250 $500 15% 5% 25% 5% 10% $975 $38 $1,625 $63 $50 $6,500 $750 $6,500 $1,250 $500 10% 0% 50% 0% 250% $650 $0 $3,250 $0 $1,250 $70,000 $6,250 $13,710 20% 20% 20% $14,000 $1,250 $2,742 $70,000 $6,250 $13,710 20% 0% 20% $14,000 $0 $2,742 $2,000 $2,000 10% 10% $200 $200 $2,000 $2,000 500% 500% $10,000 $10,000 $22,000 $3,000 $200,960 10% 10% $298,080 $300 $329,347 $22,000 $3,000 $200,960 10% 10% $2,200 $300 $57,717 103% Membership Revenue Faculty Staff Penetration Membership Membership Rate Membership Revenue 3,710 10% 371 $480 $178,080 Community Members Membership Rate Membership Revenue 200 $600 $120,000 Total Membership Revenue $298,080 University of Vermont Phase II Implementation Strategies Recreation Revenue Assumptions Personnel Expenses Total Square Feet - Recreation Total Square Feet - Aquatics Total Square Feet Current Recreation Net Increase % 97,000 46,500 143,500 Page 16 Net New Expenses Current Aquatics Net Increase % Net New Expenses Building Staff Web Marketing Staff IM Wages Fitness, PT, Instructor Wages Lifeguards Facility Intern TOTAL $50,000 $2,000 $4,000 $33,000 $46,240 $10,594 $18,000 $163,834 20% 10% 10% 10% 10% 0% 10% $10,000 $200 $400 $3,300 $4,624 $0 $1,800 $20,324 $50,000 $2,000 $4,000 $33,000 $46,240 $10,594 $18,000 $163,834 0% 0% 0% 0% 0% 25% 0% $0 $0 $0 $0 $0 $2,649 $0 $2,649 Operating Expenses Current Net Increase % Net New Expenses Current Net Increase % Net New Expenses $17,235 $5,500 $5,310 $1,100 $32,350 $56,402 $1,420 $2,300 $10,992 $4,136 $3,050 $5,030 $650 $8,000 $400 $9,250 $8,970 $2,250 $900 $175,245 10% 10% 10% 10% 10% 0% 25% 10% 0% 15% 10% 10% 15% 10% 10% 10% 10% 10% 10% $1,724 $550 $531 $110 $3,235 $0 $355 $230 $0 $620 $305 $503 $98 $800 $40 $925 $897 $225 $90 $11,237 $17,235 $5,500 $5,310 $1,100 $32,350 $66,402 $1,420 $2,250 $50 $10,992 $10,992 $4,136 $650 $8,000 $400 $9,250 $8,970 $2,250 $900 $188,157 15% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 25% 0% 0% $2,585 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,243 $0 $0 $4,828 Per SF $3.25 $1.50 $0.25 $0.35 Per SF (2012) $3.77 $1.74 $0.29 $0.41 Total Cost $540,656 $249,534 $41,589 $58,225 $890,004 Equipment/Supplies Office Supplies Uniforms & T-shirts Retails Sales Equipment Fitness Equipment & Repair Special Projects Event Programming Miscellaneous Professional Development Student Development Department Wide Student Training Meals Printing Photo Phone Postage Technology Software Advertising Budget CPR & First Aid Television Fees TOTAL Operating Expenses Utilities Repair & Maintenance Contract Services Insurance Total Expense Inflator 103% University of Vermont Phase II Implementation Strategies Student Fee Revenue Annual Student Fee Early Fee Collection Starts 2008 2009 $1,200 2009 2010 2011 Page 17 2012 2013 2014 2015 2016 2017 2018 Enrollment Total Number of Students 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 266 $ 900 $ 1,166 $ 273 $ 1,200 $ 1,473 $ 282 $ 1,236 $ 1,518 $ 290 $ 1,273 $ 1,563 $ 299 $ 1,311 $ 1,610 $ 308 $ 1,351 $ 1,658 $ 317 $ 1,391 $ 1,708 $ 327 1,433 1,759 Student Fees - Athletics/Recreation Existing Student Fee New Student Fee Total Student Fee $ $ $ 243 $ $ 243 $ 250 $ 300 $ 550 $ $ $ $ 2,430,000 $ $ 2,430,000 $ 2,503,000 $ 3,000,000 $ 5,503,000 $ 258 $ 600 $ 858 $ Student Revenue Existing Student Revenue New Student Fee Revenue Total Student Fee Revenue Enrollment Growth Rate Annual Fee Increase 0.00% 103.00% 2,578,000 $ 2,655,000 $ 2,735,000 $ 2,817,000 $ 2,902,000 $ 2,989,000 $ 3,078,000 $ 3,171,000 $ 3,266,000 6,000,000 $ 9,000,000 $ 12,000,000 $ 12,360,000 $ 12,730,800 $ 13,112,724 $ 13,506,106 $ 13,911,289 $ 14,328,628 8,578,000 $ 11,655,000 $ 14,735,000 $ 15,177,000 $ 15,632,800 $ 16,101,724 $ 16,584,106 $ 17,082,289 $ 17,594,628 APPENDIX 4 (This page left blank intentionally) CHAPTER 34 – EXISTING BUILDING CODE EVALUATION REPORT UNIVERSITY OF VERMONT GUTTERSON FIELD HOUSE & PATRICK GYMNASIUM Prepared For: Cannon Design 100 Cambridge Street – Suite 1400 Boston, MA 02114 May 2009 Project No. B45400 © 2008 Rolf Jensen & Associates, Inc. All Rights Reserved. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 2 May 8, 2009 TABLE OF CONTENTS INTRODUCTION .................................................................................................. 3 APPLICABLE CODES AND STANDARDS ......................................................... 4 NEW CONSTRUCTION REQUIREMENTS ...................................................... 5 EXISTING CONSTRUCTION REQUIREMENTS .............................................. 5 GENERAL ............................................................................................................ 5 ADDITIONS .......................................................................................................... 6 ALTERATIONS .................................................................................................... 6 VARIANCE ........................................................................................................... 6 EXISTING BUILDING DESCRIPTION ................................................................. 7 BUILDING SEPARATIONS ............................................................................... 7 USE AND OCCUPANCY .................................................................................. 8 HEIGHT, AREA AND CONSTRUCTION TYPE ................................................ 8 FIRE PROTECTION SYSTEMS........................................................................ 9 ACCESSIBLE FEATURES ................................................................................ 9 MEANS OF EGRESS ...................................................................................... 13 PROPOSED RENOVATIONS, ALTERATIONS AND ADDITIONS.................... 13 PROJECT B1: NEW RECREATION CENTER (I of II) .................................... 13 PROJECT B2: FIELD HOUSE EXPANSION & TRACK RESURFACING ....... 13 PROJECT C1: MULTIPURPOSE FACILITY ................................................... 13 PROJECT C2: NEW LOBBY / LOUNGE CONNECTOR ................................. 14 PROJECT D1: EXISTING FACILITY RENOVATIONS .................................... 14 PROJECT D2: NEW RECREATION/AQUATIC CENTER (II of II) .................. 15 PROJECT D3: RENOVATIONS OF GUCCIARDI ........................................... 15 EXISTING BUILDING - CHAPTER 34/BUILDING REHABILITATION ANALYSIS .......................................................................................................... 16 REPAIRS ........................................................................................................ 16 RENOVATIONS .............................................................................................. 17 RECONSTRUCTION ...................................................................................... 18 ADDITIONS ..................................................................................................... 20 ACCESSIBILITY REQUIREMENTS – ADAAG .................................................. 23 ADDITIONS ........................................................................................................ 23 ALTERATIONS AND RENOVATIONS .............................................................. 23 ADAAG DISPROPORTIONALITY CRITERIA ................................................. 23 ACCESSIBILITY DISCUSSION ...................................................................... 24 RECOMMENDATIONS ...................................................................................... 25 APPENDIX A – OCCUPANT LOAD / MEANS OF EGRESS CAPACITY EVALUATION..................................................................................................... 27 APPENDIX B – MAJOR FIRE WALL REQUIREMENTS ................................... 32 UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 3 May 8, 2009 INTRODUCTION Cannon Design retained Rolf Jensen & Associates, Inc. (RJA) to provide fire protection, life safety and accessibility code consulting services for the future addition / renovation project at the Gutterson Fieldhouse and Patrick Gymnasium on the campus of University of Vermont (UVM) located in Burlington, Vermont. This report serves as a preliminary investigation of the major fire protection / life safety / accessibility code requirements for the project. This report describes our understanding the facility’s existing fire protection, life safety and accessibility features and the impact that these features will have on any future change in use, alteration or addition projects. The information contained within this report is based on the following: • Review of existing drawings of the Gutterson Fieldhouse and Patrick Gymnasium provided to RJA by Cannon Design (CD). • Project meeting with Colleen McKenna and James DiPaoli, P.E. (RJA) on August 12, 2008. • Project meeting with Ken Bean (UVM), Michael Sheehan (RJA) and James DiPaoli (RJA) on September 3, 2008. • Walk through visual survey inspection of the building conducted by Michael Sheehan (RJA) and James DiPaoli (RJA) on September 3, 2008. • Project related correspondence with Cannon Design. The purpose of this survey was to visually examine the existing fire protection, life safety and accessibility features within the Gutterson Fieldhouse and the Patrick Gymnasium. RJA’s review included but was not limited to an examination of the fire alarm system(s), automatic sprinkler system, passive fire protection features, construction type(s), building separations, emergency lighting, egress components and routes, and accessibility features throughout the building(s). The purpose of this examination was to determine the general conditions and to identify any potential problems related to any future alterations or addition projects. It should be noted that information and observations contained within this report are based on a walk-thru visual survey of the existing facility. Functional, destructive or intrusive visual inspections or fire protection system testing was not conducted. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 4 May 8, 2009 APPLICABLE CODES AND STANDARDS The major applicable codes and standards for the project include the following: • The Vermont Fire Protection and Building Safety Code (VFBSC), 2008 Edition: o The VFBSC adopts and amends the 2006 Edition of the International Building Code (IBC). o The VFBSC adopts and amends the 2006 Edition of NFPA 101 Life Safety Code (LSC). • The Americans with Disabilities Act Accessibility Guidelines (ADAAG) with Vermont amendments. • The 2004 Vermont Plumbing Rules (VPR) which include sections unique to Vermont as well as selective sections of the 2003 International Building Code (IBC) and the 2003 International Plumbing Code (IPC). • The 2005 Edition of NFPA 70, National Electrical Code (NEC). • Elevator Safety Rules which adopt the 2002 Edition of ASME A17.3 National Safety Code for Existing Elevators and Escalators with Vermont amendments. Note: It should be recognized that the State of Vermont is in the process of adopting the 2008 VFBSC. Based on discussions with appropriate Vermont authorities, it is the understanding of RJA that the 2008 Edition of the VFBSC will be adopted in late June to early July of 2009 pending legislative approval. A draft of the 2008 VFBSC has been made available to the public and has served as the basis of this report. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 5 May 8, 2009 NEW CONSTRUCTION REQUIREMENTS In general, all new work associated with any change in use, addition or renovation project should conform to the specific “new construction” requirements of the VFBSC. In addition, the level of fire protection and life safety in unrenovated portions of the building should not be reduced as a result of the renovation work. Renovated portions of existing mechanical, plumbing, electrical and other systems in a building should be made in conformance with the “new construction” requirements of the Code. Renovation to existing systems should not cause a reduction in the level of life safety or adversely affect the performance of said systems. Where any renovations subject portions of the building to excessive loads, those portions should be upgraded to comply with the “new construction” requirements of the Code. Alterations to means of egress elements should comply with the “new construction” requirements of the Code. EXISTING CONSTRUCTION REQUIREMENTS GENERAL The VFBSC is primarily intended for the application in the design and construction of new buildings. The arrangement of safeguards specified by the VFBSC, for new buildings, results in an acceptable level of fire and life safety. In general, unrenovated portions of an existing building are not required to comply with all “new construction” requirements of the current (or anticipated) edition of the Code. An existing building is presumed to meet the provisions of the applicable laws, codes, rules or regulations, bylaws or ordinances in effect at the time of the building(s) construction and/or alteration. An existing building is permitted to continue to be occupied pursuant to its use and occupancy, provided that the building is maintained. However, this does not permit the continuation of existing building features which were installed in conflict with any codes or laws in effect at the time of construction or installation. The VFBSC generally addresses existing buildings by mandating that minimum levels of fire and life safety be maintained. This is achieved by requiring all of the following: • Continued compliance with the edition of the Code in effect at the time of original construction; • Compliance with Chapter 43, Building Rehabilitations of the LSC Section 3403.2 of the IBC and the appropriate existing building sections of the LSC; • Upgrades retroactively required by the Authority Having Jurisdiction (AHJ) for the general safety and welfare of the building occupants and public. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 6 May 8, 2009 The extent to which unrenovated portions of an existing building must be upgraded is dependent on the present condition and on the type of and amount of renovation work being performed. In all cases, all new work included that associated with upgrades resulting from application of the Existing Building Evaluation method should conform to the specific “new construction” requirements of the Code. ADDITIONS An addition to an existing facility is required to comply with all code requirements for new construction, including its structural elements and systems. The combined height and area of the existing building plus the addition should not exceed that allowed by the Code. Additions are permitted to be considered to be a separate building where a fire wall separation in accordance with the requirements of VFBSC §705 Fire Walls is provided (Refer to Appendix B for an overview of major fire wall requirements). ALTERATIONS Alterations to existing structures are required to conform to the requirements of the Code for new construction and should not result in an increase in hazard to building occupants. Portions of the structure not altered or affected by the alteration are not required to comply with the code requirements for new construction. VARIANCE If the feasibility of bringing the existing building into compliance with the existing requirements of the Code is not feasible or practical, a variance to the requirements of the Code may be requested. The request for variance would be based on a complete fire and life safety assessment of the existing and new building areas (including any upgrades to the existing structure). UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 7 May 8, 2009 EXISTING BUILDING DESCRIPTION The existing athletic facility consists of two (2) interconnected buildings; Gutterson Fieldhouse and Patrick Gymnasium. Together, the facility serves as focal point of UVM’s intercollegiate and recreational athletic programs. BUILDING SEPARATIONS Based on discussions with Cannon Design and UVM, it is the understanding of RJA that the athletic facility was constructed in a number of phases, which include but are not limited to the following: • Gutterson Fieldhouse: A three (3) story, 93,100 square foot facility originally constructed in the 1960’s. A two (2) story, 11,300 square foot addition was recently added and is not separated from Gutterson Fieldhouse. • Patrick Gymnasium: A two (2) story, 86,400 square foot facility which was constructed in 1962. Over time, there have been two (2) additions which include following: o An 11,900 square, one (1) story Strength and Conditioning space. It is the understanding of RJA that this space was created in the 1980’s and renovated in 2005. It is anticipated that this portion of the building will be demolished as part of the proposed new hockey rink. o The Lobby which was created in a 1980’s. This portion of the building does not appear to be separated from the remainder of Patrick Gymnasium. It is anticipated that this portion of the building will be demolished as part of the proposed new program space. • Tennis Courts: A 50,100 square foot structure containing six (6) tennis courts was also added in the 1980’s. It appears that a separation between Patrick Gymnasium was intended, however, it has not been maintained properly. Based on RJA’s review of the PFG athletic complex, it appears that Gutterson Fieldhouse and Patrick Gymnasium are separated by back-to-back exterior walls with a two (2) hour fire resistance rated (FRR) vestibule between them. While it does not appear that this separation is a true fire wall it is the opinion of RJA that this separation provides equivalent separation and Patrick Gymnasium and Gutterson Fieldhouse should each be considered a separate building. As the project approaches schematic design (SD) and the scope of the proposed work is further defined, building separations will be further evaluated and discussed. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 8 May 8, 2009 USE AND OCCUPANCY Both the Patrick Gymnasium and the Gutterson Field House are classified as a nonseparated mixed-use facilities. The building contains the following occupancy classifications and uses: • Use Group A-3, Assembly Occupancies: Conference rooms, gymnasium w/o spectator seating (Strength and Conditioning), track (Gutterson) • Use Group A-4, Assembly Occupancies: Arenas w/ spectator seating (Patrick Gymnasium Basketball Courts & Gutterson Skating/Hockey Rink), Patrick Gymnasium swimming pool (Forbush Auditorium), Gutterson Fieldhouse tennis courts. • Use Group B, Business Occupancies: Offices, classrooms with less than 50 people, administrative areas, athletic medicine, locker rooms, etc. • Use Group S-1, Storage Occupancies: Equipment and storage spaces • Use Group S-2, Storage Occupancies: Mechanical/Electrical/Plumbing spaces and zamboni parking. HEIGHT, AREA AND CONSTRUCTION TYPE The complete PFG athletic complex has a footprint of approximately 231,700 square feet and three (3) stories above grade. The PFG complex consists of two (2) buildings; Gutterson Fieldhouse and Patrick Gymnasium, whose heights, areas and construction types are discussed bellow: GUTTERSON FIELDHOUSE Gutterson Fieldhouse is a two (2) story structure (26-feet average roof height) with a maximum “footprint” area of approximately 109,000 square feet. The building has a minimum construction type of Type 2B, Noncombustible Unprotected Construction. PATRICK GYMNASIUM Patrick Gymnasium is a three (3) story structure (39-foot average roof height) with a maximum “footprint” area of approximately 137,300 square feet. The building appears to have a minimum construction type of Type 1B, Noncombustible Protected Construction with the exception of the Third Floor mezzanine which has a number of structural elements with unprotected steel. The extent of unprotected steel should be confirmed by the design team’s structural engineer. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 9 May 8, 2009 FIRE PROTECTION SYSTEMS AUTOMATIC SPRINKLER SYSTEMS Based on RJA’s review, it appears that Gutterson Fieldhouse is protected throughout by automatic sprinklers in accordance with the requirements of NFPA 13 Standard for the Installation of Sprinklers. However, it does not appear as though Patrick Gymnasium is provided with complete sprinkler coverage. The only sprinklered portions of Patrick include new locker room spaces on the First Floor, and the Tennis Court and Strength and Conditioning additions. STANDPIPE SYSTEMS Based on RJA’s inspection, it does not appear as though standpipe connections have been provided in either building. As such, Gutterson Fieldhouse is considered to be a fully sprinklered building, however Patrick Gymnasium is not considered to be a fully sprinklered building. FIRE ALARM SYSTEMS The buildings are provided with emergency voce/alarm fire alarm systems and each contains a separate fire alarm panel. Based on discussions with UVM, it is the understanding of RJA that the PFG athletic complex consists of a number of different fire alarm zones and that in the event of an emergency, the entire complex is not evacuated. Both Gutterson Fieldhouse and Patrick Gymnasium are provided with speaker- strobes. Some of the notification appliances in Gutterson Field House are non-ADA compliant frosted lens strobes. ACCESSIBLE FEATURES SITE FEATURES – ACCESSIBLE PARKING The athletic complex is provided with an adjacent exterior parking lot and an open mutlilevel parking garage. It appears that a number of accessible spaces have been provided, however the number of accessible spaces relative to the number of spaces provided was not confirmed. ACCESSIBLE ENTRANCES The PFG athletic complex is provided with multiple main entrances which comply with the requirements of the Americans with Disabilities Act Accessibility Guidelines (ADAAG). ACCESSIBLE ROUTES Based on RJA’s review of the PFG athletic complex it appears that an accessible route has been provided throughout the facility. However, the following observations were made during RJA’s September 3rd survey: UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 10 May 8, 2009 • Access to the shower facilities on the First Floor of Patrick Gymnasium is not provided, as a 6-inch curb interrupts the accessible route. • There is a ramp on the First Floor of Patrick Gymnasium leading up to the Women’s General Locker Room that appears to exceed the maximum allowable slope (1:12) permitted by ADAAG. Further, this ramp is not provided with handrails. • There is a level change on the Third Floor of Patrick Gymnasium. Two (2) wheelchair lifts have been provided, however access to these lifts have been compromised due to the presence of a copy machine and a refrigerator. • An accessible route has been provided throughout general circulation areas within the basketball and hokey venues, however, accessible seating has not been provided. • As discussed below, there is no accessible route into the pool (Forbush Auditorium). A pool lift is considered an acceptable accessible route, however no such apparatus was observed at the time of RJA’s survey. • There are a number of racquet ball courts throughout the athletic complex, access to each racquet ball court is provided by a door with a 20-inch width and a 57-inch height. • An accessible route has not been provided to lockers, there is a 28-inch clear width between the face of locker room benches and adjacent lockers. It is the understanding of RJA that as funding becomes available UVM has proactively began addressing this issue over time. • Access to the four (4) press boxes within the hockey arena of Gutterson Fieldhouse has not been provided. ELEVATORS AND LIFTS Based on RJA’s review of the existing buildings, there appeared to be three (3) wheelchair lifts, two (2) of which are located on the Third Floor of Patrick Gymnasium and one (1) located in the lobby/concession area of the rink within the Gutterson Fieldhouse. These lifts have the following dimensional characteristics: Patrick Gymnasium Wheelchair Lifts: Both of these lifts are identical and have a 34-inch width and a 45-inch depth with controls mounted 41-inches above the finish floor of the lift. As indicated above, there is limited access to both of these lifts. The lift outside Classroom 217 is not provided with any pull side clearance and the lift outside of the Life Skills Center is blocked by a photocopier. During RJA’s inspection, it was unclear whether the lifts were operational. Gutterson Fieldhouse Lift: This lift connects all three (3) levels of Gutterson Fieldhouse and is enclosed in a two (2) hour fire resistance rated shaft. The dimensions of this lift were not obtained because it is normally locked. Access to this lift is available when a key is provided by the box office. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 11 May 8, 2009 Based on RJA’s review, there appears to be two (2) elevators within the athletic complex with the following dimensional characteristics: Patrick Gymnasium Elevator: This elevator is provided with emergency recall and fire fighter operations. Further, the door providing access to the elevator has a 32-inch width with a 60-inch by 60-inch cab size. Gutterson Fieldhouse Elevator: This elevator is provided with emergency recall and fire fighter operations. Further, the door providing access to the elevator has a 32-inch width with a cab dimension drastically exceeding the requirements of ADAAG. ACCESSIBLE SEATING Based on RJA’s review of the accessible seating within Patrick Gymnasium’s Basketball bleacher seating and Gutterson Arena’s arena seating, it does not appear as though any accessible seating has been provided. It should be noted that non-accessible bleacher style seating has also been provided on the pool deck and tennis courts of Patrick Gymnasium. TOILET FACILITIES There are a number of toilet facilities throughout the building between locker rooms, public toilets and employee use toilets. Based on RJA’s review, there were a total of two (2) accessible toilets within the entire athletic complex. These were located in the following locations: - Gutterson Unisex Toilet Room - Women’s Locker Room in Patrick Gymnasium Note: It is noted that no accessible sinks were observed throughout the PFG athletic complex. Further, throughout the facility only one (1) accessible urinal was observed. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 12 May 8, 2009 DRINKING FOUNTAINS There were a number of drinking fountains located throughout the building. Fountains were predominantly located in any of the following locations: corridors, locker rooms, athletic workout locations (i.e. fitness rooms, track, basketball courts). Water fountains consisted of primarily of three (3) styles; wall mounted porcelain fountains (non accessible), accessible rectangular fountains with 100% knee clearance and accessible fountains with accessible knee clearances. Due to limited access, RJA’s review did not encompass all drinking fountains, however the following observations were made on those types observed: (1) Wall Mounted Porcelain Fountains: Not accessible due to knee clearance requirements. Not accessible. (2) Accessible Rectangular Fountains: These fountains were observed to have spouts located at 36-inches AFF, controls at 29-inches AFF, and 27-inches of knee clearance and mounted 19-inches off the wall. Accessible, no action is required. (3) Other Accessible Fountains: These fountains were observed to have spouts located 36-inches AFF, controls mounted at 31-inches AFF, knee clearances at 28-inches AFF and mounted 19-inches off of the wall. Accessible, no action is required. POOL (FORBUSH AUDITORIUM) The pool within Patrick Gymnasium is not provided with an accessible route into the pool, a pool lift or a sloped entry. LOCKER ROOMS AND SHOWERS Locker rooms within Patrick Gymnasium did not appear to be accessible, as noted above, access to the lockers is not provided as the clear width between benches and adjacent lockers is approximately 28-inches. Benches were located 18-inches AFF. Lockers were located in three (3) tiers with locks at the following heights; 16-inches, 38inches and 63-inches. Further, access to group showers is not provided in a number of locations due to the presence of a 6-inch water retention slip. Within group showers, shower controls are located 60-inches AFF. It should be noted that RJA was provided with limited access to team locker rooms throughout Patrick Gymnasium and Gutterson Fieldhouse. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 13 May 8, 2009 MEANS OF EGRESS Based on RJA’s review, it appears that Patrick Gymnasium and Gutterson Fieldhouse do not rely on one another’s means of egress components (i.e. stairs, exit doors, etc.). As such, RJA’s analysis of the means of egress has evaluated the cumulative occupant loads/egress capacities and the occupant load/egress capacities of each building. Additionally, due to the separation of large assembly spaces (i.e. Gutterson Fieldhouse Hockey Arena, Patrick Gymnasium’s Basketball Courts, etc.) the occupant loads/egress capacities of rooms has been evaluated. PROPOSED RENOVATIONS, ALTERATIONS AND ADDITIONS Phase II of UVM’s implementation study has proposed a building planning concept phasing strategy. This strategy provides an overview to conceptual changes which will occur within the existing PFG athletic facility. PROJECT B1: NEW RECREATION CENTER (I of II) Project B1 appears to include the demolition of the 50,100 ft2 structure containing the existing tennis courts within the complex and the creation of a new structure that will make up the New Recreation Center. Based on the Phase II Implementation study, it appears that this work will be done in Project B1 and Project B2. It appears that the new structure will be connected to the existing facility. As the project approaches schematic design, the interface between the existing building and the new addition will be discussed and further evaluated. PROJECT B2: FIELD HOUSE EXPANSION & TRACK RESURFACING Phase B2 appears to include the expansion of the existing Gutterson Fieldhouse and the resurfacing of the indoor track. On a conceptual level, it appears that the expansion will be between 10,000 ft2 to 20,000 ft2. PROJECT C1: MULTIPURPOSE FACILITY Project C1 Multipurpose Facility will include the demolition of the existing 11,900 ft2 Strength and Conditioning space and the construction of a new structure exceeding 50,000 ft2 which will contain a new skating/hockey arena, offices, and multipurpose spaces. It is the understanding of RJA that this structure will be a three (3) tiered structure with the following levels; concourse level, event level, plaza level. It appears that it is intended that this building will be connected with the existing athletic complex. Additional evaluation and discussion regarding the interface between the new structure and the existing athletic complex will take place as the project approaches the schematic design phase. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 14 May 8, 2009 PROJECT C2: NEW LOBBY / LOUNGE CONNECTOR Project C2 New Lobby / Lounge Connector appears to be a renovation of the existing lobby space of the PFG athletic facility. The scope of renovations and works within this phase is unclear at this time and will be evaluated as the scope of the work is more clearly defined. PROJECT D1: EXISTING FACILITY RENOVATIONS It is the understanding of RJA that Project D1 will include renovations and alterations to the existing building, however the scope of these renovations are unclear at this time and will be further evaluated as the project approaches the schematic design (SD) phase. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 15 May 8, 2009 PROJECT D2: NEW RECREATION/AQUATIC CENTER (II of II) Project D2 will include the second phase of work within the New Recreation Center. Refer to Project B1 for additional discussion. PROJECT D3: RENOVATIONS OF GUCCIARDI Project D3 will include renovations to the existing portion of the building referred to as Gucciardi. The scope of the renovations to the space is unclear at this time and will be further evaluated as the project approaches the schematic design (SD) phase. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 16 May 8, 2009 EXISTING BUILDING - CHAPTER 34/BUILDING REHABILITATION ANALYSIS The 2008 Edition of the Vermont Fire and Building Safety Code (VFBSC) will amend Chapter 34 Existing Buildings of the 2006 International Building Code and requires the following: • Existing buildings and structures should comply with the existing occupancy sections of the 2006 Edition of NFPA 101 Life Safety Code (LSC) and the requirements of the 2006 Edition of NFPA 1 Uniform Fire Code (UFC). • Rehabilitation work (i.e. repairs, renovations, modifications, reconstruction, change of use, or additions) should comply with Chapter 43 Building Rehabilitations of the LSC. Note: Structural systems are required to comply with Section 3402.2 of the 2006 Edition of the International Building Code. • Additions should comply with the height and area provision of Chapter 5 General Building Heights and Areas of the International Building Code. The VFBSC has six (6) work categories which include the following: • Work Category #1: Repair • Work Category #2: Renovation • Work Category #3: Modification • Work Category #4: Reconstruction • Work Category #5: Change of Use of Occupancy Classification (N/A) • Work Category #6: Addition Of these work categories, it is the understanding of RJA that all but Work Category #5 are applicable to the planned work for this project. The major fire protection and life safety requirements for the applicable work categories is explained in greater detail as follows. REPAIRS All repair work should not make the building less conforming with the existing chapters of the LSC, or with any previously approved alternative arrangements (LSC §43.3.1.4). Further, work should be done using like materials or materials permitted by the VFBSC (LSC §43.3.1.3). The scope of proposed repair work is unclear at this time but will be clearly identified as the project approaches the schematic design (SD) phase of the project. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 17 May 8, 2009 RENOVATIONS All new work should comply with the requirements of the VFBSC applicable to existing buildings (LSC §43.4.1.3). Work performed should not make the building less conforming with other sections of the VFBSC, or with any previously approved alternative arrangements (LSC 43.4.1.4). It should be noted that all interior finish materials should meet the requirements of new construction (these requirements are prescribed by the Life Safety Code). UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 18 May 8, 2009 RECONSTRUCTION The category of work encompassing reconstruction contains a number of different requirements which are detailed in the sections below. Modifications are considered extensive when the total area of rehabilitation work areas exceed fifty percent (50%) of the area of a building. This level of work is considered to be Reconstruction. MEANS OF EGRESS: The means of egress should comply with the requirements applicable to the existing occupancy chapters of the VFBSC (LSC §43.6.2.1). The means of egress capacity should exceed the occupant load of the building (LSC §43.6.2.2). Refer to Appendix A for an analysis of the existing building(s). ILLUMINATION OF MEANS OF EGRESS AND EXIT SIGNS: • The means of egress in all rehabilitation work areas should comply with the requirements for new construction (LSC §43.6.2.4.1 & LSC §43.6.2.5.1). • Where the reconstruction rehabilitation work on any floor exceeds fifty-percent (50%) of that floor area, the means of egress throughout that floor should be provided with illumination in accordance with the requirements of new construction (LSC §43.6.2.4.2 & LSC §43.6.2.5.2). • Where the reconstruction rehabilitation work area exceeds fifty-percent (50%) of the aggregate floor areas within the building, the means of egress within the rehabilitation and the means of egress, including the exit and exit discharge paths, serving the rehabilitation work area should be provided with illumination and exit signage in accordance with the requirements for new construction (LSC §43.6.2.4.3 & LSC §43.6.2.5.3). It is the understand of RJA that both buildings are provided with emergency power from a 60 kW, 480/277 V diesel emergency generator. Although, it is noted per the UVM Campus Life Task Force Facility Audit that the emergency system does not segregate life-safety loads from other electrical loads. This issue and condition will be discussed further as the project approaches the schematic design (SD) phase. HANDRAILS AND GUARDS: Based on RJA’s review, it appears that the existing handrails and guards throughout the existing athletic complex were in compliance with the requirements for existing buildings. No action is required. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 19 May 8, 2009 FIRE BARRIERS AND SMOKE BARRIERS: This section is not applicable to the UVM athletic complex as this section is specific to small residential board and care occupancies and two-family dwelling units (LSC §43.6.3). EXTINGUISHING SYSTEMS: • Where the reconstruction rehabilitation work on any floor exceeds fifty-percent (50%) of that floor area, a sprinkler system should be provided throughout the story (LSC §43.6.4.2). • Where the reconstruction rehabilitation work area exceeds fifty-percent (50%) of the aggregate floor areas within the building, automatic sprinklers should be provided on the all floors containing rehabilitation work (LSC §43.6.4.1). • Standpipes are required to be provided in rehabilitation work areas where required by the VFBSC (LSC §43.6.4.5). As indicated, Patrick Gymnasium is not completely protected throughout by automatic sprinklers. Based on the scope of the proposed work, it should be recognized that the VFBSC may require that sprinklers be provided throughout the entire building. FIRE ALARM SYSTEMS – SMOKE ALARMS This section is not applicable to the UVM athletic complex as this section is specific to lodging or rooming houses, hotels and dormitories, apartment buildings, individual sleeping rooms, guestrooms and dwelling units (LSC §43.6.5). ELEVATORS Elevators should be provided with Phase I and Phase II Emergency Operations (LSC §43.6.6). All elevators within the UVM Athletic Complex are provided with Phase I & II Emergency Operations. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 20 May 8, 2009 ADDITIONS The VFBSC requires that additions comply with the height and area provisions of Chapter 5 of the IBC. An evaluation of Patrick Gymnasium and Gutterson Fieldhouse is shown in the following sections of this report. In all cases, additions should be designed and constructed in accordance with requirements of new construction. CONSTRUCTION CLASSIFICATION Gutterson Fieldhouse Overview: Patrick Gymnasium Predominantly Type 1B, Noncombustible Protected Construction, however there are unprotected structural elements so the minimum construction type of the building. Defaults to Type 2B, Noncombustible Unprotected Construction. Type 2B, Noncombustible Unprotected Construction. Overview: BUILDING HEIGHT EVALUATION Patrick Gymnasium The building has three (3) stories above grade and a maximum average roof surface height of approximately 39-feet. The facility is a Type 2B, Noncombustible Unprotected building that is not fully protected by automatic sprinklers. The height limitations for a Use Group A-4, Assembly Occupancy of Type 2B Construction is two (2) stories and 55-feet (VFBSC Table 503). The existing building does not comply with the height requirements of the IBC as a Type 2B building. Note: If Patrick Gymnasium were to be of Type 1B, Noncombustible Protected Construction the height limitation would be 11 stories. Gutterson Gymnasium The building has two (2) stories above grade and a maximum average roof surface of 26-feet. The building is a Type 2B, Noncombustible Unprotected building that is protected throughout by automatic sprinklers. The height limitations for a Use Group A-4, Assembly occupancy of Type 2B construction w/ sprinkler protection is three (3) stories and 75-feet. The existing building complies with the height requirements of the IBC. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 21 May 8, 2009 Overview: BUILDING AREA EVALUATION Patrick Gymnasium The building has a maximum “footprint” area of 137,300 ft2 prior to demolitions/renovations and approximately 71,700 ft2 after demolitions. The area limitations for a Use Group A-4, Assembly Occupancy of Type 2B Construction w/o sprinklers but 100% open is 16,625 ft2 (VFBSC Table 503). The existing building does not comply with the height requirements of the IBC as a Type 2B building. Gutterson Gymnasium The building has a maximum footprint area of approximately 109,000 ft2 and is 100% open. The building is a Type 2B, Noncombustible Unprotected building that is protected throughout by automatic sprinklers. The area limitations for a Use Group A-4, Assembly occupancy of Type 2B construction w/ sprinkler protection is 35,625 ft2. The existing building does not comply with the height requirements of the IBC as a Type 2B building. Note: If Patrick Gymnasium were to be of Type 1B, Noncombustible Protected Construction an unlimited area would be permitted. CONSTRUCTION TYPE / HEIGHT & AREA / ADDITION SEPARATION RECOMMENDATIONS Patrick Gymnasium: In the existing condition, Patrick Gymnasium greatly exceeds the allowable area (as well as the height). If an addition were to be added to the existing building, one (1) of the following two (2) options could be taken: (1) Upgrade the construction type of Patrick Gymnasium to be Type 1B, Noncombustible Protected Construction. This would permit the building and subsequent additions to be unlimited in area. Based on RJA’s review, a majority of structural elements within Patrick Gymnasium are of Type 1B construction. Areas of Type 2B, Noncombustible Unprotected Construction were noted in the lobby sections of Patrick Gymnasium on all levels. (2) Separate the additions with a fire wall. Under this approach, the addition would be considered a separate building. Refer to Appendix B for an overview of the major requirements for fire walls. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 22 May 8, 2009 Gutterson Fieldhouse: In the existing condition, Gutterson Fieldhouse greatly exceeds the allowable area prescribed by Chapter 5 of the IBC. Further, based on RJA’s review a significant level of work would be required to upgrade the building’s construction type. If an addition were to be added to Gutterson Fieldhouse, one (1) of the following two (2) options could be taken. (1) Upgrade the construction type of Gutterson Fieldhouse to be Type 1B, Noncombustible Protected Construction. Based on RJA’s review, this would take a significant level of work and is not advisable. (2) Separate additions with a fire wall. Recommended approach. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 23 May 8, 2009 ACCESSIBILITY REQUIREMENTS – ADAAG ADDITIONS Each space or element added to the existing building should comply with the applicable provisions of the minimum requirements for new construction (ADAAG §4.1.5). The addition and any renovated area of the building are required to meet the current requirements of ADAAG. ALTERATIONS AND RENOVATIONS No alteration should be undertaken which decreases or has the effect of decreasing accessibility or usability of a building or facility below the requirements for new construction at the time of alteration (ADAAG 4.1.6.1(a)). An alteration that affects or could affect the usability of or access to an area containing a primary function shall be made so as to ensure that, to the maximum extent feasible, the path of travel to the altered area and the restrooms, telephones, and drinking fountains serving the altered area, are readily accessible to and usable by individuals with disabilities, unless such alterations are disproportionate to the overall alterations in terms of cost and scope (as determined under criteria established by the Attorney General) (ADAAG §4.1.6(2)). ADAAG DISPROPORTIONALITY CRITERIA The Americans with Disabilities Act Accessibility Guidelines (ADAAG) requires that up to 20% of the money being spent on the renovation/ alterations be spent on accessibility upgrades/ features to the building. Further, Section 504 of the Federal Rehabilitation Act states that institutions receiving federal aid should be run in an accessible manner. If any of the federal funding is for construction, the requirements of Section 504 mandate that it comply with ADDAG or UFAS. In choosing which accessible elements to provide, priority should be given to those elements that will provide the greatest access, in the following order: • An accessible entrance; • An accessible route to the altered area; • At least one accessible restroom for each sex or a single unisex restroom; • Accessible telephones; • Accessible drinking fountains; and • When possible, additional accessible elements such as parking, storage, and alarms. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 24 May 8, 2009 ACCESSIBILITY DISCUSSION As indicated in previous sections of this report, there are a limited number of accessible features within the building. Being so, based on the levels of renovations and alterations within the building a significant level of accessibility upgrades could be required. It should be noted that the money being spent on additions is permitted to excluded from the 20% threshold (ADAAG §4.1.5). UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 25 May 8, 2009 RECOMMENDATIONS The following recommendations resulted from the fire protection engineering survey conducted by RJA and from the existing building analysis generated in this report. These recommendations address conditions observed that have an impact on the fire protection and life safety of the buildings and that should be implemented as part of the proposed new addition and renovation project. • The two (2) new substantial additions (i.e. University Multipurpose Events Center and the New Recreation Center) be separated from the other portions of the PFG athletic complex by fire walls with a three (3) hour fire resistance rating (FRR). Refer to Appendix B for an overview of the major fire wall requirements. • Existing double height racquet ball courts should be separated from the upper floor of Patrick Gymnasium with one (1) hour fire resistance rated (FRR) construction or 45-minute rated wired glass. • Doors to existing exit stairs should be provided with a 90-minute fire resistance rating where stairs connect four (4) or more stories and a one (1) hour fire resistance rating where stairs connect less than four (4) stories. Further, it should be confirmed that all stair doors are self-closing and latching. • Additional discussion with RJA is required as the scope of the proposed work is more clearly defined to determine whether sprinkler protection will be required throughout the building. o Where the reconstruction rehabilitation work on any floor exceeds fiftypercent (50%) of that floor area, a sprinkler system should be provided throughout the story (LSC §43.6.4.2). o Where the reconstruction rehabilitation work area exceeds fifty-percent (50%) of the aggregate floor areas within the building, automatic sprinklers should be provided on the all floors containing rehabilitation work (LSC §43.6.4.1). • As part of the renovation project, funds up to 20% of the project costs should be allotted for upgrading the accessibility features within the existing building. • It is the recommendation of RJA that Cannon Design and UVM determine whether federal funding will be used for construction, if so the entire athletic complex may be required to comply with the requirements of new construction for ADAAG. UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 26 May 8, 2009 Very truly yours, ROLF JENSEN & ASSOCIATES, INC. (RJA) Prepared by: Michael P. Sheehan MPS B45400 May 8, 2009 Date UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 27 May 8, 2009 APPENDIX A – OCCUPANT LOAD / MEANS OF EGRESS CAPACITY EVALUATION GUTTERSON FIELDHOUSE Gutterson Field House First Floor Occupant Load Occupancy Type Area(ft2) Load Factor (ft2/occ) Load (occ) 11,149 100 Gross 112 Business (Office) 1,347 15 Net 90 Assembly 3,857 300 Gross 13 Mechanical/Storage 1,101 50 Gross 23 Locker Rooms 47,571 Fixed Seating 4,035 Arena 17,141 50 Gross 343 Rink 32,333 50 Gross 647 Field House 2,862 100 Gross 29 Corridors Total 117,361 5,292 Gutterson Field House First Floor Exit Capacity Egress Element Field House South Doors Field House West Doors Field House North Doors Stair 199 Doors Vestibule 189A Doors Hockey Locker Door Rink East Doors Rink South Doors Total Width(in) 66 304 132 66 66 35 144 280 865 Factor(in/occ) 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 Capacity (occ) 330 1,520 660 330 330 175 720 1,400 5,465 > 5,292 UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 28 May 8, 2009 Gutterson Field House Second Floor Occupant Load Occupancy Type Area(ft2) Load Factor (ft2/occ) Load (occ) 2,180 100 Gross 22 Business 1,309 15 Net 88 Assembly 10,040 50 Gross 201 Fitness 10,682 50 Gross 214 Running Track 4,960 100 Gross 50 Corridors Total 29,171 575 Gutterson Field House Second Floor Exit Capacity Egress Element Running Track West Doors Running Track Northeast Door Corridor 290 Stair 294 Corridor 290 Stair 295 Cardio/Fitness Stair 295 Door Cardio/Fitness Stair 296 Door Total Width(in) 66 Factor (in/occ) 0.2 Capacity (occ) 330 33 80 82 0.2 0.3 0.3 165 266 273 36 0.2 180 36 -- 0.2 180 1,394 > 575 UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 29 May 8, 2009 PATRICK GYMNASIUM Patrick Gymnasium First Floor Occupant Load Occupancy Type Area(ft2) Load Factor (ft2/occ) 2,823 100 Gross Business 843 15 Net Assembly 5,224 300 Gross Mechanical/Storage 8,574 50 Gross Locker Rooms 8,892 50 Gross Fitness 2,559 15 Gross Pool Deck 3,489 50 Gross Pool 6,858 100 Gross Corridors Total 39,262 Load (occ) 29 57 18 172 178 171 70 69 764 Patrick Gymnasium First Floor Exit Capacity Egress Element Northwest Stair Northeast Door East Doors South Doors Southwest Doors Total Width(in) 56 33 66 66 66 -- Factor (in/occ) 0.3 0.2 0.2 0.2 0.2 Capacity (occ) 186 165 330 330 330 1,341 > 764 UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 30 May 8, 2009 Patrick Gymnasium Second Floor Occupant Load Occupancy Type Area(ft2) Load Factor (ft2/occ) Load (occ) 14,576 100 Gross 146 Business 159 15 Net 11 Assembly 2,432 300 Gross 9 Mechanical/Storage 2,137 50 Gross 43 Locker Rooms 1,243 20 Net 63 Classrooms 15,297 50 Gross 306 Fitness 22,393 50 Gross 448 Gym 36,267 50 Gross 726 Tennis Courts 13,115 100 Gross 132 Corridors Total 107,619 1,884 Patrick Gymnasium Second Floor Exit Capacity Egress Element Tennis Court West Doors Northwest Vestibule Doors Northwest Gym Corridor Doors North Gym Lobby Doors Northeast Gym Corridor Doors East Lobby Doors Southeast Door South Stair Door Center Corridor Doors Total Width(in) 990 99 Factor (in/occ) 0.2 0.2 Capacity (occ) 4,950 495 330 528 0.2 0.2 1,650 2,640 198 132 33 33 132 2,805 0.2 0.2 0.2 0.2 0.2 990 660 165 165 660 12,375 > 1,884 UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 31 May 8, 2009 Patrick Gymnasium Third Floor Occupant Load Occupancy Type Area(ft2) Load Factor (ft2/occ) 6,841 100 Gross Business 1,186 300 Gross Mechanical/Storage 2,584 20 Net Classroom 1,326 100 Gross Corridors Total 11,937 Load (occ) 69 4 130 14 217 Patrick Gymnasium Third Floor Exit Capacity Egress Element Stair 297 Stair 299 Stair 298 Door Stair 295 Stair 296 Total Width(in) 44 56 33 44 44 -- Factor (in/occ) 0.3 0.3 0.2 0.3 0.3 Capacity (occ) 146 186 165 146 146 789 > 217 UVM – ATHLETIC FACILITY ADDITION CHAPTER 34 ANALYSIS – EXISTING CONDITIONS B45400 – Page 32 May 8, 2009 APPENDIX B – MAJOR FIRE WALL REQUIREMENTS Fire walls should be designed and constructed in accordance with the following major requirements: • Fire walls should be constructed with noncombustible materials and should have sufficient structural stability under fire conditions to allow collapse of construction on either side without collapse of the wall (IBC §705.2) • The fire wall separating additions should minimally have a three (3) hour fire resistance rating (FRR) (IBC §705.4). • Openings though a fire wall should be protected in accordance with the requirements of Section 715.4 and have self-closing or automatically closing doors and/or fire shutters. • Fire walls should be continuous from exterior wall to exterior wall and should extend at least 18-inches beyond the exterior surface of exterior walls (Note: There are some exceptions to this requirement) (IBC §705.5). • Fire walls should extend from the foundation to a termination point at least 30inches above both adjacent rooms (Note: There are some exceptions to this requirement) (IBC §705.6). • Each opening though a fire wall should not exceed 120 square feet and the aggregate with of openings should not exceed 25-percent (25%) of the length of the wall. Note: Openings are not limited to 120 square feet where both buildings are protected throughout by automatic sprinklers (IBC §705.8).