Comments
Description
Transcript
Rail Infrastructure Development Link 1
Rail Infrastructure Development Link 1 1 Thailand – Malaysia at Padang Besar 1. 2. 3. 4. 5. 6. 1. 2. 3. 4. 5. 6.2 Landbridge train crossing the border SRT locomotive waiting to haul Langkawi Express to Hat Yai CIQ at Padang Besar station Langkawi Express northbound from KL to Hat Yai International passengers waiting for the train Train no.35 from Bangkok arriving at Butterworth station 2 Thailand-Malaysia at Padang Besar after Renovation 3 Thailand-Malaysia at Padang Besar after Renovation 4 Thailand-Malaysia at Padang Besar after Renovation 5 Joint Traffic Agreement • Uninterrupted movement of passengers and cargoes • Technical compliance • Standard operation procedures • Single stop for CIQ clearances Padang Besar: Thailand – Malaysia Border Station Level crossing in Thailand 6 Joint Traffic Agreement • Conformity of technical requirements – Loading gauge, structure gauge, clearance, axle-load, speed, braking system, couplers, signaling, etc. • Compatibility of operational practices – Service & safety level – Joint inspection, train schedule, train precedence, dispute settlement, etc. 7 Thai Train at Thanaleng Station in Lao PDR Padang Besar Yard: 7 Malaysia – Thailand Border Thailand – Lao PDR at Thanaleng Phase 1: Nong Khai – Thanaleng March 20, 2004 Thai Government agreed to offer financial assistance to Lao PDR: 30% grant (THB59 million) and 70% low interest-bearing loan (THB138 million). Grand opening March 5, 2009. Phase 2: Thanaleng – Vientiane June 14, 2012 The Loan Agreement amounted 1,650 Million Baht was signed for funding8 the Phase 2 of Lao Railway project. For the time being, the construction of the freight yard or Inland Container Depot at Thanaleng station is under construction 8 Thailand – Cambodia Aranyaprathet – Khlongluk – Poipet ประเทศไทย (Thailand) วัฒนานคร (Watana Nakhon) 20.640 km อรัญประเทศ (Aranyaprathet) 5.000 km 1.000 km ที่หยุดรถคลองลึก (Klongluk) ประเทศกัมพูชา 9 (Cambodia) 9 แผนผังแสดงแนวเส้ นทางรถไฟเดิมระหว่ าง ชายแดนไทย-กัมพูชา (Map of Railway Connecting Point at Thailand-Cambodia Border) ที่หยุดรถคลองลึก (Klong Luk) (Railway corridor) แนวทางรถไฟเดิม ต้ นไม้ ใหญ่ (Tree) เสาคาสิโน แนวถนน (Road) ประเทศไทย (Thailand) ประเทศกัมพูชา (Cambodia) (Casino pillar) WINNER กําแพงคาสิโน (Casino wall) ร้ านค้ า (Shop) สถานีปอยเปตเดิม (Existing Poi Pet station) ทางเชื่อม (Skywalk) Thai side area (as of February 16, 2015) 13 Cambodia side area (Si Sophon) (as of January 2014) 14 Thai side area (as of January 2014) 15 Thai side area (as of January 2014) 16 Thai side area (as of January 2014) 17 Thai side area (as of January 2014) 18 Thai side area (as of January 2014) 19 Thailand - Myanmar Thanbyuzayat Three Pagoda Pass Namtok Dawei 20 Ban Khao (Kanchanaburi) 20 DOH Projects to support Dawei port development Kanchanaburi-border Rd. 2 lanes 70 kms. Construction completed Motorway Bang Yai – BanPong Kanchanaburi Detailed design completed Phu nam ron Myanmar Thailand Motorway Kanchanaburi - border Under F.S. fiscal yr.2012, 30 M.THB Dawei Port Development Project (Italian-Thai Development PCL) DAWEI PROJECT 160 KM 70 KM KANCHANABURI PHU NAM RON Myanmar – Thailand Border B.Phu Nam Ron to Dawei length 160 KM Current Status: Temporary access road for equipments and materials mobilization completed. Development-in-Progress Highlight Section Distance (KM) Status Poipet – Sisophon 48 Track rehabilitation going on; expected completion 2014 Sisophon – Phnom Penh 337 Track rehabilitation going on; expected completion 2018 Aranyaprathet – Poipet 6 Phnom Penh – Loc Ninh Loc Ninh – Ho Chi Minh 254 129 Track rehabilitation needed; expected start in 2014 Feasibility Study conducted Expected start in 2014 23 Border Railway Bridge: Aranyaprathet (Thailand) – Poipet (Cambodia) 23 Development-in-Progress Highlight Section Namtok – Three Pagoda Pass Three Pagoda Pass Thanbyuzayat Lashio - Muse Thanaleng - Vientiane 24 Distance (KM) Status 153 Feasibility Study and Prelim. Design by KOICA 110 Feasibility Study and Prelim. Design by KOICA 232 9 Attempt to mobilize resources Lao PDR took the loan of 1,650 million baht from Thai Government on June 14, 2012 to construct ICD at Thanaleng and extension line from Thanaleng to Vientiane. Rail Track on Friendship Bridge: Nong Khai (Thailand) – Thanaleng (Lao PDR) 24 Opportunities/Challenges • Protocol 6: Railway Border and Interchange Stations • Interoperability – Train tracking system – Multiple network access – Signaling System • Demand-side management – Multimodal transport – Station/Terminal facilities 25 Woodland Train Checkpoint: Malaysia – Singapore Border Padang Besar Train Checkpoint: 25 Malaysia – Thailand Border Key Success Factors • Proper Management Structure and Tools Reform Transport Structure; Role Separation of Policy Maker-Regulation-Operation; Establishing Railway Bureau In MOT; Infrastructure Separation; PSO; Change Management, etc • Labor Union Resistance/Support • Stakeholders support especially politician and government • Resource mobilization • Private Sector Participation or PPP 26 26 Thank you 27