Comments
Transcript
The Urban Nexus Da Nang/Vietnam June, 26 2014
Licence Partner of MYT Business Unit The Urban Nexus Da Nang/Vietnam June, 26th 2014 Dipl.-Ing. (FH) Martin Schaub WEHRLE Umwelt GmbH [email protected] www.wehrle-umwelt.com 1 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology Milestones in the history of the WEHRLE-WERK AG and WEHRLE Umwelt GmbH 2002 Transfer of the Environmental Branch of WEHRLE-WERK AG into the subsidiary company WEHRLE Umwelt GmbH (WUG), Foundation of WEHRLE China 1980 Begin of business in the field of Environmental Protection Technologies (Waste Water Treatment, Sludge Treatment) in a WEHRLE-WERK AG branch 1927–2005 Expanding business of WEHRLE-WERK AG with various products: Boilers, Combined Heat-and-power stations, Thermal treatment of household refuse and toxic waste, Energy recovery from biomass 1920 Transformation into a stock corporation “WEHRLE-WERK AG” End 19. Cty Begin of manufacturing of low pressure boilers 1860 Foundation of the locksmith’s trade "Wilhelm Wehrle" 2 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology WEHRLE Umwelt GmbH today: more 25 years of experience in the waste water business 100% subsidiary company of WEHRLE-WERK AG 60 employees waste water treatment for the industry and leachate from landfills plants for mechanical- biological treatment of solid waste and organic matter (AD technology) potable water processing plants More than 200 references world-wide Turn over 13-18 Mil. € 3 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology Environmental Technologies of WEHRLE Umwelt GmbH Aerobic waste water treatment Physical–chemical water treatment Membrane bioreactor Membrane units (Ultra-, Nanofiltration, Reverse Osmosis) WEHRLE Loop Reaktor (WLR) Activated Carbon plant Sequencing-Batch-Reactor (SBR) Ammoniak stripping plants Anaerobic waste water treatment Digestion of solid waste EGSB reactor (BIODIGAT® SB) Mechanical biological treatment of mixed solid waste (MYT) (BIOMEMBRAT®) Anaerobic Filter (BIODIGAT® AF) Anaerobic (BIODIGAT® AS) Mechanical biological treatment of mixed solid waste (Dry Digestion) Mechanical biological treatment of high organic waste (Wet Digestion) 4 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology Municipal Solid Waste Kahlenberg ZAK-Concept Mechanical pretreatment Mixed MSW Paper, packaging Metal separation Biologcical decomposition Off-gas treatment Biological drying Mechanical separation Electric current Co-generation Heat Anaerobic digestion Aerobic waste water treatment Inerts Solid recovered fuel 5 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology WEHRLE‘s history in MBT Technology February 1997 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for the world’s first pilot plant for “Percolation” (Commissioning and Operation 1997-1999) July 1999 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for a technical Percolation plant (Throughput: 20,000 tons/year MSW) (Commissioning and Operation 2000-2002) July 2002 Commissioning of the Biological Drying Pilot Plant July 2004 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for a technical Percolation plant (Throughput: 100,000 tons/year MSW) (Commissioning 2006) Feb 2010 - Aug 2010 Commissioning and Operation of the BIODAMP Plant in Thailand July 2012 Order of an important International Pharmaceutical Company for a technical Wet Digestion Plant (Throughput: 70,000 tons/year) January 2013 Order for Engineering Services for the MYT Plant Symevad (Northern France) June 2013 - Oct 2013 Commissioning and Operation of the BIODAMP Pilot Plant in China 6 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology WEHRLE‘s history in MBT Technology Percolation Pilot Plant Company: ZAK, Ringsheim Location: Kahlenberg, Germany Input: 1 ton/day Municipal Solid Waste (MSW) Year: 1997 7 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology WEHRLE‘s history in MBT Technology February 1997 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for the world’s first pilot plant for “Percolation” (Commissioning and Operation 1997-1999) July 1999 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for a technical Percolation plant (Throughput: 20,000 tons/year MSW) (Commissioning and Operation 2000-2002) July 2002 Commissioning of the Biological Drying Pilot Plant July 2004 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for a technical Percolation plant (Throughput: 100,000 tons/year MSW) (Commissioning 2006) Feb 2010 - Aug 2010 Commissioning and Operation of the BIODAMP Plant in Thailand July 2012 Order of an important International Pharmaceutical Company for a technical Wet Digestion Plant (Throughput: 70,000 tons/year) January 2013 Order for Engineering Services for the MYT Plant Symevad (Northern France) June 2013 - Oct 2013 Commissioning and Operation of the BIODAMP Pilot Plant in China 8 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology WEHRLE‘s history in MBT Technology Percolation Demonstration Plant Company: ZAK, Ringsheim Location: Kahlenberg, Germany Input: 20,000 tons/year Municipal Solid Waste (MSW) Year: 2000 9 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology WEHRLE‘s history in MBT Technology February 1997 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for the world’s first pilot plant for “Percolation” (Commissioning and Operation 1997-1999) July 1999 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for a technical Percolation plant (Throughput: 20,000 tons/year MSW) (Commissioning and Operation 2000-2002) July 2002 Commissioning of the Biological Drying Pilot Plant July 2004 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for a technical Percolation plant (Throughput: 100,000 tons/year MSW) (Commissioning 2006) Feb 2010 - Aug 2010 Commissioning and Operation of the BIODAMP Plant in Thailand July 2012 Order of an important International Pharmaceutical Company for a technical Wet Digestion Plant (Throughput: 70,000 tons/year) January 2013 Order for Engineering Services for the MYT Plant Symevad (Northern France) June 2013 - Oct 2013 Commissioning and Operation of the BIODAMP Pilot Plant in China 10 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology WEHRLE‘s history in MBT Technology Biological Drying Pilot Plant Company: ZAK, Ringsheim Location: Kahlenberg, Germany Input: 10,000 tons/year Municipal Solid Waste (MSW) Year: 2002 11 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology WEHRLE‘s history in MBT Technology February 1997 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for the world’s first pilot plant for “Percolation” (Commissioning and Operation 1997-1999) July 1999 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for a technical Percolation plant (Throughput: 20,000 tons/year MSW) (Commissioning and Operation 2000-2002) July 2002 Commissioning of the Biological Drying Pilot Plant July 2004 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for a technical Percolation plant (Throughput: 100,000 tons/year MSW) (Commissioning 2006) Feb 2010 - Aug 2010 Commissioning and Operation of the BIODAMP Plant in Thailand July 2012 Order of an important International Pharmaceutical Company for a technical Wet Digestion Plant (Throughput: 70,000 tons/year) January 2013 Order for Engineering Services for the MYT Plant Symevad (Northern France) June 2013 - Oct 2013 Commissioning and Operation of the BIODAMP Pilot Plant in China 12 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology WEHRLE‘s history in MBT Technology MYT® Plant „MBT Kahlenberg“ Company: ZAK, Ringsheim Location: Kahlenberg, Germany Input: 100,000 tons/year Municipal Solid Waste (MSW) Year: 2006 13 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology WEHRLE‘s history in MBT Technology February 1997 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for the world’s first pilot plant for “Percolation” (Commissioning and Operation 1997-1999) July 1999 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for a technical Percolation plant (Throughput: 20,000 tons/year MSW) (Commissioning and Operation 2000-2002) July 2002 Commissioning of the Biological Drying Pilot Plant July 2004 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for a technical Percolation plant (Throughput: 100,000 tons/year MSW) (Commissioning 2006) Feb 2010 - Aug 2010 Commissioning and Operation of the BIODAMP Plant in Thailand July 2012 Order of an important International Pharmaceutical Company for a technical Wet Digestion Plant (Throughput: 70,000 tons/year) January 2013 Order for Engineering Services for the MYT Plant Symevad (Northern France) June 2013 - Oct 2013 Commissioning and Operation of the BIODAMP Pilot Plant in China 14 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology WEHRLE‘s history in MBT Technology BIODAMP Pilot Plant Thailand Company: WEHRLE Umwelt GmbH Location: Petchaburi, Thailand Input: 3 tons/day Municipal Solid Waste (MSW) Year: 2010 15 Da Nang June, 26th 2014 WEHRLE’s history in MBT Technology WEHRLE‘s history in MBT Technology February 1997 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for the world’s first pilot plant for “Percolation” (Commissioning and Operation 1997-1999) July 1999 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for a technical Percolation plant (Throughput: 20,000 tons/year MSW) (Commissioning and Operation 2000-2002) July 2002 Commissioning of the Biological Drying Pilot Plant July 2004 Order of Zweckverband Abfallbehandlung Kahlenberg (ZAK) for a technical Percolation plant (Throughput: 100,000 tons/year MSW) (Commissioning 2006) Feb 2010 - Aug 2010 Commissioning and Operation of the BIODAMP Plant in Thailand July 2012 Order of an important International Pharmaceutical Company for a technical Wet Digestion Plant (Throughput: 70,000 tons/year) January 2013 Order for Engineering Services for the MYT Plant Symevad (Northern France) June 2013 - Oct 2013 Commissioning and Operation of the BIODAMP Pilot Plant in China 16 Da Nang June, 26th 2014 17 Da Nang June, 26th 2014 The grounds of the Zweckverband Abfallbehandlung Kahlenberg 18 Da Nang June, 26th 2014 Landfill from 1973 - 2005: Disposal of about 6 Mio. tons of waste 19 Da Nang June, 26th 2014 The landfill after renaturation: Habitat for many rare animals and plants 20 Da Nang June, 26th 2014 Merops Apiaster Conservation area and goal for family outings 21 Da Nang June, 26th 2014 Zweckverband Abfallbehandlung Kahlenberg (ZAK) • ZAK is a special purpose association formed in a legal communal cooperation between the counties Emmendingen(EM) and Ortenaukreis (OG) • ZAK is based in Ringsheim (Germany) • ZAK serves 570,000 residents -> producing about 100,000 tons of household waste per year • ZAK‘s function: Waste management of the delivered waste via recycling, maximum yield extraction of biogas & RDF and disposal 22 Da Nang June, 26th 2014 ZAK State of BadenWürttemberg Location of the ZAK in Germany 23 Da Nang June, 26th 2014 Household Waste Bio-Waste Packaging Paper Glass About 20 drop-off points (excavated ground, construction rubble, used tires, electronic waste, matured wood, lop, bulky waste) Two extra pick-ups per year (bulky waste, lop, special waste) Commercial waste (third party private) Waste management in the ZAK linked districts 24 Da Nang June, 26th 2014 Mechanical – Biological Waste Treatment Trials • 1996 - Fermentation trials on a semi-technical scale (No appropriate technology available, extreme amount of procedural deficiencies) • Parallel development of the ZAK-Process (MBT treatment of household waste including household bio-waste) – Material utilisation and landfilling (e.g. inert material and metals) – Energy utilisation (RDF, Biogas) – Operational efficiency (reduction of mass, minimalisation of non-treated residue and bio-waste, energy self-sufficient MBT) – Ecology (encapsulation, air and water treatment, saving fossil fuels) • 2000 - 2003 - Large Pilot/Demonstration-Plant 25 Da Nang June, 26th 2014 View of the Demonstration-Plant 26 Da Nang June, 26th 2014 constituents Household Waste RDF Water MBT Minerals Metals Benefit / Value for use Biogas Rest Losses Waste breakdown 27 Da Nang June, 26th 2014 Mechanical – Biological Waste Treatment MBT – Kahlenberg 28 Da Nang June, 26th 2014 Process steps of the MBT Kahlenberg: Mechanical Preparation 29 Da Nang June, 26th 2014 Building 1: Waste acceptance bunker - approx. 100,000 tons household waste per year from 570,000 residents 30 Da Nang June, 26th 2014 Building 2: View of the mechanical preparation step 31 Da Nang June, 26th 2014 Heavy mineral fraction sorted out 32 Da Nang June, 26th 2014 „Can scrap“ 33 Da Nang June, 26th 2014 Process steps of the MBT Kahlenberg: Biological Conversion 34 Da Nang June, 26th 2014 DAMP® - Defined Aerobic Mixing Process Waste Process water Agitator Screw Press Solids Press water 35 Da Nang June, 26th 2014 DAMP-Reactor Design Figures: • 6 concrete DAMP-Reactors • Filling Volume 250 m³ (each) • Retention Time in DAMP 2-3 days Aggregates of the Biological Conversion step: DAMP-Reactor 36 Da Nang June, 26th 2014 Fundamental and conceptional further developments (Percolation / DAMP): • Goal: Determine and set RDF and Bio-Gas output rates • Grade size reduction / homogenisation (Slurry-Mix) • Reduction of toxic substances • Aerobic pre-treatment – ideal for Biological Drying • Remaining material includes useful organics for the Biological Drying step elements: - percolator / DAMP / mixer - biogas fermenter - waste water cleaning system - presses Aggregates of the Biological Conversion step: Agitator 37 Da Nang June, 26th 2014 Aggregates of the Biological Conversion step: Planetary Gearbox38 Da Nang June, 26th 2014 Discharge from the biological conversion step, reduced in size, washed and homogenized 39 Da Nang June, 26th 2014 Aggregates of the Biological Conversion step: Dewatering Press 40 Da Nang June, 26th 2014 Mechnical-physical water treatment 41 Da Nang June, 26th 2014 CHP Plant Aggregates of the biological conversion step: Biogas fermenters 42 Da Nang June, 26th 2014 Process steps of the MBT Kahlenberg: Biological Drying 43 Da Nang June, 26th 2014 Demands on the input material: • loose, homogeneous, air-flow-friendly material • defined consistant moisture content (approx. 55% - 60% dry substance) • aerobic pre-treated material • microbiological useful organic content • controlled air, solids and energy management Aggregates of the Biological Drying step: Drying tunnel 44 Da Nang June, 26th 2014 Biological Drying tunnel (equipped with moving-floor) 45 Da Nang June, 26th 2014 Aggregates of the Biological Drying step: Discharge Machine 46 Da Nang June, 26th 2014 Aggregates of the Biological Drying step: Conveyors und discharge machine, completely enclosed and evacuated 47 Da Nang June, 26th 2014 Output of the Biological Drying step 48 Da Nang June, 26th 2014 Process steps of the MBT Kahlenberg: Air Treatment 49 Da Nang June, 26th 2014 Air Treatment Basics • Preferably tight encapsulation of all machines and controlled and monitored air extraction • Preferably airtight building construction • Multiple use of extracted air volume • Differentiated, flexible air treatment processes • Consequential cleanliness and maintenance of all equipment • Minimise emission exposure to personnel 50 Da Nang June, 26th 2014 fresh air facility buildings (machine halls) enclosures of machinery (point sources) collected exhaust air (point sources and buildings) ventilation supply air excess air DAMP / MZR drying tunnels alkaline air scrubbing acid air scrubbing air moistening regenerative thermal oxidizer biofilter clean air Air flow concept of the MBT Kahlenberg 51 Da Nang June, 26th 2014 Aggregates of the Air Treatment step: Humidifier, waschers 52 Da Nang June, 26th 2014 Aggregates of the Air Treatment step: Bio filters 53 Da Nang June, 26th 2014 Regenerative Thermal Oxidation (RTO) Aggregates of the Air Treatment step: RTO 54 Da Nang June, 26th 2014 Process steps of the MBT Kahlenberg: Mechanical Material Separation 55 Da Nang June, 26th 2014 Goals: • specified, homogeneous RDF • defined inert material • scrap metal Demands on the input material: • loose, homogeneous and free-flowing material • specified consistant moisture content (>85 % dry) • absolute dustproof encapsulation • trouble free „just in time“ logistics View of the Mechanical Material Separation step 56 Da Nang June, 26th 2014 Controlling of the separation quality 57 Da Nang June, 26th 2014 MYT® Maximum Yield Technology 58 Da Nang June, 26th 2014 MBT Kahlenberg The important products generated from the treatment of about 100,000 tons/a of household waste Plant operating time: 5 days/week, 2 shifts 59 Da Nang June, 26th 2014 Products of the Mechanical Separation step: EBS (Refuse Derived Fuel) mid caloric range (~13,000 MJ/ton) 60 Da Nang June, 26th 2014 Products of the Mechanical Separation step: EBS (Refuse Derived Fuel) mid caloric range (~14,000 MJ/ton) 61 Da Nang June, 26th 2014 Products of the Mechanical Separation step: EBS (Refuse Derived Fuel) high caloric range (~16,000 MJ/ton) 62 Da Nang June, 26th 2014 • • • Fuel or mineral optimized produktion Landfilling according legal Landfill Directives Separation accurancy adjustable „at the touch of a button“ Products of the Mechanical Separation step: Mineralstoffe (Mineral fraction) 63 Da Nang June, 26th 2014 64 Da Nang June, 26th 2014 Further development of the energy concept Power Plants RDF Cement Plants Vehicles Power Grid BT Electricity Biogas CHP Plant BT Heating Gas Network Heating Network MYT® Obtain max. Energy potential Efficient use of Energy Energy – and Environmental Management 65 Da Nang June, 26th 2014 Example MBT Kahlenberg Energy potential out of approx. 120,000 tons household waste Hu about 7,000 MJ/ton, Hu about 235,000 MWh/year Energy potential / Heating value (MWh/a) 250,000 235,000 200,000 165,000 150,000 100,000 40,000 50,000 30,000 25,000 Losses House load MYT® 0,000 Energy potential total Energy carrier RDF Energy carrier Biogas MYT® works on its own energy and covers its energy needs completely through the use of regenerative energy sources 66 Da Nang June, 26th 2014 Example MBT Kahlenberg Annual CO2 - savings from about 120,000 tons household waste - Electricity from Biogas (pp) – RDF instead of coal 90,000 80,000 20,000 70,000 Tons per Year 60,000 50,000 40,000 62,000 30,000 20,000 10,000 0,000 RDF instead of coal Electricity from Biogas (pp) Climate friendly electricity and heat is obtained from the energy carriers biogas and high-biomass content RDF 67 Da Nang June, 26th 2014 Waste fees Baden-Württemberg Comparison of the waste fees for a 4 person model household in 2013 in Baden-Württemberg The Ortenaukreis has a simple and clear waste management concept and tariff system The waste fees are low! 68 Da Nang June, 26th 2014 Simple waste management concepts – low efforts needed for logistic and sorting systems reduced costs helps keep waste collection fees low. Short waste treatments times – keeps machine size to a minimum = lower investment costs. Complete and flexible use of the energy potential. Energy carriers adapted to the needs of the energy user. Well thought out design and tried and proven technology. High operational reliability means long term operational success. Modular concept – using tried and proven machines. Small and large sized plants economically viable. Experienced specialized companies guarantee an easy and secure new project implementation. Flexible site location – in the center of the waste collection area within direct vacinity to the energy users – economic logistic concepts. Ecologically sound low-emission technology – site acceptance even in direct vicinity to populated areas. Operators profit from the training and consultation of ZAK. New plants can be operated with own personnel and in an exemplary manner. 69 Da Nang June, 26th 2014 Licence Partner of MYT Business Unit Fueling the Future! 70 Da Nang June, 26th 2014