Da Nang City and Nexus Project 4 REGIONAL NEXUS WORKSHOP
by user
Comments
Transcript
Da Nang City and Nexus Project 4 REGIONAL NEXUS WORKSHOP
4th REGIONAL NEXUS WORKSHOP Da Nang City and Nexus Project Presented by Da Nang delegation Ulaanbaatar, November 5-7, 2014 Content 1 Overview about Nexus Proposal 2 Progress since the 3rd Regional Workshop 3 Expected Benefits 4 Lessons Learnt 1 Overview about Nexus Proposal Distance from Ha Noi Capital 764 Km Hà Nội Da Nang Hoàng Sa Đà Nẵng Area: 1,285.43 km2 Population: 1.000.370 people (2013) Trường Sa Hồ Chí minh Distance from Ho Chi Minh City 964 Km 1 Overview about Nexus Proposal Current situation in Da Nang Eastern Coastal Area: high ground water table, narrow walkways/accessibility to connect septic tanks, the pollution of the groundwater and the river with coli bacteria and the unaffordable costs of conventionally separated waste water and drainage water systems. Promoting waste water vacuum sewer collection system allowing also further usage of sludge combined with organic waste for energy production, the treated waste water for irrigation (urban agriculture, green areas) and the remaining residues as fertilizer. DPI and DoNRE intend to implement a pilot project on vacuum sewer collection with 110 households in An Hai Bac Ward of Eastern Coastal Area. Purpose of the pilot project: to gain concrete experiences on the technology which apparently is apt for waste water collection and treatment in Da Nang. 2 Progress since the 3rd Regional Workshop Continuous in-depth meetings with related departments and Da Nang People’s Committee on the pilot project in June, July, August, October 2014. A full report about the pilot project on vacuum sewer system in An Hai Bac ward has been elaborated integrating comments from the city partner and including a technical solution for every household of 110 households in the pilot area. In the meeting with GIZ Nexus team on September 30, 2014 in Ha Noi, World Bank representative agreed conventional gravity system is not always the best solution and WB is looking for a new solution as well as ready to support and finance it. 2 Progress since the 3rd Regional Workshop GIZ Nexus project also supported Da Nang delegation to site visit in Chiangmai from Oct. 27-30, 2014 to learn experience about appropriate technology with regard to methane gas collection and processing both from the landfill and the leachate to produce energy and the residues as fertilizer for non-food agricultural and forestry products are being experimented. An intern from Austria coming to Da Nang will look more into details of urban agriculture (UA) and how treated irrigation water and sludge could be used in a safe manner for UA. GIZ Nexus project invited the Da Nang delegation to Viet Water Fair 2014 to be organized in Ho Chi Minh City from Nov. 12-14, 2014 to further observe the demonstration of vacuum system equipment. 3 Expected Benefits Demonstration project on vacuum sewer system for Pilot Project An Hai Bac Ward in Da Nang Eastern Coastal Area ready for implementation. Scaling up for the whole Eastern Coastal Area to be envisaged after the demonstration project to be implemented, monitored and evaluated. Awareness to be created among Da Nang decision makers on vulnerability of city with regard to pollution of coast line and river because of inappropriate waste water management with septic tanks and combined surface and waste water drainage system. Vacuum sewer as alternative to costly gravity sewer has been presented including feasibility considerations with regard to investment and operation and maintenance. 4 Lessons Learnt Mobilizing resources for financing takes time and efforts as the budget of Da Nang city is limited and the city has always relied on external sources to finance their development projects. It needs time for synchronous inter-sectoral cooperation to approach the problem comprehensively from multiple angles. Thank you for your attention!