...

Interstate 95 (I-95) Widening Project

by user

on
Category: Documents
12

views

Report

Comments

Transcript

Interstate 95 (I-95) Widening Project
Interstate 95 (I-95) Widening Project
from north of SR 60 to the Indian River/Brevard County line
in Indian River County
Lane Switch: N
orthbound lane shift to southbound lane from north of CR 512
to the Indian River / Brevard County Line.
BREVARD COUNTY
INDIAN RIVER COUNTY
1
Se
ba
sti
an
Blv
d.
Lane shift Northbound Lanes
to Southbound Lanes
Fellsmere Rd.
CR 512
154.5
153.5
Lane shift Southbound Lanes
to Northbound Lanes
153
LANE SHIFT
152
151
149
LANE SHIFT
95
SR 60
Seat Belts Save Lives.
Buckle Up Everyone
Every Time!
SW10th Street Interchange Improvement
FM#: 430932-1-52-01
I-95 SOUTHBOUND EXIT RAMP TO SW 10TH STREET
CLOSED NIGHTLY APRIL 24 — APRIL 28
Contact Information
Andrea Pacini
Public Information Officer
561-214-3358
[email protected]
Patrick Kennedy
Project Administrator
561-662-8054
[email protected]
Please visit www.d4fdot.com
for information on FDOT
construction projects in
Palm Beach County.
T
he I-95 southbound exit ramp to SW 10th Street will
undergo a full closure, nightly, 9 p.m. until 5 a.m.,
Sunday, April 24 through Thursday, April 28 for
construction activities. Traffic will be detoured via Hillsboro
Boulevard and Military Trail.
This 1.5-mile project began construction May 2015 and
is expected to be completed in summer 2017, weather
permitting. Work is being performed by Community Asphalt
Corp., with Cardno administering the construction contract for
the Florida Department of Transportation.
Maintenance of Traffic
The I-95 southbound exit ramp to SW 10th Street will
undergo a full closure, nightly, 9 p.m. until 5 a.m., Sunday,
April 24 through Thursday, April 28. Motorists will be detoured
via Hillsboro Boulevard and Military Trail.
Indrio Road (SR 614) Widening Project
FM#: 230338-4-52-01
Indrio Road Widening Project
Open House
Wednesday, May 4, 2016
4:30 PM— 6:30 PM
Lakewood Park Branch Library
7605 Santa Barbara Drive
Fort Pierce, Florida 34951
Public participation is solicited
without regard to race, color,
national origin, age, sex,
religion, disability or family
status.
If you need special
accommodations under the
Americans with Disabilities Act
or require translation services
(free of charge) please contact
Kathleen Dempsey, Project
Public Information Officer, prior
to the meeting. She can be
reached by phone at (772) 3595118 or email at
[email protected].
Please visit www.d4fdot.com for
information on FDOT
construction projects in the
Treasure Coast.
O
n Wednesday, May 4, 2016, the Florida Department of
Transportation (FDOT) will host an informational Open House for
the widening project on Indrio Road (State Road 614), from west of
the I-95 interchange to east of Emerson Avenue (State Road 607).
The Open House will be held from 4:30 PM until 6:30 PM at Lakewood Park
Branch Library, 7605 Santa Barbara Drive, Fort Pierce, Florida 34951.
Project personnel will be on hand to discuss the scope of work, construction
schedule, and address questions and comments one-on-one. No formal
presentation will be made.
This 2.7-mile project is expected to begin May 2, 2016, and is anticipated to
be completed by spring 2019, weather permitting. The cost for construction
is $23.95 million. Work will be performed by Dickerson Florida Inc., with
FDOT and Target Engineering Group overseeing the project.
Scope of Work:





Reconstructing the existing two-lane Indrio Road to a four-lane, divided
highway with a raised median
Constructing a 6-foot sidewalk along the south side and a 12-foot-wide
multi-purpose trail along the north side of Indrio Road
Realigning Spanish Lakes Boulevard to connect with Koblegard Road
Reconstructing Koblegard Road from Indrio Road north
approximately .5 mile
Installing new highway lighting, signage and signalization
Maintenance of Traffic:
During construction at least one lane of traffic in each direction will be
maintained at all times along Indrio Road. Two-way traffic along Spanish
Lakes Boulevard will be maintained at all times.
For additional information regarding this upcoming construction project,
please contact Kathleen Dempsey, Project Public Information Officer, at
(772) 359-5118, [email protected], or visit www.d4fdot.com.
Fly UP