Report Printed: 5/24/2016 Construction Cost and Time Page 1 of 4
by user
Comments
Transcript
Report Printed: 5/24/2016 Construction Cost and Time Page 1 of 4
Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Summary Sheet For Contracts Completed Third Quarter Fiscal Year 2015/2016 District 1 2 3 4 5 6 7 Original Contract Amount Contract Lettings Adjusted Original Amount (less Contingency Pay Item Amount) Present Contract Amount Actual Expenditures (See Note 2 Below) Regular Amount Paid Work To For Date Innovative (See Note 1 Contracting below) Amount % Increase Over Adjusted Original Amount Page 1 of 4 Supplemental Supplemental Agreement Agreement (Excluding Contingency) % (Including Contingency) (See Note 3 Below) Contracts (See Note 4 Below) < 10% Increase % Of in Cost % Of Original Amount Original Amount Amount Amount Central Let $ 100,164,999 $ 98,859,770 $ 103,969,888 $ 102,916,802 $ 120,000 $ 101,009,305 2.17% 92.86% $ 4,289,837 4.34% $ 3,804,889 3.80% District Let $ 89,340,490 $ 88,661,996 $ 92,760,075 $ 92,178,748 $ 80,000 $ 91,559,745 3.27% 85.71% $ 3,601,118 4.06% $ 3,419,583 3.83% All Contracts $ 189,505,489 $ 187,521,766 $ 196,729,963 $ 195,095,550 $ 200,000 $ 192,569,050 2.69% 89.80% $ 7,890,955 4.21% $ 7,224,472 3.81% Central Let $ 144,598,853 $ 143,242,331 $ 152,075,688 $ 157,196,905 $ - $ 151,149,423 5.52% 90.32% $ 7,945,230 5.55% $ 7,476,835 5.17% District Let $ 48,567,070 $ 47,893,426 $ 49,774,622 $ 48,740,208 $ - $ 47,137,500 -1.58% 86.67% $ 1,399,463 2.92% $ 1,207,553 2.49% All Contracts $ 193,165,923 $ 191,135,757 $ 201,850,310 $ 205,937,113 $ - $ 198,286,923 3.74% 89.13% $ 9,344,693 4.89% $ 8,684,388 4.50% Central Let $ 110,784,301 $ 109,435,328 $ 115,002,044 $ 118,942,418 $ - $ 117,968,957 7.80% 83.87% $ 4,667,644 4.27% $ 4,217,741 3.81% District Let $ 18,680,096 $ 18,198,082 $ 18,849,467 $ 18,545,676 $ - $ 17,842,831 -1.95% 92.31% $ 249,477 1.37% $ 169,371 0.91% All Contracts $ 129,464,397 $ 127,633,410 $ 133,851,511 $ 137,488,094 $ - $ 135,811,788 6.41% 86.36% $ 4,917,121 3.85% $ 4,387,112 3.39% Central Let $ 63,771,008 $ 63,241,357 $ 70,262,093 $ 70,753,196 $ - $ 70,891,697 12.10% 80.00% $ 6,751,057 10.68% $ 6,491,085 10.18% District Let $ 151,538,426 $ 150,785,980 $ 155,190,553 $ 154,197,646 $ - $ 154,152,903 2.23% 90.91% $ 3,798,649 2.52% $ 3,652,128 2.41% All Contracts $ 215,309,434 $ 214,027,337 $ 225,452,646 $ 224,950,842 $ - $ 225,044,600 5.15% 85.71% $ 10,549,706 4.93% $ 10,143,213 4.71% Central Let $ 124,278,037 $ 122,790,037 $ 126,618,099 $ 125,324,735 $ - $ 123,880,059 0.89% 100.00% $ 3,005,483 2.45% $ 2,340,062 1.88% District Let $ 333,556,690 $ 332,175,690 $ 368,700,243 $ 367,930,760 $ 3,351,667 $ 340,733,364 2.58% 100.00% $ 35,441,009 10.67% $ 35,143,552 10.54% All Contracts $ 457,834,727 $ 454,965,727 $ 495,318,342 $ 493,255,495 $ 3,351,667 $ 464,613,423 2.12% 100.00% $ 38,446,492 8.45% $ 37,483,614 8.19% Central Let $ 105,695,404 $ 104,058,709 $ 108,267,383 $ 108,222,538 $ 3,428,000 $ 107,454,416 3.26% 88.24% $ 3,309,583 3.18% $ 2,571,980 2.43% District Let $ 27,707,700 $ 26,881,702 $ 28,654,229 $ 27,422,110 $ $ 26,683,161 -0.74% 94.74% $ 1,088,031 4.05% $ 946,529 3.42% All Contracts $ 133,403,104 $ 130,940,411 $ 136,921,612 $ 135,644,648 $ 3,428,000 $ 134,137,577 2.44% 91.67% $ 4,397,614 3.36% $ 3,518,509 2.64% 750,000 1,509,541 Central Let $ 89,050,722 $ 88,061,222 $ 90,560,262 $ 90,064,431 $ District Let $ 16,570,905 $ 16,125,905 $ 16,518,090 $ 15,995,698 $ All Contracts $ 105,621,627 $ 104,187,127 $ 107,078,352 $ 106,060,129 $ - - 750,000 $ 89,330,068 1.44% 100.00% $ 1,773,728 2.01% $ $ 15,768,201 -2.22% 100.00% $ 32,941 0.20% $ $ 105,098,269 0.87% 100.00% $ 1,806,669 1.73% $ (52,816) 1,456,725 1.70% -0.32% 1.38% Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Summary Sheet For Contracts Completed Third Quarter Fiscal Year 2015/2016 Weather Days District Contract Lettings Original Contract Days Days Added 1 2 3 4 5 6 7 % of Original Days Holiday Time Extensions Days Added % of Original Days Time Extensions % of Original Days Days Added Supplemental Agreement Days Added % of Original Days Page 2 of 4 Total Days (Less Weather & Holidays) Days Added Present Days Days Used % of Original Days Days % % Used Increase Contracts (Less (Less < 20% Weather Weather & Increase & Holiday) in Time Holiday) Central Let 6,473 955 14.75% 284 4.39% 82 1.27% 196 3.03% 6,751 4.29% 7,995 8,046 6,807 5.16% 85.71% District Let 3,661 364 9.94% 179 4.89% 23 0.63% 470 12.84% 4,154 13.47% 4,701 4,458 3,915 6.94% 90.48% All Contracts 10,134 1,319 13.02% 463 4.57% 105 1.04% 666 6.57% 10,905 7.61% 12,696 12,504 10,722 5.80% 87.76% Central Let 5,754 1,197 20.80% 458 7.96% 207 3.60% 535 9.30% 6,496 12.90% 8,157 8,806 7,151 24.28% 74.19% District Let 3,624 518 14.29% 213 5.88% 134 3.70% 168 4.64% 3,926 8.33% 4,658 5,890 5,159 42.36% 66.67% All Contracts 9,378 1,715 18.29% 671 7.16% 341 3.64% 703 7.50% 10,422 11.13% 12,815 14,696 12,310 31.26% 71.74% Central Let 8,321 1,811 21.76% 725 8.71% 162 1.95% 765 9.19% 9,248 11.14% 11,793 12,025 9,489 14.04% 87.10% District Let 1,358 349 25.70% 106 7.81% 29 2.14% 98 7.22% 1,485 9.35% 1,940 1,934 1,479 8.91% 84.62% All Contracts 9,679 2,160 22.32% 831 8.59% 191 1.97% 863 8.92% 10,733 10.89% 13,733 13,959 10,968 13.32% 86.36% Central Let 3,450 379 10.99% 174 5.04% 14 0.41% 585 16.96% 4,049 17.36% 4,602 4,649 4,096 18.72% 70.00% District Let 4,347 762 17.53% 231 5.31% 537 12.35% 232 5.34% 5,116 17.69% 6,127 6,079 5,086 17.00% 90.91% All Contracts 7,797 1,141 14.63% 405 5.19% 551 7.07% 817 10.48% 9,165 17.55% 10,729 10,728 9,182 17.76% 80.95% Central Let 7,738 852 11.01% 404 5.22% - 0.00% 579 7.48% 8,317 7.48% 9,606 9,784 8,528 10.21% 92.00% District Let 6,140 565 9.20% 269 4.38% - 0.00% 815 13.27% 6,955 13.27% 7,807 7,648 6,814 10.98% 86.67% All Contracts 13,878 1,417 10.21% 673 4.85% - 0.00% 1,394 10.04% 15,272 10.04% 17,413 17,432 15,342 10.55% 90.00% Central Let 4,870 1,152 23.66% 302 6.20% 144 2.96% 275 5.65% 5,289 8.60% 6,743 6,645 5,191 6.59% 88.24% District Let 3,475 647 18.62% 186 5.35% 238 6.85% 18 0.52% 3,731 7.37% 4,564 4,457 3,624 4.29% 94.74% All Contracts 8,345 1,799 21.56% 488 5.85% 382 4.58% 293 3.51% 9,020 8.09% 11,307 11,102 8,815 5.63% 91.67% Central Let 4,355 767 17.61% 285 6.54% 2 0.05% 117 2.69% 4,474 2.73% 5,526 5,458 4,406 1.17% 100.00% District Let 1,602 155 9.68% 153 9.55% 47 2.93% (24) -1.50% 1,625 1.44% 1,933 1,835 1,527 -4.68% 100.00% All Contracts 5,957 922 15.48% 438 7.35% 49 0.82% 93 1.56% 6,099 2.38% 7,459 7,293 5,933 -0.40% 100.00% Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Summary Sheet For Contracts Completed Third Quarter Fiscal Year 2015/2016 District 8 Totals This Qtr Totals Fiscal Year 2014/2015 Original Contract Amount Contract Lettings - $ - Present Contract Amount $ - Actual Expenditures (See Note 2 Below) Regular Amount Paid Work To For Date Innovative (See Note 1 Contracting below) Central Let $ District Let $ 103,491,842 $ 102,667,246 $ 104,401,905 $ All Contracts $ 103,491,842 $ 102,667,246 $ 104,401,905 Central Let $ 738,343,324 $ 729,688,754 $ District Let $ 789,453,219 $ 783,390,027 $ All Contracts Totals Previous Quarter Adjusted Original Amount (less Contingency Pay Item Amount) $ - % Increase Over Adjusted Original Amount Amount $ - $ 104,383,551 $ - $ $ 104,383,551 $ - 766,755,457 $ 773,421,025 $ 834,849,184 $ 829,394,397 - Page 3 of 4 Supplemental Supplemental Agreement Agreement (Excluding Contingency) % (Including Contingency) (See Note 3 Below) Contracts (See Note 4 Below) < 10% Increase % Of in Cost % Of Original Amount Original Amount Amount Amount 0.00% 0.00% $ 103,660,533 0.97% 100.00% $ $ 103,660,533 0.97% 4,298,000 $ 761,683,925 $ 3,431,667 $ - 0.00% $ - 0.00% 1,367,033 1.33% $ 910,061 0.88% 100.00% $ 1,367,033 1.33% $ 910,061 0.88% 4.38% 91.03% $ 31,742,562 4.35% $ 28,412,133 3.85% 797,538,238 1.81% 92.92% $ 46,977,721 6.00% $ 45,395,961 5.75% $ 1,559,222,163 3.05% 91.82% $ 78,720,283 5.20% $ 73,808,094 4.83% $ 1,527,796,543 $ 1,513,078,781 $ 1,601,604,641 $ 1,602,815,422 $ 7,729,667 Central Let $ 270,529,610 $ 267,219,607 $ 279,576,384 $ 279,554,852 $ - $ 276,799,110 3.58% 92.54% $ 10,109,474 3.78% $ 9,046,774 3.34% District Let $ 271,484,393 $ 268,889,073 $ 273,658,312 $ 271,145,841 $ - $ 265,865,243 -1.12% 95.65% $ 3,047,298 1.13% $ 2,173,918 0.80% All Contracts $ 542,014,003 $ 536,108,680 $ 553,234,696 $ 550,700,693 $ - $ 542,664,353 1.22% 93.81% $ 13,156,772 2.45% $ 11,220,692 2.07% Central Let $ 714,324,826 $ 704,915,784 $ 739,803,035 $ 736,872,789 $ - $ 738,662,792 4.79% 86.21% $ 28,465,957 4.04% $ 25,479,404 3.57% District Let $ 540,522,559 $ 532,821,843 $ 558,558,681 $ 552,167,020 $ 905,160 $ 551,105,572 3.43% 92.31% $ 20,538,700 3.85% $ 18,264,346 3.38% $ 1,289,039,809 $ 905,160 $ 1,289,768,364 4.20% 89.09% $ 49,004,657 3.96% $ 43,743,750 3.49% All Contracts $ 1,254,847,385 $ 1,237,737,627 $ 1,298,361,716 Notes: 1 "Regular Work To Date" is the total value of work paid to contractor as reported in the Department's Construction Reporting System (SiteManager and CRS). 2 "Actual Expenditures" is the total amount paid for work as recorded in the Department's Financial Management System and reflects all expenditures against each contract. 3 "Supplemental Agreement (Excluding Contingency)" is the total amount of contract changes that were recorded as being expended by reason code in the Department's Contract Change Tracking System. 4 "Supplemental Agreement (Including Contingency)" is the total amount allocated within the Department's Construction Reporting System (SiteManager and CRS) for contract changes. Highlighted Column indicates Performance Measures Reported by Construction Office Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Summary Sheet For Contracts Completed Third Quarter Fiscal Year 2015/2016 Weather Days District Contract Lettings Original Contract Days Days Added 8 Totals This Qtr Totals Previous Quarter Totals Fiscal Year 2014/2015 Central Let - District Let % of Original Days Holiday Time Extensions Days Added % of Original Days Time Extensions Days Added % of Original Days Supplemental Agreement Days Added % of Original Days Page 4 of 4 Total Days (Less Weather & Holidays) Days Added Present Days Days Used % of Original Days Days % % Used Increase Contracts (Less (Less < 20% Weather Weather & Increase & Holiday) in Time Holiday) - 0.00% - 0.00% - 0.00% - 0.00% - 0.00% - - - 0.00% 0.00% 3,762 291 7.74% 271 7.20% - 0.00% 169 4.49% 3,931 4.49% 4,493 4,399 3,837 1.99% 0.00% All Contracts 3,762 291 7.74% 271 7.20% - 0.00% 169 4.49% 3,931 4.49% 4,493 4,399 3,837 1.99% 100.00% Central Let 40,961 7,113 17.37% 2,632 6.43% 611 1.49% 3,052 7.45% 44,624 8.94% 54,422 55,413 45,668 11.49% 85.26% District Let 27,969 3,651 13.05% 1,608 5.75% 1,008 3.60% 1,946 6.96% 30,923 10.56% 36,223 36,700 31,441 12.41% 88.50% All Contracts 68,930 10,764 15.62% 4,240 6.15% 1,619 2.35% 4,998 7.25% 75,547 9.60% 90,645 92,113 77,109 11.87% 86.62% Central Let 15,848 3,237 20.43% 1,048 6.61% 293 1.85% 1,293 8.16% 17,434 10.01% 21,759 22,077 17,792 12.27% 86.57% District Let 12,931 1,650 12.76% 806 6.23% 211 1.63% 752 5.82% 13,894 7.45% 16,356 16,064 13,608 5.24% 95.65% All Contracts 28,779 4,887 16.98% 1,854 6.44% 504 1.75% 2,045 7.11% 31,328 8.86% 38,115 38,141 31,400 9.11% 90.27% Central Let 45,283 6,760 14.93% 2,500 5.52% 1,129 2.49% 1,864 4.12% 48,276 6.61% 57,604 57,388 48,128 6.28% 90.15% District Let 39,622 4,420 11.16% 2,013 5.08% 692 1.75% 3,075 7.76% 43,389 9.51% 49,860 48,493 42,060 6.15% 89.56% All Contracts 84,905 11,180 13.17% 4,513 5.32% 1,821 2.14% 4,939 5.82% 91,665 7.96% 107,464 105,881 90,188 6.22% 89.87% Report Printed: 5/24/2016 Report Date: 04/18/16 District Contract Number 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 T1497 T1501 T1512 T1514 T1527 T1535 T1541 T1546 T1557 T1565 T1566 T1569 T1570 T1578 T1591 T1592 T1594 T1603 T1607 T1608 T1614 T1622 T1624 T1996 T1A05 T1A12 T1A13 T1A14 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 E1J69 E1J71 E1J72 E1N08 E1N35 E1N47 E1N64 E1N65 E1N66 E1N67 E1N70 E1N71 E1N75 E1N76 E1N96 E1O03 E1O06 E1O15 E1O17 E1O49 E1O84 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Financial Project ID Let Date Quarter Let Year Let/ Num of Number Contract Projects s 43003715201 40828635201 40826835201 42524715201 41787615201 43085415201 42525115201 42910415201 42928415201 42525015201 20010575201 42911415201 42584615201 43086015201 43130115201 42729815201 43135415201 43480915201 43275415201 43337215201 42814515201 43576915201 42983115201 43086115201 42910815201 43121015201 43086915201 43341115201 3/28/2012 6/20/2012 9/26/2012 6/19/2013 2/6/2013 3/27/2013 6/19/2013 2/26/2014 8/27/2014 3/27/2013 4/30/2014 9/25/2013 3/26/2014 12/4/2013 4/30/2014 5/21/2014 6/18/2014 3/25/2015 5/20/2015 5/20/2015 6/17/2015 5/20/2015 7/29/2015 1/28/2015 10/29/2014 12/3/2014 3/25/2015 12/3/2014 QTR3 QTR4 QTR1 QTR4 QTR3 QTR3 QTR4 QTR3 QTR1 QTR3 QTR4 QTR1 QTR3 QTR2 QTR4 QTR4 QTR4 QTR3 QTR4 QTR4 QTR4 QTR4 QTR1 QTR3 QTR2 QTR2 QTR3 QTR2 11/12 11/12 12/13 12/13 12/13 12/13 12/13 13/14 14/15 12/13 13/14 13/14 13/14 13/14 13/14 13/14 13/14 14/15 14/15 14/15 14/15 14/15 15/16 14/15 14/15 14/15 14/15 14/15 20074625201 41263625201 41664925201 42347115201 43496715201 43019125201 43160515201 42909615201 41787625201 43121315201 40826895201 43006015201 43504415201 43510615201 42949925201 43121115201 43574215201 43600415201 43642215201 43504615201 43494415201 6/29/2012 5/31/2012 5/17/2012 6/19/2014 6/19/2014 6/19/2014 8/29/2014 10/16/2014 6/18/2015 11/20/2014 1/15/2015 1/15/2015 11/20/2014 11/20/2014 10/16/2014 2/19/2015 11/20/2014 2/19/2015 5/21/2015 10/15/2015 7/16/2015 QTR4 QTR4 QTR4 QTR4 QTR4 QTR4 QTR1 QTR2 QTR4 QTR2 QTR3 QTR3 QTR2 QTR2 QTR2 QTR3 QTR2 QTR3 QTR4 QTR2 QTR1 11/12 11/12 11/12 13/14 13/14 13/14 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 15/16 15/16 Dist 01 - Central Let Contrats SubTotal 28 Dist 01 District Let Contracts SubTotal 21 District 01 Totals 02 02 T2260 T2415 49 21327245201 42884215201 9/24/2008 QTR1 3/28/2012 QTR3 08/09 11/12 Number of SAs Original Contract Days Present Contract Days Days Used 1 1 3 3 2 1 2 1 1 1 1 1 3 2 1 5 1 1 1 2 1 1 1 1 1 1 1 1 1 7 19 5 9 0 4 2 0 0 4 6 4 9 2 1 5 0 0 1 0 0 0 0 2 0 0 1 60 700 650 300 768 90 600 130 175 80 300 250 250 270 270 275 130 150 80 100 100 80 70 90 160 145 90 110 99 779 871 363 835 96 681 190 202 101 324 308 305 410 452 313 258 162 89 121 114 104 81 133 182 194 97 131 261 779 865 334 810 153 680 219 201 117 281 291 305 407 447 312 258 144 82 121 101 104 71 133 158 194 87 131 42 82 6473 7995 1 2 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 6 14 5 4 1 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 550 565 795 200 60 175 150 130 65 70 50 80 75 180 90 155 50 60 41 60 60 629 936 1092 242 67 213 176 153 67 91 63 95 80 195 91 210 50 80 51 60 60 23 33 3661 65 115 2 1 40 1 Num % Days Contracts Used of <= 1.2% Orig Days Increase in Time Page 1 of 42 Unused Days Days Time Delinquent Days Suspended Extension 376.7% 101.3% 107.8% 92.7% 96.7% 163.3% 100.5% 149.2% 101.1% 120.0% 85.7% 100.4% 112.0% 98.9% 100.0% 99.6% 164.6% 88.0% 91.3% 100.0% 87.0% 100.0% 85.7% 120.0% 85.0% 100.0% 88.9% 108.2% 0 1 1 1 1 0 1 0 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 -162 0 6 29 25 -57 1 -29 1 -16 43 17 0 3 5 1 0 18 7 0 13 0 10 0 24 0 10 0 162 0 0 0 0 57 0 29 0 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8046 85.7% 24 -51 629 936 1092 242 61 204 175 150 23 91 63 92 77 160 51 210 16 89 48 30 19 110.0% 153.5% 112.7% 106.5% 90.0% 94.9% 99.3% 97.7% 32.3% 110.0% 100.0% 96.3% 96.0% 80.6% 55.6% 107.1% 32.0% 128.3% 92.7% 50.0% 31.7% 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 0 0 0 0 6 9 1 3 44 0 0 3 3 35 40 0 34 -9 3 30 41 4701 4458 90.5% 19 10134 12696 12504 87.8% 1120 40 1589 131 1588 131 119.6% 280.0% SA Days CRS Original Contract Amount 0 4 57 7 0 0 4 24 0 0 0 0 0 0 5 0 84 0 0 0 0 0 0 2 0 0 0 9 Amount Included in Original for Contingency Pay Item Adjusted Original Amount $0 $133,862 $150,000 $50,000 $150,000 $20,540 $70,779 $50,000 $50,000 $50,000 $0 $62,064 $50,000 $53,649 $94,834 $50,000 $0 $32,002 $13,967 $27,308 $0 $34,375 $11,919 $14,047 $50,000 $50,000 $24,017 $11,866 $90,611 $14,650,438 $19,323,948 $3,271,307 $12,162,349 $443,972 $7,858,785 $2,145,109 $2,459,778 $915,067 $855,140 $6,119,936 $2,746,051 $5,581,206 $7,729,579 $1,594,078 $989,000 $357,971 $304,235 $626,021 $678,214 $785,985 $180,527 $322,443 $2,104,862 $3,720,622 $607,336 $235,200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 39 75 164 56 67 6 77 36 27 21 24 58 55 140 177 38 44 12 9 21 14 24 11 41 22 49 7 12 264 0 1326 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 37 69 196 36 7 38 26 23 2 21 13 15 5 15 1 44 0 12 10 0 0 42 302 101 6 0 0 0 0 0 0 0 0 0 0 0 11 0 8 0 0 0 $8,819,248 $6,703,703 $54,100,000 $1,880,948 $93,903 $4,346,396 $3,021,172 $1,285,754 $135,934 $660,116 $129,260 $567,387 $143,326 $3,493,285 $229,418 $3,069,378 $140,780 $260,177 $122,267 $96,653 $41,385 243 9 0 570 470 $ 89,340,490 $ 678,494 $ 88,661,996 43 192 273 0 1896 666 $ 189,505,489 $ 1,983,723 $ 187,521,766 1 0 1 0 0 0 0 0 248 49 196 $ 221 42 $90,611 $14,784,300 $19,473,948 $3,321,307 $12,312,349 $464,512 $7,929,564 $2,195,109 $2,509,778 $965,067 $855,140 $6,182,000 $2,796,051 $5,634,855 $7,824,413 $1,644,078 $989,000 $389,973 $318,202 $653,329 $678,214 $820,360 $192,446 $336,490 $2,154,862 $3,770,622 $631,353 $247,066 100,164,999 $57,786,749 $75,000 $ 1,305,229 $ $50,000 $50,000 $150,000 $50,000 $3,487 $50,000 $50,000 $50,000 $8,934 $29,692 $9,480 $27,173 $7,141 $50,000 $9,702 $50,000 $9,482 $9,522 $6,051 $4,653 $3,177 $150,000 $0 98,859,770 $8,769,248 $6,653,703 $53,950,000 $1,830,948 $90,416 $4,296,396 $2,971,172 $1,235,754 $127,000 $630,424 $119,780 $540,214 $136,185 $3,443,285 $219,716 $3,019,378 $131,298 $250,655 $116,216 $92,000 $38,208 $57,636,749 $75,000 Report Printed: 5/24/2016 Report Date: 04/18/16 District Contract Number 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 T1497 T1501 T1512 T1514 T1527 T1535 T1541 T1546 T1557 T1565 T1566 T1569 T1570 T1578 T1591 T1592 T1594 T1603 T1607 T1608 T1614 T1622 T1624 T1996 T1A05 T1A12 T1A13 T1A14 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 E1J69 E1J71 E1J72 E1N08 E1N35 E1N47 E1N64 E1N65 E1N66 E1N67 E1N70 E1N71 E1N75 E1N76 E1N96 E1O03 E1O06 E1O15 E1O17 E1O49 E1O84 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Financial Project ID 43003715201 40828635201 40826835201 42524715201 41787615201 43085415201 42525115201 42910415201 42928415201 42525015201 20010575201 42911415201 42584615201 43086015201 43130115201 42729815201 43135415201 43480915201 43275415201 43337215201 42814515201 43576915201 42983115201 43086115201 42910815201 43121015201 43086915201 43341115201 Dist 01 - Central Let Contrats SubTotal $ District 01 Totals T2260 T2415 21327245201 42884215201 103,969,888 Total CRS Contract Adjustments Regular Work To Date (From CRS) $89,035 $15,330,267 $20,142,554 $3,411,911 $13,258,294 $464,512 $8,206,423 $2,159,801 $2,509,778 $965,067 $880,470 $6,464,300 $3,242,177 $5,727,333 $8,062,184 $1,668,510 $1,119,395 $389,973 $318,202 $651,711 $678,214 $820,360 $192,446 $336,490 $2,208,421 $3,770,622 $631,353 $270,085 20074625201 41263625201 41664925201 42347115201 43496715201 43019125201 43160515201 42909615201 41787625201 43121315201 40826895201 43006015201 43504415201 43510615201 42949925201 43121115201 43574215201 43600415201 43642215201 43504615201 43494415201 Dist 01 District Let Contracts SubTotal 02 02 CRS Present Contract Amount $43,964 $0 $0 $14,244 $0 $55,062 $0 $50,518 $0 $24,512 $0 $13,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $88,897 $14,964,740 $20,429,764 $3,351,339 $12,897,465 $444,356 $8,137,566 $2,156,391 $2,520,762 $906,551 $883,951 $6,471,534 $3,374,573 $5,707,127 $7,860,334 $1,623,620 $1,113,069 $374,757 $281,765 $633,208 $676,248 $783,395 $180,527 $331,697 $2,164,641 $3,700,017 $608,128 $250,380 $ $9,865,997 $7,531,485 $55,514,659 $1,908,269 $106,903 $4,413,679 $3,021,172 $1,285,754 $135,934 $660,116 $129,260 $567,387 $143,326 $3,493,285 $228,371 $3,093,216 $140,780 $260,177 $122,267 $96,653 $41,385 102,916,802 CRS Innovative Contract Adjustments $ $9,845,954 $7,530,256 $55,350,517 $1,858,269 $100,206 $4,400,332 $3,068,023 $1,252,542 $127,000 $658,410 $124,484 $532,744 $131,167 $3,362,358 $218,669 $2,981,779 $132,639 $256,975 $116,216 $92,000 $38,208 (201,300) $ Total CRS Adjustments $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $120,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 120,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $9,666 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $80,000 $0 $0 $0 $0 $0 $0 $0 92,760,075 $ 92,178,748 $ (9,666) $ 80,000 $ $ 196,729,963 $ 195,095,550 $ (210,966) $ 200,000 $ $68,778,139 $91,225 $0 $0 $0 $0 $44,933 $14,964,740 $20,429,764 $3,337,095 $12,897,465 $389,294 $8,137,566 $2,105,873 $2,520,762 $882,039 $883,951 $6,458,534 $3,494,573 $5,707,127 $7,860,334 $1,623,620 $1,113,069 $374,757 $281,765 $633,208 $676,248 $783,395 $180,527 $331,697 $2,164,641 $3,700,017 $608,128 $250,380 (81,300) $ 102,835,502 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $80,000 $0 $0 $0 $9,666 $0 $0 $0 $ $64,418,038 $91,225 Actual Expenditure Num % Contracts Total CRS (Does Not Include Expend. <= 1.1% Amount Paid to Innovative Contract of Adj Increase Contractor Adjustment Orig Amt in Cost Payments) $43,964 $0 $0 $14,244 $0 $55,062 $0 $50,518 $0 $24,512 $0 $13,000 $120,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 70,334 Page 2 of 42 $44,933 $15,047,703 $20,268,347 $3,228,109 $12,514,104 $179,170 $8,012,739 $2,085,969 $2,358,044 $784,407 $883,951 $6,460,044 $3,324,455 $5,640,992 $7,721,971 $1,623,620 $1,113,069 $374,757 $281,765 $633,208 $676,248 $783,395 $180,527 $331,697 $2,077,091 $3,520,482 $608,128 $250,380 $ $9,845,954 $7,530,256 $55,350,517 $1,858,269 $100,206 $4,400,332 $3,068,023 $1,252,542 $127,000 $658,410 $124,484 $532,744 $131,167 $3,442,358 $218,669 $2,981,779 $132,639 $247,309 $116,216 $92,000 $38,208 26 112.5% 113.2% 102.2% 100.2% 110.8% 100.6% 98.3% 95.7% 100.0% 104.4% 103.9% 98.6% 97.4% 97.2% 99.5% 96.3% 101.0% 102.5% 100.0% 100.0% 100.0% 85.7% 18 89.8% 44 $ 91,559,745 (10,966) $ 195,084,584 $ 192,569,050 $68,778,139 $91,225 92.9% 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 $9,861,107 $7,530,256 $55,125,629 $1,834,616 $100,206 $4,322,422 $2,921,086 $1,182,541 $127,000 $658,410 $124,484 $532,744 $132,630 $3,345,583 $218,669 $2,906,324 $132,639 $256,975 $116,216 $92,000 $38,208 92,249,082 $0 $0 $ 101,009,305 49.6% 102.7% 104.9% 98.7% 102.9% 40.4% 102.0% 97.2% 95.9% 85.7% 103.4% 105.6% 121.1% 101.1% 99.9% 101.9% 112.5% 104.7% 92.6% 101.1% 99.7% 99.7% 100.0% 102.9% 98.7% 94.6% 100.1% 106.5% $65,700,299 $91,225 114.0% 121.6% Amount Paid After CRS $0 $82,963 $161,418 $108,986 $383,360 $210,124 $124,827 $19,904 $162,718 $97,632 $0 $1,510 $170,118 $66,135 $138,364 $0 $0 $0 $0 $0 $0 $0 $0 $0 $87,549 $179,536 $0 $0 $ $1,576 $545,967 $668,606 $90,604 $945,945 $0 $276,859 $35,308 $0 $0 $25,330 $282,300 $446,126 $92,478 $237,771 $24,432 $130,395 $0 $0 $1,618 $0 $0 $0 $0 $53,559 $0 $0 $23,019 Holiday Weather Time Days Extensio n Days 17 48 138 38 41 4 58 11 22 18 14 35 14 121 159 32 39 2 7 5 2 22 8 21 20 44 5 10 955 18 22 26 18 26 2 19 14 2 3 10 5 11 19 18 6 5 10 2 16 12 2 3 4 2 5 2 2 Time Ext Days 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 7 0 0 0 10 0 0 0 0 0 0 5 0 13 0 0 0 0 0 0 0 0 0 0 9 3,804,889 $1,046,749 $827,782 $1,414,659 $27,320 $13,000 $67,283 $0 $0 $0 $0 $0 $0 $0 $0 $1,047 $23,837 $0 $0 $0 $0 $0 $ (689,336) $ 3,419,583 364 179 9 264 $ (2,515,534) $ 7,224,472 1,319 463 13 312 $3,077,841 $0 $6,631,289 $16,225 163 12 24 47 31 13 4 13 9 2 0 2 0 2 1 8 1 16 0 6 0 0 0 85 7 4 SA Days $15,153 $0 $224,888 $23,653 $0 $77,910 $146,936 $70,001 $0 $0 $0 $0 $1,463 $96,775 $0 $75,455 $0 $9,666 $0 $0 $0 0 22 165 16 3 25 17 21 2 12 13 13 4 7 0 28 0 6 10 0 0 284 Changed Conditions (1,826,198) $ 0 0 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 SA Allocated Amount (From CRS) 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 48 42 121 101 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 77 42 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 District Contract Number 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 T1497 T1501 T1512 T1514 T1527 T1535 T1541 T1546 T1557 T1565 T1566 T1569 T1570 T1578 T1591 T1592 T1594 T1603 T1607 T1608 T1614 T1622 T1624 T1996 T1A05 T1A12 T1A13 T1A14 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 E1J69 E1J71 E1J72 E1N08 E1N35 E1N47 E1N64 E1N65 E1N66 E1N67 E1N70 E1N71 E1N75 E1N76 E1N96 E1O03 E1O06 E1O15 E1O17 E1O49 E1O84 Changed Conditions Work Orders Financial Project ID $ 20074625201 41263625201 41664925201 42347115201 43496715201 43019125201 43160515201 42909615201 41787625201 43121315201 40826895201 43006015201 43504415201 43510615201 42949925201 43121115201 43574215201 43600415201 43642215201 43504615201 43494415201 Dist 01 District Let Contracts SubTotal $ 21327245201 42884215201 1,676,647 $ $835,826 $99,861 $1,373,941 $0 $13,000 $0 $0 $0 $0 $27,986 $4,704 $0 $0 $12,658 ($1,047) $0 $0 $0 $0 $0 $0 $ District 01 Totals T2260 T2415 SA Amount Premium Cost $0 $0 $334,024 $0 $335,638 $10,644 $46,042 $0 $262,529 $0 $0 $0 $248,527 $9,547 ($17,725) $0 $0 $0 $0 $0 $17,931 $1,430 $22,866 $0 $36,506 $0 $20,908 $2,691 $259,901 $0 $2,784 $0 $19,459 $0 $9,904 $0 $0 $0 $2,349 $0 $0 $0 $0 $0 $0 $0 $7,107 $0 $18,835 $0 $24,624 $0 $1,419 $0 $23,019 $0 43003715201 40828635201 40826835201 42524715201 41787615201 43085415201 42525115201 42910415201 42928415201 42525015201 20010575201 42911415201 42584615201 43086015201 43130115201 42729815201 43135415201 43480915201 43275415201 43337215201 42814515201 43576915201 42983115201 43086115201 42910815201 43121015201 43086915201 43341115201 Dist 01 - Central Let Contrats SubTotal 02 02 Page 3 of 42 $0 $9,614 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 2,366,929 $ 4,043,576 $ $1,989,021 $16,225 24,312 9,614 33,926 $430,946 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Plans Modifications Work Orders District Contract Number 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 T1497 T1501 T1512 T1514 T1527 T1535 T1541 T1546 T1557 T1565 T1566 T1569 T1570 T1578 T1591 T1592 T1594 T1603 T1607 T1608 T1614 T1622 T1624 T1996 T1A05 T1A12 T1A13 T1A14 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 E1J69 E1J71 E1J72 E1N08 E1N35 E1N47 E1N64 E1N65 E1N66 E1N67 E1N70 E1N71 E1N75 E1N76 E1N96 E1O03 E1O06 E1O15 E1O17 E1O49 E1O84 Financial Project ID 43003715201 40828635201 40826835201 42524715201 41787615201 43085415201 42525115201 42910415201 42928415201 42525015201 20010575201 42911415201 42584615201 43086015201 43130115201 42729815201 43135415201 43480915201 43275415201 43337215201 42814515201 43576915201 42983115201 43086115201 42910815201 43121015201 43086915201 43341115201 Dist 01 - Central Let Contrats SubTotal 57 20074625201 41263625201 41664925201 42347115201 43496715201 43019125201 43160515201 42909615201 41787625201 43121315201 40826895201 43006015201 43504415201 43510615201 42949925201 43121115201 43574215201 43600415201 43642215201 43504615201 43494415201 Dist 01 District Let Contracts SubTotal District 01 Totals 02 02 T2260 T2415 Time Ext Days 0 0 0 0 0 0 0 11 0 0 0 0 30 0 0 0 0 0 0 0 0 0 0 16 0 0 0 0 21327245201 42884215201 0 0 0 7 0 0 0 0 0 7 0 0 0 0 0 0 0 0 0 0 0 SA Days 81 $ 0 95 0 5 0 0 0 0 0 0 0 0 0 0 0 11 0 8 0 0 0 119 $ 71 200 $ 144 0 2,389,005 $ $56,914 $314,019 $96,582 $22,343 $0 $67,283 $0 $0 $0 $0 $0 $0 $0 $5,994 $0 $23,837 $1,341 $6,222 $0 $0 $0 14 0 30 Specification Modification Work Orders SA Amount Premium Cost ($1,576) $0 $328,205 $0 $446,552 $194,978 $62,256 $0 $689,450 $18,277 $0 $0 $79,218 $11,206 $8,387 $0 $0 $0 $0 $0 $7,399 $7,399 $192,307 $40,346 $458,800 $45,280 $36,741 $0 $26,087 $0 $27,758 $0 $6,266 $0 $0 $0 $0 $0 $4,838 $0 $0 $0 $0 $0 $0 $0 $2,148 $0 $14,169 $0 $0 $0 $0 $0 $0 $0 0 0 57 0 0 0 4 14 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 2 0 0 0 0 $ 2,983,540 $ $4,643,736 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 317,486 - 326,485 - 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8,999 $547,987 $0 SA Days 0 $0 $0 $0 $8,999 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 594,535 Page 4 of 42 0 0 - Value Engineering Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - $ - - $ - $ - - $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 SA Days 0 0 - Partnering Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - - $ - $ - $ $0 $0 SA Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $840 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 840 $ - $ 840 $ - $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 CEI Action/InAction Work Orders District Contract Number 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 T1497 T1501 T1512 T1514 T1527 T1535 T1541 T1546 T1557 T1565 T1566 T1569 T1570 T1578 T1591 T1592 T1594 T1603 T1607 T1608 T1614 T1622 T1624 T1996 T1A05 T1A12 T1A13 T1A14 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 E1J69 E1J71 E1J72 E1N08 E1N35 E1N47 E1N64 E1N65 E1N66 E1N67 E1N70 E1N71 E1N75 E1N76 E1N96 E1O03 E1O06 E1O15 E1O17 E1O49 E1O84 Financial Project ID 43003715201 40828635201 40826835201 42524715201 41787615201 43085415201 42525115201 42910415201 42928415201 42525015201 20010575201 42911415201 42584615201 43086015201 43130115201 42729815201 43135415201 43480915201 43275415201 43337215201 42814515201 43576915201 42983115201 43086115201 42910815201 43121015201 43086915201 43341115201 Time Ext Days 0 0 0 0 0 0 0 0 3 0 0 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dist 01 - Central Let Contrats SubTotal 21 20074625201 41263625201 41664925201 42347115201 43496715201 43019125201 43160515201 42909615201 41787625201 43121315201 40826895201 43006015201 43504415201 43510615201 42949925201 43121115201 43574215201 43600415201 43642215201 43504615201 43494415201 Dist 01 District Let Contracts SubTotal - District 01 Totals 02 02 T2260 T2415 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21 21327245201 42884215201 0 0 SA Days 67 Minor Changes Work Orders SA Amount Premium Cost $0 $0 ($26,306) $0 $15,508 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,892 $0 $0 $0 $22,455 $0 $0 $0 $0 $0 $104,670 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $18,968 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 67 0 0 0 0 0 0 0 0 0 0 0 $ 0 86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 144,187 $ $200,041 $401,293 $16,531 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $7,459 $0 $0 $0 $0 $0 - $ 625,324 $ 200,041 153 $ 769,511 $ 200,041 $7,006 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $7,006 $0 SA Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $200,041 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 86 0 0 Page 5 of 42 0 0 0 - Defective Materials Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - - $ - $ - $ $0 $0 SA Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Weather Related Damage Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - - $ - $ - $ $0 $0 SA Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ $9,776 $0 $5,627 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 - Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 15,403 $ - 15,403 $ - $136,731 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Claims Work Orders District Contract Number 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 T1497 T1501 T1512 T1514 T1527 T1535 T1541 T1546 T1557 T1565 T1566 T1569 T1570 T1578 T1591 T1592 T1594 T1603 T1607 T1608 T1614 T1622 T1624 T1996 T1A05 T1A12 T1A13 T1A14 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 E1J69 E1J71 E1J72 E1N08 E1N35 E1N47 E1N64 E1N65 E1N66 E1N67 E1N70 E1N71 E1N75 E1N76 E1N96 E1O03 E1O06 E1O15 E1O17 E1O49 E1O84 Financial Project ID 43003715201 40828635201 40826835201 42524715201 41787615201 43085415201 42525115201 42910415201 42928415201 42525015201 20010575201 42911415201 42584615201 43086015201 43130115201 42729815201 43135415201 43480915201 43275415201 43337215201 42814515201 43576915201 42983115201 43086115201 42910815201 43121015201 43086915201 43341115201 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dist 01 - Central Let Contrats SubTotal District 01 Totals T2260 T2415 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 21327245201 42884215201 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $80,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20074625201 41263625201 41664925201 42347115201 43496715201 43019125201 43160515201 42909615201 41787625201 43121315201 40826895201 43006015201 43504415201 43510615201 42949925201 43121115201 43574215201 43600415201 43642215201 43504615201 43494415201 Dist 01 District Let Contracts SubTotal 02 02 SA Days 0 0 0 80,000 Utility Delays Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - $ - $ 80,000 $ - $0 $0 Page 6 of 42 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Material Shortage Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $4,977 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $ 4,977 $ - 1 $ 4,977 $ - $0 $0 $0 $0 SA Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 1 0 0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Cost Savings Initiative Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - - $ - $ - $ $0 $0 SA Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 $ 0 0 0 - Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ ($6,891) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ (6,891) $ - $ (6,891) $ - $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Page 7 of 42 Totals Work Orders District Contract Number 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 T1497 T1501 T1512 T1514 T1527 T1535 T1541 T1546 T1557 T1565 T1566 T1569 T1570 T1578 T1591 T1592 T1594 T1603 T1607 T1608 T1614 T1622 T1624 T1996 T1A05 T1A12 T1A13 T1A14 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 E1J69 E1J71 E1J72 E1N08 E1N35 E1N47 E1N64 E1N65 E1N66 E1N67 E1N70 E1N71 E1N75 E1N76 E1N96 E1O03 E1O06 E1O15 E1O17 E1O49 E1O84 Financial Project ID 43003715201 40828635201 40826835201 42524715201 41787615201 43085415201 42525115201 42910415201 42928415201 42525015201 20010575201 42911415201 42584615201 43086015201 43130115201 42729815201 43135415201 43480915201 43275415201 43337215201 42814515201 43576915201 42983115201 43086115201 42910815201 43121015201 43086915201 43341115201 Dist 01 - Central Let Contrats SubTotal 82 20074625201 41263625201 41664925201 42347115201 43496715201 43019125201 43160515201 42909615201 41787625201 43121315201 40826895201 43006015201 43504415201 43510615201 42949925201 43121115201 43574215201 43600415201 43642215201 43504615201 43494415201 Dist 01 District Let Contracts SubTotal District 01 Totals 02 02 T2260 T2415 Time Ext Days 4 0 0 0 0 0 0 11 3 0 0 18 30 0 0 0 0 0 0 0 0 0 0 16 0 0 0 0 21327245201 42884215201 9 0 0 7 0 0 0 0 0 7 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount Premium Cost ($1,576) $0 $635,924 $0 $797,698 $205,622 $108,298 $0 $951,980 $18,277 $0 $0 $327,744 $20,752 ($9,339) $0 $0 $0 $0 $0 $25,330 $8,829 $304,064 $40,346 $495,306 $45,280 $80,103 $2,691 $285,988 $0 $30,542 $0 $130,395 $0 $9,904 $0 $0 $0 $7,187 $0 $0 $0 $0 $0 $0 $0 $9,255 $0 $51,972 $0 $24,624 $0 $1,419 $0 $23,019 $0 0 4 57 7 0 0 4 24 0 0 0 0 0 0 5 0 84 0 0 0 0 0 0 2 0 0 0 9 196 $ 42 302 101 6 0 0 0 0 0 0 0 0 0 0 0 11 0 8 0 0 0 23 470 $ 105 666 $ 0 30 221 42 4,289,837 $ $1,096,506 $815,173 $1,492,682 $27,320 $13,000 $67,283 $0 $0 $0 $27,986 $4,704 $0 $0 $18,652 ($1,047) $31,296 $1,341 $6,222 $0 $0 $0 3,601,118 $ 7,890,955 $ $6,776,493 $16,225 341,797 $200,041 $9,614 $0 $8,999 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 218,654 560,451 $985,939 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 District Contract Number 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 T2436 T2439 T2443 T2491 T2503 T2510 T2512 T2513 T2516 T2517 T2524 T2526 T2527 T2528 T2529 T2530 T2535 T2537 T2543 T2544 T2546 T2551 T2552 T2554 T2556 T2559 T2560 T2561 T2566 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 E2Q67 E2Q76 E2Q95 E2R09 E2R10 E2R18 E2R93 E2R94 E2S05 E2S71 E2S89 E2T03 E2T06 E2T30 E2T32 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Financial Project ID Let Date Quarter Let Year Let/ Num of Number Contract Projects s 21325945201 42732815201 42698615201 42975245201 42889315201 43224915201 42869015201 42975125201 42975265201 41695325201 42870915201 42869815201 42870515201 42870615201 42871215201 21156035201 42053145201 42476915201 43055515201 42880815201 42889615201 43035225201 43055415201 43112915201 21007535201 43054915201 43054615201 43055815201 43401415201 9/26/2012 9/26/2012 2/6/2013 9/25/2013 10/30/2013 2/5/2014 12/4/2013 2/5/2014 2/26/2014 2/26/2014 5/7/2014 2/26/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 6/18/2014 6/18/2014 8/27/2014 8/27/2014 9/24/2014 10/29/2014 10/29/2014 10/29/2014 9/24/2014 9/24/2014 12/3/2014 12/3/2014 12/3/2014 QTR1 QTR1 QTR3 QTR1 QTR2 QTR3 QTR2 QTR3 QTR3 QTR3 QTR4 QTR3 QTR4 QTR4 QTR4 QTR4 QTR4 QTR4 QTR1 QTR1 QTR1 QTR2 QTR2 QTR2 QTR1 QTR1 QTR2 QTR2 QTR2 12/13 12/13 12/13 13/14 13/14 13/14 13/14 13/14 13/14 13/14 13/14 13/14 13/14 13/14 13/14 13/14 13/14 13/14 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 21042095201 42931315201 42886915201 20970515201 20967615201 42468515201 42607215201 42822915201 43225115201 42869515201 20954125201 42871115201 43074715201 42339815201 43194215201 11/15/2012 2/20/2013 9/19/2012 1/23/2013 2/20/2013 5/23/2013 8/21/2013 8/21/2013 11/20/2013 4/23/2014 4/23/2014 7/23/2014 7/23/2014 12/10/2014 12/10/2014 QTR2 QTR3 QTR1 QTR3 QTR3 QTR4 QTR1 QTR1 QTR2 QTR4 QTR4 QTR1 QTR1 QTR2 QTR2 12/13 12/13 12/13 12/13 12/13 12/13 13/14 13/14 13/14 13/14 13/14 14/15 14/15 14/15 14/15 Dist 02 Central Let Contract SubTotal 31 Dist 02 District Let Contracts SubTotal 15 District 02 Totals 03 03 03 03 03 03 03 T3088 T3226 T3310 T3311 T3396 T3401 T3409 46 21894615201 22077345201 22041255201 22041265201 42323315201 42323415201 42462215201 7/25/2012 5/25/2011 8/12/2009 6/17/2009 9/25/2013 10/30/2013 7/30/2014 QTR1 QTR4 QTR1 QTR4 QTR1 QTR2 QTR1 12/13 10/11 09/10 08/09 13/14 13/14 14/15 Number of SAs Original Contract Days Present Contract Days Days Used 1 1 1 1 1 1 1 1 1 1 2 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 0 0 1 0 0 0 2 0 3 2 0 2 1 0 3 1 0 0 1 4 0 0 0 0 0 0 1 0 300 70 150 65 35 90 260 300 70 300 150 225 195 260 190 150 120 60 70 180 190 180 90 140 280 75 120 160 119 349 75 204 90 49 95 389 350 143 488 298 303 311 425 354 207 164 61 93 342 261 237 114 151 288 78 165 199 154 936 111 203 87 49 102 389 452 142 488 302 303 311 425 354 196 164 60 93 340 261 235 114 150 236 77 163 190 154 34 64 5754 8157 2 1 1 3 1 2 1 1 3 1 1 1 1 2 1 6 2 1 4 1 2 1 0 0 1 0 0 0 0 1 550 150 45 120 60 540 285 469 205 230 360 255 90 145 120 673 217 76 344 84 689 344 536 217 307 373 322 96 216 164 22 19 3624 56 83 1 1 2 1 1 1 1 6 7 2 6 1 0 0 Num % Days Contracts Used of <= 1.2% Orig Days Increase in Time Page 8 of 42 Unused Days Delinquent Days Time Days Suspended Extension 296.3% 151.4% 105.3% 120.0% 102.9% 107.8% 100.0% 134.3% 162.9% 127.3% 112.7% 104.4% 111.8% 113.5% 152.6% 118.7% 121.7% 98.3% 101.4% 101.7% 106.8% 107.8% 105.6% 99.3% 81.8% 98.7% 98.3% 100.6% 100.0% 0 0 1 1 1 1 1 0 0 0 1 1 1 1 0 1 0 1 1 1 1 1 1 1 1 1 1 1 1 -587 -36 1 3 0 -7 0 -102 1 0 -4 0 0 0 0 11 0 1 0 2 0 2 0 1 52 1 2 9 0 587 36 0 0 0 7 0 102 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8806 74.2% 23 -649 672 470 121 775 550 689 418 533 217 307 340 322 96 216 164 105.8% 286.7% 235.6% 512.5% 903.3% 102.4% 140.7% 106.2% 100.5% 109.1% 90.8% 103.9% 100.0% 102.8% 120.0% 1 0 0 0 0 1 0 1 1 1 1 1 1 1 1 1 -253 -45 -431 -466 0 -74 3 0 0 33 0 0 0 0 4658 5890 66.7% 10 9378 12815 14696 71.7% 608 1136 1005 800 300 300 145 853 1501 1255 1260 504 478 201 852 1501 1249 1323 498 474 197 106.4% 107.3% 102.9% 145.8% 108.3% 98.7% 97.2% SA Days CRS Original Contract Amount 2 0 9 16 1 0 0 1 45 76 15 10 23 15 0 0 23 0 0 5 0 16 5 0 0 0 0 10 0 Amount Included in Original for Contingency Pay Item Adjusted Original Amount $50,000 $16,502 $56,040 $8,041 $11,135 $0 $96,597 $50,000 $13,325 $58,877 $67,277 $59,189 $50,000 $81,793 $50,000 $0 $50,000 $0 $50,000 $54,149 $0 $61,863 $50,000 $50,000 $50,000 $36,224 $50,000 $59,866 $25,644 $3,245,279 $224,345 $4,814,483 $100,343 $197,615 $134,282 $8,691,282 $3,218,007 $229,978 $5,065,873 $3,765,614 $4,840,383 $3,805,596 $6,106,060 $4,985,067 $1,259,477 $1,704,776 $107,840 $1,688,869 $7,031,292 $1,837,492 $6,159,720 $1,890,620 $4,004,390 $1,442,042 $802,917 $2,372,564 $5,277,336 $527,040 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 47 5 45 9 13 5 129 49 28 112 133 68 93 150 164 57 21 1 23 157 71 41 19 11 8 3 45 29 35 736 0 1868 0 253 45 431 466 0 74 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 90 67 15 198 24 136 59 35 12 56 13 64 6 71 20 -1232 1269 0 866 168 $ 48,567,070 $ 673,644 $ 47,893,426 33 -1881 2005 0 2734 703 $ 193,165,923 $ 2,030,166 $ 191,135,757 1 1 1 0 1 1 1 1 0 6 -63 6 4 4 0 0 0 63 0 0 0 0 0 0 0 0 0 0 205 282 217 157 173 178 56 535 $ 33 0 16 26 0 13 0 32 0 21 0 3 0 0 24 40 83 33 303 31 0 0 $3,295,279 $240,847 $4,870,523 $108,384 $208,750 $134,282 $8,787,879 $3,268,007 $243,303 $5,124,750 $3,832,891 $4,899,572 $3,855,596 $6,187,853 $5,035,067 $1,259,477 $1,754,776 $107,840 $1,738,869 $7,085,441 $1,837,492 $6,221,583 $1,940,620 $4,054,390 $1,492,042 $839,141 $2,422,564 $5,337,202 $552,684 144,598,853 $ $9,881,230 $645,001 $86,971 $1,788,515 $621,989 $8,195,419 $1,520,777 $2,445,796 $592,903 $7,686,286 $1,997,720 $5,283,383 $205,480 $6,196,552 $1,419,048 $13,348,458 $22,282,331 $9,150,583 $5,621,006 $2,789,487 $2,645,210 $2,097,227 1,356,522 $ $64,090 $40,470 $6,529 $50,000 $23,941 $86,278 $50,000 $50,000 $7,003 $65,080 $50,000 $50,000 $7,889 $72,364 $50,000 $0 $150,000 $126,713 $87,031 $50,000 $50,000 $50,000 143,242,331 $9,817,140 $604,531 $80,442 $1,738,515 $598,048 $8,109,141 $1,470,777 $2,395,796 $585,900 $7,621,206 $1,947,720 $5,233,383 $197,591 $6,124,188 $1,369,048 $13,348,458 $22,132,331 $9,023,870 $5,533,975 $2,739,487 $2,595,210 $2,047,227 Report Printed: 5/24/2016 Report Date: 04/18/16 District Contract Number 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 T2436 T2439 T2443 T2491 T2503 T2510 T2512 T2513 T2516 T2517 T2524 T2526 T2527 T2528 T2529 T2530 T2535 T2537 T2543 T2544 T2546 T2551 T2552 T2554 T2556 T2559 T2560 T2561 T2566 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 E2Q67 E2Q76 E2Q95 E2R09 E2R10 E2R18 E2R93 E2R94 E2S05 E2S71 E2S89 E2T03 E2T06 E2T30 E2T32 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Financial Project ID 21325945201 42732815201 42698615201 42975245201 42889315201 43224915201 42869015201 42975125201 42975265201 41695325201 42870915201 42869815201 42870515201 42870615201 42871215201 21156035201 42053145201 42476915201 43055515201 42880815201 42889615201 43035225201 43055415201 43112915201 21007535201 43054915201 43054615201 43055815201 43401415201 Dist 02 Central Let Contract SubTotal $ District 02 Totals T3088 T3226 T3310 T3311 T3396 T3401 T3409 21894615201 22077345201 22041255201 22041265201 42323315201 42323415201 42462215201 152,075,688 Total CRS Contract Adjustments Regular Work To Date (From CRS) $3,400,997 $240,847 $4,870,523 $112,449 $208,750 $134,282 $8,787,879 $3,353,518 $243,303 $5,335,260 $3,864,530 $4,899,572 $3,937,461 $6,237,853 $5,035,067 $1,284,233 $1,824,298 $107,840 $1,738,869 $7,135,441 $1,861,682 $6,221,583 $1,940,620 $4,054,390 $1,492,042 $839,141 $2,422,564 $5,428,747 $552,684 $3,123,889 $224,345 $4,844,339 $111,553 $200,747 $134,282 $8,967,904 $3,194,774 $238,211 $5,663,021 $3,881,828 $4,987,033 $4,006,951 $6,218,179 $5,418,212 $1,254,859 $1,779,783 $107,840 $1,721,840 $7,222,230 $1,898,076 $6,254,748 $1,924,570 $4,069,302 $1,448,762 $797,777 $2,506,188 $5,599,258 $527,040 $ $10,154,583 $605,429 $96,284 $2,687,596 $621,989 $8,206,705 $1,520,777 $2,445,796 $592,903 $7,580,608 $1,997,720 $5,283,383 $205,480 $6,196,552 $1,578,817 21042095201 42931315201 42886915201 20970515201 20967615201 42468515201 42607215201 42822915201 43225115201 42869515201 20954125201 42871115201 43074715201 42339815201 43194215201 Dist 02 District Let Contracts SubTotal 03 03 03 03 03 03 03 CRS Present Contract Amount 157,196,905 CRS Innovative Contract Adjustments $739,311 $71,365 $0 $0 $0 $6,188 $0 $293,352 $0 $0 $9,496 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $10,003,453 $554,900 $96,295 $2,664,366 $598,048 $8,178,408 $1,507,456 $2,450,466 $585,900 $7,142,686 $2,088,940 $4,965,217 $200,119 $6,154,717 $1,549,237 (1,119,712) $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $0 $15,320 $16,502 $247,777 $185,372 $0 $61,280 $0 $0 $0 $0 $0 $0 $0 $0 49,774,622 $ 48,740,208 $ (526,251) $ - $ 201,850,310 $ 205,937,113 $ (1,645,963) $ - $14,095,924 $24,823,352 $8,839,978 $6,054,584 $2,700,963 $2,628,131 $2,093,592 $0 $0 $0 $158,382 $0 $0 $0 $ $ $ $0 $0 $0 $0 $0 $0 $0 Actual Expenditure Num % Total CRS (Does Not Include Contracts Expend. Amount Paid to Innovative Contract <= 1.1% of Adj Contractor Adjustment Increase Orig Amt Payments) in Cost $739,311 $71,365 $0 $0 $0 $6,188 $0 $293,352 $0 $0 $9,496 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $13,883,485 $23,732,063 $9,225,149 $6,208,685 $2,763,621 $2,645,210 $2,097,227 Total CRS Adjustments $2,384,578 $152,980 $4,844,339 $111,553 $200,747 $128,094 $8,967,904 $2,901,422 $238,211 $5,663,021 $3,872,332 $4,987,033 $4,006,951 $6,218,179 $5,418,212 $1,254,859 $1,779,783 $107,840 $1,721,840 $7,222,230 $1,898,076 $6,254,748 $1,924,570 $4,069,302 $1,448,762 $797,777 $2,506,188 $5,599,258 $527,040 (1,119,712) $ 156,077,193 $0 $15,320 $16,502 $247,777 $185,372 $0 $61,280 $0 $0 $0 $0 $0 $0 $0 $0 $10,003,453 $539,579 $79,792 $2,416,589 $412,676 $8,178,408 $1,446,176 $2,450,466 $585,900 $7,142,686 $2,088,940 $4,965,217 $200,119 $6,154,717 $1,549,237 (526,251) $ 48,213,955 (1,645,963) $ 204,291,148 $0 $0 $0 $158,382 $0 $0 $0 Page 9 of 42 $14,095,924 $24,823,352 $8,839,978 $5,896,202 $2,700,963 $2,628,131 $2,093,592 $3,083,025 $152,980 $4,835,215 $111,553 $200,747 $128,094 $8,851,811 $3,113,254 $232,462 $5,552,944 $3,786,451 $5,007,517 $3,890,841 $5,933,793 $5,280,952 $1,254,859 $1,779,783 $107,840 $1,698,982 $6,861,498 $1,898,076 $5,599,650 $1,856,552 $3,749,497 $1,448,762 $787,483 $2,389,680 $5,236,558 $527,040 $ 151,149,423 95.0% 68.2% 100.4% 111.2% 101.6% 95.4% 101.8% 96.7% 101.1% 109.6% 100.6% 103.5% 102.2% 97.2% 105.9% 99.6% 104.4% 100.0% 100.6% 97.6% 103.3% 90.9% 98.2% 93.6% 100.5% 98.1% 100.7% 99.2% 100.0% 90.3% Amount Paid After CRS 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 28 $698,448 $0 $9,124 $0 $0 $0 $116,093 $211,832 $5,749 $110,077 $85,881 $20,484 $116,110 $284,386 $137,260 $0 $0 $0 $22,858 $360,732 $0 $655,098 $68,018 $319,805 $0 $10,294 $116,508 $362,700 $0 $ (4,927,770) $ 7,476,835 1197 72 18 6 141 7 89 0 13 7 42 5 34 3 63 18 10 1 8 2 2 1 25 16 5 31 27 22 24 34 16 12 3 0 12 57 19 6 5 1 2 2 4 2 17 458 0 0 0 0 1 0 0 0 0 0 0 14 0 7 10 0 0 0 0 0 0 0 0 5 0 0 0 0 5 0 161 86.7% 13 $ (1,076,456) $ 1,207,553 518 213 80 5 $ 198,286,923 89.1% 41 $ (6,004,226) $ 8,684,388 1715 671 80 166 $409 $332,885 $721,433 $206,375 $27,642 $18,959 $114,705 $535,027 $1,449,731 $74,566 $587,679 $25,866 $0 $0 56 81 78 83 19 14 18 0 0 0 38 0 0 42 0 0 0 0 0 0 0 0 SA Days 47,137,500 149 201 137 74 154 164 38 18 22 9 19 1 47 17 22 4 14 8 23 3 4 2 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 1 0 1 0 1 1 1 $273,353 $39,572 $9,314 $899,081 $0 $11,286 $0 $0 $0 $105,678 $0 $0 $0 $0 $159,769 37 4 37 7 11 4 104 33 23 75 106 46 69 96 48 6 15 1 10 100 39 35 14 10 5 1 41 27 18 Changed Conditions 101.9% 89.3% 99.2% 139.0% 69.0% 100.2% 98.1% 102.3% 100.0% 91.2% 106.9% 88.5% 101.3% 92.6% 113.2% 105.6% 110.7% 106.0% 110.3% 97.6% 100.5% 96.7% $3,301 $0 $0 $0 $0 $53,727 $2,751 $711 $0 $188,858 $7,161 $335,164 $0 $484,783 $0 $105,718 $0 $0 $4,066 $0 $0 $0 $85,511 $0 $210,510 $31,639 $0 $81,865 $50,000 $0 $24,756 $69,521 $0 $0 $50,000 $24,190 $0 $0 $0 $0 $0 $0 $91,545 $0 Holiday Time Weather Extensio Days n Days $10,000,153 $539,579 $79,792 $2,416,589 $412,676 $8,124,680 $1,443,425 $2,449,755 $585,900 $6,953,829 $2,081,779 $4,630,053 $200,119 $5,669,934 $1,549,237 $14,095,514 $24,490,466 $9,561,411 $6,102,577 $2,673,321 $2,609,172 $1,978,887 1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 SA Allocated Amount (From CRS) 0 0 0 0 0 0 0 3 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 35 8 0 0 0 0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 District Contract Number 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 T2436 T2439 T2443 T2491 T2503 T2510 T2512 T2513 T2516 T2517 T2524 T2526 T2527 T2528 T2529 T2530 T2535 T2537 T2543 T2544 T2546 T2551 T2552 T2554 T2556 T2559 T2560 T2561 T2566 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 E2Q67 E2Q76 E2Q95 E2R09 E2R10 E2R18 E2R93 E2R94 E2S05 E2S71 E2S89 E2T03 E2T06 E2T30 E2T32 Changed Conditions Work Orders Financial Project ID $ District 02 Totals 21894615201 22077345201 22041255201 22041265201 42323315201 42323415201 42462215201 2,275,503 $ $48,937 ($50,000) $9,795 $807,486 $0 $43,065 $0 $20,184 $0 $0 $0 $0 $0 $0 $0 21042095201 42931315201 42886915201 20970515201 20967615201 42468515201 42607215201 42822915201 43225115201 42869515201 20954125201 42871115201 43074715201 42339815201 43194215201 Dist 02 District Let Contracts SubTotal T3088 T3226 T3310 T3311 T3396 T3401 T3409 SA Amount Premium Cost $6,154 $0 $0 $0 $0 $0 $7,144 $0 $0 $0 $0 $0 $5,708 $0 ($1,314) $0 $0 $0 $17,045 $703 $49,251 $0 $3,575 $0 $33,849 $0 $37,171 $0 $0 $0 $0 $0 $160 $0 $0 $0 $0 $0 $0 $0 $8,416 $0 $0 $0 $7,272 $0 $0 $0 $0 $0 $0 $0 $4,281 $0 $91,545 $0 $0 $0 21325945201 42732815201 42698615201 42975245201 42889315201 43224915201 42869015201 42975125201 42975265201 41695325201 42870915201 42869815201 42870515201 42870615201 42871215201 21156035201 42053145201 42476915201 43055515201 42880815201 42889615201 43035225201 43055415201 43112915201 21007535201 43054915201 43054615201 43055815201 43401415201 Dist 02 Central Let Contract SubTotal 03 03 03 03 03 03 03 Page 10 of 42 431,649 $28,629 $0 $0 $373,749 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 879,467 $ 402,378 $ 3,154,970 $ 834,027 $90,305 $462,337 $26,182 $14,881 $0 $0 $0 $0 $126,728 $0 $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Plans Modifications Work Orders District Contract Number 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 T2436 T2439 T2443 T2491 T2503 T2510 T2512 T2513 T2516 T2517 T2524 T2526 T2527 T2528 T2529 T2530 T2535 T2537 T2543 T2544 T2546 T2551 T2552 T2554 T2556 T2559 T2560 T2561 T2566 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 E2Q67 E2Q76 E2Q95 E2R09 E2R10 E2R18 E2R93 E2R94 E2S05 E2S71 E2S89 E2T03 E2T06 E2T30 E2T32 Financial Project ID 21325945201 42732815201 42698615201 42975245201 42889315201 43224915201 42869015201 42975125201 42975265201 41695325201 42870915201 42869815201 42870515201 42870615201 42871215201 21156035201 42053145201 42476915201 43055515201 42880815201 42889615201 43035225201 43055415201 43112915201 21007535201 43054915201 43054615201 43055815201 43401415201 Dist 02 Central Let Contract SubTotal 66 21042095201 42931315201 42886915201 20970515201 20967615201 42468515201 42607215201 42822915201 43225115201 42869515201 20954125201 42871115201 43074715201 42339815201 43194215201 Dist 02 District Let Contracts SubTotal District 02 Totals 03 03 03 03 03 03 03 T3088 T3226 T3310 T3311 T3396 T3401 T3409 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 20 3 0 0 0 0 0 13 0 0 0 0 0 0 0 0 21894615201 22077345201 22041255201 22041265201 42323315201 42323415201 42462215201 0 27 0 0 0 0 0 0 0 0 0 7 0 0 0 SA Days SA Amount $98,349 $0 $0 $0 $3,132 $0 $3,500 $105,627 $8,234 $144,072 $42,542 $23,731 $66,627 $46,802 $0 $24,756 $73,186 $0 $0 $8,711 $15,774 $0 $0 $0 $8,900 $0 $5,345 $32,527 $0 2 0 9 0 1 0 0 1 45 53 1 10 16 5 0 0 23 0 0 0 0 16 0 0 0 0 0 5 0 331 $ 30 0 12 26 0 13 0 32 0 21 0 3 0 0 24 5,355,551 $ 161 $ 588,801 $ 100 492 $ 5,944,352 $ 40 0 10 301 0 0 0 $281,269 $17,501 $54,528 $643,272 $0 $0 $0 577,408 $0 $0 $0 $10,441 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 34 0 0 0 0 0 0 0 Specification Modification Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $29,421 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $224,416 $0 $0 $98,741 $0 $15,182 $14,250 $14,554 $0 $57,675 $0 $0 $0 $0 $163,983 Page 11 of 42 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Value Engineering Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Partnering Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 10,441 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - 587,849 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - $169,088 $0 $0 $420,470 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 ($56,741) ($31,593) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $3,300 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 CEI Action/InAction Work Orders District Contract Number 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 T2436 T2439 T2443 T2491 T2503 T2510 T2512 T2513 T2516 T2517 T2524 T2526 T2527 T2528 T2529 T2530 T2535 T2537 T2543 T2544 T2546 T2551 T2552 T2554 T2556 T2559 T2560 T2561 T2566 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 E2Q67 E2Q76 E2Q95 E2R09 E2R10 E2R18 E2R93 E2R94 E2S05 E2S71 E2S89 E2T03 E2T06 E2T30 E2T32 Financial Project ID 21325945201 42732815201 42698615201 42975245201 42889315201 43224915201 42869015201 42975125201 42975265201 41695325201 42870915201 42869815201 42870515201 42870615201 42871215201 21156035201 42053145201 42476915201 43055515201 42880815201 42889615201 43035225201 43055415201 43112915201 21007535201 43054915201 43054615201 43055815201 43401415201 Dist 02 Central Let Contract SubTotal 0 21042095201 42931315201 42886915201 20970515201 20967615201 42468515201 42607215201 42822915201 43225115201 42869515201 20954125201 42871115201 43074715201 42339815201 43194215201 Dist 02 District Let Contracts SubTotal District 02 Totals 03 03 03 03 03 03 03 T3088 T3226 T3310 T3311 T3396 T3401 T3409 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21894615201 22077345201 22041255201 22041265201 42323315201 42323415201 42462215201 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days 0 $ 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2 $ 0 2 $ 0 0 15 0 0 0 0 5,313 $ $0 $0 $0 $0 $0 $0 $0 $15,157 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 Minor Changes Work Orders SA Amount Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 ($6,855) $0 $0 $0 $0 $0 $2,594 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,568 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,006 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $1,373 $0 $0 $44,849 $0 $0 $0 $0 $1,324 $0 $0 $0 $0 $57,216 $0 $0 $0 $0 $0 $0 $1,357 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 0 0 5 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ - 4 0 $ 20,470 $ 7,006 10 5 $ $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 106,119 Defective Materials Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 15,157 $170,060 $0 $139,162 ($52,050) $0 $0 $0 Page 12 of 42 106,119 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Weather Related Damage Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 $ - $ - 0 0 $ $ - 0 0 $ - $ - 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 48 0 2 31 0 0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 136,731 Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 136,731 $45,752 $1,215,323 $0 $52,356 $17,268 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - $ $0 $589,752 $0 $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Claims Work Orders District Contract Number 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 T2436 T2439 T2443 T2491 T2503 T2510 T2512 T2513 T2516 T2517 T2524 T2526 T2527 T2528 T2529 T2530 T2535 T2537 T2543 T2544 T2546 T2551 T2552 T2554 T2556 T2559 T2560 T2561 T2566 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 E2Q67 E2Q76 E2Q95 E2R09 E2R10 E2R18 E2R93 E2R94 E2S05 E2S71 E2S89 E2T03 E2T06 E2T30 E2T32 Financial Project ID 21325945201 42732815201 42698615201 42975245201 42889315201 43224915201 42869015201 42975125201 42975265201 41695325201 42870915201 42869815201 42870515201 42870615201 42871215201 21156035201 42053145201 42476915201 43055515201 42880815201 42889615201 43035225201 43055415201 43112915201 21007535201 43054915201 43054615201 43055815201 43401415201 Dist 02 Central Let Contract SubTotal 0 21042095201 42931315201 42886915201 20970515201 20967615201 42468515201 42607215201 42822915201 43225115201 42869515201 20954125201 42871115201 43074715201 42339815201 43194215201 Dist 02 District Let Contracts SubTotal District 02 Totals 03 03 03 03 03 03 03 T3088 T3226 T3310 T3311 T3396 T3401 T3409 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21894615201 22077345201 22041255201 22041265201 42323315201 42323415201 42462215201 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Page 13 of 42 Utility Delays Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $10,428 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 16 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $3,382 $0 $0 $4,066 $0 $0 $0 $0 $0 $58,566 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 15 0 0 0 0 0 23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 38 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 66,014 Material Shortage Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $58,566 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $23,141 $0 $0 $0 $0 $0 $0 $0 $0 $0 58,566 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 $ 10,428 $ - 16 0 $ 23,141 $ - 0 0 $ 10,428 $ - 16 38 $ 89,155 $ 58,566 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 97 38 0 0 0 0 0 0 0 0 0 0 0 0 0 135 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Cost Savings Initiative Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ - $ - 0 0 $ 135 0 $ - $ - 0 0 $ 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ $0 $0 $0 $0 $0 ($11,855) $0 $0 $0 ($105,678) $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 - Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 (117,533) $ - (117,533) $ - ($173,321) ($131,885) $0 $0 ($25,866) $0 $0 $0 $0 $0 $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Page 14 of 42 Totals Work Orders District Contract Number 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 T2436 T2439 T2443 T2491 T2503 T2510 T2512 T2513 T2516 T2517 T2524 T2526 T2527 T2528 T2529 T2530 T2535 T2537 T2543 T2544 T2546 T2551 T2552 T2554 T2556 T2559 T2560 T2561 T2566 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 E2Q67 E2Q76 E2Q95 E2R09 E2R10 E2R18 E2R93 E2R94 E2S05 E2S71 E2S89 E2T03 E2T06 E2T30 E2T32 Financial Project ID 21325945201 42732815201 42698615201 42975245201 42889315201 43224915201 42869015201 42975125201 42975265201 41695325201 42870915201 42869815201 42870515201 42870615201 42871215201 21156035201 42053145201 42476915201 43055515201 42880815201 42889615201 43035225201 43055415201 43112915201 21007535201 43054915201 43054615201 43055815201 43401415201 Dist 02 Central Let Contract SubTotal 207 21042095201 42931315201 42886915201 20970515201 20967615201 42468515201 42607215201 42822915201 43225115201 42869515201 20954125201 42871115201 43074715201 42339815201 43194215201 Dist 02 District Let Contracts SubTotal District 02 Totals 03 03 03 03 03 03 03 T3088 T3226 T3310 T3311 T3396 T3401 T3409 Time Ext Days 0 0 0 0 0 0 0 0 0 6 0 0 0 20 100 38 0 0 0 0 13 0 0 0 0 0 0 0 0 21894615201 22077345201 22041255201 22041265201 42323315201 42323415201 42462215201 0 27 0 38 16 0 42 0 0 0 0 7 0 4 0 SA Days SA Amount $107,886 $0 $0 $11,210 $3,132 $0 $10,581 $97,458 $8,234 $264,532 $94,387 $27,306 $100,476 $83,973 $1,324 $24,756 $73,346 $0 $0 $65,927 $24,190 $0 $7,272 $0 $8,900 $0 $13,550 $124,072 $0 2 0 9 16 1 0 0 1 45 76 15 10 23 15 0 0 23 0 0 5 0 16 5 0 0 0 0 10 0 535 $ 33 0 16 26 0 13 0 32 0 21 0 3 0 0 24 7,945,230 Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $88,690 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $273,353 ($39,572) $9,795 $906,227 $0 $69,534 $14,250 $49,896 $0 ($48,003) $0 $0 $0 $0 $163,983 1,074,629 $28,629 $0 $0 $384,190 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 134 168 $ 1,399,463 $ 412,819 341 703 $ 9,344,693 $ 1,487,448 0 0 0 0 0 0 0 40 83 33 303 31 0 0 $414,064 $1,563,276 $163,131 $630,166 ($8,599) $0 $0 $169,088 $716,480 $0 $420,470 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 District 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 Contract Number T3411 T3412 T3419 T3423 T3424 T3432 T3434 T3455 T3456 T3463 T3465 T3468 T3476 T3501 T3502 T3510 T3523 T3530 T3532 T3535 T3536 T3540 T3555 T3562 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Financial Project ID 42636815201 42462325201 42163915201 42164425201 41343515201 42696115201 42987815201 43000415201 42986515201 42873815201 42987615201 42696515201 42385815201 42985615201 42764915201 43077615201 42986315201 43174415201 43253215201 42693615201 40393125201 21988025201 43630635201 42874515201 Let Date 10/29/2014 12/4/2013 10/30/2013 3/27/2013 2/6/2013 9/24/2014 8/27/2014 10/29/2014 7/30/2014 8/27/2014 10/29/2014 6/18/2014 3/26/2014 7/29/2015 6/18/2014 9/24/2014 7/29/2015 1/28/2015 2/25/2015 12/3/2014 1/28/2015 1/28/2015 4/29/2015 5/20/2015 Quarter Let QTR2 QTR2 QTR2 QTR3 QTR3 QTR1 QTR1 QTR2 QTR1 QTR1 QTR2 QTR4 QTR3 QTR1 QTR4 QTR1 QTR1 QTR3 QTR3 QTR2 QTR3 QTR3 QTR4 QTR4 Year Let/ Num of Number Contract Projects s 14/15 13/14 13/14 12/13 12/13 14/15 14/15 14/15 14/15 14/15 14/15 13/14 13/14 15/16 13/14 14/15 15/16 14/15 14/15 14/15 14/15 14/15 14/15 14/15 Dist 03 Central Let Contracts SubTotal 03 03 03 03 03 03 03 03 03 03 03 03 03 E3K74 E3L71 E3L88 E3L98 E3M60 E3M93 E3N07 E3N22 E3N70 E3N72 E3N81 E3N95 E3O16 31 42692815201 42874415201 42697015201 42874615201 42697215201 43078215201 43460315201 41547435201 41694415201 42462115201 43558115201 42820815201 42358925201 11/13/2014 3/13/2014 11/13/2014 11/13/2014 12/11/2014 12/11/2014 7/9/2015 10/9/2014 11/13/2014 11/13/2014 5/14/2015 3/12/2015 1/8/2015 QTR2 QTR3 QTR2 QTR2 QTR2 QTR2 QTR1 QTR2 QTR2 QTR2 QTR4 QTR3 QTR3 14/15 13/14 14/15 14/15 14/15 14/15 15/16 14/15 14/15 14/15 14/15 14/15 14/15 Dist 03 District Let Contracts SubTotal 13 District 03 Totals 04 04 04 04 04 04 04 04 04 04 T4255 T4311 T4331 T4345 T4352 T4374 T4380 T4384 T4394 T4398 Dist 04 Central Let Contracts SubTotal 44 40398415201 42924615201 22974435201 40836215201 42919815201 43019615201 42974015201 42973815201 43060225203 42974115201 12/8/2010 4/27/2011 3/28/2012 5/22/2013 3/27/2013 7/30/2014 9/24/2014 8/27/2014 5/21/2014 8/27/2014 QTR2 QTR4 QTR3 QTR4 QTR3 QTR1 QTR1 QTR1 QTR4 QTR1 10/11 10/11 11/12 12/13 12/13 14/15 14/15 14/15 13/14 14/15 10 Number of SAs Original Contract Days Present Contract Days Days Used Num % Days Contracts Used of <= 1.2% Orig Days Increase in Time Page 15 of 42 Unused Days Delinquent Days Time Days Suspended Extension SA Days CRS Original Contract Amount 0 119 24 31 15 3 2 0 0 19 4 0 47 0 11 0 0 0 0 0 0 0 0 0 Amount Included in Original for Contingency Pay Item Adjusted Original Amount $0 $87,127 $53,530 $132,771 $50,000 $50,000 $20,930 $0 $7,298 $50,257 $50,000 $50,000 $50,000 $0 $26,778 $50,000 $7,797 $0 $50,000 $26,436 $23,136 $16,058 $0 $33,113 $577,753 $7,333,330 $4,691,282 $12,225,382 $3,832,641 $1,717,542 $439,000 $919,509 $139,786 $4,698,602 $1,046,728 $1,776,839 $2,257,108 $170,379 $607,199 $3,914,092 $82,373 $217,000 $3,123,126 $454,953 $345,929 $330,959 $409,629 $703,629 1 4 3 3 2 2 2 1 1 2 2 2 1 1 2 1 1 1 1 1 1 1 3 1 0 8 1 6 3 0 0 0 0 2 0 0 1 0 2 0 0 0 0 0 0 0 0 0 130 330 250 530 355 120 160 150 64 235 200 220 276 55 125 190 42 60 120 85 60 120 60 90 196 606 366 798 512 205 197 176 105 360 269 294 370 66 199 241 52 67 143 109 69 141 66 134 196 606 363 798 508 205 197 176 323 360 262 284 370 66 197 240 52 66 143 109 69 141 66 134 100.0% 150.0% 108.4% 105.8% 114.1% 136.7% 101.3% 100.0% 451.6% 108.1% 98.5% 108.6% 117.0% 100.0% 112.8% 99.5% 100.0% 98.3% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 1 0 1 1 1 0 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 3 0 4 0 0 0 -218 0 7 10 0 0 2 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 218 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 66 157 92 237 142 82 35 26 41 106 65 74 47 11 63 51 10 7 23 24 9 21 6 44 48 45 8321 11793 12025 87.1% 27 -232 281 0 2707 1 1 1 2 1 1 1 1 1 2 1 1 1 0 0 0 1 0 0 0 1 1 0 1 0 0 160 160 115 180 100 70 28 90 120 150 60 105 20 219 192 230 201 134 77 28 168 166 244 80 178 23 219 192 230 200 134 76 27 168 163 244 80 178 23 107.5% 100.0% 117.4% 99.4% 102.0% 100.0% 96.4% 145.6% 101.7% 104.7% 116.7% 127.6% 100.0% 1 1 1 1 1 1 1 0 1 1 1 0 1 0 0 0 1 0 1 1 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 47 32 95 21 32 6 0 37 41 87 10 73 3 15 4 1358 1940 1934 84.6% 11 6 0 0 484 98 $ 18,680,096 $ 482,014 $ 18,198,082 63 49 9679 13733 13959 86.4% 38 -226 281 0 3191 863 $ 129,464,397 $ 1,830,989 $ 127,633,410 1 1 3 1 2 1 1 1 3 1 24 1 15 5 5 0 0 1 1 0 920 180 870 266 547 102 100 96 243 126 1352 266 947 650 615 112 118 101 281 160 1352 319 947 650 615 110 117 99 280 160 126.7% 150.6% 100.1% 216.2% 100.9% 98.0% 99.0% 97.9% 99.6% 100.0% 0 0 1 0 1 1 1 1 1 1 0 -53 0 0 0 2 1 2 1 0 0 53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 186 48 76 89 63 10 18 5 38 34 246 38 1 295 5 0 0 0 0 0 $36,988,133 $3,983,113 $12,844,415 $1,202,547 $6,123,829 $348,825 $480,024 $547,622 $831,515 $420,985 15 52 3450 4602 4649 70.0% 7 -47 53 0 567 585 $ 63,771,008 765 $ 12 0 20 0 2 1 0 41 5 7 10 0 0 $577,753 $7,420,457 $4,744,812 $12,358,153 $3,882,641 $1,767,542 $459,930 $919,509 $147,084 $4,748,859 $1,096,728 $1,826,839 $2,307,108 $170,379 $633,977 $3,964,092 $90,170 $217,000 $3,173,126 $481,388 $369,064 $347,017 $409,629 $736,742 110,784,301 $ $1,363,705 $1,490,639 $1,400,953 $4,259,734 $1,718,927 $1,217,750 $31,110 $785,011 $2,595,171 $2,986,421 $154,105 $594,506 $82,064 1,348,975 $ $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $1,910 $50,000 $50,000 $50,000 $5,690 $22,506 $1,908 $1,313,705 $1,440,639 $1,350,953 $4,209,734 $1,668,927 $1,167,750 $29,200 $735,011 $2,545,171 $2,936,421 $148,415 $572,000 $80,156 $150,000 $50,000 $101,074 $50,000 $50,000 $18,115 $22,736 $25,962 $40,849 $20,915 $ 529,651 109,435,328 $36,838,133 $3,933,113 $12,743,341 $1,152,547 $6,073,829 $330,710 $457,288 $521,660 $790,666 $400,070 $ 63,241,357 Report Printed: 5/24/2016 Report Date: 04/18/16 District 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 Contract Number T3411 T3412 T3419 T3423 T3424 T3432 T3434 T3455 T3456 T3463 T3465 T3468 T3476 T3501 T3502 T3510 T3523 T3530 T3532 T3535 T3536 T3540 T3555 T3562 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Financial Project ID 42636815201 42462325201 42163915201 42164425201 41343515201 42696115201 42987815201 43000415201 42986515201 42873815201 42987615201 42696515201 42385815201 42985615201 42764915201 43077615201 42986315201 43174415201 43253215201 42693615201 40393125201 21988025201 43630635201 42874515201 Dist 03 Central Let Contracts SubTotal 03 03 03 03 03 03 03 03 03 03 03 03 03 E3K74 E3L71 E3L88 E3L98 E3M60 E3M93 E3N07 E3N22 E3N70 E3N72 E3N81 E3N95 E3O16 T4255 T4311 T4331 T4345 T4352 T4374 T4380 T4384 T4394 T4398 Dist 04 Central Let Contracts SubTotal $581,122 $9,661,184 $5,104,767 $14,453,163 $3,728,903 $1,769,571 $451,610 $927,409 $141,897 $5,089,590 $1,059,431 $1,794,755 $2,266,725 $163,661 $695,402 $4,024,706 $84,330 $216,611 $3,259,005 $440,397 $338,614 $338,632 $409,629 $704,780 $ $1,363,705 $1,490,639 $1,400,953 $4,287,109 $1,718,927 $1,217,750 $31,110 $874,968 $2,642,211 $2,986,421 $159,104 $594,506 $82,064 42692815201 42874415201 42697015201 42874615201 42697215201 43078215201 43460315201 41547435201 41694415201 42462115201 43558115201 42820815201 42358925201 District 03 Totals 115,002,044 Total CRS Contract Adjustments Regular Work To Date (From CRS) $577,753 $9,192,655 $4,794,812 $11,830,936 $3,972,326 $1,767,542 $459,930 $919,509 $147,084 $4,901,429 $1,096,728 $1,826,839 $2,297,266 $170,379 $703,188 $3,964,092 $90,170 $217,000 $3,173,126 $481,388 $369,064 $347,017 $409,629 $736,742 $ Dist 03 District Let Contracts SubTotal 04 04 04 04 04 04 04 04 04 04 CRS Present Contract Amount 118,942,418 CRS Innovative Contract Adjustments $0 $6,400 $0 $0 $0 $0 $0 $0 $13,260 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $1,373,851 $1,445,553 $1,371,419 $4,172,519 $1,766,800 $1,189,202 $28,465 $824,968 $2,488,780 $3,075,573 $150,561 $576,000 $81,985 (178,042) $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,500 $0 $3,649 $0 18,849,467 $ 18,545,676 $ (7,149) $ - $ 133,851,511 $ 137,488,094 $ (185,191) $ - $40,660,763 $4,102,286 $13,255,935 $3,085,087 $6,466,757 $348,825 $480,024 $548,351 $893,080 $420,985 $ 70,262,093 $41,250,312 $4,023,382 $13,396,275 $3,080,524 $6,440,760 $339,314 $456,013 $527,560 $843,974 $395,082 $ 70,753,196 $0 $101,442 $0 $0 $0 $0 $0 $0 $0 $0 $ (101,442) $ $ $ $ $ $581,122 $9,654,784 $5,104,767 $14,453,163 $3,728,903 $1,769,571 $451,610 $927,409 $128,637 $5,089,590 $1,059,431 $1,794,755 $2,266,725 $163,661 $695,402 $4,024,706 $84,330 $216,611 $3,259,005 $440,397 $338,614 $338,632 $409,629 $704,780 (178,042) $ 118,764,376 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,500 $0 $3,649 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - Actual Expenditure Num % Total CRS (Does Not Include Contracts Expend. Amount Paid to Innovative Contract <= 1.1% of Adj Contractor Adjustment Increase Orig Amt Payments) in Cost $0 $6,400 $0 $0 $0 $0 $0 $0 $13,260 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 40398415201 42924615201 22974435201 40836215201 42919815201 43019615201 42974015201 42973815201 43060225203 42974115201 Total CRS Adjustments Page 16 of 42 (7,149) $ $581,122 $9,613,805 $5,095,312 $14,207,037 $3,719,464 $1,671,197 $451,610 $927,409 $132,173 $4,749,794 $1,059,431 $1,727,691 $2,239,507 $163,661 $695,402 $3,718,840 $84,330 $216,611 $3,171,161 $440,397 $338,614 $338,632 $409,629 $704,780 $ $1,373,851 $1,445,553 $1,371,419 $4,172,519 $1,766,800 $1,189,202 $28,465 $824,968 $2,488,780 $3,072,073 $150,561 $572,352 $81,985 117,968,957 $1,311,778 $1,451,830 $1,371,419 $3,907,768 $1,673,682 $1,136,275 $28,465 $824,968 $2,390,489 $2,941,259 $150,561 $572,352 $81,985 18,538,528 $ 17,842,831 (185,191) $ 137,302,904 $ 135,811,788 $0 $101,442 $0 $0 $0 $0 $0 $0 $0 $0 $41,250,312 $3,921,940 $13,396,275 $3,080,524 $6,440,760 $339,314 $456,013 $527,560 $843,974 $395,082 (101,442) $ 70,651,754 $ 100.6% 131.1% 108.6% 116.2% 97.0% 97.3% 102.9% 100.9% 94.6% 101.1% 101.2% 97.2% 99.2% 96.1% 114.5% 95.0% 102.4% 99.8% 101.5% 96.8% 97.9% 102.3% 100.0% 100.2% 83.9% 99.9% 100.8% 101.5% 92.8% 100.3% 97.3% 97.5% 112.2% 93.9% 100.2% 101.4% 100.1% 102.3% 1 0 1 0 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 26 SA Allocated Amount (From CRS) Amount Paid After CRS $ 1 1 1 1 1 1 1 0 1 1 1 1 1 $0 $40,979 $9,456 $246,126 $9,439 $98,374 $0 $0 $3,536 $339,797 $0 $67,064 $27,218 $0 $0 $305,866 $0 $0 $87,844 $0 $0 $0 $0 $0 $0 $1,772,197 $50,000 $527,216 $89,685 $0 $0 $0 $0 $152,569 $0 $0 $9,842 $0 $69,211 $0 $0 $0 $0 $0 $0 $0 $0 $0 (795,419) $ 4,217,741 $62,073 $6,277 $0 $264,750 $93,118 $52,927 $0 $0 $98,291 $130,814 $0 $0 $0 $0 $0 $0 $27,375 $0 $0 $0 $89,957 $47,040 $0 $4,999 $0 $0 92.3% 12 $ (695,696) $ 86.4% 38 $ $41,508,810 $3,920,334 $13,389,797 $3,080,524 $6,430,289 $339,314 $456,013 $527,560 $843,974 $395,082 112.7% 99.7% 105.1% 267.3% 105.9% 102.6% 99.7% 101.1% 106.7% 98.8% 70,891,697 80.0% 0 1 1 0 1 1 1 1 1 1 8 $ Holiday Time Weather Extensio Days n Days 62 51 64 209 86 30 17 24 17 79 53 24 28 5 34 27 5 4 12 12 6 15 2 28 1811 43 23 69 16 10 5 0 33 34 77 8 28 3 4 60 28 28 17 11 18 2 17 27 12 21 19 6 22 24 5 3 11 12 3 6 4 16 725 4 9 26 5 22 1 0 4 7 10 2 16 0 Changed Conditions Time Ext Days 0 0 0 0 0 36 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36 0 0 0 0 0 0 0 0 0 0 0 15 0 SA Days 0 0 16 4 4 0 0 0 0 8 0 0 47 0 8 0 0 0 0 0 0 0 0 0 130 0 0 20 0 2 0 0 0 0 0 0 0 0 169,371 349 106 15 22 (1,491,115) $ 4,387,112 2160 831 51 152 $258,498 $1,606 $6,478 $0 $10,471 $0 $0 $0 $0 $0 $3,672,630 $119,174 $411,520 $1,882,539 $342,928 $0 $0 $729 $61,565 $0 239,943 $ 6,491,085 127 36 45 48 36 9 16 4 26 32 379 59 12 31 27 27 1 2 1 12 2 174 0 0 0 14 0 0 0 0 0 0 14 0 2 1 266 0 0 0 0 0 0 269 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 District 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 Contract Number T3411 T3412 T3419 T3423 T3424 T3432 T3434 T3455 T3456 T3463 T3465 T3468 T3476 T3501 T3502 T3510 T3523 T3530 T3532 T3535 T3536 T3540 T3555 T3562 Changed Conditions Work Orders Financial Project ID E3K74 E3L71 E3L88 E3L98 E3M60 E3M93 E3N07 E3N22 E3N70 E3N72 E3N81 E3N95 E3O16 $ 42692815201 42874415201 42697015201 42874615201 42697215201 43078215201 43460315201 41547435201 41694415201 42462115201 43558115201 42820815201 42358925201 Dist 03 District Let Contracts SubTotal District 03 Totals 04 04 04 04 04 04 04 04 04 04 SA Amount $0 $464,584 $49,955 $106,851 $26,009 $3,150 $1,560 $0 $0 $61,500 $0 $14,633 $24,743 $0 $5,089 $0 $0 $0 $0 $0 $0 $354 $0 $0 42636815201 42462325201 42163915201 42164425201 41343515201 42696115201 42987815201 43000415201 42986515201 42873815201 42987615201 42696515201 42385815201 42985615201 42764915201 43077615201 42986315201 43174415201 43253215201 42693615201 40393125201 21988025201 43630635201 42874515201 Dist 03 Central Let Contracts SubTotal 03 03 03 03 03 03 03 03 03 03 03 03 03 T4255 T4311 T4331 T4345 T4352 T4374 T4380 T4384 T4394 T4398 Dist 04 Central Let Contracts SubTotal Page 17 of 42 1,352,133 Premium Cost $0 $141,250 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 267,978 $0 $0 $0 $0 $3,651 $0 $0 $0 $3,190 $0 $0 $0 $1,908 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 8,749 $ $ 1,360,882 $ 40398415201 42924615201 22974435201 40836215201 42919815201 43019615201 42974015201 42973815201 43060225203 42974115201 $712,871 $3,257 $264,521 $1,575,597 $29,679 $3,246 $2,267 $1,939 $2,400 $3,600 $ 2,599,377 267,978 $128,765 $0 $69,821 $0 $0 $0 $0 $0 $0 $0 $ 198,586 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Plans Modifications Work Orders District 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 Contract Number T3411 T3412 T3419 T3423 T3424 T3432 T3434 T3455 T3456 T3463 T3465 T3468 T3476 T3501 T3502 T3510 T3523 T3530 T3532 T3535 T3536 T3540 T3555 T3562 Financial Project ID 42636815201 42462325201 42163915201 42164425201 41343515201 42696115201 42987815201 43000415201 42986515201 42873815201 42987615201 42696515201 42385815201 42985615201 42764915201 43077615201 42986315201 43174415201 43253215201 42693615201 40393125201 21988025201 43630635201 42874515201 Dist 03 Central Let Contracts SubTotal 03 03 03 03 03 03 03 03 03 03 03 03 03 E3K74 E3L71 E3L88 E3L98 E3M60 E3M93 E3N07 E3N22 E3N70 E3N72 E3N81 E3N95 E3O16 83 42692815201 42874415201 42697015201 42874615201 42697215201 43078215201 43460315201 41547435201 41694415201 42462115201 43558115201 42820815201 42358925201 Dist 03 District Let Contracts SubTotal District 03 Totals 04 04 04 04 04 04 04 04 04 04 T4255 T4311 T4331 T4345 T4352 T4374 T4380 T4384 T4394 T4398 Dist 04 Central Let Contracts SubTotal Time Ext Days 0 46 0 0 39 -2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40398415201 42924615201 22974435201 40836215201 42919815201 43019615201 42974015201 42973815201 43060225203 42974115201 0 0 0 0 0 0 0 0 0 0 0 14 0 SA Days SA Amount $0 $1,310,641 $3,575 $178,456 $77,908 $5,265 $11,050 $0 $0 $18,230 $1,363 $0 $11,268 $0 $70,611 $11,957 $0 $0 $0 $0 $1,620 $4,919 $0 $0 0 119 8 22 11 3 2 0 0 5 1 0 0 0 3 0 0 0 0 0 0 0 0 0 525 $ 0 0 0 0 0 1 0 41 3 0 0 0 0 45 $ 97 570 $ 0 246 33 0 29 5 0 0 0 0 0 313 $ 199,523 $ 2,902,956 $ 5,333,981 1,627,667 $0 $0 $0 $0 $0 $0 $0 $0 $23,968 $0 $0 $0 $0 $4,139,811 $132,841 $325,524 $324,673 $337,445 $5,358 $0 $0 $68,329 $0 $ Specification Modification Work Orders Premium Cost $0 $920,387 $0 $0 $92,400 $0 $0 $0 $0 $0 $0 $0 $0 $0 $25,322 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $32,271 $27,375 $0 $2,880 $0 $89,957 $47,040 $0 $0 $0 $0 14 0 0 0 0 0 0 0 0 0 0 2,703,433 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 $ - 1,651,635 0 0 $ - 2,388,276 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 $ $ - 0 0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (88,334) $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 3,300 Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - 0 0 $ - $ - (88,334) $ - 0 0 $ 3,300 $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ Partnering Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ Value Engineering Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 23,968 $2,271,858 $0 $6,638 $98,769 $11,011 $0 $0 $0 $0 $0 $ Page 18 of 42 - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 CEI Action/InAction Work Orders District 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 Contract Number T3411 T3412 T3419 T3423 T3424 T3432 T3434 T3455 T3456 T3463 T3465 T3468 T3476 T3501 T3502 T3510 T3523 T3530 T3532 T3535 T3536 T3540 T3555 T3562 Financial Project ID 42636815201 42462325201 42163915201 42164425201 41343515201 42696115201 42987815201 43000415201 42986515201 42873815201 42987615201 42696515201 42385815201 42985615201 42764915201 43077615201 42986315201 43174415201 43253215201 42693615201 40393125201 21988025201 43630635201 42874515201 Dist 03 Central Let Contracts SubTotal 03 03 03 03 03 03 03 03 03 03 03 03 03 E3K74 E3L71 E3L88 E3L98 E3M60 E3M93 E3N07 E3N22 E3N70 E3N72 E3N81 E3N95 E3O16 36 42692815201 42874415201 42697015201 42874615201 42697215201 43078215201 43460315201 41547435201 41694415201 42462115201 43558115201 42820815201 42358925201 Dist 03 District Let Contracts SubTotal District 03 Totals 04 04 04 04 04 04 04 04 04 04 T4255 T4311 T4331 T4345 T4352 T4374 T4380 T4384 T4394 T4398 Dist 04 Central Let Contracts SubTotal Time Ext Days 0 0 0 0 0 7 0 0 0 0 0 29 0 0 0 0 0 0 0 0 0 0 0 0 40398415201 42924615201 22974435201 40836215201 42919815201 43019615201 42974015201 42973815201 43060225203 42974115201 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days 25 $ 12 0 0 0 0 0 0 0 2 7 10 0 0 31 $ 36 56 $ 0 0 0 0 0 0 0 0 0 0 0 0 (384,814) $ $30,968 $0 $0 $0 $0 $0 $0 $0 $1,238 $0 $4,999 $4,000 $0 0 0 0 0 0 0 0 0 0 0 0 Minor Changes Work Orders SA Amount Premium Cost $0 $0 ($3,028) $0 $0 $0 ($777,502) $1,039,155 $0 $0 $11,000 $0 $0 $0 $0 $0 $0 $0 $121,353 $0 $12,928 $0 $1,080 $0 ($7,817) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 1 0 0 0 0 0 6 3 0 0 0 0 0 0 0 0 0 0 0 0 0 41,205 1,039,155 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,999 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,034 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 3,034 Defective Materials Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 - Weather Related Damage Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 0 0 0 0 0 0 0 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $79,271 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 85 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 4,999 0 0 $ - $ - 0 0 $ - $ - 0 0 $ (343,609) $ 1,044,154 0 0 $ 3,034 $ - 0 0 $ - $ - 7 85 $ (1,701,542) $ $30,394 $0 $0 $0 $0 $0 $0 $0 $0 $0 30,394 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 3 1,409,970 Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ ($1,705,619) $0 $0 ($142) $4,219 $0 $0 $0 $0 $0 $ Page 19 of 42 1,409,970 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $ $205,492 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 205,492 589,752 589,752 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Claims Work Orders District 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 Contract Number T3411 T3412 T3419 T3423 T3424 T3432 T3434 T3455 T3456 T3463 T3465 T3468 T3476 T3501 T3502 T3510 T3523 T3530 T3532 T3535 T3536 T3540 T3555 T3562 Financial Project ID 42636815201 42462325201 42163915201 42164425201 41343515201 42696115201 42987815201 43000415201 42986515201 42873815201 42987615201 42696515201 42385815201 42985615201 42764915201 43077615201 42986315201 43174415201 43253215201 42693615201 40393125201 21988025201 43630635201 42874515201 Dist 03 Central Let Contracts SubTotal 03 03 03 03 03 03 03 03 03 03 03 03 03 E3K74 E3L71 E3L88 E3L98 E3M60 E3M93 E3N07 E3N22 E3N70 E3N72 E3N81 E3N95 E3O16 0 42692815201 42874415201 42697015201 42874615201 42697215201 43078215201 43460315201 41547435201 41694415201 42462115201 43558115201 42820815201 42358925201 Dist 03 District Let Contracts SubTotal District 03 Totals 04 04 04 04 04 04 04 04 04 04 T4255 T4311 T4331 T4345 T4352 T4374 T4380 T4384 T4394 T4398 Dist 04 Central Let Contracts SubTotal Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40398415201 42924615201 22974435201 40836215201 42919815201 43019615201 42974015201 42973815201 43060225203 42974115201 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 Utility Delays Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 - - $ - $ 271,969 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $271,969 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ Page 20 of 42 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ - 0 0 $ 271,969 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $271,969 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Material Shortage Work Orders $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $ - $ $115,942 $0 $3,287 $8,860 $0 $0 $0 $0 $0 $0 $ 128,089 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 - Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 (331,072) $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - 0 0 $ - $ - 0 0 $ - $ - - 0 0 $ - $ - 0 0 $ (331,072) $ - $115,942 $0 $3,287 $8,860 $0 $0 $0 $0 $0 $0 $ Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cost Savings Initiative 128,089 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 ($80,900) $0 ($5,410) $0 $0 $0 $0 $0 $ (86,310) $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Page 21 of 42 Totals Work Orders District 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 Contract Number T3411 T3412 T3419 T3423 T3424 T3432 T3434 T3455 T3456 T3463 T3465 T3468 T3476 T3501 T3502 T3510 T3523 T3530 T3532 T3535 T3536 T3540 T3555 T3562 Financial Project ID 42636815201 42462325201 42163915201 42164425201 41343515201 42696115201 42987815201 43000415201 42986515201 42873815201 42987615201 42696515201 42385815201 42985615201 42764915201 43077615201 42986315201 43174415201 43253215201 42693615201 40393125201 21988025201 43630635201 42874515201 Dist 03 Central Let Contracts SubTotal 03 03 03 03 03 03 03 03 03 03 03 03 03 E3K74 E3L71 E3L88 E3L98 E3M60 E3M93 E3N07 E3N22 E3N70 E3N72 E3N81 E3N95 E3O16 162 42692815201 42874415201 42697015201 42874615201 42697215201 43078215201 43460315201 41547435201 41694415201 42462115201 43558115201 42820815201 42358925201 Dist 03 District Let Contracts SubTotal District 03 Totals 04 04 04 04 04 04 04 04 04 04 T4255 T4311 T4331 T4345 T4352 T4374 T4380 T4384 T4394 T4398 Dist 04 Central Let Contracts SubTotal Time Ext Days 0 46 0 0 39 41 0 0 0 0 0 29 0 0 7 0 0 0 0 0 0 0 0 0 40398415201 42924615201 22974435201 40836215201 42919815201 43019615201 42974015201 42973815201 43060225203 42974115201 0 0 0 0 0 0 0 0 0 0 0 29 0 SA Days SA Amount Premium Cost $0 $0 $1,772,197 $1,061,638 $53,530 $0 ($412,925) $1,039,155 $103,918 $92,400 $19,415 $0 $12,610 $0 $0 $0 $0 $0 $201,082 $0 $14,290 $0 $18,747 $0 $28,194 $0 $0 $0 $75,699 $25,322 $11,957 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,620 $0 $5,272 $0 $0 $0 $0 $0 0 119 24 31 15 3 2 0 0 19 4 0 47 0 11 0 0 0 0 0 0 0 0 0 765 $ 12 0 20 0 2 1 0 41 5 7 10 0 0 98 $ 191 863 $ 14 246 38 1 295 5 0 0 0 0 0 585 $ $30,968 $0 $32,271 $27,375 $3,651 $2,880 $0 $89,957 $51,468 $0 $4,999 $4,000 $1,908 29 0 0 0 14 0 0 0 0 0 0 4,667,644 $0 $0 $0 $0 $0 $0 $0 $0 $23,968 $0 $4,999 $0 $0 249,477 $ 4,917,121 $ $3,740,465 $136,098 $512,433 $1,908,989 $365,933 $8,604 $2,267 $1,939 $70,729 $3,600 $ 6,751,057 3,524,553 28,967 3,553,520 $2,818,928 $0 $79,746 $107,629 $11,011 $0 $0 $0 $0 $0 $ 3,017,314 Report Printed: 5/24/2016 Report Date: 04/18/16 District 04 04 04 04 04 04 04 04 04 04 04 Contract Number E4K48 E4L95 E4M77 E4P28 E4P42 E4P43 E4P91 E4Q13 E4Q62 E4Q67 E4Q81 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Financial Project ID 23097815201 41304815201 22858325201 43053415201 42744115201 42636215201 43397915201 43060515201 42993615201 42824115201 43400615201 Let Date 7/10/2009 6/21/2011 6/29/2012 1/3/2014 5/2/2014 3/31/2014 6/6/2014 8/1/2014 1/9/2015 2/6/2015 4/3/2015 Quarter Let QTR1 QTR4 QTR4 QTR3 QTR4 QTR3 QTR4 QTR1 QTR3 QTR3 QTR4 Year Let/ Num of Number Contract Projects s 09/10 10/11 11/12 13/14 13/14 13/14 13/14 14/15 14/15 14/15 14/15 Dist 04 District Let Contracts SubTotal 11 District 04 Totals 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 BDT74 T5369 T5401 T5404 T5417 T5419 T5420 T5427 T5464 T5483 T5488 T5489 T5494 T5495 T5501 T5503 T5511 T5518 T5520 T5525 T5526 T5527 T5529 T5535 T5539 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 E5L71 E5N21 E5R02 E5R52 E5R71 E5W28 E5W30 E5W49 E5W57 E5W64 E5W68 E5W73 E5W74 E5W75 E5W82 21 41299435201 23765025201 42201515201 24023335201 40735545201 23953555201 42290225201 43174815201 42363025201 42727915201 42907915201 43067515201 42488715201 42886715201 42886215201 42868815201 43068015201 43471315201 23867825201 43067115201 43065315201 43361515201 43544315201 43545915201 43471215201 11/7/2011 3/27/2013 4/24/2013 5/23/2012 4/25/2012 6/27/2012 5/23/2012 10/31/2012 4/30/2014 6/18/2014 12/4/2013 2/25/2015 5/21/2014 5/21/2014 7/30/2014 8/27/2014 12/3/2014 2/25/2015 12/3/2014 2/25/2015 4/29/2015 4/29/2015 3/25/2015 5/20/2015 2/25/2015 QTR2 QTR3 QTR4 QTR4 QTR4 QTR4 QTR4 QTR2 QTR4 QTR4 QTR2 QTR3 QTR4 QTR4 QTR1 QTR1 QTR2 QTR3 QTR2 QTR3 QTR4 QTR4 QTR3 QTR4 QTR3 11/12 12/13 12/13 11/12 11/12 11/12 11/12 12/13 13/14 13/14 13/14 14/15 13/14 13/14 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 14/15 41299445201 40550625201 41307215201 23827565201 40441815201 41499925201 43214919201 43327115201 41299435214 42821315201 24099295201 43524315201 43524415201 43528315201 43524715201 2/23/2009 8/18/2010 10/13/2011 9/27/2012 7/25/2013 5/6/2014 2/18/2014 11/4/2014 6/3/2014 6/24/2014 12/2/2014 1/6/2015 1/6/2015 2/3/2015 3/3/2015 QTR3 QTR1 QTR2 QTR1 QTR1 QTR4 QTR3 QTR2 QTR4 QTR4 QTR2 QTR3 QTR3 QTR3 QTR3 08/09 10/11 11/12 12/13 13/14 13/14 13/14 14/15 13/14 13/14 14/15 14/15 14/15 14/15 14/15 Dist 05 Central Let Contracts SubTotal 25 Number of SAs Original Contract Days Present Contract Days Days Used Num % Days Contracts Used of <= 1.2% Orig Days Increase in Time Page 22 of 42 Unused Days Delinquent Days Time Days Suspended Extension SA Days CRS Original Contract Amount 0 82 79 0 30 4 20 0 0 17 0 Amount Included in Original for Contingency Pay Item Adjusted Original Amount $150,000 $150,000 $150,000 $50,000 $50,000 $50,000 $21,400 $50,000 $50,000 $11,022 $20,024 $63,740,000 $54,273,100 $23,056,000 $1,580,613 $1,005,000 $2,056,087 $660,640 $2,985,506 $836,950 $175,956 $416,128 1 1 5 1 1 1 4 1 1 2 2 7 5 5 1 0 0 1 0 0 1 0 975 878 790 265 237 371 223 303 115 90 100 1558 1407 1139 342 285 415 291 346 122 119 103 1558 1406 1139 335 285 411 290 346 121 118 70 148.0% 111.6% 110.0% 114.3% 112.7% 100.0% 108.5% 106.9% 99.1% 117.8% 67.0% 0 1 1 1 1 1 1 1 1 1 1 0 1 0 7 0 4 1 0 1 1 33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 583 447 270 77 18 40 48 43 7 12 3 20 20 4347 6127 6079 90.9% 10 48 0 0 1548 232 $ 151,538,426 $ 752,446 $ 150,785,980 35 72 7797 10729 10728 81.0% 17 1 53 0 2115 817 $ 215,309,434 $ 1,282,097 $ 214,027,337 5 2 4 5 1 4 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 15 7 5 6 2 9 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 460 390 290 710 870 800 980 90 250 200 290 220 180 300 110 220 240 120 118 180 120 140 210 130 120 802 516 361 980 1082 863 1097 126 322 273 439 250 247 328 176 263 252 137 129 207 127 148 219 132 130 1058 517 361 980 1082 863 1095 132 322 273 439 250 247 303 176 262 252 127 106 207 127 148 211 116 130 219.3% 114.1% 107.2% 114.8% 109.1% 100.0% 99.8% 122.2% 106.8% 105.0% 100.0% 100.9% 100.0% 91.7% 100.0% 106.4% 100.0% 91.7% 80.5% 100.0% 101.7% 100.0% 96.2% 87.7% 100.0% 0 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -256 -1 0 0 0 0 2 -6 0 0 0 0 0 25 0 1 0 10 23 0 0 0 8 16 0 256 1 0 0 0 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 77 72 50 165 133 63 117 22 57 63 149 30 67 28 66 29 12 17 11 27 5 8 9 2 10 41 46 7738 9606 9784 92.0% 23 -178 263 0 1289 15 1 1 2 4 1 1 1 1 1 2 1 1 1 1 55 6 2 8 11 1 0 0 2 1 0 0 0 0 0 810 949 821 685 754 100 365 150 360 386 120 150 190 150 150 1383 1130 1119 1010 767 127 380 157 370 480 124 193 220 158 189 1383 1130 1120 1009 733 125 380 157 359 473 121 176 175 124 183 162.5% 103.2% 109.3% 123.4% 91.1% 113.0% 100.0% 100.0% 96.9% 114.0% 97.5% 94.7% 81.1% 77.3% 96.0% 0 1 1 0 1 1 1 1 1 1 1 1 1 1 1 0 0 -1 1 34 2 0 0 11 7 3 17 45 34 6 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 67 151 223 164 46 12 15 7 10 33 4 43 30 8 39 265 54 21 105 79 0 0 14 15 10 0 0 0 0 0 14 0 0 0 0 2 0 0 0 0 $63,890,000 $54,423,100 $23,206,000 $1,630,613 $1,055,000 $2,106,087 $682,040 $3,035,506 $886,950 $186,978 $436,152 $27,584,500 $5,167,891 $4,603,457 $10,111,333 $18,388,845 $15,255,527 $5,635,429 $398,541 $1,180,000 $2,914,000 $5,354,000 $2,347,000 $1,795,728 $6,951,000 $2,189,795 $2,402,000 $2,135,211 $813,663 $544,771 $2,686,000 $2,084,540 $549,000 $1,091,016 $384,344 $1,710,446 579 $ 124,278,037 506 30 75 161 -33 15 0 0 0 61 0 0 0 0 0 $163,288,700 $59,450,000 $51,759,000 $23,633,000 $21,289,000 $260,959 $3,585,585 $361,568 $1,657,000 $4,777,365 $518,519 $149,000 $1,329,919 $557,571 $939,504 $150,000 $50,000 $50,000 $50,000 $150,000 $150,000 $60,000 $16,000 $50,000 $50,000 $59,000 $50,000 $50,000 $72,000 $50,000 $50,000 $50,000 $46,000 $36,000 $50,000 $50,000 $29,000 $50,000 $20,000 $50,000 $ 1,488,000 $450,000 $150,000 $150,000 $150,000 $150,000 $11,000 $50,000 $15,000 $50,000 $50,000 $21,000 $5,000 $50,000 $29,000 $50,000 $27,434,500 $5,117,891 $4,553,457 $10,061,333 $18,238,845 $15,105,527 $5,575,429 $382,541 $1,130,000 $2,864,000 $5,295,000 $2,297,000 $1,745,728 $6,879,000 $2,139,795 $2,352,000 $2,085,211 $767,663 $508,771 $2,636,000 $2,034,540 $520,000 $1,041,016 $364,344 $1,660,446 $ 122,790,037 $162,838,700 $59,300,000 $51,609,000 $23,483,000 $21,139,000 $249,959 $3,535,585 $346,568 $1,607,000 $4,727,365 $497,519 $144,000 $1,279,919 $528,571 $889,504 Report Printed: 5/24/2016 Report Date: 04/18/16 District 04 04 04 04 04 04 04 04 04 04 04 Contract Number E4K48 E4L95 E4M77 E4P28 E4P42 E4P43 E4P91 E4Q13 E4Q62 E4Q67 E4Q81 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Financial Project ID 23097815201 41304815201 22858325201 43053415201 42744115201 42636215201 43397915201 43060515201 42993615201 42824115201 43400615201 Dist 04 District Let Contracts SubTotal District 04 Totals 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 BDT74 T5369 T5401 T5404 T5417 T5419 T5420 T5427 T5464 T5483 T5488 T5489 T5494 T5495 T5501 T5503 T5511 T5518 T5520 T5525 T5526 T5527 T5529 T5535 T5539 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 E5L71 E5N21 E5R02 E5R52 E5R71 E5W28 E5W30 E5W49 E5W57 E5W64 E5W68 E5W73 E5W74 E5W75 E5W82 CRS Present Contract Amount $66,946,050 $54,843,389 $23,301,620 $1,680,613 $1,055,000 $2,106,087 $677,370 $3,035,506 $886,950 $221,816 $436,152 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 154,197,646 $ - $ - $ 225,452,646 $ 224,950,842 $ (101,442) $ - $29,571,831 $5,268,390 $4,806,215 $10,458,539 $18,447,512 $14,971,879 $5,635,429 $398,541 $1,180,000 $2,914,000 $5,354,000 $2,347,000 $1,795,728 $6,886,782 $2,189,795 $2,402,000 $2,135,211 $813,663 $536,238 $2,686,000 $2,084,540 $549,000 $1,091,016 $384,344 $1,710,446 126,618,099 $196,216,668 $59,944,413 $51,745,315 $24,988,747 $21,387,024 $242,155 $3,585,585 $361,568 $1,757,000 $4,977,255 $518,519 $149,000 $1,329,919 $557,571 $939,504 $29,554,288 $4,979,533 $4,675,801 $10,091,859 $18,384,136 $14,890,213 $5,839,349 $381,567 $1,130,000 $2,885,939 $5,430,627 $2,330,140 $1,805,364 $6,967,320 $2,201,353 $2,340,586 $2,020,774 $766,183 $524,085 $2,559,071 $2,090,950 $526,575 $886,923 $386,973 $1,675,126 $ 125,324,735 $195,534,566 $60,316,725 $51,437,545 $25,103,249 $21,312,688 $231,155 $3,535,585 $355,868 $1,745,808 $4,969,687 $502,367 $148,500 $1,303,884 $494,639 $938,494 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $11,100 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ (11,100) $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total CRS Adjustments $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 155,190,553 $ 41299445201 40550625201 41307215201 23827565201 40441815201 41499925201 43214919201 43327115201 41299435214 42821315201 24099295201 43524315201 43524415201 43528315201 43524715201 $66,899,168 $54,825,050 $22,963,906 $1,713,025 $1,018,660 $2,037,825 $696,418 $2,614,486 $810,170 $214,581 $404,357 CRS Innovative Contract Adjustments $ 41299435201 23765025201 42201515201 24023335201 40735545201 23953555201 42290225201 43174815201 42363025201 42727915201 42907915201 43067515201 42488715201 42886715201 42886215201 42868815201 43068015201 43471315201 23867825201 43067115201 43065315201 43361515201 43544315201 43545915201 43471215201 Dist 05 Central Let Contracts SubTotal Total CRS Contract Adjustments Regular Work To Date (From CRS) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,601,667 $0 $0 $0 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - Actual Expenditure Num % Total CRS (Does Not Include Contracts Expend. Amount Paid to Innovative Contract <= 1.1% of Adj Contractor Adjustment Increase Orig Amt Payments) in Cost $66,899,168 $54,825,050 $22,963,906 $1,713,025 $1,018,660 $2,037,825 $696,418 $2,614,486 $810,170 $214,581 $404,357 $67,456,372 $54,583,811 $22,672,777 $1,712,786 $1,018,660 $2,037,825 $696,418 $2,545,146 $810,170 $214,581 $404,357 $ 154,197,646 $ 154,152,903 (101,442) $ 224,849,400 $ 225,044,600 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $11,100 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ Page 23 of 42 $29,554,288 $4,979,533 $4,675,801 $10,091,859 $18,384,136 $14,890,213 $5,839,349 $381,567 $1,130,000 $2,885,939 $5,419,527 $2,330,140 $1,805,364 $6,967,320 $2,201,353 $2,340,586 $2,020,774 $766,183 $524,085 $2,559,071 $2,090,950 $526,575 $886,923 $386,973 $1,675,126 (11,100) $ 125,313,635 $2,601,667 $0 $0 $0 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $198,136,233 $60,316,725 $51,437,545 $25,103,249 $22,062,688 $231,155 $3,535,585 $355,868 $1,745,808 $4,969,687 $502,367 $148,500 $1,303,884 $494,639 $938,494 $29,554,288 $4,956,479 $4,675,281 $10,008,344 $18,074,458 $14,848,574 $5,839,538 $381,567 $1,130,000 $2,771,829 $5,329,312 $2,239,653 $1,760,006 $6,782,907 $2,169,152 $2,178,963 $1,893,630 $766,183 $520,797 $2,470,592 $2,053,062 $526,575 $886,922 $386,821 $1,675,126 $ 105.8% 100.6% 98.3% 108.4% 101.4% 99.1% 105.4% 85.3% 96.8% 122.0% 97.2% SA Allocated Amount (From CRS) Amount Paid After CRS 1 1 1 1 1 1 1 1 1 0 1 $557,205 ($241,240) ($291,130) ($239) $0 $0 $0 ($69,341) $0 $0 $0 3056050 420289 95620 50000 0 0 -4669 0 0 34838 0 90.9% 10 $ (44,745) $ 85.7% 18 $ 195,198 107.7% 96.8% 102.7% 99.5% 99.1% 98.3% 104.7% 99.7% 100.0% 96.8% 100.6% 97.5% 100.8% 98.6% 101.4% 92.6% 90.8% 99.8% 102.4% 93.7% 100.9% 101.3% 85.2% 106.2% 100.9% 123,880,059 100.0% $169,140,051 $63,247,521 $51,645,443 $24,880,177 $21,130,156 $231,155 $0 $355,868 $1,745,490 $4,969,687 $502,367 $148,500 $1,303,884 $494,639 $938,426 103.9% 106.7% 100.1% 105.9% 100.0% 92.5% 0.0% 102.7% 108.6% 105.1% 101.0% 103.1% 101.9% 93.6% 105.5% 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 25 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $ $0 $23,053 $520 $83,514 $309,678 $41,639 $189 $0 $0 $114,111 $90,214 $90,487 $45,358 $184,413 $32,201 $161,623 $127,144 $0 $3,288 $88,479 $37,889 $0 $2 $152 $0 $ (1,433,576) $ $28,996,182 $2,930,796 $207,898 $223,072 $932,531 $0 $3,535,585 $0 $318 $0 $0 $0 $0 $0 $68 3,652,128 10,143,213 $1,987,331 $100,499 $202,758 $347,206 $58,667 $283,648 $0 $0 $0 $0 $0 $0 $0 $64,218 $0 $0 $0 $0 $8,533 $0 $0 $0 $0 $0 $0 2,340,062 $32,927,968 $494,413 $13,685 $1,355,747 $98,024 $18,805 $0 $0 $100,000 $199,890 $0 $0 $0 $0 $0 Holiday Time Weather Extensio Days n Days Changed Conditions 76 367 213 15 7 25 31 13 4 10 1 39 59 57 17 11 15 17 9 3 2 2 Time Ext Days 456 15 0 45 0 0 0 0 0 0 0 762 231 516 1141 26 45 32 129 85 45 84 16 34 37 128 14 46 14 42 14 4 12 10 20 1 1 7 1 5 852 26 111 190 126 18 3 1 4 2 9 2 25 14 5 29 405 23 27 18 36 48 18 33 6 21 26 21 14 21 14 24 14 8 5 1 7 4 7 2 1 5 404 41 40 33 38 28 9 14 3 8 24 2 9 7 3 10 530 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days 0 82 79 0 0 0 0 0 0 17 0 178 447 0 0 5 21 15 0 0 0 5 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 0 20 0 161 47 0 0 0 0 61 0 0 0 0 0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 District 04 04 04 04 04 04 04 04 04 04 04 Contract Number E4K48 E4L95 E4M77 E4P28 E4P42 E4P43 E4P91 E4Q13 E4Q62 E4Q67 E4Q81 Changed Conditions Work Orders Financial Project ID District 04 Totals BDT74 T5369 T5401 T5404 T5417 T5419 T5420 T5427 T5464 T5483 T5488 T5489 T5494 T5495 T5501 T5503 T5511 T5518 T5520 T5525 T5526 T5527 T5529 T5535 T5539 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 E5L71 E5N21 E5R02 E5R52 E5R71 E5W28 E5W30 E5W49 E5W57 E5W64 E5W68 E5W73 E5W74 E5W75 E5W82 SA Amount $835,865 $536,157 $16,790 $0 $5,225 $4,164 $5,986 $0 $0 $34,838 $2,660 23097815201 41304815201 22858325201 43053415201 42744115201 42636215201 43397915201 43060515201 42993615201 42824115201 43400615201 Dist 04 District Let Contracts SubTotal 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 Page 24 of 42 $ 1,441,685 $ 16,961 $ 4,041,062 $ 215,547 $294,952 $113,750 $67,573 $292,661 $46,621 $137,015 $0 $0 $0 $1,702 $17,682 $7,684 $5,154 $0 $54,576 $0 $655 $0 $0 $3,130 $0 $6,575 $3,413 $0 $16,193 41299435201 23765025201 42201515201 24023335201 40735545201 23953555201 42290225201 43174815201 42363025201 42727915201 42907915201 43067515201 42488715201 42886715201 42886215201 42868815201 43068015201 43471315201 23867825201 43067115201 43065315201 43361515201 43544315201 43545915201 43471215201 Dist 05 Central Let Contracts SubTotal $ 41299445201 40550625201 41307215201 23827565201 40441815201 41499925201 43214919201 43327115201 41299435214 42821315201 24099295201 43524315201 43524415201 43528315201 43524715201 Premium Cost $7,903 $0 $9,058 $0 $0 $0 $0 $0 $0 $0 $0 1,069,336 $13,525,802 $365,278 $0 $1,413,568 $174,510 $0 $0 $0 $35,063 $215,003 $2,974 $4,500 $0 $0 $46,890 $5,697 $1,387 $12,260 $435 $19,776 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 39,555 $50,599 $21,506 $0 $0 $2,200 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Plans Modifications Work Orders District 04 04 04 04 04 04 04 04 04 04 04 Contract Number E4K48 E4L95 E4M77 E4P28 E4P42 E4P43 E4P91 E4Q13 E4Q62 E4Q67 E4Q81 Financial Project ID 23097815201 41304815201 22858325201 43053415201 42744115201 42636215201 43397915201 43060515201 42993615201 42824115201 43400615201 Dist 04 District Let Contracts SubTotal 21 District 04 Totals 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 BDT74 T5369 T5401 T5404 T5417 T5419 T5420 T5427 T5464 T5483 T5488 T5489 T5494 T5495 T5501 T5503 T5511 T5518 T5520 T5525 T5526 T5527 T5529 T5535 T5539 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 E5L71 E5N21 E5R02 E5R52 E5R71 E5W28 E5W30 E5W49 E5W57 E5W64 E5W68 E5W73 E5W74 E5W75 E5W82 Time Ext Days 0 0 0 0 0 0 0 21 0 0 0 21 41299435201 23765025201 42201515201 24023335201 40735545201 23953555201 42290225201 43174815201 42363025201 42727915201 42907915201 43067515201 42488715201 42886715201 42886215201 42868815201 43068015201 43471315201 23867825201 43067115201 43065315201 43361515201 43544315201 43545915201 43471215201 Dist 05 Central Let Contracts SubTotal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 41299445201 40550625201 41307215201 23827565201 40441815201 41499925201 43214919201 43327115201 41299435214 42821315201 24099295201 43524315201 43524415201 43528315201 43524715201 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $91,202 $5,762 $0 $46,404 $11,535 $5,698 $10,647 $1,925 $0 $0 $330 0 0 0 0 30 0 20 0 0 0 0 50 $ 363 $ 0 5 16 84 7 0 0 14 0 0 0 0 0 0 0 14 0 0 0 0 0 0 0 0 0 140 0 0 30 0 0 15 0 0 0 0 0 0 0 0 0 $ Specification Modification Work Orders Premium Cost $16,338 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 173,503 $ 16,338 5,507,484 $ 2,404,614 $366,049 ($13,468) $186,828 $60,822 $79,676 $68,402 $0 $0 $0 $14,745 $0 $0 $24,811 $8,135 $0 $45,453 $765 $0 $10,185 $0 $0 $0 $3,816 $6,023 $2,170 864,412 $8,209,344 $172,703 $0 $50,450 $32,798 ($18,805) $0 $0 $105,738 $0 $3,026 $0 $0 $0 $0 $3,040 $0 $13,247 $1,084 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ Page 25 of 42 17,371 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $ - - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ Value Engineering Work Orders $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $ - - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ Partnering Work Orders $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $ - - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 CEI Action/InAction Work Orders District 04 04 04 04 04 04 04 04 04 04 04 Contract Number E4K48 E4L95 E4M77 E4P28 E4P42 E4P43 E4P91 E4Q13 E4Q62 E4Q67 E4Q81 Financial Project ID 23097815201 41304815201 22858325201 43053415201 42744115201 42636215201 43397915201 43060515201 42993615201 42824115201 43400615201 Dist 04 District Let Contracts SubTotal 0 District 04 Totals 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 BDT74 T5369 T5401 T5404 T5417 T5419 T5420 T5427 T5464 T5483 T5488 T5489 T5494 T5495 T5501 T5503 T5511 T5518 T5520 T5525 T5526 T5527 T5529 T5535 T5539 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 E5L71 E5N21 E5R02 E5R52 E5R71 E5W28 E5W30 E5W49 E5W57 E5W64 E5W68 E5W73 E5W74 E5W75 E5W82 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 41299435201 23765025201 42201515201 24023335201 40735545201 23953555201 42290225201 43174815201 42363025201 42727915201 42907915201 43067515201 42488715201 42886715201 42886215201 42868815201 43068015201 43471315201 23867825201 43067115201 43065315201 43361515201 43544315201 43545915201 43471215201 Dist 05 Central Let Contracts SubTotal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 41299445201 40550625201 41307215201 23827565201 40441815201 41499925201 43214919201 43327115201 41299435214 42821315201 24099295201 43524315201 43524415201 43528315201 43524715201 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days 4 $ 4 $ 265 15 0 0 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 290 506 10 45 0 -80 0 0 0 0 0 0 0 0 0 0 Minor Changes Work Orders SA Amount Premium Cost $2,174,409 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,580 $0 ($4,669) $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 4 0 0 0 0 0 2,175,320 $ 473,778 $ $1,475,287 $72,518 $0 $1,791 $0 ($8,770) $0 $0 $0 $0 $0 $0 $0 ($72,353) $0 $0 $0 $0 ($8,533) $0 $0 $0 $0 $0 $0 $ 1,459,940 $10,832,312 $88,010 $35,645 $22,947 $12,280 $0 $0 $0 $0 $27,319 $0 $0 $0 $0 $0 30,394 $169,381 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ Page 26 of 42 169,381 $492,992 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Defective Materials Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $ - - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $14,620 $0 $0 $0 $0 $ 14,620 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $ - - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ Weather Related Damage Work Orders $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $424 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 $ 3 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 424 $ - 205,916 $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Claims Work Orders District 04 04 04 04 04 04 04 04 04 04 04 Contract Number E4K48 E4L95 E4M77 E4P28 E4P42 E4P43 E4P91 E4Q13 E4Q62 E4Q67 E4Q81 Financial Project ID 23097815201 41304815201 22858325201 43053415201 42744115201 42636215201 43397915201 43060515201 42993615201 42824115201 43400615201 Dist 04 District Let Contracts SubTotal 0 District 04 Totals 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 BDT74 T5369 T5401 T5404 T5417 T5419 T5420 T5427 T5464 T5483 T5488 T5489 T5494 T5495 T5501 T5503 T5511 T5518 T5520 T5525 T5526 T5527 T5529 T5535 T5539 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 E5L71 E5N21 E5R02 E5R52 E5R71 E5W28 E5W30 E5W49 E5W57 E5W64 E5W68 E5W73 E5W74 E5W75 E5W82 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 41299435201 23765025201 42201515201 24023335201 40735545201 23953555201 42290225201 43174815201 42363025201 42727915201 42907915201 43067515201 42488715201 42886715201 42886215201 42868815201 43068015201 43471315201 23867825201 43067115201 43065315201 43361515201 43544315201 43545915201 43471215201 Dist 05 Central Let Contracts SubTotal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 41299445201 40550625201 41307215201 23827565201 40441815201 41499925201 43214919201 43327115201 41299435214 42821315201 24099295201 43524315201 43524415201 43528315201 43524715201 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $7,719 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 $ 0 0 0 0 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Utility Delays Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 7,719 $ 279,688 $ $0 $0 $0 $0 $38,891 $21,474 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 60,365 $107,933 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Page 27 of 42 - 0 271,969 $0 $0 $0 $0 $38,891 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 38,891 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 $ 0 34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Material Shortage Work Orders Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 128,089 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 128,089 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $ - - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ Cost Savings Initiative $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - (86,310) $ - $0 $0 $0 $0 $0 ($463,188) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ (463,188) $ $0 $0 ($13,685) $0 ($10,593) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Page 28 of 42 Totals Work Orders District 04 04 04 04 04 04 04 04 04 04 04 Contract Number E4K48 E4L95 E4M77 E4P28 E4P42 E4P43 E4P91 E4Q13 E4Q62 E4Q67 E4Q81 Financial Project ID 23097815201 41304815201 22858325201 43053415201 42744115201 42636215201 43397915201 43060515201 42993615201 42824115201 43400615201 Dist 04 District Let Contracts SubTotal 537 District 04 Totals 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 BDT74 T5369 T5401 T5404 T5417 T5419 T5420 T5427 T5464 T5483 T5488 T5489 T5494 T5495 T5501 T5503 T5511 T5518 T5520 T5525 T5526 T5527 T5529 T5535 T5539 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 E5L71 E5N21 E5R02 E5R52 E5R71 E5W28 E5W30 E5W49 E5W57 E5W64 E5W68 E5W73 E5W74 E5W75 E5W82 Time Ext Days 456 15 0 45 0 0 0 21 0 0 0 551 41299435201 23765025201 42201515201 24023335201 40735545201 23953555201 42290225201 43174815201 42363025201 42727915201 42907915201 43067515201 42488715201 42886715201 42886215201 42868815201 43068015201 43471315201 23867825201 43067115201 43065315201 43361515201 43544315201 43545915201 43471215201 Dist 05 Central Let Contracts SubTotal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 41299445201 40550625201 41307215201 23827565201 40441815201 41499925201 43214919201 43327115201 41299435214 42821315201 24099295201 43524315201 43524415201 43528315201 43524715201 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $3,101,476 $542,342 $24,509 $46,404 $16,760 $15,442 $11,963 $1,925 $0 $34,838 $2,990 0 82 79 0 30 4 20 0 0 17 0 232 $ 817 $ 265 54 21 105 79 0 0 14 15 10 0 0 0 0 0 14 0 0 0 0 2 0 0 0 0 579 506 30 75 161 -33 15 0 0 0 61 0 0 0 0 0 Premium Cost $24,242 $0 $9,058 $0 $0 $0 $0 $0 $0 $0 $0 3,798,649 $ 33,300 10,549,706 $ 3,050,614 $2,136,288 $172,800 $254,401 $355,274 $165,189 ($245,067) $0 $0 $0 $16,446 $17,682 $7,684 $29,965 ($64,218) $54,576 $45,453 $1,419 $0 $1,651 $3,130 $14,620 $6,575 $7,229 $6,023 $18,363 $ 3,005,483 $32,675,391 $625,991 $21,960 $1,486,965 $208,994 ($18,805) $0 $0 $140,801 $242,322 $6,000 $4,500 $0 $0 $46,890 $178,118 $1,387 $25,507 $1,518 $58,667 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 265,197 $543,591 $21,506 $0 $0 $2,200 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 District Contract Number Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Financial Project ID Let Date Quarter Let Year Let/ Num of Number Contract Projects s Dist 05 District Let Contracts SubTotal 15 District 05 Totals 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 T6207 T6232 T6278 T6288 T6308 T6314 T6322 T6324 T6327 T6351 T6355 T6361 T6362 T6363 T6368 T6369 T6370 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 E6G56 E6H34 E6H59 E6H61 E6H94 E6I14 E6I20 E6I33 E6I57 E6I58 E6I77 E6I78 E6I83 E6I85 E6I87 E6I90 E6J21 E6J40 E6J70 40 41984815201 25054835201 24994115201 42913515201 42751315201 42560045201 42750525201 42913615201 43080515201 42904315201 42902115201 43003115201 42918515201 42751515201 43003315201 43081915201 42913715201 5/22/2013 6/22/2011 5/23/2012 2/26/2014 6/19/2013 12/4/2013 9/25/2013 9/25/2013 3/26/2014 2/5/2014 5/21/2014 9/24/2014 6/18/2014 5/22/2013 7/30/2014 10/29/2014 8/27/2014 QTR4 QTR4 QTR4 QTR3 QTR4 QTR2 QTR1 QTR1 QTR3 QTR3 QTR4 QTR1 QTR4 QTR4 QTR1 QTR2 QTR1 12/13 10/11 11/12 13/14 12/13 13/14 13/14 13/14 13/14 13/14 13/14 14/15 13/14 12/13 14/15 14/15 14/15 42611915201 42560035201 42999915201 43119215201 42913725201 43209815201 43117715201 43067015201 43119015201 43119415201 24994175201 43081615201 43081415201 41774079201 42934415201 43493015201 43584215201 43590015201 43717615201 1/31/2013 6/27/2013 3/27/2014 6/12/2014 6/12/2014 2/27/2014 1/29/2015 2/26/2015 9/25/2014 8/28/2014 8/28/2014 7/31/2014 11/20/2014 3/27/2014 10/30/2014 3/26/2015 2/26/2015 1/29/2015 6/11/2015 QTR3 QTR4 QTR3 QTR4 QTR4 QTR3 QTR3 QTR3 QTR1 QTR1 QTR1 QTR1 QTR2 QTR3 QTR2 QTR3 QTR3 QTR3 QTR4 12/13 12/13 13/14 13/14 13/14 13/14 14/15 14/15 14/15 14/15 14/15 14/15 14/15 13/14 14/15 14/15 14/15 14/15 14/15 Dist 06 Central Let Contracts SubTotal 17 Dist 06 District Let Contracts SubTotal 19 District 06 Totals 07 07 07 07 07 07 07 07 07 T7151 T7307 T7325 T7329 T7334 T7337 T7339 T7340 T7341 36 25689015201 42715215201 42900515201 42907325201 42455015201 42907315201 42902815201 42715415201 42896115201 3/28/2012 12/5/2012 6/19/2013 10/30/2013 8/28/2013 10/30/2013 2/25/2015 4/30/2014 3/26/2014 QTR3 QTR2 QTR4 QTR2 QTR1 QTR2 QTR3 QTR4 QTR3 11/12 12/13 12/13 13/14 13/14 13/14 14/15 13/14 13/14 Number of SAs Original Contract Days Present Contract Days Days Used 34 86 6140 7807 7648 75 132 13878 17413 3 4 4 4 3 3 4 2 6 3 2 1 5 1 1 1 3 5 8 6 2 2 6 2 2 0 0 0 0 4 5 1 0 1 280 820 650 180 280 250 240 260 280 180 160 150 360 350 170 120 140 396 914 1028 330 454 282 450 410 368 241 194 191 391 521 172 180 221 50 44 4870 6743 1 2 1 1 4 1 2 1 1 1 1 2 1 1 3 5 1 1 1 0 9 0 0 1 0 2 0 0 0 0 0 0 0 0 0 1 0 0 560 240 350 280 180 120 130 140 120 120 160 140 65 300 170 125 150 80 45 775 411 393 317 283 234 184 156 138 162 194 173 96 346 192 178 197 83 52 31 13 3475 81 57 5 1 1 1 1 2 2 2 1 10 0 8 0 2 2 0 0 0 Num % Days Contracts Used of <= 1.2% Orig Days Increase in Time Page 29 of 42 Unused Days Delinquent Days Time Days Suspended Extension 86.7% 13 159 1 17432 90.0% 36 -19 396 877 1028 327 473 281 450 407 366 241 194 187 340 521 137 199 221 118.6% 92.7% 119.1% 115.0% 147.9% 99.6% 117.5% 110.4% 99.3% 100.0% 100.0% 97.3% 85.8% 109.7% 79.4% 128.3% 100.0% 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 1 0 37 0 3 -19 1 0 3 2 0 0 4 51 0 35 -19 0 6645 88.2% 15 98 774 411 353 317 283 198 184 148 138 162 194 173 93 346 190 178 197 75 43 104.8% 152.9% 88.6% 100.0% 100.0% 90.0% 113.1% 94.3% 100.0% 117.5% 100.0% 105.7% 95.4% 108.0% 98.8% 100.0% 104.7% 90.0% 80.0% 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 40 0 0 36 0 8 0 0 0 0 3 0 2 0 0 8 9 4564 4457 94.7% 18 8345 11307 11102 91.7% 990 615 350 270 385 200 185 150 320 1137 785 453 369 518 300 280 188 383 1114 785 453 369 518 300 280 187 381 97.7% 100.7% 105.7% 100.0% 116.9% 115.0% 100.0% 99.3% 99.4% SA Days CRS Original Contract Amount Amount Included in Original for Contingency Pay Item Adjusted Original Amount 0 852 815 $ 333,556,690 $ 1,381,000 $ 332,175,690 264 0 2141 1394 $ 457,834,727 $ 2,869,000 $ 454,965,727 0 0 0 0 19 0 0 0 0 0 0 0 0 0 0 19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 74 122 254 120 82 32 210 150 88 61 34 41 31 171 2 45 81 38 0 1598 275 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 215 171 43 37 103 114 47 16 18 42 34 25 31 46 22 53 44 3 7 0 0 0 0 0 0 7 0 0 0 0 8 0 0 0 0 3 0 0 107 0 0 1071 18 $ 27,707,700 $ 825,998 $ 26,881,702 33 205 38 0 2669 293 $ 133,403,104 $ 2,462,692 $ 130,940,411 1 1 1 1 1 1 1 1 1 23 0 0 0 0 0 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 147 168 83 99 68 70 95 38 63 42 -28 124 30 92 0 0 0 0 0 0 0 0 0 0 15 0 0 2 20 0 65 30 0 0 0 $6,954,601 $41,560,972 $14,358,568 $3,942,164 $3,950,337 $6,981,212 $2,272,423 $3,959,132 $4,029,465 $643,250 $1,061,111 $327,561 $7,296,527 $5,378,636 $619,197 $896,920 $1,463,328 105,695,404 $80,000 $672,365 $211,699 $50,070 $50,000 $50,000 $51,180 $51,415 $50,120 $39,250 $50,130 $14,958 $80,258 $50,000 $29,000 $46,528 $59,721 $ $4,988,310 $6,337,856 $1,579,746 $838,500 $1,480,942 $328,706 $1,123,808 $1,219,000 $619,046 $931,395 $1,198,756 $1,207,213 $94,720 $502,650 $1,872,759 $1,961,000 $1,024,661 $248,698 $149,934 $17,196,050 $14,844,440 $15,491,284 $5,019,226 $8,989,959 $4,224,761 $2,749,000 $1,688,000 $5,790,872 1,636,694 $6,874,601 $40,888,606 $14,146,869 $3,892,094 $3,900,337 $6,931,212 $2,221,243 $3,907,717 $3,979,345 $604,000 $1,010,981 $312,603 $7,216,269 $5,328,636 $590,197 $850,392 $1,403,607 $ $58,000 $59,110 $50,000 $40,300 $51,700 $17,632 $50,385 $50,000 $39,934 $49,000 $50,000 $51,325 $6,040 $32,313 $101,085 $50,000 $50,000 $11,846 $7,328 $150,000 $135,000 $120,000 $50,000 $84,500 $50,000 $50,000 $50,000 $55,000 104,058,709 $4,930,310 $6,278,746 $1,529,746 $798,200 $1,429,242 $311,074 $1,073,423 $1,169,000 $579,112 $882,395 $1,148,756 $1,155,888 $88,680 $470,337 $1,771,674 $1,911,000 $974,661 $236,852 $142,606 $17,046,050 $14,709,440 $15,371,284 $4,969,226 $8,905,459 $4,174,761 $2,699,000 $1,638,000 $5,735,872 Report Printed: 5/24/2016 Report Date: 04/18/16 District Contract Number Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Financial Project ID Dist 05 District Let Contracts SubTotal District 05 Totals 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 T6207 T6232 T6278 T6288 T6308 T6314 T6322 T6324 T6327 T6351 T6355 T6361 T6362 T6363 T6368 T6369 T6370 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 E6G56 E6H34 E6H59 E6H61 E6H94 E6I14 E6I20 E6I33 E6I57 E6I58 E6I77 E6I78 E6I83 E6I85 E6I87 E6I90 E6J21 E6J40 E6J70 $ 367,930,760 $ $ 495,318,342 $ 493,255,495 $ $7,631,613 $42,578,168 $13,941,778 $4,117,920 $4,058,444 $7,349,895 $2,348,653 $4,129,233 $4,029,465 $643,250 $1,061,111 $327,561 $7,398,541 $5,591,336 $643,584 $896,920 $1,519,911 $ District 06 Totals T7151 T7307 T7325 T7329 T7334 T7337 T7339 T7340 T7341 368,700,243 42611915201 42560035201 42999915201 43119215201 42913725201 43209815201 43117715201 43067015201 43119015201 43119415201 24994175201 43081615201 43081415201 41774079201 42934415201 43493015201 43584215201 43590015201 43717615201 Dist 06 District Let Contracts SubTotal 25689015201 42715215201 42900515201 42907325201 42455015201 42907315201 42902815201 42715415201 42896115201 Total CRS Contract Adjustments Regular Work To Date (From CRS) $ 41984815201 25054835201 24994115201 42913515201 42751315201 42560045201 42750525201 42913615201 43080515201 42904315201 42902115201 43003115201 42918515201 42751515201 43003315201 43081915201 42913715201 Dist 06 Central Let Contracts SubTotal 07 07 07 07 07 07 07 07 07 CRS Present Contract Amount 108,267,383 $7,814,383 $42,047,398 $14,063,237 $4,126,575 $4,025,547 $7,090,190 $2,183,494 $4,133,336 $3,868,532 $597,697 $1,066,049 $279,990 $7,072,667 $6,965,131 $598,711 $810,742 $1,478,859 $ $4,988,310 $7,490,311 $1,579,746 $838,500 $1,273,380 $328,706 $1,185,042 $1,219,000 $619,046 $931,395 $1,198,756 $1,207,213 $94,720 $502,650 $1,872,759 $1,961,000 $965,063 $248,698 $149,934 108,222,538 $ - $ 27,422,110 $ $ 136,921,612 $ 135,644,648 $ $17,486,083 $15,019,838 $16,100,076 $4,985,077 $9,312,842 $4,397,983 $2,738,366 $1,644,638 $5,714,657 Actual Expenditure Num % Total CRS (Does Not Include Contracts Expend. Amount Paid to Innovative Contract <= 1.1% of Adj Contractor Adjustment Increase Orig Amt Payments) in Cost 3,351,667 $ 3,351,667 $ 371,282,427 $ 340,733,364 (11,100) $ 3,351,667 $ 3,340,567 $ 496,596,062 $ 464,613,423 $0 $0 $0 $0 $45,106 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $33,098 $0 $0 $3,120,000 $0 $0 $0 $108,000 $0 $0 $0 $0 $0 $0 $200,000 $0 $0 $0 $0 (78,204) $ 3,428,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 28,654,229 Total CRS Adjustments $ $4,865,434 $7,429,547 $1,465,179 $763,060 $1,238,573 $320,865 $1,115,103 $1,179,457 $562,195 $872,317 $1,094,981 $1,139,099 $88,652 $470,337 $1,693,855 $1,919,802 $844,018 $217,030 $142,606 $ $17,654,738 $14,844,440 $16,150,823 $5,019,226 $9,299,052 $4,277,589 $2,749,000 $1,688,000 $5,790,872 CRS Innovative Contract Adjustments Page 30 of 42 - $ 3,349,796 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ (78,204) $ $0 $0 $0 $0 $3,600 $0 $0 $0 $0 $0 $3,120,000 $0 $0 $45,106 $108,000 $0 $0 $0 $0 $0 $0 $200,000 $0 $0 $33,098 $0 3,428,000 $750,000 $0 $0 $0 $0 $0 $0 $0 $0 $7,814,383 $45,167,398 $14,063,237 $4,126,575 $3,980,441 $7,198,190 $2,183,494 $4,133,336 $3,868,532 $597,697 $1,066,049 $279,990 $7,272,667 $6,965,131 $598,711 $777,644 $1,478,859 $ 111,572,334 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $ 3,349,796 $750,000 $0 $0 $0 $3,600 $0 $0 $0 $0 $7,814,501 $42,014,765 $13,981,485 $3,989,208 $3,968,548 $7,073,032 $2,177,671 $4,124,281 $3,761,105 $597,697 $1,066,049 $279,933 $6,840,975 $6,964,220 $598,703 $777,644 $1,424,599 $ $4,865,434 $7,429,547 $1,465,179 $763,060 $1,238,573 $320,865 $1,115,103 $1,179,457 $562,195 $872,317 $1,094,981 $1,139,099 $88,652 $470,337 $1,693,855 $1,919,802 $844,018 $217,030 $142,606 $ 107,454,416 $4,865,434 $7,303,699 $1,465,179 $763,060 $1,228,979 $320,865 $1,112,117 $1,177,974 $562,195 $872,317 $1,094,981 $1,129,248 $88,652 $0 $1,636,257 $1,883,066 $819,502 $217,030 $142,606 27,422,110 $ 26,683,161 $ 138,994,444 $ 134,137,577 $18,236,083 $15,019,838 $16,100,076 $4,985,077 $9,309,242 $4,397,983 $2,738,366 $1,644,638 $5,714,657 $17,242,093 $14,905,397 $16,143,898 $4,951,447 $9,306,402 $4,415,486 $2,642,648 $1,606,582 $5,660,340 Amount Paid After CRS SA Allocated Amount (From CRS) 100.0% 15 $ (30,549,062) $ 35,143,552 100.0% 40 $ (31,982,638) $ 37,483,614 113.7% 102.8% 98.8% 102.5% 101.7% 102.0% 98.0% 105.5% 94.5% 99.0% 105.4% 89.5% 94.8% 130.7% 101.4% 91.4% 101.5% 88.2% 98.7% 116.3% 95.8% 95.6% 86.0% 103.1% 103.6% 100.8% 97.1% 98.9% 95.3% 97.7% 100.0% 0.0% 92.4% 98.5% 84.1% 91.6% 100.0% 0 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 15 $ 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Holiday Time Weather Extensio Days n Days 565 1417 269 673 Changed Conditions Time Ext Days 0 0 SA Days 289 345 $117 $3,152,633 $81,752 $137,367 $11,893 $125,158 $5,822 $9,055 $107,427 $0 $0 $57 $431,691 $911 $8 $0 $54,260 $677,012 $1,017,196 $416,790 $175,756 $108,107 $368,684 $76,230 $170,101 $0 $0 $0 $0 $102,014 $212,700 $24,387 $0 $56,583 49 80 215 102 40 17 121 105 74 50 23 36 23 97 0 43 77 15 37 39 18 19 15 47 15 14 11 11 5 8 40 2 2 4 10 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 69 0 92 0 0 0 0 0 0 0 0 0 0 15 0 (4,117,917) $ 2,571,980 1152 302 15 176 $0 $125,847 $0 $0 $9,595 $0 $2,987 $1,484 $0 $0 $0 $9,851 $0 $470,337 $57,598 $36,736 $24,515 $0 $0 $0 $1,152,455 $0 $0 $207,562 $0 $61,234 $0 $0 $0 $0 $0 $0 $0 $0 $0 $59,598 $0 $0 152 27 24 18 99 76 30 13 15 16 31 12 28 0 20 45 34 0 7 35 17 19 19 4 14 7 3 3 5 3 13 3 22 2 8 6 3 0 0 104 0 0 0 24 10 0 0 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 94.7% 18 $ (738,950) $ 946,529 647 186 159 0 91.7% 33 $ (4,856,867) $ 3,518,509 1799 488 174 176 101.2% 101.3% 105.0% 99.6% 104.5% 105.8% 97.9% 98.1% 98.7% 1 1 1 1 1 1 1 1 1 $993,991 $114,441 $43,822 $33,631 $2,840 $17,503 $95,718 $38,056 $54,316 $458,688 $0 $659,540 $0 $309,093 $52,828 $0 $0 $0 97 142 60 82 39 59 73 25 38 50 24 23 17 29 11 22 13 25 0 2 0 0 0 0 0 0 0 0 2 1 0 0 30 0 0 0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 District Contract Number Changed Conditions Work Orders Financial Project ID SA Amount Dist 05 District Let Contracts SubTotal District 05 Totals 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 T6207 T6232 T6278 T6288 T6308 T6314 T6322 T6324 T6327 T6351 T6355 T6361 T6362 T6363 T6368 T6369 T6370 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 E6G56 E6H34 E6H59 E6H61 E6H94 E6I14 E6I20 E6I33 E6I57 E6I58 E6I77 E6I78 E6I83 E6I85 E6I87 E6I90 E6J21 E6J40 E6J70 $ 74,305 $ 16,852,924 $ 113,860 $192,852 $68,505 $338,260 $7,080 $72,303 $124,300 $34,580 $3,694 $1,672 $7,236 $32,501 $0 $129,891 $415,000 $0 $13,883 $56,583 $ District 06 Totals T7151 T7307 T7325 T7329 T7334 T7337 T7339 T7340 T7341 15,783,588 42611915201 42560035201 42999915201 43119215201 42913725201 43209815201 43117715201 43067015201 43119015201 43119415201 24994175201 43081615201 43081415201 41774079201 42934415201 43493015201 43584215201 43590015201 43717615201 Dist 06 District Let Contracts SubTotal 25689015201 42715215201 42900515201 42907325201 42455015201 42907315201 42902815201 42715415201 42896115201 Premium Cost $ 41984815201 25054835201 24994115201 42913515201 42751315201 42560045201 42750525201 42913615201 43080515201 42904315201 42902115201 43003115201 42918515201 42751515201 43003315201 43081915201 42913715201 Dist 06 Central Let Contracts SubTotal 07 07 07 07 07 07 07 07 07 Page 31 of 42 1,498,340 $0 $0 $0 $0 $17,559 $58,334 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $168,081 $0 $0 $5,418 $9,791 $0 $0 $0 $19,884 $1,200 $0 $0 $0 $1,943 $7,673 $0 $0 $0 75,893 $0 $139,232 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 213,990 $ 139,232 $ 1,712,330 $ 215,125 $74,660 $53,880 $10,092 $0 $51,532 $33,461 $0 $9,287 $0 $2,618 $0 $0 $0 $0 $3,083 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Plans Modifications Work Orders District Contract Number Financial Project ID Dist 05 District Let Contracts SubTotal 0 District 05 Totals 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 T6207 T6232 T6278 T6288 T6308 T6314 T6322 T6324 T6327 T6351 T6355 T6361 T6362 T6363 T6368 T6369 T6370 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 E6G56 E6H34 E6H59 E6H61 E6H94 E6I14 E6I20 E6I33 E6I57 E6I58 E6I77 E6I78 E6I83 E6I85 E6I87 E6I90 E6J21 E6J40 E6J70 0 41984815201 25054835201 24994115201 42913515201 42751315201 42560045201 42750525201 42913615201 43080515201 42904315201 42902115201 43003115201 42918515201 42751515201 43003315201 43081915201 42913715201 Dist 06 Central Let Contracts SubTotal District 06 Totals T7151 T7307 T7325 T7329 T7334 T7337 T7339 T7340 T7341 0 0 0 0 14 0 42 30 0 0 0 0 0 34 0 0 0 120 42611915201 42560035201 42999915201 43119215201 42913725201 43209815201 43117715201 43067015201 43119015201 43119415201 24994175201 43081615201 43081415201 41774079201 42934415201 43493015201 43584215201 43590015201 43717615201 Dist 06 District Let Contracts SubTotal 07 07 07 07 07 07 07 07 07 Time Ext Days 25689015201 42715215201 42900515201 42907325201 42455015201 42907315201 42902815201 42715415201 42896115201 0 23 0 0 0 0 0 0 0 0 0 0 0 24 0 0 0 0 0 SA Days SA Amount 45 $ 185 $ 42 -28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 9,419,666 $ $499,242 $1,419,324 $2,917 $6,556 $23,094 $275,365 $65,393 $157,988 $0 $8,819 $0 $0 $24,047 $152,786 $24,387 $0 $5,021 14 $ 0 0 0 0 0 0 7 0 0 0 0 3 0 0 0 0 0 0 0 2,664,939 Specification Modification Work Orders Premium Cost 8,555,254 17,371 $19,532 $0 $0 $0 $0 $0 $0 $70,393 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $976,488 $0 $0 $1,477 $0 $71,177 $16,577 $0 $0 $4,300 $5,483 $0 $0 $0 $0 $0 $0 $0 Page 32 of 42 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Premium Cost $ - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 89,925 0 0 $ $0 $435,329 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Value Engineering Work Orders $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Premium Cost - $ - - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Partnering Work Orders - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Premium Cost - $ - - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,000 $0 $0 $0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 47 10 $ 1,075,502 $ 435,329 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - 167 24 $ 3,740,441 $ 525,254 0 0 $ - $ - 0 0 $ - $ - 0 0 $ 8,000 $ - 0 0 0 0 0 0 0 0 0 0 0 19 0 65 0 0 0 0 $336,893 $6,839 $662,533 $18,054 $309,093 $5,193 $0 $0 $0 $0 $0 $0 $0 $80,331 $1,819 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 CEI Action/InAction Work Orders District Contract Number Financial Project ID Dist 05 District Let Contracts SubTotal 0 District 05 Totals 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 T6207 T6232 T6278 T6288 T6308 T6314 T6322 T6324 T6327 T6351 T6355 T6361 T6362 T6363 T6368 T6369 T6370 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 E6G56 E6H34 E6H59 E6H61 E6H94 E6I14 E6I20 E6I33 E6I57 E6I58 E6I77 E6I78 E6I83 E6I85 E6I87 E6I90 E6J21 E6J40 E6J70 0 41984815201 25054835201 24994115201 42913515201 42751315201 42560045201 42750525201 42913615201 43080515201 42904315201 42902115201 43003115201 42918515201 42751515201 43003315201 43081915201 42913715201 Dist 06 Central Let Contracts SubTotal 42611915201 42560035201 42999915201 43119215201 42913725201 43209815201 43117715201 43067015201 43119015201 43119415201 24994175201 43081615201 43081415201 41774079201 42934415201 43493015201 43584215201 43590015201 43717615201 Dist 06 District Let Contracts SubTotal District 06 Totals 07 07 07 07 07 07 07 07 07 T7151 T7307 T7325 T7329 T7334 T7337 T7339 T7340 T7341 Time Ext Days 25689015201 42715215201 42900515201 42907325201 42455015201 42907315201 42902815201 42715415201 42896115201 SA Days SA Amount 481 $ 771 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 $ 4 33 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11,018,513 $ 492,992 12,478,453 $ 662,373 555,235 $0 $0 $6,413 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $18,000 $0 $0 ($180,274) $0 $0 $0 $0 $0 $6,377 $0 $0 $0 $0 $1,129 ($47,678) $0 $0 4 Minor Changes Work Orders Premium Cost $0 $3,271 $198,178 $184,162 $58,107 $0 $0 $22,592 $14,349 $0 $16,548 $0 $7,674 $45,540 $0 $598 $4,216 (202,446) $ 352,789 $31,285 $0 $10,852 $0 $0 $0 $0 $0 $0 $ Page 33 of 42 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount 0 $ 2 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Defective Materials Work Orders Premium Cost - $ - 14,620 $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 6,413 0 0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $985 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Premium Cost - $ - - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Weather Related Damage Work Orders - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Premium Cost - $ - - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - 0 5 $ 985 $ - 0 0 $ - $ - 28 0 $ - $ - 6,413 0 5 $ 985 $ - 0 0 $ - $ - 28 0 $ - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Claims Work Orders District Contract Number Financial Project ID Dist 05 District Let Contracts SubTotal 0 District 05 Totals 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 T6207 T6232 T6278 T6288 T6308 T6314 T6322 T6324 T6327 T6351 T6355 T6361 T6362 T6363 T6368 T6369 T6370 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 E6G56 E6H34 E6H59 E6H61 E6H94 E6I14 E6I20 E6I33 E6I57 E6I58 E6I77 E6I78 E6I83 E6I85 E6I87 E6I90 E6J21 E6J40 E6J70 0 41984815201 25054835201 24994115201 42913515201 42751315201 42560045201 42750525201 42913615201 43080515201 42904315201 42902115201 43003115201 42918515201 42751515201 43003315201 43081915201 42913715201 Dist 06 Central Let Contracts SubTotal 42611915201 42560035201 42999915201 43119215201 42913725201 43209815201 43117715201 43067015201 43119015201 43119415201 24994175201 43081615201 43081415201 41774079201 42934415201 43493015201 43584215201 43590015201 43717615201 Dist 06 District Let Contracts SubTotal District 06 Totals 07 07 07 07 07 07 07 07 07 T7151 T7307 T7325 T7329 T7334 T7337 T7339 T7340 T7341 Time Ext Days 25689015201 42715215201 42900515201 42907325201 42455015201 42907315201 42902815201 42715415201 42896115201 SA Days SA Amount 0 $ 57 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 168,298 $ 38,891 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $ - 0 0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 Premium Cost $ 0 0 0 0 0 0 0 0 0 0 Utility Delays Work Orders 107,933 - Page 34 of 42 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ - $ $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 9 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount 0 $ 34 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ - $ - - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 $ 9 0 $ 0 0 0 0 0 0 0 0 0 - Premium Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - Material Shortage Work Orders $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount 0 $ 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Premium Cost - $ - - $ - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cost Savings Initiative - $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 SA Days SA Amount 0 $ 0 $ Premium Cost (24,278) $ - (487,466) $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 ($190,812) ($823,116) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 ($403,000) $0 $0 $0 0 55 $ (1,416,928) $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $ - 0 0 $ - $ - 0 0 $ - $ - - $ - 0 0 $ - $ - 0 55 $ (1,416,928) $ - $18,467 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Page 35 of 42 Totals Work Orders District Contract Number Financial Project ID Dist 05 District Let Contracts SubTotal 0 District 05 Totals 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 T6207 T6232 T6278 T6288 T6308 T6314 T6322 T6324 T6327 T6351 T6355 T6361 T6362 T6363 T6368 T6369 T6370 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 06 E6G56 E6H34 E6H59 E6H61 E6H94 E6I14 E6I20 E6I33 E6I57 E6I58 E6I77 E6I78 E6I83 E6I85 E6I87 E6I90 E6J21 E6J40 E6J70 0 41984815201 25054835201 24994115201 42913515201 42751315201 42560045201 42750525201 42913615201 43080515201 42904315201 42902115201 43003115201 42918515201 42751515201 43003315201 43081915201 42913715201 Dist 06 Central Let Contracts SubTotal 42611915201 42560035201 42999915201 43119215201 42913725201 43209815201 43117715201 43067015201 43119015201 43119415201 24994175201 43081615201 43081415201 41774079201 42934415201 43493015201 43584215201 43590015201 43717615201 Dist 06 District Let Contracts SubTotal District 06 Totals 07 07 07 07 07 07 07 07 07 T7151 T7307 T7325 T7329 T7334 T7337 T7339 T7340 T7341 Time Ext Days 25689015201 42715215201 42900515201 42907325201 42455015201 42907315201 42902815201 42715415201 42896115201 10 5 0 0 23 0 42 30 0 0 0 0 0 34 0 0 0 SA Days SA Amount 815 $ 1394 $ 42 -28 124 30 92 0 0 0 0 0 0 0 0 0 0 15 0 Premium Cost 35,441,009 $ 38,446,492 $ $692,093 $1,300,288 ($283,761) $197,797 $153,504 $399,664 $99,973 $184,274 $16,021 $16,056 $49,048 $0 $161,612 $218,326 $24,387 $14,481 $65,820 144 275 $ 3,309,583 28 127 0 0 0 24 10 0 0 21 0 0 0 24 0 0 4 0 0 0 0 0 0 0 0 7 0 0 0 0 8 0 0 0 0 3 0 0 $0 $1,162,568 $0 $0 ($173,379) $9,791 $71,177 $16,577 $0 $19,884 $11,878 $6,468 $0 $0 $1,943 $8,802 ($47,678) $0 $0 567,297 832,494 $19,532 $0 $6,413 $0 $17,559 $58,334 $0 $70,393 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 172,231 $0 $574,561 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 238 18 $ 1,088,031 $ 574,561 382 293 $ 4,397,614 $ 746,792 0 2 0 0 0 0 0 0 0 0 2 20 0 65 30 0 0 0 $461,306 $60,719 $683,477 $18,054 $360,626 $38,654 $0 $9,287 $0 $2,618 $0 $0 $0 $80,331 $4,902 $0 $0 $0 Report Printed: 5/24/2016 Report Date: 04/18/16 District Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Financial Project ID Contract Number 07 07 07 07 07 T7343 T7347 T7358 T7361 T7363 07 07 07 07 07 07 07 07 07 07 07 E7I67 E7I81 E7I96 E7J77 E7J91 E7J96 E7J98 E7K00 E7K03 E7K15 E7L04 Let Date Quarter Let Year Let/ Num of Number Contract Projects s 42308815202 25841345201 43140415201 42906115202 43066215201 5/21/2014 5/21/2014 12/3/2014 12/3/2014 6/17/2015 QTR4 QTR4 QTR2 QTR2 QTR4 13/14 13/14 14/15 14/15 14/15 42893615201 43113715201 40625565201 43075125201 42714215201 43066115201 42907715201 42907215201 42896815201 43149015201 43227115201 6/11/2014 6/11/2014 6/11/2014 12/10/2014 4/22/2015 11/26/2014 12/10/2014 2/11/2015 3/11/2015 7/15/2015 11/12/2015 QTR4 QTR4 QTR4 QTR2 QTR4 QTR2 QTR2 QTR3 QTR3 QTR1 QTR2 13/14 13/14 13/14 14/15 14/15 14/15 14/15 14/15 14/15 15/16 15/16 Dist 07 Central Let Contracts SubTotal 14 Dist 07 District Let Contracts SubTotal 11 District 07 Totals 25 Dist 08 Central Let Contracts SubTotal 08 08 08 08 08 08 08 08 Number of SAs Original Contract Days Present Contract Days Num % Days Contracts Used of <= 1.2% Orig Days Increase in Time Days Used Page 36 of 42 Unused Days 4 1 1 2 1 0 0 0 1 0 270 250 110 135 125 304 348 136 164 161 267 346 134 164 160 86.3% 99.2% 98.2% 100.0% 99.2% 1 1 1 1 1 37 2 2 0 1 25 23 4355 5526 5458 100.0% 14 68 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 1 0 0 0 1 0 0 195 120 260 150 150 150 130 80 145 120 102 284 157 305 164 170 183 143 95 194 136 102 281 156 305 164 170 183 131 95 194 128 28 98.5% 99.2% 106.5% 100.0% 103.3% 100.0% 90.8% 101.3% 100.0% 93.3% 27.5% 1 1 1 1 1 1 1 1 1 1 1 3 1 0 0 0 0 12 0 0 8 74 11 2 1602 1933 1835 100.0% 11 98 36 25 5957 7459 7293 100.0% 25 Delinquent Days Time Days Suspended Extension 0 0 0 0 0 SA Days CRS Original Contract Amount 0 0 0 0 0 Amount Included in Original for Contingency Pay Item Adjusted Original Amount $50,000 $50,000 $45,000 $50,000 $50,000 $4,503,063 $3,030,755 $988,200 $1,415,000 $2,875,112 0 0 0 0 0 34 98 26 29 36 0 0 1054 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 89 37 75 14 15 33 13 14 49 16 0 0 0 355 -24 $ 16,570,905 $ 445,000 $ 16,125,905 166 0 0 1409 93 $ 105,621,627 $ 1,434,500 $ 104,187,127 117 $ 0 0 -30 0 5 0 0 1 0 0 0 89,050,722 $ $3,868,793 $1,095,029 $1,992,240 $928,888 $1,440,612 $2,030,000 $1,378,500 $412,263 $1,483,258 $1,563,213 $378,109 $ $50,000 $47,000 $50,000 $40,000 $50,000 $50,000 $50,000 $19,000 $50,000 $0 $39,000 0 0 0 0 0.0% 0 0 0 0 0 785 365 667 645 425 450 170 255 901 437 783 777 469 587 271 268 901 437 781 730 425 587 271 267 103.6% 103.8% 105.1% 105.7% 89.6% 100.0% 104.1% 99.6% 1 1 1 1 1 1 1 1 0 0 2 47 44 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 88 58 80 48 44 137 94 13 12 29 3762 4493 4399 0.0% 8 94 0 0 562 169 $ 103,491,842 $ 824,596 $ 102,667,246 8 12 29 3762 4493 4399 100.0% 8 94 0 0 562 169 $ 103,491,842 $ 824,596 $ 102,667,246 Statewide Central Let Contracts SubTotal 156 255 356 40961 54422 55413 85.3% 133 -991 1635 0 10409 3052 $ 738,343,324 $ 8,654,571 $ 729,688,754 Statewide District Let Contracts SubTotal 113 168 206 27969 36223 36700 88.5% 100 -477 1279 0 6308 1946 $ 789,453,219 $ 6,063,192 $ 783,390,027 Statewide Totals 269 423 562 68930 90645 92113 86.6% 233 -1468 2914 0 16717 4998 $ 1,527,796,543 $ 14,717,763 $ 1,513,078,781 Dist 08 District Let Contracts SubTotal District 08 Totals QTR4 QTR4 QTR3 QTR3 QTR4 QTR4 QTR3 QTR4 11/12 11/12 12/13 12/13 12/13 12/13 13/14 13/14 8 28 14 36 84 0 0 7 0 $19,914,762 $10,280,444 $40,666,800 $11,249,740 $6,746,576 $7,676,614 $6,573,418 $383,488 - $3,818,793 $1,048,029 $1,942,240 $888,888 $1,390,612 $1,980,000 $1,328,500 $393,263 $1,433,258 $1,563,213 $339,109 9 1 6 4 2 2 5 0 5/22/2012 4/10/2012 2/25/2013 3/26/2013 5/14/2013 5/21/2013 3/11/2014 6/10/2014 $ 88,061,222 0 41546225202 42479215201 43128115201 40615145201 42768515201 43108935201 42902315201 43112315201 - 989,500 1 2 2 2 1 1 2 1 E8L99 E8M03 E8M05 E8M77 E8M80 E8M93 E8N21 E8N37 0 $ $4,553,063 $3,080,755 $1,033,200 $1,465,000 $2,925,112 $ $150,000 $116,455 $150,000 $150,000 $63,950 $84,515 $84,736 $24,940 $19,764,762 $10,163,989 $40,516,800 $11,099,740 $6,682,626 $7,592,099 $6,488,682 $358,548 Report Printed: 5/24/2016 Report Date: 04/18/16 District Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Financial Project ID Contract Number 07 07 07 07 07 T7343 T7347 T7358 T7361 T7363 07 07 07 07 07 07 07 07 07 07 07 E7I67 E7I81 E7I96 E7J77 E7J91 E7J96 E7J98 E7K00 E7K03 E7K15 E7L04 42308815202 25841345201 43140415201 42906115202 43066215201 Dist 07 Central Let Contracts SubTotal $ 90,560,262 Total CRS Contract Adjustments Regular Work To Date (From CRS) $4,553,063 $3,080,755 $1,033,200 $1,494,392 $2,925,112 $4,196,722 $3,163,023 $920,104 $1,504,704 $2,880,318 $ $3,868,793 $1,095,029 $1,992,240 $928,888 $1,442,753 $2,030,000 $1,378,500 $412,263 $1,428,302 $1,563,213 $378,109 42893615201 43113715201 40625565201 43075125201 42714215201 43066115201 42907715201 42907215201 42896815201 43149015201 43227115201 90,064,431 $ $ 15,995,698 $ District 07 Totals $ 107,078,352 $ 106,060,129 $ $ - $ $20,008,584 $10,285,978 $40,884,133 $11,481,897 $6,938,552 $7,714,483 $6,704,790 $383,488 41546225202 42479215201 43128115201 40615145201 42768515201 43108935201 42902315201 43112315201 - 750,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 16,518,090 $ $19,972,782 $10,855,663 $40,781,351 $10,973,748 $6,915,696 $7,540,572 $6,985,687 $358,052 - $ $ - $ 746,400 - $154,000 $0 $49,500 $0 $0 $0 $3,000 $0 $4,196,722 $3,163,023 $920,104 $1,504,704 $2,880,318 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 750,000 Actual Expenditure Num % Total CRS (Does Not Include Contracts Expend. Amount Paid to Innovative Contract <= 1.1% of Adj Contractor Adjustment Increase Orig Amt Payments) in Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 (3,600) $ - Total CRS Adjustments $0 $0 $0 $0 $0 (3,600) $ $3,814,687 $997,607 $1,975,737 $835,230 $1,373,852 $1,980,915 $1,371,830 $394,582 $1,393,730 $1,520,960 $336,568 $ E8L99 E8M03 E8M05 E8M77 E8M80 E8M93 E8N21 E8N37 CRS Innovative Contract Adjustments $0 $0 $0 $0 $0 Dist 07 District Let Contracts SubTotal Dist 08 Central Let Contracts SubTotal 08 08 08 08 08 08 08 08 CRS Present Contract Amount $ $ $0 $0 $0 $0 $0 $0 $0 $0 746,400 $154,000 $0 $49,500 $0 $0 $0 $3,000 $0 Page 37 of 42 90,810,831 $4,140,383 $3,099,166 $920,104 $1,462,449 $2,833,673 $ $3,814,687 $997,607 $1,975,737 $835,230 $1,373,852 $1,980,915 $1,371,830 $394,582 $1,393,730 $1,520,960 $336,568 $ 89,330,068 $3,688,104 $997,607 $1,975,126 $835,230 $1,370,181 $1,934,577 $1,336,400 $394,582 $1,387,075 $1,512,751 $336,568 91.9% 102.3% 93.1% 103.4% 98.6% 100.0% 96.6% 95.2% 101.7% 94.0% 98.5% 97.7% 100.6% 100.3% 96.8% 96.8% 99.3% 1 1 1 1 1 14 SA Allocated Amount (From CRS) Amount Paid After CRS $56,339 $63,857 $0 $42,254 $46,645 $ 1 1 1 1 1 1 1 1 1 1 1 $0 $0 $0 $29,392 $0 (1,480,763) $ $0 $0 $0 $0 $2,141 $0 $0 $0 $54,957 $0 $0 (52,816) 15,995,698 $ 15,768,201 100.0% 11 $ (227,498) $ $ 106,806,529 $ 105,098,269 100.0% 25 $ (1,708,261) $ $ $ $19,818,782 $10,855,663 $40,731,851 $10,973,748 $6,915,696 $7,540,572 $6,982,687 $358,052 $19,745,451 $10,701,323 $40,551,799 $10,925,662 $6,919,857 $7,491,522 $6,966,867 $358,052 0.0% 99.9% 105.3% 100.1% 98.4% 103.5% 98.7% 107.4% 99.9% 0 $ 1 1 1 1 1 1 1 1 1,509,541 $126,583 $0 $611 $0 $3,671 $46,338 $35,430 $0 $6,656 $8,209 $0 - $ 1,456,725 - Holiday Time Weather Extensio Days n Days 23 82 2 27 18 767 30 23 15 9 10 26 11 12 16 3 0 11 16 24 2 18 285 59 14 13 5 5 7 2 2 33 13 0 Changed Conditions Time Ext Days 0 0 0 0 0 SA Days 0 0 0 0 0 2 33 0 0 47 0 0 0 0 0 0 0 0 0 0 -30 0 0 0 0 0 0 0 0 155 153 47 (30) 922 438 49 3 0 0 0 0 $73,332 $154,339 $180,052 $48,086 $4,160 $49,050 $15,820 $0 $93,822 $5,533 $217,333 $232,157 $191,976 $37,868 $131,372 $0 25 28 44 25 15 85 62 7 63 30 36 23 29 52 32 6 0 0 0 0 0 0 0 0 0 0 0 84 0 0 0 0 Dist 08 District Let Contracts SubTotal $ 104,401,905 $ 104,383,551 $ (206,500) $ - $ (206,500) $ 104,177,051 $ 103,660,533 100.0% 8 $ (516,519) $ 910,061 291 271 0 84 District 08 Totals $ 104,401,905 $ 104,383,551 $ (206,500) $ - $ (206,500) $ 104,177,051 $ 103,660,533 100.0% 8 $ (516,519) $ 910,061 291 271 0 84 Statewide Central Let Contracts SubTotal $ 766,755,457 $ 773,421,025 $ (1,693,400) $ 4,298,000 $ 2,604,600 $ 776,025,625 $ 761,683,925 91.0% 142 $ (14,341,700) $ 28,412,133 7113 2632 71 873 Statewide District Let Contracts SubTotal $ 834,849,184 $ 829,394,397 $ (749,566) $ 3,431,667 $ 2,682,101 $ 832,076,497 $ 797,538,238 92.9% 105 $ (34,538,262) $ 45,395,961 3651 1608 826 812 Statewide Totals $ 1,601,604,641 $ 1,602,815,422 $ (2,442,966) $ 7,729,667 $ 5,286,701 ############ $ 1,559,222,163 91.8% 247 $ (48,879,962) $ 73,808,094 10764 4240 897 1685 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 District Changed Conditions Work Orders Financial Project ID Contract Number 07 07 07 07 07 T7343 T7347 T7358 T7361 T7363 07 07 07 07 07 07 07 07 07 07 07 E7I67 E7I81 E7I96 E7J77 E7J91 E7J96 E7J98 E7K00 E7K03 E7K15 E7L04 SA Amount $15,813 $2,284 $20,461 $23,469 $5,254 42308815202 25841345201 43140415201 42906115202 43066215201 Dist 07 Central Let Contracts SubTotal $ 42893615201 43113715201 40625565201 43075125201 42714215201 43066115201 42907715201 42907215201 42896815201 43149015201 43227115201 $ District 07 Totals $ E8L99 E8M03 E8M05 E8M77 E8M80 E8M93 E8N21 E8N37 300,193 Premium Cost $0 $0 $0 $0 $0 $ 5,701 $0 $0 $3,493 $0 $2,141 $1,006 $36,819 $0 ($53,279) $0 $0 Dist 07 District Let Contracts SubTotal Dist 08 Central Let Contracts SubTotal 08 08 08 08 08 08 08 08 Page 38 of 42 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 (9,820) $ 290,373 - $ 5,701 $ - $66,402 $2,759 ($13,220) $150,630 $66,193 $122,140 $14,408 $0 41546225202 42479215201 43128115201 40615145201 42768515201 43108935201 42902315201 43112315201 - $0 $0 $0 $103,254 $0 $0 $0 $0 Dist 08 District Let Contracts SubTotal $ 409,312 $ 103,254 District 08 Totals $ 409,312 $ 103,254 Statewide Central Let Contracts SubTotal $ 10,771,529 $ 1,043,674 Statewide District Let Contracts SubTotal $ 21,093,900 $ 745,744 Statewide Totals $ 31,865,429 $ 1,789,418 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Plans Modifications Work Orders District Financial Project ID Contract Number 07 07 07 07 07 T7343 T7347 T7358 T7361 T7363 07 07 07 07 07 07 07 07 07 07 07 E7I67 E7I81 E7I96 E7J77 E7J91 E7J96 E7J98 E7K00 E7K03 E7K15 E7L04 42308815202 25841345201 43140415201 42906115202 43066215201 Dist 07 Central Let Contracts SubTotal 0 42893615201 43113715201 40625565201 43075125201 42714215201 43066115201 42907715201 42907215201 42896815201 43149015201 43227115201 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $3,916 $0 $742 $51,199 $0 0 0 0 0 0 84 $ 0 0 0 0 5 0 0 1 0 0 0 1,394,462 Specification Modification Work Orders Premium Cost $0 $0 $0 $11,673 $0 $ $0 $0 $6,964 $0 $9,962 $2,700 $0 $1,320 $15,761 $0 $0 93,823 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 - Value Engineering Work Orders Premium Cost $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 - Partnering Work Orders Premium Cost $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 - Premium Cost $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Dist 07 District Let Contracts SubTotal 0 6 $ 36,707 $ - 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - District 07 Totals 0 90 $ 1,431,169 $ 93,823 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - $ - 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - Dist 08 Central Let Contracts SubTotal 08 08 08 08 08 08 08 08 Time Ext Days 0 0 0 0 0 Page 39 of 42 E8L99 E8M03 E8M05 E8M77 E8M80 E8M93 E8N21 E8N37 41546225202 42479215201 43128115201 40615145201 42768515201 43108935201 42902315201 43112315201 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 $119,752 $48,319 $0 $162,171 $5,863 $0 $173,176 $0 $0 $0 $0 $0 $0 $0 $5,845 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Dist 08 District Let Contracts SubTotal 0 7 $ 509,281 $ 5,845 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - District 08 Totals 0 7 $ 509,281 $ 5,845 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - Statewide Central Let Contracts SubTotal 326 1488 $ 20,705,783 $ 5,111,956 0 0 $ - $ - 0 0 $ (88,334) $ - 0 0 $ 11,300 $ - Statewide District Let Contracts SubTotal 130 443 $ 11,733,106 $ 500,920 0 0 $ - $ - 0 0 $ $ - 0 0 $ 840 $ - Statewide Totals 456 1931 $ 32,438,889 $ 5,612,876 0 0 $ - $ - 0 0 $ (88,334) $ - 0 0 $ 12,140 $ - - Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 CEI Action/InAction Work Orders District Financial Project ID Contract Number 07 07 07 07 07 T7343 T7347 T7358 T7361 T7363 07 07 07 07 07 07 07 07 07 07 07 E7I67 E7I81 E7I96 E7J77 E7J91 E7J96 E7J98 E7K00 E7K03 E7K15 E7L04 42308815202 25841345201 43140415201 42906115202 43066215201 Dist 07 Central Let Contracts SubTotal 0 42893615201 43113715201 40625565201 43075125201 42714215201 43066115201 42907715201 42907215201 42896815201 43149015201 43227115201 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $18,468 0 0 0 0 0 0 $ 60,605 0 0 0 0 0 0 0 0 0 0 0 Minor Changes Work Orders Premium Cost $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 - Defective Materials Work Orders Premium Cost $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $6,054 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 - Weather Related Damage Work Orders Premium Cost $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 - Premium Cost $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Dist 07 District Let Contracts SubTotal 0 0 $ - $ - 0 0 $ 6,054 $ - 0 0 $ - $ - 0 0 $ - $ - District 07 Totals 0 0 $ 60,605 $ - 0 0 $ 6,054 $ - 0 0 $ - $ - 0 0 $ - $ - 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - Dist 08 Central Let Contracts SubTotal 08 08 08 08 08 08 08 08 Time Ext Days 0 0 0 0 0 Page 40 of 42 E8L99 E8M03 E8M05 E8M77 E8M80 E8M93 E8N21 E8N37 0 41546225202 42479215201 43128115201 40615145201 42768515201 43108935201 42902315201 43112315201 0 0 0 0 0 0 0 0 28 14 36 0 0 0 0 0 $35,659 $13,827 $497,038 $0 $177,797 $0 ($68,650) $1,719 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $8,621 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $1,977 $0 $0 $0 $0 $0 $0 $0 $0 $0 Dist 08 District Let Contracts SubTotal 0 78 $ 657,390 $ - 0 0 $ 8,621 $ - 0 0 $ - $ - 0 0 $ 1,977 $ - District 08 Totals 0 78 $ 657,390 $ - 0 0 $ 8,621 $ - 0 0 $ - $ - 0 0 $ 1,977 $ - Statewide Central Let Contracts SubTotal 57 412 $ 138,924 $ 1,252,349 6 7 $ 123,773 $ - 0 0 $ - $ - 7 88 $ 1,752,193 $ Statewide District Let Contracts SubTotal 4 685 $ 14,330,463 $ 698,032 4 5 $ 15,660 $ - 0 0 $ - $ - 28 0 $ 17,804 $ Statewide Totals 61 1097 $ 14,469,387 $ 1,950,381 10 12 $ 139,433 $ - 0 0 $ - $ - 35 88 $ 1,769,997 $ 589,752 589,752 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Claims Work Orders District Financial Project ID Contract Number 07 07 07 07 07 T7343 T7347 T7358 T7361 T7363 07 07 07 07 07 07 07 07 07 07 07 E7I67 E7I81 E7I96 E7J77 E7J91 E7J96 E7J98 E7K00 E7K03 E7K15 E7L04 42308815202 25841345201 43140415201 42906115202 43066215201 Dist 07 Central Let Contracts SubTotal 0 42893615201 43113715201 40625565201 43075125201 42714215201 43066115201 42907715201 42907215201 42896815201 43149015201 43227115201 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 0 0 0 0 0 0 $ - 0 0 0 0 0 0 0 0 0 0 0 Utility Delays Work Orders Premium Cost $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 18,467 Material Shortage Work Orders Premium Cost $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 - Cost Savings Initiative Premium Cost $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Time Ext Days 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SA Days SA Amount $0 $0 $0 $0 $0 0 0 0 0 0 0 $ 0 0 0 0 0 0 0 0 0 0 0 - Premium Cost $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Dist 07 District Let Contracts SubTotal 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - District 07 Totals 0 0 $ - $ - 0 0 $ 18,467 $ - 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - 0 0 $ - $ - Dist 08 Central Let Contracts SubTotal 08 08 08 08 08 08 08 08 Time Ext Days 0 0 0 0 0 Page 41 of 42 E8L99 E8M03 E8M05 E8M77 E8M80 E8M93 E8N21 E8N37 41546225202 42479215201 43128115201 40615145201 42768515201 43108935201 42902315201 43112315201 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $67,841 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ($130,930) $0 ($156,461) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Dist 08 District Let Contracts SubTotal 0 0 $ 67,841 $ - 0 0 $ - $ - 0 0 $ - $ - 0 0 $ (287,391) $ - District 08 Totals 0 0 $ 67,841 $ - 0 0 $ - $ - 0 0 $ - $ - 0 0 $ (287,391) $ - Statewide Central Let Contracts SubTotal 0 57 $ 412,334 $ 9 72 $ 212,570 $ 135 0 $ - $ - 0 55 $ (2,297,498) $ - Statewide District Let Contracts SubTotal 0 0 $ 193,921 $ 16 1 $ 28,118 $ 0 0 $ - $ - 0 0 $ (436,093) $ - Statewide Totals 0 57 $ 606,255 $ 25 73 $ 240,688 $ 135 0 $ - $ - 0 55 $ (2,733,591) $ - 310,860 310,860 186,655 186,655 Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Detailed Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Page 42 of 42 Totals Work Orders District Financial Project ID Contract Number 07 07 07 07 07 T7343 T7347 T7358 T7361 T7363 07 07 07 07 07 07 07 07 07 07 07 E7I67 E7I81 E7I96 E7J77 E7J91 E7J96 E7J98 E7K00 E7K03 E7K15 E7L04 42308815202 25841345201 43140415201 42906115202 43066215201 Dist 07 Central Let Contracts SubTotal 2 42893615201 43113715201 40625565201 43075125201 42714215201 43066115201 42907715201 42907215201 42896815201 43149015201 43227115201 0 0 47 0 0 0 0 0 0 0 0 Dist 07 District Let Contracts SubTotal 47 District 07 Totals 49 Dist 08 Central Let Contracts SubTotal 08 08 08 08 08 08 08 08 Time Ext Days 0 0 0 0 0 E8L99 E8M03 E8M05 E8M77 E8M80 E8M93 E8N21 E8N37 0 41546225202 42479215201 43128115201 40615145201 42768515201 43108935201 42902315201 43112315201 0 0 0 0 0 0 0 0 SA Days SA Amount $19,729 $2,284 $21,202 $74,668 $23,722 0 0 0 0 0 117 $ 0 0 -30 0 5 0 0 1 0 0 0 1,773,728 Premium Cost $0 $0 $0 $11,673 $0 $ $0 $0 $10,457 $0 $12,103 $9,760 $36,819 $1,320 ($37,518) $0 $0 (24) $ 93 $ 0 $ 28 14 36 84 0 0 7 0 99,524 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 32,941 $ - 1,806,669 $ 99,524 $ - $90,883 $64,905 $327,358 $312,801 $249,853 $122,140 $197,374 $1,719 $0 $0 $0 $103,254 $0 $0 $5,845 $0 Dist 08 District Let Contracts SubTotal 0 169 $ 1,367,033 $ 109,099 District 08 Totals 0 169 $ 1,367,033 $ 109,099 Statewide Central Let Contracts SubTotal 611 3052 $ 31,742,562 $ 8,495,245 Statewide District Let Contracts SubTotal 1008 1946 $ 46,977,721 $ 1,944,697 Statewide Totals 1619 4998 $ 78,720,283 $ 10,439,942 Report Printed: 5/24/2016 Report Date: 04/18/16 District Contract Number Financial Project ID Page 1 of 4 Construction Cost and Time Innovative Contract Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Contractor Vendor ID Contract Name Designer Vendor ID Designer Name CEI Vendor ID CEI Name Report Printed: 5/24/2016 Report Date: 04/18/16 District Contract Number Financial Project ID Page 2 of 4 Construction Cost and Time Innovative Contract Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Actual Letting Date Original Contract Amount Present Contract Amount Regular Work To Date (From CRS) Total CRS SA Allocated Amount Total CRS Contract Adjustments Expenditure (From FM System) Liquidated Damages Freight Adjustments Contract Adjustments Arbitration Court Orders Orders Report Printed: 5/24/2016 Report Date: 04/18/16 District Contract Number Financial Project ID Page 3 of 4 Construction Cost and Time Innovative Contract Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Other Adjustments Damage Recovery Total Contract Adjustments Incentives Innovative Contracting Adjustments Liquidated No Excuse Incentive / A+B Savings Bonuses Disincentive Disincentive Lane Rental Total Innovative Contracting Adjustments Total Adjustments Report Printed: 5/24/2016 Report Date: 04/18/16 Construction Cost and Time Innovative Contract Data For Contracts Completed Third Quarter Fiscal Year 2015/2016 Innovative Contract Type District Contract Number Financial Project ID Total Adjustments Actual Expenditures Expenditures CRS Amounts DOT Original Estimate Code Description Page 4 of 4 Report Printed: 5/24/2016 Report Date: 01/13/2010 Note: There were no PPP projects passed in this quarter. Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 1 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Note: There were no PPP projects passed in this quarter. Page 2 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Note: There were no PPP projects passed in this quarter. Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 3 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Note: There were no PPP projects passed in this quarter. Page 4 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Note: There were no PPP projects passed in this quarter. Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 5 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Note: There were no PPP projects passed in this quarter. Page 6 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Note: There were no PPP projects passed in this quarter. Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 7 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Note: There were no PPP projects passed in this quarter. Page 8 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Note: There were no PPP projects passed in this quarter. Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 9 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Note: There were no PPP projects passed in this quarter. Page 10 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 11 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 12 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 13 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 14 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 15 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 16 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 17 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 18 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 19 of 20 Report Printed: 5/24/2016 Report Date: 01/13/2010 Construction Cost and Time Detailed Data For Contracts Completed Second Quarter Fiscal Year 2009/2010 Page 20 of 20