WELDING PROCEDURE SPECIFICATION (WPS) PREQUALIFIED QUALIFIED BY TESTING
by user
Comments
Transcript
WELDING PROCEDURE SPECIFICATION (WPS) PREQUALIFIED QUALIFIED BY TESTING
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION WELDING PROCEDURE SPECIFICATION (WPS) 675-070-10 MATERIALS 05/15 PREQUALIFIED QUALIFIED BY TESTING AWS D1.3 Sheet Steel Contractor/Organization: Welding Process(es): Type: Manual Mechanized Tandem Semiautomatic Automatic Parallel JOINT DESIGN USED Single Double Weld Backing: Yes Backing Mat’l: Groove Welded From: GAS Shielding Gas: Flow Rate: Backing Gas: Yes FILLER METAL No One side Both Sides Percent Mixture: No FLUX PREHEAT Preheat Temp Min.: Preheat Temp Max: Pass No. Electrode Size TECHNIQUE Welding Current Amperes Volts Travel Speed* Melting Rate Identification : Revision: Date: By: Supporting PQR No. (s): POSITION Position of Groove: Fillet: Vertical Progression: Up Down BASE METALS Material Spec: Type or Grade: Support Steel: Thickness Range: Sheet Steel Support Steel Thickness: Base Metal Prep: COATING(S) Type: Thickness: ELECTRICAL CHARACTERISTICS Transfer Mode (GMAW): Short-Circuiting Globular Spray Current: AC DCEP DCEN Pulsed Other: Tungsten Electrode (GTAW) Size: Type: FOR FDOT USE ONLY Wire Feed Speed *(or Weld Time for Arc Spot Welds) FOR CERTIFIED WELDING INSPECTOR (CWI) USE ONLY Signature Date JOINT DETAILS FOR FDOT CONSULTANT USE ONLY Comments: Return this completed form to the FDOT State Materials Office Structural Materials Systems Field Operations Office.