Comments
Description
Transcript
Document 2800046
"D" "B" DIM "C" DIM DIM BEAM CAMBER AND BUILD-UP NOTES: Bottom of Deck The build-up values given in the table are based on theoretical beam cambers. The Contractor shall monitor beam cambers for the purpose of predicting camber values at the time of the deck pour. | Span If the predicted cambers based on field measurements differ more than +/- " from the theoretical "Net Beam Camber @ 120 Days" shown in the Data Table, obtain approval from the Engineer Top of Beam to modify the build-up dimensions as required. When the measured beam cambers create a conflict with the bottom mat of deck steel, notify the Engineer a minimum Begin Span of 21 days prior to casting. End Span DIM "A" includes the weight of the Stay-In-Place Formwork. BUILD-UP DIAGRAM FOR TANGENT SPANS DIM "A" | | Span End Span Beari ng Begi n Span Beari ng | DIM Bottom of Deck DIM DIM "C" "D" "B" (ALONG | BEAM) (CASE 1) | Span Top of Beam Begin Span DEAD LOAD DEFLECTION DIAGRAM End Span BUILD-UP DIAGRAM FOR SAG VERTICAL CURVE SPANS (ALONG | BEAM) (CASE 2) Top Flange Width (Varies) Sl ope = Var i es Bridge Deck DIM DIM Bottom of Deck "D" "B" DIM "C" (Varies) | Span Top of Beam " Design Min. | Beam (Beam Type Varies) Begin Span End Span See Required Theoretical BUILD-UP DIAGRAM FOR CREST VERTICAL CURVE SPANS Build-up over | Beam - CONTROL AT | SPAN BUILD-UP OVER BEAMS (ALONG | BEAM) (CASE 3) Bottom of Deck "B" "D" INSTRUCTIONS TO DESIGNER: DIM DIM DIM "C" Although not shown here in the Diagrams or Notes, the effect of Horizontal Curvature, when present, needs to be considered for the Build-up Calculations. | Span Top of Beam NOTE: Begin Span End Span Work this Index with the Build-up and Deflection Data Table for AASHTO, Bulb-T and Florida-I BUILD-UP DIAGRAM FOR CREST VERTICAL CURVE SPANS Beams in Structures Plans. - CONTROL AT BEGIN OR END SPAN (ALONG | BEAM) (CASE 4) REVISIONS Date By 01/01/10 SJN Description Added FLORIDA-I BEAMS to the Standard Title Block and Note. Changed the beam section to Florida-I Beam in the BUILD UP OVER BEAMS detail. Date 2010 Interim Design Standard By Description BUILD-UP & DEFLECTION DATA FOR AASHTO, BULB-T AND FLORIDA-I BEAMS Interim Date Sheet No. 01/01/10 1 of 1 Index No. 20199