1" Dowel Load Transfer Devices (See Typical Sections Top of Raised
by user
Comments
Transcript
1" Dowel Load Transfer Devices (See Typical Sections Top of Raised
b " V-Groove (See Bars 5B2 1" Dowel Load Transfer Devices (See Typical Sections Top of Raised for details) Sidewalk Note 6 & Detail "B") 2" Cover Bars 4C @ 6" sp. (tie Bars Sides (Typ.) 1" Dowel Load Expansion Joint (See Transfer Devices "Expansion Joint Detail " this sheet and Detail "B") 4C to Bars 5A) (Typ.) 4 ~ Bars 5F (Top of Slab) Approved metal (Required only or fiber cap when Raised Sidewalk is 3" Approach Slab 3s p. @ (See Note 10) 6" Lap Splice 2’ -0" M in. skewed) Edge of Precast Coping Gutter Line Bar 5T " Bottom of Raised Sidewalk " Preformed Expansion Bars 5L @ 6" sp. Joint Filler 1’-0" (tied to alternating Bars 5T and 5X) 1’-0" Field cut reinforcing »¿ Expansion & Precast or C-I-P Coping Spacing Bars EXPANSION JOINT DETAIL " open joints in Traffic Railing) Bars 5S 1’-0" sp. (Typ.) minimum cover (Typ.) 2b " Bars 5A @ 6" sp. (tied to Bars 5U1) (Typ.) 6" Spacing (Typ.) (See Note 7) b " V-Groove Spacing (Typ.) Bars 5B1 5T and 5X @ in Precast Coping 5T and 5X (Raised Sidewalk expansion joints are to coincide with as required to maintain Begin or End Retaining Wall Coping Alternating Bars " Open Joint 2" Cover @ 2" Cover @ Open Joints Expansion Joints 30’-0" Max. (See Note 6) »¿˘" Expansion Joint Spacing ~ 30’-0" Min., 90’-0" Max. (See Not »¿ ˘" Open Jo PARTIAL PLAN VIEW FOR VERTICAL SHAPE TRAFFIC RAILING »¿˘" Open J Precast Coping and (Skewed Approach Slab Shown, Perpendicular Approach Slab Similar) 1. Expansion Joint in » Bars 4C to Bars 5C or provide Bars 4C @ 4" spacing with the 42" Vertical Shape Traffic Railing. " Open Joint in Precast Coping Top of C-I-P CONSTRUCTION REQUIREMENTS: Construct the raised sidewalk level transversely and Raised Sidewalk. g n i p tCo s a c e "Pr 0 ’ 0 1 n* o i t c g Se n i p d Co n ga n i l i c Ra i f f a r tT s a c e .Pr n "Mi 0 ’ 2 1 Traffic Railing Top of Precast Coping expansion joints plumb; do not construct the raised sidewalk or C-I-P coping perpendicular Top of Retaining 6. Wall Panel (Typ.) Provide and install Preformed Expansion Joint Filler in accordance with Specification 7. -3" 2’ Section 932. Construct b" V-Grooves in raised sidewalk and C-I-P coping plumb and provide at »¿ 30’-0" maximum intervals as shown. Space V-Grooves equally between ˘" Expan Joints and/or Begin or End Raised Sidewalk. V-Groove locations are to coincide with 2" Cover M in. Construct ˘" Expansion Joints in raised sidewalk and C-I-P copings plumb and perpendic or radial to the Gutter Line. Provide at 90’-0" maximum intervals as shown. Railing C-I-P Buildup Concrete Coping Top of recessed Transfer Devices in accordance with Specification Section 350. »¿5. Varies Dowel Load Transfer Devices will be ASTM A 36 smooth round bar and hot-dip galvanized in accordance with Specification Section 962. Install Dowel Load ( 1’ -0" M ax. ) 4. C-I-P Traffic Provide Class II concrete for slightly aggressive environments or Class IV for moderately or extremely aggressive environments. Precast to the roadway surface. Slip forming of coping and/or raised sidewalk is not permitted. 3. Varies C: \d\projects\standards\structures\2013book\06120-1of3. dgn »¿to coincide with APPLICATIONS: This raised sidewalk is only applicable for a TL-4 crash test rating. For TL-5 crash test rating increase Expansion Joint spacing to 60’-0" minimum and increase 2. C-I-P Traffic Railing (Precast Coping Shown, C-I-P Coping Similar) (Traffic Railing not Shown for Clarity) RAISED SIDEWALK NOTES: V-Groove locations in the Traffic Railing. 8. Spacing shown is along the Gutter Line. 9. For MSE Walls, provide Dowel Bars 4D and extend 8" above the top of retaining wall panel. Clearance Varies rd960rh Field cut as necessary to maintain 2" minimum cover to the top of the buildup concrete. See Wall Company Drawings for number and spacing of Dowel Bars 4D. 10. Finish Sidewalks in accordance with Specification Section 522. Bottom of Dowels 4D (Typ.) Precast Coping (See Note 9) 11. Work this Index with the following: 11: 51: 46 AM Index No. 422 - Traffic Railing - (42" Vertical Shape) Index No. 423 - Traffic Railing - (32" Vertical Shape) 12. The following Indexes contain details of the intersection of the retaining wall at approach slabs: Index No. 20900 - Approach Slabs (Flexible Pavement Approaches) Index No. 20910 - Approach Slabs (Rigid Pavement Approaches) PARTIAL ELEVATION VIEW Retaining Wall (MSE Wall shown, other types similar) CROSS REFERENCE: For Detail "B", see Sheet 2. (Precast Coping Shown, C-I-P Coping Similar) * C-I-P End Section must be = 12’-0". LAST REVISION 07/01/12 REVISIO N 6/28/2012 (Precast Coping & Raised Sidewalk Reinforcing not Shown for Clarity) DESCRIPTION: FDOT DESIGN STANDARDS 2013 INDEX WALL COPING WITH TRAFFIC RAILING/RAISED SIDEWALK NO. 6120 SHEET NO. 1 1’-3" 11" 42" Vertical Shape 7’-9" 32" Vertical Shape 5’-11" (C-I-P Raised Sidewalk) (See Note 2) Top of Precast Coping 1’-10" (Shown dashed) (Precast Coping) C-I-P Traffic 4" Taper Railing Transition Bars 5X 9" 1’-1" 32" Vertical Shape 7" 1’-3" 42" Vertical Shape Bullet Railing (Not required for 42" Coping (Alternate with Bars 5T) (See Note 3) (42" Vertical Shape similar) Transition Precast Coping PARTIAL END VIEW OF TRAFFIC RAILING END Top of Travel TRANSITION FOR GUARDRAIL ATTACHMENT Lane or Shoulder (Showing Bars 5S, Bars 5T and Bars 5X) Top of (Precast Coping Shown, C-I-P Coping Similar) Precast Coping Coping ( 6" M ax. )( See Note 2) Curb H eight Varies Bars 5T 1" Dowel Load Top of Precast Coping Transfer Devices Bars 5T @ 1’-0" sp. at Expansion Joints (Alternate with Bars Bars 5A @ 6" sp. Bars 4C @ 6" sp. 5X) (See Note 3) (lap with Bars 4C) (lap with Bars 5A) 5" Bars 5S (See Note 3) Ft / 2 Ft 0 :. e p o Sl 2" Top of See Note 4 3’ -6" ~ 42" Vertical Shape Bars 5X @ 1’-0" sp. (32" Vertical Shape shown) Coping ( C-I-P or Precast Traffic Railing) Gutter Line C-I-P or Precast Traffic Railing 2’ -8" ~ 32" Vertical Shape 6" M in. Bars 5S Em bed. Vertical Shape Pedestrian Railing) UNIT QUANTITY CY/LF 0.095 » ¿ Bars 5B2 @ Expansion Joint Filler 1’-0" sp. (Typ.) Bars 5L @ 1’-0" sp. 2’ -3" Precast Coping ITEM b " Preformed (Typ.) 6" ESTIMATED QUANTITIES FOR PRECAST COPING 2" Min. Cover 6" Bars 5B1 3" Cover Two Layers 30Lb. Roofing Felt Varies Optional extension for Precast Coping » ¿ 6" M in. 1’ -1b " NOTE: See Index No. 422 and Index No. 423, Railing End Detail for details. (2" min.) Dowel Bars 4D C: \d\projects\standards\structures\2013book\06120-2of3. dgn Concrete (Precast Coping) (MSE Walls only) Spacing Concrete (C-I-P Raised Sidewalk) CY/LF 6" C.I.P Buildup Concrete 5 sp. @ 1’-0" = 5’-0" Spacing (MSE Walls only) Bars 5B1 1" Dowels 0.232 Retaining Wall Spacing Reinforcing Steel (Precast Coping) excluding Bars 5T, 5X and 5S (Typ.) LB/LF 23.90 LB/LF 13.50 LB 32.04 6" 5 sp. @ 1’-0" = 5’-0" (5B2) 8" 2 sp. @ 8" 3" (Type Varies) = 1’-4" (5B1) Bars 5B 1 4" 5 Reinforcing Steel (C-I-P Raised Sidewalk) (Typ.) » Additional Reinf. @ Expansion Joints (Dowels) Smooth or Textured Face of Wall The above concrete quantities are based on a Type D TYPICAL SECTION THRU PRECAST COPING WITH C-I-P RAISED SIDEWALK Concrete Curb (See Note 2). AND RETAINING WALL AT EXPANSION JOINTS b " V-Groove (Typ.) NOTES: b" V-Groove (Typ.) 1. Actual width varies depending on type of Retaining Wall used. rd960rh 2. Match roadway curb shape (Type) and height. See Roadway Plans and Index No. 300. 5’-11" dimension is based on a 32" Vertical Shape Traffic Railing with a Type D curb adjacent to a 6’-0" wide sidewalk. Adjust this »¿˘" Preformed Expans »¿˘" Preformed Expans Joint Filler Joint Filler dimension as required for other curb types or transitions at Begin or End Retaining Wall. 3. See Index No. 422 and Index No. 423 for Bars 5S, 5T & 5X and Bullet Railing details. Adjust vertical dimension 11: 51: 50 AM of Bars 5T and 5X, see Reinforcing Steel Note 5. 4. Trim end of Bars 5T and 5X to clear construction joint for 42" Vertical Shape Traffic Railing. 5. At the Contractor’s option, mechanical couplers may be used to splice reinforcing. Complete details, including reinforcement lengths are required in the Shop Drawings. Mechanical couplers shall develop 125% of the bar PRECAST COPING yield strength. C-I-P COPING 6. Contractor to maintain stability of precast coping prior to junction slab completion. 6/28/2012 DETAIL "B" LAST REVISION 07/01/12 REVISIO N (Showing Locations of b " V-Grooves and " Preformed Expansion Joint Filler) DESCRIPTION: FDOT DESIGN STANDARDS 2013 INDEX WALL COPING WITH TRAFFIC RAILING/RAISED SIDEWALK NO. 6120 SHEET NO. 2 REINFORCING STEEL BENDING DIAGRAMS - RAISED SIDEWALK 7’-9" BILL OF REINFORCING STEEL LENGTH 5B1 Bullet Railing Precast Traffic Railing/Coping ~ 11’-6" 5B2 Gutter Line Length as Required Bars 5X @ 1’-0" sp. C-I-P Traffic Railing 5 9’-6"/11’-6" B2 5 AS REQD. C 4 5’-5" 4C 5F F 5 5’-0" 5’-0" AS REQD. N/A BARS 5B1, 5B2, 4C & 5F 5’-0" 2’-0" L 5 4’-5" 4’-5" Smooth Steel Bar 2’-0" 2’-0" Top of C-I-P Coping 1’ -1b " 1" DOWEL Precast Coping ~ 3’-11" (See Note 6) Coping Top of C-I-P Coping (Const. Joint Required) Bars 5T @ 1’-0" sp. (Alternate with Bars 5X) (See Note 2) Bars 5A @ 6" sp. Top of Travel 5" Lane or Shoulder Bars 5S Bars 5B2 @ 1’-0" sp. (Typ.) 2" (See Note 2) Ft / 2 Ft 0 :. e p o Sl Top of Coping 2" Cover 6" 1" Dowel 5T) (See Note 2) (42" Vertical Shape similar) (See Note 7) N/A (Alternate with Bars (32" Vertical Shape shown) Precast Coping Option ~ 5’-5" 3’-9" (Top & Sides) 6" B1 9’-1" ( 6" M ax. )( See Note 1) 5’-9" Curb H eight Varies 5 ( M in. ) A 3" Cover C-I-P Coping ~ 7’-3" Transfer Devices at b " Preformed BAR 5L » ¿ Expanded Polystyrene (b" Side) Joint Filler 6" Spacing BAR 5A Two Layers 30Lb. Roofing Felt Expansion Joints (Typ.) Expansion 8" 1’ -10" 90 6" Bars 5L @ 1’-0" sp. 1" Dowel Load 5 sp. @ 1’-0" = 5’-0" Spacing 1" Dowels Bars 5B2 REINFORCING STEEL NOTES: Varies (Type Varies) 6" 1. All bar dimensions in the bending diagrams are out to out. Spacing 2. All reinforcing steel at expansion joints will have a 2" minimum cover. Bars 5B2 7 sp. @ 1’-0" = 7’-0" 3" 6" 3. Lap splices for Bars 5B will be a minimum of 2’-0". 4. Lap splice Bars 5A with Bars 4C. Lap splices will be a minimum of 2’-0". »¿(1’-1˘" Max., 2" M Smooth or Textured Face of Wall TYPICAL SECTION THRU C-I-P COPING AND RAISED SIDEWALK 5. See Index No. 422 and Index No. 423 for Bars 5S, 5T and 5X. Adjust vertical AND RETAINING WALL AT EXPANSION JOINTS dimensions of Stirrup Bars 5T and 5X to 3’-0" for 32" Vertical Shape or 3’-10" Construction Joint Permitted for 42" Vertical Shape. Optional Keyway 6. Dimension shown is for lap splice option. For mechanical coupler option, this dimension is 1’-8". Buildup for 7. Dimension shown is for lap splice option. For mechanical coupler option, this dimension stepped MSE is 5’-8", and reinforcing size must be increased to #5 bars (Bars 5C). 2" 6" Welded Wire Reinforcement will conform to ASTM A 497. 45 M in. Wall Panels 8. The Contractor may use Welded Wire Reinforcement when approved by the Engineer. M ax. C: \d\projects\standards\structures\2013book\06120-3of3. dgn Retaining Wall (0" min., »¿11˘" m Coping Expanded Polystyrene (b") ESTIMATED QUANTITIES FOR C-I-P COPING 6" BUILDUP FOR STEPPED MSE WALL PANELS rd960rh ITEM Concrete UNIT QUANTITY CY/LF 0.326 AND C-I-P COPING NOTES: 11: 51: 52 AM 1. Match roadway curb shape (Type) and height. See Roadway Plans and Index No. 300. 6’-8" dimension is based Reinforcing Steel (Typical) excluding Bars 5T, 5X and 5S (Typ.) 35.03 as required for other curb types or transitions at Begin or End Retaining Wall. 2. See Index No. 422 and Index No. 423 for Bars 5S, 5T & 5X and Bullet Railing details. Adjust vertical dimension of Additional Reinf. @ Expansion Joints (Dowels) LB Bars 5T and 5X, see Reinforcing Steel Note 5. 32.04 The above concrete quantities are based on a Type D Concrete Curb on a level Retaining Wall (See Note 1). LAST REVISION 07/01/12 REVISIO N 6/28/2012 on a 32" Vertical Shape Traffic Railing with a Type D curb adjacent to a 6’-0" wide sidewalk. Adjust this dimension LB/LF DESCRIPTION: FDOT DESIGN STANDARDS 2013 INDEX WALL COPING WITH TRAFFIC RAILING/RAISED SIDEWALK NO. 6120 SHEET NO. 3 ( C-I-P Traffic Railing) COPING/ COPING RAILING 42" Vertical Shape Precast Coping ~ 9’-6" 3’ -6" ~ 42" Vertical Shape C-I-P 2’ -8" ~ 32" Vertical Shape PRECAST 32" Vertical Shape 1’-3" 2’ -3" C-I-P Coping SIZE 1’-1" 6’-6" » ¿ MARK 6’-8"