Bottom of Deck
BEAM CAMBER AND BUILD-UP NOTES:
The build-up values given in the Data Table* are based on theoretical beam cambers.
The Contractor shall monitor beam cambers for the purpose of predicting
camber values at the time of the deck pour.
»¿
on field measurements differ more than +/Top of Beam
If the predicted cambers based
1
2"
from the theoretical "Net Beam
Camber @ 120 Days" shown in the Data Table*, obtain approval from the Engineer
to modify the build-up dimensions as required.
A
When the measured beam cambers
create a conflict with the bottom mat of deck steel, notify the Engineer a minimum
Begin Span
End Span
of 21 days prior to casting.
BUILD-UP DIAGRAM FOR TANGENT SPANS
Dim. "A" includes the weight of the Stay-In-Place Formwork.
»¿
»¿
Top of Beam
A
Begin Span
Bea
Dim. "A"
»¿
Bea
A
»¿
End Span
Bottom of Deck
Begi
n Span
Dim. "C"
Di
m . "D "
Di
m . "B"
»¿(ALONG FLANGE) (CA
End Span
BUILD-UP DIAGRAM FOR SAG VERTICAL CURVE SPANS
»¿(ALONG FLANGE) (CA
DEAD LOAD DEFLECTION DIAGRAM
»¿(ALONG
Di
m . "D "
Di
m . "B"
Bottom of Deck
A
* Dimensions are along slope.
Va
r
i
e
s
»¿
(
Se
e Be
a
m
Top of Beam
»¿ Left Top F
Sh
e
e
t
s
)
A
Begin Span
Va
r
i
e
s
(
Se
e Be
a
m
Sh
e
e
t
s
)
*
1
’
4
"
End Span
*
*
8" 8"
BUILD-UP DIAGRAM FOR CREST VERTICAL CURVE SPANS
»¿ Right Top F
*
1
’
4
"
»¿
Sl
o
pe = Va
r
i
e
s
»¿- CONTROL AT
*
*
8" 8"
»¿(ALONG FLANGE) (CA
Bridge Deck
(Varies)
Bottom of Deck
1
2"
Di
m . "D "
Di
m . "B"
Dim. "C"
rd960rh
C:
\d\projects\standards\structures\2013book\20299-1of1.
dgn
Dim. "C"
A
Design Min. (Typ.)
For Cases 1, 2 & 3 = Dim. "C"
For Cases 1, 2 & 3 = Dim. "C"
For Case 4 = Dim. "B" or Dim. "D"
For Case 4 = Dim. "B" or Dim. "D"
»¿
Top of Beam
12:
55:
32 PM
Fl
o
r
i
da U Be
a
m
Begin Span
End Span
A
BUILD-UP DIAGRAM FOR CREST VERTICAL CURVE SPANS
6/28/2012
- CONTROL AT BEGIN OR END SPAN
SECTION A-A
BUILD-UP OVER BEAMS
* NOTE:
(LOOKING AHEAD STATION)
Work this Index with the Build-up and Deflection
safsadkfsajdflkjsdlf
Data Table for Florida U Beams in Structures Plans.
LAST
REVISION
01/01/11
REVISIO N
»¿(ALONG FLANGE) (CA
DESCRIPTION:
INDEX
FDOT DESIGN STANDARDS
BUILD-UP & DEFLECTION DATA FOR
2013
FLORIDA U BEAMS
NO.
20299
SHEET
NO.
1
Fly UP