Flume Or Flumes At The Point Or Points Of Low... Grade To Drain As Shown In Runoff
¡ Public Rd. Or Crossover Provide Approximately A Minimum Of 0.20% Grade On Gutter, Slightly Warping The Surface Of The Median Pavement If Necessary, Within Limits Of The Median Curb Or Curb And Gutter. Construct A Drainage Flume Or Flumes At The Point Or Points Of Low Grade. See Details. A Grade To Drain As Shown In Runoff Prop. Pavt. The Plans Or As Adjusted By Runoff The Engineer During Construction Prop. Median Pavt., Warp B Median Width As Indicated B Surface If Necessary To Drain To Prop. Flumes In Detail Plans Slope To Approx. Match That Of Adjoining Auxiliary Lane Match Surfaces Pavt. (Breakover 0.02 Min., 0.05 Max.) Runoff Runoff Exist. Pavt. Or Superelevated Crown Line (Exist. Pavt.) Or Lane Line Of Portion Of New 4-Lane Pavt. Superelevated Pavt. (Exist. Pavt. Or New 4-Lane Pavt.) A Varies (4.75’ Typ.) Varies (4.75’ Typ.) 7" For Type A Curb Match Existing Grade Provide Smooth Section 18" For Types E & F Curbs 9" For Types A & E Curbs 6" For Type F Curb Median In Detail Plans s e ri a V C SECTION AA 3’-0" C 9" 1’-6" 1’-6" 9" 9" 4" 9" 5’ Wide Sod Unless Other Treatment Called For In Plans 3" C: \d\projects\standards\roadway\00200-s\00283-01. dgn R Exist. Or New Pavt. 4 ’ Prop. Pavt. Grade Established Min. Slope 0.01’/ft. ¡ Median Const. Ditch Const. Ditch To Drain SECTION CC To Drain FLUME DETAIL sm 970re SECTION BB (May Drain From Any Point Designated In the Plans Or As Adjusted By The Engineer During Construction) GENERAL NOTES 4: 58: 52 PM 1. These details are to apply to projects which provide for the conversion of 2-lane sections to 4-lane divided highway sections and for superelevated sections of new 4-lane divided highways. Layout above is illustration only. Cost of flumes to be included in the contract price for Curb or Curb and Gutter. Sod to be paid for under the contract unit price for Performance Turf, SY. 6/24/2013 2. Flumes to be located in low point of noses and at other points as designated in the plans. The locations may be adjusted by LAST REVISION 07/01/07 REVISIO N the Engineer during construction. DESCRIPTION: INDEX FDOT 2014 DESIGN STANDARDS MEDIAN OPENING FLUME NO. 283 SHEET NO. 1of 1